Desert Botanical Laboratory, Tumamoc Hill, Tucson, Pima County, AZ. Surveyed as HABS ARIZ,10-TUCSO,31-, with a 7,845-word written history.
From the record
“Desert Botanical Laboratory, Tumamoc Hill, Tucson, Pima County, AZ”
Survey record header. Machine-read text.
Surveyed by the federal HABS program as HABS ARIZ,10-TUCSO,31- · the record runs 7845 words · one of 134 surveyed structures published for this county.
Source document
Quoted word for word from HABS ARIZ,10-TUCSO,31-.
Not written, edited or summarised by this site.
In Coville, Chairman of the Advisory Committee on Botany to the newly formed Carnegie Institution in Washington, proposed a desert laboratory. The purpose of the laboratory would be to provide facilities for the investigation of all facets of desert plant life and to determine the differences between desert vegetation and plants of more humid regions. Coville, in his argument, stated that the develop- ment and success of arid land agriculture, as well as pure scientific research hinged on this first desert laboratory. As a result of Coville's proposal a grant was established for a desert laboratory and Mr. Coville and Dr. MacDougal were delegated to search for the most advantageous area for the new laboratory.
They chose a site located 2 just west of Tucson, Arizona, now known as Tumamoc Hill. This site was chosen after an extensive survey of New Mexico, California, and Arizona. The natural and artificial advantages that led to the choice of the Tucson were: one-the area had a unique desert vegetation, two- the town of Tucson was of sufficient size and had a train stop, and three-the University of Arizona had a growing agricultural program. In with the designation of the site, Carnegie appointed the first resident investigator, W.A. Cannon, and hired a small staff.4 The Tumamoc Hill site, water supply, road, and electrical hookup were don- ated by the Chamber of Commerce of Tucson, and construction was start- ed 00 the first building.
5 The site of the first building was chosen about halfway up the 800 foot hill. The 'L'-shaped building of volcanic rock was built stones removed from the hill's slope and carted to DESERT BOTANICAL LABORATORY COMPLEX HABS No. AZ-138 (Page 2) the building site by mule-drawn wagons. The building's designer was Forbes of Douglas, Arizona. Forbes was recommended by his brother Forbes, a professor of desert botany at the University of Arizona. Building supervision was done by David Holmes, who taught at the Univer- sity and was the architect of many buildings at the University of Arizona and in Tucson. The building was considered most noteworthy for it's ventilation system consisting of intake vents on the soffit of the roof eaves, and exit vents in the form of dormers and a hip ridge vent.
The first years of the Desert Botanical Laboratory were very busy, with at least 5 major research papers written at Tumamoc Hill between 7 and In the Carnegie Institution organized a Department of Botanical Research, designating Dr. MacDougal, then the Director of New York Botanical Laboratory, as Director, and making the Desert Bot- anical Laboratory its headquarters. This new program, coupled with the lab's successful first years, led to a recommendation for the expansion of facilities and staff in September of Among the new staff mem- bers hired was Godfrey Sykes, an Arizona resident and personal friend of Dr. MacDougal. Sykes was hired as Facilities and Maintenance Director.
In the Laboratory acquired land through leases and purchases, in- 9 creasing its land holdings to more than 800 acres. A building exten- sion,started that same year to the east end of the existing laboratory, doubled the size of the facility and created a south.-facing 'U1-shaped building. Hie addition was designed by David Holmes, who had managed the construction of the original section; the contractor for the addition was Welsh of Tucson.10 The total building, then measuring approx- imately 126 feet long with 85 foor wings, was consistent in style and mat- erials, giving the building a unified character. The discerning eye can DESERT BOTANICAL LABORATORY COMPLEX HABS No. AZ-138 (Page 3> identify the juncture between the building and its extension.
The roof of both the old and new sections was covered with slate shingles at the time of this new construction. With the addition, the Laboratory now contained a library and reading room, a drafting room, a photographic darkroom, as well as general laboratory and office space. The building also contained a chemical room with, hoods" and fume drafts, a subterranean constant temperature chamber, and a structural roof platform for meteor- ological instruments. 11 A greenhouse was started on the southeast end of the addition, but was not completed until Other improvements in included: two reservoirs, and a 5-mile long fence around the entire 800 acre site to keep out grazing animals which were disturbing the experimental-plots.
A reservoir to retain rainwater runoff from the roof of the main laboratory building was built just to the south of the building. Gutters and leaders were installed on both sections of the building and were connected to the reservoir. The col- lected water was used to maintain plant specimens. The second reservoir was built on the hill above the laboratory to help update the inadequate city water system. This reservoir was supplied with water pumped up from the Santa Cruz valley, from a 400 foot deep well dug for the Desert Laboratory. It took feet of pipe to connect the well to the res- ervoir I In Dr. Forest Shreve and his wife joined the staff, and in this same year a second building was constructed.
This building built at the base of the hill was designed by Godfrey Sykes; the construction contractor 14 was again F. Welsh of Tucson. This 20' x40 ' building, to be used as a shop, employed similar methods of construction and ventilation found . D on the main laboratory. The walls were of double brick with a volcanic DESERT BOTANICAL LABORATORY COMPLEX HABS No. AZ-138 (Page 4) rubble stone exterior surface; the wood floors were reported to have 16 . .. been built with "extra rigidity . The roof was covered with slate shingles and had a ventilating ridge roll. A full complement of tools was installed, and the lighting was designed especially for the equip- ment use. 17 The third stone building for the Laboratory was contracted for in June of Again the construction contractor was F.
Welsh, for the stone and concrete work; a second contractor, J. Chapman, also of Tucson, was contracted to work on the building. Although the original designer is "I o unknown, it is known that Gf Sykes made alterations to the plan. The building, located to the southeast of the main laboratory, was 46' x 28' with exterior walls of volcanic rubble stone, lined with structural brick. The building was designed as a Chemistry Laboratory, and was equip- ped with water, gas, air, AC and DC current, vacuum, and large fume hoods. The roof had a 30' x 25' flat insolation deck of lead, used for solar 19 experiments. The remainder of the roof was covered with tar paper. Dr. Spoehr moved to Camel, California in and the equipment from the Chemistry Lab was removed and sent to California to aid Dr.
Spoehr in his research. Other changes done in included painting and woodwork maintenance and the replacement of the wooden sidewalks at the main build- 20 ing with tile. in the years from to the Desert Botanical Laboratory was extremely active. During this period of time main investigators included Dr. MacDougal who was affiliated with the Laboratory until its close; Augustus Spoehr, whose major concern was biochemistry of plants worked from to Dr. McGinnies worked for Carnegie from to and later was affiliated DESERT BOTANICAL LABORATORY COMPLEX HABS No. AZ-13S CPage 5) with the Laboratory through the University of Arizona. Dr. Cannon worked from to and Dr.
Shreve was supported by Carnegie even after the close of the Desert Laboratory until his death in the Godfrey Sykes, who was instrumental in the success of the Laboratory, retired in Besides the work done by these men, about 40 men and women worked from 2 to 12 months , and several hundred scientists from all parts of the world visited.2^ However, in due to economic problems, the Carnegie funding was drastically cut and only a small staff, under the 22 direction of Dr. Shreve remained. On November 6 at AM, a fire broke out in the Chemistry building. Before the fire was extinguished, most of the building was destroyed except the rock and brick walls, and the Main laboratory was threatened.
23 The building remained unrepaired until the Forest Service bought the property in In June of the Carnegie Institution sold the property to the U.S. Forest Service, for one dollar, after offering it to the University of Arizona which declined. The transfer included 220 acres of land owned by Carnegie, and 640 acres of leased state land. In June of The Southwestern Forest and Range Experiment Station moved to Tumamoc Hill. The property had been known locally as Tumamoc Hill, an Indian word for Horned-Toad, a desert reptile of Arizona common to that area of Arizona; however, the name had seldom been used while the property was the Carnegie Laboratory, but the name was quickly adopted by the Forest Service.
In the Forest Service began improvements to the property including widening the road up the hill, re fencing, and adding evaporative coolers to the buildings. Major improvements included rebuilding the interior DESERT BOTANICAL LABORATORY COMPLEX HABS No. AZ-138 (Page 6) and the roof of the Chemistry building, and the construction of a new building. The new building was a 37' x 45' rectangular building of volcanic rock, with concrete floors and a flat parapeted roof. The use of vigas,"a parapet roof, and the overall building form implies an attempt at re- gionalism, however, the result is a building more similar to the Santa Fe style than any Arizona style. The building was used for office space by the Forest Service.
In the Research Foundation of New York, in agreement with the Forest Service, built 2 metal buildings near the Chemistry building. They also improved the water system and added power lines during their period at 26 Tumamoc Hill. The metal buildings are still intact and xn use. The Southwestern and Rocky Mountain Forest and Range Experiment Station used Tumamoc Hill as its headquarters until September when the or- ganization was consolidated under the name of the Kooky Mountain Forest- and Range Experiment Station and moved its headquarters to Ft, Collins, Colorado.
The Experiment Station continued to use only one of the Tumamoc Hill buildings after this consolidation; the other buildings remained empty until In the University of Arizona leased the buildings on the hill for use by the Geosciences Department, College of Earth Sciences. In the University purchased the Tumamoc Hill Laboratory and its lands for with the provision of one building to remain offices for the Rocky Mountain Experiment Station. The University of Arizona's Department of Geosciences has used the buildings for offices and research DESERT BOTANICAL LABORATORY COMPLEX HABS No. AZ-138 (Page 7) space, and conducted in-depth biological research from the hill since that time.
The desert Botanical Laboratory is iirportant as the first center for the study of desert plant ecology, and for the outstanding scientists who paved the way for further development in the study of plants and ecology. The site itself is important also because of the numerous ancient Indian sites and artifacts still intact on the hill and in the surrounding area. The Desert Botanical Laboratory was designated a National Historic Landmark in and was registered in and is listed in the National Register of Historic Places. In the complex was des- ignated as a State Natural Area by the Arizona State Parks Board. DESERT BOTANICAL LABORATORY COMPLEX HABS No. AZ-138 (Page 8) Notes 1) Yearbook of the Carnegie Institution {Vol. 1, p. 5. 2) Ibid (Vol. 2, p.xxvi. 3) Judith C.
Wilder, "Years of the Desert Laboratory", Journal of Arizona History,. (Vol. 8, #3; p. 78. 4) Yearbook (Vol. 2, p. xxvii. 5) Yearbook (Vol. 2, p. xxvi also: Wilder, p. 7 8. 6) Gary D. Mathews, "Holmes and Holmes", p. 15. 7) Yearbook (Vol. 3, p. 8) Yearbook (Vol. 28, p. also: Wilder, p. 78. 9) Yearbook (Vol. 5, p. also: Carnegie Papers, "Construction Contract with F. Welsh, June The University of Arizona Special Collections, 10} Ibid., June contracts. 11) Yearbook (Vol. 5, p. 12} Ibid, (Vol. 6, p. 68. 13) Ibid, (Vol. 5, p. 14) June Construction contract. 15) Yearbook (Vol. p. 72. 16) Ibid. 17) Ibid. 18) Dr. D. T. MacDougal; Personal letter from Godfrey Sykes, August 19) Yearbook (Vol. 20) Ibid, (Vol. 20, p. 63. 21) Wilder, p. 79. 22) Ibid. DESERT BOTANICAL LABORATORY COMPLEX HABS No.
AZ-13S (Page 9) 23) "Tucson Daily Star", (Nov. 7, p. 2. 24) William McGinnies, Discovering The Desert, University of Arizona Press, 25) U.S. Department ot Agriculture; forest- Service Report: The Tumamoc Hill Property of" Tucson; (Dec- 3, p. 1. 26) Ibid, p. 2. 27) MeGinnies, p. 38. DESERT BOTANICAL LABORATORY COMPLEX, MAIN LABORATORY HABS No, A2-13S-A (Page 10)
Historic American Buildings Survey
Chronology and Physical Character When Mr. Coville and Dr. MacDougal finally located a suitable site for the new Desert Botanical Laboratory, they were faced with a difficult problem: hew could they continue their considerable research projects in Carmel and at the Sal ton Sea while at the same time assuring themselves and their benefactor, the Carnegie Institution, of a properly constructed laboratory? The solution presented itself in the person of Mr. Forbes of Douglas, Arizona; an architect of some note in the area and a friend of the researchers. Forbes designed the original structure as an 'L' shaped building about 60 feet along each leg.
The building contained four ' large rooms: a main laboratory space of about 800 square feet, a store- room/drawing room, a library, and a private study, each about 300 square feet. A photographic darkroom occupied one corner of the storeroom. Be- cause of the relatively mild climate of Tucson, circulation space was provided outside the building along the east and south inner legs of the 'L' via a tiled walkway. The exterior bearing walls utilized native vol- canic rock removed from a site nearby and laid with gypsum mortar in a neat, solid fashion. Massive stone lintels were utilized to allow instal- lation of 17 - 3' x 7' wood casement windows and four transomed doors, allowing light and cooling breezes to penetrate the 18" thick dark stone walls.
These walls were covered on the inside with smooth-troweled gypsum plaster applied directly over the stone. The roof structure consisted of rafters with collar and knee bracing in a high, broad-hipped roof with deep overhangs to protect the walls from the sun. Ceiling joists at 12' supported wood lath and gypsum plaster ceilings. DESERT BOTANICAL LABORATORY COMPLEX, MAIN LABORATORY HABS No. A2-X38-A <Page 11) These joists also extended the full width t>f the overhang, providing the structure for the tongue and groove board soffits. Aside from the shading already mentioned, the overhangs offered another advantage.
Large cast iron grates were fitted into the soffits (and later removed and replaced with screens) and coirbined with a vent running trie entire length of the ridge to allow the sun's energy to convectively flush the attic space with cooler outside air. This effectively insulated the laboratory spaces below from the searing desert sun, and kept them relatively cool even on the hottest of sunnier days. The shiplap roof sheathing was waterproofed with tarpaper and batten strips, due to the unavailability of funds to complete the proposed slate roof. Floor joists of douglas fir were set on ledgers along the stone walls and supported tongue and groove douglas fir floors. The floors remained bare until when they were covered with linoleum.
The crawl space under the floors was also ventilated by means of 9" x 12" cast iron grates set in the stone wall. Interior partitions consisted of wood stud walls fin- ished with gypsum plaster. Plumbing and electrical were integral with the structure and served several lab work stations. Gas piping also served several burners. Heating was accomplished with two brick-lined stone fireplaces, one on the south wall of the main laboratory, and one set in the southeast corner of the library. Both fireplaces were removed as gas fired heaters were introduced, but the chimneys still provide exhaust for the new equipment. In the laboratory's workload expanded, and the varied types of re- search being carried out required more space.
The job of designing the extension fell to Mr.David Holmes, a Tucson architect, the man who had supervised the construction of the original structure. Holmes' plan call- DESERT BOTANICAL LABORATORY COMPLEX, MAIN LABORATORY HABS No. AZ-138-A (Page 12) ed for the addition of two new laboratory spaces: a physical lab and a physiology lab, as well as a chemistry workshop, a greenhouse for horti- cultural experiments, and a horticultural workshop. A bathroom was in- stalled in the workshop. This plan doubled the si:r,e of the laboratory, turning it into a broad 'U', which opens to the south.
The only evi- dence that the building was completed in two parts is an almost indis- tinguishable joint in the north and south walls at the center, and the mitered joint of the soffit at the midpoint of the north and south sides, a remnant of the original hipped roof's return. The north facade of the original structure was carefully studied, as was the feel and character of the original building as a whole. Because of Mr. Holmes' sensitivity, the enlargement retains that character so much so that it can be called an extension rather than an addition. Once again, native volcanic stone was used for the walls; however, the mortar used to lay it up was of a slightly different color and consistency.
Except for this minor detail, and the thickness of the wall that separates them, the stonework on the two halves is exactly alike. Rough stone lintels span openings containing the same casement windows and transomed doors. The high roof was extended to cover the entire structure, but ended on the east wing with a gable end to accommodate the high-roofed wood framed greenhouse. The eave and ridge vents were the same type as in the original structure. Also at this time, the entire structure was reroofed with slate, fur- ther unifying the original and new sections. One observer was so impres- sed by the appearance of the building, he professed it to be "a natural object in the desert." Additional research facilities were incorporated into the extension.
These included a rooftop meteorological platform in the center, accessed via a stairway in the chemistry shop; and a subterranean constant temper- DESERT BOTANICAL LABORATORY COMPLEX, MAIN LABORATORY HABS No. A2-136-A <Page 13) ature chamber, approximately 6' x 7', ~dug~ directly out of bedrock. The chairber was Insulated by double-brick walls with an airspace between them_, and had a poured concrete floor. It too was accessed through the chemistry shop- Fireplaces were installed in the two new laboratories to supplement the two that already existed. Those fireplaces remain today. With the extension cams many iitprovements in the water and gas system for the labs.
Gutters and downspouts were installed and connected to a new stone cistern south of the building; water collected in this way was uti- lized in the new horticultural experiments. The tiled walkway was extend- ed around the entire inside of the ' U' - As seen today/ the building is little changed from the way it appeared in Many superficial changes in the interior plumbing, gas, and e- lectricaL systems have been made, but these do not affect the character of the building. The U.S. Forest Service acquired the building in and by had completed installation of three evaporative coolers on the roof. It is also believed that the Forest Service installed the new bathrooms in the west wing, but evidence as to the exact date of the installation is sketchy.
The Forest Service also rebuilt the greenhouse which had fallen into disrepair, and evidence indicates that it was rebuilt according to the original plans. In the University of Arizona began to use the laboratory as a paleoenvironmental lab. Changes in the use of the spaces of the building was necessitated by differences in the types of work being conducted by the university scientists who new work there. In add- ition, the University reroofed the building in removing the ridge vent and replacing it with turbine ventilators. It is also believed that DESERT BOTANICAL LABORATORY COMPLEX, MAIM LABORATORY HABS No. A2-138-A (Page 14) the University is responsible for installing an acoustical tile ceiling in the easternmost room of the main wing, now used as a library.
This was done to acocstirtiodate the new coolers which the University installed. The University also reconditioned the greenhouse, replacing the glass with plexiglass panels to alleviate maintenance problems. These changes, how- ever, do little to affect the overall character of the structure, and it remains a harmonious part of the desert which it inhabits. Architectural Merit and Interest: This early century building was begun in by the Carnegie Institution as a Desert Botanical Laboratory. It was constructed of local volcanic rock. In the building was extended in the same form to double its size. For several years this structure was the center for all the laboratory's desert environmental studies. Condition of Fabric: Generally good, but there are indications of settlement problems.
Overall Dimensions: E-W length, West wing: East wing: N-S of main section width. Number of Stories: One Layout Shape: 'U' shaped. Foundations : Volcanic rock set in lime mortar Wall Construction, Finish and Color: Dark volcanic rubble rock set in line mortar, exterior. Structural Systems, Framing: Rock bearing wan supporting 2" x 5V joists and 2" x 4" and DESERT BOTANICAL LABORATORY COMPLEX, MAIN LABORATORY HABS No. AZ-138-A <Page 15) 2" x6" rafters, all at 16" on center. Walkways: Red clay tile walkway on the south side of the building in the court area. The tile is set in a cement mortar. A volcanic rock retaining wall in height helps to define this walkway.
Chimneys: There are four stucco-covered brick, chimneys on the section of the building, and two volcanic rock-faced chimneys on the section. All chimneys have brick flues. Openings: Doorways and Doors: The doorway openings are formed with large rock lintels. There are eight doorways on the court side of the building, and one doorway on the east side of the east wing., All doorways have screen doors and screened transom windows. The doors have a glass panel over a wooden panel. One doorway at the center of the south facade, and the doorway on the west side of the east wing occupy former window openings. The east doorway to the laboratory room has been replaced with a single glass panel double door.
Windows: Majority of the windows are double wooden casement windows with two panes on each leaf. There are two hopper win- dows: one on die north side and one on the west side. Each leaf of these windows have two panes of glass. A window on the west is a small square single casement window. It has four panes of glass. All windows have long rock lintels. Several of the double casement windows show signs of being re- hung to open out. This makes an alternating pattern of windows opening in and opening out. DESERT BOTANICAL LABORATORY COMPLEX, MAIN LABORATORY HABS No. AZ-138-A <Page 16) Poof: Shape, Covering: A hip roof with a gable on the south end of the east wing; grey asphalt shingle surface.
Cornice, Eaves: Eaves project about 4' on all sides except the east side of the west wing which projects 8'. The eave has a wooden soffit with x soffit vents located all along the eaves. A rain gutter is hung on the east facade of the building and on the inside part of the court. Miscellaneous: A platform is located at about the center of the building straddling the ridge of the roof. Six turbine vents are on the roof's ridge and four evaporative coolers are on the slope of the roof of the inside part of the court. Floor Plans: Basement: There was once a constant temperature chamber in the basement under the portion of the building. It is long and wide. The ceiling height is to the wood ceiling. It has a concrete floor, and the walls are of red brick.
Main level: The original portion of the building had an L-shaped plan which opened up to the southeast. The long leg was on the north side and it contained the principal laboratory with an office, darkroom, and restroom facilities to the west end of the leg. The shorter leg of the 'L' contains two small offices and restroom faciltiies. The addition was also L-shaped which opened up to the southwest and abutted the original building. The longer leg , on the north, contained two small offices towards the west end of the leg, and a library on the northeast comer. The library had a fireplace on it's DESERT BOTANICAL LABORATORY COMPLEX, MAIN LABORATORY HABS No. A2-138-A (Page 17) south wall.
Another fireplace is located on the west wall of the office which is between the other office and the library. The shorter leg contains a small laboratory which abuts the lib- rary on it's south wall. This laboratory provides access to a greenhouse which is abutted to the south wall of the laboratory. Access to the greenhouse is also available from the south end of the greenhouse. Most of the rooms are accessible through doors on the inside part of the court. The library is the only room that has access to the east facade of the building. Attic: The attic is unfinished and contains electrical tubing/ a telephone panel, and a wooden ladder which leads up to the roof's platform. Stairways: The attic access stair is located on the west wall of the office which abuts the principal library.
Built of wood, it is made up of two risers to a platform, then sixteen more risers which lead to the attic. The risers are 8h" and the treads are 8 The width of the stairway is and there is a simple wooden handrail. Flooring: Flooring is of douglas fir covered with green linoleum sheets. Wall and Ceiling Finish: The wall is painted plaster. The ceiling, in the library is a dropped acoustical tile ceiling. The office on the south end of the west wing has modern acoustical tile attached to wooden lath. The office next to the library also has an acoustical tile ceiling but these are of an older time period and don't have any holes. The rest of the rooms have plaster on wooden lath ceilings. DESERT BOTANICAL LABORATORY COMPLEX, MAIN LABORATORY HABS No.
A2-13S-A (Page 18> Doorways and Doors: All openings have simple moulded trim. All interior doors have 5 horizontal wooden panels set in a wood frame. Trim: There is a wooden picture rail about 2 feet below the ceiling. This picture rail is located in every room except the small lab- oratory and the greenhouse. Also in each room there is a wooden base board about 7V high. Hardware: Some doors have a stamp design door handle. Most of the hinges are butt hinges. On the casement windows there is a simple small latch. All hardware appears to be of brass. Lighting: The lighting is composed of modern fluorescent tubes which are hung from the ceiling. Mechanical Equipment: Heating is done with gas space heaters. Evaporative coolers and ridge turbine vents are used to cool the building.
A modern plumbing system was placed in about General Setting and Orientation: The building is et about half-way up the north slope of the hill. This building is part of a complex which formed the Desert Botanical Laboratory. The other structures are located to the southeast and to the south. This building's court faces south and the longest dimension of the building runs along an East-West axis. Historical Landscape Design: The original native vegetation seems to have been saved during the construction of the building. There are gravel paths which DESERT BOTANICAL LABORATORY COMPLEX, MAIN LABORATORY HABS No. A2-138-A (Page 19> are defined with volcanic rocks. Outbuildings: There is a round reservoir located to the south of the building. It is partially subterranean.
There are volcanic rock walls and a concrete slab covering. DESERT BOTANICAL LABORATORY COMPLEX, SHOP No- AZ-138-B (Page 30) HISTORIC AMERICAN BUILDINGS SURVEY Building Name: Shop Building, Desert Botanical Laboratory Address: Tumamoc Hill, Pima County, Tucson, Arizona Architectural Merit and Interest: This turn of the century native volcanic stone building, built in was a service building for the Desert Botanical Labora- tory of the Carnegie Foundation. Condition of Fabric: Structurally sound, superficial deterioration. Over-all Dimensions: 20' North-South, 40' East-West. Number of Bays: N/A Number of Stories: One Layout, Shape: Rectangular Foundations: Poured concrete.
Wall Construction, Finish and Color: 3tone, brick interior with lime mortar; exterior volcanic rubble stone with high lime content mortar. Structural System, Framing: Bearing wall supporting 2x6 joists; 2x4 rafter system 24" o.c. on a 2 x 6 wall plate. Brick segmental arched openings; double header arch over windows and entrance door; triple header arch over sliding door; entrance surface on arches stucco and scored to resemble stone. DESERT BOTANICAL LABORATORY COMPLEX, SHOP HABS No. AZ-138-B (Page 21) Porches, Stoops, Bulkheads: Concrete apron at main sliding door at center of south facade. Con- crete step at entrance door at east end of south facade.
Chimneys: One chimney made of volcanic rubble stone with brick flue, located near the west end of the south facade and flush with the exterior wal 1. Openings: Doorways and Doors One, four panel wood entrance door at east end of south facade. One, two panel vehicular entrance, made of diagonal T/G wood with v-groove, at center of south facade. Roof: Shape, Covering: Slate tile hip roof, with ridge vent, running east to west. Cornice, Eaves: Rafter ends and roof sheathing exposed. Dormers, Cupolas, Towers: None. Floor Plans: Single room. Former wall separated a room on west side. Stai rways : Iron ladder to attic. Flooring: T/G fir, running east to west on (full) 2 x 10 joists, set on dirt 16" o.c.
Wal 1 and Cei lin_g_ F_i_nj sh : Exposed brick x x (to 1 joint), common bond with header every 7th course. Doorways and Doors: No interior doors. B L LAB0RAT Ry C HAlfL HABS No. If^ D AZ-138-B (Page 22) ^EX. SHOP Special Decorative Features, Trim and Cabinet Work: 4" flat board tijim around openings. Notable Hardware: Standard door and window hardware. Mechanical Equipment: Formerly - heating by stove (fuel ?) plumbing, one sink with well water. electrical, added to interior of structure. General Setting: West of access road to Desert Botanical Laboratory at top of hill; located in a clearing among low desert vegetation. Historic Landscape Design: Native Vegetation Outbuildings: Foundations for other structures - one slightly southeast, the other - to the west.
Chronology and Physical Character The Shop Building for the Desert Botanical Laboratory was built in at the hase of Tumamoc Hill. The 20' x 40' native volcanic stone building was built after designs by Godfrey Sykes, then the Facilities and Maintenance Director for the Laboratory. The construction contrac- tor was F. Vfelsh of Tucson, who had built the addition to the main lab building in The walls were built of the stone and lined with a double wythe of brick which was left exposed on the interior. The openings were arched with brick arches. These arches were plastered on the exterior; the plaster being formed and molded in such a way as to appear to be large ashlar stone. The arches were again exposed on the interior. DESERT BOTANICAL LABORATORY COMPLEX, SHOP HAB5 No.
AZ-139-B (Page 23) The floors were constructed of "extra rigidity* of tongue and grrove planks resting on a joist and beam system, to accept the weight of the tools- The illumination was "designed especially with regard to the use of the apparatus and tools with which it is furnished." The roof was covered with slate shingles and "furnished with the ventilating ridge which has been found so efficient in other buildings of the laboratory." The shop was furnished with iron- and wood-working tools: "A full complement of carpenters and cabinetmaker's tools, lathe, drill press, band saw, planer, forge, grinding wheels, etc., with fittings, have been put into place, and separate motors have been fitted to the larger tools; current being secured from a line leading to the Laboratory." The shop was built to aid in reducing costs, both monetary and time, by having in-house service for construction and maintenance of machinery and equipment.
It was used in to construct a new boat for the use of laboratory personnel during the course of their travels and studies. DESERT BOTANICAL LABORATORY COMPLEX, CHEMISTRY HABS No. AZ-X38-C (Page 24) Historic .American Buildings Survey Desert Botanical Laboratory , Chemistry Building Address: Tumamoc Hill, Tucson, Pine County, Arizona Architectural Merit and Interest: Volcanic rubble stone building built in to serve as the Chemical laboratory for the Desert Botanical Laboratory of the Carnegie Institution, established in The building was gutted by fire in and rebuilt sometime in the by the U.S. Forest Service. Condition of the Fabric: In general, the building is in good condition with slight det- erioration of the exposed exterior wood.
Overall Dimensions: Mumber of Stories: One Layout Shape: Rectangular Foundations: Poured Concrete Wall Construction, Finish and Color: Volcanic rubble stone exterior laid in a soft lime mortar with harder cement mortar patching. Double wythe brick in the common bond (header course every eight course), exposed on the interior and painted. Poured concrete lintels with brick jack arches in- DESERT BOTANICAL LABORATORY COMPLEX, CHEMISTRY HABS No. A2-138-C (Page 25) side. Over east window is a double steel angle lintel. Structural System, Framing: Shale brick and volcanic stone bearing walls with 2" x 6" wood joists and 2" x 6" rafters at 16" on center.
Porches, Stoops, Bulkheads: Concrete stoop at south entry; raised platform at north entrance made of a 4" thick concrete slab over a stone apron, platform has a 2" pipe railing. Chimneys: Two volcanic stone chimneys; one on the north slope, one on the south slope of roof; with sheet metal collar at base; brick con- struction for both below roof. Openings: Doorways and Doors: South and north entrances with transoms, wood framed. North door has a glass panel and a wood panel. South door is a newer flush hollow-core. Windows and Shutters: Wood double-hung windows, one over one sash, weighted. East window dating from the rebuilding after the fire has two windows side by side with wood center piece.
Roof: Shape,Covering: Hipped roof with ridge running east-west; cov- ered ridge vent; grey asphalt shingle surface. Cornice, Eaves: overhang, tongue and groove soffit with soffit vents x 24" screened) , 2" x 6" fascia board, and 4" crown moulding at wall. Dormers, Cupolas, Towers: Evaporative cooler on south slope of roof. Floor Plans: The original plan contained 5 rooms, one large room occupied DESERT BOTANICAL LABORATORY COMPLEX, CHEMISTRY HABS No. AZ-138-C (Page 26) the west half of the building. The other half was divided into quadrants (4 abutting rooms divided by 9" thick brick partitions). The existing plan is unchanged for the east half. The large west room is divided by frame partitions into 3 rooms (2 rooms at west and one extending from south to north) .
So there are now 7 rooms separated by 3 brick partitions to the east and 2 of stud construction to the west. Stairways: None Flooring: Concrete slab with linoleum flooring except for microscope room (located at center of south side) which has bare concrete. Wall and Ceiling Finish: Interior partitions of exposed brick (shale) in running bond with struck joints; steel lintel over interior brick openings; tension rod running east-west, tying the 2 north-south brick partitions. Wood stud partitions with 4' x 81 cellulose wood fiber wall panels and wood battens. Ceiling consists of IV thick wood fiber panels nailed directly to roof joists. Doorways and Doors: 2 two-panel doors in the east portion of building; hollow core doors for the wood partitions.
Doorways have flat board moulding 3V and 4" wide. Interior window trim has 3V' flat moulding. Special Decorative Features, Trim and Cabinet Work: 5H" base board on frame partitions; 2" crown moulding on brick walls. DESERT BOTANICAL LABORATORY COMPLEX, CHEMISTRY HABS No. A2-138--C (Page Notable Hardware: Standard hardware throught. Mechanical Equipment: Space heaters {formerly heated by stoves) , electrical lighting, no plunfoing. General Setting: Desert area; east of parking area on top of Tumamoc Hill; site slopes slightly to the north-east. Historic Vegetation: Native vegetation. Outbuildings: Small wood shed housing water pump south of building in fenced enclosure. DESERT BOTANICAL LABORATORY COMPLEX, CHEMISTRY HABS No.
AZ-138-G (Page 28) Desert Botanical Laboratory Chemistry Building Chronology and Physical Character The Chemistry Building, located to the southwest of the Main Laboratory was contracted for in the June of The contract, written by Dr. MacDougal and G. Sykes, set forth the building requirments and prices to be met by Welsh, the construction contractor. Welsh, a concrete contractor from Tucson, had worked on both the addition to the Main Laboratory and on the Shop building. A second Tucson contractor, J. Chapman, was also hired. Al- though the architect is unknown, it is known that Godfrey Sykes made design decisions during construction and supervised construction of the building. The plan of the building was a rectangle 28' wide and 48' long, containing 5 rooms.
The largest room, located an the west end of the building, was design- ed as the main laboratory for chemical experiments and microscope work. A second laboratory, located adjacent to the main laboratory on the south-center third of the building, was a photochemical darkroom. The east end of the building was divided into 2 rooms. The northeast room served as entry to the building, and as a machine and chemical preparation room; the southeast room contained vacuum pump machinery. The north-center area of the building served as access to the two laboratory areas and as the building's library. Foundations and footings were of concrete, carried down to the bedrock, and a cross foundation was laid for the west laboratory space.
The exterior walls were built of volcanic ru ble rock; the stone was removed from an area of Tumamoc Hill just a few hundred feet uphill from the building site. Welsh was directed by Dr. MacDougal in the construction agreement to 2 "(remove the rock) in such a manner as not to deface the landscape seriously"f The rock walls were constructed with lime mortar joints, and built to accommo- DESERT BOTANICAL LABORATORY COMPLEX, CHEMISTRY HABS No. A2-13S-C (Page 29) date an interior height of On the interior,the rock walls were lined with structural double shale brick that supported the floor and roof systems, as well as creating a smoother interior room finish.
The overall v&ickness of the finished composite exterior walls was Four interior partitions were built of double brick, and were also structural. Door and window lintels were of formed concrete and were poured and cured by Welsh on the site. Door and window frames were of wood and were shipped by train from California. Windows were operable with spring latched top opening sashes; the casement windows opened in to encourage good air flow. The floors were laid early in the construction process. The wood joists and subflooring used in the majority of the building were laid integral with the construction of the brick walls.
The subfloors of the vacuum pump room and of the machine room, both located on the east end of the building, were con- crete and machinery anchor bolts were imbedded in the floors when they were poured. The roof was a flat-topped hip roof; ceiling joists and roof trusses were of wood. The attic space was used for storage and experimental equipment. The flat deck was covered with sheet lead and used as an Insolation Deck for solar experiments; the remainder of the roof was covered with tar paper and later recovered with slate shingles. The building was equipped with water, gas, AC and DC.current, vacuum and air pressure. Four of the five rooms were plumbed and contained sinks; however, this building had no indoor toilet facilities.
The utilities all eneterd the building through the southwest foundation wall; waste drains converegecl and exited through the east corner of the building. Built-in equipment included large corbeled brick ventilating hoods and fume DESERT BOTANICAL LABORATORY COMPLEX, CHEMISTRY HABS No. A2-138-.C (Page 30) drafts located in the laboratory spaces. The building also had a structurally free-standing pier of brick with a soapstone cap. This pier had a concrete footing and was built during wall construction. The pier was used for micro- scopes and other delicate instruments that needed to be free from normal floor vibrations.
The building was completed in late and was used as a chemical laboratory until In a major part of the chemical equipment was removed and sent to Camel, California, where Dr. Spoehr, once chemist of the Desert Lab- oratory, was working. Part of the building continued to be used as a chemical laboratory after this period; however, the majority of the building was used as office space. On November at AM, the Chemistry building caught fire. Be- fore the fire was extinguished, the building's roof, floors, windows, and doors were destroyed, leaving only the rock and brick walls standing; and many important records and projects were destroyed. The building was not rebuilt until the Forest Service bought the property.
When the Forest Service bought the Botanical Laboratory, they began major im- provements including the reconstruction of the Chemistry building for office use. The building was reconstructed in a character similar to the original building and to the other existing buildings on the site. However, a few minor changes from the original plan were made. The large west space was di- vided into three offices by the addition of 2 wood-stud and fiberboard parti- tions, and a window was added to the east facade. Tins window was about 6' wide and had a wood frame and a steel lintel. Original casement windows were replaced with double-hung wood framed windows and screens. New floors were needed to replace the wood floors destroyed by the fire.
These new subfloors were of poured concrete, flooring was linoleum. DESERT BOTANICAL LABORATORY COMPLEX," CHEMISTRY HABS No. AZ-138-.C (Page 31) The roof was rebuilt in the manner of the other buildings on the site, rather than as the roof originally found on this building; the flat-topped was re- placed with a hip roof with soffit vents and a ventilating ridge roll. The roof structural system was 2x6 joists and rafters at 16" on center; the new roof was covered with slate shingles. A ceiling of wood fiber panels was nailed directly to the ceiling joists. The brick fume hoods and brick microscope table were removed during recon- struction, as was all interior plumbing, although water faucets were left on the exterior.
New equipment included the addition of an evaporative cooler and fluorescent lighting. In the slate roof was replaced with asphalt shingles by the University of Arizona. The university also replaced one window on the south facade of the building with a door, giving the building a second exit. The date of this alteration is uncertain. Little has been done to the building other than the reroofing and minor maintenance since the acquisition of the property by the University. DESERT BOTANICAL LABORATORY COMPLEX, U.S. FOREST SERVICE HABS No. AZ-13S-D <Page 32) Historic American Buildings Survey U.S. Forest Service Building Desert Botanical Laboratory Address: Tumamoc Hill/ Tucson, Pima County, Arizona Architectural Merit and Interest: building in Desert Botanical complex.
Strong attempt to relate to historic buildings on site local volcanic rock. Condition of Fabric: Generally good. Structurally sound, minor surface deterioration. Overall Dimensions: 36MO" x Number of Stories: One Layout Shape: Rectilinear Foundations: Poured Concrete Wall Construction, Finish, and Color: Local volcanic rock with cement mortar exposed dark brown. Structural System, Framing: Stone bearing wall system with wood frame inset supporting ceiling joists and roof system. Porches, Stoops, Bulkheads: Porch on east side raised platform with concrete floor and stone base of volcanic rock; iron pipe railing. Openings: Doors and Doorways: Single entrance door situated at center of east DESERT BOTANICAL LABORATORY COMPLEX, U.S. FOREST SERVICE . HABS No. AZ-138-D <page 33) facade.
Wood frame with wood door having glass panel over solid panel. Windows and Shutters: Wood double-hung sash, one over one pane. Roof: Shape, Covering: Flat, built-up asbestos roofing, sloped for drainage to conmon scupper at center of West (rear) facade. Parapet: Stone parapet with cement mortar pointing. Rear parapet steps down toward center of building. Floor Plans: Entry is made into principal room at East-center of the building. There is an even distribution of rooms around the perimeter of the building so there is one room in each corner and one at the rear (west) center. A small restroom facility is located at the south-center. Flooring: Poured concrete slab with carpet; tile. Wall and Ceiling Finish: Plaster applied directly to the stone; paint.
Doorways and Doors: All doorways have 1x5 flat board trim; doors are of wood with glass panel over solid wood panel. Special Decorative Features, Trim and Cabinet Work: 1 x'5 wood baseboard with quarter-round base shoe. Notable Hardware: Standard hardware through out. Mechanical Equipment: Central air conditioning/gas heat {unit on roof). Standard plumbing fixtures. Fluorescent lighting. DESERT BOTANICAL LABORATORY COMPLEX, U.S. FOREST SERVICE HABS No. AZ-138-D (Pag 34) General Setting: Situated at the west side of the Tumamoc Hill complex with its principal facade facing East. Historic Landscape Design: Natural, controlled desert vegetation; gravel paths defined by volcanic rock borders.
Outbuildings: Underground storage facility to the Southwest, opens to the west on the slope of the hill. Chronology and Physical Character In June of The Carnegie Institution of Washington, turned over to the Forest Service its Desert Laboratory at Tucson, Arizona. The pro- perty became the headquarters for the Southwestern Forest and Range Exper- iment Station. During the time the property was occupied by the Station several improve- ments were made. One major improvement was the construction of Building #2 shortly after the station occupied the site in June of In September of the Southwestern and Rocky Mountain Forest and Range Experiment Stations were consolidated under the name of the Rocky Moun- tain Forest and Range Experiment Station, with Headquarters in Ft. Collins, Colorado.
After the consolidation, a branch station remained in Building #2, sharing it with agricultural research service personnel. From when the University of Arizona purchased the Tumamoc Hill pro- perty, the U.S. Geological Survey has leased this building.
The federal surveyors worked through Tucson building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HABS ARIZ,10-TUCSO,31-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.