From the record
“The Stand Pipe (Surge Tank) was at the head of the penstock pipe, allowing inflowing water to back up and retain water in the Pressure Tunnel and Penstock pipes system when Childs Powerhouse gates were closed for repairs.”
Written record, HAER AZ-65-CC survey. Machine-read text.
Surveyed by the federal HAER program as HAER AZ-65-CC · the record runs 608 words · one of 63 surveyed structures published for this county.