From the record
“Hoover Dam, Circuits 1-15, U.S. Highway 93, Boulder City, Clark County, NV”
Survey record header. Machine-read text.
Surveyed by the federal HAER program as HAER NV-27-L · one of 16 surveyed structures published for this county.
Hoover Dam, Circuits 1-15, U.S. Highway 93, Boulder City, Clark County, NV. Surveyed as HAER NV-27-L, with a 0-word written history.
“Hoover Dam, Circuits 1-15, U.S. Highway 93, Boulder City, Clark County, NV”
Survey record header. Machine-read text.
Surveyed by the federal HAER program as HAER NV-27-L · one of 16 surveyed structures published for this county.
| Willow Valley, Arizona | The place record: every map, photograph and survey of this town. |
| Mohave County, Arizona | 293 topographic sheets across the county. |
| Library of Congress record | The original filed report as the survey filed it. |
The federal survey recorded these other structures elsewhere in Mohave County. These are the other structures they measured and filed a report on, longest report first.
| Sheet | Structure | Survey | Report |
|---|---|---|---|
| Grand Gulch Mine | HAER AZ-78 | 26,766 words | |
| Tassi Ranch | HALS AZ-2 | 12,717 words | |
| Waring Ranch | HALS AZ-3 | 10,052 words | |
| Pine Ranch | HALS AZ-4 | 8,187 words | |
| Davis Dam | HAER AZ-77-A | 5,427 words | |
| Green Springs | HALS AZ-3-C | 4,958 words | |
| Horse Valley Ranch | HALS AZ-3-A | 4,400 words | |
| Willow Beach Ranger Station | HABS az-220 | 3,965 words | |
| Davis Dam | HAER AZ-77 | 3,462 words | |
| Pine Valley | HALS AZ-3-B | 3,428 words | |
| Shanley Camp | HALS AZ-3-E | 2,412 words | |
| Dinner Pocket | HALS AZ-3-F | 2,311 words | |
| London Bridge | HAER ARIZ,8-LANAC,1- | 2,098 words | |
| Spencer Camp | HALS AZ-3-D | 1,962 words | |
| Pipe Spring Fort | HABS ARIZ,8-MOC.V,1- | 1,435 words |