Plans for the original structure construction of are not available. Plans for the rehabilitation project show much of the original structure, photo- graphs of which are included here with. The other historic details and chronology was obtained from minutes of Colusa County Board of Supe rvi so rs. On May 1 6 , 1 80 1 , the County of Colusa Board of Supervisors made a request to the State of California that a bridge be erected across the Sacramento River,. The initial location desired was at the north end of Fifth Street in Colusa, however, was changed to "above the Farmers Warehouse" which is about easterly or downstream from the existing bridge. Advertisement for plans and specifications was made, bids were received and the contract was awarded to the Ca 1 I - fornia Bridge Co.
on August 31, Plans are not available; however, from County Records it can be concluded that this was a wooden d raw-bridge with wooden piles and foundation. The Contractor completed the work in December 1 88 1 and was paid A bridge tender wa.s hired in 1 883 to collect toll fees and open the bridge for river traffic. In the Colusa Bridge was declared a "free bridge" and charging of the tolls was discontinued. During the next several years the bridge continued to serve the Colusa area, but not without problems. Frequent repairs were re- quired because of severe f1ooding of the Sacramento River, and a .new floor was installed in In February J. H.
Peart, County Surveyor', inspected the bridge and said that the bridge was unsafe and recommended that no expendi- ture be made to correct this condition. The Board of Supervisors instructed the bridge tender to advise persons crossing the bridge of the unsafe condition. On April 5, the Board unanimously passed a motion to build a steel bridge over the Sacramento River. 'After several months of preparing.and revising the plans and.
specifications, the project was finally advertised for bidding on July 26, and bids opened on August The contract was awarded to the Colusa Stone Com- pany , the low bid being in the- amount of and the contract was signed on August 12, The work proceeded and was completed and accepted by the County on January 21, The County Engineer of Record during this construction period.was'J. W. Kaerth. The original plans for the project are hot available, however, specifi- cations are relatively complete. The b r I d g e is' a s t ruct u ra 1 s tee 1 , p i n -connec ted Pratt, through truss, s i mi la r to se ve ra 1 oth e r b r t dge s a 1 on g the S acra men to Ri ve r and N o r t h e rn Ca 1 i f orn i a . The b r i dg e i s 0 00' Ion 9, 2 2' wide and has a ve rt i c a 1 c1ea ranc e of 13.fi 1 .
i t cons i s ts of 2 - long fixed 1 spans at the nor t h end , 1 - 120 1 on g f i xed span at the south end and a sw i ng s pan , wh i ch p i vo ts e ach abo ut a cen te r pier when ope ne d Each spa n i s s upp or ted by s a nds tone pie rs on s tee 1 piles. The sw i n g spa n i s supp orte d on a mas s i ve pie r co ns t ructed of sand- s tone on s tee 1 pi les. The s t r u ctu ra 1 membe r s ar e 1 ightwe i gh t to a 3 low for nan d-op en i ng T he sw i ng or cen t ra 1 se ct i on is formed of 1 two i d en t i ca1 1 10 t ru sses conn ec ted by a 20 1 me mber between these trusse s.
The tur n i ng mech an i sm cons i s ts of a se ries of gears and shafts wh i ch t ran smi t fore e , wh i ch f o rce was or i g i ri a 1-1 y applied by hand f rom a t u rn i n g ke y i n the deck o f the b r i dg e. The swing sec- t i ons rides o n a serie s of s ma 1 1 whee Is conn ecte d by axles to the cen te r pos t. The original Colusa Bridge was removed in by W. A.
Farrls at a cost to the County of Asphalt paving was installed.over the wooden deck in October In March the bridge was painted according to specifications (in part) as fo1 lows: "After said bridge is cleaned to the satisfaction and approval of the Surveyor or Superintendent of said work, it shall then receive a thorough coat of Pioneer red lead and pure boiled linseed oil and such lamp black as may be directed by the Superintendent in charge.
After the first coat is thoroughly dried, a second coat of similar, mixture of Pioneer red lead and pure boiled lin- seed oil, mixed with and equivalent bulk of Prince's metallic and pure boiled linseed oil mixed in the same consistency as red-lead arid"oil and this last mixture shall then be thinned, if necessary,' to bring the paint to the proper working consistency....all steel work painted - not wood.joists or flooring. Removal and replacement of the wooden floor joists and deck and re- painting was required several times during the years to follow. On July 5, a contract in the amount of was awarded to Jenkins & 1 ton for "Alterations and Re pairs - Colusa Bridge"..
The work included new piles and caps and installations of electric power and an electric motor and appurtenances to operate the bridge and thereby eliminate the hand-operating mechanism. The specifications (in part) were'as follows: 'The motor to operate end wedges shall be located as s hown and shall be a Westinghouse, type C,i,, slip ring motor with Solenoid brake, Ful1 load speed 860 Current 3 phase,-60 cycles, 220 volts. Controller Westtnghouse, Type F.A, Resistance, We sting house Standard for intermittent hoist duty. The motor for turning the bridge shall be 20 West- inghouse type C.I., slip ring hoist motor. Ful1 load speed 680 Current 3 phase, 60 cycles, 220 volts. Controller Westinghouse, Type F.A. Reversible. Resistance, Westinghouse Standard for intermittent hoist du ty .
Foot b rake, The alterations and repairs v/ere completed as specified except the hand operating mechanism was merely by-passed and not removed, for a secondary backup system to allow hand operation in emergencies. In Se ptember a contract was awarded to repair the "South Do 1 - phin" of the bridge. Records are incomplete on these dolphin or fende r installations, therefore, exact time is not known. These i ns ta llations, although are an original part of the bridge, were req u I red at some later date as an effort to protect the bridge piers from catching debris during heavy winter flows in the River, I n mo st instances the nose of the dolphin would catch the debris and c ause debris backup.
It was and is still a common occurrence for t he County crews to dislodge by dynamite or other methods log j ams from the dolphins for free river f1ow downstream. Tremendous press ures are caused by these build-ups which without,these dolphins wou 1 d exert unsafe pressures on the bridge piers.- By vehicle traffic volume and speeds had increased tremen- dously as did truck and farm equipment widths and weights. On September 17, the State Bridge Department- issued a bridge inspection report which'limited the speed limit to 10 miles per hour for vehicles over 5 tons and ]6 ton weight limit for semi- tra i 1e r veh i c1es , On August 16, the County Surveyor, Chas.'de St.
Maurice, pre- sented cost estimates to the Board of Supervisors for .improvement on the Bridge to H~ 1 5 capacity, strengthening of floor beams, new floor system, truss and bracing where necessary together with painting, fender or dolphin work and other minor improvements.
On September 3, the Board of Supervisors passes a resoiut ion as follows (in part): WHEREAS, the draw bridge across the Sacramento River at Colusa, California, is in a dangerous state of dis- repa i r; and WHEREAS, it has recently been determined by a survey conducted by the District Bridge Engineers of the Public Roads Administration; by an engineer of the Bridge Depart- ment of the California Division of Highways; and by repre- sentatives of the Division of Highways District No, 3; and by the County Surveyor (that the bridge) should be closed to heavy traffic; and WHEREAS, the continued use of said bridge by heavy equipment is dangerous to life and property;' and WHEREAS, plans and specifications are now being pre- pared pursuant to a reconstruction and re-building of said br i dge ; NOW, THERFORE, be it resolved that the Board of Supervisors of the County of Colusa, at a regular meet- ing of said Board held on September 19 A 61 do hereby declare that said bridge be closed to heavy traffic pend- ing the repairs and reconstruction thereof to all vehicles and conveyances, the total gross weight of which exceeds pounds, and that no traffic whatever be permitted to cross over said bridge at a speed in excess of ten (l 0) miles per hour.
* Be it further resolved that, from and after the date hereof, no vehicle or conveyance, the gross weight of which Is in excess of pounds, shall be per- mitted to cross over said bridge, and that a violation thereof, or of the speed herein determined, shall be deemed to be in violation of Section 510 and/or 5 1 6 of the Vehicle Code of the State of California. 8e it further resolved that due publicity be given resolution, that appropriate signs be prepared and installed at the entrances o.f said bridge notifying all persons of the condition of said structure.
Plans and specifications were prepared .for the "repair" project by the State Department of Public Works, Division of Highways, and bids were opened on April 2 , The contract was awarded to the low 'bidder, Lord & Bishop, in the amount of The p ro- ject was financed jointly by the County, State and Federal Govern- ment. The project got underway and was -accepted as completed onc January 27, In the requirement for 12 hours advanced notice for opening the draw bridge was approved by the U. .S. Corps of Engineers and the position of bridge tender was terminated. In the bridge was rated for "all legal loads" by the State Bridge Depart ment. During the period of to. river traffic had virtually dis- appeared and the draw bridge opening v/as needed only once or twice in k to 6 years.
Several rather severe accidents occurred to damage the bridge and load limits were established periodically until repairs were completed. The dolphins continued to catch debris and log jams each year of heavy river flows and the County Forces would dislodge the debris as the need arose. in March the County commenced efforts to replace the bridge and replacement commenced in July Prior to completion of the "project and removal of the bridge, the County will preserve the record of this structure as follows: 1. Provide archival 1y processed photographs and negatives of the existing structure and of the "repair" project of plans. 2. Preserve the entire turning mechanism and appurtenances in the State Park in Colusa. 3.
Preserve the bridge house and decorative and ornamental iron work in the City of Williams historical facility. The Colusa Bridge has had a major influence on the growth patterns and development of the Colusa area and has played an essential roll In Colusa history.