El Capitan Bridge, Spanning Merced River on El Capitan crossover road, Yosemite Village

El Capitan Bridge, Spanning Merced River on El Capitan crossover road, Yosemite Village, Mariposa County, CA. Surveyed as HAER CAL,22-YOSEM,22-, with a 3,219-word written history.

From the record

“El Capitan Bridge exemplifies the National Park Service rustic style" of architecture.”

Written record, HAER CAL,22-YOSEM,22- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,22-YOSEM,22- · the record runs 3219 words · one of 124 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

80 words

Source document Quoted word for word from HAER CAL,22-YOSEM,22-. Not written, edited or summarised by this site.

This bridge carries the El Capitan Crossover Road over the Merced River, approximately 2.5 miles southwest of Yosemite Village in Yosemite National Park, Mariposa County, California. QUAD: EL CAPITAN, CA UTM: Date of Construction: Designer and Builder: Designed by the Bureau of Public Roads, U.S. Department of Agriculture. Contractors: Sullivan & Sullivan; later Kuckenberg & Wittman. Original and Present Owner Yosemite National Park, National Park Service. Structure Type: Steel girder and reinforced concrete bridge faced in logs FHwA Structure No.:

Written history

3064 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,22-YOSEM,22-. Not written, edited or summarised by this site.

This document was prepared as part of the Yosemite Roads and Bridges Recording Project, conducted by the Historic American Engineering Record in summer Richard H. Quin, Historian El Capitan Bridge HAER NO. CA-101 DRAFT Page 2 II. HISTORY OF EL

Capitan Bridge

El Capitan Bridge, spanning the Merced River in the middle of Yosemite Valley, appears to be constructed of massive redwood logs supported by bold masonry piers and abutments; actually, the structure is largely of structural steel and reinforced concrete construction, faced with native materials in the rustic style of architecture then prevailing for park structures. The bridge is a three-spanned structure, in length, constructed on a frame of steel I-beams supporting a reinforced concrete deck. The bridge rests on masonry abutments and two masonry piers. The piers and abutments are constructed of smooth boulders (taken in part from the river bed) and rest on poured concrete footings set over wooden pilings.

The stones used are generally from 12 to 14 in height and from 1a to 49 in length and are set with their weathered surfaces exposed. They are bedded in mortar with the 1 to 1 1;2 joints raked out at least 1 deep. The steel I-beams that carry the main load of the bridge are masked from view by 42 diameter redwood log stringers supported on 42 sills resting on the abutments. These logs are not purely decorative, but help support the sidewalks/bridle paths on the sides of the deck. The concrete deck is covered with 9 of asphalt at the crown and has two expansion joints, each 1 wide, over the piers. 1 The first El Capitan Bridge was a 90' iron truss structure located about a mile downstream of the present bridge.

When siting this structure, the ancient El Capitan moraine was blasted out to alleviate some flooding problems. (This was the first major alteration to the Valley landscape.) Originally called the Lower Iron Bridge, by the structure had taken its present name after El Capitan, the great granite monolith above. 2 This bridge was destroyed by heavy snow loads in the winter of and its wreckage lay in the river for many years. Its replacement was a wooden truss bridge, designed with low sides so as not to obstruct the view for passengers in carriages. 3 The bridge's floor was replaced in 4 In Maj. William W.

Forsyth, Acting Superintendent of the park, stated that the El Capitan Bridge over the Merced River near El Capitan is now in a precarious condition and if not replaced soon by a new one will have to be closed for travel. 5 The bridge was finally replaced in by new combination wood-and-steel Pratt through truss bridge with a total span of The end posts and upper chords were hewed 12 x16 timbers, and the lower chords were paired 9 channel irons. The structure rested on solid concrete abutments. It was constructed by the California Construction Company of San Francisco at a cost of Costs borne by the Government for haulage and building of approaches brought the total price to The new bridge had a capacity of 12 tons.

6 The south truss of the bridge failed in April and the structure was closed to traffic. As the National Park Service had five years previously contracted with the Bureau of Public Roads for the construction of new roads and road structures within the park system, the BPR was asked to oversee the construction of a replacement bridge. Surveys for the new structure were conducted in the summer of and test piles were driven in August. Plans for the bridge were drawn up in by the Bureau' s San Francisco district office and the National Park Service's landscape architecture division. 7 The BPR engineers designed the structure, and the NPS landscape engineers prepared the sheets of architectural details for the rustic-style structure. El Capitan Bridge HAER NO.

CA-101 DRAFT Page 3 The old El Capitan Bridge Road was removed in spring the work being completed in May. The old bridge abutments were taken out and the river bank was landscaped. Removal of the structure cost obliteration of the bridge site another and removal of the north portion of the road cost 8 However, the old road route can be traced. The present bridge is located about a mile upstream. The contract for the building of the new bridge was combined with a contract for the construction of a new Stoneman Bridge (HAER No. CA-95] farther up the river. Bids for the new bridges were opened at the San Francisco district office of the Bureau of Public Roads on 20 October and the firm of Sullivan & Sullivan was awarded the work on 10 November.

The Oakland, California contracting firm had submitted the low combined bid of By late November, the contractors had established a construction camp at the base of Bridalveil Fall, a site that had been used for other Valley road and bridge projects. They opened a new quarry site near the power house dam on the El Portal Road. 9 Stone from this quarry was also used in the construction of Stoneman Bridge (HAER No. CA-95]. Specifications on the construction drawings indicate that the bridge was designed for a dead load of 150 per cu. with a an allowance of 15 per sq. ft. for future paving. The live load for the roadway was rated for three typical 15-ton trucks plus 30 percent for impact. The sidewalks and bridle paths were rated for 65 per cu. ft.

The specifications estimated the following materials would be required for construction: Class A Concrete 435 cu. Class D Concrete . . . . . 100 cu. Class s Concrete . 170 cu. * Reinforcing Steel . Structural Steel . . . . . Masonry . . 530 cu. Piling . . . . . . . . . . . . . lin. ft. Untreated Timber 42 diameter Redwood Logs . 375 lin. ft . Timber Rail . . . 350 lin. ft. Wet Excavation (Removed) . cu. Dry Excavation (Removed) . . . . 420 cu. 10 The roadway slab was to be poured with Class D concrete. Substructure work was to use a Class A mix, except for the seals, which would use a special Class s concrete. The reinforcing steel were to be deformed bars. Sawed timbers were to be prime structural redwood, and the pilings were to be local Douglas fir or cedar.

All hardware was to be galvanized. 11 Actual work on the bridge began on 5 January with the building of coffer dams for the piers. These dams proved to be poorly constructed and were placed by equipment too light to drive them into the rocky river bed, so the project met with delays while heavier equipment was brought in. The quarrying for the stone for the masonry piers and abutments was carried out by a subcontractor, Kelly & Tipton; this work was underway with good progress by late January. In addition to the rock taken from the quarry, some boulders were used in the masonry piers and abutments; these were taken from the El Capitan moraine at the old bridge site a mile downstream.

12 * Classes of concrete ref er to the amount of Portland cement used in the mixture, with Class A having the highest proportion and so on. Class s concrete was a special mix used for the bridge seals. El Capitan Bridge HAER NO. CA-101 DRAFT Page 4 To make up for the late start and early delays in the project, Sullivan & Sullivan went to two shifts, but produced no better results. Similar delays were encountered on the Stoneman Bridge project. T. M. Roach, the resident engineer for the Bureau of Public Roads, was convinced that the firm had little experience in the building of bridges, especially in foundation work. On 20 February he terminated their contract; the work on the two bridges was only 6 percent complete.

13 The National Surety Company, which had issued bonds for Sullivan & Sullivan, was called upon to complete the work under the contract. They engaged the Portland, Oregon construction firm Kuckenberg & Wittman (who had submitted the second lowest bid for the project) to perform the remaining work. Kuckenberg & Wittman began work on both bridges on 21 March. As the two planned piers were both in the river, caissons were employed in the excavation of their footings. These were put in place in March At the same time, wooden piles were being driven for the falsework. On 19 April, workers began excavation for pier #2. Soon afterwards, spring floods carried off the f alsework. A coffer dam was put in place in May so that work could resume on pier #2.

Another round of flooding in June delayed work on the pier until July 14 Construction of the bridge remained plagued with such setbacks. Walings and a cofferdam for the construction of abutment #1 were started on 13 June. The remaining piles for the bridge were driven in July, and work began on the abutments. By summer's end, abutment #1 was complete except for the masonry veneer, and footings for abutment #2 and pier #2 were being constructed. The placing of the masonry facing, under subcontractor Kelly & Tipton, commenced in the fall, and by November, the bridge seats had been placed and the steel I-beams, made by Bethlehem Steel and supplied by the Mcclintic-Marshall Company of San Francisco, had arrived. The steel was then put in place and the concrete deck was poured.

The concrete was comprised in part of a course aggregate made from diorite (a veined granite) taken from the excavation of the Wawona Tunnel, and sand from a pit in Leidig Meadow. By the end of the month, the contractors were ready to place the redwood log stringers. These logs, which were supplied by the Hammond Lumber Company of Eureka, California, were placed in notches carved in the wooden sills and supported by 12 diameter log braces and attached with 1 diameter anchor bolts. The seven-foot sidewalks/bridle paths, comprised of 2 x6 laminated wooden lumber topped by of asphalt, were laid by the end of the year.

Redwood guard rails, consisting of an a rail set 2' over a 12 log sill, extending between 24 diameter post at irregular spaces and supported by 6 dowels and 15 interval posts, were built along the sides. 15 The project was completed and accepted on 8 January representing an overrun of a full 170 days. The bridge still had not been paved; this work was to be done by day labor under supervision of the Bureau of Public Roads. Due to the onset of winter weather, no more work was done until early spring. 16 Backfill for the approaches was placed in March and April, and paving commenced. The paving work was completed on 27 May and the bridge was opened to traffic.

17 Rip-rap to protect the river bank around the bridge came from border stones that had originally been placed along the Valley roads in the neighborhood of Camp Curry and Yosemite Village to deter motorists from driving in the meadows; Superintendent Charles Goff Thomson had found the appearance of these El Capitan Bridge HAER NO. CA-101 DRAFT Page 5 stones annoying, and ordered them moved and used at the bridge.* To hide some of the damage to the river bank caused by the bridge construction, Emergency Conservation Works personnel landscaped the approaches in planting willow switches and seeding native plants. 18 Following the bridge's completion, eight new road signs were placed to mark the new El Capitan Crossover.

19 Severe flooding on the Merced River on 11 December tore the guard rail and log sides off the bridge; these were replaced in May The logs were again replaced in or and at about this time, the wooden guard rails were replaced with aluminum rails to the general detriment of the bridge' s appearance. The wooden sidewalks were covered with asphalt. El Capitan Bridge was resurfaced in the fall of by Harm Brothers Construction Company. The hot plant mix was obtained from the Mariposa Sand and Gravel Plant at El Portal. The surface treatment was part of a larger contract that also included the paving of the Wawona Tunnel and the lower part of the Glacier Point Road between Chinquapin Flat and the entrance to the Badger Pass Ski Area.

21 After heavy flooding in late the north approach to the bridge was raised to avoid future high water. Park superintendent Thomson had urged that the new El Capitan Bridge be built to resemble a log bridge, as he felt that the further construction of stone arch bridges in the Valley would seem repetitious (although he oversaw the construction of the stone-arched new Stoneman Bridge at about the same time).

The new El Capitan Bridge is constructed of steel and reinforced concrete, but the stone piers and abutments and the log stringers on the sides give the bridge the appearance of being built from native materials, making the structure a powerful example of the National Park Service's rustic style of architecture, which dictated that buildings and structures be constructed to harmonize with the natural surroundings. *Border stones are again being used in some places around the Valley to deter vehicles. El Capitan Bridge HAER NO. CA-101 DRAFT Page III. ENDNOTES 1.

Bureau of Public Roads, El Capitan Bridge, Yosemite National Park Project construction drawings RG 276-A, sheets 1-4 & 6, July and National Park Service Landscape Division, El Capitan Bridge, Yosemite National Park, architectural plans, 22 August Copies in Park Landscape Architect's office, Yosemite National Park. Measurements confirmed by HAER field survey, June 2. George M. Wheeler, Topographical Map of the Yosemite Valley and Vicinity, U.S. Army Corps of Engineers, 10 November 3. Greene, I:69n. 4. Ibid., I:416. 5. William W. Forsyth, Major, Sixth Cavalry, Report of the Acting Superintendent of the Yosemite National Park to the Secretary of the Interior, (Washington, Government Printing Office, 8. 6.

Mark Daniels, Report of the Landscape Engineer of the National Parks, in Reports of the Department of the Interior, 2 vols. (Washington, Government Printing Office, I:850; Charles Goff Thomson, Superintendent, Yosemite National Park, Final Report El Capitan Bridge Removal, October 1 (copy in Yosemite National Park Maintenance and Engineering Office); Report of the Superintendent of the National Parks to the Secretary of the Interior, (Washington, Government Printing Office, David Shurfey, park Engineer's Report, in 6Report of the Superintendent of the Yosemite National Park to the Secretary of the Interior, (Washington, Government Printing Office, 24. 7. A. W.

Schimberg, Final Construction Report, Stoneman and El Capitan Bridges, Yosemite National Park, Mariposa County, California" (San Francisco, CA: Bureau of Public Roads, 11 May 2. 8. Charles G. Thomson, Superintendent's Monthly Report, May 10; Idem, Final Report 1. 9. Schimberg, Charles Goff Thomson, Superintendent's Monthly Report, October 8; Superintendent's Monthly Report, November 8; Superintendent's Monthly Report, December 7. 10. El Capitan Bridge construction drawing RG 276-A, sheet 1. 11. Ibid. 12. Schimberg, 13. Ibid., 6. El Capitan Bridge HAER NO. CA-101 7 DRAFT Page s_ 14. Schimberg, Thomson, Superintendent's Monthly Report, March 6; Superintendent's Monthly Report, May 7. 15.

Schimberg, Thomson, Superintendent's Monthly Report, July 10; Superintendent's Monthly Report, August 8; Superintendent's Monthly Report, October 7; Superintendent's Monthly Report, November 7; Superintendent's Monthly Report, December 9; BPR construction drawings RG sheets 6. 16. Thomson, Superintendent's Monthly Report, July 10; Superintendent's Monthly Report, August 8; Superintendent's Monthly Report, October 7; Superintendent's Monthly Report, November 7; Superintendent's Monthly Report, December 9. 17. Idem, Superintendent's Monthly Report, March 9; Superintendent's Monthly Report, April 9; Superintendent's Monthly Report, May 11. 18. Idem, Superintendent's Monthly Report, February 10. 19. Idem, Superintendent's Monthly Report, August 16. 20. Lawrence C.

Merriam, Superintendent's Monthly Report, May lOf. 21. Harlan D. Unrau, Historical Overview and Assessment of Significance of Stone Walls and Rock Work Along Glacier Point Road in Yosemite National Park. (Denver, CO: National Park Service, Denver Service Center, January 37. El Capitan Bridge HAER NO. CA-101 DRAFT Page ~ IV. BIBLIOGRAPHY PUBLISHED GOVERNMENT DOCUMENTS Daniels, Report of the Landscape Engineer of the National Parks, in Reports of the Department of the Interior, 2 vols. Washington, Government Printing Office, Vol. I. Forsyth, William W. Report of the Acting Superintendent of the Yosemite National Park to the Secretary of the Interior, Washington, Government Printing Office, Greene, Linda Wedel.

Yosemite, The Park and Its Resources: A History of the Discovery, Management, and Physical Development of Yosemite National Park, California. 3 vols. Washington, National Park Service, Shurfey, David, park Engineer's Report, in Report of the Superintendent of the Yosemite National Park to the Secretary of the Interior, Washington, Government Printing Office, Report of the Superintendent of the National Parks to the Secretary of the Interior, Washington, Government Printing Office, Unrau, Harlan D. Historical Overview and Assessment of Significance of Stone Walls and Rock Work Along Glacier Point Road in Yosemite National Park. Denver, co: National Park Service, Denver Service Center, January UNPUBLISHED GOVERNMENT DOCUMENTS Bureau of Public Roads.

El Capitan Bridge, Yosemite National Park Project 1- B2. Construction drawings RG 76 A&B, Sheets 1-4 and 6, July Copies in Park Landscape Architect' s office, Yosemite National Park. Merriam, Lawrence C. Superintendent's Monthly Report, May National Park Service Landscape Division. El Capitan Bridge, Yosemite National Park. Architectural plans, 22 August Copies in Park Landscape Architect' s off ice, Yosemite National Park. Schimberg, A. w. Final Construction Report, Stoneman and El Capitan Bridges, Yosemite National Park, Mariposa County, California. San Francisco: Bureau of Public Roads, 11 May Thomson, Charles Goff. Final Report El Capitan Bridge Removal, October Yosemite National Park Maintenance and Engineering Office.

--Superintendent' s Monthly Report, May --Superintendent' s Monthly Report, October --Superintendent' s Monthly Report, November --Superintendent' s Monthly Report, December --Superintendent' s Monthly Report, January --superintendent' s Monthly Report, February El Capitan Bridge HAER NO. CA-101 DRAFT Page 9 --Superintendent' s Monthly Report, March --Superintendent' s Monthly Report, May --Superintendent' s Monthly Report, July_ --Superintendent' s Monthly Report, August --Superintendent' s Monthly Report, November --Superintendent' s Monthly Report, December --Superintendent' s Monthly Report, March --Superintendent' s Monthly Report, April --Superintendent' s Monthly Report, February Wheeler, George M. Topographical Map of the Yosemite Valley and Vicinity. U.S.

Army Corps of Engineers, 10 November SECONDARY

Sources

Sargent, Shirley. Galen Clark: Yosemite Guardian. San Francisco, Sierra Club,

In context

Mariposa County, California 179 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Mariposa County

24 of 123 records shown

The federal survey recorded these other structures elsewhere in Mariposa County. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Yosemite National Park Roads & BridgesHAER CAL,22-YOSEM,5-61,713 words
Ahwahnee HotelHABS CA-283053,778 words
Ahwahnee HotelHABS CA-2830-B23,148 words
Camp CurryHALS CA-6522,874 words
Ahwahnee HotelHABS CA-2830-C21,781 words
Ahwahnee HotelHABS CA-2830-A21,698 words
Wawona RoadHAER CAL,22-WAWO,4-12,883 words
Big Oak Flat RoadHAER CAL,22-YOSEM,29-11,999 words
Yosemite Hydroelectric Power PlantHAER CAL,22-YOSEM,4-10,292 words
Wawona HotelHABS CAL,22-WAWO,1-8,556 words
All Year HighwayHAER CAL,22-ELPOR,1-8,260 words
Glacier Point RoadHAER CAL,22-YOSEM,10-6,292 words
Yosemite MuseumHABS CA-28094,975 words
Coulterville RoadHAER CAL,22-YOSEM,28-4,927 words
Sweetwater Gold MineHAER CA-2281-A4,915 words
Wawona TunnelHAER CAL,22-YOSEM,26-4,803 words
Sweetwater Gold MineHAER CA-22814,787 words
Wawona Covered BridgeHAER CAL,22-WAWO,5-3,748 words
Chinquapin Service Station & Lunch RoomHABS CAL,22-WAWO,2-3,510 words
Sweetwater Gold MineHAER CA-2281-B3,188 words
Tenaya Creek BridgeHAER CAL,22-YOSEM,19-2,497 words
Tamarack Creek BridgeHAER CAL,22-YOSEM,12-2,480 words
Cascade Creek BridgeHAER CAL,22-YOSEM,13-2,447 words
Sentinel BridgeHAER CAL,22-YOSEM,15-2,378 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,22-YOSEM,22-. United States federal work, no copyright under 17 U.S.C. 105.