Dolores Mellon, for Architect Milford Wayne Donaldson, FAIA, Inc. NATIONAL CITY ~NT"A fiiE DEPOT (California Southern Trancontinental Terminus Depot) HASS No. CA-2654 (Page 2) PART I. HISTORICAL INFORMATION A. Physical History: 1. The California Southern Transcontinental Terminus Depot is a two-story wood structure erected upon a concrete foundation. Built in the structure originally functioned as both a passenger and freight terminal until it was converted to accommodate only freight, in which capacity the depot survived until the Although marred by recent additions, the building retains most of its historic fabric and stands on its original site, adjacent to National City's still active rail line. 2. Architect: Not known. 3.
Original Property Owner: Frank A Kimball, a builder and contractor from New Hampshire. 4. Builder: W.A. Stratton 5. Original plans and construction: The building was designed in Italianate style of architecture exhibiting a low-pitched hop roof with widely overhanging eaves and decorative brackets, tall, narrow windows, double doors and belt course, all typical of the style. The contract for the structure awarded to builder W.A. Stratton was 6. Alterations and additions: Numerous alterations and additions have occurred throughout the building's history. Major alterations are listed below, in approximate chronological order: a. Two small windows were added to the east side (c. b. The wood depot platform and floors were removed, the floor was replaced with concrete (date unknown). c.
Two door openings on the west side were modified for the addition of a box car vintage) that served as restrooms when the building was a restaurant (c. d. One second story window on the west side was removed to allow a door to be added as a fire exit to a steel fire escape platform and stairs (c. e. Two first story doors on the northside were modified for the addition of a one story, wood frame building and boxcar. The addition was used as a kitchen and the box car was used for refrigerated storage when the building was a restaurant (c. NATIONAL CITY SANTA FE DEPOT (California Southern Trancontinental Terminus Depot) HASS No. CA-2654 (Page 3) f. First story siding on the east side was modified by addition of vertical siding over original siding (c. B.
Historical Context: On June 15, Frank A. Kimball, a builder and contractor from New Hampshire met with Francois Pioche, the owner of Rancho de la Nacion. Kimball had moved west in first settling in San Francisco where he and his brothers enjoyed immense success in business. However, due to ill health, Frank had to seek warmer climates, and in he traveled to San Diego. While in San Diego, Kimball had the opportunity to view Rancho de la Nacion fronting on San Diego Bay. It was Kimball's belief that the rancho, with its miles of coastline and favorable climate, would be an ideal location for a new city. The rancho, an original Spanish land grant, had changed hands several times prior to Francois Pioche's ownership.
Kimball purchased the land which included acres and six miles of waterfront from Pioche for and renamed his acquisition, "The National Ranch". Located immediately below the City of San Diego on the San Diego Bay, National City was laid out on the National Ranch in by the Kimball brothers. The city grew slowly at first with a small boom in the spurred by the announcement that the Texas and Pacific Railroad was to locate its terminus there. Some grading was started before this early effort was crushed by the Central/Southern Pacific's "Big Four" and a national depression. The Southern Pacific's directors Governor Leland Stanford, Collins P.
Huntington, Charles Crocker and Mark Hopkins, known collectively as "The Big Four", had publicly stated their intention to never allow a competing railroad into California. Through manipulation and political maneuvering the Southern Pacific was very successful in their efforts for many years. Like many far-sighted businessmen during this era, Kimball recognized that his hopes for the creation of a permanent settlement in National City depended upon his ability to procure a railroad link for his fledgling city. As early as Kimball corresponded with railroad officials in an attempt to interest them in his plan.
Kimball ascertained that his best hope for success lay with the Atchison, Topeka and the Santa Fe Railroad Company which was determined to run rails from the East Coast to the Pacific Ocean, but had not yet committed to a specific area for their West Coast terminus. Kimball had been corresponding with Tom Nickerson, president of the Santa Fe, since March of It would take another full year of negotiations, however, until the Santa Fe organization would agree to a separate railroad. The California Southern Railroad was chartered on October 12, by the stock holders of the Santa Fe Railroad.
The board of directors of the California Southern Railroad was identical to the board of directors of the Santa Fe Railroad with the exception of Frank Kimball, who sat only on the California Southern Railroad's board of directors. The Santa Fe was attracted to the San Diego area and National City in particular for many reasons, chief among them was that San Diego Bay was one of the finest natural harbors in the world, and second only to the San Francisco. All that was needed was a transcontinental railroad. The West Coast terminus was to be located in National City in an arrangement worked out with NATIONAL CITY SAN"FA FE DEPOT (California Southern Trancontinental Terminus Depot) HABS No. CA-2654 (Page 4) the Kimball brothers who owned the acre National Ranch fronting on San Diego bay.
The agreement called for the Kimball brothers to give the Santa Fe in cash, acres of land, and 486 lots in National City. The land that was given to the Santa Fe included three miles of bayfront. This bayfront land was crucial to the Santa Fe in their competition with the Southern Pacific as they wanted to have the closest port on the West Coast to service the east as well as a shipping point to the orient for the terminus of their transcontinental railroad. The terminus facility (Station) was crucial to the Santa Fe's efforts to break up the Southern Pacific's strangle-hold monopoly of the transportation of goods and people in the State of California.
The Santa Fe decided the best course of action was to have the materials, including locomotives for the railroad, delivered by sea to the terminus grounds surrounding the Station, and to construct the railroad north and east from National City to meet up with the Atlantic and Pacific Railroad (controlled by the Santa Fe) then building across Arizona.
A large wharf was constructed by the Santa Fe at the National City terminal and grading was begun on December 20, The first rail was laid at National City in June of In July of that year, the San Diego Union reported that the California Southern Railroad had spent approximately towards the building of the railroad with the bulk of the funds spent in the San Diego Bay region, "giving work to anyone who wants to work, increasing the value of real estate, building wharfs, etc." The first locomotive was unloaded at the National City wharf on July 13, The Southern Pacific was vigorous in their efforts to stop the work on the Santa Fe railroad. They refused to allow the California Southern to cross their tracks at Colton, California.
A crossing frog was constructed at the terminal grounds to be installed at Colton. The Southern Pacific obtained a court order to stop the installation of this crossing frog and sent a deputy to National City to confiscate it. When he retired to a hotel room for the night, the California Southern loaded the crossing frog onto a flat bed and transported the crossing to Colton. The Southern Pacific kept three engines continuously moving over the location to prevent use of the crossing. The Santa Fe prevailed in court and the first link was completed in California of the Santa Fe Route the Pacific. By October of the California Southern Station at National City was completed.
Service to Colton from National City began in August The Southern Pacific continued to do everything within its considerable power to block the Santa Fe's efforts to reach the Colorado River. Through dogged efforts and some deft business moves the Santa Fe was able to overcome the Southern Pacific and the first through transcontinental train left the National City Station on November 14, The first train from the east arrived on November 16, 9542hab&.ncdlhisl-klf.p-1\a NATIONAL CITY SJ\f<:JT'A'F'I! DEPOT (California Southern Trancontinental Terminus Depot) HABS No. CA-2654 (Page 5) PART II. ARCHITECTURAL INFORMATION A. General Statement: 1.
Architectural Character: The building was designed in the Italianate style of architecture exhibiting a low-pitched flat topped hip roof with widely overhanging eaves and decorative brackets; tall, narrow windows; double doors and a molded string course, all typical of the style. 2. Condition of Fabric: There are very few changes to the Station externally for the recommended period of significance The greatest impact to the Station's original fabric for the period was the addition of the two small windows on the east side (c. the wood platform and floors were removed and replaced with concrete (date unknown), and two door openings and one window opening were modified B. Description of Exterior: 1. Overall Dimensions: X 2.
Foundations: Northern portion of the building has a concrete slab on grade foundation. The southern portion of the building has a solid concrete foundation above grade. 3. Walls: The exterior of the building is horizontal simple drop wood siding (except addition of vertical siding to the first floor on the east side of the building). A molded string course runs around the building's exterior between floor levels. 4. Structural System, Framing: This two story wood framed building has (assumed actual) stud walls at 16" on center supporting the second floor and roof. Second floor framing is (assumed actual) joists at 16" on center running north/south.
Second floor ceiling is actual) joists at 32" on center, running easUwest with (actual) boards at 16" on center running north/south below the ceiling joists supporting a lath and plaster ceiling. NATIONAL CITY SAtHA FE DEPOT (California Southern Trancontinental Terminus Depot) HASS No. CA-2654 (Page 6) The roof framing is 77/a" actual) rafters at 32" on center running east/west with skip sheathing at 10" on center above the rafters supporting the roof. 5. Porches, Stoops, Balconies, Bulkheads: N/A (None) 6. Chimneys: This building has two brick chimneys. They are centrally located (east/west) in the building, one in the northern half of the building, the other in the southern half. The chimneys are distinctive with their corbel table tops and tall chimney stack.
Each chimney also has two non-historic sheet metal spark arrestors. 7. Openings: a. Doorways and Doors: All historic doorways on this building have shaped pediments with central rosettes. The jamb casing actual) has a%" chamfer on both outside corners. The doorway was a two lite transom now replaced with plywood. The doors are four panel wood with miscellaneous non-historic hardware. b. Windows: All historic windows on this building are generally tall, narrow double hung and eight-paned. The windows have shaped pediments with central rosettes. The jamb casing or SW' actual) has%" chamfer on both outside corners. 8. Roof: a. Shape, Covering: The roof is a low-pitched (approximately flat topped hip roof.
Modern roofing (pre-1956) of a rigid diamond shaped mineral fiber shingle covers the original wood roof shingles. b. Cornice, Eaves: Widely overhanging wood eaves appear to be supported by paired decorative wood brackets surrounding the building. The eave contain an integral sheet metal gutter system that leads to round, exposed sheet metal downspouts at the building corners. NATIONAL CITY SAtff1<. FE DEPOT (California Southern Trancontinental Terminus Depot) HABS No. CA-2654 (Page 7) C. Description of Interior: 1. Floor Plans: a. First Floor: A large portion of original fabric remains in the interior. The original stairway is intact under the paneling.
The baggage, waiting and freight rooms have been altered to accommodate office space, as has the ticket office, all located on the first floor. The railroad's original safe remains and is in excellent condition. The brick walls of the safe are original and built in b. Second Floor: The second floor, which once housed the station master and his family in nine rooms, has been altered with new room partitions, the enclosure of original doorways, and the painting over, or covering with wood of most of the glass transoms. An original coal burning fireplace remains upstairs. When the depot was converted to a restaurant, a dumb-waiter was added to transport food from the first floor kitchen in the northeast portion of the building. 2. Stairways: The building has one central internal stairway.
All original woodwork is existing, covered by either non-historic carpet or on the balustrade, non-historic paint. Although a more detailed study is recommended, it appears that the interior wood risers were first covered with a clear varnish and then a white chalk paint, possibly a primer, then a light brown/beige paint, a pinkish-red paint, a lighter brown paint and finally the application of a chocolate brown paint. The stairway balustrade was first varnished and then covered in a very dark green paint which is found elsewhere in the interior. The balustrade was later covered in white paint, then follows the color paint pattern found on the risers. 3. Flooring: No original floors are currently visible.
Carpeting covers the concrete and wood floors on the first floor, except the exposed brick floor in safe. Carpeting covers the original fir floors on the second floor. 4. Wall and Ceiling Finish: All original wainscotting has been removed, and the plaster which once covered the brick walls has been removed, exposing the original brick construction on the ground floor. A suspended T-bar acoustical ceiling now covers the original wood lath and plaster ceiling on the first floor and a spray on acoustic ceiling has been applied on the second floor ceiling. Wood paneling and artificial brick veneer was added to some interior walls and stairways in the NATIONAL CITY SA~~+JAc FE DEPOT (California Southern Trancontinental Terminus Depot) HASS No. CA-2654 (Page 8) 5. Openings: a.
Doorways and Doors: The original metal safe doors are the only original doors remaining on the first floor. There are several original doorways and doors on the second floor. The original doors are four panel with redwood panels and sugar pine stiles. The original finish was varnish. b. Windows: The first floor has an assortment of historic and non-historic double hung windows. Tall, double hung windows provide ample natural light to the second floor of this building. Glass transoms would have originally brought natural light to the central hallway on the second floor but they have been painted over or covered with plywood. Window trim for most windows is simple (actual) jamb casing and head casing with 1" thick sill and (actual) apron. 6.
Decorative Features and Trim: A small amount of original trim remaining on the second floor. The two northern offices have a simple chair rail and picture rail that visually ties the windows and doors together. 7. Hardware: Very little original hardware remains. 8. Mechanical Equipment: a. Heating, Air Conditioning, Ventilation: None of the original system remains. Various non-historic additions have been made. b. Lighting: None of the original system remains. Various non-historic additions have been made. c. Plumbing: None of the original system remains. Various non-historic additions have been made. NATIONAL CITY ~N::PA: FE DEPOT (California Southern Trancontinental Terminus Depot) HABS No. CA-2654 (Page 9) d.
Fire Sprinkler System: A new fire sprinkler system has been added throughout the building. D. Site: 1. General Setting and Orientation: The site includes two box cars (c. vintage) that were imported and used by the restaurant for a restroom and storage facility during the early remodel. A non- historic storage building is attached to the Station. The storage building was the former kitchen during the restaurant remodel. 2. Historic Landscape Design: There is no evidence of any historic (or non-historic) landscape design. The entire site is covered with non-historic asphalt topping. 3. Outbuildings: There is no evidence of any historic outbuilding at the site.