BlockBefore

Merced Irrigation District, Edendale Creek Turnout & Weir, East of Snelling Highway, Hopeton

Merced Irrigation District, Edendale Creek Turnout & Weir, East of Snelling Highway, Hopeton, Merced County, CA. Surveyed as HAER CAL,24-HOPT.V,1-, with a 2,880-word written history.

From the record

“The Edendale Creek turnout and weir are locally important as original features of the Merced Irrigation District's Main Canal.”

Written record, HAER CAL,24-HOPT.V,1- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,24-HOPT.V,1- · the record runs 2880 words · one of 2 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

2782 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,24-HOPT.V,1-. Not written, edited or summarised by this site.

The Edendale Creek turnout and weir are locally important as original features of the Merced Irrigation District's Main Canal. The canal played a vital role in the economic and social development of Merced County from until Report Prepared by: Cindy L. Baker, Historian PAR Environmental Services, Inc. Street Sacramento, CA Date: January MERCED IRRIGATION DISTRICT, EDENDALE CREEK TURNOUT AND WEIR HAERNO.CA-192-A Page 2

Description

The Edendale Creek Turnout Structure is a reinforced concrete structure of feet in length and 24 feet in width with a concrete weir (CA-192-A-1) approximately 134 feet downstream. The present turnout reflects several modifications made since it was constructed in The most significant modifications involved reconstruction of the original wooden bulkhead with concrete (around the addition of a concrete roadbed over the structure and replacement of the original wooden gates The gate activators were replaced with salvaged cast iron activators in The original plan and construction methods are not certain. However the turnout modifications dating from as well as subsequent modifications, are detailed in Section II.

Two concrete gauging wells are located downstream approximately 120 feet from the structure. A concrete sharp-crested weir was constructed another 14 feet downstream. This document treats these features as auxiliary components of the turnout. On-site examination of the turnout, an analysis of engineering drawings and reports, and archival research indicate that the historical integrity of the original structure does not remain intact. The timber bulkheads were replaced with concrete in The original wooden decking was replaced with a concrete cap roadbed in The original wooden gates and gate structure were replaced with steel gates and iron I-beams in The gear housings were replaced with modern housings in Virtually nothing remains of the original timber construction.

Architectural and Engineering Information

Turnout Structure The Merced Canal and Irrigation Company constructed the Edendale Turnout structure in The structure was part of an extensive system of canals and tunnels and was one of numerous turnouts allowing releases from the main canal, appropriately known as the Main Canal (see Figure 1, Page 9). Work on the system began in The canal crossed Edendale Creek in (see Figure 2, Page A turnout would have been needed to allow continued flow into the creek and prevent flooding from damaging the canal. At the time it was constructed, the turnout at Edendale Creek was a minor feature of the system and was not noted in contemporary maps and reports. The original turnout probably consisted of four gates held in place by timber bulkhead.

This original structure was apparently replaced with reinforced poured-in-place concrete (CA-192-A- 3) in (Abrahamsen Dockweiler This concrete bulkhead acted as a gate in the levee embankment along the Main Canal (CA-192-A-6). Two one-foot-thick concrete walls extended from the gate structure approximately 15 feet into the Main Canal and then downstream from the gates about 19 feet, preventing erosion along both sides of the embankment. A concrete apron prevented erosion beneath the structure. These walls were MERCED IRRIGATION DISTRICT, EDENDALE CREEK TURNOUT AND WEIR HAERNO.CA-192-A Page 3 stepped at the top and each was capped with a 4-foot-wide and 7.5-inch-thick concrete slab. Two wing walls flanked the downstream opening of the turnout.

These walls were 5.5 feet in height and were imbedded into the bank. Between the two exterior walls, three 10-inch-thick poured-in-place concrete piers with beveled leading edges held the gates in place. The piers were 4 feet, 7 inches apart on center. The center pier maintained a height of 11 feet for 11 feet downstream from the gates, while the two walls around it were 11 feet tall for approximately four or five feet from the gates then dropped at a 45 degree angle to the concrete floor of the structure. This configuration remains intact today. The original wooden gates were four feet in width and of unknown height, although their modern steel replacements are 5 feet 8 inches tall.

The wooden gates were held in place in channels formed in the concrete walls during the construction of the concrete bulkheads in The modern steel gates travel in steel brackets cemented to the walls along the old channels. The walls were 3 feet 9 inches apart. Each gate was operated independently. The gate was raised or lowered using a gear that turned the gate stem. This configuration remains intact today. There is a 2-foot 3-inch-wide catwalk (CA-192-A-5) attached to the upstream side of the turnout. The catwalk is 19 feet, 7 inches long and protected with a hand railing made of 2-mch-diameter pipe. The catwalk does not appear to date to the original construction date of # Two stilling wells were constructed approximately 136 feet downstream from the gates.

They were both 2.5 feet in diameter vertical cylindrical concrete structures. The one nearest the streambed still contains a measuring scale. It was formed with an inner lip to hold a cover in place around the mouth of the structure. The other well, higher up the bank is much deeper and probably used to measure the creek in flood stage. It does not have a measuring scale. It was formed with an outer lip to hold a lid that would fit inside the concrete structure. Approximately 14 feet downstream of the wells and 150 feet downstream from the gates, a sharply-crested concrete aggregate weir slows the flow into Edendale Creek (CA-192-A-8, CA- 192-A-9, CA-192-A-10).

Concrete walls (CA-192-A-2), 10 inches thick, were attached to the top of the weir and extended into the bank to channel the flow and prevent erosion. This structure was probably built around as wall thickness and construction techniques are identical to the concrete turnout bulkhead. Modifications In the Merced Irrigation District constructed a concrete deck on the structure to create a roadbed (CA492-A-4). The center pier was extended another eight feet in length to support an 8.5-inch-tall concrete cap. A 9-inch-tall concrete curb was formed on the downstream side of the new roadbed (MID MERCED IRRIGATION DISTRICT, EDENDALE CREEK TURNOUT AND WEIR HAERNO.CA-192-A Page 4 Modifications In the Merced Irrigation District replaced the original gates with steel replacement gates.

They were placed in tracks cemented to the original piers. In the earlier pedestal base-type activators (or actuators) were replaced with cast-iron salvaged gear housings with plastic pipe extending upward to serve as gate stem protectors (Abrahamsen (CA-192-A-7). A new structure made of welded salvaged I-beam was bolted to the original concrete walls and piers (MID The five vertical members are 9 inches by 9.5 inches wide and 38 inches tall on the upstream elevation. The three central members are bolted to the original piers and are capped with and welded to horizontal 6-inch by 2-inch beams. The activators sit on top of the horizontal beams. III.

HISTORICAL INFORMATION Merced Irrigation District History Initial irrigation efforts using water from the Merced River began around along the river bottom lands (Outcalt Small embankments, constructed at low spots along the river as flood prevention methods, protected farmland but also created a need for irrigation. Small farm ditches, used to cultivate alfalfa, corn, field vegetables, garden produce and fruit, extended from the river to the bottom lands in the (Elliott and Moore While the land was convenient to irrigate, it was also recognized that the eastern Merced County plains contained fertile soil only lacking an adequate water supply. William G.

Collier envisioned the first large-scale plan for an irrigation system in Collier and two partners incorporated the Robla Canal Company in and built seven miles of ditches and a 1,580-foot-long tunnel to bring water from the Merced River to Canal Creek. From the creek, water was diverted to farm ditches until the creek emptied into the San Joaquin River (McSwain Outcalt Radcliffe The Farmers Canal Company, incorporated in bought out the Robla Canal Company in Their new system extended across Bear Creek, Mariposa Creek, and the Chowchilla River for about 50 miles including a diversion at Canal Creek and lateral branches and ditches off the main system. As a result, it irrigated a vast region of agricultural land (Elliott and Moore Outcalt Radcliffe Charles Crocker and C.

H.-Huffman purchased the Farmers Canal Company in at a loss to the latter company. Crocker and Huffman organized the Merced Canal and Irrigation Company (MCI) to operate the system. In they set about widening the old Robla Canal. In they built an additional five miles of the Main Canal heading southwest from Canal Creek. The Edendale turnout was likely constructed during this phase as the Main Canal crossed Edendale Creek. In a second 1,996-foot-long, timber-lined tunnel was started.

By the Main Canal had been completed to the Lake Yosemite reservoir site, which began to MERCED IRRIGATION DISTRICT, EDENDALE CREEK TURNOUT AND WEIR HAERNO.CA-192-A Page 5 fill on February 1, (see Figures 1 and 2, Pages 9 and 10) (Abrahamsen Lewis Publishing Company McSwain Outcalt Raddiffe In Crocker and Huffman incorporated the Crocker-Huffman Land and Water Company, which immediately ceded its holdings to the Merced Canal and Irrigation Company. Huffman, who owned considerable acreage within reach of the canal system, organized and led development and colonization in the area, resulting in an economic boom in Merced County. In addition to land sales and irrigation water, the Crocker-Huffman Company also provided a domestic water supply to the City of Merced.

This conduit was used from until when the City switched to wells and pumps for their daily water needs (McSwain Outcalt Radcliffe The Crocker-Huffinan Company continued in operation with little change to the system other than routine maintenance into the twentieth century. By the company was preparing for sale of the system. Part of their preparation included replacing deteriorating timber bulkheads on the Main Canal with concrete structures. In they hired J. H. Dockweiler, a consulting engineer from San Francisco, to prepare an appraisal of the physical works of the irrigation system.

His report placed the value at and contained engineering drawings, photographs, cost estimates, and detailed plans of typical headgates, side gates, bridges and other features along the canal (Dockweiler McSwain While the Edendale turnout was not specifically described, a photograph of a "Typical Flood Gate" depicts concrete abutments almost identical to those at the Edendale turnout.

Dockweiler also included plans of the Fahrens Creek Flood Gates (see Figure 3, Page 11) and noted that it was, "typical of renewals in and of old structures on Canal 1A [Main Canal] when timber bulkheads were replaced with concrete." This would seem to indicate a high probability that the Edendale Creek Turnout was replaced with concrete at the same time (Dockweiler The Merced Irrigation District (MID) was formed on December 8, in order to form a district capable of buying out Crocker and Huffman. The MID purchased the system, consisting of the canals, laterals, diversion dam, Lake Yosemite reservoir, and the company's water rights, for on January 18, This transfer included the Edendale Creek right-of-way.

MID immediately set to work making repairs and modifications to the system (Abrahamsen McSwain Outcalt Improvements continued for decades after MID's acquisition of the system. MID typically advertised for bids for these jobs in the local newspaper. If they received no bids, they did the work themselves. Periodic reports of MID to its Board of Directors list significant contracts awarded for these projects.

However the Edendale turnout improvements would likely have been listed under the commonly used heading of "small diversions" and were not mentioned by name (MID MERCED IRRIGATION DISTRICT, EDENDALE CREEK TURNOUT AND WEIR HAERNO.CA-192-A Page 6 Replacement of original timber structures with concrete continued until the early In MID awarded a contract to Lloyd Terrell of Turlock to replace the original timber headgate on the Main Canal with a new concrete structure. In MID again hired Terrell to rebuild a combination floodgate and headgate at Fahrens Creek on the Main Canal.

Other improvements were put on hold until after World War II in (Abrahamsen McSwain Although efforts to expand the system included construction of new canals and a dam, MID did not alter the Main Canal or its lateral ditches. Over the next several decades, routine maintenance was completed on the system, but little alteration occurred (McSwain MID, the County, and local landowners that maintain the bridges have slowly been replacing the original wooden bridges with concrete structures. A letter dated March 18, for example, addressed the construction of a new concrete bridge at the Robinson Ranch location that year (Leachman Even with the above changes, the canal retains its historic appearance today.

The majority of the banks are earthen, although about one-third have been lined with concrete through the years. Four wooden bridges remain in place, as do the Canal Creek headgates. The Main Canal headgates were constructed in to and have not been changed, other than through conversion to a remote-controlled operation. Community History The Edendale Creek Turnout is significant to local history for its contribution to economic and social development as an integral part of the original Merced Canal and Irrigation Company's Main Canal. This company contributed greatly to the development of agriculture in the region and to the ultimate creation of a number of small farm-based residential subdivisions. IV.

PROJECT INFORMATION This documentation has been prepared at the request of MID, which is proposing to enlarge the existing Edendale Creek Turnout and replace the downstream weir. Three additional concrete bays will be constructed upstream on the Main Canal adjacent to the original four bays, which will remain in place. The channel downstream will be modified by excavating a 38-foot-wide and 120-foot length channel with an 18-inch layer of riprap over the cut slopes. A new reinforced concrete weir with wing walls will be constructed. Downstream, a new channel will be cut and lined with riprap. The Project Manager and photographer for the recordation was David DeVries of Mesa Technical of Berkeley, California. Cindy L. Baker of PAR Environmental Services, Inc.

was the Principal Investigator for the written documentation. The document is based on a previous MERCED IRRIGATION DISTRICT, EDENDALE CREEK TURNOUT AND WEIR HAERNO.CA-192-A Page 7 investigation conducted by PAR Environmental Services, Inc. reported in National Register of Historic Places Significance Evaluation, Main Canal Merced County, California V.

Sources

Abrahamsen, Eric Personal communication with Cindy L. Baker, PAR Environmental Services, Inc., Sacramento, California. Dockweiler, J. H. Report on the Reproduction Cost of the Crocker-Huffman Land & Water Company Irrigation System, Merced County, California, including maps, photographs, and engineering drawings. On file, Merced Irrigation District Office, Merced, California. Elliott and Moore History of Merced County, California. Elliott and Moore, Publishers, San Francisco, California. On file, California Room, California State Library, Sacramento. m Hall, William Detailed Irrigation Map - Merced Sheet On file, California State Archives, Sacramento. Leachman, J. Letter dated March 18, to Darrel Larimer, Merced Irrigation District regarding the replacement of a bridge across Main Canal.

On file, Merced Irrigation District Office, Merced, California. Lewis Publishing Company A Memorial and Biographical History of the Counties of Merced, Stanislaus, Calaveras, Tuolumne, and Mariposa, California. Lewis Publishing Company, Chicago. On file, California Room, California State Library, Sacramento. McSwain, Kenneth R. History of the Merced Irrigation District. Published by the Merced Irrigation District, Merced. Merced Irrigation District (MID) Merced Irrigation District to Dan Canny, Secretary, Bond Certificate Commission, San Francisco, August 7, On file, California State Archives, Sacramento.

MERCED IRRIGATION DISTRICT, EDENDALE CREEK TURNOUT AND WEIR HAERNO.CA-I92-A Page 8 Report to the Board of Directors of the Merced Irrigation District for California Bond Certificate Commission Order No. 47, Expenditures. On file, California State Archives, Sacramento. Concrete Deck on the Edendale Creek Headgate, Drawing No. September 10, On file, Merced Irrigation District, Merced. Edendale Creek, Check Structure (Head of Edendale Creek). Drawing November On file, Merced Irrigation District, Merced. Outcalt, John History of Merced County, California. Historic Record Company, Los Angeles. Radcliffe, Corwin History ofMerced County. A. H. Cawston, Publisher, Merced, California. Yep, Walter Letter from Walter Yep, Environmental Resources Branch, U. S.

Army Engineer District, Sacramento, Corps of Engineers, to Cherilyn Widell, State Historic Preservation A Officer, California State Department of Parks and Recreation, Sacramento, January 29, On file, Office of Historic Preservation, Sacramento. MERCED IRRIGATION DISTRICT, EDENDAXE CREEK TURNOUT AND WEIR HAER NO. CA-192-A Page 9

Figure Not Available

See field records for details Figure 1. Project Vicinity Map MERCED IRRIGATION DISTRICT, EDENDALE CREEK TURNOUT AND WEIR HAERNO.CA-192-A Page 10 Figure 2. Official Map of Merced County, Depicting Main Canal Alignment MERCED IRRIGATION DISTRICT, EDENDALE CREEK TURNOUT AND WEIR HAERNO.CA-192-A Page 11 5 flu T I I $ ! i D 1 O O I _J u. it sui a: I w z tu (K X !l & Figure 3. Plans for Timber Bulkhead Replacement for Concrete MERCED IRRIGATION DISTRICT, EDENDALE CREEK TURNOUT AND WEIR HAERNO.CA-192-A Pagel2 Figure 4. Site Map

In context

Hopeton, California The place record: every map, photograph and survey of this town.
Merced County, California 203 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Merced County

1 record

The federal survey recorded these other structures elsewhere in Merced County. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
San Luis Gonzaga AdobeHABS CAL,24-____,1-1,866 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,24-HOPT.V,1-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.