Butt Valley Dam Butt Valley Reservoir Road Caribou vicinity Plumas County, California U.S.G.S.: Caribou, Topographic Quadrangle, UTM Coordinates: Zone 10 (a) E, N; (b) E, N; (c) E, N; (d) E, N Date of Construction: modified in and Engineer: Stone and Webster and CM. Mardel and James D. Galloway Designer: Julius Howells Builder: Niels Schultz
Significance
3544 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HAER CAL,32-CARBU.V,1-.
Not written, edited or summarised by this site.
Butt Valley Dam was constructed during the development of North Fork Feather River hydroelectric power and was part of the overall system. The existing dam consists of the rock fill dam and the hydraulic-fill dam, connected by silt blankets laid in The dam was designed by Julius Howells, a key player in the development of the Great Western Power Company and of hydroelectricity in California. The dam has remained essentially unaltered since the connection. Report Prepared by: Tracy D. Bakic, Cindy L. Baker, and Mary L. Maniery Cultural Resource Specialists PAR Environmental Services, Inc. Street Sacramento, California Date: November BUTT VALLEY DAM HAER No. CA-189 Page 2 1.
Description
The Butt Valley Dam is located near the headwaters of the north fork of the Feather River, and its reservoir is one of the principal water storage facilities for PG&E's hydroelectric projects located on the Feather River (CA-189-3). The water released from Butt Valley Reservoir is used by PG&E for power generation at the Butt Valley Powerhouse, Caribou Powerhouse No. 1 and 2, Oakflat Powerhouse, Beldon Powerhouse, Rock Creek Powerhouse, Cresta Powerhouse and Poe Powerhouse. Butt Valley Reservoir serves as the forebay for the two Caribou powerhouses. A gate tender's residential complex, which includes a house, barn and shed, is located near the southwest edge of the reservoir (see HAER Nos. CA-189-A, CA-189-B, CA-189-C for information regarding the house, barn, and shed). II.
ENGINEERING INFORMATION The Butt Valley Dam is a hydraulic fill structure composed of a puddle core, two hydraulic slopes, and rock fill toes on the upstream and downstream sides. The dam has a total crest length of feet and a crest thickness of 25 feet. A concrete parapet wall extends along the top of the crest. The upstream slope is and the downstream slope has a ratio of 3 and Completed in for a cost of about the dam impounds water in a 75-mile-square drainage area and holds about acre-feet of water. Leakage in resulted in the Great Western Power Company laying four silt blankets on the upstream side of the dam. One of these extended from the crest of the old rock fill dam to the upstream slope.
Associated features of the dam include a concrete spillway, located on the south side of the dam (Maniery and Baker
Hi. Historical Information
Early Hydroelectric Development in California Hydroelectric generation began to take hold in California during the As high voltage transmission technology evolved, the transportation of electrical power over hundreds of miles became possible and development surged. No restrictions on energy prices had been instituted and, other than steam plants, the only fuel readily available was oil, which fluctuated radically in price. In response to this new hydroelectric technology and increasing interest in water rights, the State of California by passed laws to control water appropriation for power development. Soon after, the Railroad Commission Act created the public control of power rates, eventually evolving into the Public Utilities Commission (Hockett 1927:i; Means 8).
BUTT VALLEY DAM HAER No. CA-189 Page 3 Engineering firms on the East coast began developing operations in California around this time, including Boston-based Stone and Webster, who were active on the Truckee, Feather and American rivers and also worked as engineers for Southern California Edison on the San Joaquin River. Large municipalities soon began competing to acquire water rights on major rivers (Means along with five other northern California power companies, rushed to secure rights for hydroelectric development on rivers in northern California. GWP acquired important rights on the north fork of the Feather River and began plans to build power plants and reservoirs using these rights.
These plans included building a dam at Butt Valley (Hockett 1927:i; Means 8, 12; Shoup and Cornford Historically Butt Creek flowed through a long, narrow valley - Butt Valley - and plunged a thousand feet to the headwaters of the north fork of Feather River in the canyon below. Today the valley, with a drainage of 75 square miles, is dammed at its outlet, creating a reservoir known as Butt Lake (Galloway Butt Valley was occupied long before its development for hydroelectric operations. The community, which included a post office, hotel, store, a Chinese section, and eventually a school, was considered one of the liveliest spots in western Plumas County during the (Richards A number of families also operated dairies in the valley from the mid-1800s.
Some remained until their land was purchased by the Western Power Company at the turn of the century. Between and WPC acquired all of Butt Valley, over acres, for its hydroelectric operations there (Wickman Butt Valley had long been viewed a potential hydroelectric generation reservoir. On April 8, Augustus Bidwell filed a water appropriation notice with Plumas County for water from Butt Creek. This water would be conveyed to the Feather River Canyon near Caribou for a new horsepower hydroelectric plant to be constructed there.
WPC began clearing and burning timber and underbrush on the site and digging a tunnel and test pits on the center line of the dam to the 100 feet contour on both sides of the creek (Western Power Company Wickman In WPC began building one of the first dams on Butt Creek. The company began clearing and burning timber and underbrush on the site and digging a tunnel and test pits on the center line of the proposed Butt Valley Dam to the 100-foot contour on both sides of the creek. However, further construction was stalled until WPC had been reincorporated as the GWP (Western Power Company Wickman This reincorporation took place in (Coleman BUTT VALLEY DAM HAER No.
CA-189 Page 4 Great Western Power Company Dam As demand for electricity surged during the GWP began making plans to expand their power generation capacities. A small rock fill dam, upstream from the present dam, was built in in preparation for construction of the first Almanor Dam, also known as the Eastwood Dam (Geomatrix GWP built a small power plant at Butt Valley to provide power for hydraulic sluicing used to create Almanor Dam. The drainage area of Butt Valley consists of square miles. Ultimately, its principal water supply came from Lake Almanor once the Big Meadows Dam and tunnel was constructed (Jansen and Leps By GWP had enough men working in the Butt Valley area to warrant stationing a company physician there. Dr. Fred J.
Davis, and his wife spent a year there caring for the workmen, including the families of roughly 30 married workers. In the GWP had nearly 100 men working in the valley. They built a sawmill and a hydroelectric plant to power it. The GWP plant contained two generating units operated by two Pelton impulse wheels. Its power was used for construction from to and then sold to local mines after that (Wickman Water from Butt Creek was diverted to a 8,460-foot-long flume and then to a pressure pipe into the small power plant. The flume used the same bench carved by the old Cariboo Mining Company for their flume used in hydraulic mining.
This flume was over-structured with planks so that vehicles could drive on it (Kramar Siler Construction of Stone and Webster Dam Due to the continued demand for electricity, GWP decided to build the Caribou Powerhouse 12 miles downstream from Lake Almanor, powered with water from the lake conveyed through Butt Valley. Water from Lake Almanor was conveyed by tunnel to Butt Creek in Butt Valley. Tunnel 1, the Prattville tunnel, was feet long. The water flowed six miles through Butt Creek into the dam-impounded two-mile-long Butt Valley Reservoir. Water was then released from this reservoir into a penstock leading to the powerhouse. By the GWP owned acres of land in Butt Valley for the Butt Valley Reservoir, which would hold an expected capacity of acre feet.
Construction of the Caribou Powerhouse began in under the direction of Stone and Webster Company, an engineering firm from Boston, Massachusetts (see attached map depicting Caribou Powerhouse development) (Coleman Lippincott Shoup andCornford The first work phase included building construction supply railroads and 12 construction camps. Railroad construction consisted of building nine-and-a-half miles of branch railroad from the Western Pacific line at Listo (later renamed Howelis) to the Caribou powerhouse site. An additional 13 miles of narrow-gauge railroad near Butt Creek was built to supply lumber for BUTT VALLEY DAM HAER No. CA-189 Page 5 concrete forms and buildings. The latter railroad consisted of three lines connected by three incline railways.
This phase was completed by January (Shoup and Cornford The next phase included tunnel, powerhouse and dam construction, completed by the erection of the transmission line. The Butt Valley Dam was constructed to increase the capacity of a naturally existing reservoir. It was built in part using a hydraulic monitor to sluice rocks and dirt into the neck of Butt Valley and impound Butt Creek. The simple rock fill dam was 26 feet high, 40 feet wide at the top, and 110 feet at the bottom with an elevation at the top of the dam at feet above mean sea level (amsl). At one end of the dam was a 9-foot-wide electric sluice gate set in a reinforced-concrete gate house.
This gate served as the entrance to Tunnel 2 (Shoup and Cornford The GWP dam was located at the same site as the old Caribou Mining Company ditch diversion dam. The construction contractors for the dam, Stone and Webster, built their rock fill dam farther upstream when they began the Caribou powerhouse development. The Stone and Webster dam consisted of two rock fills made from materials excavated during tunnel construction with finer material sluiced between them to decrease permeability. They built a 7' 4" diameter concrete outlet pipe through the dam with a timber headgate. Its concrete spillway crested at feet amsl. Five-foot-tall flashboards set in place raised the reservoir elevation to feet amsl.
These flashboards were replaced in Unfortunately there were numerous leaks along the spillway sides and outlet pipe (Mardel When the GWP decided to improve the Butt Valley Dam again in more families left the valley. Cottages, barns, the local school and the Butt Valley Hotel were salvaged and burned. Windows and hardware removed from the hotel were used in constructing a new two-story caretaker's, or gate tender's, house at Butt Valley. A barn was also moved near the new house from the area to be covered by the rising reservoir. Ben Goon, a long-time GWP employee, and his family moved into the new house (CA-189-1, CA-189-2) (Kramar Quadrio (see HAER No. CA-189-A for information on the Gate Tender's Complex).
Great Western Power Dam Construction Caribou began operation on May 6, producing electricity for Oakland and the San Francisco Bay region. This production made GWP serious competition for PG&E's market in northern California. Within a few years, dry seasons forced water to be directed through the Almanor Dam to the Big Bend Powerhouse, instead of through Butt Dam to Caribou. Caribou had a greater head than Big Bend, but less generating capacity. GWP decided to install a third generator in Caribou to prevent that energy loss in the future. Additional work was also needed near the intake of the Prattville tunnel. Channeling in Lake Almanor was necessary to increase head pressure at Caribou 1.
Construction camps were set up for the workers needed to build the massive bulkheads and a channel feet long (Shoup and Cornford BUTT VALLEY DAM HAER No. CA-189 Page 6 This construction project, under the direction of C. M. Mardel, Chief Engineer for and consulting engineer James D. Galloway, included improving the Butt Valley Dam and reservoir to ensure a continued supply of water to Caribou, work that was completed in early (Geomatrix The dam designer was Julius Howells and the contractor hired for the project was Niels Schultz, owner of Schultz Construction Company of San Francisco. For Schultz agreed to build an hydraulic fill dam with a crest width of 20 feet at feet amsl. The spillway elevation was set at feet amsl.
The dam's upstream slope was 3:1 and downstream slope was 2:1 Mardel The contractor was given use of GWP property during the construction period. This included the GWP camp at Butt Valley and timber from the old Butt Valley Powerhouse flume, as well as use of the company's branch railroad. This camp was also known as the maintenance camp and included cottages on a plateau downstream of the dam near the spillway. The caretaker's cottage and a number of barns and outbuildings were located just to the west (Mardel The GWP prepared the dam site by grading one to one-and-a-half feet of soil in the puddle core area and removing all loose gravel and sand in the stream bed.
During this work, a four-inch- diameter vent pipe to the tunnel was discovered in the puddle core area on the west side of the dam. It was removed in when Tunnel No. 2 developed problems (Mardel 6). Schultz began work in June Construction consisted of conventional hydraulic sluicing fill grounded with upstream and downstream rock toes. The upstream toe began at the base of the previous rock fill dam built by Stone and Webster in (Geomatrix Mardel 4) and was ten feet wide at the crest with an upstream slope of The downstream toe had a slope of with a crest width of 20 feet. A road was graded on the top of the downstream rock toe. Howells placed six Goldbeck cells in the middle of the dam's puddle core at elevation feet amsl to determine how well it was solidifying.
Goldbeck cells are a cell with a diaphragm that makes an electrical contact when subjected to internal air pressure. The cells were made on site using plans published in the Proceedings of the Society of Civil Engineers. However, the cells were installed without proper drainage for condensation and provided unreliable records (Mardel The puddle core was made of fines predominately deposited under still water. The outer sections of the dam were called the stability sections and were made primarily of grit deposited under flowing water (see attached typical section of the Butt Valley Dam) 1923a). The new dam was faced on its water side with an 18-inch-thick layer of loose rock, known as rip-rap. The reservoir capacity was increased to acre feet.
This reserve of water was enough to run the Caribou system for 45 days without additional recharge from Lake Almanor. The spillway for this dam was built on the east abutment 12 feet below the dam's crest elevation of feet amsl. (Coleman Galloway Shoup and Cornford BUTT VALLEY DAM HAER No. CA-189 Page 7 # When the dam showed signs of seepage, engineers installed four hydraulic fill silt blankets on the upstream toe of the dam in Silt blanket No. 4 extended from the crest of the old rock dam to the upstream slope of the hydraulic fill dam.
Continuing concerns over seepage resulted in installation of a drain in along the east abutment below the dam (Geomatrix During December of workers installed a cedar log boom at the dam to stop driftwood from entering the intake tower (Siler In a bridge was built across the spillway of the dam (see attached site plan and typical section of the Butt Valley Dam and Spillway). Other than these changes, no significant structural changes have been made to the Butt Valley Dam (Jansen and Leps IV. SOURCES A. Engineering Drawings Anonymous Plan of Butt Valley Dam and associated structures and complexes. On file, PG&E, San Francisco, California. Great Western Power Company 1923a Topographic Map of Butt Valley Dam Site with Proposed Dam and Spillway (includes a typical cross-section of the dam.
It appears that a person by the name of Robarts drew the map. The map is dated June On file, Pacific Gas and Electric Company, San Francisco. Pacific Gas and Electric Company (PG&E) Butt Valley Dam and Spillway, Upper N. Fork River Project. On file, Pacific Gas and Electric Company, San Francisco. B. Historic Maps and Views Stone and Webster Caribou Development, Great Western Power Co., Stone and Webster, Boston (map). In Stone & Webster Journal, dated October On file, Meriam Library, California State University, Chico. C. Interviews Quadrio, Marilyn Personal communication with Mary Maniery, PAR Environmental Services, Inc., April 30, BUTT VALLEY DAM HAER No.
CA-189 Page 8 Siler, Harry Personal telephone communication with Cindy Baker PAR Environmental Services, Inc., May 13, Record of conversation on file at PAR Environmental Services, Inc., Sacramento. D. Bibliography Coleman, Charles M. P. G. andE: The Centennial Story of Pacific Gas and Electric Company, McGraw-Hill Book Company, Inc., New York. Galloway, J. D. Great Western Power Company. Report on the Design and Location of Tunnel 1-A between Lake Almanor and Butt Valley. San Francisco. On file, Water Resources Collection Archives, University of California, Berkeley, Correspondence with A. H. Markwart, Vice-President in Charge of Engineering, Pacific Gas & Electric Co., San Francisco, September 3, On file, Water Resources Collection Archives, University of California, Berkeley.
Geomatrix Interim Report: Lake Almanor and Butt Valley Dams: Summary of Existing Data. Geomatrix Consultants, prepared for Pacific Gas and Electric Company, San Francisco. Great Western Power Company Contract filed June 15, with Niels Schultz, Schultz Construction Company, San Francisco, for Construction of Butt Valley Dam. On file, Pacific Gas and Electric Company, San Francisco. Hockett, Hugh Report on the Pit River Development of the Pacific Gas and Electric Company. University of California, Berkeley. On file, Water Resources Collection Archives, University of California, Berkeley. Jansen, Robert, and Thomas Leps, Inc. Review of Safety of Butt Valley Dam. Prepared for Pacific Gas and Electric Company, San Francisco. On file, Pacific Gas and Electric Company Archives, San Bruno.
BUTT VALLEY DAM HAER No. CA-189 Page 9 Kramar, D. Glenn Activities in the Butt Creek Area, From to In Plumas County Historical Society Publication 11. Plumas County Historical Society. On file, Special Collections, Meriam Library, CSU Chico. Lippincott Personal correspondence and papers file. On file, Water Resources Collection Archives, University of California, Berkeley. Maniery, Mary L., and Cindy Baker National Register of Historic Places Evaluation of Butt Valley Dam, North Fork Feather River Hydroelectric System, Plumas County, California. Prepared by PAR Environmental Services, Inc. for PG&E. On file, California State Historic Preservation Office, Sacramento. Mardel, C. M. Great Western Power Company of California: History and Data by C. M.
Mardel On file, Pacific Gas and Electric Company, San Francisco. Means, Thomas H. Water Right Values - Pit River. On file, Water Resources Collections Archives, University of California, Berkeley. Peterson, O. W. Correspondence with J. H. Fagg, Pacific Gas and Electric Company, September 7, On file, Pacific Gas and Electric Company Archives, San Bruno. Box File: De Sabla Division, Butt Valley Dam to The Plumas County Historical Society "He Was A Good Guy: The Story of Ben Goon." In Plumas Memories, Plumas County Historical Society Publication No. 11, April 7, No.11 and 17, May reprint. On file, Plumas County Museum, Quincy, California. Richards, Verne "Activity Along Butt Crick" In Plumas County Historical Society Publication No.
11, April 7, On file Special Collections, Meriam Library, CSU Chico. Shoup, Laurence H. and Daniel Cornford The Caribou 1 Powerhouse: An Historic Overview and National Register of Historic Places Evaluation. Prepared for Pacific Gas and Electric Company, San Francisco. BUTT VALLEY DAM HAER No. CA-189 Page 10 Western Power Company Report of Construction at the End of October, Western Power Company, Prattville. On file, WRCA, University of California, Berkeley. Wickman, Bill Herman Man on the Lake Almanor Basin: A Study in Environmental Modification. Thesis, Chico State College. On file, Special Collections, Meriam Library, California State University, Chico. PART V. PROJECT INFORMATION PG&E is currently seismically retrofitting the Butt Valley Dam.
PG&E is recording the dam according to the HABS/HAER standards, and is filing documents with the State of California Office of Historical Preservation and the Western Regional Office of the National Park Service, San Francisco, California. This recordation has been prepared to meet those stipulations. This report was compiled by Tracy D. Bakic with historical text prepared by Cindy L. Baker, Historian and engineering descriptions prepared by Mary L. Maniery, Historian. Maps and graphics were prepared by Claire Warshaw. The preceding are all employees of PAR Environmental Services Inc., Sacramento. Photography was prepared by David DeVries, Mesa Technical, Berkeley, California.
The documentation is based on a previous investigation conducted by PAR Environmental Services entitled National Register of Historic Places Evaluation of Butt Valley Dam, North Fork Feather River Hydroelectric System, Plumas County, California BUTT VALLEY DAM HAERNo.CA-189 Page 11 Location Map of Butt VaUey Dam (USGS: Almanor and Caribou, CA, Topographic Quadrangle BUTT VALLEY DAM HAERNo. CA-189 Page 12 CARIBOU DEVELOPMENT GREAT WESTERN POWER CO STONEaWE8STER BOSTON Scale I--12000. October. ^MtDyer Mt.Keddie $% Map Depicting Caribou Powerhouse Development (Stone & Webster BUTT VALLEY DAM HAERNo. CA-189 Page 13 Map Depicting the Butt Valley Dam and Associated Elements, Including the Gate Tender's House, Shed and Barn (Anonymous BUTT VALLEY DAM HAER No.
CA-189 Page 14 Location Map and Site Plan (Inset) of Butt Valley Dam Gate Tender's Residential Complex (USGS: Caribou, CA, Topographic Quadrangle BUTT VALLEY DAM HAERNo. CA-189 Page IS # BUTT VALLEY DAM HAERNo.CA-189 Page 16 %** i5i Site Plan and Topical Section of the Butt Valley Dam and Spillway (PG&E
The federal surveyors worked through Caribou building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER CAL,32-CARBU.V,1-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.