Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville

Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville, Tulare County, CA. Surveyed as HAER CAL,54-SPRI.V,2-, with a 2,287-word written history.

From the record

“The Tule River Hydroelectric Project is significant for its contribution to the development of hydroelectric power which made possible the expansion of irrigated agricultural in the southern San Joaquin Valley, and for its association with A.”

Written record, HAER CAL,54-SPRI.V,2- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,54-SPRI.V,2- · the record runs 2287 words · one of 33 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

77 words

Source document Quoted word for word from HAER CAL,54-SPRI.V,2-. Not written, edited or summarised by this site.

On the Middle Fork Tule River in Sections 26, 27, 28, 29, 30, and 31 T. 20 S., R. 30 E., Section 36, T. 20 S., R. 29 E., and Section 6, T. 21 S., R. 30 E., Tulare County, California (UTM Coordinates in the western Sierra Nevada Mountain Range about 2 miles east of Springville, California, and 105 air miles north of Los Angeles. Dates of Construction: Builder: Globe Light & Power Company/Mount Whitney Power Company,

Significance

2121 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,54-SPRI.V,2-. Not written, edited or summarised by this site.

The Tule River Hydroelectric Project is significant for its contribution to the development of hydroelectric power which made possible the expansion of irrigated agricultural in the southern San Joaquin Valley, and for its association with A. G. Wishon who was both a founder of Mount Whitney Power Company and later, as president of San Joaquin Light & Power Company, Mount Whitney's bitter opponent and competitor. The Tule River Hydroelectric Project water conveyance system, although suffering significant alterations from the original, retains its historic setting and feeling of association with the past. Report Prepared By: Thomas T.

Taylor Southern California Edison Company Environmental Affairs Division Rosemead,CA Date: May r Tule River Hydroelectric Project Water Conveyance System HAER No. CA-216 (Page 2)

Description

The source of water to power the Globe Light & Power Company/Mount Whitney Power & Electric Company/Southern California Edison Company Tule River Hydroelectric Project is derived from the North (Doyle) and South (Nelson) Forks of the Tule River Middle Fork. Small concrete dams form the Project intakes and divert water into the water conveyance system. The dam on the North Fork is feet long (Photo CA-216-1); the South Fork dam is feet long (Photo CA-216-2).

A 377 foot long branch flume on the North Fork and a 673 foot long branch flume on the South Fork (Photos CA-216-3, CA-216-4) merge at the junction of the North and South Forks Tule River Middle Fork into a single water conveyance system (Photo CA-216-5) that carries a maximum of about 50 second-feet of water approximately six miles along the north side of the Tule River Middle Fork valley (Photos CA-216-6 and CA-216-7) to the concrete-lined forbay/settling basin at the head of the penstock (Photos CA-216-8, CA-216-9, CA-216-10). Elevation at the intakes is about feet, and about feet at the forebay for an average grade of (2 foot per feet) along the flume sections and (1 foot per feet) in the concrete-lined ditch sections of the water conveyance system.

The North Fork intake was originally 17 feet higher in elevation and 200 feet further upstream. It was changed to the present configuration when the San Joaquin Light & Power Corporation built its Tule River plant adjacent and upstream, locating the powerhouse to utilize the lost head in the Mount Whitney Power & Electric Company flume (Fowler As originally built, the wooden flume box was 4 feet wide and 3 feet deep, constructed of 12 x 1 Vi inch pine planks (Photo CA-216-11). The plank joints were sealed with 4 x Vt inch pine strips on sides and bottom, and a 2 x 2 inch triangular strip in each bottom corner (Fowler SCE Drawing The flume box was supported on pine bents, stringers, and trusses of mostly 4x6 inch and 2x6 inch lumber.

Flume support foundations were Vh x IVi x 1 inch stones, cedar footings, or at the North Fork crossing of the South Fork branch flume 1 in 12 inch battered, mortar-laid, dimension-rock piers (SCE Drawings and Flume sections of the original water conveyance system totaled about feet in length. The concrete-lined ditch sections are 4.5 feet wide on the bottom, feet wide at the top, and 3 feet deep (Photo CA-216-12). The concrete lining is on average 2Vi inches thick and is covered with a l/2 inch coat of gunnite (plaster). Concrete-lined ditch sections of the original water conveyance system totaled about feet in length. There was one inverted siphon on the original water conveyance system.

Located across Siphon Canyon about one mile northeast of the forebay, the buried 36 inch diameter siphon is constructed of lap-riveted no. 11 iron sheets and is 879 feet long. There is a 5 foot elevational difference between the siphon's upper and lower ends. Tule River Hydroelectric Project Water Conveyance System HAER No. CA-216 (Page 3) In the years all of the flume sections were rebuilt with 16 gage metal inch diameter "half circle" flume troughs suspended from pine bents, stringers, and trusses of primarily 6x6 inch and 2 x 6 lumber (Photos CA-216-13 and CA-216-14, SCE Drawings and The new flume sections were built in the footprint of the original, and at the North Fork crossing utilized one of the two original mortar-laid, dimensional-rock piers (Photo CA-216-3).

In a wild-fire destroyed the flume sections in an approximately 1.3 mile long segment of the water conveyance system above Coffee Camp Picnic Area. This portion of the water conveyance system was replaced by a "double-barrel" inverted siphon consisting of twin 30 inch diameter metal pipes approximately feet in length (SCE Drawings and There is a 7.7 foot elevational difference between this siphon's upper and lower ends. In the late steel hand-rails were added to the flume sections in compliance with federal Occupation Safety and Health Administration regulations. In October a wild-fire destroyed approximately feet of flume in the next canyon east of the double-barrel siphon. The burned flume was replaced with a 600 foot long inverted siphon.

The penstock drops the water from the forebay approximately feet to the powerhouse (Photos CA-216-15), The discharge water is returned to the Middle Fork of the Tule River upstream from the powerhouse by way of a foot long tailrace. The initial segment of the tailrace is a 220 foot long tunnel which passes under the original transformer room (now an office) (Photos CA-216-16 and CA-216-17) and in front of the operator's cottage (no longer extant) (Photos CA-216-18 and CA-216-19), finally emptying into a concrete-lined ditch which carries the water the remainder of the distance back to the Tule River.

Historical Context

Development of the Tule River's hydroelectric potential began in September of when, shortly after his departure from Mount Whitney Power Company in a dispute with principlestockholder John H. Hammond over direction of the Company, Albert G. Wishon1 filed 1 Albert G. Wishon, along with William H. Hammond and Benjamin M. Maddox founded Mount Whitney Power Company in with financial backing from Hammond's older brother, famed mining engineer John Hays Hammond, in order to develop a hydroelectric project on the Kaweah River (Myers Wishon's adamant urging of J. H, Hammond during to provide additional funding in order to expand Mount Whitney's generation capacity resulted in a irreconcilable split between the two and wishon's departure (ibid.:95). Wishon's bitter feelings toward J. H.

Hammond prompted him as manager of San Joaquin Power Company to block Mount Whitney's expansion by purchasing Tule River Hydroelectric Project Water Conveyance System HAER No. CA-216 (Page 4) for water rights and a powerhouse site on the Tule River Middle Fork (Snyder Also in a group of San Jose interests incorporated as the Globe Light & Power Company and began acquiring water rights and right-of-ways for another hydroelectric project on the Tule River Middle Fork (Fowler In Mount Whitney purchased the stock of Globe Light & Power and under the latter Company's name began construction in of the hydroelectric project (ibid.).

In September the plant was completed and put into operation and on November 8 of that year the properties of Globe Light & Power were deeded to Mount Whitney which re-incorporated under the name Mount Whitney Power & Electric Company (ibid.). Albert Wishon, seeking financing in Los Angeles for his Tule River power project, was offered the position of manager of the San Joaquin Power Company by William G. Kerckhoff and Allan C. Balch (Snyder & 2), at that time partners of Los Angeles real estate and interurban railroad developer Henry E. Huntington.

Under Wishon's direction, the Tule River hydroelectric plant on the San Joaquin Power Company was built slowly beginning in an finally began operation on January 21, (Snyder The San Joaquin Power Company powerhouse is located at the North Fork of the Tule River Middle Fork (Doyle Fork) intake of the Mount Whitney plant, and derives its water solely from that fork (the Mount Whitney plant has intakes on both the North and South Forks of the Tule River Middle Fork). In June Henry Huntington purchased John H. Hammond's controlling interest in the Mount Whitney Power & Electric Company (Myers The following year, Henry Huntington merged his electrical utility businesses with Southern California Edison (ibid.).

Mount Whitney continued operation as a subsidary of Edison until when it ceased to exist as a separate entity (ibid.). Electricity generated by the Tule River plant and other hydroelectric projects owned by Mount Whitney Power & Electric Company and Wishon's San Joaquin Power Company played a crucial role in the development of agriculture in the San Joaquin Valley. The inexpensive energy produced by these facilities was used to drive electric pumps which contributed significantly to the rise of wide-spread irrigated farms. Prior to this development irrigated agriculture was mostly dependent on diversions from local rivers and streams, supplemented in the dry months with expensive and unreliable gasoline-engine powered pumps.

Farms during the pre- hydroelectric period were exclusively located within a short distance of water courses. Inexpensive and reliable electric pumps allowed farms to be sited anywhere. The former dry valley floor rapidly flourished with cultivation, and the demand for electricity grew faster and far beyond the wildest expectations of the developers of these pioneer hydroelectric facilities. adjacent electrical utility companies and encircling Mount Whitney's service territory with San Joaquin Power's transmission lines (ibid.:95-97). Tule River Hydroelectric Project Water Conveyance System HAER No. CA-216 (Page 5) in.

Sources

Fowler, Frederick H. Hydroelectric Power Systems of California and Their Extensions into Oregon and Nevada. Department of the Interior, United States Geological Survey, Water Supply Paper Washington, DC: Government Printing Office. Myers, William A. Iron Men and Copper Wires: A Centennial History of the Southern California Edison Company. Glendale: Trans-Anglo Books. Snyder, John W. Report on Bridge on 06-TUL-190, Report to Frank Waterhouse, Chief, Environmental Branch, District 06, California Department of Transportation. Sacramento: California Department of Transportation, Office of Environmental Planning. An Evaluation of Tule River Hydroelectric Complex. Report to Frank Waterhouse, Chief, Environmental Branch, District 06, California Department of Transportation.

Sacramento: California Department of Transportation, Office of Environmental Planning. IV. PROJECT INFORMATION This Historic American Engineering Record (HAER) documentation of the Tule River Hydroelectric Project water conveyance system was undertaken as mitigation for the reconstruction of an approximately six hundred foot section of flume, burned in a wild-fire during October with an inverted siphon. The purpose of the HAER documentation is to conserve the historic look of the wood bent-supported flumes that comprise about two thirds of water conveyance system (the other third of the water conveyance system is comprised of concrete-lined canals and two other inverted siphons).

Wild fires are endemic to the dense chamise chaparral covering much of the project area and pose a threat to the remaining wood- bent supported flumes. In order to maintain the viability of the hydroelectric project, burned flume sections are replaced where feasible with metal siphons which are less vulnerable to this type of natural disaster. Tule River Hydroelectric Project Water Conveyance System HAERNo. CA-216 (Page 6) Tule River Hydroelectric Project Water Conveyance System HAERNo. CA-216 (Page 7) Portion of Springville, Calif. 7.5 Water Conveyance System HAER No. CA-216 (Page 8) in i in 1^ > *. 00 in s- a. ex. O o _ O - u 33 CO X CM I m it!!: m in: rwi % -a CO w -si Water Conveyance System HAER No. CA-216 (Page 9) J^ CO 10 X '*> iiil. % mtH -v~ Water Conveyance System .i-rf..

i^i^mai * HAER No. CA-216 (Page 10) r i* **- * . .* . .j. *. T L . I L WIW*'* Water Conveyance System HAER No. CA^a^fPajffia *n**#U iVzW^i'-wrK*" * -* * w " LIGHT.*

Power Company

End View of Truss and Pier S.L.STO\/ALL, EfJGX OCT. Hfe I3 & fypror**/ 0. Material /*~ar Truss ii, Splic* plat**, t'* **' 4 ., ,< 4 S'-e- i 4 . X / -** " - ' / 0tf*l'rsri *V" Ja /*# /' '. Lurrt6mn ZZrHk"*t2"A/i'-0" Hi-* / * - * , ^'A /i-0" 7-- * . '*" *" * /e-fl" * / *- " * * x .. JI * - * - i ao-mn * SfrtFifmir fame**. 4-1 -1 II-*" * " i - t" r r : r \J (A) (A) CD 0) r "r :- ': "LV ig^gfoffi^/sS**^^^ Water Conveyance System HAER No. CA-216 (Page 12) t! 1 T VI X J %U UVKVU IV A 1 UJCVi Water Conveyance System HAER No. CA-216 (Page 13) .yfff'^yar-jcjai!uyjogz*?-. y fju-n Water Conveyance System HAER No. CA-216 (Page 14) ..ii in,i u-i , .,, It * iii i " 39 :' #4 \-4 I IO < Water Conveyance System HAER No. CA-216 (Page 16) I ? I'M mi1 J fc l u t -T 1 J> "0 I.- ; 3J " "( T S 2 a 4 J

In context

Springville, California The place record: every map, photograph and survey of this town.
Tulare County, California 365 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Springville

2 records

The federal surveyors worked through Springville building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Tule River Hydroelectric ComplexHAER CAL,54-SPRI.V,1-3,784 words
Tule River Hydroelectric ComplexHAER CAL,54-SPRI.V,1-A-1,294 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,54-SPRI.V,2-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.