Southern Pacific Railroad Natron Cutoff, Tunnel No. 17, Milepost 408, Dorris, Siskiyou County, CA. Surveyed as HAER CAL,47-DORR,1-, with a 1,717-word written history.
From the record
“The Southern Pacific Railroad Cascade Route, built as the Natron Cutoff between Black Butte, California and Natron, Oregon was one of a series of major rebuildings and realignments of the original Central Pacific Railroad.”
Written record, HAER CAL,47-DORR,1- survey. Machine-read text.
Surveyed by the federal HAER program as HAER CAL,47-DORR,1- · the record runs 1717 words · one of 23 surveyed structures published for this county.
Source document
Quoted word for word from HAER CAL,47-DORR,1-.
Not written, edited or summarised by this site.
The Southern Pacific Railroad Cascade Route, built as the Natron Cutoff between Black Butte, California and Natron, Oregon was one of a series of major rebuildings and realignments of the original Central Pacific Railroad. Begun in under railroad magnate E.H. Harriman to replace the original Central Pacific route over the Siskiyou Mountains into Oregon, the Natron Cutoff had to overcome both natural and political obstacles. Stalled by government anti-trust lawsuits against Harriman, by World War I and the ensuing federal takeover of the nation's railroads, the Natron Cutoff finally overcame the rugged Cascade Mountains of Oregon to reach completion in at an ultimate cost of nearly $40 million.
For the purpose of the current project, the Natron Cutoff was found likely to be eligible for the National Register of Historic Places at the state level of significance under Criterion A for its significance in engineering, transportation history, and the economic history of central Oregon, and in the development of the West, and under criterion B for its association with E.H. Harriman. The Natron Cutoff's period of significance is to from the beginning of construction in through the years of its role in the economic development of the central Oregon, to the conclusion of the railroad's achievements in World War II. Built in Tunnel 17 is a contributive element of this property.
Tunnel 17 is a 2,076-foot, single track railroad tunnel, with concrete portal faces and wingwalls. The semi-circular arched opening is framed in dressed stone masonry voussoirs, the portal has a dressed stone parapet atop a stone masonry belt course and topped by a dressed stone masonry coping. A coping of dressed stone masonry blocks tops the stepped wingwalls. As-built, the tunnel was concrete-lined for the first fifty feet in from each portal, with the remainder lined in redwood timber; the railroad has subsequently covered the timbering with shotcrete. The tunnel is on a left-hand curved alignment, and carries the tracks of the Union Pacific Railroad's (formerly Southern Pacific) Cascade Route line. H.
Historical Information
Contractors, Erickson & Petterson of San Francisco built Tunnel 17 (originally numbered Tunnel 1) in as an element of the reconstruction and extension of a railroad originally built by the Weed Lumber Company from Weed to Grass Lake. Southern Pacific quietly acquired the line in and began to extend it to Klamath Falls as the California Northeastern Railroad [For a full history of this line and of this undertaking, sec the documentation set for the Southern Pacific Railroad Natron Cutoff (Southern Pacific Natron Extension) (Southern Pacific Cascade Route), Southern Pacific Cascade Route Tunnels, HAER No..] After assuming control of the Southern Pacific/Central Pacific and merging them with the Union Pacific in Edward H.
Harriman had embarked on a series of huge reconstruction projects system-wide. One of these was the construction of a new main line through central Oregon to eliminate the original Central Pacific main line that reached Oregon by a torturous climb through the Siskiyou Mountains. Work began on the south end of the project first, with the acquisition and extension of the California Northeastern. In Harriman initiated work on the north end of the project, by beginning construction of the Oregon Eastern Railroad south from Natron Oregon toward a meeting with the California Northeastern. Two contracting firms divided the work, with Erickson & Petterson of San Francisco handling the work on the California Northeastern, and Utah Construction Company of Ogden building the Oregon Eastern.
Tunnels 17 and 18 (HAER CA-) were the only tunnels required on the California Northeastern; all the tunnels on the Natron Cutoff conformed to Southern Pacific Common Standard plans. Erickson & Petterson built their tunnels by driving a drift (a small pilot tunnel) at the spring line of the final arch, and centered. From this they widened the arch to full section down to the spring line. They then drove one or two drifts at grade line and, using black powder, blasted the remaining bench directly down into dump cars in the drifts. Crews then concreted the first fifty feet of the bore in from the portal, and lined the remainder in timber.
Reaching Dorris on May 1, the contractors built a temporary line through Klamath Pass between Dorris Hill and D Hill so that construction could continue northward while crews worked on driving Tunnel 1 (today Tunnel 17, HAER CA-) and Tunnel 2 (today Tunnel 18, HAER CA-) through the ridge. However, in April an employee of SOUTHERN PACIFIC RAILROAD NATRON CUTOFF, TUNNEL 17 (Dorris Tunnel) HAER No. CA-218 Page 4 Erickson and Petterson, said to be "sore at the railroad" but more likely upset at the contractors for payment practices, wrecked the north end of Tunnel 1 by setting off a case of powder. The resulting blast injured seven, killed a horse, and badly damaged a steam shovel some two hundred feet inside the tunnel.
Fortunately, the machine broke the force of the blast and saved the lives of twenty-five workers. Fifty feet of timbering at the mouth of the tunnel was destroyed, and another 150 feet were so badly damaged as to require replacement Concussion broke windows in nearby shops and saloons. Dorris Sheriff Hatch arrested one Frank Peterson after two of his fellow workers reported seeing him fire the charge. By July, however, things were apparently back to normal since the contractors finished the railroad through to Klamath Falls the following month. m.
Sources
Austin, Ed and Tom Dill. The Southern Pacific in Oregon. Edmonds WA: Pacific Fast Mail, Beebe, Lucius. The Central Pacific and the Southern Pacific Railroads, Berkeley; Howell-North, "Blasting Near Dorris " The Siskiyou News, October "Bray Station, The Siskiyou News, December 12, "California Northeastern to Be Extended," The Siskiyou News, July "Contractor Arrested," The Siskiyou News, December "Contracts on Natron-Klamath Extension," Eugene Weekly Guard, May 11, "Delay on the The Siskiyou News, March 7, "Dorris, The Siskiyou News, February "Dorris Doings," The Siskiyou News, September "Dorris Items," The Siskiyou News, November "Dorris Tunnel Wrecked," The Siskiyou News, April 22, "Dorris Votes to Incorporate," The Siskiyou News, December 24, Dunscomb, Guy L.
A Century of Southern Pacific Steam Locomotives. Modesto: Guy L. Dunscomb, "E.H. Harriman Is President," The Sacramento Bee, September 30, "Eugene-Klamath Road Will Be Main Route Of Southern Pacific," Eugene Weekly Guard, August SOUTHERN PACIFIC RAILROAD NATRON CUTOFF, TUNNEL 17 (Dorris Tunnel) HAERNo. CA-218 Page 5 Fickewirth, Alvin A. California Railroads: An Encyclopedia of Cable Car, Common Carrier, Horsecar, Industrial, Interurban, Logging, Monorail, Motor Road, Short Lines, Streetcar, Switching and Terminal Railroads in California San Marino: Golden West Books, Fitzgerald, "Shasta Division-Gateway to the North ," Southern Pacific Bulletin, July "From 'Oregon Trail' to Portland Division," Southern Pacific Bulletin, May Hofsommer, Don L.
The Southern Pacific, College Station TX: Texas A & M University Press, "Macdoel," The Siskiyou News, October 31, February 27, May 5, "May Have Thrown Up Railroad Contract," Eugene Daily Guard, November 19, "Millions To Be Expended: Southern Pacific Is to Be Put in Fine Shape," The Sacramento Bee, June 25, "Mount Hebron," The Siskiyou News, July "Natron Extension Announced," Eugene Weekly Guard, December 15, "Natron Extension Soon," Eugene Weekly Guard, January "Natron-Ontario Line Will Be Built Soon," Eugene Weekly Guard, August 23, "New Line to California," Eugene Weekly Guard, October "Picard," The Siskiyou News, September 26, "Progress on the California Northeastern," The Siskiyou News, March 28, "Railroad Construction," Railroad Age Gazette, March "Railroad Construction," The Railroad Gazette, August 27, "Railroad Work at Klamath Falls," Eugene Weekly Guard, August 23, Signor, John R.
Rails in the Shadow of ML Shasta: 100 Years of Railroading Along Southern Pacific's Shasta Division. San Diego: Howell North Books, "The New Town of Dorris," The Siskiyou News, September 5, "The Proposed Klamath Falls Line of the Southern Pacific," The Railroad Gazette, June 7, SOUTHERN PACIFIC RAILROAD NATRON CUTOFF, TUNNEL 17 (Dorris Tunnel) HAER No. CA-218 Page 6 United States Geological Survey. Topographic map. Dorris, Calif, quadrangle, series, Provisional Edition IV. PROJECT INFORMATION As a result of the merger of the Union Pacific and Southern Pacific Railroads, a federal undertaking under the jurisdiction of the Surface Transportation Board of the U.S.
Department of Transportation, and in order to accommodate freight trains utilizing longer and taller cars and loads-tri-level auto rack cars and cars carrying double-stacked containers--the Union Pacific will need to increase tunnel clearances on the former Southern Pacific Natron Cutoff. The tunnels, built between and are contributing elements of the National Register-eligible Southern Pacific Cascade Route Tunnels Historic District. The railroad has laser-measured all tunnels and will determine clearance needs on a tunnel-by-tunnel basis. Some, because of curved alignment, will require interior work to allow for longer cars such as tri-level auto rack cars; others will require both interior and portal work to provide sufficient vertical clearance for "double- stack" container cars.
The latter work may impact the character-defining tunnel portals if crown mining of the tunnels (as opposed to lowering the tunnel floors) is selected. Inasmuch as this would cause an adverse effect to the tunnels, Union Pacific, in consultation with the California and Oregon SHPOs, has elected to record the tunnels for the Historic American Engineering Record. A field review with Oregon SHPO staff resulted in guidance to document representative tunnels from the early and late construction periods. Documentation was carried out by Preservation Services, John Snyder Field Director and Historian, and Ed Andersen, Photographer. Photos were made in November and research was carried in June and from November through April
The federal surveyors worked through Dorris building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER CAL,47-DORR,1-. United States federal work, no copyright under 17 U.S.C. 105.