At Beverly Vista, the Primary Building (Building D) is a fine example of public school design. Building D, was designed by the Los Angeles architectural firm of Gable and Wyant in the Italian Romanesque Revival style. Incorporating the distinguishing characteristics of this architectural idiom such as brick exterior walls, a tiled roof, an extensive and unifying use of arches as a decorative motif, and a tower which is reminiscent of ecclesiastical Romanesque precedents. Gable and Wyant were particularly known for their work in the Spanish Colonial Revival style, as for example, in their design for Hangar 1 at the Los Angeles International Airport. Beverly Vista illustrates their facility with a different but related architectural vocabulary.
The use of the Romanesque Revival style also represents a distinctly traditional choice of architectural imagery. While all of the other schools in the district showcase the Spanish style, that eventually became integral to the mythology of southern California, Beverly Vista suggests a more urban approach to school design. Constructed in Building D is the third oldest extant public school building constructed by the District in Beverly Hills. BEVERLY VISTA SCHOOL, PRIMARY BUILDING (BUILDING D) HABS NO. CA-2704-C PAGE (2) A. General Statement: 1. History: In Building D, the Primary Building, was added to the overall school complex. Building D was designed by the Los Angeles based architectural firm of Gable and Wyant.
The only visible alterations to the facade are replaced windows with opaque transoms. 2. Architectural Character: Building D is very similar in design and massing to the Elm Drive elevation (west) of Building A. Like all of the early buildings (Buildings A, B, and D) at Beverly Vista, it is two stories, clad in multi-colored brick, and accented by cast stone detailing. Arches provide the principal decorative motif. As with Buildings A and B, Building D incorporates the distinguishing characteristics of Italian Romanesque Revival style such as brick exterior walls, a tiled roof, and an extensive and unifying use of arches as a decorative motif. Building D is a good example of public school design. 3. Summary Description: The structure is capped with a tiled, side-gable roof.
A central, raised bay containing the entry is front-gabled. Elevated a half dozen steps above ground level, it repeats the design seen on Building A. Above the double, glazed doors, the arched transom features a pattern of radiating muntins. A single arched opening on the second story above the entry contains two windows separated by a column. Within the arch, the spandrel is embellished with a circular design. Side wings contain two stories of one-over-one windows with transoms. Arched corbeling appears below the second story window sills and outlines the raking cornice of the gable end. A copper gutter below the roof has weathered to a verdigris finish. B. Description of Exterior: 1. Overall Dimensions: Building D measures approximately by overall.
The total square footage of the building is approximately The two-story building has a "T" shaped rectangular plan and a partially subterranean basement. BEVERLY VISTA SCHOOL, PRIMARY BUILDING (BUILDING D) HABS NO. CA-2704-C PAGE (3) 2. Foundations: Concrete post (pier) and girder foundation. 3. Wall Construction: Unpainted, wire-cut brick varying in color from brown to red to ochre are set in a common bond pattern. 4. Structural System, Framing: The structural system is all unreinforced masonry. The building's framing system was strengthened with steel braces in 5. Porches, Balconies, Bridges: The first floor of the building has two covered walkways. One walkway connects to Building A while the other connects to Building C. The second floor of the building has two bridges.
One bridge connects to Building A and the other connects to Building C. 6. Chimney: None 7. Openings: a. Doorways and Doors: Door placement: The main entry is centered on the west elevation and is elevated six steps above street level. Secondary entries are located on the north and south elevations at the east and west ends of the building. Door materials and type: The main entry has double wood doors with 9 lights atop a single panel on each side and a fanlight transom. The cloister entry has double wood doors with 12 unevenly sized lights atop a single panel on each side. The doors at the east end of the north elevation and at each end of the south elevation are double wood doors with 9 lights atop a single panel on each side and a lunette above.
Door features: The main entry frontispiece is cast stone with a central archway framed by spiraled, engaged columns and decoratively molded BEVERLY VISTA SCHOOL, PRIMARY BUILDING (BUILDING D) HABS NO. CA-2704-C PAGE (4) archivolts. Directly above the central entry, a row of blind arches rise from colonnettes above the gabled pediment. Scrolled brackets are to either side of the arches. Wrought iron stair rails and cement stairs are located in front of the main entry. Arched doors on the north and south elevations are framed by archivolts articulated in brick. b. Windows: Window shape and placement: Banks of five, equally spaced, flat- headed, vertical windows define classroom spaces on the west, north, and south elevations.
Paired, arched windows are located above the main entry on the west elevation. Paired and single arched windows in alternating bays are found on the second story of the south elevation. Three pairs of flat-headed windows are equally spaced on the second floor of the east elevation. Window materials and type: The building has all original wood windows, except for those on the east elevation which have been replaced with aluminum. The window type are three-part, vertical division sash with the top sashes filled in with solid panels. Window features: Projecting sills of header bricks. Flush lintels of soldier bricks. There are bands of cast stone arched corbeling below the second story classroom windows on the west elevation.
Paired arched windows on the west elevation are set into a single arch, separated by an engaged, cast stone, spiraled colonnette, and topped by a decorative stucco and brick spandrel. Arched windows on south elevation are framed by brick and cast stone corbeling; double windows are separated by spiraled columns. Original, wood-framed windows on the east elevation are four-over-four awning type. 8. Roof: a. Shape, Covering: The building has a cross-gabled and hipped roof covered in red clay barrel tiles with copper rain gutters. BEVERLY VISTA SCHOOL, PRIMARY BUILDING (BUILDING D) HABS NO. CA-2704-C PAGE (5) b. Dormers, Cupolas, Towers: None 9. Architectural Details: Cast stone corbel courses are located at gable ends.
There is an arched panel defined by bricks on the north elevation and cast stone tablets are set into the south elevation. C. Description of Interior: 1. Floor Plans: While the exterior of the building exhibits a sophisticated architectural vocabulary, the interior spaces are straightforward and utilitarian in character with little, if any, architectural detailing. Building D features interior layouts that utilize double-loaded corridors off of which rectangular classrooms open. Classrooms are illuminated with windows across one wall and each have cloakrooms at the rears of their spaces. a. Basement Floor Plan: The partial basement is comprised of two large spaces which contained the student and faculty dining rooms. b.
First Floor Plan: Double-loaded corridors run east-west off of which are rectangular shaped classrooms. (See first floor plan layout). c. Second Floor Plan: Double-loaded corridors run east-west off of which are rectangular shaped classrooms. (See second floor plan layout). 2. Stairways: Staircases with wood risers, treads, and balustrades are located at the east and west ends of the building. BEVERLY VISTA SCHOOL, PRIMARY BUILDING (BUILDING D) HABS NO. CA-2704-C PAGE (6) 3. Flooring: Concrete flooring is in the hallways, maple wood floors are in the classrooms, and white hexagonal tile flooring is in the restrooms. 4. Wall and Ceiling Finish: Lath and plaster walls are throughout the building. 5. Openings: a.
Doorways and Doors: Classroom doors are non-original single slab wood doors with narrow lights glazed with safety glass. b. Windows: The overall fenestration pattern has not been extensively modified. The interior walls surrounding the window openings retain their original configurations, materials, and detailing in most locations. 6. Decorative Features and Trim: The walls are trimmed with baseboards and wood chair rails. 7. Hardware: Most of the original hardware has been replaced. Non-original door hardware is throughout the building. 8. Mechanical Equipment: a. Heating, Air Conditioning, Ventilation: Heating: Offices and classrooms within Building D were originally heated using a low-pressure steam boiler that was located in the basement of Building A that served room radiators.
These radiators are intact in each classroom and office of Building D, though they are now enclosed with non-original metal security cases. BEVERLY VISTA SCHOOL, PRIMARY BUILDING (BUILDING D) HABS NO. CA-2704-C PAGE (7) Air Conditioning: The building was not initially fitted with air conditioning. A centralized air cooling system was installed in Building D at an unknown time. Ventilation: Ventilation was provided via classroom windows. b. Lighting: Original electric lighting was incandescent. Non-original suspended fluorescent lighting was installed throughout the building at some unknown date. c. Plumbing: The boys' restrooms are located at the east ends of both the first and second floors. The girls' restrooms are located at the west ends of both the first and second floors.
A women's staff restroom is centrally located along the main corridor of the first floor. Some original plumbing fixtures have been replaced, however, most are intact with marble partition walls, porcelain valve toilets, and cast iron trough sinks. d. Fixtures: Cloakrooms with sinks are at one end of each classroom. 9. Original Furnishings: Chalkboards and wood trays (some replaced, some original) are on two or three walls of each classroom. Prepared by: Janet Ostashay, Director of Cultural Resources Management Leslie Heumann, Principal Architectural Historian PCR Services Corporation 233 Wilshire Ste. 130 Santa Monica, California Date: December BEVERLY VISTA SCHOOL, PRIMARY BUILDING (BUILDING D) HABS NO.
CA-2704-C PAGE (8) BUILDING D - CURRENT BASEMENT PLAN: LEGENDi " 1 KfTCHEN 2 STORAGE 5 5EMNGUNE/ EOUITMEKT 4 OFFICE 5 RESTROOM 6 LUNCH SHEIIER 7 0BHW*SHIN<3 AREA ft COVERED WtNUW puiuxMS-ir 9 STUDENT DWIW3 K> FACULTYDWING n UNEXCAVWED UNDERFLCOR SIWCE BUILDING "D" & "F" BASEMENT PLAN BEVERLY VISTA SCHOOL, PRIMARY BUILDING (BUILDING D) HABS NO. CA-2704-C PAGE (9) BUILDING D - CURRENT FIRST FLOOR PLAN 8 19 E& 5. 17 [ 2?
20 a LEGEND; 1 2 3 0OYSRESTROOM JANffOR 2ND GRAPE \& 1ft tr 20 A 6 6 DATCARE STORAGE 7 TEACHERS WORKROOM 20 d 9 10 FACULTY RESTKOOM Rsre-s n GIRL'S RESTRCOM 12 SCIENCE LAP R-5 o SCIENCE STORAGE M SWF WOMEN'S RESTKOOM IS RESOURCE K-5 16 2ND GRAPE 17 2NP GRAPE id CORRIDOR 19 COVERED WALMVW 20 STORAGE &UILDINC5 "D" FIRST FLOOR PLAN BEVERLY VISTA SCHOOL, PRIMARY BUILDING (BUILDING D) HABS NO. CA-2704-C PAGE BUILDING D - CURRENT SECOND FLOOR PLAN: LEGEND: 1 STORAGE 2 BOVSRESTROOM 3 JANITOR 4 5DC 5 GRADE 6 GRAPE 7 PREPARATORY AREA & FACUITY LOUNGE 9 RESTROOM K> GRADE 11 STORAGE 12 GRADE 13 GIRL'S RESTROOM M COMPUTER LAD 1-5 GRADE 16 GRADE 17 CORRIDOR 16 BRIDGE 19 STORAGE &UILDING "D" SECOND FLOOR FLAN r