Big Bend Vicinity Shasta County, California USGS Chalk Mountain Quadrangle, (Provision Edition UTM Coordinates: Zone 10, N, E Date(s) of Construction: modified Builder: Pacific Gas and Electric Company Present Owner(s): Pacific Gas and Electric Company Present Occupant(s): Pacific Gas and Electric Company
Significance
2878 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HAER CA-317.
Not written, edited or summarised by this site.
The Pit 4 Diversion Dam is important as an original feature of the Pit 3, 4 and 5 Hydroelectric Project. Pit 4 Dam is an excellent example of early twentieth century hydroelectric architecture and represents the original aesthetic design characteristics of the overall Pit River system, while also unique and designed as a separate, individual feature. The system and the dam itself reflect a higher degree of architectural aesthetics than projects built in later years. Its impact on California has been significant, helping to support and encourage the industrial development of Northern California and especially the San Francisco Bay Area. Electricity from the Pit River has powered the growth of the state just as hydroelectric construction helped develop the economy of Shasta County.
This remote system has had far-reaching effects and continues to remind us of a time when electric power was a new and awesome herald of our future potential. Report Prepared By: Cindy L. Baker, Historian PAR Environmental Services, Inc. Street Sacramento, CA Date: September PIT 4 DIVERSION DAM, HAER NO. CA-317 Page2
Description
The Pit 4 Dam (CA-317-1) consists of an Ambursen (slab and buttress) section and a gravity section with an energy-dissipating baffle system and concrete apron. There are two drum gates (CA-317-6) installed at the dam that were the largest in the world in Each is 14 feet, 5 inches high and 68 feet wide. They have been in place since The Ambursen section (CA-317-5) consists of eleven bays created by concrete buttresses and sidewalls. The diversion dam, with baffle piers at its toe, was constructed by Pacific Gas and Electric Company in Its completed crest length is 470 feet. The slab and buttress section is 200 feet in length, four feet wide at the top and 130 feet thick at its base.
The concrete gravity section is 181 feet in length with a top thickness of approximately 30 feet and a bottom thickness of 66 feet. The spillway crest (CA-317-19) is 38 feet above the strearnbed and 76 feet above the dam's foundation. There are three seven-foot by seven-foot sluiceways through the base of the gravity section that provide the outlet for the darn. The crest of its spillway is at elevation feet above mean sea level (arnsl), while the crest of the darn is at arnsl. The darn creates a 106-acre reservoir capable of storing acre-feet (California, State of There are several structures associated with the darn. On the west side of the river, at the highest darn elevation, is a horizontal board-formed concrete intake/gatehouse (CA-317-2).
This square house is two stories high, has a hipped roof, and metal louvers. The structure has three sets of four-paned windows on the west side. A steel truss walkway (CA-317-9) extends across the dam, accessing a small control house on the west side and a tower enclosing a circular staircase on the east side. The control house is on the downstream side of the darn, near the energy dissipaters. It also has a hipped roof and is covered with metal. Four-pane windows are present on the west side just below the roofline, providing light into the structure. It is accessed by a concrete catwalk with metal handrails. A circular metal stairway begins at the highest elevation of the darn on the east side and winds down five stories to access the lower gallery.
The stairway is encased in a circular vertical board-formed cast-in-place concrete structure (CA-317-10) that is accessed through a circular one-story vertical board-formed cast-in-place concrete structure. The structure, shaped like a tower, has a cone-shaped copper roof with a knob on top. Small, four-pane windows are symmetrically placed around the tower just below the roofline to provide some natural light.
Construction of the Pit 4 Powerhouse in the brought up very few concerns that were unforeseen during its initial design in the The most notable change, in fact one of the few modifications, was the addition of a fish water release outlet (CA-317-18) added to the Pit 4 Darn so that when water was released to Pit 4 Powerhouse, there would be sufficient water remaining in the Pit River below the dam for fish to survive. PG&E made the necessary modifications, namely a hole cut through the gravity section of the dam and fitted with an outlet pipe. This work was finished by October PIT 4 DIVERSION DAM, HAER NO. CA-317 Page3 There have been few modifications to the system in the last 25 years.
Two missing baffles in the spillway energy-dissipating structure (CA-317-16) of Pit 4 Dam were replaced in A 48 feet long 3 feet high concrete parapet was also installed along the upstream of the right abutment in In a new fish release pipe and trashrack debris loader and cleaner were installed at the power intake at the dam. On-site examination of the dam, an analysis of engineering drawings and reports, and archival research indicate that the historical integrity of the original structural design, materials, workmanship, setting, location, and association are intact.
Architectural and Engineering Information
Pit 4 Diversion Dam Pacific Gas and Electric Company constructed the Pit 4 Diversion Dam in The structure was part of an extensive system of dams, tunnels and powerhouses on the Pit River in Shasta County. The dam is one of four dams on the Pit 3, 4, and 5 Hydroelectric Project that impound and divert water to associated powerhouses. Pit 4 Dam, for example, diverts water to the tunnel that ultimately powers the Pit 4 Powerhouse. Pit 4 Dam is an integral feature of the Pit River Hydroelectric Project and was noted in contemporary maps and reports.
Modifications In PG&E replaced two missing baffles in the spillway energy-dissipating structure of the dam (California A 48 feet long and 3 feet high concrete parapet was added to the right abutment in In a new fish release pipe and trashrack debris loader and cleaner was installed at the power intake at Pit 4 Diversion Dam (California III. HISTORICAL INFORMATION Pit River Hydroelectric History PG&E' s plans for hydroelectric development on the Pit River started in earnest on November 16, when the Company acquired water rights of the Mt. Shasta Power Corporation Shasta) through the purchase of lands along the Pit River. (Galloway Mt.
Shasta, organized in had incorporated in to build developments on the Pit River to sell electricity and water, but abandoned the project when they lacked the funding necessary to complete the job (California 1912:i; Coleman PG&E 1920a: 1921a:n.p.; San Francisco Chronicle PIT 4 DIVERSION DAM, HAER NO. CA-317 Page4 In PG&E also acquired the Northern California Power Company, Consolidated. With these two purchases, PG&E could finally go forward with developing plans on the Pit River. Initial plans included a stairway of six powerhouses following the river's drop in elevation. Over the sixty miles from Fall River to Big Bend, the river fell 2, 104 feet in elevation, of which feet could be utilized by the powerhouses (Coleman Markwart The Pit River project was designed by Frank G.
Baum, a consulting engineer in San Francisco. Baum had been involved with hydroelectric development in California since and was a great advocate of the profitability of the transmission and sale of electricity. In Baum started working as an engineer for California Gas and Electric Corporation, absorbed by PG&E in He resigned in to become a private consulting engineer. In he returned to PG&E as chief engineer of hydroelectric operations. He worked on the Spaulding Dam, Drum Powerhouse, and the Halsey and Wise powerhouses with PG&E, and before that on the Electra Powerhouse for Standard Electric Company.
His greatest contribution, though, was in promoting the feasibility of long distance high-voltage transmission (Baum Baum and Barfoed Coleman Doty Early features of the Pit system were built by PG&E under Vice-President of electrical construction and operation, P. M, Downing, and construction engineer 0. W. Peterson. The first powerhouse, Pit 1, went online September 30, This development diverts water from the Fall and Tule Rivers, passes it through the powerhouse, and releases it into the Pit River. The success of this first segment of the Pit River system was heralded in northern California for its tremendous benefit to development. Chambers of commerce throughout the Sacramento Valley sent 500 representatives who gathered to see PG&E President Creed start the Pit 1 generators.
Another spectators waited at the Vaca-Dixon Substation to witness the arrival of newly created energy from the Pit River (Coleman In March PG&E announced its decision to proceed with Pit River development to meet the growing demands for electricity in the state. Company engineers calculated an increase in energy demands at 7.5 percent a year, at that time another 12 million kilowatt hours. While facing the realities of the constant increase, PG&E was also witnessing high daily load factors. While the daily peak load averaged around 75 percent of its generation capacity, the annual load factor from to averaged at 63 percent. These were considered high load factors compared with the rest of the country.
The company realized it would have to build another plant the size of Pit 1 every two years to meet the increasing market demand. If the demand growth rate continued through PG&E would need to build one every year. With this in mind, they began drawing up plans for Pit 2, 3, 4, and 5 by (Pacific Service Magazine May Pit 2, however, was never constructed. PIT 4 DIVERSION DAM, HAER NO. CA-317 Page5 Pit 4 Diversion Dam The initial work on the Pit 4 project began in the spring of right on schedule. The Pit 4 dam was intended to impound a small reservoir with a water level height sufficient to feed an intake tower. The intake tower would be connected to a tunnel that would then lead to penstocks connected to a Pit 4 Powerhouse.
The Pit 4 dam included an Ambursen (slab and buttress) section and a gravity section with an energy-dissipating baffle system and concrete apron similar to one at the Pit 3 dam. The Ambursen section consists of ten bays created by concrete buttresses and sidewalls. The diversion dam, with baffle piers at its toe, was completed by July of (Pacific Service Magazine April July Work on the Pit 4 Powerhouse itself would have to wait. PG&E officials testified at a hearing before the Federal Energy Commission in that while Pit 4 might have been completed by they planned to put other projects ahead of it, including the Melones Plant on the Stanislaus River, Salt Springs on the Mokelumne River, and additions to the South Yuba River system.
As a result, further work on Pit 4 was put on hold for nearly 25 years (California By the early PG&E was ready to start work on the Pit 4 Powerhouse. The horsepower plant was expected to cost Work began July 1, with hopes of being completed in Work had actually begun in as mentioned previously, when the Pit 4 dam and reservoir were constructed. Twenty-five years later, work resumed with construction of a 19-foot-diameter four-mile-long tunnel and the powerhouse itself. When completed along with Pit 6 seven miles downstream from Pit 5, PG&E anticipated that the new projects would raise their statewide system production to 5.5 million horsepower.
These additions more than doubled the prewar energy production totals during a period of rapid statewide development following the end of World War II (P. G. and E. Progress May The reinforced concrete tunnel intake had been built in on the right bank 90 feet up stream of the dam. The original gate to the tunnel was removed and used on the Pit 5 project to conserve metal during World War II. The intake led to a tunnel feet in length. Slightly less than 140 feet of the tunnel were driven in while the rest was driven in Pit 4 began generating an additional kilowatts for the PG&E system in June just as anticipated. Pit 4 became the sixth plant within the Pit River watershed including the Pit 1, Hat 1, and Hat 2 facilities, which divert water from Pit River tributaries.
PG&E also continued work on the rest of its system, following the dedication of Pit 4 with the kilowatt Morro Bay steam plant a few months later (P. G. and E. Progress June During the Christmas holiday in a severe storm greatly damaged the intake structure of the Pit 4 Dam. It had to be rebuilt, leaving the Pit 4 Powerhouse out of operation until mid- February The original construction type was rebuilt in kind (PG&E GM PIT 4 DIVERSION DAM, HAER NO. CA-317 Page6 IV. PROJECT INFORMATION This documentation has been prepared at the request of PG&E (the Licensee), who is proposing to make improvements to the dam. The California Division of Safety of Dams (DSOD) requires that the modifications be made to meet updated flood protection requirements.
To meet DSOD requirements, the Licensee proposes to raise the top of the Pit 4 Dam to an elevation of 3 feet to permit the reservoir level to rise during extreme flood events in order to safely pass up to cubic feet per second.
Proposed alterations to the dam to meet this goal are as follows: construct 302 linear feet of a 6.8 feet high, reinforced concrete parapet along the slab and buttress section and adjacent spillway pier; construct 197 linear feet of new concrete slab (15 inches thick) along the upstream face of the slab and buttress section between elevation feet and the dam crest elevation of feet; construct 115 linear feet of concrete parapet, varying from three to seven feet in height along the left abutment of the dam; construct 53 linear feet of 9.8 feet high concrete parapet along the upstream edge of the non-overflow section at the right abutment; install a three-foot wide by 45-foot long steel walkway along the upstream face of the right non-overflow section to provide access to the right abutment of the dam; construct 45 linear feet of concrete wave wall (six feet maximum height) along the lower left spillway training wall; and repair deteriorated concrete surfaces on the concrete buttresses.
The Project Manager, Cindy L. Baker of PAR Environmental Services, Inc. was the Principal Investigator for the written documentation. The document is based on a previous investigation conducted by PAR Environmental Services, Inc. reported in National Register of Historic Places Significance Evaluation, Pit 3, 4, and 5 Hydroelectric System, Shasta County, California (Baker with Maniery The photographer for the recordation was David DeVries of Mesa Technical of Berkeley, California. Alison Macdougall of Pacific Gas and Electric Company facilitated the work as PG&E's contact and coordination person. V.
Sources
Baker, C., with M. Maniery National Register of Historic Places Significance Evaluation, Pit 3, 4 and 5 Hydroelectric System, Shasta County, California. Baum, F. The Pit River Power and 220,000-Volt Transmission Problem. Electrical World. Vol. 81, No. 4, January 27, On file, North Richmond Library Facility, University of California, Berkeley. PIT 4 DIVERSION DAM, HAER NO. CA-317 Page7 Baum, F. G., and S. Barfoed Pit River Power Developments. Electrical World. Vol. 81, No. 45, February 2, On file, North Richmond Library Facility, University of California, Berkeley. California, State of Dam Safety Inspection, Pit 4. On file, Department of Water Resources, Division of Dam Safety, Sacramento. Safety Inspection, Pit 4. On file, Department of Water Resources, Division of Dam Safety.
Dam Safety Inspection, Pit 4. On file, Department of Water Resources, Division of Dam Safety. Coleman, C. M. PG&E of California: The Centennial Story of the Pacific Gas and Electric Company, New York, McGraw-Hill Book Company, Inc. Doty, I. Report on the Pacific Gas and Electric Company and the Pit River Development. University of California, Berkeley. On file, Water Resources Collection Archives, University of California, Berkeley. Markwart, A. H. "The Development of Pit River," in Journal of Electricity and Western Industry. On file, California State Library, California Room, Sacramento California, State of District Engineer's Report on Application of Mt. Shasta Power Corporation. State Water Commission, San Francisco.
On file, Water Resources Collection Archives, University of California, Berkeley. Pacific Gas and Electric Company The Pit River Region, a Veritable Water-Power Wonderland. Pacific Service Magazine. November Vol. XII, No. 6. Pacific Gas and Electric, San Francisco, California. On file, California Room, California State Library, Sacramento. General Maintenance Order On file, PG&E Hydro Department, Burney. P. G. and E. Progress "Two More Large Powerhouses for the Pit River." PG&E Progress, May On file, California State Library, California Room, Sacramento. PIT 4 DIVERSION DAM, HAER NO. CA-317 Page8 P. G. and E. Progress "Two New Power Plants Ready." PG&E Progress, June On file, California State Library, California Room, Sacramento. Pacific Service Magazine "Outline of Our Pit River No.
3 Development." Pacific Service Magazine, December On file, California State Library, California Room, Sacramento. "Pit 3 Completed, Pit 4 Started." Pacific Service Magazine, April On file, California State Library, California Room, Sacramento. "Diversion Dam Completed and In Service." Pacific Service Magazine, July On file, California State Library, Sacramento. San Francisco Chronicle "Eastern Capital in Shasta Plant Power Concern Incorporates with a Capitalization of Ten Million Dollars." March 7, On file, Water Resources Collection Archives, University of California, Berkeley. PIT 4 DIVERSION DAM HAER NO. CA-317 Page9 CHALK MOUNTAIN, CA PROVISIONAL EDITION 7.5 MINUTE SERIES (TOPOGRAPHIC) SCALE FEET
The federal survey recorded these other structures elsewhere in Shasta County. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER CA-317. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.