From the record

“Quarters No. 2 at the Sacramento National Wildlife Refuge was constructed by the Civilian Conservation Corps The CCC completed projects critical to the development of the refuge for waterfowl and other wildlife.”

Written record, HABS CA-2778-A survey. Machine-read text.

Surveyed by the federal HABS program as HABS CA-2778-A · the record runs 5062 words · one of 7 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

141 words

Source document Quoted word for word from HABS CA-2778-A. Not written, edited or summarised by this site.

752 County Road 99W Willows Glenn County California U.S.G.S. Logandale, California Quadrangle Universal Transverse Mercator Coordinates: Zone 10 E570357 Quarters No. 2 is located at the southern margin of the headquarters complex and faces west as does the garage that is further to the south. A driveway access road is oriented north-south (Figure 1). The office and shop area is to the north, the barn is to the east, the canals and marshes are to the east. The site is at 95 ft asl in the SE 1/4 of the SE 1/4 of the NW 114 and the NE 114 of the NE 114 of the SW 1/4 of Section 10, Township 18 North, Range 3 West, Mt. Diablo Meridian. (Figure 2). The headquarters complex is in the northern central valley of California, about 10 miles south of Willows (Figure 3).

Significance

4626 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HABS CA-2778-A. Not written, edited or summarised by this site.

Quarters No. 2 at the Sacramento National Wildlife Refuge was constructed by the Civilian Conservation Corps The CCC completed projects critical to the development of the refuge for waterfowl and other wildlife. The work of the CCC is recognized as important to the nation, especially because it was completed in a period of desperation, and fostered a renewed sense of pride and self-worth for the men and the country. Camp Sacramento was established on the Sacramento NWR on May 15, with Company beginning the work projects. The following year they were replaced by a Veterans group, Company who remained at the refuge until the program ended in July The maximum number of 200 men were emolled at the camp at its peak.

During their combined 5Yz years occupation, the two companies built the infrastructure of the Sacramento A tally of their accomplishments includes construction of 52 water control and road structures, one diversion dam, one combination bridge and dam, miles of dikes, roads, canals, and fence, and building the headquarters complex. The headquarters complex included two residences, a garage, service building, water tower, office, barn, duck hospital, and lookout tower. SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 2) ~ 0Pump c house I' North Figure 1: Sacramento Headquarters Complex, as-built SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No.

CA-2778-A (Page 3) Figure 2: USGS Quadrangle Map, Logandale, California. SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 4) CALtFORNIA \ POOL I \ REFUGE HEADQUARTER$ POOll8: I LOCATION MAP J 11 5 POOL 11 "COL 4 jt = POOL 7 - - - " Dr f Wea! her Road Trciis POOL ?A POOL a;; I; ~ . - J! ~- POOL IC POOl fl '\ RfflJGE !JOUNDARY M>l ES Figure 3: Location and Vicinity Map for the Sacramento SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 5) PART I. HISTORICAL INFORMATION A. Physical History: 1. Date of erection: Quarters No.

2 was built in and the Garage was remodeled in Construction dates are provided by Sacramento NWR Narrative Reports, photographic documentation, and CCC records. 2. Architect: Plans with the architect's name have not been located. According to the Narrative Reports, the house plan was prepared on-site and sent to the Fish and Wildlife Service's Washington Office where it was approved for construction by Mr. Gregson. Quarters No. 2 was built from materials salvaged from the Spalding Ranch. 3. Original and subsequent owners, occupants, uses: The Sacramento NWR Headquarters complex is built on land that was once part of the extensive Dr. Hugh Glenn Ranch that operated from to In N. D. Rideout purchased about acres from the Glenn estate.

In Edward Potter acquired several parcels, but there was a dispute about the correct owner, finally in Col. Zephania S. Spalding paid in gold coin at an auction for the property (Glenn County Deed Records The Spalding Ranch, as it became known, consisted of about acres. By the 191 Os the ranch was growing thousands of acres ofrice, alfalfa, and grain. Then, in the the Spalding Ranch, like many neighboring ranches, began losing money. In the United States government condemned acres in Colusa and Glenn counties, including a portion of the Spalding Ranch for creation of a migratory waterfowl refuge (Glenn County Deed Records The Sacramento NWR was established in by Executive Order No.

reserving and setting apart these lands as a refuge and breeding ground for migratory birds and other wildlife. 4. Builder, contractor, suppliers: Materials were salvaged from the farm buildings that were demolished by the Quarters No. 2 was constructed by the 5. Original plans and construction: Plans were prepared on site in 193 7 and sent to Washington, for approval. Mr. Gregson was involved in reviewing and approving the plans, although the architect is not known. The plans were not approved until The original plans have not been located. SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 6) Beginning in October Quarters No. 2 was constructed from materials salvaged from the Spalding Ranch buildings.

"Floor plan was plotted of four old buildings in the Headquarters group for project estimates. Estimates were made of salvage materials on these old buildings and materials needed for reconstruction of north and south residences and the garage" (Annual Narrative Quarters No. 2 was finished in May 6. Alterations and additions: Exterior Additions and alterations have changed the original floor plan and overall dimensions of the house. The most extensive alterations occurred in when a chimney fire broke out, burning the livingroom, kitchen, back bedroom, rear sun-porch, and front porch (Figure 4). The fire damage also burned out the windows, which were replaced along with an enclosed front porch (Figure 5).

A major structural change occurred at this time when the back of the house was extended to square off the rear of the house. With this alteration the back bedroom was lengthened and the sun-porch was reduced to a utility porch. In a bedroom wing was added to the south side of the house (Figure 6). Some of the brick work on the east elevation was replaced during this alteration and metal duct work was extended out the rear wooden louvre vent to the outside heat pump. All of the windows have been changed from the original wood frame sash to aluminum frames. The current aluminum windows were installed during the remodeling. The small, gable roof front porch was replaced with a larger porch in Interior Interior alterations began in when a fire gutted the house (Figure 7).

The fire required substantial rebuilding of the interior: All of the old interior wall (knotty pine) and ceiling material was removed, the building was re-wired and the building was then practically re-built on the inside, with sheetrock used for inside wall and ceiling finish ... One small bedroom was enlarged by setting out a partition and encompassing part of the back porch area, thereby providing a much more livable bedroom. A new bathtub was installed but the rest of the plumbing fixtures were replaced. Linoleum was laid on the kitchen and bathroom floors, and the rest of the fir flooring in the house was covered with asphalt tiling (Annual Narrative The bathroom was completely remodeled in the with new flooring and fixtures.

SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 7) Figure 4: Exterior fire damage of Quarters No. 2, (Refuge Narrative, Figure 5: Quarters No. 2, front, (Refuge Narrative, SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 8) Figure 6: Quarters No. 2, rear, addition under construction, (Refuge Narrative, Figure 7: Interior fire damage of Quarters No. 2, (Refuge Narrative, SACRAMENTO NA TI ON AL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 9) B.

Historical Context History of Civilian Conservation Corps The Civilian Conservation Corps was only one of several New Deal programs set in motion during President Franklin D. Roosevelt's first 100 days in office in The CCC more than any other program was associated with Roosevelt's personal philosophy of environmental conservation and positive motivation for young people. Initially called Emergency Conservation Work (ECW), the popular name of CCC caught on almost immediately, and the name was formally changed in July Roosevelt's vision for this large work force of primarily young men was to repair the land from the decades of poor management and over-use.

The ECW as proposed in the legislation that authorized the program consisted of unemployed young men, between the ages of 18 and 23, who were unmarried, and whose families were on relief roles (the age requirement was later changed to 17 and All men who applied for the CCC had to have been unemployed for at least six months. No man on probation or parole was eligible. The monthly salary of the CCC enrollee was of which was sent to the family members at home, or was placed in an account for the enrollee for distribution upon his leaving the The enrollees were provided a month along with living quarters, food, and clothing, as well as medical care and transportation to the camps.

Enlistment periods were for six months, with re-enrollment possible for up to two years (the enrollment period was relaxed after The men were assigned to Companies and traveled to camps where they performed job duties. Camps were limited to 200 men. The only exception was made for Native American's who continued to live at home while working on projects on their reservations. The majority of the CCC workforce was made up of young men, called Juniors, although two other groups of men were accepted, including veterans of World War I, known in the CCC as the "Veterans." Veterans were older and could be married. The Junior and Veteran companies and camps were kept separate because of problems with the attitude of the older men.

The Labor Department oversaw the recruitment with stations set up in counties across the nation. The local labor department made the selection of the recruits until when that function was taken over by the federal Labor Department. The War Department administered the camps, physical training, transportation, and camp construction. The Agriculture and Interior Departments were in charge of finding work projects for the men. By using the strengths of each of the agencies, Roosevelt was able to develop a program without stigma of a military forced labor camp or competition with employed men. SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No.

CA-2778-A (Page 10) The CCC was never made into a permanent agency, although efforts were made in and By the United States economy was beginning to recover and men began finding work in the private sector. With U.S. entry in to World War II, Congress moved to terminate the CCC in June of CCC at Sacramento NWR In May of Company transferred to Camp to the newly established Sacramento The buildings on the Spalding Ranch were in poor condition with windows broken out and doors needing repair. The men moved into camp and began the work of cleaning up the ranch headquarters, dismantling board fences, cleaning weeds out of the irrigation canals, and adding gravel to roads (Refuge Narrative, May 193 7).

The camp initially used several of the ranch buildings for offices for the Refuge and CCC staff, and Army personnel. At the Sacramento refuge personnel including a manager and labor-patrolman identified projects and provided general over-sight. CCC personnel included a camp superintendent, several foremen, a mechanic, clerk, equipment operators, blacksmith, civil engineer, and the enrollees. Army personnel were in charge of running the camp and included a commanding officer and his assistant, an educational advisor, and contract surgeon. In June plans for houses were prepared in camp and submitted to Mr. Gregson in the Washington, office for review.

While the refuge staff was awaiting approval to start work on the residences, the enrollees were kept busy developing the infrastructure of the refuge. They began by rebuilding box culverts and sand bagging a break in the canal. Plans for dikes, culverts, and water control gates were approved in July of and work began on Pond units No. 2 and No.5. By the end of the CCC enrollees had built fences, dikes, signs, and markers; constructed truck trails, a water supply system, and water control structures; installed a telephone line; cleared channels; excavated canals and ditches; planted a nursery; and had begun surveying the refuge. By the spring of the headquarters plans were beginning to take shape. The enrollees razed a two-story residence, salvaging the good lumber.

The old water tank house was moved to make way for the new gallon tank tower. "The building when completed will be encased with brick veneer to the platform, 28 ft above the ground. The tank will be enclosed with a stucco house resting on the platform" (Refuge Narrative May-June The enrollees also began building the 26 x 72 ft Service Building. The Service Building is a brick veneer, side gable building with five garage bays. One of the end bays was enclosed for a shop. In May of the CCC Company changed. The young enrollees of Company were replaced with a Veteran's group, Company Changes in the attitude and SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No.

CA-2778-A (Page 11) program were noted immediately, as observed in the Refuge Narrative (May-June "the Veteran's are not interested in the education program, but did start a camp newspaper, The Honker." The Veteran enrollees worked on the truck trails, completing approximately 10 miles of graveled roadway in 193 8 and continued to clean-up the refuge, razing old buildings as the refuge development proceeded. All lumber was salvaged and stored so that materials were readily available. Construction of a large poured concrete bridge and diversion dam was a major project that took several months to complete. In May of Camp Sacramento was visited by Mr. J. Clark Salyer, (the first Division Chief for Refuges Mr. Murray, and Mr. Gregson. It was Mr.

Gregson who was responsible for reviewing and approving the plans for the residences. Between and building the refuge headquarters was the primary activity of the CCC enrollees. First, the residential garage was remodeled for use by the Refuge Manager. Then the Refuge Manager's residence (Quarters No. 1) was created from one of the original farmhouses. Originally the residence was a wood-clad craftsman- style house with an inset porch and wide overhanging eaves with knee-braces. The craftsman style was transformed into a brick veneered, building with boxed eaves and tile roof. The office and the Patrolman's Residence (Quarters No. 2) were both completed using salvaged lumber and then veneered with brick and finished with red tile roofs.

The standard 100-ft-tall steel-frame lookout tower was constructed in the center of the headquarters compound. A barn was added to the headquarters complex, using a plan and materials that differed markedly from the other buildings. The barn plan is a simple side gable roof with clipped eaves, central gable cupola, and wood siding. The barn was later converted into a carpentry shop. A duck hospital, blacksmith shop, equipment shed, oil house, and pump house completed the headquarters ensemble. In work efforts again focused on building ponds and water control structures, dikes and truck trails, and rip-rapping eroded areas. By the end of the camp activities also included transferring equipment and materials and closing down the camp.

Camp Sacramento closed in July CCC Context Property Types The CCC work projects are often associated with the Rustic-style of architecture that was popularized by the National Park Service and Forest Service during the The Rustic-style ... is characterized by a design related to the natural landscape and expressed in the use of materials natural to their setting and in scale SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 12) and proportion to the physical features of their particular site. An important element in Rustic design is to create buildings that were subordinate to the setting, rather than an intrusion dominating the scene.

The nonintrusive concept was carried out through the use of horizontal lines, low silhouette, organic forms and scale, proportion, and texture of the building materials. Attention was paid to many details on these structures, assuring its harmony with the surroundings (Smith Prior to the the Fish and Wildlife Service did not have a well-developed image and few permanent facilities. Developing plans for all of the buildings needed on the refuges was placed under the direction of an architect for the Department of Agriculture, Amos Emory. Working with a cadre of architects they churned out plans for all of the necessary buildings in These standard plans were used extensively in the mid-west where many refuges were established in the The standard plans were often modified as they moved West.

It is interesting to note that the standard plans developed in did not follow the rustic-style that pervaded most of the architecture found in National Parks and National Forests. The Fish and Wildlife Service's buildings were utilitarian and modernistic, constructed of cinder block with steel sash windows, and tile roofs. The one-story residences were usually side-gable with interior chimney's and had a rambling character that appears more like the ranch style than the rustic. The Sacramento NWR presents a blend of CCC-plan buildings (Service Building, Lookout Tower, and Barn), new designs (Quarters No. 2, Office, water tank tower), and modifications of standing buildings (Quarters No. 1, Garage).

The only features repeated on each of the buildings, except the barn, is brick veneer and tile roofs that provided a unified appearance to the ensemble. PART II. ARCHITECTURAL INFORMATION A. General Statement: 1. Architectural character: The Quarters No. 2 does not convey a recognized architectural style or method of construction, nor is it the work of a master craftsman. The house is a small, wood frame, end-gable house form. The exterior wall is finished with brick veneer and the roof is a red tile material. The wall and roofing material provide a consistent appearance to the headquarters buildings that were all finished with brick and tile. The plan is unique to the Sacramento but the architect and drawings have not been located.

The house was built as a residence for the Patrolman, usually a young, unmarried man who worked on the refuge seasonally. SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 13) 2. Condition of fabric: Quarters No. 2 is in poor condition. The tile roofs are leaking, the exterior brick veneer is beginning to crack and shift away from the wood frame as the metal ties are deteriorating. The concrete foundation is unreinforced and is cracked. The interior of the house was badly damaged by a fire in The windows and interior were destroyed in the blaze. The windows have all been replaced. B. Description of Exterior: 1. Overall dimensions: The original floor plan for Quarters No. 2 was a rectangular plan, 37 ft long and 27 ft wide.

The one-story residence was divided into two bedrooms, a livingroom, bathroom, and kitchen with an enclosed back porch (Figures A bedroom and bathroom addition extends 16' 11" x 16' 7" to the south. 2. Foundations: The building is set on an 8" wide un-reinforced concrete continuous wall footing. The Quarters No. 2 joists are supported on irregularly spaced 4 x 6" beams that are supported on 4 x 6" posts. The posts are set on 18 x l 8"concrete footings. 3. Walls: The exterior is sheathed with horizontal boards, tar paper and brick. 4. Structural systems, framing: The building is standard stud-wall wood frame construction, utilizing boards salvaged from the farm buildings. The roof slope is moderate.

The roof structure consists of 1" by approximately 1O" boards nailed to 2 x 4" joists 24"on center. Joists are supported at exterior walls and by two irregular trusses that run the length of the structure. Pre-manufactured trusses were used for the new addition. Several rafters were cut when the addition was constructed, these rafters are not tied into the structure. 5. Porches, stoops, balconies: Quarters No. 2 has a new gable roof porch that extends 10 ft off the front and is 18 ft wide and is slightly off set from the center of the building. The roof is covered with tile, the gable end is in-filled with plywood, and there is a railing surrounding the wooden deck porch. The rear sun porch was altered in when the rear wall of the house was extended and the porch enclosed. 6.

Chimneys: One chimney, centrally placed and slightly on the south side of the east-west gable. The chimney is built of unreinforced brick with no attachments to the roof structure. The chimney vents a wood stove. SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 14) 7. Openings: a. Doorways and doors: West (front) Elevation: There are only two entrances to Quarters No. 2, the front door which is centered on the west elevation. The front door is a wood exterior door with a window in the upper half. A metal screen door protects the main door. East Elevation: The second door is on the rear elevation. The door is wood with a window in the upper half. The placement of the door has been altered.

Originally, the door entered on to the sun porch. The sun porch has been engulfed by the rear extension that changed the roof line and brought the rear wall out flush with the sun porch. The door is slightly off center of the gable, with a screen door. b. Windows and shutters: The window sashes have all been changed from wood sash to aluminum frame, but the opening size has been retained. There is soldier coursing at the headers and rowlock coursing at the sill. The original windows were six-over-six, double-hung wood sash and fixed multi- pane windows on the corner of the sun porch. New windows added in the south addition are horizontal aluminum sliders, although the soldier coursing at the lintels and the rowlock coursing at the sills is repeated. West Elevation: Quarters No.

2 faces west and the front door is centered and flanked by large windows. Originally, the windows were six-over-six, double hung wood sash and frame. The wood sash has been replaced with an aluminum frame fixed sash upper pane and a sliding lower-114 window. South Elevation: The south elevation has two of the original window openings, although the sash has been replaced with aluminum frames identical to the west elevation. The south wing includes two aluminum slider sash windows and a small bathroom privacy window. East Elevation: The east wall has been extensively altered. The original sun porch windows have all been removed. All of the windows have been replaced with aluminum sliders.

North Elevation: The north elevation includes one of the large sash styles (originally double hung wooden) and two smaller windows that also would have had wood sash double hung windows. The smaller size windows are in the bathroom and kitchen. All windows are currently aluminum frame. SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 15) 8. Roof: a. Shape, coverings: Quarters No. 2 is an end gable, wood frame, rectangular form with later additions that in-filled the rear (east) wall under a common roof, and a south wing addition that creates an L-shape to the building. The one-story residence is finished with a medium-pitched gable covered with red clay tiles. b.

Cornice, eaves: The eaves are shallow and project slightly over the body of the building. The eaves are enclosed in a flat soffit and the gable ends are finished with a split corner rake tile at the edge. C. Description of Interior: 1. Floor plan: The house was originally a rectangular form with living room and bedroom at the front of the house, a bathroom next to the bedroom and a kitchen at the back of the house. A small bedroom is off the livingroom at the back of the house. And, an enclosed rear, sun porch stretched 3/4 across the rear elevation. However, the house has undergone major alterations. The rear wall of the house was extended about 10 ft to be flush with the sun porch. This modification extended the very small bedroom to a more normal size.

Then a large addition was built on the south elevation to provide a master bedroom and bathroom. The house is now L- shaped. 2. Stairways: None. 3. Flooring: Wood flooring was present in the house but was replaced after the fire. Currently, the bedrooms are carpeted and the kitchen and bathroom have linoleum flooring. 4. Wall and ceiling finish: The interior walls and ceiling in the front bedroom are finished with the original lathe and plaster. The livingroom walls were originally finished with wood paneling. The paneling was damaged by the fire and replaced with plaster board. All other rooms have been updated to dry-wall finishing. 5. Openings: a. Doorways and doors: Doors are present on each of the bedrooms, bathrooms. Doors are standard stock, wood, hollow-core doors.

SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 16) 6. Mechanical equipment: a. Heating, air conditioning, ventilation: The building's heating system has been overhauled with new duct work installed in the attic and exits out the rear of the house at the gable vent where it joins a heat pump. b. Lighting: Electrical wiring was installed in and has been revised over the years. c. Plumbing: Plumbing is connected to a septic tank. Water is from a well. D. Site: 1. General setting and orientation: Quarters No. 2 and the Garage are located at the southern margin of the headquarters complex that was constructed by the Quarters No. 2 faces west as does the garage that is further to the south, Quarters No.

1 faces east and is set slightly to the north of Quarters No. 2. A driveway access road is oriented north-south between the houses. SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 17) Figure 8: Quarters No. 2, 15% complete (Refuge Annual Narrative, Figure 9: Quarters No. 2, 40% complete, view ofrear (Refuge Annual Narrative, SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 18) Figure 10: Quarters No. 2 as completed (front), west and south sides (Refuge Annual Narrative, Figure 11: Quarters No. 2 as completed (rear), east and south sides (Refuge Annual Narrative, SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No.

2 (Patrolman's House) HABS No. CA-2778-A (Page 19) ~n ~ ~ - - --2;:.::o -- 1s -11 2 ~ Boe< doer .J eziza --- - ~j _ _ , !, l '?i ! ~ I ~.i i "_! - ,I n 1 i-~ ~- 11 IJ ~1 IF--= ~ - Livfo.9 Room i J)JI. z Z2 if J -1 l o -r Is -4 ij + -s . I ' 1 I -- --'------i l ttr-o I PlAN Figure 12: Current floor plan of Quarters No. 2. SACRAMENTO NATIONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 20) t South Mtfitlon W ST ELEVATION DJ OJI D D NORTH ELE:VATION Figure 13: Front (West) and Side (North) Elevations of Quarters No. 2. SACRAMENTO NA TI ON AL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 21) Brick venef1t' - -. --~ ___ __ . EAST ELEVATION ''--Clay tile shingles "--Brick veneer

South Elevation

Figure 14: Rear (East) and Side (South) Elevations of Quarters No. 2. SACRAMENTO NA TI ONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 22) PART III. SOURCES OF INFORMATION A. Original Architectural Drawings: No drawings or the original plans were located. According to the Narrative Reports, the house plan was prepared on-site and sent to the Fish and Wildlife Service's Washington Office where it was approved for construction by Mr. Gregson. Quarters No. 2 was built from materials salvaged from the Spalding Ranch. Architectural drawings were prepared for the bedroom addition in and are presented here. The drawings were prepared by U.S. Fish and Wildlife Service engineering staff. B.

Early views: See Figures that are from the Sacramento National Wildlife Refuge's Annual Narrative for The Annual Narratives are on-file at the Sacramento National Wildlife Refuge office, there are no negative numbers. C.

Bibliography

219 words

Source document Quoted word for word from HABS CA-2778-A. Not written, edited or summarised by this site.

Annual Narratives. Sacramento NWR Annual Narrative. Unpublished report, on- file, Willows, California, Bancroft, Hubert Howe. The Works by Hubert Howe Bancroft: History of California, Vol. VII, San Francisco, The History Company, Beck, Warren A. and David A. Williams. California: A History of the Golden State. New York, Doubleday and Company, Bernstein, Alfred I. FEMA 310 Seismic Evaluation of Buildings Sacramento National Wildlife Refuge Residence, FWS Property No. 2, Glenn County, Willows, California. Unpublished report, on-file Willows, California, Sacramento Glenn County Deed Records. Rideout, N. D. to Edward Potter, Book Glenn County Courthouse, Willows, June 7, Glenn County Deed Records. Stanton (Commissioner) to Zephania S.

Spalding, Book Glenn County Courthouse, Willows, May 24, Glenn County Deed Records. USA from Glenn and Colusa Counties - condemnation, Volume Glenn County Courthouse, Willows, December 4, Glenn County Deed Records. USA from Spalding Co., et al. - Declaration of Taking and Judgement, Volume Glenn County Courthouse, Willows, January 25, SACRAMENTO NA TI ONAL WILDLIFE REFUGE HEADQUARTERS COMPLEX, QUARTERS No. 2 (Patrolman's House) HABS No. CA-2778-A (Page 23) Illamann, Tom, Pete Miller, Gerald Miller, and Jim Vodden. Sacramento NWR Single Family Home Investigation, Otak Project No. I Otak, Lake Owego, Oregon. Unpublished report, on-file Willows, California, Sacramento Mccomish, Charles Davis and Rebecca T. Lambert. History of Colusa and Glenn Counties. Los Angeles, Historic Record Company,

In context

Willows, California The place record: every map, photograph and survey of this town.
Glenn County, California 156 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Willows

3 records

The federal surveyors worked through Willows building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Sacramento National Wildlife RefugeHABS CA-27787,124 words
Sacramento National Wildlife RefugeHABS CA-2778-B3,753 words
Glenn County CourthouseHABS CAL,11-WILL,1-31 words

Provenance

  • Written history. Quoted verbatim from HABS CA-2778-A. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.