Alison Garcia Kellar, Architectural Historian Garavaglia Architecture, Inc. (GA) San Francisco, California Date: August LAWRENCE LIVERMORE NATIONAL LABORATORY, LIVERMORE POOL-TYPE REACTOR HAER No. CA-2356 Page 2 Part I. Historical Information A. Physical History 1. Date of erection: Designed: Construction Begun: Building Completed: 2. Architect: The Austin Company, an engineering and building company based in Oakland, California, designed Building Headquartered in Cleveland, Ohio, the firm was noted for its industrial and military construction. 1 The international engineering company Foster Wheeler Corporation designed and built the which was housed inside of Building 2 3. Original and subsequent owners, occupants, uses: The building has always been owned by the U.S.
Government, as part of one of the laboratories of the Atomic Energy Commission (AEC) and its successor agencies (currently the Department of Energy/National Nuclear Security Administration [DOE/NNSA]). 3 The original user was the Lawrence Radiation Laboratory, which evolved into Lawrence Livermore National Laboratory. The occupants had continuously been Lawrence Livermore National Laboratory employees, and the building was continuously used through for nuclear research, supporting the weapons program, in addition to chemistry, physics, and biomedical research programs at the and Lawrence Berkeley National Laboratory 5.
Original plans and construction: Building 280 and adjacent Increment 1 of Building 281 were originally considered to be one building, designated as Building as together, they accommodated the functions of the As originally designed, Building 193 comprised the facility. Designed in and constructed first, the T-shaped one-story Increment 1 of Building 281 was attached to Building 280 by a personnel air-lock entrance. Adjacent Building 281 originally housed the control room for the and its related chemistry laboratories. The gross-square-foot concrete-block structure had windows on the north and south elevations. Designed concurrently in Building 280 was created specifically to house the as a double-height, round, domed structure.
The gross-square-foot structure measured 80 in diameter and 52 in height. 4 Construction consisted of a reinforced concrete ring wall with a cylindrical shell of welded steel plates topped with a self- supporting roof of steel plates. The building s foundation and all flooring were comprised 1 Michael A. Sullivan and Rebecca A. Ullrich, Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment (Livermore: Lawrence Livermore National Laboratory: 2 K. R. Heidecker and R. A.
Ullrich, Five-Year Re-Evaluation of Historic Building Assessment (Livermore: Lawrence Livermore National Laboratory: 3 Lawrence Livermore National Laboratory, High Energy Laser Facility, Written Historical and Descriptive Data, Historic American Engineering Record, National Park Service, U.S. Department of the Interior, page 2. From Prints and Photographs Division, Library of Congress (HAER No. CA-232; 4 Heidecker and Ullrich, LAWRENCE LIVERMORE NATIONAL LABORATORY, LIVERMORE POOL-TYPE REACTOR HAER No. CA-2356 Page 3 of reinforced concrete. An insulated steel shell and steel dome encompassed the airtight interior. Located at the center of Building the construction of the required a submerged aluminum tank, surrounded by biological shielding, to house the core.
The tank measured 6 -7 in diameter and was 3/8 thick. The reinforced board-formed concrete core included a thermal column of graphite and 35 uranium fuel elements, each measuring 3 x 3 x 35 , submerged into the floor storage pit. 6. Alterations and additions: In an LLNL-wide renumbering campaign designated Building 193 as Buildings 280 and In two years after its construction, the went critical, meaning it began operating at a steady power level, and closed down in to modify the containment system and upgrade the power from one to two megawatts. Building 280 was decommissioned in and has not been in use since. 5 B. Historical Context: 1. Early History The was the brainchild of E. O. Lawrence and Edward Teller, physicists affiliated with the Manhattan Engineering District.
Lawrence and Teller believed that the existing Los Alamos National Laboratory (LANL) was not working aggressively enough to achieve the goal of accelerating advancements in nuclear weaponry. The two physicists advocated for the founding of a second laboratory, determined that the design and production of a thermonuclear weapon in a new facility would be the next advancement in nuclear weaponry. Lawrence and Teller's argument was well received within the AEC, as the Soviet Union had just detonated its first atomic weapon in American nuclear policymakers felt an urgency to stay ahead of the Soviet Union both technologically and militarily, fearing the potential actions of an enemy armed with nuclear weapons.
To deter the use of such weapons by the opposition, policymakers were determined to significantly increase the U.S. stockpile. Convinced that a second laboratory would accelerate the process of building up a nuclear arsenal, the AEC established the in Livermore, California, in September of as a second nuclear weapons design facility. 6 Herbert York, the first director of articulated four missions for the new laboratory;; including designing thermonuclear weapons, providing diagnostic measurements for weapons tests for LANL and developing a controlled thermonuclear reaction for power sources, and basic physics research.
York was in strong pursuit of both weapons and non-weapons related research, as he felt that a diversified research program at would attract the country s brightest young scientists. 7 2. Mission History The following mission history is from the Five-Year Re-Evaluation of Historic Building Assessment created in In construction began on the Facility, Buildings 280 and The 5 Ibid. 6 Ibid., 247 7 Herbert York, Making Weapons, Talking Peace, Physics Today (April LAWRENCE LIVERMORE NATIONAL LABORATORY, LIVERMORE POOL-TYPE REACTOR HAER No. CA-2356 Page 4 facility was intended to replace the old Water-Boiling Neutron Source Reactor built by in The was considered an old model reactor, not large enough or suitable for weapons research.
Building 280 housed the and Building 281 housed research laboratories for the reactor. The was designed as a flexible research reactor primarily to support the weapons program but also intended for use by the chemistry, physics, and biomedical research programs at both and From when it first went critical, until the was a workhorse for the weapons program. The was used for a variety of chemistry and physics experiments, including weapon radiochemical analysis, bomb fraction measurements, analysis of samples from nuclear tests, capture-to-fission ratio measurements of uranium cross-section measurements, calibration of instruments for determining fission yield, instrument testing, and radiation damage studies.
The provided valuable information regarding nuclear processes, nuclear testing, and nuclear weapons design. Without its own research reactor would have had to contract this work to LANL or ARCO, limiting its ability to come up with new techniques and designs. From to the also provided support to a variety of non-weapons-related research programs including the biomedical research programs at and The research for biomedical programs included studying the effects of radiation on living things, using tracers to monitor biological processes, and creating isotopes for medical purposes. In after more than twenty years of service, the was decommissioned. 8 8 Heidecker and Ullrich, LAWRENCE LIVERMORE NATIONAL LABORATORY, LIVERMORE POOL-TYPE REACTOR HAER No. CA-2356 Page 5 Part II.
Structural/ Design/ Equipment Information A. General Statement: 1. Architectural character: The building (Building is a round, domed structure comprised of welded steel plates clad in mastic sprayed material. The building is an unembellished, windowless industrial building, made to serve a specific scientific research purpose. Like other industrial buildings, this building was designed to support and accommodate the machines it housed, in this case the reactor. As identified in the Historic Context and Building Assessments for the Lawrence Livermore National Laboratory Built Environment, Building 280 is characterized as Industrial Vernacular, a style present among Cold War era buildings. 9 2. Condition of fabric: The core of the has been removed, and the containment vessel remains intact.
Minimal portions of the flooring have been test bored throughout. The vacant building is in very good condition. B. Description of Exterior: 1. Overall dimensions: The building measures 80 in diameter and 52 in height, and has a working floor area of nearly square feet. 10 The building measures 38 from the ground to the spring point of the dome. 2. Foundations: The foundation is a 6 level concrete slab, with a 4 curb around the entire circumference. 11 3. Walls: The building is a cylindrical shell of welded thick steel plates, reinforced with angle rings. 12 The dome and its walls are insulated with a 3/8 layer of cork and mastic sprayed on the outside of the building, covered with reflective paint. 13 4.
Structural system, framing: The structural system is comprised of the welded steel plate walls, and a self-supporting roof of steel plates. The base of this structure is welded to large anchor bars which are buried into a reinforced-concrete perimeter ring wall. 5. Porches and loading docks: A contemporary overhang sits over the large, main, truck door. A shallow concrete ramp leads to the main door from the south. 7. Openings: a. Doorways and doors: There are three metal frame exterior doors at the eastern portion of the building. This included one truck door and two personnel escape doors, all of which opened inward. 14 9 Sullivan and Ullrich, 10 Heidecker and Ullrich, and Lawrence Radiation Laboratory, The Livermore Pool Type Reactor UCRL- (Livermore: Lawrence Radiation Laboratory: 15.
11 Lawrence Radiation Laboratory, 15. 12 Ibid.,15. 13 Ibid., 21. 14 Ibid., 15. LAWRENCE LIVERMORE NATIONAL LABORATORY, LIVERMORE POOL-TYPE REACTOR HAER No. CA-2356 Page 6 b. Windows and shutters: There are no windows present in this building. 8. Roof: a. Shape, covering: The roof is a rounded dome of self-supporting steel plates, clad in a mastic spray covering. A stack with a butterfly vent and a dosimeter sit at the apex of the roof. A ladder along the north side of the building runs up onto the domed roof and leads to the vent. C. Description of Interior: 1. Floor plans: The former sits in the center of the round floor plan. The space has no interior walls or compartmentalized spaces aside from the To the west of the disassembled reactor is an openly submerged equipment pit.
Also submerged below are a hold up tank and storage tank. A magnet pit sits to the north of the reactor. Stairs located northeast of the reactor lead from the ground floor up to the reactor. When the was in operation, work stations with various related computers, equipment, and machinery extended radially from the reactor. 2. Stairways: An open metal stairway leads up to the reactor. 3. Flooring: The concrete flooring was initially surface hardened and covered with five coats of a strippable plastic paint to facilitate decontamination. An equipment pit is located in the floor to the west of the reactor shield, measuring 12 x 34 x 16 deep. Conduits built into the floor run radially from the reactor faces to the building wall and are capped at floor level. 15 4. Wall and ceiling finish: a.
Wall finish: The interior is comprised of an airtight steel shell and steel dome, which forms a controlled-leakage steel barrier designed to assure containment of radioactive effluents under all conditions. The interior of the building is insulated with a 1 layer of polyurethane on the walls, to provide both acoustic and thermal insulation b. Ceiling finish: The domed ceiling is insulated with a 1- layer of polyurethane on the ceiling, to provide both acoustic and thermal insulation. 16 5. Openings: a. Doorways and doors: An airlock personnel door sits between Building 280 and Building There is a cave door at the reactor. 7. Hardware: The hardware present in the building includes a 15-ton traveling crane with 2-ton monorail hoist which serviced the reactor. 15 Ibid., 16. 16 Ibid., 21.
LAWRENCE LIVERMORE NATIONAL LABORATORY, LIVERMORE POOL-TYPE REACTOR HAER No. CA-2356 Page 7 8. Mechanical equipment: a. Heating, air conditioning, ventilation: Beam plug storage located to the southeast of the building included air conditioning exhaust vents, a decontamination system, and two butterfly vents, which allowed for air circulation and gas waste exhaustion. 17 The stack located at the top of the dome includes a butterfly vent, which connects to the beam plug storage via an 8 x 16 duct that runs along the ceiling and wall. There is an air-conditioning duct on north wall, while an in-take duct sits on the south wall. An early air-cleaning system connected to the building assured that internal pressure would remain low in the event of a building seal.
Pipes along the western portion of the building would allow for the high-expansion foam fire protection system to deploy in case of an internal fire. 18 b. Lighting: Lighting in the building is comprised of fluorescent fixtures, both flush in the dropped ceiling and suspended from the gypsum ceiling. c. Plumbing: The concrete floor has flush drains and covered pits, including one large equipment pit surrounded by narrow drainage gutters. Located in the northwest of the building, the submerged equipment tank housed waste tanks, demineralizers, and several pumps and filters. 19 d. Electrical: Fourteen 4 conduits were buried in the concrete floor, which ran radially from the reactor to the building wall.
These conduits capped at the floor level for use with experimental equipment or for utilities extension. D. Machines: Two dosimeters, which measured exposure to radiation, were located outside of Building one by the northern escape door, and the other on top of the roof. The 15-ton crane operated with a variable-speed motor. E. Site Layout: The building is located in the northwest portion of the Livermore campus. The building is largely isolated, surrounded by paved asphalt. T-shaped Building originally utilized as the s laboratory building, is attached to Building 280 just to the west. Building 281 originally housed the control console and many of the mechanical utilities for the reactor.
20 Presently, an electrical substation and emergency system sit unattached to the south of the air lock chamber. A grouping of trees with a paved walkway extends to the south of the site, while a parking lot sits to the east. A one-story auxiliary gabled structure, housing the emergency scrubber system, sits immediately to the north. Beyond the parking lot to the east sit two other buildings. 17 Ibid., 15. 18 Ibid., 22. 19 Ibid., 16. 20 Ibid, 19. LAWRENCE LIVERMORE NATIONAL LABORATORY, LIVERMORE POOL-TYPE REACTOR HAER No. CA-2356 Page 8 Part III. Operations and Process A. Operations: The building was constructed to house the a low-power low-flux reactor, designed for basic research and radioisotope production.
The was completed in and first operated in 21 This facility was versatile and suitable for general research by all departments at The reactor neutron-research program of the had three general experimental programs: precision gamma studies, solid-state studies with neutron diffraction spectrometers and radiation damage experiments, and precision measurements of neutron interactions with matter. 22 B. Technology: While the is no longer extant, the support equipment remains. The following is a summation of the reactor core, which was the impetus for the construction of Building The swimming pool type reactor, or Livermore Pool Type Reactor was a one megawatt solid fuel, light water moderated and cooled reactor.
The reactor core resided in a tank approximately six feet in diameter and three-eights of an inch thick surrounded by biological shielding. The fuel elements of the reactor core were modeled after those in the Materials Test Reactor located at the National Reactor Testing Station in Idaho. The design of a swimming pool type reactor was considered superior to a water boiler because it overcame the problems with escaping gases or loose fission products experienced by water-boiler reactors. In the event of an accidental explosion, the water surrounding the swimming pool type reactor would contain radiation.
23 The reactor s core was cooled by a closed circulation system using low conductivity water, which was circulated downward through the core, a holdup tank, primary coolant pump, and heat exchanger before returning to a reactor tank. C. Workers: Workers form a variety of departments utilized the research conducted with the reactor. This included technicians, engineers, physicists, scientists and office staff from internal divisions including Mechanical Shops, Mechanical Equipment, Health Chemistry, Health Physics, Mechanical Engineering, Electronics Engineering, Plant Engineering, and the Neutronics N Division. 24 D. End Product: By the early the was irradiating over 900 samples.
At that time, about one-third of the output samples went to UC Berkeley researchers, and the rest remained at Livermore for use by chemistry and physics groups. 25 The provided valuable information 21 Heidecker and Ullrich, 82 83. 22 Ibid., 83. 23 Ibid., 82. 24 Holds Open House, The Magnet, Vol. 2, no. 6 (June 1. 25 Shopping for Isotopes, The Magnet, 4. LAWRENCE LIVERMORE NATIONAL LABORATORY, LIVERMORE POOL-TYPE REACTOR HAER No. CA-2356 Page 9 regarding nuclear processes, nuclear testing, and nuclear weapons design in support of programs. 26 From to scientists in the biological and medical fields were able to use the to investigate the effects of radiation on living things and to study life processes in plants and animals by tracer techniques. 27 Part IV. Sources of Information A.
Architectural drawings: Original building plans were not referenced for the production of this report. An early internal publication, The Livermore Pool Type Reactor (UCRL- was published in and included schematic diagrams, sections, and plans reflecting he building and its operating systems shortly after construction. B. Early Views: Construction photographs of Building provided by were referenced for the production of this report. These photographs depicted site preparation, core construction, crane and wall construction, and exterior siding treatment. Photographs of Building 280 during the early years of operation depicting various workstations, instrument panels, and auxiliary and support instruments were also reviewed.
Aside from the released, provided images, limited photographs of the complex were accessible and or available in a reproducible format. D. Selected