BlockBefore

Atlas Launch Complex 576-A, Vandenberg Space Force Base Thirteenth Street and Watt Road, Lompoc

Atlas Launch Complex 576-A, Vandenberg Space Force Base Thirteenth Street and Watt Road, Lompoc, Santa Barbara County, CA. Surveyed as HAER CA-2395, with a 22,502-word written history.

From the record

“Atlas Launch Complex 576 A is significant for its important associations with the development and operation of intercontinental ballistic missiles (ICBM) and missile launch complexes during the Cold War.”

Written record, HAER CA-2395 survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-2395 · the record runs 22502 words · one of 167 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

54 words

Source document Quoted word for word from HAER CA-2395. Not written, edited or summarised by this site.

Vandenberg Space Force Base Launch Complex 576 A Thirteenth Street and Watt Road Lompoc Vicinity Santa Barbara County California U.S. Geological Survey Casmalia Quadrangle, Universal Transverse Mercator Coordinates: Zone 10 Pad 1 (Facility Pad 2 (Facility Pad 3 (Facility LOB (Facility MOD-II (Facilities Dates of Construction: 59, 67 Engineer: U.S. Army Corps of Engineers

Significance

143 words

Source document Quoted word for word from HAER CA-2395. Not written, edited or summarised by this site.

Atlas Launch Complex 576 A is significant for its important associations with the development and operation of intercontinental ballistic missiles (ICBM) and missile launch complexes during the Cold War. This includes its critical role in the initial deployment of the Atlas D missile, the United States first operational ICBM, and its subsequent role in the ICBM Advanced Ballistic Re-Entry Systems (ABRES) and Ballistic Missile Re-Entry Systems programs as an Atlas E and F missile launch site. Launch Complex 576 A is also significant for its engineering and technological contributions to the development of operational ICBM launch complexes and to the ABRES/BMRS programs. The Atlas and Thor missiles and the ABRES/BMRS programs played critical roles in U.S.

military and civilian space programs. Historian(s): Josh Smallwood, Timothy Yates, Lea Kolesky, Cheyenne Good, M. Colleen Hamilton ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 2)

Written history

22230 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CA-2395. Not written, edited or summarised by this site.

The Vandenberg Space Force Base Atlas Launch Complex 576-A is eligible for listing in the National Register of Historic Places under Criteria A and C. The Atlas Launch Complex 576-A was determined eligible for the with California State Historic Preservation Officer (SHPO) concurrence in The launch complex s eligibility was reaffirmed under Section 106 consultation in and The launch complex is in a deteriorated condition, and the one remaining steel gantry (or missile service tower) at the complex is in extremely poor condition. Restoration of the facility is too cost-prohibitive to be feasible. This Historic American Engineering Record (HAER) serves to document the facility before it becomes subject to further deterioration.

The following report contains historical, architectural, and photographic documentation to HAER Level II standards of the Atlas Launch Complex 576-A. The preparation of this HAER was coordinated with Christopher Ryan, Cultural Resources Manager. Applied EarthWorks, Inc. Historians and Architectural Historians M. Colleen Hamilton, Timothy Yates, Lea Kolesky, and Cheyenne Good prepared the HAER document. In addition to Mr. Ryan, staff who coordinated and assisted research efforts supporting the preparation of this HAER include Historic Preservation Manager Josh Smallwood, Cultural Resources Specialist James Carucci, and Base Historian Scott Bailey.

Historical research focused on the acquisition and interpretation of primary and secondary source documents relating to the mission and construction history of the Atlas Launch Complex 576-A. Research and documentation procedures followed the standards established in the National Park Service HAER guidelines. Engineering and architectural as- built drawings for the initial construction of the launch complex in were supplied by staff named above. Applied EarthWorks staff conducted research at the History Office and the Engineering Vault at the latter of which yielded as-built drawings for maintenance and modifications of the launch complex.

In addition to as-built drawings, sources consulted include historic photographs, historic newspapers, launch complex operational guides, and other records archived at the History Office. A variety of cultural resource management documents addressing the Atlas Launch Complex 576-A and other facilities at were also consulted. Photographic documentation for this project consists largely of representative current condition exterior and interior large-format (4 x 5 ) archival photographs of Atlas Launch Complex 576-A facilities prepared in conjunction with this HAER document. Professional photographer William Dewey shot the launch complex facilities on March 22, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 3) assisted by Christopher Ryan, Archaeologist Robert Newcomb, and Donald J.

Prichard, Director and Curator of the Space and Missile Technology Center. Photographic documentation also includes large- format archival photographs shot in as well as archival quality reproductions of historic photographs. ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 4) ACRONYMS AND ABBREVIATIONS AFB Air Force base ABM Anti-ballistic missile AFBMD Air Force Ballistic Missile Division AFSC Air Force Systems Command AMROC American Rocket Company ARDC Air Research and Development Command Ballistic Missile Re-entry System CPT Crew procedure trainers DASO Demonstration and shakedown operations DPR Department of Parks and Recreation GOB Guidance Operations Building HPTEM High Performance Target Engine Measurement ICBM Intercontinental ballistic missiles IRBM Intermediate-Range Ballistic Missile IWST Integrated weapon system training LOB Launch Operations Building LOX Liquid oxygen LSB Launch and Service Building MST Missile service towers NASA National Aeronautics and Space Administration National Register of Historic Places ORT Operational readiness training POW Prisoner of war SAC Strategic Air Command SHPO State Historic Preservation Officer SLV Standardized launch vehicles SMS Strategic Missile Squadron USAF United States Air Force VAFB Vandenberg Air Force Base Vandenberg Space Force Base ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 5) PART I. HISTORICAL OVERVIEW 1 Introduction Formerly Vandenberg Air Force Base (VAFB), today s Vandenberg Space Force Base is in Santa Barbara County on the Central Coast of California, approximately 9 miles northwest of the city of Lompoc, 55 miles northwest of Santa Barbara, and 140 miles northwest of Los Angeles. State Route 246 divides the installation into North and South Scattered across are launch complexes and support facilities for every type of ICBM and space booster the United States has developed, including office buildings, maintenance shops, warehouses, military housing, a long airstrip, and weather, tracking, and communications facilities.

2 is the only military installation in the United States from which unmanned government and commercial satellites can be safely launched into polar orbit. 3 It is also the only site from which Minuteman III ICBMs are launched to verify weapon systems performance. Numerous first-and-only events in U.S. Air Force history occurred at the base, hereafter referred to by the historic identifier, VAFB. VAFB played a crucial role in the effort to safeguard the national security of the United States during the Cold War. The Air Force established VAFB at the site of the former Camp Cooke as a missile testing base where missiles and supporting ground equipment could be tested under operational conditions, and as a training base for its operational missile combat and maintenance crews. All of the U.S.

ICBMs have been flight tested at VAFB and thousands of men, including crews from the British Royal Air Force, received missile weapon system combat and maintenance training under operationalconditions at VAFB. In addition to its tremendous contribution to the ballistic missile weapon system programs, VAFB also played a pivotal role in America s military space program during the Cold War. Numerous critically important military satellites, including most of this nation s surveillance and reconnaissance satellites, have been launched from VAFB. Atlas Launch Complex 576 A played an important historical role in ICBM programs at VAFB. Beginning in these programs helped produce evolutionary advances in missile technology, deployment, survivability, accuracy, warhead potency, and reaction time.

4 ICBM launch facilities at VAFB utilized a number of different designs, beginning with aboveground gantry- type launchers constructed at Atlas Launch Complex 576 A, site of the first Atlas missile 1 Much of this Historical Overview has been excerpted directly from documents previously prepared by Patrick Nowlan, Roy McCullough, and Josh Smallwood: Patrick Nowlan and Roy McCullough, Cold War Properties Evaluation Phase III, Inventory and Evaluation of Atlas, Titan, Bomarc, and Blue Scout Junior Launch Facilities at Vandenberg Air Force Base, California, for the United States Air Force (Champaign, Illinois: Tri-Services Cultural Resources Research Center, U.S.

Army Construction Engineering Research Laboratories, Josh Smallwood, Department of Parks and Recreation Forms for the Atlas Launch Complex 576 A (Vandenberg Air Force Base, California: Center for the Environmental Management of Military Lands [CEMML], Built Environment Inventory Districts, Project 2020-BEI, 2 Nowlan and McCullough, Cold War Properties Evaluation Phase III, 3 Nowlan and McCullough, Cold War Properties Evaluation Phase III, 4 Nowlan and McCullough, Cold War Properties Evaluation Phase III, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 6) launched at VAFB on September 9, and, one month later, site of the first operational Atlas ICBM in the United States to be equipped with a nuclear warhead and placed on active alert.

5 ICBM launch facilities at VAFB and elsewhere subsequently progressed to belowground coffin launchers, silo elevator lift launchers, and eventually in-silo launchers. The launch facilities at VAFB were prototype and testing/training facilities, predecessors of the facilities constructed at operational bases across the Air Force Strategic Air Command (SAC). The SAC used the VAFB facilities to test and adjust weapon system deficiencies before executing the final design configuration at operational field bases. SAC s ICBM crews also received a significant portion of their operational readiness training at VAFB launch facilities, and the launches helped to perfect operational launching and maintenance procedures.

Missiles were launched from VAFB downrange to a target in the Pacific Ocean, which was initially established as the U.S. Navy s Pacific Missile Range and later named the U.S. Air Force Western Test Range. 6 Cold War Background Relations between the Soviet Union and the West quickly deteriorated after the end of World War II as each struggled to create a post-war world based upon their own political ideologies. Tensions between the countries reached a critical point in 49 when the Soviet Union blocked access to West Berlin. Although a massive airlift campaign by the United States prevented war, the incident revealed the strengths and weaknesses of both countries.

The Soviets held a substantial military advantage in conventional forces while the United States was the sole possessor of the atomic bomb. Leaders in the United States, faced with post-war budgetary restrictions, soon came to view nuclear weapons as a relatively inexpensive and politically acceptable means to offset any Soviet threat. Consequently, the United States began producing smaller, more powerful nuclear bombs while at the same time dramatically reducing its defense budget. The United States nuclear policy in the and was greatly affected by a number of developments. The creation of the North Atlantic Treaty Organization in April committed the United States to assist Western Europe militarily in the event of a Soviet-backed invasion.

7 The first was the Soviet detonation of a nuclear bomb in August This event ended the United States nuclear monopoly and provided the impetus for the United States to develop the more powerful hydrogen bomb. Only a few months after the Soviet detonation, Mao Zedong s Red Army defeated the forces of Chiang Kai-shek, the United States longtime ally in China. Mao established the People s Republic of China the following year. When the Soviets consolidated their alliance with the Chinese, it appeared as if half a billion people had joined the enemy camp. These events prompted U.S. leaders to reassess the nation s defense policies. Greatly coloring that reassessment was a report known as portrayed the Soviet Union as a dangerous opponent armed with nuclear weapons and bent on world domination.

5 Nowlan and McCullough, Cold War Properties Evaluation Phase III, 6 Nowlan and McCullough, Cold War Properties Evaluation Phase III, 7 The Weapon of Choice, program 2 in War and Peace in the Nuclear Age series, videocassette (produced by WGBH/Boston and Central Independent Television/England in association with NHK/Japan), ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 7) Warning that the Soviet Union could have as many as 200 atomic bombs by the report urged an immediate buildup of the United States nuclear and conventional forces. 8 By that time, both superpowers possessed the hydrogen bomb and had invested in fleets of long- range bombers, the Soviet Union had also begun to invest heavily in the development of long- range missiles.

9 By the mid-1950s, the Soviet s long-range missile program began to pull ahead of U.S. efforts. In August the Soviets announced the launching of a multi-stage long-range ballistic missile that had reached a very high, unprecedented altitude and claimed that this accomplishment would make it possible to reach remote areas without resorting to a strategic air force. 10 Further proof of the advanced state of the Soviet missile program came on October 4, when one of their rockets placed the world s first man-made satellite, Sputnik, into orbit. The Soviets quickly followed this launch with an even more impressive launch. In November, a Soviet rocket placed the 1,120-pound Sputnik 2 satellite, carrying a live dog, into orbit. This launch had tremendous strategic implications.

A booster that could carry a payload of comparable weight into space would also be capable of delivering a nuclear bomb to targets within the United States. Leaders in both countries realized that such a development would effectively offset the United States advantage in long-range bombers. The age of the missile had arrived. Camp Cooke and the Creation of VAFB In as the United States readied itself for the increasing likelihood of war, the federal government acquired acres along the California coast between Point Sal and Point Arguello. After selecting this land for use as a training site for infantry and armored divisions, the Army named the new base Camp Cooke in honor of Civil War General Philip St. George Cooke.

While construction of barracks and various support structures at Camp Cook progressed, the United States entered World War II. During the war, the Army used Camp Cooke to train a wide variety of units, including armored, infantry, anti-aircraft artillery, combat engineer, and ordnance units. At its peak, Camp Cooke consisted of a 1,500-bed hospital, fire stations, chapels, warehouses, theaters, recreational facilities, miles of paved roads, and railroad sidings. It even had a mock city used by the Army to train troops in urban combat techniques. In during the later stages of the war, the Army established a prisoner of war (POW) camp at the base for detaining captured German and Italian soldiers. Eventually sixteen branch POW camps, housing war prisoners, were created.

In addition to the POW camp, a maximum-security Army Disciplinary Barracks was constructed on post property near the city of Lompoc. 11 After World War II, the Army deactivated Camp Cooke 8 The Weapon of Choice. 9 The Weapon of Choice. 10 Carl Berger and Warren S. Howard, History of the 1st Strategic Aerospace Division and Vandenberg Air Force Base, (Vandenberg Air Force Base, California: Headquarters, 1st Strategic Aerospace Division, April 8. Joseph T. Donohue, History of Vandenberg Air Force Base: From Cooke to Vandenberg, from Tanks to 11 Missiles (Vandenberg Air Force Base, California: 1st Strategic Aerospace Division, 3 4. ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 8) and placed the facility in caretaker status.

Most of the camp was leased for agriculture and grazing at this time. When the Korean War broke out, the Army reactivated Camp Cooke to support infantry training. The Army deactivated Camp Cooke for a second time in when the fighting in Korea came to an end. During the amid new innovations in missile technology, the U.S. Air Force found the need for an adequate missile testing and training installation. In a committee was formed to examine more than 200 potential missile sites before deciding on the then- vacant U.S. Army Camp Cooke. The unpopulated coastal location and geography enabled missiles to be launched into the Pacific Ocean utilizing the Pacific Missile Range, later renamed the Western Test Range.

This location was also beneficial to the satellite launch program because satellites, carried on boosters made of modified ICBMs, could be launched into polar orbit (toward the South Pole) without population over- flights. By June the Army had transferred North Camp Cooke to the Air Force for use as a missile launch and training base renamed Cooke Air Force Base. 12 Major construction ensued over the next two years, as earth-grading and tons of concrete and steel were used to build launch complexes.

The Air Research and Development Command (ARDC) was responsible for the design and activation of launch and support facilities along with research and development testing, while SAC, established on January 1, was responsible for initial operational Figure 1 Early construction at VAFB, June capability and training missile launch crews. 13 On October 5, Cooke AFB was renamed VAFB in honor of the late General Hoyt S. Vandenberg, a former Air Force chief of staff. 14 In ARDC was redesignated as Air Force Systems Command (AFSC).

For the 12 Nowlan and McCullough, Cold War Properties Evaluation Phase III, 13 Space Launch Delta 30 History Office, History, Vandenberg Space Force Base, accessed February 14 Nowlan and McCullough, Cold War Properties Evaluation Phase III, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 9) next few decades, SAC and AFSC carried out a wide range of operations centered on space launches and ballistic missile testing and training. 15 VAFB played a crucial role in the effort to safeguard the national security of the United States during the Cold War through the development of ICBMs as a deterrent against nuclear attack and as the launch vehicle for placing unmanned photo-satellites into orbit to conduct reconnaissance on foreign installations.

Early Ballistic Missile Development Post-World War II evaluation of the German V-1 and V-2 rockets, which were so effective against allied forces during the war, led the Army Air Force to initiate research programs on the development of long-range missiles in 16 Strategic and air-defense missiles have distinctly different roles, which reflect the divergent concepts of deterrence versus defense. ICBMs were strategic missiles developed as deterrence systems, meant to discourage an aggressor from attacking either the United States or its allies for fear of triggering a swift and certain nuclear retaliation. To bolster the United States strategic nuclear deterrent, the U.S.

Air Force worked to develop two types of strategic missiles: the winged air-breathing cruise missile and the ballistic missile, as described below. Air-breathing missiles looked and performed like aircraft. They had wings to generate aerodynamic lift, used jet engines that required an external oxygen supply, and were powered and guided throughout their flight. In contrast, the ICBM was bullet-shaped, carried an internal oxygen supply, and the majority of its parabolic trajectory was outside Earth s atmosphere. It was called a ballistic missile because when the warhead reached the apogee of its flight path it followed a ballistic trajectory to its target.

17 When the Korean War prompted increased military spending in the early the Air Force began to fund a new long-range ballistic missile study by Convair designated Project which later became known as Project Atlas. The Air Force began funding further studies of the Atlas ballistic missile design in fiscal year This funding, however, remained at a very low level as compared to the funds allocated to the Snark and Navajo cruise missile programs. 18 When United States armed services began developing long-range missiles after World War II, it soon became apparent that the nation s existing ranges were inadequate to support missile test flights that could at times extend for up to several thousand miles.

Realizing this, in the Department of Defense began searching for an adequate site for a long-range missile proving grounds. A special selection committee eventually chose the Cape Canaveral area in Florida. The Department of Defense established Cape Canaveral as a joint services long-range missile research and development facility in Cape Canaveral became one component of a missile John C. Lonnquest and David F. Winkler, To Defend and Deter: The Legacy of the United States Cold War 15 Missile Program (Bodega Bay, California: Hole in the Head Press, 16 Nowlan and McCullough, Cold War Properties Evaluation Phase III, John C. Lonnquest and David F. Winkler, To Defend and Deter: The Legacy of the United States Cold War 17 Missile Program (Bodega Bay, California: Hole in the Head Press, 3.

18 Jacob Neufeld, The Development of Ballistic Missiles in the United States Air Force, (Washington, Office of Air Force History, United States Air Force, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 10) test range that included administrative headquarters at nearby Patrick Air Force Base, launch sites at Cape Canaveral, and downrange tracking facilities extending into the Atlantic Ocean. This missile test range is known today as the Air Force Eastern Test Range. The Air Force, in charge of developing and administering the range, began extensive testing of its cruise type missiles at Cape Canaveral in Technological advances, including the development of increasingly powerful nuclear warheads that weighed less than previous warheads, increasingly favored ICBM development.

19 President Eisenhower assigned highest national priority to the ICBM development program in Eisenhower also supported the Air Force in its bid to gain control of ICBM development. Although budget cuts by the Eisenhower administration in 57 temporarily slowed progress toward an operational ballistic missile, the launch of the Sputnik satellites in October and November of again focused attention on the U.S. ICBM program. Congress reacted by restoring national priority to the ICBM program and by increasing funds for ICBM development. The Air Force initiated a second ICBM development program, designated Titan, in By the Air Force began funding the development of yet another ICBM, this latest missile was designated the Minuteman.

The Minuteman ICBM was to be a smaller, more effective, three- stage, solid-fueled ICBM that would be relatively cheap to produce. 20 As the pace of the Air Force ICBM program quickened, intelligence reports indicated that the Soviet Union would likely have a dangerous number of ICBMs armed with nuclear warheads operational by Fearing the United States would not be ready to match that threat, Department of Defense officials decided that an Intermediate-Range Ballistic Missile (IRBM) should be developed and based in Europe to act as a stopgap measure until a sufficient number of American ICBMs became operational.

After it was concluded that an IRBM with a 1,500-mile range could be developed in a relatively short time, the Joint Chiefs of Staff granted approval in for two IRBM programs: the Air Force Thor IRBM program and the Army/Navy Jupiter IRBM program. Both programs advanced simultaneously, in direct competition with each other. 21 When the Atlas and Thor programs received top national priority, the Air Force initiated the construction of highly technical launch complexes at Cape Canaveral in preparation for the research and development portion of those programs. As research and development facilities, the complexes constructed at Cape Canaveral did not resemble the type of operational launch complexes that would be practical at field missile bases.

Operational launch facilities needed to be less vulnerable to enemy attack while at the same time allowing for a quick launch reaction time. Since research and development facilities were not designed for this purpose, in the Air Force began to search for a site for an operational testing base where missiles and their supporting ground equipment could be developed and tested under operational conditions. The Air Force also wanted a base where missile combat and maintenance crews could be trained. A 19 Neufeld, The Development of Ballistic Missiles, 99 20 Neufeld, The Development of Ballistic Missiles, 133 21 Neufeld, The Development of Ballistic Missiles, 143 The IRBM programs were assigned equal priority with the ICBM program in January1956. ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 11) special site selection board evaluated nearly 200 sites before recommending Camp Cooke in June ICBM Development at VAFB Ground-breaking activities at the new missile center began in May when VAFB was still known as Cooke Air Force Base. The Air Force committed over million for the initial improvements to the installation. Over million went toward the construction of launch complexes while more than $32 million was spent on repairs and modifications to base support buildings and an airfield. Approximately $25 million was directed toward the construction of over Capehart homes to ease the severe housing shortage that developed as the base population increased.

22 The Corps of Engineers, having earlier gained valuable experience in missile base construction at Cape Canaveral, was the supervising construction agency responsible for converting the former Camp Cooke into a modern missile and space center. The Corps of Engineers worked closely with the Air Force Ballistic Missile Division (AFBMD) at Inglewood, California, and with civilian contractors to rapidly complete missile and support facilities at VAFB. 23 Initial construction at what is now referred to as North VAFB included seven Thor pads and six Atlas pads. By mid-1966, the Corps of Engineers had overseen the construction of eleven Atlas pads, four Titan I silos, three Titan II silos, fourteen Minuteman silos, and two launch facilities for Bomarc.

24 ICBM program activities at VAFB generated evolutionary advances in missile technology, deployment, survivability, accuracy, warhead potency, and reaction time. The first ICBM launch facilities at VAFB were aboveground gantry-type complexes. Subsequent ICBM programs utilized above- and belowground coffin-type launchers, silo lift-type launch facilities and eventually silo launch facilities. The launch facilities at VAFB were prototype facilities, duplicating in every possible way the facilities constructed at operational bases. SAC used VAFB facilities to work out weapon system deficiencies before settling on the final configuration at field bases.

SAC s initial ICBM crews received a significant portion of their training (termed ORT for Operational Readiness Training ) at VAFB operational launch facilities. The climax of ORT at VAFB was usually a live launch across the Western Test Range to an instrumented target in the Pacific Ocean. Besides providing important missile performance data, ORT launches helped SAC perfect operational ICBM launching and maintenance procedures. 25 ORT exercises declined at VAFB after SAC s initial missile crews received their Versar, Inc., A Historical Significance Assessment and Effects Determination of Space Launch Complex 3.

22 Vandenberg Air Force Base, California (Columbia, Maryland: Versar, Inc., August 18, 23 The Corps of Engineers was responsible for the brick and mortar part of the launch complexes at VAFB (e.g. the construction of gantries, silos, and other technical facilities). Individual contractors and in some cases, Air Force personnel, installed the instrumentation at new launch facilities. 24 The Bomarc was an anti-aircraft cruise missile built by the Boeing Company. Beginning in the U.S. Navy launched Bomarc missiles from VAFB for use as high-speed targets for surface-to-air and air-to-air missile practice off the Southern California coast. 25 SAC Shapes Missile Force for Survival, Aviation Week, June 20, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 12) training at VAFB.

Once SAC s operational missile squadrons were manned with experienced men, they assumed the job of training replacement recruits. This freed up VAFB s missile facilities for operational weapon system testing programs. Atlas The United States first operational ICBM was the Atlas missile. The initial design studies for the predecessor to the Atlas were completed in However, this early design was a huge 90 -long, 12 -wide rocket with five engines deemed necessary to launch a 65-ton thermonuclear warhead to intercontinental range. 26 A megaton-class thermonuclear warhead was expected because of the limited accuracy of the guidance systems and the size of the explosion believed necessary to be effective against hardened targets.

The hydrogen bomb tests in revealed that the warhead for the Atlas missile could be made substantially smaller and lighter; therefore, the five-engine design was replaced by a three-engine design. On June 11, an Atlas A (XSM-65A) test model, having a range of only 600 miles, was launched at Cape Canaveral. Due to a booster malfunction, the missile had to be destroyed a few seconds after lift-off.

27 The first successful Atlas A flight to the full range of 600 nautical miles occurred on December 17, The Atlas went through numerous upgrades, and after several test failures the Atlas D missile made a successful launch from Missile Row at Cape Canaveral on July 28, Following this, the Strategic Missile Squadron deployed three Atlas D missiles at VAFB on Figure 2 First test launch of an operational 28 Atlas D missile, Launch Complex October 31, 576 A, Pad 2, September 9, The Atlas D was unique compared to subsequent ICBMs in that it was the only one-and-one- half-stage missile that had been deployed. The Atlas D measured 75 feet tall, had a range of miles, and could deliver a 1.44-megaton warhead.

The operational missile launch complex 26 Mark Wade, Atlas, Encyclopedia Astronautica, accessed March 27 Mark Wade, Atlas, Encyclopedia Astronautica, accessed March National Park Service, Intercontinental Ballistic Missiles: The Atlas Missile, U.S. Department of the Interior, 28 National Park Service, last modified October 20, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 13) contained three missiles, a control center, and a radio guidance system that was accurate to 1.5 miles. The Atlas D launchers featured two different shelter configurations. One type held the missiles in a vertical position with the use of a gantry, while the other sheltered the missiles in aboveground coffin launchers. They had a launch response time of approximately 15 minutes.

The Atlas D missiles were operational from October through October 29 A total of thirty Atlas D ICBMs were deployed across the United States during that time, including six at VAFB, fifteen at Warren AFB in Wyoming, and nine at Offutt AFB in Nebraska. The Atlas E ICBM was similar to the Atlas D except the launch complex contained a single missile sheltered in an underground coffin. This method improved blast protection and survivability of the missiles during a nuclear attack. The missile bay had a retractable roof. To launch the missile, the roof was pulled back and the missile was raised to the vertical position, fueled, and fired.

The missile was also the first to depend on inertial guidance, an electronic system which continuously monitors the position, velocity, and acceleration of the missile without the need for communication with a control center. The launch response time of the Atlas E was still approximately 15 minutes, the same as the Atlas D. The Atlas E ICBMs were operational from September through January 30 A total of twenty-eight Atlas E ICBMs were deployed across the United States during that time, including one at VAFB, nine at Fairchild AFB in Washington, nine at Forbes AFB in Kansas, and nine at Warren AFB. The Atlas F ICBM measured 82 feet tall, slightly taller than the previous Atlas missiles.

It was equipped with a better guidance package and carried a larger payload (a 4.5-megaton warhead); otherwise, it was very similar to the Atlas E ICBM. One of the biggest differences in this newest ICBM was the hardened underground launch complex. The missile was held in a blast-proof underground silo equipped with an elevator lift system, and it could be launched in about 10 minutes. Its first flight was on August 8, and it was deployed operational from to The U.S. Air Force established six strategic missile squadrons, each of which supported twelve individual missile sites, for a total of seventy-two operational Atlas F missile sites.

These included sites at Schilling AFB in Kansas, Lincoln AFB in Nebraska, Altus AFB in Oklahoma, Dyess AFB in Texas, Walker AFB in New Mexico, and Plattsburgh AFB in New York. In addition to these seventy-two operational sites, there were three Atlas F test sites at VAFB. 31 The Atlas program represented a paradigm shift in U.S. nuclear defense technology. Its implementation came at a time when SAC s long-range nuclear bombers proved increasingly too vulnerable to Soviet defenses. As Atlas chronicler Stewart M. Powell argues, although the program came with an unprecedented price tag, it produced engineering and technological advances at a pace exceeding the Manhattan Project during World War II, which had produced the operational atomic bomb.

Atlas development, explains Powell, yielded lessons that were National Park Service, Intercontinental Ballistic Missiles: The Atlas Missile, U.S. Department of the Interior, 29 National Park Service, last modified October 20, National Park Service, Intercontinental Ballistic Missiles: The Atlas Missile, U. S. Department of the Interior, 30 National Park Service, last modified October 20, National Park Service, Intercontinental Ballistic Missiles: The Atlas Missile, U. S. Department of the Interior, 31 National Park Service, last modified October 20, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 14) applied to subsequent U.S.

rocket systems, including the Titan, the Minuteman, and the Saturn, which was used to carry the Apollo spacecraft to the moon in 32 United States Space Boosters Besides acting in their capacity as nuclear-armed weapon systems, the United States long-range missiles also had great potential as boosters for both military and civilian purposes. Only days after the Soviets launched the first Sputnik satellite, an Air Force Scientific Advisory Board urged the development of second generation ballistic missiles for use as space boosters as well as weapon systems. The committee established high priorities for the development of military satellite systems and the development of the Thor and Atlas satellite booster systems.

33 Once the reliability of the Thor and Atlas missiles was established in test flights, they were pressed into service in the military and civilian space programs. The same held true for the Titan ICBM. While the weapon system aspect of these programs continued to evolve, modified missiles were used to place military and scientific payloads into orbit beginning in The first launch vehicles were merely modified ICBMs. Improved and standardized launch vehicles were eventually developed to increase performance and payload capacity. These improved enabled scientists to develop and deploy increasingly heavier and more sophisticated satellite systems.

The Air Force and the National Aeronautics and Space Administration (NASA) developed a wide variety of standard upper stages for the Thor, Atlas, and Titan boosters, including Able, Agena, Delta, Centaur, and Burner (I and II). Both the Air Force and NASA relied heavily on Thor, Atlas, Titan, Scout, and later Delta launch vehicles for many of their varied space programs. Most United States space launches have been and continue to be conducted at Cape Canaveral and the Kennedy Space Center on the East Coast and at VAFB/VSFB on the West Coast.

Atlas Program at VAFB As addressed in more detail below, construction began on Atlas Launch Complex 576 A in and the Air Force launched the first Atlas missile from VAFB at Launch Complex 576-A in September Each of the complex s three launch pads featured a 135 gantry set on rails that rolled away before a missile was fired. 34 Subsequent Atlas facilities constructed at VAFB were designed to better protect missiles from an enemy attack. The second Atlas complex built at VAFB was Complex a three-pad complex for Atlas D series missiles. Completed in (later designated Launch Complex featured aboveground concrete coffins where missiles were maintained in a horizontal position. Crews raised the Atlas missiles in the coffins to a vertical position before launching.

Atlas D complexes constructed at operational bases around the country duplicated this launch complex design. 35 32 Stewart M. Powell, The Day of the Atlas, Air Force Magazine, October 60. 33 Roger A. Jernigan, Air Force Satellite Control Facility: Historical Brief and Chronology, Present (Onizuka Air Force Station, California: Air Force Satellite Control Facility History Office, 2. 34 Berger and Howard, History of the 1st Strategic Aerospace Division and VAFB, 27. 35 Berger and Howard, History of the 1st Strategic Aerospace Division and VAFB, 35. ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 15) The number of Atlas pads at VAFB swelled to eleven by as the Corps of Engineers completed Launch Complexes 576-E, and 36 These Atlas ICBM training and test complexes were designed and constructed to better withstand the overpressure, ground shock, and radiation associated with a nuclear attack. 37 and were prototype facilities for the Atlas E ICBM. Atlas E complexes at operational sites featured belowground coffin launch silos with sliding concrete doors. Although more secure in these underground complexes, the missiles contained within still had to be raised to a vertical position before launch. and 576-E, all completed in featured fully hardened underground silos employing elevators that raised the missile to the surface before firing.

38 This type of facility, known as a silo-lift facility, was built for the Atlas F ICBM. Instructors from the SMS began conducting Atlas integrated weapon system training (IWST, later called operational readiness training [ORT]) for crews from Warren AFB s SMS in February This training was similar to the Thor IWST training conducted earlier at VAFB. The main difference was the use of crew procedure trainers special equipment that simulated entire launches. Student combat crews proceeded to the after completing the classroom portion of their training. Atlas ORT also made use of VAFB s operational launch facilities. 39 SAC crews conducted several operational Atlas launches from VAFB complexes during the course of the Atlas ORT program at VAFB.

The early Atlas program at VAFB did not always go smoothly as several Atlas launches ended in failure when the missiles exploded in mid-flight. These failures prompted the Air Force to initiate Project Golden Ram, an intensive joint study by four Air Force Commands and Atlas prime contractors. The goal of Golden Ram was to pinpoint faulty equipment, missile design, and operational and maintenance procedures associated with the Atlas weapon system. Three VAFB launches were an integral part of Project Golden Ram, helping technicians eliminate many shortcomings in the Atlas weapon system. The last Golden Ram launch occurred in August 40 The Atlas training program at VAFB ended in after preparing the nation s first Atlas ICBM crews for operational duty.

VAFB s Atlas demonstration and shakedown operations (DASO) test program, conducted by SAC crews, began in and continued through mid-1964. Several of the Atlas DASO launches supported the Army s Nike-Zeus research and development program, a project aimed at developing an anti-ballistic missile (ABM) system. Atlas D missiles launched from Complex 65- 36 These testing facilities were referred to by the acronym OSTF, which depending on the source consulted, was variously defined as Operational System Test Facility, Operational Suitability Test Facility, and Operational Silo Test Facility. Anthony F. Turnhollow, A History of the Los Angeles District, U.S. Army Corps of Engineers, (Los 37 Angeles: U.S.

Army Engineer District, Dames & Moore, Inc., Request for Determination of Eligibility: Atlas 576 G. Vandenberg Air Force Base, 38 California (Austin, Texas: Dames & Moore, Inc., September 20, 6. 39 Berger and Howard, History of the 1st Strategic Aerospace Division and VAFB, 33 34. 40 Berger and Howard, History of the 1st Strategic Aerospace Division and VAFB, 36. ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 16) 2 served as target vehicles for the Nike-Zeus program. 41 By the Atlas ICBM was rapidly becoming obsolete as the more advanced Titan II and Minuteman ICBM weapon systems became fully operational. As a result, Atlas ICBM testing ceased at VAFB. The only Atlas activity after at North VAFB involved mainly Air Force Advanced Ballistic Re-Entry Systems (ABRES) test launches.

The Air Force had initiated the ABRES program at VAFB in November This program involved the launching of Atlas missiles in support of re-entry systems research. 42 Atlas Launch Complex 576 A The Air Force had Atlas Launch Complex 576 A, originally designated Complex constructed as a three-pad facility with a Launch Operations Building (or blockhouse ) for the Atlas D operational testing program. The Air Force equipped each pad with a 135 -high steel gantry set on rails so that it could be rolled away from missiles during launches and rolled back into place to prepare other missiles for launch. A concrete Launch and Service Building with flame-proof doors was constructed underneath each pad.

Each pad also incorporated a water-cooled steel flame bucket beneath each launch mount, a critical element of the wet launches that took place at the facility. Water deluges served to cool the flame buckets, reduce the noise of the rockets, and convey exhaust fumes from the buckets to concrete and earthen exhaust trenches and into exhaust disposal ponds. Construction associated with the Atlas 576 A complex began on May 1, when the P. J. Walker Company started building the associated MOD-II Command Guidance Station approximately 2 miles south of the 576 A complex site based on designs by Los Angeles-based architectural-engineering firm Holmes & Narver, Inc. 43 The P. J. Walker Company also constructed the missile assembly and maintenance buildings that supported the Atlas program.

44 The Air Force held a formal ground-breaking ceremony on May 8, to celebrate both the construction of new facilities to support the ballistic missile program and the extensive plan for rehabilitation and modernization of existing facilities at what would become VAFB the following year. 45 Construction of the guidance system was completed in eleven months and cost a total of 46 41 Titan missiles launched from VAFB also eventually served as target vehicles in support of the Nike-Zeus program. 42 The ABRES program was a joint service effort to research, develop, and test reentry vehicles. The goals of the program were to investigate the physics of reentry, develop new materials and test new techniques forpenetrating sophisticated defenses.

43 Emile Genest, Corps Role to Vandenberg, SAC Missileer (Lompoc, California), October 4, 44 United States Air Force (USAF), The Intercontinental Ballistic Missile and Vandenberg Air Force Base in History of the Air Research and Development Command, July-December Volume III (Historical Division, Office of Information Headquarters, Air Research and Development Command, 4. 45 USAF, The Intercontinental Ballistic Missile, 4 5. 46 Emile Genest, Corps Role to Vandenberg, SAC Missileer (Lompoc, California), October 4, 6b. ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 17) Figure 3 Aerial view of Atlas Launch Complex 576 A, The station consisted of centralized Guidance Operations Building (GOB; Facility a transmitter pad (Facility a tracking radar (gone), and a receiver pad (gone), along with four rate pads (gone) radiating outward in an X configuration, each a distance of approximately feet from the GOB. The MOD-II Command Guidance Station was the ground-based guidance system needed to launch the Atlas D missile at Complex 576 A. The tracking radar communicated with the missile by way of a light-weight beacon aboard the missile. It measured the missile s range, azimuth, and elevation. A second beacon on board the missile relayed information to the rate receiver regarding the missile s flight path and velocity.

This information was received by the MOD-II computer, which calculated the ballistic trajectory ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 18) and sent signals back to the missile to correct its flight path. The MOD-II Command Guidance Station would support Atlas D launches from Atlas Launch Complex 576 A between and 47 Subject to numerous alterations since that time, the station is not considered a contributing element of Launch Complex 576 A. Figure 4 Bird s-eye aerial view of Atlas Launch Complex 576 A, circa The Corps of Engineers began taking bids for constructing three Atlas launch pads on June 4, 48 A joint firm consisting of two building companies made the successful bid: the Sacramento building partnership of Fredericksen & Kasler and the Oakland corporation of Stolte, Inc.

was the lowest bidder by more than and won the contract from the Corps of Engineers. 49 The joint firm of Fredericksen & Kasler Stolte, Inc. began construction of the Atlas launchers and associated facilities on June 13, using plans drawn by Holmes & Narver. 50 As construction progressed, Fredericksen & Kasler Stolte, Inc. subcontracted the construction of 47 WS-107A Operational Base, Camp Cooke California, Guidance Station Plot Plan, Civil, Drawing No. I-C-3, Sheet 3, Filed Under (Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division [ARDC], January 30, 48 Emile Genest, Corps Role to Vandenberg, SAC Missileer (Lompoc, California), October 4, 7b.

Advertisement for Fredericksen & Kasler Stolte, Inc., SAC Missileer (Lompoc, California), October 4, 3c; 49 Genest, Corps Role, 7b. 50 USAF, The Intercontinental Ballistic Missile, 4. ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 19) each Atlas pad s gantry to Vinnell Steel, Inc. 51 Using plans drawn by Holmes & Narver, Vinnell Steel, Inc. crews raised the first tower s steel frame in early August and completed construction in late October 52 Fredericksen & Kasler Stolte, Inc. crews completed construction of the launch facility in January and turned the complex over to Convair Astronautics for the final installation and checkout of operational and ground support equipment.

53 Following Air Force approval of Pad 1 in May and Pad 2 in November Pad 3 received final military approval in April 54 SAC took full operational control of the launch complex from the 1st Missile Division on August 31, 55 In addition to the three pads, gantries, and associated wet-launch infrastructure, Complex 576 A included ancillary features such as two wood-frame technical engineering support buildings, a power plant, a deluge system water tank and pump house, three diked fuel tanks, a gate house, and temporary trailer offices, and a wood-frame supply and maintenance building. All of these ancillary facilities have since been removed.

The first launch took place less than six months after the Corps of Engineers and its various contractors completed 576 A, a mere ten days after SAC took control of the complex. Prior to the launch, the Air Force changed the designation of the facility from Complex to 576 A, designated for the squadron conducting the Atlas program at VAFB, the On September 9, the SMS undertook the first West Coast launch of an Atlas missile, what historian Jeffrey E. Geiger has described as America s first lady of intercontinental ballistic missiles. Launched from Pad 2, the Atlas D missile, nicknamed Desert Heat, carried an inert warhead nautical miles west to a target near Wake Island.

56 The main purpose was to achieve a successful launch, but the re-entry vehicle also demonstrated accuracy, landing approximately 1.2 nautical miles short of the target. 57 This demonstrational launch of an Atlas D missile was the first launch of an Atlas ICBM by an all-American military crew. 58 The full list of launch and guidance crews is provided in the following tables. Service Tower Done: Thor Launcher Finished Turned Over to Base, SAC Missileer (Lompoc, California), 51 October 31, 1a. 52 1st Service Tower is Raised, SAC Missileer (Lompoc, California), August 8, 1a; Service Tower Done: Thor Launcher Finished Turned Over to Base, SAC Missileer (Lompoc, California), October 31, 7a. 53 USAF, The Intercontinental Ballistic Missile, 11.

54 Jeffery Geiger, Camp Cooke and Vandenberg Air Force Base, From Armor and Infantry Training to Space and Missile Launches (Jefferson, North Carolina: McFarland & Company, Inc., Publishers, Appendix G; Nowlan and McCullough, Cold War Properties Evaluation Phase III, 55 USAF, The Intercontinental Ballistic Missile, 11. 56 Salute to the Atlas, Mesa Missileer (Lompoc, California), August 12, 8-A. 57 Geiger, Camp Cooke and Vandenberg Air Force Base, 58 Dames & Moore, Inc., Historic Architectural and Engineering Survey Report, Atlas ABRES-A, Vandenberg Air Force Base, California (Austin, Texas: Dames & Moore, Inc., March 15, 3. ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 20) Table 1 Desert Heat Launch Crew 59 Position Rank Name Site Commander Major Ernest J.

Bankey Launch Control Officer Captain Gerald J. Winchell Missile System Analyst Technical sergeant Bruce R. Pottorff Control System Analyst Staff Sergeant Henry E. Taylor Power Distribution System Technician Master Sergeant Robert G. Hartz Missile Electrician Master Sergeant Roger L. Struxness Missile Maintenance Technician Master Sergeant Arthur E. Meyers Missile Maintence Technician Airman First Class Donald L. Dashner Missile Maintenance Technician Airman First Class Kenneth L. Ballman Missile Engine Mechanic Master Sergeant Joseph G. Fioti Ground Support Equipment Specialist Staff Sergeant Earle E. Slade Propulsion Systems Technician Staff Sergeant Barry M. McLean Guidance System Technician Staff Sergeant Gary F. Oberpriller Hydraulics Technician Technical Sergeant Ray W. King, Jr.

Table 2 Desert Heat Guidance Crew 60 Position Rank Name Guidance Control Officer Captain Dewey M. Garwood Track Analyst Sergeant Major Bernard I. Tannheimer Track Transmitter Specialist Staff Sergeant Richard A. DeVaux Track Receiver Specialist Staff Sergeant Ronald M. Fero Track Data Processing Specialist Staff Sergeant Franklin D. Wilkins Track Antenna Servo-Mechanism Specialist Airman Second Class Davis E. Burt Track Antenna Servo-Mechanism Specialist Airman First Class Walter F. Williams Rate Analyst Technical Sergeant Hugh M. Shannon Rate Transmitter Specialist Airman Second Class Robert Woringer Rate Data Processing Specialist Staff Sergeant George T. Gehres Rate Receiver Specialist Staff Sergeant Alfred J. Lawton Rate Receiver Specialist Airman Second Class Max B.

Clark Exercise Analyst Staff Sergeant Donald L. Troxel Exercise Simulation Specialist Airman First Class J. K. Rasband Exercise Recorder Specialist Staff Sergeant Elijah C. Freeland Digital Computer Analyst Technical Sergeant Leonard R. Young Digital Computer Systems Specialist Staff Sergeant Donald C. Sauser Digital Computer Electr-Mechanical Specialist Airman First Class Ernest G. Oster 59 SAC s First Atlas Crews, SAC Missileer (Lompoc, California), September 11, B1. 60 SAC s First Atlas Crews, SAC Missileer (Lompoc, California), September 11, B1. ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 21) On September 20, a Southern Pacific train with Soviet Premier Nikita Khrushchev on board passed through VAFB on its way from Los Angeles to San Francisco.

The train passed by Atlas Launch Complex 576 A where two Atlas D ICBMs were on the launch pad. 61 Along with the three 135 -tall missile gantries, the Atlas D missiles were clearly visible from the train. President Eisenhower and the U.S. State Department chose the Southern Pacific train as Khrushchev s transportation, knowing it would pass through VAFB and give him a first-hand view of the operational Atlas D missiles standing on alert at Complex 576 A. However, as historian Jeffrey Geiger explains: As the train rolled through Vandenberg along the Pacific coast, Khrushchev left his seat, strolled to the press car, and sat with his back to the window.

When the two shiny Atlas missiles at Complex 576A came into sight and were announced over the loudspeaker system, a reporter informed Khrushchev. Without even glancing over his shoulder, he retorted, I m not interested in your missile bases, we have more than you do and ours are better. 62 Figure 5 Special locomotive with Soviet Premier Nikita Khrushchev on board passing Atlas Launch Complex 576-A on its way through VAFB on September 20, The missile gantry shown in the background is Pad 3, as seen from Tangair siding along the Southern Pacific Railroad. At least two Atlas D ICBMs were reportedly on display at 576 A that day. Note SAC sign along the Southern Pacific tracks visible above and to the right of the locomotive.

Geiger postulates that Khrushchev almost certainly knew that, had he turned to look at the U.S. missiles, the press would have had a field day describing his facial expression, and he then would have been expected to reciprocate with a visit to a Russian missile base for President 61 Premier, Russ Party Ignore Missile Base, Los Angeles Times (Los Angeles, California) September 21, 2. 62 Geiger, Camp Cooke and Vandenberg Air Force Base, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 22) Eisenhower, something the Soviet Union would never tolerate. 63 This event was one of many tactical plays exchanged between U.S. and Soviet officials during the Cold War.

The Atlas D missile was the Air Force Ballistic Missile Division s first born ICBM, developed with twin motivations: a deterrent to war merely by its existence, or a means of swift, massive, indescribably destructive retaliation if an aggressor chose to wage a nuclear attack. The Atlas D missile was on the launch pad as a display of the United States nuclear armament for the entire world to witness. This was a declaration of Mutual Assured Destruction, in which the United States would retaliate with swift vengeance in the event of a first nuclear strike.

For the first time ever, the United States could protect itself and its allies with the mere threat of a nuclear-armed missile that could travel more than nautical miles and strike within 1.5 miles of its target; within roughly half an hour. This was a pivotal event in the U.S. Soviet nuclear arms race of the Cold War. Atlas missiles remained in the Emergency War Order posture at Complex 576 A from September through February 6, On October 31, the Atlas D at Pad 1 became the first nuclear-armed ICBM placed on emergency operational alert in the United States. This event, explains Geiger, marked the beginning of a transition period from relying solely on bombers to a mixed strategic force with ballistic missiles as the Air Force s leading long-range strategic weapon delivery system.

This occurred at a moment when technological advances in the Soviet Union s air defenses had reduced the ability of American long-range bombers to deter the threat of a nuclear first strike. Illustrating this on May 1, the Soviet Union downed a high- altitude U-2 during a reconnaissance flight. 64 Figure 6 Two Atlas D missiles armed with nuclear warheads on full combat alert at 576-A Pad 1 (left) and Pad 2 (right), October 63 Geiger, Camp Cooke and Vandenberg Air Force Base, 64 Geiger, Camp Cooke and Vandenberg Air Force Base, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 23) After undertaking another Atlas D demonstration launch from Pad 3 at 576 A on January 26, the SMS began conducting ORT for other SAC Atlas missile crews.

This training took place in classrooms, in CPT (special equipment that simulated entire launches), and at 576 A. 65 SMS trainers would bug equipment in the and at 576 A during dry runs, and student crews would have to locate and correct these discrepancies. Student launch crews also practiced fueling and refueling the Atlas D missile at 576 A. 66 Atlas ORT would take place at VAFB until On March 23, President John F. Kennedy stood at 576 A to watch the launch of an unarmed Atlas from Complex situated one mile to the north. This marked the first time a U.S. president witnessed a live missile launch. He attended the event with an entourage that included General Thomas S. Power and Secretary of Defense Robert S. McNamara.

Once the launch was completed, President Kennedy s party drove over to the Launch Operations Building to meet the launch crew. 67 Figure 7 President John F. Kennedy during his visit to VAFB to observe an unarmed Atlas launch from Complex Pad 2, on March 23, Kennedy and his entourage watched the launch from Complex 576 A, 1 mile south of Complex marking the first time a U.S. president witnessed a live missile launch. Beginning in Atlas D ICBMs launched from 576 A served as target vehicles for the Army s Nike anti-missile missile. The first such launch occurred at Pad 1 on October 26, This was the first use of that pad. Pad 1 supported a total of four Nike target launches by 65 The Atlas were in an old barracks at the main cantonment. They have since been removed.

66 Berger and Howard, History of the 1st Strategic Aerospace Division and VAFB, During one fueling exercise at 576 A on March 7, the Atlas D missile exploded. There were no injuries but the pad was seriously damaged. It was subsequently repaired. 67 Geiger, Camp Cooke and Vandenberg Air Force Base, 198 ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 24) March 16, while Pad 3 supported seven such launches between December 12, and December 4, SAC crews conducted the Nike target launches. 68 On November 4, the Air Force conducted its first ABRES launch at 576 A. 69 Initially code-named Project Reindeer and then Project Sleighride, the ABRES program was a more extensive continuation of the re-entry research that the Air Force had begun several years earlier using the Lockheed rocket.

According to Aviation Week & Space Technology, the early ABRES program focused on developing decoys and penetration aids, new high-performance materials for re-entry vehicles, and maneuverable nose cones that could change targets during descent. 70 Atlas D, E, and F missiles launched from VAFB and Cape Canaveral boosted the special ABRES cones. In addition to the ABRES cones, each vehicle also carried at least one and sometimes several piggy-back pods on the side of its airframe. The Air Force, NASA, and the Atomic Energy Commission provided scientific experiments for these pods.

71 All three pads at 576 A eventually supported ABRES launches, which continued at the complex through mid- October All of the pads required some modifications to accommodate the E and F versions of the Atlas missile. 72 The Air Force began making several modifications to the launch complex using designs by the Stearns-Roger Corporation to support the development of the ABRES program. 73 Modifications made at the complex included the construction of a technical engineering support facility, storage facility, and new patrol road. At each of the complex s three launch pads, crews installed terrestrial azimuths, theodolites, collimators, and flame deflectors, and enclosed the missile service towers using corrugated plastic.

Other 1960s-era modifications by Stearns-Roger included the installation of chain-link fencing and various mechanical and electrical upgrades to 68 Vandenberg AFB Launch Summary (Vandenberg Air Force Base, California: Headquarters, Strategic Missile Center, January No Nike target launches took place at Pad 2. 148 Ibid. Pad 1 supported 576 A s first ABRES launch. 69 Vandenberg AFB Launch Summary. Pad 1 supported 576 A s first ABRES launch. 70 Advanced Missile Re-Entry Flight Tests Planned, Aviation Week & Space Technology, 10 December 27. The ABRES program expanded in the to include research on advanced technology for complete missile systems. The Air Force also utilized Minuteman ICBMs in its ABRES program.

71 Advanced Missile Re-Entry Flight Tests Planned, Aviation Week & Space Technology, 10 December 27. 72 Dames & Moore, Inc., Historic Architectural and Engineering Survey Report, Atlas ABRES-A, Vandenberg Air Force Base, California (Austin, Texas: Dames & Moore, Inc., March 15, 73 ABRES Modification-Pad 3. 4300A Complex Vandenberg AFB. Cover Sheet and Drawing Index, Drawing No. Filed Under (Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], April 16, ABRES Modification-Pad 1. A Complex Vandenberg AFB. Pad 1, 2, & 3 Miscellaneous Construction, Drawing No.

Filed Under (Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], May 16, 5 ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 25) support required changes to the propellant loading system. 74 These modifications are evident in aspects of Complex 576 A documented as part of this HAER. A reinforced-concrete collimator was added to each of the three launch pads at Complex 576 A in to support the ABRES program. The collimators had to be placed directly in front of the flame bucket. This necessitated installing a wedge-shaped flame deflector between the flame bucket and the collimator. The collimator is a fixed telescope used for adjusting the line-of-sight accuracy of other instruments.

It supplemented the theodolite and fine-tuned the vertical alignment of the taller upper stage of the Atlas E and Atlas F missiles launched during the post- ABRES program. While the Atlas D relied on a ground-based command guidance system, Atlas E and Atlas F employed all-inertial guidance that required the use of theodolites and a collimator. The Air Force also had gantries at the 576 A launch complex sheathed in corrugated plastic panels to help shelter workers and equipment from rain and the site s frequently strong coastal winds. 75 Stearns-Roger designed an addition to the Launch Operations Building in 76 Koebig & Koebig, Inc., designed a second addition to the building the following year.

77 In addition to the significant upgrades completed to support the Air Force s various programmatic shifts, maintenance-related construction was a regular occurrence at the complex. Per plans drawn by SAC, modifications made in the and included the installation of fences and handrails; exterior painting; various electrical upgrades; roof repair and replacement; repair and replacement of lighting systems; gantry elevator repairs; drainage system repairs; emergency erosion control; fire alarm system upgrades; and heating, ventilation, and air conditioning installation. 78 74 ABRES Modification-Pad 3. 4300A Complex Vandenberg AFB. Propellant Loading System, Fuel Instrument Piping-Schematic, Drawing No.

Sheet 3, Filed Under (Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], April 16, 75 ABRES Modification-Pad 1. A Complex, General Plot Plan. Drawing No. Filed Under (Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], May 16, ABRES Modification-Pad 3. 4300A Complex Vandenberg AFB. General, General Site Plan, Drawing No. Sheet 4, Filed Under (Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], April 16, ABRES Modification-Pad 1. 4300A Complex Vandenberg AFB. Service Tower Enclosure Elevations, Drawing No.

Sheet 4, Filed Under (Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], April 16, 76 Vandenberg AFB California, Modifications to and Structural and Electrical, Plans and Details, Drawing No. Filed Under (Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, February 14,

Abres a

Complex. Vandenberg AFB California. Launch Operations Building Addition, Architectural Plan, Drawing No. WTF 105-A1, Filed Under (Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], June 28, 77 Technical Support Facilities for ABRES A, Vandenberg Air Force Base, California. Launch Operations Building Addition, Foundation and Roof Plans, Drawing No. Sheet 17, Filed Under (Vandenberg Air Force Base, California: Koebig & Koebig, Inc., Engineering-Architecture, Los Angeles, and Department of the Air Force, Space and Missile Systems Organization, February 9, 78 Paint 576A Missile Complex. Missile Service Towers, No. & Elevations, Drawing No.

Sheet 4 of 10, Filed Under (Vandenberg Air Force Base, California: Strategic Air Command, August 9, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 26) Between and the Air Force changed the designation of the complex three times. In the Air Force redesignated 576 A as 4300-A. By mid-1965, the Air Force had changed the facility s designation to ABRES-A. BMRS-A-1 (Pad 1) supported a total of thirty-six Atlas launches by September 8, A-2 (Pad 2) supported fifteen Atlas launches by August 7, and BMRS-A-3 (Pas 3) supported thirty-two Atlas launches by October 12, 79 Following the last launch at A-3, the Air Force mothballed the entire complex until when it selected the complex to support the High Performance Target Engine Measurement (HPTEM) program.

Later that year, the Air Force completed modifications at BMRS-A-3 using plans drawn by the Facilities Systems Engineering Company of El Segundo, California. 80 These modifications involved the installation of a 46 -deep Minuteman silo tube into the LSB through the flame bucket. The flame bucket and the launch mount were both removed. In before the new set-up was ever used, the HPTEM program was canceled. The Air Force subsequently removed the missile service towers at BMRS-A-1 and BMRS-A-2 in By plans drawn by the Quintron engineering and manufacturing firm for an upgrade of the complex s communication system reflected the earlier decommission of Pads 1 and 2.

81 Further modifications at the complex occurred after the American Rocket Company (AMROC) began leasing the Launch Operations Building and Pad 3 from the Air Force in 82 Using plans drawn by AMROC in construction crews modified the missile service tower and umbilical mast, completed various electrical upgrades for the ground support system, and installed missile tube stiffeners to support the company s commercial launch vehicles. 83 AMROC attempted to Replace Cooling Tower, Drawing No. Sheet 1 of 1, Filed Under (Vandenberg Air Force Base, California: Strategic Air Command, April 10, ABRES Pad No 2 Emergency Repair Erosion Control, Site Plan and Schedule of Work, Drawing No.

VAB Sheet 1 of 2, Filed Under (Vandenberg Air Force Base, California: Strategic Air Command, August 23, Repair Drainage - ABRES A , General Site Plan, Drawing No. VAB Sheet 1 of 4, Filed Under (Vandenberg Air Force Base, California: Strategic Air Command, April 8, Repair Elevators ABRES Pads Elevation, Wiring Diagram, Details and Notes, Drawing No. VAB-61, Filed Under (Vandenberg Air Force Base, California: Strategic Air Command, February 12, Maintain Roofs-6 Buildgs, Roof Plans, Elevations, & Details, Drawing No. VAB (PHIII), Sheet 1 of 2, Filed Under (Vandenberg Air Force Base, California: Strategic Air Command, February 13, 79 Vandenberg AFB Launch Summary. One of the launches at Pad 1, conducted on October 2, was a space launch utilizing an Atlas F with a Burner II upper stage.

The booster carried two classified satellites. 80 Modification of ABRES Site 3, Vandenberg AFB, Plans & Sections, Drawing No. Filed Under (Vandenberg Air Force Base, California: Facilities Systems Engineering Corporation, El Segundo, California, August 20, Plot Plan - ABRES Comm Systems, Vandenberg AFB, Calif, Drawing No. 4VA1860-1, Sheet 4 of 7, Filed 81 Under (Vandenberg Air Force Base, California: Quintron, October 28, 82 Smallwood, DPR forms for the Atlas Launch Complex 576 A, 40. 83 Missile Tube Stiffners, Drawing No. Sheet 1 of 1, Filed Under (Vandenberg Air Force Base, California: American Rocket Company, November 13, Smallwood, DPR forms for the Atlas Launch Complex 576 A, 13, 28. ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 27) launch its commercial booster, the first such attempt at VAFB, on October 5, 84 The launch failed, however. The program was canceled following the failure of the maiden launch. 85 The following tables provide detail on the missile launches that took place at the three Complex 576 A launch pads. Table 3 Launch Complex 576 A, Pad 1 Launch History 86 Launch Date Vehicle Launch Data October 26 Atlas D Nike Target Missile Program K-5/Pod 20 Target, supporting the U.S.

Army s Nike-X ABM development effort, USAF AFSC; apogee: km mi) December 22 Atlas D K-7/Pod 4 ABM sensor test/plume characterization mission, USAF SAC; apogee: km mi) February 13 Atlas D ABM test, USAF SAC; apogee: km mi) March 16 Atlas D Target/Aeronomy mission, USAF SAC; apogee: 300 km mi); FAILURE (Stage 1 failed) November 4 Atlas D ABRES Reduced Exo-atmospheric Cross Section (REX)-III re- entry vehicle test flight, USAF SAC; apogee: km mi); First ABRES program launch December 18 Atlas D ABRES Low Observatory Re-entry Vehicle (LORV)-8 re-entry vehicle test flight, USAF SAC; apogee: km mi) June 18 Atlas D ABRES LORV-1/Pod 31 re-entry vehicle test flight, USAF SAC; apogee: km mi) September 15 Atlas D ABRES LORV-3/Pod 26 re-entry vehicle test flight, USAF SAC; apogee: km mi) December 1 Atlas D ABRES LORV-5 re-entry vehicle test flight, USAF SAC; apogee: km mi) February 27 Atlas D ABRES LORV-4 re-entry vehicle test flight, USAF SAC; apogee: km mi) March 26 Atlas D ABRES LORV-7 re-entry vehicle test flight, USAF AFSC; apogee: km mi) June 8 Atlas D ABRES LORV-6 re-entry vehicle test, USAF AFSC; apogee: km mi) November 29 Atlas D re-entry vehicle test flight, USAF AFSC; apogee: km mi) February 10 Atlas D KX-38/Pod 32 re-entry test/plume mission, USAF AFSC; apogee: km mi) March 4 Atlas D re-entry vehicle test flight, USAF AFSC; apogee: 500 km mi); FAILURE (failed first stage) 84 Geiger, Camp Cooke and Vandenberg Air Force Base, Appendix G.

85 Smallwood, DPR forms for the Atlas Launch Complex 576 A, 40, 45. 86 Smallwood, DPR forms for the Atlas Launch Complex 576 A, 41 42. ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 28) Table 3 Launch Complex 576 A, Pad 1 Launch History (continued) Launch Date Vehicle Launch Data March 19 Atlas D re-entry vehicle test flight, USAF AFSC; apogee: km mi) May 3 Atlas D re-entry vehicle test flight, USAF AFSC; apogee: 500 km mi); FAILURE (failed first stage) June 30 Atlas D re-entry vehicle test flight, USAF AFSC; apogee: km mi) May 19 Atlas F ABRES Simulated Boost Glide Re-entry Vehicle re- entry vehicle test flight, USAF AFSC; apogee: km mi) November 10 Atlas F ABRES Boost Glide Re-entry Vehicle re-entry vehicle test flight, USAF AFSC; apogee: km mi) February 26 Atlas F ABRES re-entry vehicle test flight, USAF AFSC; apogee: km mi) April 18 Atlas E ABRES Re-entry Vehicle Test Observable (RVTO)-1A-1 re- entry vehicle test flight, USAF AFSC; apogee: km mi) June 29 Atlas F ABRES RVTO-1A-2 re-entry vehicle test flight, USAF AFSC; apogee: km mi) September 27 Atlas F RVTO-1A-3 re-entry vehicle test flight, USAF AFSC; apogee: km mi) November 24 Atlas F RVTO-1A-4 re-entry vehicle test flight, USAF AFSC; apogee: km mi) August 20 Atlas F ABRES RVTO-1A-5 re-entry vehicle test flight, USAF AFSC; apogee: km mi) December 3 Atlas F ABRES RVTO-1A-6 re-entry vehicle test flight, USAF AFSC; apogee: km mi) June 9 Atlas F ABRES RVTO-1A-7 re-entry vehicle test flight, USAF AFSC; apogee: km mi) April 5 Atlas F ABRES Low Angle Re-entry (LAR)-1 re-entry vehicle test flight, USAF AFSC; apogee: km mi) September 1 Atlas F ABRES LAR-2 re-entry vehicle test flight, USAF AFSC; apogee: km mi) October 2 Atlas F/ USAF/US Army RADCat/RADS at SAMSO Space Test Program Burner 2 Flight military technology satellite September 30 Atlas F Ballistic Missile Re-entry System Advanced Control Experiment (ACE)-1 re-entry vehicle test flight, USAF AFSC; apogee: km mi) March 6 Atlas F Supplementary Flight Testing re-entry vehicle test flight, USAF AFSC; apogee: km mi) May 1 Atlas F re-entry vehicle test flight, USAF AFSC; apogee: km mi) June 28 Atlas F re-entry vehicle test flight, USAF AFSC; apogee: km mi) September 8 Atlas F ACE-3 re-entry vehicle test flight, USAF AFSC; apogee: km mi) ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 29) Table 4 Launch Complex 576 A, Pad 2 Launch History 87 Launch Date Vehicle Launch Data September 9 Atlas D Initial operational capability demonstration launch, USAF SAC; apogee: km mi) August 5 Atlas F ABRES Low Observatory Re-entry Vehicle (LORV)-2A re-entry vehicle test flight, USAF AFSC; apogee: km mi) August 8 Atlas F ABRES Maneuverable Ballistic Re-entry Vehicle re-entry vehicle test flight, USAF AFSC; FAILURE; apogee: 500 km mi) October 11 Atlas F ABRES Simulated Boost Glide Vehicle re-entry vehicle test flight, USAF AFSC; FAILURE; apogee: 50 km (31 mi) January 18 Atlas F ABRES Target Vehicle Experimental re-entry vehicle test flight, USAF AFSC; apogee: km mi) March 16 Atlas F ABRES re-entry vehicle test flight, USAF AFSC; apogee: km mi) July 29 Atlas F ABRES re-entry vehicle test flight, USAF AFSC; apogee: km mi) October 14 Atlas F ABRES re-entry vehicle test flight, USAF AFSC; apogee: km mi) April 6 Atlas F Orbiting Vehicle (OV)1-13 and OV1-14 magnetosphere satellites for spaceflight technology experiments May 3 Atlas F ABRES Penaid TVX re-entry vehicle test flight, USAF AFSC; FAILURE; apogee: 100 km (60 mi) June 1 Atlas F ABRES PDV re-entry vehicle test flight, USAF AFSC; apogee: km mi) July 11 Atlas F OV1-15S and OV1-16 Cannonball 1 magnetosphere satellites for spaceflight technology experiments March 18 Atlas F OV1-17S, OV1-19S, OV1-17A Orbiscal 2, and OV1-18S magnetosphere satellites for spaceflight technology experiments August 7 Atlas F OV1-20P, Gridsphere 2, Grids[here 1, Rigidsphere, Musketball 1, Cannonball 2, Mylar balloon, and OV1-21P satellites 87 Smallwood, DPR forms for the Atlas Launch Complex 576 A, 43.

ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 30) Table 5 Launch Complex 576 A, Pad 3 Launch History 88 Launch Date Vehicle Launch Data January 26 Atlas D Initial operational capability demonstration launch, USAF SAC; apogee: km mi) December 12 Atlas D Nike Target Missile Program K-6 target mission, USAF AFSC; apogee: km mi) January 31 Atlas D ABM test, USAF SAC; apogee: km mi) February 28 Atlas D ABM test, USAF SAC; apogee: km mi) June 12 Atlas D ABM test, USAF SAC; apogee: km mi) July 29 Atlas D target mission, USAF SAC; apogee: km mi) September 22 Atlas D target mission, USAF SAC; apogee: km mi) December 4 Atlas D target mission, USAF SAC; apogee: km mi) March 2 Atlas D target mission, USAF SAC; apogee: km mi) June 10 Atlas D target mission, USAF SAC; apogee: km mi) February 13 Atlas F ABRES re-entry vehicle test flight, USAF AFSC; apogee: km mi) June 9 Atlas F/ ABRES re-entry vehicle test flight, USAF Trident AFSC; apogee: km mi) July 22 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) October 27 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident FAILURE; apogee: km mi) December 21 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) January 31 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) March 6 Atlas E/ ABRES re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) April 27 Atlas E/ ABRES re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) June 22 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) 88 Smallwood, DPR forms for the Atlas Launch Complex 576 A, 44 45.

ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 31) Table 5 Launch Complex 576 A, Pad 3 Launch History (continued) Launch Date Vehicle Launch Data September 25 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) November 16 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident FAILURE; apogee: 10 km (6 mi) January 16 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) September 16 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) October 10 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident FAILURE; apogee: 10 km (6 mi) December 12 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) February 8 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) March 13 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) May 30 Atlas F/ ABRES re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) December 22 Atlas F/ ABRES RVTO-2A-1 re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) June 29 Atlas F/ ABRES RVTO-2A-3 re-entry vehicle test flight, USAF AFSC; Trident apogee: km mi) August 29 Atlas F RVTO-3A-2 re-entry vehicle test flight, USAF AFSC; apogee: km mi) March 23 Atlas F ACE-2 re-entry vehicle test flight, USAF AFSC; apogee: km mi) October 14 Atlas F RVTO-3A-1 re-entry vehicle test flight, USAF AFSC; apogee: km mi) October 5 AMROC AMROC maiden launch, FAILURE; apogee: 0 km (0 mi) IRR ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 32) PART II. PHYSICAL DESCRIPTION OF THE ATLAS LAUNCH COMPLEX 576 A 89 Atlas Launch Complex 576 A consists of three launch pads (Pad 1, Pad 2, Pad 3) and a centrally located Launch Operations Building. Each concrete pad originally incorporated a movable steel gantry set on steel rails above an a launch mount and flame bucket, and a variety of tanks and piping for storing and transmitting missile propellants and propellant-related gases. Water conduits also supplied water deluges to dampen launch flames during actual launches or wet dress rehearsal launches. These deluges conveyed missile exhaust materials to concrete and earthen exhaust trenches, which in turn conveyed exhaust material to exhaust ponds.

Within the approximately 67-acre and roughly triangular main portion of the complex, each pad is oriented southwest-northeast and connected by paved roads. Pad 3 retains the highest degree of historic integrity among the three pads. Launch Complex 576 A originally included the following features that are no longer present: two wood-frame technical engineering support buildings, a power plant, a system water tank and pump house, three diked fuel tanks, a gate house, temporary trailer offices, and a wood-frame supply and maintenance building. Figure 8 Map of Atlas Launch Complex 576 A, Launch Complex 576 A was originally served by a remote MOD-II Command Guidance Station approximately 2 miles south-southeast of the complex.

The station consisted of a centralized GOB, a transmitter pad, tracking radar, a receiver pad, and four rate pads radiating outward in an 89 Limited portions of this physical description of the Atlas 576 A Launch Complex are excerpted directly from Dames & Moore, Inc., Historic Architectural and Engineering Survey Report, Atlas ABRES-A, prepared by Karen J. Weitze and Marcie Liburn, as well as Smallwood, DPR forms for the Atlas Launch Complex 576 A, and Nowlan and McCullough, Cold War Properties Evaluation Phase III. ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 33) X configuration, with each rate pad positioned at a distance of approximately from the GOB. The MOD-II Command Guidance Station was the ground-based guidance system needed to launch the Atlas D missile at Complex 576 A.

Base planners have demolished or removed multiple physical features of this system. As a result, the MOD-II Command Guidance Station no longer retains historic integrity and is not considered a contributing element of the Atlas Launch Complex 576 A. Parenthetical references to large-format HAER photographs taken in March documenting elements of the Atlas Launch Complex 576 A, as listed in the Index to Large Format Black and White Photographs below, are provided in the remainder of this physical description. These photographs illustrate the current condition of the Atlas Launch Complex 576 A.

Original Atlas Launch Complex 576 A Elements Launch Operations Building ( Blockhouse, Building Commonly referred to as the blockhouse, the Launch Operations Building (LOB) is a 90 x 68 reinforced-concrete structure with 12 -thick walls. The building s main floor is 11 high and the basement is 10 -10 high. A 3 -4 earthen overlay covers the building s flat roof, and 3:1 slopes of earthen fill cover the north, south, and east elevations (HAER CA-2395-1). A steel blast door secures the centered main entry at the building s canted west-facing fa ade (HAER CA-2395-2, HAER CA-2395-3). Two escape hatches, a periscope, rectangular concrete air intake structure with louvered vents, and a rectangular exhaust vent structure puncture the earthen overlay above the roof.

A 64 -high steel truss TV tower is near the southwest end of the canted fa ade wall (HAER CA-2395-1). 90 An 11 x 20 tunnel extends from the entry to the building interior and terminates at an adjacent loading shaft and an interior circulation corridor running along the west elevation. Two west east-oriented interior circulation corridors divide the main floor into thirds. Moving west to east, the northerly third of the building s original interior arrangement consisted of a security room, first-aid room, janitor room and restrooms, a lunch and locker room, and a visitor s observation room.

The southerly third of the original arrangement consisted of a maintenance room, communications room, communications operations room, launch operations office, and crew briefing and conference room at the east end of the plan. The central third of the building s original interior arrangement featured a storage room and stairwell, a large room containing the checkout equipment area and launch control equipment area, and the launch control room at the east end of the plan. The basement comprised rooms for equipment, including transformer banks, 90 WS-107A Operational Base, Cooke Air Force Base, California, Launch Operations Building, Tower, Structural, Drawing No.

A1-II.1-S-8, Filed Under (Cooke Air Force Base, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Air Force Ballisitc Missile Division [ARDC], June 14, Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 14; Nowlan and McCullough, Cold War Properties Evaluation Phase III, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 34) electrical and mechanical equipment, and cable trays, as well as entries to cableway tunnels at the eastern portion of the plan. 91 91 WS-107A Operational Base, Camp Cooke, California, Launch Operations Building, Ground Floor Plan, Architectural, Drawing No.

A1-II.1-A-3a, Filed Under (Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Air Force Ballisitc Missile Division [ARDC], March 12, WS-107A Operational Base, Camp Cooke, California, Launch Operations Building, Basement Floor Plan, Architectural, Drawing No. A1-II.1-A-2, Sheet 54 of Filed Under (Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Air Force Ballisitc Missile Division [ARDC], April 15, Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 14; Nowlan and McCullough, Cold War Properties Evaluation Phase III, ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 35) Figure 9 Floor plan of Launch Operations Building ( blockhouse ), The Air Force had an L-shaped addition constructed at the original eastern and southern elevations in to expand the main floor as part of alterations to the Atlas Launch Complex 576 A over several years to equip it for Atlas E and F missile launches. The addition does not incorporate a basement, and its raised foundation surmounts the cableway tunnels. A operations brochure for the launch complex features a blockhouse floor plan that shows how the Air Force reorganized the expanded main floor. By launch control centers for each launch pad and a VIP gallery occupied the eastern portion of the main floor. To the west, the remaining ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 36) northern third of the main floor consisted of a General Dynamics/Convair launch operations room, the original restroom, and an Air Force office. The remaining southern third of the main floor consisted of a communications room and TV room. A large room at the center of the building west of the VIP gallery continued to contain the checkout equipment. The blockhouse interior was altered again, including removal and replacement of equipment, as part of launch complex modifications for the short-lived HPTEM program in the early and for the facility s use by AMROC in the late 92 Cableway Cable systems connect from the blockhouse to each of the three pads. These consist of coaxial cables that transmit data in the form of electromagnetic waves.

The cables run through three tunnels that extend from the east portion of the blockhouse toward the pads and surface at distances of between 50 and 75 from the blockhouse. At those surface locations, concrete distribution boxes connected to cableways, also known as wave guides. Only the cableway from the distribution box east of the blockhouse (as opposed to the boxes to the north and south of the blockhouse) remains intact today (HAER CA-2395-4). It extends approximately 730 east toward Pad 3. The cableway consists of a shallow wood-framed channel carried in four layers on a post and cantilevered triangular cross beam system. Nonoriginal corrugated panels now sheath the cableway to Pad 3.

Several hundred feet from the pads, reinforced-concrete distribution boxes that remain intact transitioned the cables from the cable trays to 300 325 -long pressurized cable tunnels that carried the cables to the LSB at each pad. The tunnel at Pad 3 continues to contain cable extending from the east end of the intact Pad 3 cableway and concrete distribution box (HAER CA-2395-5, HAER CA-2395-6) to the Pad 3 Launch and Service Building. 93 Gantry (Launch Service Tower) Only the substantially deteriorated Pad 3 Gantry remains standing today (HAER CA-2395-7 through HAER CA-2395-12, HAER CA-2395-36 through HAER CA-2395-40). Also known as missile service towers the gantries that originally stood at all three pads were designed to accommodate the mounting of an Atlas ICBM on the launch mount.

The tapered gantry structure remaining at Pad 3 is an open steel trusswork designed to remain stable in high coastal winds. The structure is 132 high with top widths of 28 at the west and east elevations and 42 at the north and south elevations, and bottom widths of 52 at the west and east elevations and 24 at the north and south elevations. 92 Aerospace Test Wing, A Site Familiarization Brochure (Vandenberg Air Force Base, California: U.S.

Air Force, Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 14; Nowlan and McCullough, Cold War Properties Evaluation Phase III, Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 13; Nowlan and 93 McCullough, Cold War Properties Evaluation Phase III, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 37) Figure 10 Gantry (Launch Service Tower) as of The gantry originally featured an elevator on the north side of the structure that is no longer present. Engineers designed the gantry to allow personnel to access and service all levels of Atlas ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 38) missiles prior to launches and equipped the structure to move on rails to the opposite side of the pad during launches. 94 Figure 11 Bird s-eye aerial view of Atlas Launch Complex 576 A Pad 3 circa A missile pressurization control panel at the northeast leg of the tower enabled personnel to manipulate tank pressures while connecting or disconnecting the missile to the launcher. The structure also featured movable platforms or levels equipped to swing away from and toward the missile. These platforms were powered by pneumatically operated motors controlled from panels at each platform. In addition to the elevator, ladders provided for personnel to move from platform to platform. Each platform provided access to a variety of equipment used to prepare the missile for launch.

The first level featured electrical control and circuit breaker panels as well as compressors on the north and south sides of the structure that supplied the platform motors and other equipment. In the Air Force also had all three gantries at Launch Complex 94 Holmes & Narver, Inc./Department of the Air Force, Elevations, Missile Service Towers, Camp Cooke, California, A1-II.2.3.4 May Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 14; Nowlan and McCullough, Cold War Properties Evaluation Phase III, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 39) 576 A sheathed in corrugated plastic panels to help shelter workers and equipment from rain and the site s frequently strong coastal winds.

95 As with the demolished gantries that formerly stood at Pads 1 and 2, the Pad 3 Gantry featured a movable assembly known as the tower drive system. Engineers designed the gantry to move on parallel rails between a launch service position at the west end of the pad to the park position 300 away at the east end of the pad (HAER CA-2395-9). Missiles were launched with the gantry in park position. The gantry rests on eight steel wheels. Electric drive motors formerly powered the pairs of wheels on the east side. Steel tower bumpers at the east ends of the rails and rail clamps at the east legs of the gantry allowed the moving structure to be stopped and secured in the park position on the east side of the pad during launches (HAER CA-2395-10).

Drive motor cables rolled onto reels on the south side of the tower as it moved. 96 Launch and Service Building (Pad 1: Building Pad 2: Building Pad 3: Building The LSB at each pad are in varied states of deterioration. The PAD 3 LSB retains by far the most character-defining features of the operating launch pad system, including historic tanks, associated pipe systems, control panels, and other equipment, and therefore represents the most intact example at the Atlas Launch Complex 576 A. The reinforced-concrete were positioned below the gantries, but function as aboveground structures.

Their east sides abut earthen berms approximately 150 -long that form ramps for placing Atlas missiles in launch position and providing for the tower drive systems to move gantries to the east sides of the pads during launches. The aboveground configuration of the provided flame buckets installed at the west sides of the buildings to be positioned below the launch mounts, where they could convey missile exhaust away from the buildings. Two large-format photographs, one of Pad 1 and one of Pad 2, are included in this HAER (HAER CA-2395-34, HAER CA-2395-35). Reflecting the emphasis on Pad 3 in the large-format views for this HAER, the remainder of this description focuses on the Pad 3 LSB unless otherwise specified.

97 The Pad 3 LSB has a rectangular plan measuring 129 x 104 with 12 -thick reinforced-concrete walls (HAER CA-2395-7, HAER CA-2395-8, HAER CA-2395-24, and HAER CA-2395-32). At the center of the building s west elevation, the flame bucket abutment walls extend the building configuration by 17 (HAER CA-2395-30). Circular steel staircases at the west elevation corners facilitate circulation between the LSB entries and the launch area at the top of the building. Metal roll-up doors secure entries along the north and south elevations. 98 95 ABRES Modification-Pad 1. 4300A Complex Vandenberg AFB. Service Tower Enclosure Elevations, Drawing No.

Sheet 4, Filed Under (Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], April 16, Aerospace Test Wing, A Site Familiarization Brochure, Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 9; Nowlan and McCullough, Cold War Properties Evaluation Phase III, 96 Aerospace Test Wing, A Site Familiarization Brochure, 61. 97 Aerospace Test Wing, A Site Familiarization Brochure, Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 7. 98 Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 7. ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 40) Figure 12 Launch and Service Building floor plan, Engineers organized the LSB around meeting the challenge of transferring hazardous propellants and pressurizing gases to and from missiles. These included liquid oxygen, liquid nitrogen, gaseous nitrogen, helium, and fuel, the latter a highly refined kerosene that is a heat- resistant hydrocarbon. The two-part propellant system employed to launch Atlas missiles made use of liquid oxygen as an oxidizer. Tanks for fuel and liquid oxygen made up large portions of Atlas missiles. The tank section of Atlas F missiles, for example, consisted mainly of two tanks separated by a bulkhead, the upper one a 18,294-gallon liquid oxygen tank and the lower one an 11,384-gallon fuel tank.

As highly volatile substances, liquid oxygen an extremely combustible blue liquid with a boiling point of degrees Fahrenheit and required careful handling and storage to ensure that they did come into contact. 99 As U.S. Army Brigadier General T. J. Hayes explained in extreme precautions must be taken to assure that no trace of hydrocarbons remains in liquid oxygen pipes. Filtering is stringent. No particles larger than 150 microns may pass through these systems. 100 To help ensure that fuel and liquid oxygen did not come into contact, engineers placed the fuel and liquid oxygen systems on different sides of Both systems depended on the presence of 99 Paul D. Troxler, Space Missile Facilities, The Military Engineer, V. 53, No.

352 (March-April Aerospace Test Wing, A Site Familiarization Brochure, 2, 4, 13. T. J. Hayes, ICBM Site Construction, The Military Engineer, V. 54, No. 362 (November-December 100 ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 41) liquid nitrogen, a cryogenic substance like liquid oxygen but with lower boiling point of 320 degrees Fahrenheit. Liquid nitrogen was used to produce pressurized nitrogen gas, which propelled fuel into the missile fuel tank during the standby stage of launches. During countdown, pressurized nitrogen gas conveyed liquid oxygen into the missile liquid oxygen tank. Missiles were also filled with liquid nitrogen and helium during countdown.

Helium transferred to the missile booster provided for pressurization of the main tanks in the missile tank section during flight. 101 The north portion of the LSB mainly housed electrical and fuel-related equipment. The L-shaped room, with its entry at the west end of the north elevation near a circular stairway, contains a steel tank labeled liquid nitrogen storage tank (HAER CA-2395-13, HAER CA-2395-14). As- built plans indicate that the original 8 -4 -high, 21 -long structure formed two tanks, one for liquid nitrogen storage and the other a nitrogen and helium heat exchanger tank. Arthur D. Little, Inc. manufactured this as well as the LSB s other major tanks.

Behind the liquid nitrogen storage tank is the fuel control area, which incorporates a variety of valves, meters, a vacuum pump, and steel grate flooring that covers the fuel catch tank (HAER CA-2395-14). 102 Accessed by three entries to the east of the liquid nitrogen tank and fuel control room is the high- pressure room, also identified on as-built plans as the high pressure gaseous nitrogen storage area. The eastern portion of the room contains several tanks that pressurized the fuel transfer and loading system (HAER CA-2395-15). The largest contained nitrogen for full pressurization of the missile fuel tank. The rear portion of this tank supported smaller nitrogen tanks for partial pressurization of the missile fuel tank.

Two moderately sized tanks are stacked on the west side of the full pressurization tank: one for liquid nitrogen storage tank pressurization and one for fuel oil tank gas blanket topping. West of these tanks are the fuel control field station console and the liquid nitrogen/helium control field station console (HAER CA-2395-16). These rectangular metal structures contain control mechanisms and meters related to fuel, nitrogen, and helium transfers.

As-built plans indicate that the high-pressure gaseous nitrogen storage room also contained six other consoles or control units that have been removed: the nitrogen control unit and the trichlor flushing unit between the field control stations and the tank stacks; two hydraulic pneumatic supply stations at the north portion of the room to the west of the tank stacks; and, at the far west portion of the room, the inert fluid-lichlor unit, dynamic checkout unit, and the pressurization control unit. 103 Troxler, Space Missile Facilities, Aerospace Test Wing, A Site Familiarization 101 Brochure, 7, 79, 96. WS-107A Operational Base, Camp Cooke, California, Launch and Service Building, Nitrogen Storage & 102 Helium-Nitrogen Heat Exchanger Tank, Drawing No.

A1-II.2.3.4.P7, Sheet Filed Under (Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division [ARDC], August 26, WS-107A Operational Base, Camp Cooke, California, Launch and Service Building, Plan of Lower Level, Mechanical, Drawing No. A1-II.2.3.4.-P1, Sheet Filed Under (Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division [ARDC], August 26, WS-107A Operational Base, Camp Cooke, California, Launch and Service Building, Plan of Lower Level, 103 Mechanical, Drawing No. A1-II.2.3.4.-P1, Sheet Filed Under (Camp Cooke, California: Holmes & ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 42) East of the fuel control and high-pressure room, the north elevation s easternmost entry accesses a passageway leading to the mechanical and electrical room (HAER CA-2395-17). Heavy-duty metal screens, including screen doors at two entries, and two motor control boards divide the passageway from the transformer room to the east, which has two louvered vents at the north elevation. Underground electrical lines entered the transformer room through the east elevation wall and connected a line air breaker unit and two transformer cubicles (HAER CA-2395-18).

To the east were a line of three 250-kilovolt-ampere 4160/240/480-volt liquid-filled transformers along the east elevation wall and three 50-kilovolt-ampere 480-120/208-volt dry transformer units along the transformer room s south wall. 104 The Pad 3 fuel storage tank is located underground approximately 10 east of the transformer room. Supplied by Arthur D. Little, Inc., the steel fuel tank has a 15,000-gallon storge capacity, which provided sufficient fuel for a single instance of missile propellent loading. Pressurized with nitrogen gas during missile loading, the tank was vented to release the gas into the atmosphere upon draining of the fuel transfer line leading to the missile tank.

A retaining wall extending east from the transformer room has an opening to the fuel transfer station secured by a metal roll-up door. 105 At the south end of the passageway between the high-pressure room and the transformer room, a sliding steel door secures the mechanical and electric room. The door is painted with the emblem of the Test Wing, activated October 20, under the Ballistic Missile Division at VAFB (HAER CA-2395-17). The mechanical and electrical room housed computer banks, a variety of communications equipment connected by cable to the blockhouse, and power supply, distribution, and generation equipment as well as technology related to autopilot operations, ordnance testing, optical proficiency analysis, and countdown functions (HAER CA-2395-19).

A single entry from the mechanical and electrical room provides access to the plenum chamber, where the pressurized tunnel connects to the LSB (HAER CA-2395-20). Mechanical ventilation of the plenum chamber forced fresh air into the cable tunnel at slightly higher than atmospheric pressure, thereby expelling foul air. The Pad 3 cable tunnel extends approximately 75 east and Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division [ARDC], August 26, WS-107A Operational Base, Camp Cooke, California, Launch and Service Building, Instrument Air Supply Piping, Drawing No.

A1-II.2.3.4.-I-104, Sheet Filed Under (Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Air Force Ballistic Missile Division [ARDC], April 104 WS-107A Operational Base, Camp Cooke, California, Launch and Service Building (A) (B) Substation Plan and Details, Electrical, Drawing No. A1 II.2.3.4.-E-1, Sheet 167 of Filed Under (Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division [ARDC], April 15, Aerospace Test Wing, A Site Familiarization Brochure, 79, 82; WS-107A Operational Base, 105 Camp Cooke, California, Launch and Service Building, Flow Diagram Fuel System, Drawing No.

A1-II.2.3.4.-P-9, Sheet Filed Under (Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division [ARDC], August 26, WS-107A Operational Base, Camp Cooke, California, Launch and Service Buildings A, B, and C , Plan-Lower Level, Architectural, Drawing No. A1 II.2.3.4.-A-2 Sheet 93 of Filed Under (Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division [ARDC], April 15, ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 43) northeast from the plenum chamber (HAER CA-2395-21), turns to the northwest for approximately 200 (HAER CA-2395-22), and turns west at a distance of approximately 15 before surfacing at the concrete distribution box and cable tray connection (HAER CA-2395- 106 From west to east, the south elevation of the Pad 3 LSB has three entries secured by metal roll- up doors and a pedestrian entry with a steel door (HAER CA-2395-24). The westernmost entry provides access to the L-shaped liquid oxygen control room.

This room contains a 28,000-gallon tank that originally served as the LSB s liquid oxygen storage tank, and later served as the liquid oxygen topping tank when the Air Force had an exterior liquid oxygen storage tank installed as part of modifications to support Atlas E and F missile ABRES launches (HAER CA-2395-25, HAER CA-2395-26). The space also contains a network of large pipes at the liquid oxygen control area in the western portion of the room (HAER CA-2395-25), and a control panel and an emergency shower at the east wall near the entry (HAER CA-2395-26). The liquid oxygen control area originally incorporated a liquid oxygen catch tank, a liquid oxygen sub-cooler tank, and a vacuum pump that are no longer present.

107 East of the liquid oxygen control room, two entries provide access to the liquid oxygen transfer room, also identified on as-built plans as the high pressure gaseous oxygen storage room, which contains eight gaseous nitrogen/liquid oxygen pressurization tanks (HAER CA-2395-27; HAER CA-2395-28). Nitrogen gas was employed to pressurize liquid oxygen and thereby cause it to flow through the transfer circuit system, chilling the transfer lines and associated valves and filters, and partially filling the missile s liquid oxygen tank. A boil-off valve in the missile facilitated chilling of the missile liquid oxygen tank by providing for oxygen gas to pass through the tank and be released into the atmosphere. This chilling process limited pressure buildup in the lines and missile tanks.

After partial filling of the missile tank and pressurization of the tank ullage (unfilled tank space), increase of pressure in the liquid oxygen storage tank accelerated the flow of liquid oxygen into the transfer system to complete filling of the missile s liquid oxygen tank. Until launch, the missile tank continued to be topped with liquid oxygen to compensate for the vaporization of liquid oxygen in the missile tank and its continued release into the atmosphere via the liquid oxygen boil-off valve that prevented excessive pressure buildup. 108 106 Aerospace Test Wing, A Site Familiarization Brochure, Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 7.

WS-107A Operational Base, Camp Cooke, California, Launch and Service Buildings A, B, and C , Plan- 107 Lower Level, Architectural, Drawing No. A1 II.2.3.4.-A-2 Sheet 93 of Filed Under (Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division [ARDC], April 15, 108 Aerospace Test Wing, A Site Familiarization Brochure, 79; WS-107A Operational Base, Camp Cooke, California, Launch and Service Buildings A, B, and C , Plan-Lower Level, Architectural, Drawing No. A1 II.2.3.4.-A-2 Sheet 93 of Filed Under (Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division [ARDC], April 15, ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 44) The pedestrian entry at the east end of the south elevation provides access to the personnel shelter and the bathroom. An interior door allows for circulation between the personnel shelter and the mechanical and electric room. 109 Flame Buckets and Water System Essential to the Atlas D, E, and F wet launches that took place at the three pads were the complex s water system and the flame buckets positioned immediately below the launch mounts. Figure 13 Atlas Launch Complex 576 A Water System, 109 Aerospace Test Wing, A Site Familiarization Brochure Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 7. ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 45) East of Street, the Corps of Engineers had a 250,000-gallon water storage tank, a pump house, and a valve system constructed to supply water to the launch complex. A 36 pipe constructed from the pump house to the blockhouse fed 24 pipes that conveyed water to each pad. Approximately 50 southwest of the Pad 3 LSB south elevation is a x 7.5 reinforced- concrete water valve box. Each pad had a valve box. The valve box supplied the and the flame bucket. The valve box could increase conveyance to gallons per minute during launches to supply water deluges at the flame bucket. 110 Figure 14 Flame bucket water system as of 110 Aerospace Test Wing, A Site Familiarization Brochure, Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 12.

ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 46) Manifolds branched off from the water distribution line to eight valves at the rear of each flame bucket for transmitting water throughout the Manifolds on each side of the flame buckets connected to nozzles that transmitted water into the flame buckets. The pivoted-steel flame buckets were pinned in place beneath the launch mount at the west ends of the and conveyed wet-launch exhaust into the exhaust trenches at each pad. The Air Force removed the flame bucket at Pad 3 in when it modified the facility to accommodate the Minuteman missile.

One of the launch complex s flame buckets remains present at Pad 1 (HAER CA-2395- 111 Flame Exhaust Trenches The concrete and earthen flame exhaust trenches at the west sides of each launch pad served to carry wet-launch exhaust to disposal ponds. The concrete trench sections nearest the pads are approximately 45 wide at the top with sharply tapered walls and approximately 5 wide channel bottoms. Stretching to the southwest and west, the Pad 1 trench consists of a 225 long concrete section, a short riprap section, a 750 -long earthen channel, and a -long ditch leading to a disposal pond shared with Pad 2.

The Pad 2 trench leads southwest from the rear of the Pad 2 beginning with a 150 -long concrete section that descends steeply through a 50 -long riprap and earthen section, to a ditch carrying the waste a final to the disposal pond shared with Pad 1. The Pad 3 trench stretches to the south and southwest from the Pad 3 Its initial 225 -long concrete section transitions to a 50 -long riprap section. The remainder of the trench consists of a 750 -long earthen section and a second 75 -long riprap section leading to a small disposal basin. 112 Tank Farm Located approximately 35 north of the of the LSB at Pad 3, the intact high-pressure tank farm consists of a 40 x 30 fenced reinforced-concrete foundation pad and various cylinders, pipes, and valves.

The cylinders and pipelines at the tank farms supplied nitrogen and helium to the LSB high-pressure rooms. The Pad 2 tank farm has been completely removed and only fragmental remains of the Pad 3 tank farm remain present. At Pad 3, a utility trench covered by metal grating runs at a right angle from the tank farm to the LSB s high-pressure room. 113 67 Atlas Launch Complex 576 A Elements Launch Mount (Removed) The Air Force removed the launch mount and flame bucket from Pad 3 in when it installed a 46 -long, 12 -diameter vertical tube to accommodate the Minuteman missile. Historic 111 Aerospace Test Wing, A Site Familiarization Brochure, Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 10, 12.

112 Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 113 WS-107A Operational Base, Camp Cooke, California, Launch and Service Buildings A-B-C, Floor Reinforcement Plan, Structural, Drawing No. A1-II.2.3.4.-S-35, Sheet 126 of Filed Under (Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division [ARDC], October Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 47) photographs suggest that launch mount design may have changed over the course of the Atlas program. By the latter the Atlas E and F launch mount (or launcher-erector ) at Pad 3 had a trapezoidal shape.

The launcher consisted of a tubular steel frame with support pedestals in each quadrant. The pedestals incorporated hydraulic hold-down hooks and provided a stable support for missiles. An electrically operated screw jack tilted the frame on pivots from a horizontal to a vertical position to allow for attachment of the missile in a horizontal position. Once attached, the missile was raised into the vertical launch position, with the mount frame pivoting back to a horizontal position. 114 Universal Umbilical Tower (Removed) In the Air Force had 108 -high steel truss universal umbilical towers constructed at each of the 576 A launch complex pads.

No longer present at any of the three pads, the umbilical towers were positioned at the rear of each LSB to the north of the Collimator structures that the Air Force had constructed at each pad at that time. The flame bucket wing walls of the LSB were extended in the direction of the universal umbilical tower to sufficiently protect the added tower structure. The same corrugated plastic panels installed on the exteriors of the gantries to protect missileers from the elements were also installed on the umbilical towers. 115 The tower structure provided for elevation of umbilical cables to facilitate their connection to the payloads of Atlas E and F missiles, which were larger and substantially higher than Atlas D missiles when placed in the vertical launch position.

116 The key component of the tower was the operable boom that swung out from the tower to connect umbilical cables to receiving connections within 6 and 16 of the missile centerline. At station 47 near the middle portion of the tower above the boom extension and retraction machinery were a control console, hydraulic oil reservoir, nitrogen purge bottle, primary nitrogen bottles and associated equipment and pipelines. The boom could be extended manually or automatically and retracted into a nested position within the tower and secured with a latching mechanism. Electrical switches enabled automatic retraction of the boom in response to missile ignition during launches.

The boom was equipped to decelerate to zero feet per second after swinging 14 from the missile toward the tower and into a nesting position. 117 114 Aerospace Test Wing, A Site Familiarization Brochure, 67. 115 Pad 2 ABRES-A Site VAFB, Universal Umbilical Tower and MST Modifications, General, Cover Sheet and Drawing Index, Drawing No. Sheet 1, Filed Under (Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division (AFSC), October 14, Aerospace Test Wing, A Site Familiarization Brochure, 64; Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 9. 116 Evaluating the launch complex in Dames & Moore asserted that umbilical towers constructed in replaced earlier towers.

However, as-built plans associated with original development of the launch complex and historic photographs dating to the late and early do not offer evidence of umbilical towers constructed at any of the pads prior to Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 117 Aerospace Test Wing, A Site Familiarization Brochure, 64 65; Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 48) Figure 15 Universal Umbilical Tower as of Collimator In the Air Force had collimator and associated flame deflector structures constructed at each of Launch Complex 576 A pads.

Whereas the Atlas D missile depended on ground-based command guidance from the MOD-II Command Guidance Station, the larger Atlas E and F missiles launched from the 576 A complex as part of the ABRES program relied on all-inertial guidance necessitating the aid of collimators and theodolites (described below). Collimator structures employed fixed telescopes (also known as auto-collimating plumb aligners) that ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 49) adjusted the line-of-sight accuracy of other instruments and supplemented the theodolites. The collimators fine-tuned the vertical alignment of the upper stage of an inertially guided missile. 118 Engineers had the collimators constructed to the rear of each at the mouths of the concrete- line exhaust trenches.

These cylindrical reinforced-concrete buildings were constructed along with and positioned immediately west of wedge-shaped flame deflectors. The remainder of this description focuses on the Pad 3 collimator (HAER CA-2395-30). The 14 diameter collimator stands 26 high with 12 -thick walls. Four apertures pierce the building. The collimator incorporates an off-center 4 -diameter circular roof manhole with a cover, a personnel entry-exit with an 8 -thick blast-resistant steel door positioned to provide a line-of-sight to the theodolite enclosure to the southeast, and a rectangular portal at the west-facing portion of the building.

A 12 diameter steel sighting tube with a cover projects at an approximately 35-degree angle from the collimator s roof-wall juncture through the upper portion of the flame deflector. The sighting tube required alignment with Polaris (the North Star). Steel spiral stairs ascend the building to a platform at the personnel entry door. Steel rungs led from the manhole in the roof to the doorway platform. An interior work station centered beneath the manhole is aligned with the interior portion of the sighting tube (HAER CA-2395-31). Other interior equipment has been removed from the Launch Complex 576 A collimators.

119 Theodolite Enclosure As noted above, the Air Force had theodolite enclosures constructed along with collimators at each of the Atlas Launch Complex 576 A pads to support Atlas E and F missile launches. These structures housed precision optical-electronic instruments known as theodolites as well as azimuth reference prisms. The theodolites aligned the stable platforms of the Atlas E and F missiles inertial guidance system and monitored alignment until firing. Theodolite enclosures remain present at each of the three pads, but their equipment has been removed. The remainder of this description focuses on the theodolite enclosure at Pad 3.

120 Situated approximately 90 southeast of the Pad 3 collimator, the theodolite enclosure is a rectangular reinforced-concrete building with a 9 -4 x 7 -4 footprint and 8 -thick, 8 -2 -high walls (HAER CA-2395-8). Six apertures pierce the theodolite enclosure. Other openings consist of a personnel entry secured by a steel door with a 12 porthole at the north elevation, a small metal louvered vent at the west elevation, and a larger metal louvered vent at the east elevation. Steel rungs ascend to the roof of the building at the west elevation, suggesting that the covered manhole provides alternative access to the building at the roof.

Two sighting tubes align with launch complex azimuth points to the southwest and northwest, while two additional sighting tubes align with true north and Polaris. Two terrestrial azimuth marks, No. 1 and No. 2, were installed first for the theodolite at Pad 2, each sited in its own cul-de-sac with an access road off Watt Road to the Titan missile complex to the north-northwest. The Air Force had terrestrial marks No. 3 and No. 4 constructed along with the theodolite at Pad 3. Terrestrial mark No. 3 is 118 Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 119 Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 120 Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 11.

ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 50) to the southwest of Pad 3 in its cul-de-sac off an unpaved road to the Pad 3 waste disposal basin. Terrestrial mark No. 4 is in a cul-de-sac with an access road east-northeast of the curvilinear drive at the Pad 2 The Air Force subsequently constructed the theodolite enclosure for Pad 1 and its terrestrial marks No. 5 and No. 6. 121 Exterior Liquid Oxygen Facilities Approximately 30 south of the Pad 3 LSB is a rectangular 80 x 20 open reinforced-concrete pit containing a 28,000-gallon steel storage tank for liquid oxygen (HAER CA-2395-32). The pit and tank are oriented east west. The Air Force had the pits and tanks installed as part of launch complex modifications to support Atlas E and F missiles.

Refrigeration equipment is located on the south side of the tank s west end. An L-shaped pipe in a trench covered by metal grating extends from the tank pit to the LSB s liquid oxygen (LOX) room. LOX tank pits and pipe trenches are present at all three Launch Complex 576 A pads, but only Pad 3 retains a 28,000-gallon tank. 122 Air Conditioning and Dehumidifier Building A reinforced-concrete air conditioning and dehumidifier building is west of the high-pressure tank farm, approximately 30 northwest from the west end of the LSB s north elevation (HAER CA-2395-33). The reinforced-concrete building has a 12 -6 x 12 -6 footprint and composite dual doors with metal sheathing securing the entry at the east elevation. Two pipes project from the north elevation.

The west elevation has a projecting, rectangular, metal louvered vent and circular opening that formerly accommodated a pipe that extended south to the umbilical tower and At the south elevation, steel rungs provide access to roof equipment. A T-shaped utility trench connects from the building to the high-pressure tank farm utility trench and to the The Air Force had air conditioning and dehumidifier buildings constructed at all three Launch Complex 576 A pads as it transitioned the facilities from Atlas D to Atlas E and F launches. The buildings remain at each pad, but only the one at Pad 3 retains equipment. 123 TV Tower Steel truss TV towers with concrete foundations originally provided for visual monitoring and recordation of Atlas D missile launches at each of the 576 A complex pads.

At Pad 3, the original TV tower was located well west of the LSB and north of the exhaust trench. None of the launch complex s original TV towers remain present today. The Air Force had new TV towers constructed as part of 67 modifications to equip each pad for Atlas E and F missile launches. A steel truss structure constructed approximately 45 south of the collimator on a 10 x 10 concrete foundation formed the second Pad 3 TV tower, which also included a camera work station (HAER CA-2395-8). This second tower necessitated a steel light stand with a concrete pedestal sited between the tower and the theodolite enclosure. An additional camera was 121 Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 11.

122 Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 11. 123 Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 11. ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 51) subsequently installed to the south. All but the second Pad 3 TV tower have been completely removed. 124 PART

Sources of Information

Primary Sources 1st Service Tower is Raised. SAC Missileer (Lompoc, California), August 8, Aerospace Test Wing. A Site Familiarization Brochure. Vandenberg Air Force Base, California: U.S. Air Force, On file with Space Launch Delta 30 History Office, 747 Nebraska Ave., Vandenberg Space Force Base, California. ABRES A Complex. Vandenberg AFB California. Launch Operations Building Addition, Architectural Plan. Drawing No. WTF 105-A1, Filed Under Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], June 28, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. ABRES Modification-Pad 1. 4300A Complex Vandenberg AFB.

Service Tower Enclosure Elevations. Drawing No. Sheet 4, Filed Under Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], April 16, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. ABRES Modification-Pad 1. A Complex Vandenberg AFB. Pad 1, 2, & 3 Miscellaneous Construction. Drawing No. Filed Under Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], May 16, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. ABRES Modification-Pad 1.

A Complex, General Plot Plan. Drawing No. Filed Under Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], May 16, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. ABRES Modification-Pad 3. 4300A Complex Vandenberg AFB. Cover Sheet and Drawing Index. Drawing No. Filed Under Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], April 16, On file with Base Planning Section 124 Dames & Moore, Inc., Historic Architectural and Engineering Survey Report: Atlas ABRES A, 12. ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 52) (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. ABRES Modification-Pad 3. 4300A Complex Vandenberg AFB. General, General Site Plan. Drawing No. Sheet 4, Filed Under Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], April 16, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. ABRES Modification-Pad 3. 4300A Complex Vandenberg AFB. Propellant Loading System, Fuel Instrument Piping-Schematic. Drawing No.

Sheet 3, Filed Under Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], April 16, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. ABRES Modification-Pad 3. 4300A Complex Vandenberg AFB. Service Tower Enclosure Elevations. Drawing No. Sheet 6, Filed Under Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division [AFSC], April 16, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California.

ABRES Pad No 2 Emergency Repair Erosion Control, Site Plan and Schedule of Work. Drawing No. VAB Sheet 1 of 2, Filed Under Vandenberg Air Force Base, California: Strategic Air Command, August 23, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. Advanced Missile Re-Entry Flight Tests Planned. Aviation Week & Space Technology, December 10, Advertisement for Frederick & Kasler Stolte, Inc. SAC Missileer (Lompoc, California), October 4, Air Force Space and Missile Museum. Atlas Pad 576 A-2, 9 September [Historic Photograph], Complex 576A. Accessed March 28, Air Force Space and Missile Museum. First Launch, Atlas 6D, Pad 576 A-3, 26 January [Historic Photograph], Complex 576A.

Accessed March 28, Genest, Emile. Corps Role to Vandenberg. SAC Missileer (Lompoc, California), October 4, ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 53) Hayes, T. J. ICBM Site Construction. The Military Engineer, V. 54, No. 362 (November- December Maintain Roofs-6 Buildgs, Roof Plans, Elevations, & Details. Drawing No. VAB (PHIII), Sheet 1 of 2, Filed Under Vandenberg Air Force Base, California: Strategic Air Command, February 13, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. Missile Tube Stiffeners. Drawing No.

Sheet 1 of 1, Filed Under Vandenberg Air Force Base, California: American Rocket Company, November 13, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. Modification of ABRES Site 3, Vandenberg AFB, Plans & Sections. Drawing No. Filed Under Vandenberg Air Force Base, California: Facilities Systems Engineering Corportation, El Segundo, California, August 20, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. Pad 2 ABRES-A Site VAFB, Universal Umbilical Tower and MST Modifications, General, Cover Sheet and Drawing Index. Drawing No.

Sheet 1, Filed Under Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, Ballistic Systems Division (AFSC), October 14, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. Paint 576A Missile Complex. Missile Service Towers, No. & Elevations. Drawing No. Sheet 4 of 10, Filed Under Vandenberg Air Force Base, California: Strategic Air Command, August 9, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. Plot Plan - ABRES Comm Systems, Vandenberg AFB, Calif. Drawing No.

4VA1860-1, Sheet 4 of 7, Filed Under Vandenberg Air Force Base, California: Quintron, October 28, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. Premier, Russ Party Ignore Missile Base. Los Angeles Times (Los Angeles, California) September 21, 2. Repair Drainage - ABRES A , General Site Plan. Drawing No. VAB Sheet 1 of 4, Filed Under Vandenberg Air Force Base, California: Strategic Air Command, April 8, On file with Base Planning Section (30CES/CECB), Civil Engineer ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 54) Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. Repair Elevators ABRES Pads Elevation, Wiring Diagram, Details and Notes.

Drawing No. VAB-61, Filed Under Vandenberg Air Force Base, California: Strategic Air Command, February 12, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. Replace Cooling Tower, Drawing No. Sheet 1 of 1, Filed Under Vandenberg Air Force Base, California: Strategic Air Command, April 10, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. "SAC Shapes Missile Force for Survival." Aviation Week. June 20, SAC s First Atlas Crews. SAC Missileer (Lompoc, California), September 11, Salute to the Atlas.

Mesa Missileer (Lompoc, California), August 12, Service Tower Done: Thor Launcher Finished Turned Over to Base. SAC Missileer (Lompoc, California), October 31, Technical Support Facilities for ABRES A, Vandenberg Air Force Base, California. Launch Operations Building Addition, Foundation and Roof Plans. Drawing No. Sheet 17, Filed Under Vandenberg Air Force Base, California: Koebig & Koebig, Inc., Engineering-Architecture, Los Angeles, and Department of the Air Force, Space and Missile Systems Organization, February 9, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. Troxler, Paul D. Space Missile Facilities. The Military Engineer, V. 53, No.

352 (March-April United States Air Force (USAF). The Intercontinental Ballistic Missile and Vandenberg Air Force Base, in History of the Air Research and Development Command, July-December Volume III. Historical Division, Office of Information Headquarters, Air Research and Development Command, Vandenberg AFB California, Modifications to and Structural and Electrical, Plans and Details. Drawing No. Filed Under Vandenberg Air Force Base, California: Stearns-Roger Corporation and Department of the Air Force, February 14, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 55) WS-107A Operational Base, Camp Cooke California, Guidance Station Plot Plan, Civil. Drawing No. I-C-3, Sheet 3, Filed Under Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division (ARDC), January 30, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. WS-107A Operational Base, Camp Cooke, California, Launch and Service Building, Nitrogen Storage & Helium-Nitrogen Heat Exchanger Tank. Drawing No.

A1-II, 2, 3, Sheet Filed Under Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division (ARDC), August 26, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. WS-107A Operational Base, Camp Cooke, California, Launch and Service Building, Plan of Lower Level, Mechanical. Drawing No.

A1-II.2.3.4.-P1, Sheet Filed Under Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division (ARDC), August 26, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. WS-107A Operational Base, Camp Cooke, California, Launch and Service Building, Instrument Air Supply Piping. Drawing No.

A1-II.2.3.4.-I-104, Sheet Filed Under Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Air Force Ballistic Missile Division (ARDC), April On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. WS-107A Operational Base, Camp Cooke, California, Launch and Service Building (A) (B) Substation Plan and Details, Electrical. Drawing No.

A1 II.2.3.4.-E-1, Sheet 167 of Filed Under Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division (ARDC), April 15, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. WS-107A Operational Base, Camp Cooke, California, Launch and Service Building, Flow Diagram Fuel System. Drawing No.

A1-II.2.3.4.-P-9, Sheet Filed Under Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division (ARDC), August 26, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 56) WS-107A Operational Base, Camp Cooke, California, Launch and Service Buildings A, B, and C , Plan-Lower Level, Architectural. Drawing No.

A1 II.2.3.4.-A-2 Sheet 93 of Filed Under Camp Cooke, California: Holmes & Narver, Inc., Engineers- Constructors, Los Angeles, and Department of the Air Force, Western Development Division (ARDC), April 15, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. WS-107A Operational Base, Camp Cooke, California, Launch and Service Buildings A-B-C, Floor Reinforcement Plan, Structural. Drawing No.

A1-II.2.3.4.-S-35, Sheet 126 of Filed Under Camp Cooke, California: Holmes & Narver, Inc., Engineers- Constructors, Los Angeles, and Department of the Air Force, Western Development Division (ARDC), October On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. WS-107A Operational Base, Camp Cooke, California, Launch Operations Building, Ground Floor Plan, Architectural. Drawing No.

A1-II.1-A-3a, Filed Under Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Air Force Ballistic Missile Division (ARDC), March 12, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. WS-107A Operational Base, Camp Cooke, California, Launch Operations Building, Basement Floor Plan, Architectural. Drawing No.

A1-II.1-A-2, Sheet 54 of Filed Under Camp Cooke, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Western Development Division (ARDC), April 15, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. WS-107A Operational Base, Cooke Air Force Base, California, Launch Operations Building, Tower, Structural. Drawing No.

A1-II.1-S-8, Filed Under Cooke Air Force Base: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Air Force Ballistic Missile Division (ARDC), June 14, On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. WS-107A Operational Base, Cooke Air Force Base, California, Missile Service Towers, Elevations." Drawing No. A1-II.2.3.4 Filed Under Cooke Air Force Base, California: Holmes & Narver, Inc., Engineers-Constructors, Los Angeles, and Department of the Air Force, Air Force Ballistic Missile Division (ARDC), May On file with Base Planning Section (30CES/CECB), Civil Engineer Squadron ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 57) drawing vault, Iceland Ave., Building Vandenberg Space Force Base, California. Secondary Sources Berger, Carl, and Warren S. Howard. History of the 1st Strategic Aerospace Division and Vandenberg Air Force Base, Vandenberg Air Force Base, California: Headquarters, 1st Strategic Aerospace Division, April Dames & Moore, Inc. Request for Determination of Eligibility: Atlas 576 G. Vandenberg Air Force Base, California. Austin, Texas: Dames & Moore, Inc., September 20, . Historic Architectural and Engineering Survey Report, Atlas ABRES-A, Vandenberg Air Force Base, California. Austin, Texas: Dames & Moore, Inc., March 15, Donohue, Joseph T. History of Vandenberg Air Force Base: From Cooke to Vandenberg, from Tanks to Missiles.

Vandenberg Air Force Base, California: 1st Strategic Aerospace Division, Geiger, Jeffery. Camp Cooke and Vandenberg Air Force Base, From Armor and Infantry Training to Space and Missile Launches. Jefferson, North Carolina: McFarland & Company, Inc., Publishers, Jernigan, Roger A. Air Force Satellite Control Facility: Historical Brief and Chronology, Present. Onizuka Air Force Station, California: Air Force Satellite Control Facility History Office, Lonnquest, John C., and David F. Winkler. To Defend and Deter: The Legacy of the United States Cold War Missile Program. Bodega Bay, California: Hole in the Head Press, National Park Service. Intercontinental Ballistic Missiles: The Atlas Missile. U.S. Department of the Interior, National Park Service. Last modified October 20, Neufeld, Jacob.

The Development of Ballistic Missiles in the United States Air Force, Washington, Office of Air Force History, United States Air Force, Nowlan, Patrick, and Roy McCullough. Cold War Properties Evaluation Phase III, Inventory and Evaluation of Atlas, Titan, Bomarc, and Blue Scout Junior Launch Facilities at Vandenberg Air Force Base, California for the United States Air Force. Champaign, Illinois: Tri-Services Cultural Resources Research Center, U.S. Army Construction Engineering Research Laboratories, Powell, Stewart M. The Day of the Atlas. Air Force Magazine, October Smallwood, Josh. Department of Parks and Recreation forms for the Atlas Launch Complex 576 A. Vandenberg Air Force Base, California: Center for the Environmental ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 58) Management of Military Lands [CEMML], Built Environment Inventory Districts, Project 2020-BEI, Space Launch Delta 30 History Office. History. Vandenberg Space Force Base. Accessed February Turnhollow, Anthony F. A History of the Los Angeles District, U.S. Army Corps of Engineers, Los Angeles: U.S. Army Engineer District, Wade, Mark. Atlas. Encyclopedia Astronautica. Accessed March The Weapon of Choice, program 1 in War and Peace in the Nuclear Age series. Videocassette. Produced by WGBH/Boston and Central Independent Television/England in association with NHK/Japan, Vandenberg AFB Launch Summary. Vandenberg Air Force Base, California: Headquarters, Strategic Missile Center, January Versar, Inc.

A Historical Significance Assessment and Effects Determination of Space Launch Complex 3. Vandenberg Air Force Base, California. Columbia, Maryland: Versar, Inc., August 18, Photograph and Illustration Credits Figure 1 U.S. Navy Seabee Museum, Port Hueneme, California. Excerpted from Webster, Julie L., Susan I. Enscore, and Martin J. Stupich. Historic American Engineering Record: Level II Documentation of Space Launch Complex 5 at Vandenberg Air Force Base, California. Albuquerque, New Mexico: Operationally Responsive Space Office, Kirtland Air Force Base, Page 74. Figure 2 Historic Photographs, First Launch from Each ABRES, No Space Launch Delta 30 History Office, 747 Nebraska Ave., Vandenberg Space Force Base, California.

Figure 3 United States Air Force, Flight AF-74-9, Frame May 20, University of California, Santa Barbara Library, Aerial Photograph Collection: by=AF-74-9. Figure 4 Historic Photographs, A-3, circa Space Launch Delta 30 History Office. Figure 5 Geiger, Jeffery. Camp Cooke and Vandenberg Air Force Base, From Armor and Infantry Training to Space and Missile Launches. Jefferson, North Carolina. McFarland & Company, Inc., Publishers, Page ATLAS LAUNCH COMPLEX 576 A HAER No. CA-2395 (Page 59) Figure 6 Historic Photographs, ABRES Site Pictures. Space Launch Delta 30 History Office. Figure 7 Missile Launch at Vandenberg Air Force Base, California (left), KN- President John F. Kennedy Views Missile Launch at Vandenberg Air Force Base California (right), John F.

Kennedy Presidential Library and Museum Website: M&f%5B1%5D=source%3A46. Figure 8 Aerospace Test Wing. A Site Familiarization Brochure. Vandenberg Space Force Base, California: U.S. Air Force, Page Space Launch Delta 30 History Office. Figure 9 Aerospace Test Wing. A Site Familiarization Brochure. Page Figure 10 Aerospace Test Wing. A Site Familiarization Brochure. Page 63. Figure 11 Historic Photographs, A-3, circa Space Launch Delta 30 History Office. Figure 12 Aerospace Test Wing. A Site Familiarization Brochure. Page Figure 13 Aerospace Test Wing. A Site Familiarization Brochure. Page 77. Figure 14 Aerospace Test Wing. A Site Familiarization Brochure. Page 78. Figure 15 Aerospace Test Wing. A Site Familiarization Brochure. Page 66. ATLAS LAUNCH COMPLEX 576 A HAER No.

CA-2395 (Page 60) Historic Measured Drawings The technical drawings used for research in this study are not available for inclusion in this document, because of the following determination: These drawings HAVE NOT been characterized as being released to the public domain and MAY contain

Export-Controlled Technical Data

Export-Controlled Technical Data is data that cannot be lawfully exported without the approval, authorization, or license under U.S. export control laws. The controlling regulations and documents are the Export Administration Regulations (EAR), the International Traffic in Arms Regulation (ITAR), and the U.S. munitions list. Due to this stipulation, it is not possible to reproduce in this document the drawings used to gather information about the design, construction, and use of facilities at the Atlas 576-A Launch Complex, California.

In context

Lompoc, California The place record: every map, photograph and survey of this town.
Santa Barbara County, California 294 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Lompoc

24 of 32 records shown

The federal surveyors worked through Lompoc building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Vandenberg Air Force BaseHAER CAL,42-LOMP,1-51,300 words
Vandenburg Air Force BaseHAER CA-29636,062 words
Point Arguello Coast Guard Rescue StationHAER CAL,42-LOMP.V,2-12,434 words
Titan II 395-D Launch ComplexHAER CA-240811,431 words
Mission La Purisima ConcepcionHALS CA-792,364 words
San Antonio Creek BridgeHAER CAL,42-LOMP.V,3-1,944 words
Mission La Purisima ConcepcionHABS CAL,42-LOMP.V,1-700 words
Vandenberg Air Force BaseHAER CAL,42-LOMP,1L-58 words
Vandenberg Air Force BaseHAER CAL,42-LOMP,1B-48 words
Vandenberg Air Force BaseHAER CAL,42-LOMP,1I-48 words
Vandenberg Air Force BaseHAER CAL,42-LOMP,1G-47 words
Vandenburg Air Force BaseHAER CA-296-A47 words
Vandenberg Air Force BaseHAER CAL,42-LOMP,1A-46 words
Vandenberg Air Force BaseHAER CAL,42-LOMP,1H-46 words
Vandenberg Air Force BaseHAER CAL,42-LOMP,1J-46 words
Vandenburg Air Force BaseHAER CA-296-C45 words
Vandenburg Air Force BaseHAER CA-296-D44 words
Vandenburg Air Force BaseHAER CA-296-E44 words
Vandenburg Air Force BaseHAER CA-296-F44 words
Vandenburg Air Force BaseHAER CA-296-G44 words
Vandenburg Air Force BaseHAER CA-296-H44 words
Vandenburg Air Force BaseHAER CA-296-I44 words
Vandenberg Air Force BaseHAER CAL,42-LOMP,1C-43 words
Vandenberg Air Force BaseHAER CAL,42-LOMP,1F-43 words

Provenance

  • Written history. Quoted verbatim from HAER CA-2395. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.