progressive. Under no consideration can Hillsborough County be said to be lacking in this respect. Forming a network of roads that reach to the adjoining counties, crossing and recrossing throughout the width and length of Hillsborough County, is a system of ways that totals an astounding mileage. Summed up in actual figures, these roads aggregate a length of 571 miles, onethird the distance from Tampa to New York.
No less than thirteen types of roadways have been used in this county; of these the slag surface type has been the most favored, 227.59 miles being treated in this manner at a total cost of $4,122,042.04. Ranking next in order is the type of road known as the asphalt block, no base. This kind of surface road has a total mileage.in the county of some 94 miles, constructed at a cost of $2,402,972. Akin to this type of highway is the asphalt block road, built with base, rather more expensive to build. Of this road there is a length rather more than 28 miles, laid at a cost to the county of $1,735,231.28. Hillsborough County has an approximate mileage of 70 miles built with the sheet asphalt surface with an accompanying expenditure of $1,956,013.17. In order of the length of road the brick surface ranks next with a mileage of 37.34 miles. This brick road with no base was built at a cost of $805,695.67. However, the brick way with base, of which there is some 16 miles in the county, is considerably more costly to construct, this mileage being laid with an expenditure of $874,351.34.
One of the most expensive and proportionately harder surfaced road types is the concrete. Of this type, Hillsborough County has a length of 2 miles, built at a cost of $171,750.70. There are also other types of roadways in the county, these not so costly an expenditure to the county. Of the latter type the county boasts a mileage of over 22 miles which is surfaced in the type known as the sand asphalt, base and top, this being built with the expenditure of $714,475.57. Nineteen or slightly more than 19 miles of Amiesite type roads have been constructed at a cost of $1,347,950.40. In addition to which a mileage of rather more than 15 miles of the Filbertine surfaced roads have been added to the county at a - cost of $1,183,424.32. The well known Kentucky rock asphalt type road has a mileage of four miles in Hillsborough County, built with an expenditure of $177,179.86. Floridalithic roadway has but a length of 2.73 miles, the cost of this type of surface being about $131,818.
Including the concrete bridges, the concrete seawalls and creosote timber bridges, this county has expended (using round numbers for greater convenience) a sum that is far from small, namely, $17,270,037.
Of the roadways, seventeen run for a length greater than ten miles, eleven forming main arteries which carry the greater part of the inter-county traffic.
That beautiful strip of roadway, known as the Riverview Road, beginning at Plant City-Manatee Forks and extending for a short distance past Riverview, has a length 12.57 miles. The contractors, The Edwards Construction Company, built this road which is of vitrified brick, no base, with a wood header curb, for the county in the year 1914. This road, nine feet in width, was built with the aid of the sale of the bonds known as the Hard Surfaced Bonds. The entire cost of this highway amounted to $139,277.77 and later, it became known as State Road No. 5, having been rebuilt by the state in 1926.
The Thonotosassa road, finished in 1914, extends through one of the most noted portions of Hillsborough County. This lake region, famed for its Indian lore, is also rich in agricultural wealth. Hence this highway carries a large portion of the county traffic. The money for this road was raised with the sale of Hard Surfaced Bonds, an expenditure of $133,806.26 being needed for the 11.44 miles of 9-foot wide road, it having a three-inch surface of vitrified brick, no base but with a curb called the wood header type of curb. The contractors, Kendrick- Webb-Davis-McNeil, completed this road in a remarkably short time. In 1926 a section of this road was rebuilt, a length of eight miles.
The same contractors who built the Thonotosassa road also constructed the road which begins at the Plant City-Manatee Forks and extends to the limits of Plant City. This thoroughfare is 14.61 miles in length, fifteen feet wide with a three-inch surface of vitrified brick. Completed in 1915 at a cost of $265,212.60, the funds for which were raised by the sale of Hard Surfaced Bonds, this road has a granite curb and like the Thonotosassa road was built without a base.
Leading out from Sulphur Springs, one of the most interesting spots in this county, is a sturdy road of good width and heavy construction. From Nebraska avenue to the Pasco County line, a distance of 10.50 miles, it carries upon its surface some of the heaviest of the county's traffic. Built at a cost of $245,255.52, this road, though built with no base, has a concrete header curb and is of the asphalt block type. Davis and Webb, contractors for this fifteen-foot-wide highway the funds for which were raised through the bonds sold and known under the name of Victory Bonds, completed this stretch of roadway in 1921.
Davis and Webb, also contractors for the 11.50 miles of fifteen-foot-wide road which extends from the end of the brick road near Riverview to the Manatee County line, constructed this highway of 24-inch asphalt block surface with concrete header curb. Victory Bonds were the means of financing the issue, the total expenditure for this strip of thoroughfare being in slight excess of $223,600. Davis and Webb completed this project in the year 1922.
Another road of sturdy specifications built by Davis and Webb and financed as was the Riverview to Manatee County line road, is the Grand Central avenue highway. This road extends from Moats Store Corner to the Pinellas County line, is rather more than ten miles in length, fifteen feet wide with a concrete header curb. Surfaced with 2%4-inch asphalt block, no base, it was finished in 1922 at a cost of $287,392.15. This road is part of the well-known Memorial Highway. -
From Six-Mile Creek, extending to the Hopewell-Plant City road is the stretch of highway known as the Hopewell-Tampa Road. This 14.74 strip of thoroughfare is fifteen feet wide, having a 2-inch asphaltic concrete surface, with a fiveinch lime rock base. Completed during the period 1923-1924 by the Wm. P. McDonald Construction Company and costing $305,880.52 this road bears a heavy portion of the traffic in this section of the county. The funds used to finance this project were raised by way of the sale of Progress Bonds.
One of the best known highways, called the West Shore Boulevard as well as known by the name of the Interbay Peninsular Drive, extends from the Memorial Highway to Ballast Point via Gadsden Point. This roadway is built of three-inch asphalt block surfacing with a concrete header, is fifteen feet wide and covers a length of 14.25 miles. The construction, done by Cone Brothers, cost a
This period, namely, 1923-1924, was one of unusual energy in the advancement of road construction and Tampa benefited to a great degree. At this time the _ Citrus Park road, or John T. Gunn Highway, as it is better known, was started. _ Beginning at the intersection of Waters and Armenia avenues, it extends to the county line at Odessa, a thriving town of not unworthy size. These 15.13 miles of fifteen-foot wide 2-inch asphaltic concrete surfaced road has a five-inch base composed of Florida lime rock. Progress Bonds to the extent of $308,366.70 were sold to insure the completion of this thoroughfare. The contractors, The Wm. P. McDonald Construction Company, finished this project during the year 1924,
In 1924 another road in Hillsborough County became a means of transporting traffic toward that section of the county that so needed this extra roadway, Plant City. This highway, called the Plant City-Thonotosassa road, has its beginning at the latter town and reaches to Plant City limits. Built of nine-foot wide, 2-inch sheet asphalt with a five-inch lime rock base, this roadway has a length of rather a trifle more than ten miles. Financed through the aid of the Progress Bonds it was completed in the same year with an expenditure of $158,374.26. The James G. Yeats Company were constructing engineers for this highway.
The Plant City-Picnic road, starting at the end of the brick Hopewell road and reaching in length to Hurrah Creek, is rather more than 16 miles in extent. For a distance of 4.24 miles this road has a width of fifteen feet, the remainder having a width of nine feet. However, the entire distance, 16.36 miles, is surfaced with 2-inch sheet asphalt with a five-inch lime rock base, the expense of this highway - amounting to about $294,867. Constructed by the Wm. P. McDonald Construction Company this enterprise was completed during 1924.
The Ruskin roadway extending from Bryan-Lightsey's Corner, Plant City road to the Manatee County line crosses three rivers. The bridges constructed across these streams caused an expenditure of $62,461.66 for that across the . Alafia River, $27,224.89 for that extending over the Palm River, and $48,368.80 for the bridge over the Little Manatee River. The full length of the road inclusive of the bridges is 26.26 miles and for the full distance is built fifteen feet wide. Constructed of three-inch asphalt block surface with no base and having a concrete ___ - _ - cihheader curb, this highway was completed by the Warren Brothers and Carroll _-- - - s Engineers in the period 1923-1924. The total cost of this beautiful thoroughfare,
2 time warrants then issued. , oa In 1923 the Wm. P. McDonald Construction Company laid the road now called ae the Lithia Road. Connecting Brandon with the Picnic road it is 11.16 miles long, made nine feet in width with a 2-inch surface of sheet asphalt and a five-inch base. _ It was completed that same year at an expenditure of $160,904. ts Two roads of an equal length and constructed by the same company, the Wm. P. McDonald Construction Company, were financed by Plant City Special A Road and Bridge Bonds and were completed during the same period of time. In 'i ae ae > &
1927 these roads were ready for use, having a specification of 15 feet of width, a slag surface treatment with a 6-inch lime rock base. The first of these two roads, called the Knights road, extends from Wilder road to Lake Thonotosassa, a distance of 10.07 miles and was finished at a cost of $196,002.11; the second road, known as the Durant road, is also a trifle more than ten miles in length, reaching from Bloomingdale through Pleasant Grove to the Alafia River and from thence extends on toward Keyesville. This latter highway, built and completed within a short time, caused an expenditure of $178,407.31.
The Wimauma-Lithia highway, which name is indicative of its extent, is an approximate 14 miles in length. This highway is built of the 6-inch lime rock base so popular and has a slag surface treatment. The construction engineers, Smith Brothers Construction Company, completed this work in 1927. This same group of engineers are responsible for the roadway, also completed in 1927, known under the name of the Wimauma East Highway. Under their capable supervision the work, including the slag surface treatment over a 6-inch lime rock base, was hurried and traffic was enabled to use this new road. Both roads, fifteen feet in width, were assured of completion through the sale of Special R. & B. District No. 5 Bonds. The latter highway traverses a distance of some 13 miles or more through a beautiful section of Hillsborough County.
There are many other roads of interest to the residents of Hillsborough county, among these, the two roads so widely known, not only in the county but throughout the state and in other parts of the country. The first of these that will be discussed is that rather lovely thoroughfare that follows the shore line of Tampa Bay.
Bayshore Boulevard, built in 1914 and rebuilt in 1926, extends from Howard avenue to Ballast Point, a distance of 3.12 miles. This beautiful boulevard is 22 feet wide, made of three-inch vitrified brick with a granite curb. The then cost of this roadway amounted to $89,074.32. It may not be amiss to here insert the plans made for the future of this beautiful seawall and highway. The Tampa Electric lines run through the center of this boulevard with a wide swath of land on either side, fitting space for the schemed plan of there growing the tropical flora, the beautiful foliage that will tend to complete the adornment of this bit of water frontage. Various types and kinds of flowering shrubs and trees have been planned for future planting and the extension of this boulevard and seawall have become a certainty that is a matter for pride in the average citizen's regard for his town and county. When, in 1926, a part of this seawall was rebuilt, 2.46 miles to be exact, the James G. Yeats Construction Company had this work in charge. During the period 1924-1926 the McGucken, McGucken and Edwards company of engineers constructed the seawall from Howard avenue to Hawthorne road, completing this portion of the undertaking at an aggregate expenditure of $359,446.47 for the 2.3 miles of concrete work. Progress Bonds and time warrants were the means of financing this project.
Memorial Highway, the first tribute in the country of its kind erected within the shortest possible time following the Armistice, is a fitting monument to the bravery of the World War heroes of this county, who were killed in action.
Winding over a length covering thirteen and one-half miles, this highway was completed on March 5, 1920. To J. J. Hedrick, Jr., engineer of this undertaking, is given the credit for the success of the original plan being carried to completion. The cost of this highway is estimated at $23,000 per mile. The aggregate amount needed for this tribute to the heroes was raised through a bond issue, fittingly named the Victory Bond issue, at total cost of $870,000. Fifteen feet wide, surfaced with the popular asphalt block type treatment, this road stretches from Howard avenue in Tampa to the Pinellas County line.
There had been planned a beautification program for this road that, due to unexpected circumstances, has been changed in a slight degree. The original plan called for the erection of tablets after the trees then planted at stated intervals had reached a sufficient size to warrant these tablets being placed on the trunk of the tree. Due to soil conditions as much as to the inability to give these trees the necessary care, this plan failed to materialize. The present scheme includes the far better idea of placing these tablets commemorizing the deeds of the county dead along with their names, upon the surface of the land adjoining the highway. The oleander trees, placed at intervals of one hundred feet and bearing the colors, pink, red and white in alternate flowering shrubs continue to bloom in season. Plans have also been made which include the erection of monuments that shall stand in prominent positions and will bear fitting inscriptions holding the information that is connected with the road as a tribute to the war veterans and its own individual history.
Although, due possibly to the late development of Hillsborough County, the county cannot take first place among the counties of Florida in the matter of road mileage, engineers concede that the more recently constructed roads are undoubtedly the best and the most substantial in the entire state. Plans to continue the extensive road building programs of the past are constantly being furthered, and it is estimated that, within a short time, the twelve main arteries leading into the county from Pinellas, Polk, Pasco and Manatee Counties, will be greatly increased in number.
Included among these twelve roadways is the internationally famous Gandy Bridge, which, because of its importance and its unique position as the longest toll bridge in the world, has been separately treated in the last chapter of this history.