tall open building with ventilating "butterfly" monitor roof, was built in and located on the old Navy Yard attached to Building 44, previously converted to a seaplane erecting shop. Although of no architectural significance, it was the first building constructed for use as a seaplane erecting shop. uilding 104 was originally used as an airplane erectin shop, and in was changed to a "flying boat shop." --- ""~ A,,c.~c.'"","'"" U.S. NAVAL AIR STATION,~UILDING NO. HABS No. (page 2) PART I. HISfORICAL' INFORMATION A. Physical History 1. Date of erection: Building 104 was built in in was modified inside, adding an off ice and parts storage across the east end; c. a toilet and locker lean-to addition was constructed on the north wall. 2. Architect/Builder: Not known. 3.
Original and subsequent owners: The original drawings con- sist of six sheets titled #Seaplane Erecting Shop,N Y&D No.'s through dated April 20, HABS Field Survey and Measurements indicated that the building was constructed according to the original plans. 4. Builder, contractor, suppliers: Lacawanna was the steel fabricator. 5. Original plans and construction: The original hangar was rectangular, clear span, steel building, with eight bays of nine trusses in single span between columns. It has a low- sloping roof featuring a centered ventilating monitor with a #butterfly" roof parallel to long sides running east-west. The exterior wall is corrugated asbestos siding with steel rolling hanger doors on the east and west sides. 6.
Alterations and additions: The mezzanine at the east end was added <August 29, Dwg All steel sash on the exterior were replaced, except the sash in the doors on the south facade were "reconditioned and retained.# Replacement sash were not identical with the original, but changes were not major. No drawings, from Preliminary Case Report by Historic Properties Assoc. Toilets were added in a lean-to on the north side. No drawings, from Preliminary Case Report by Historic Properties Assoc. 'A catwalk and platform were added <Ausust 17, Dwg The building was re-roofed and probably repainted. One rollins door on the west facade was removed "to a height of 15' -6" above the existing floor. New doors and wall panels were installed.
The remaining doors on this facade were repaired, fixed in closed position and flashed at sill. Some modifications were made to the roof trusses; no drawings, from Preliminary Case Report by Historic Properties, Assoc. Apparently, the four large doors on the south facade had been fixed in the closed position at some time between and A ramp and loading platform was built to the west from the doors added in <August 2, Dwg Exterior fabric was painted June 17, Loading dock cover constructed over loading platform and connected to building, February 6, and B.
Historical Context: Building 104 is located in the National Historic Landmark Dis- trict along the waterfront area at the southeast corner within the Pensacola Naval Air Station, which is situated at the western entrance to Pensacola Bay, on the Gulf of Mexico, in the Florida Panhandle. The waterfront area faces south, toward the western end of Santa Rosa Island and the Gulf; it sits on a peninsula which juts into the southernmost portion of the bay. Fort Pick- ens, a National Historic Landmark, stands across Pensacola Bay, at the western end of Santa Rosa Island, and another National Historic Landmark District, Fort San Carlos de Barrancas, is located at the western edge of the Air Station.
Building 104 is one of several hangar buildings and other struc- tures comprising the eighty-two acres in the District; there are forty-nine designated historic buildings and structures and seventeen additional non-designated buildings and structures within the District. Owing to the location's strategic importance, French, British, fa, .. ~ ('e::""i-.\:. ""t.c.~j.i..4 ' U.S. NAVAL AIR STATION(BUILDING NO. HABS No. (page 4) .. and Spanish'governments each established a military presence in the vicinity. The U. S. Navy maintained the Pensacola Navy Yard there from to although the military role of the base was relatively insignificant throughout the nineteenth century.
A small installation before World War I, the Navy Yard was en- closed by a high brick wall, constructed in and surrounded on its inland sides by the villages of Woolsey and Warrington. The Navy Yard closed in but reopened in as the Pensa- cola Naval Aeronautic Station. Renamed the Naval Air Station in it served as a training center for naval aviators and earned a reputation as the *Cradle of Naval Aviation.* The station leaped beyond the walls of the original Navy Yard after the war to incorporate its neighboring villages, which were removed in and Amid international tensions in the late the station experienced dramatic physical expansion. Graduates of its aviation training program participated in all of the nation's major naval engagements during World War II.
The Naval Air Station Pensacola continues to emphasize naval aviation training and currently serves as the headquarters for the Naval Education Training Command. Building 104 was the first building designed and constructed to be used as a Seaplane Erecting Shop. Built during World War I, it was attached to Building 44, previously converted to a sea- plane erecting shop. The Navy developed and erected their own naval aeroplanes because American manufacturers were primarily builders of land machines. The design of motors, of propellers, and of landing floats were unique to naval aeroplanes.
During the war years April 6, to November 11, construction was feverish, over 100 structures were added, linear feet underground electric conduit feet of cast iron water mains, square yards of concrete pavement about hangars and along waterfront. Building 104 was used for aeroplane erection and repair until the mid when preparation for an involve- ment in World War II resulted in enormous expansion and use changes. Subsequent uses cannot be determined from available documentation excepting present occupancy. PART II. ARCH'I'EC'I'URAL INFORMATION A. General Statement: 1. Architectural Character: Building 104 is a tall open rectan- ,.A..,u;;,;;~,,,.l\r U.S. NAVAL AIR STATION, flUILDING NO~ HABS No.
(page 5) sular buildins with low slopins roof and ventilating "butter- monitor, having an industrial metal buildins appearance. The buildins is one of the original government designed and built steel structures erected to accommodate the manufactur- er of naval airplanes. The structure spans the full building width, with no interior columns. Clear-story windows extend up between the roof trusses on all sides to allow plenty of light and ventilation. 2. Condition of fabric: rJhile the structural systems are in good condition, the exterior siding and roofing is in fair to poor condition and the doors are in fair condition. B. Description of Exterior: 1.
Overall dimensions: Building 104 has a rectangular confisu- ration, and is one-story with the following dimensions: filidth: -0 Length: -0 <E-fil>; Eave heisht: heisht of monitor: 8' - 0"; filidth of monitor: covers middle half of roof; Monitor roof: Slopes down from eaves to building centerline at The building fronts west historically either west or south sides opened completely for entry. There is one bay on the front and four bays in the side. Centered on the west half of the north side is a x lean-to addition. Foundations: The steel columns are supported by pyramidal piers connected by foundation walls at the north and south sides of the building <April 20, DfilG Piers of large columns "A"; base 9'x 8', top x depth not less than 5' with top 1' below finish floor.
Piers of small- er columns base x 5' , top x depth same as column "A". Columns "C" at east walls have piers: base 3'x 3', top 2'x 2', deep, 1' below floor. The foundation wall - bond beam is wide x 4' deep with face 5" out from column center and top level with floor. The steel columns are set on top of these piers and fasten down with four diameter x 4' long anchor bolts with 6 x 1/2 x 6 plates at ends embedded in pier. Endwall column "C" has 1" diameter x 2' long anchor bolts. The floor slab turns down 1' thick over column bases and butts foundation wall. This design causes column to be rigid on base and transfer A ,\_ U.S. NAVAL AIR STATION,~1:JILDING NO. io4\ HABS No. (page 6) <E-W> overturning loads to the foundation. The finish floor slab is above sea level.
Mezzanine column footings added in Dwg were 32" x 24" x 18" high. Floor slab was cut and columns set 6" below finish floor. 3. Walls: The exterior walls are thick corrugated asbestos siding, attached to stick wall framing between columns and top and bottom windows 2 angles 5 x x horizontal continuous and one angle vertical 3 x x The lower portion of the east wall was open into Building 44. 4. Structural systems, framing: The building has quadrangular Warren-type rivetted steel roof trusses; nominal depth is 12' -0" at bearing with top chord sloped up to the base of moni- tor, nominal clear span, spaced 25' -3" o.c .. There are eight bays with nine trusses forming rigid frames between columns.
Main framing trusses have two 12# C x top and bottom chords with double angle interior web members 6 x 4 x 3/8 and smaller. Where trusses connect to columns, knee braces at 45 degrees fasten below truss: two 6 x 4 x 3/8 angles. Roof purlins are 9" channels at o.c., 4 x 3 x 3/8 angle clips to trusses and supporting continuous 4 x 4 roof nailers. At the south wall alternate roof trusses are carried by trusses in the wall spanning above the rolling doors. At the east wall the roof truss is supported by columns at 33' o.c. Hinged columns at 22' o.c. are hung under the truss at the west wall forming jambs of rollup doors. Columns swing up allowing entire west wall to be open. 5.
Porches, stoops, balconies, bulkheads: A 16' wide x 36' long metal canopy covered loading dock with 45' x 12' ramp con- nects to the west side of the building. It is 4' high and has 3 dock leveler platforms used by semi-tractor trailer trucks. 6. Chim~eys: None. 7. Openings: a. Doorways and doors: The south wall was designed to have any two bays open at one time. Along this wall are four high x wide bi-passing sliding - rolling - steel framed doors covered on exterior with flat asbestos board. These doors have 6 rollers . A -..n:.~c~.A.:, ~ .. ~~, ~ ''< U.S. NAVAL AIR STATION,~ILDING NO. HABS No. (page 7) which travel over a 30# rail level with the floor. The bottom 1/3 of the doors are solid with one x personnel door at the center.
The doors are divided into 5 vertical panels, each has 4 fixed sash windows in upper glazed area 7'x The doors are framed with 9" I vertical perimeter and, 7" I 15# interior, and 3 x x 1/4 angle wall framing 3'o.c. and bottom panel "I" bracing. These doors are now fixed in place. The west wall was designed to have 6 motor operated roll up doors 22' wide x 30' high to roll up above their openings, and the columns which formed their jambs - hinged at top - swing up leaving a clear opening across the west wall. These doors are now fixed with a x roll up door plus a 3'x 7' personnel door set in to the bottom half of one roll up door adjacent to the ramp and loading dock. b. @indows and shutters: @indows on the north wall and windows on the south wall above the doors are 4 panels wide.
Those on the east and west walls are 2 panels wide. Each 2'w x panel is divided into thirds' with the center 1/3 a center pivot window sash, upper and lower sash fixed, each having two rows of 4 liters. The original drawings call for lights Factory Ribbed Glass. There was no record discovered, but all of the glazing and sash has been replaced - same number of lights. Historically the devastation of several hurri- canes would account for this alteration. On the original drawings the top space for the roll up door equipment is marked "Distance as required for rolling door detail" - the windows above this area are constructed 2 panels high in lieu of the 3 panels high designed, and the space for the roll up door is larger. 8. Roof: a. Shape, covering: Butterfly shape for glass clear-story.
Center 1/2 slopes to center where a cricket diverts water to large headers and downspouts centered on east and west walls. Roofing is granular surfaced asphalt roll roof- ing, which is fastened to a wood roof deck of 2 layers T&G wood laid diagonally. b. Cornice, eaves: North & South eave are approximately 8" & ,..A,r<4.i;;.i'.'C"I\~ . U.S. NAVAL AIR STATION,@_UILDING NO. HABS No. (page 8) . east and west eaves are 4". c. Dormers, cupolas, towers: Several large vents high and 5' square are abandoned mechanical equipment exhaust. Various size gravity and turbine ventilators are on the roof. C. Description of Interior: 1.
Floor plans: Complete ground floor is unobstructed space up to the columns of mezzanine - mezzanine has no obstructing walls, and occupies 30' x of the east end of the build- ing. Presently, the building is used for grocery and dry goods storage and has large shelves <racks> for pallets and boxes of goods in long E-W rows. The lean-to addition on the north weall now used for miscellaneous storage appears to have been constructed as locker, dressing and toilets for male and female workers, probably during Second World War. 2. Stairways: None <Only access to mezz is by ladder @ south wall> 3. Flooring: Concrete slab, smooth finish. 4. Wall and ceiling finish: No wall or ceiling finishes. 5. Openings : a.
Doorways and doors: At east wall below mezzanine are seven residential type wood paneled garage overhead doors <now sealed> for access to & from building 44. - Histor- ically this connection to Building 44 - also for seaplane erection - was open. b. Windows: No interior windows. 6. Decorative features and trim: None 7. Hardware: Manufacturer's standard steel hinges and brass locksets - not original. 8. Mechanical equipment: a. Heating, air conditioning, ventilation: Original equip- ment removed, non existing - drawings not discovered - Gas A. . t~i... ~ U.S. NAVAL AIR STATION,Q!UILDING NO. lo4) HABS No. (page 9) b. Lighting: Florescent fixtures suspended from trusses, o.c. Original lighting was 6 500 watt lamps bracketed outside of each truss. c.
Plumbing: Manufacturer's standard floor-mounted toilets, wall mounted urinal and lavatories. 9. Original furnishings: None. D. Site: 1. General setting and orientation: Large doors are orientated south and west, building sets at an angle to the seawall 20' west end and 40' east end. Site all sides of building are paved with concrete. 2. Historic landscape design: none 3. Outbuildings: None PART III SOURCES OF INFORMATION A. HABS measured drawings, photos, field notebook prepared by Victor W. Glazner, Architect for Navy. B.
Original and/subsequent drawings held at the Public ~arks Build- ing number Naval Air Station Pensacola, Florida: April 20, D~ Seaplane Erecting Shop Location Plan, Proposed Building to be Located Near ~est Wall of #44 and East of #71 April 20, DWG Seaplane Erecting Shop, Foundation Plan, Three Different Types of Column Piers, With Bond Beams, Base & Girt Connections. April 20, DWG Seaplane Erection shop Elevations and Sections Lighting Plan. Building Elevations/Sections with WM Dow Locations, Truss Framing, Roof Plan, Electrical Plan with Notes. April 20, DWG Seaplane Erecting Shop Details of Trusses A&B. Truss Elevations, Cloumn Sections, West Elevation/Section & Roof Details. . - .A,,~c.<:d;:.\ ~'""'(;iQi. U.S. NAVAL AIR STATION,@_yILDING NO. ' HABS No.
(page 10) April 20, DIAJG Seaplane Erecting Shop Bracing, Lower Chord Bracing, Top Chord Bracing, Purlin Plan, Monitor Framing, East Elevation &Deatils. April 20, DIAJG Seaplane Erecting Shop Door Details, Elevations Sections & Details. August 29, D@G Mezzanine Floor, x for Least End Building Cloumn Footings, Floor Plan, Section, Cloumn Details. August 17, ~ 104 Catwalk &Platform Plan & Details, Floor Plan, Sections, and Details. August 2, Dwg Construct Concrete Loading Dock 104 Plan-Elevation-Details, Site Plan Showing Loading Doct to @est Between 104 & 71, Foundation Plan, Plan, Eleva- tions. June 17, Dwg Exterior repairs and painting han- gars 71, 72, 73, 74, 75, 76, 44 and Elevations.
- February D@G Construct Loading Dock Cover, Building Canopy Plan; Elevations; Sections; Details; Loca- tion Maps. February DUIG Construct Loading Dock Cover Sections, Framing Plan, Lighting Plan, Light Fixture Detail & Notes. C. Historic views: None. D. Interviews: E.