BlockBefore

B. F. Marcos Building, 1610 East Seventh Avenue, Tampa

B. F. Marcos Building, 1610 East Seventh Avenue, Tampa, Hillsborough County, FL. Surveyed as HABS FLA,29-TAMP,13-, with a 1,686-word written history.

From the record

“The building is typical of many of the business/residence buildings in Ybor City.”

Written record, HABS FLA,29-TAMP,13- survey. Machine-read text.

Surveyed by the federal HABS program as HABS FLA,29-TAMP,13- · the record runs 1686 words · one of 202 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1391 words

Source document Quoted word for word from HABS FLA,29-TAMP,13-. Not written, edited or summarised by this site.

The building is typical of many of the business/residence buildings in Ybor City. It has lightwells which provide exposure to rooms on the second floor and to rooms on the first floor. The front exterior balcony is one of the most elaborate of the Ybor City styles. PART I. HISTORICAL INFORMATION A. Physical History: 1. Date of erection: Circa 2. Architect: Francis Kennard, a local Tampa architect. 3. Original and subsequent owners: The building is located on the original land allotment sold to Vincent Martinez Ybor, one of the founders of Ybor City cigar industry. It is located in Ybor City subdivision, Block 56, lot 7, east half. The following title records are compiled from Chelsea Title and Guaranty Company, Tampa, Florida.

Recorded July 24, filed February 14, Book V, page 157 Vincent Martinez Ybor and wife Mercedes to Caudilo A. Martinez Ybor Deed recorded May 29, filed June 6, Book UU, page 369 Concepcion A. Ybor, widow and Edward Manrara and wife to Caudilo A. Martinez Ybor, remaining interest in the lot B. F. Marcos Building HABS No. (Page 2) Deed recorded March 2, filed March 4, Book BB, page 88 Candido A. M. Ybor to Elosie V, Martinez Ybor Deed recorded July 8, filed July 11, Book NN, page 171 Eloise V, Martinez Ybor Schwale and husband, by attorney, sold to William N. Rushing Deed recorded July 9, filed July 11, Book M, page 142 William N. Rushing and wife leased the land to 0. J.

Stafford Deed recorded July 11, filed July 11, Book #1, page 3 Lease to Tampa Lumber Company Deed recorded June 1, filed June 1, Book NN, page 364 William N. Rushing and wife to Letita V. Graham Deed recorded February 2, filed February 4, Book page 198 Letita V. Graham to N. Franklin Carpenter, Bachelor Deed recorded March 17, filed March 17, Book VI, page 596 N- Franklin Carpenter, Bachelor to Letita V. Graham B. F. Marcos Building HABS No. (Page 3) Deed recorded July 5, filed July 7, Book 41, page 281 Letita Graham, widow to Bal domero F. Marcos (Bladomero F.

Marcos willed the building and land to his two daughters without a title change.) Deed recorded May 12, filed May 13, Book page 31 Josefa Marcos to Catalina Marcos, 1/2 interest Deed recorded May 12, filed May 13, Book page 33 Catalina Marcos to Josefa Marcos, 1/2 interest (The Marcos sisters are presently living on the second floor of the building. ) 4. Alterations and additions: Following construction a one room plan was installed in the building. However, the room was immediately divided into two equal spaces. In later years, the first floor front stores were altered to accommodate modern businesses. The windows and paneling were removed and replaced with new storefronts. The rear stairway was also removed. B. Historical Context: The first floor has been leased to several businesses.

The Bank of Ybor City leased the first floor from to "La France", an exclusive shoe store in Ybor City, leased one of the stores from the until In the other store there was a Spanish pastry store and D'Elia Jewelry store in the The Marcos family has been living in the second floor residential quarters since the building's construction. PART II. ARCHITECTURAL INFORMATION A. General St atement: 1. Architectural character: The distinctive feature of the building is its balcony with its decorative oval iron work. 2. Condition of fabric: Good. B. F. Marcos Building HABS No. (Page 4) B. Description of Exterior: 1. Over-all dimensions: The two-story rectangular building measures 90' and is 31' high. The front (south) elevation is five bays. 2. Foundation: Brick. 3.

Walls: Side and rear walls are common brick with headers at every seventh course. Front wall is deep red face brick. Pilasters run on each side of the facade topped with corbeled caps with corbeled brick pendants. The pediment is decorated with a flush brick dentil motif. Above this runs a corbeled brick dentil band. Above this band are the letters "B. F. MARCOS" in brass. The top of the pediment is decorated with a soldier course of brick and stretchers, flush with the wall. A brick cap tops the pediment. 4. Structural system, framing: Brick bearing walls support steel "I" beams. Deep "I" beam supports the masonry over the first floor storefront and stairway. The building has no interior columns except one where beam intersects stairway. Wood floor framing rests on the beams. 5.

Balcony: The street facade has a balcony running its entire width. This balcony is supported on 3" pipe columns set in concrete bases in the sidewalk. The four support columns carry 4" X 10" girder on floor flanges. There is a 2" X 10" plate bolted into the brickwork opposite this girder. Short beams are framed between the girder and the plate. Floor joists, 2" x are laid on the beams. The decking is 1" x 4" tongue-and-groove wood. The floor framing members have a milled beaded design. The balcony roof framing members are supported on 2" pipe columns from floor flanges mounted on the deck. These columns are braced back to the building with pipe. The roof rafters are 1" pipe running to pipe girders between columns at one end and to brackets set in the brickwork at the other end.

All of this pipe framing is connected with standard pipe fittings. Purlins of pipe are bolted above the roof rafters and run parallel with the facade. The roof covering is corrugated sheet metal. A galvanized metal ogee gutter is attached to the leading edge of the roof with one downspout terminating at the bottom of the balcony. The balcony railings are pipe attached to the columns using pipe "tees" and to the building with brackets set in the brickwork. The decorative iron balusters are 1" x bar stock which shows no evidence of having been heated. This stock is formed into ovals 5" wide wth 28" high ovals alternating with 14" high ovals. The balusters are bolted together and are bolted on top to 1" x bar stock and at bottom to 1" x channel iron.

The top bar is bolted to the bottom of the railing and the bottom-channel is bent down and bolted to the column. The brackets are x B. F. Marcos Building HABS No. (Page 5) bar stock formed into scroll ends and attached to the pipe work with bolts. The brackets are infilled with 1" x bar stock in decorative circles, scrolls and balusters. These infill members are bolted wherever necessary. 6. Openings: a. Doorways and doors: The first floor storefront has two doorways. The doorway to the upper floor is located to left of the storefront. The doors are six-panel with a transom. The balcony doorway is centrally located and has a flat voussior with no keystone. The'doors on the rear have metal-clad fire shutters, b.

Windows: The windows on the second floor are one-over-one sash with flat voussiors, identical with the door. These windows are evenly spaced. The windows on the rear and the skylights in the lightwells have wire mesh glass. 7. Roof: Flat with built-up covering. C. Description of Interior: 1. Floor plans: As previously noted,. the,first floor is divided into two equal rooms* The twelve second floor rooms open onto a hall which rwiz from front to rear. 2. Flooring: The first floor has a. concrete floor with asphalt tile. The floor of the entryway is terrazzo and ceramic tile in a decorative pattern. Wood flooring covers the second floor. 3. Wall and ceiling finish: All walls are plaster. The ceiling on the first floor has decorative tin. The ceilings on the second floor are plaster. 4.

Doorways and doors: The doorways have transoms. The doors are six panel. 5. Mechanical equipment: Electric. D. Site: 1. General setting and orientation: The building faces south. It ,sits next to the mall adjacent to Centre Espanol. 2. Historic landscape design: The building has a zero set-back from the sidewalk. The sidewalk has black and.white hexagonal concrete tiles in unusual design, laid out circa B. F. Marcos Building HABS No. (Page 6) Prepared by: L. Glenn West fall, Historian and Donald W. Barnes, Jr. , Architect Historic American Bui 1 dings Survey Summer PART III. SOURCES OF INFORMATION A. Interview: Pizzo, Tony. Local historian, Tampa, Florida, June 8, B.

Bibliography

183 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HABS FLA,29-TAMP,13-. Not written, edited or summarised by this site.

Tax records, Tax Assessors Office, Hillsborough County Courthouse, Tampa, Florida, Title records, Chelsea Title and Guaranty Company, Tampa, Florida. PART IV. PROJECT INFORMATION The project was made possible by the National Park Service, the Florida Bicentennial Commission and the City of Tampa. Under the direction of John Poppeliers, chief of HABS, the project was completed during the summer of at the HABS Field Office, Hillsborough Community College, Tampa, Florida, by Professor Donald W. Barnes, Jr. (Architect, North Carolina State University), Field Supervisor; L.Glenn Westfall (Hillsborough Community College), Historian; and four student architects: Steven E. Bauer (University of Kansas); Wei don E. Cunningham (University of Texas); Daniel L.

Jacoby (Cornell University); and Amy Weinstein (University of Pennsylvania). The written documentation was edited in by Susan McCown, a HABS historian in the Washington, D. C. office, for transmittal to the Library of Congress. Walter Smalling, Jr. took the photographs in ADDENDUM TO HABS No.

Marcos Building

East Seventh Avenue ' Ybor City Hillsborough County Florida 13 - XEROGRAPHIC COPIES OF COLOR TRANSPARENCIES HISTORIC AMERICAN BUILDINGS SURVEY National Park Service U.S. Department of the Interior Washington,

In context

Tampa, Florida The place record: every map, photograph and survey of this town.
Hillsborough County, Florida 170 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Tampa

24 of 199 records shown

The federal surveyors worked through Tampa building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
MacDill Air Force BaseHABS FLA,29-TAMP,52-23,267 words
Ybor Cigar FactoryHABS FLA,29-TAMP,19-7,825 words
Pauline Kilker HouseHABS FL-4794,773 words
Perry Harvey Sr. ParkHALS FL-20-A3,928 words
Seddon Island Scherzer Rolling Lift BridgeHAER FLA,29-TAMP,21-3,903 words
George Washington Junior High SchoolHABS FL-4453,721 words
Cherokee ClubHABS FLA,29-TAMP,9-3,495 words
Gutierrez BuildingHABS FLA,29-TAMP,11-3,054 words
Tampa City HallHABS FLA,29-TAMP,1-2,997 words
914 East Fourteenth Avenue (House)HABS FL-6152,909 words
918-918 ½ East Fourteenth Avenue (House & Addition)HABS FL-5712,547 words
1518 East Fourteenth Avenue (House)HABS FL-4412,392 words
1011 East Fourteenth Avenue (House)HABS FL-6172,217 words
1013 East Fourteenth Avenue (House)HABS FL-6192,103 words
2502 North Twelfth Street (House)HABS FL-6182,090 words
Scozzari Brothers BuildingHABS FLA,29-TAMP,15-2,058 words
Antonio del Rio BuildingHABS FLA,29-TAMP,21-2,054 words
1005 East Fourteenth Avenue (House)HABS FL-6161,989 words
1930 West Laurel Street (House)HABS FL-4831,822 words
M. Leibovitz BuildingHABS FLA,29-TAMP,12-1,745 words
2312 West Laurel Street (House)HABS FL-4841,707 words
F. Mayo BuildingHABS FLA,29-TAMP,14-1,682 words
El Dorado HotelHABS FLA,29-TAMP,10-1,584 words
2324 West Laurel Street (House)HABS FL-5101,480 words

Provenance

  • Written history. Quoted verbatim from HABS FLA,29-TAMP,13-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.