gabled seaplane hangar built in and located on the waterfront in the old Navy Yard. Original plans dated April 20, Building 75 was to be a double-gabled hangar similar to Buildings 71, 72, 73. During this time, Congress declared war against Germany, thus causing accelerated construction on the base throughout the remaining months of the war. So, instead of constructing a two-bay han- gar, Building 75 was increased to three bays using existing plans showing the extension of Buildings 71, 72 and 73. : ' HABS No. (page 2) . PART I. HISfORICAL INFORMATION A. Physical History 1. Date of erection: Building 75 was built in at the same time that hangars 74 and 76 and 104 were constructed.
Origi- nally known as Hansar After severe hurricane in hangar door and storm wall modifications were made in but no other significant alterations were made until the during filorld War II .. 2. Architect/Builder: Not known. 3. Original and subsequent owners: U.S. Department of the Navy. 4. Builder, contt'actot', supplier's: Lacawanna was the steel fabt'icator. 5. Original plans and construction: The Ot'iginal drawings consisted of 6 drawings of 18 to dated Apt'il 20, which were also used for the additions to Buildings 71, 72 and 73. HABS Field Survey and Measurements indicate that the building was constructed according to the Ot'iginal plans except fat' the addition of the third hangar bay at the not'th end. 6. Alterations and additions:~ In two major changes occurt'ed.
<December 29, Dwg and April 18, Dwg tht'ough The original accordion door's were replaced with sliding leaf doors on the entire west side and all but the south bay on the east side whet'e the accordion doors were fixed in place, and a concrete storm wall 12" thick and high above the hangar finished floor was added. Also, the storm wall was extended along the whole south wall as well, standing above the floor and 12" thick. In a small lean-to was added to house toilet f acili- ties at the north side of hangar' <October 24, Dwg U.S.NAVALAIRSTATto~~G~~7~~r. HABS No. (page 3) In an addition to the lsan-ttl."-s t:d~tt'tietS<l :for shower room, locker room, wCIC'kshop and sear loekE!C'.
<May 21, Dwg In the storage area at the ntez:tan1.ne wat1 extended towards the north <February 5, Dwg In alterations were made to the external hansar. door (rame, and the seaplane beacon lisht was removed <Ausust B, Dwg In the hangar was converted to a gym and hobby_ shop by adding various size rooms in the south bay with. additional rooms above and below the mezzanine level.~ <March 13, Dwg through In the orisinal lean-to toilet facilities were~ removated. <January 16, Dwg In Exterior fabric was painted (June 17, B. Historical Context: Building 76 is ~ocated in the National Historic Landmark_ District along the waterfront area at the southeast corner_ within the Pensacola Naval Air Station, which is situated at~ the western entrance to Pensacola Bay, on the Gulf of Mexico,.
in the Florida Panhandle. The waterfront area faces south, toward the western end of Santa Rosa Island and the Gulf; it_ sits on a peninsula which juts into the southernmost portion of the bay. Fort Pickens, a National Historic Landmark, stands across Pensacola Bay, at the western end of Santa Rosa Island, and another National Historic Landmark District, Fort San Carlos de Barrancas, is located at the western edge of the Air Station. Building 76 is one of several hangar buildings and other structures comprising the eighty-two acres in the District; there are forty-nine designated historic buildings and structures and seventeen additional non-designated buildings and structures within the District.
Owing to the location's strategic importance, French, Brit- ish, and Spanish governments each established a military i U.S. NAVAL AIR STATIO~~trit~~~NO. 1 HABS No. (page 4) presenc!it in the vicinity. The U. S. Navy maintained the Pensacola Navy Yat'd there from to although the military t'ole of the base was relatively insipificant throughout the nineteenth century. A small installation be.fore Ulorld War I, the Navy Yard was enclosed by a high brick wall, constt'ucted in and surrounded on its inland_ sides by the villases of Uloolsey and Ulart'inston. The Navy Yard closed in but reopened in as the Pensacola Naval Aeronautic Station.
Renamed the Naval Air Station in it set'v-ed as a training center for naval aviators and earned a reputation as the "Cradle of Naval Aviation." The station leaped beyond the walls of the Ot'iginal Navy Yard after the wat' to incot'porate its neighborins villages, which were removed in and Amid international tensions in the late the station expet'ienced dramatic physical expansion. Graduates of its aviation training program partic- ipated in all of the nation's major naval engagements during_ World Ular II. The Naval Air Station Pensacola continues to_ emphasize naval aviation training and currently serves as the headquarters for the Naval Education Trainins Command.~ Building 76 was one of tht'ee hangars to be built in the same area as the already existing Buildings 71, 72 and 73.
Build-_ ings 71, 72, and 73 were to be doubled in size while 74, 75. and 76 were new constructions. Building 76 was built not. long after Congtess had declared war against Germany on April_ 6, Buildins 76 was to be a single hangar while 76 was planned as a double, but due to the war, construction was_ feverish and by the end of Buildings 71, 72, and 73_ were doubled and 75 and 76 were triple hangars, along with square yat'ds of concrete pavement along the watet'~ ft'ont. During this period the Navy experimented in using aircraft to locate mines, submarines, dt'op bombs, and land on. water and/at' ships.
These hangars t'emained in use through the and early when preparation for and involve- ment in hlorld War II t'esulted in enormous expansion and use changes at the Naval Ait' Station, Pensacola. PART II. ARCHTECTURAL INFORMATION A. General Statement: 1. Architectural Character: Building 76 is a plain t'ectangular tt'iple-gabled roof metal framed industrial buildins. Al- though of no architectural significance, it is one of many U.S.NAVALAIRSTAUON~~~f::' HABS No. (page 5) goverQtnent designed and built steel. stt'uctures of the early nineteen hundreds, initially used for seaplane development during World lilar I.. 2.
Condition of fabric: lilhile the structural systems are in good condition, the exterior asbestos siding is in fair condition and the built-up gravel roofing is in poor condi- tion; the doors are in fair condition. The Office and Stor- age Rooms are in poor condition. ,, B. Description of Exterior:. 1. Overall dimensions: Building 76 is has a rectangular config- uration, and is one story clear interior height> with the following dimensions: lilidth: <E-fJ>; Length: Eave height: Approximately 28' 10" Ridse height: Approximately 31' 10" The building fronts east or west. Historically, either east or west sides opened completely for entry. There are three 72' bays at the front and six bays on the side. Centered on the north side is a lean-to addition x 2.
Foundations: The steel columns are supported by pyramidal piers connected by foundation walls at perimeter of the building and across the interior line of columns <April 20, Dwg Pier: base x top x 2'- 6", depth Ste~l column bears on pier below finish floor and fasten with 4'x 1" diameter x anchor bolts and embedded plate washers. Concrete floor. pours around column and down wall to top of deep wide continuous foundation wall. This design causes column to be rigid on base and transfer overturning loads into the foundation. The floor slab is 5.3 above sea level. 3. Walls: The exterior wall is thick corrugated asbestos siding attached to 4" channels set horizontal at 4' centeLs and attached to columns with x 3 x angle clips.
In some locations asbestos siding is replaced with corLugated galvanized steel siding. 4. StLuctural systems, framing: The building has quadrangular Pratt-type rivetted steel roof trusses; nominal depth is at beaLing; top chord sloped up to the centerline; three nominal 72" clear spans, spaced 16" -8" o.c.; top chord 2 angles 6" x 4" x bottom chord 2 channels 9" x U.S. NAVAL AIR STATIO~~~~7~ HABS No. (page 6) and welts 2 angles x 2" x There are six bays with seven trusses between columns. Roof purlins ate 8 channels x set at 9' centers, the panel points of roof trusses. Outermost bays on east and west are "X" braced at the lower truss chord with 2 angles 2"x and cross braced at panel points with angles 5"x 3"x At quarter points bottom chords of all trusses are laterally braced with 2.
angle The exterior perimeter walls are not laterally braced. The row of columns across the center of the building are horizontally braced at centers with 2 angles 3"x and "I" braced with 2 angles x at end bays and interior bays except lower: is open. 5. Porches, stoops, balconies, bulkheads: A lean-to of wood_ construction is attached to north wall, exterior finish is corrugated asbestos roof and walls painted to match hangar.~ 6. Chimneys: None. 7 Openings : a. Doorways and doors: The original accordion doors were-_ removed, e~cept the doors in the east side of the south hangar bay, and replaced with sliding leaf doors.
The original accordion doors that remained were fixed in~ place with a 12" thick by concrete storm wall._ In these doors were cut at the top of the storm wall and removed for construction of a new framing for hobby_ shops, whereas the side of the building was finally covered with corrugated galvanized steel siding. b. hlindows and shutters: All original windows remain. 8. Roof: a. Shape, covering: The roof is three-gabled; built-up roofing with gravel surface on double layer tongue and groove sheathing laid diagonally nailed to 4 x 4 timber bolted to purlins. b. Cornice, eaves: Eaves extend 11" on nor-th and south end and 4" on east and west. c. Dormers, cupolas, towers: Located 26 1 -8" from east and west' edae of roof on each ri~se. is a r(lof vent stand-. ins high with a base diameter.
C. Description of Interior:_ 1. Floor plans: Building 76 consists of three open hansar bays in which the north ,,and center bays are unobstructed. However, the south bay has several rooms along the east and south walls which were added when the building was converted into a recreation building and hobby shop. There were also rooms added between those on the ground floor and the. mezzanine storage and off ice. The mezzanine is located at the southern end of the east wall 32' x 16' with a platform addition out to 21' to the north, all located within the truss framing. At the north wall of the building is a lean- to addition with toilet facilities and storage space. 2. Stairways: one toward S.E.
along wall of hobby rooms leading to second level-another along south wall from second level to mezzanine area. 3. Flooring: Conc~ete slab, smooth; wood floors on second. level and mezzahine.: 4. Wall and ceiling finish: No wall or ceiling finishes, exposed structure. 5. Openings: a. Doorways and doors: Mezzanine and doors to lean-to wood framed, wood horizontal panel Colonial type. b. Windows: No interior windows. 6. Decorative features and trim: None 7. Hardware: Standard steel hinges, brass oval knob lockset P&F Corbin No. CU29 New Britain, Conn. 8. Mechanical equipment:_ U.S. NAVAL AIR STATIONI;;t;~~n:;c;-~~~r- HABS No. FL 375 (page 8) a. Heat.ins, air conditionins, ventilation: Original equip- ment not evident. b.
Lightins florescent fixtures remain but not from origi- nal construction c. Plumbing: Original fixtures not evident except toilet facility in lean-to on north wall. 9. Orisinal furnishings: D. Site: 1. General setting and orientation: Large doors orientated east & west, Building sets 43' at south wall from concrete seawall to west of Building 75 with concrete pavement on east, south and west sides and grass on the north side.-. 2. Historic landscape design: none 3. Outbuildings: None PART III. SOURCES OF INFORMATION A. HABS measur~d drawings, photos, field notebook prepared by Victor W. Glazner, Architect for Navy. B.
Original and/subsequent drawings held at the Public Works Build- ing number Naval Air Station Pensacola, Florida: April 20, DWG Aeroplane Hangars Site Plan Locating Additions and New Hangars.: April 20, DWG Aeroplane Hangars Elevations, Sec- tions, Foundation & Framing Plans. April 20, DfilG Aeroplane Hangars Floor Plans, Section, Mezzanine, Elevation and Framing. April 20, DWG Aeroplane Hangars Section, Founda- tion, Framing, and Details. April 20, D@G Aeroplane Hangars Door Elevation & Details. ... Apt'il 20, DliJG Aet'QJ>lane.~j!~ Floor Plan & Mezzanine Floor Plan of Existing H nsars. December 29, Seaplane Ransars Construction Details of Stormwalls, Sections, Location Map of Building. April 16, Dwg General Plans &Door Details, Eleva~ tion Framing, Wheel & Idler & Tt'ack Detail~.
April 18, DWG Hangars 71, 71, 73 General Plan: Location of New Steel Rolling Replacement Doors. April 18, DWG Plans, Sections, and Details Hangars 71, 72, 73, 75 & 76 Details of Door Guides for New Steel Rolling Doors. April 18, DWG Hangars 71, 72, 73, 75 & 76 Details: of Door Guides and Door Braces, for New Steel Rolling Door's. October' 24, Proposed Toilet Addition to Nor'th End of Seaplane Hangars No. 71, 72, 73, 75 & 76, Elevations,~ Floor Plan, Section & Foundation. May 21, DWG Lean-To Additions to North Ends of Seaplane Hangars Buildings 71, 72, 73, 75 76, Floor Plan, Eleva~ tions, Sections, Fotlndation, Electrical, and Existing Toilet Room. February 5, Dwg Seaplane Hangar' No. 76 Extension of storage area, structural details, floor framing, plan, sections, and plan.
August 8, Dwg Alterations to Buildings Altera- tion of external door frame, and removal of seaplane beacon light. Plan, elevation showing members to be removed and new members to be added. January 16, Dwg Renovate toilet facilities Build- ing 76, Plans and elevations, mechanical plan, removal plan,floor_ plan and elevations. March 13, Dwg Gymnasium and hobby shop Building 76, plans, views and schedules. Floor plans (ground floor and 2nd level below mezzanine), sections and elevations, door eleva- tions. U.S. NAVAL AIR STATIO~I~~{fN~~<;~~J; HABS No. (page 10) March 13, Dwg Gymnasium and hobby shop Building 76, Sections and Details, floor sections, wall sections, door details, framing details. March 13, Dwg Gymnasium and hobby shop Building 76, Electric lighting plan and details.
Floor plan with lighting placement, attachment details. June 17, Exterior repairs and painting han- gars, 71, 72, 73, 74, 75, 76, 44, & elevations. C. Historic views: None. D. Interviews: E.