BlockBefore

New River Tunnel, Carries U.S. Highway 1 (South Federal Highway) under New River, Fort Lauderdale

New River Tunnel, Carries U.S. Highway 1 (South Federal Highway) under New River, Fort Lauderdale, Broward County, FL. Surveyed as HAER FL-50, with a 2,563-word written history.

From the record

“The New River Tunnel (later renamed the Henry E.”

Written record, HAER FL-50 survey. Machine-read text.

Surveyed by the federal HAER program as HAER FL-50 · the record runs 2563 words · one of 6 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

204 words

Source document Quoted word for word from HAER FL-50. Not written, edited or summarised by this site.

The New River Tunnel (Henry E. Kinney Tunnel) is located in the census designated place of the City of Fort Lauderdale, Broward County, Florida. The New River Tunnel (Henry E. Kinney Tunnel) carries U.S. Highway 1 (South Federal Highway) under the New River. The New River Tunnel (Henry E. Kinney Tunnel) (Florida Master Site File Number is located in Sections of Township 50 South, Range 42 East on the Fort Lauderdale South United States Geological Survey (USGS) quadrangle map. The approximate center of the New River Tunnel (Henry E. Kinney Tunnel) is located at the coordinates of latitude and longitude These coordinates were obtained on September 21, utilizing Esri ArcMap data. The coordinates datum is World Geodetic System The New River Tunnel (Henry E.

Kinney Tunnel) is owned by the Florida Department of Transportation (FDOT). Figure 1 shows the location of the New River Tunnel (Henry E. Kinney Tunnel) on a USGS quadrangle map. The current documentation is of the north and south portal and walls. Structural Types: Concrete Tunnel Date of Construction: Architect/Engineer/Builder: Engineer: Singstad and Baillie (Ole Singstad, principal designer) (New York)/Builder: Thorington Construction Company (Rhode Island) Former Owner/Use: Florida State Road Department (antecedent to the FDOT)/Automotive Tunnel Current Owner/Use: FDOT/Automotive Tunnel

Significance

1134 words

Source document Quoted word for word from HAER FL-50. Not written, edited or summarised by this site.

The New River Tunnel (later renamed the Henry E. Kinney Tunnel) was constructed in to replace a movable bridge. The design and construction of the tunnel was innovative at a time in Florida when bridges were exclusively used. Prominent engineers Singstad and Baillie of New York designed the tunnel. At the time it was built, the tunnel was notable for its projected longevity years versus 75 years for a replacement bridge), engineering, automation, and safety features. Engineers claimed in that the tunnel was the only vehicular tunnel that was waterproof and that it was secure enough to be utilized as a hurricane shelter.

The use of a tunnel at this location also contributed to the preservation of downtown Fort Lauderdale as a historic corridor that has maintained its historic setting and feeling. Description: The New River Tunnel (Henry E. Kinney Tunnel) is an approximately 864 long steel and concrete tunnel constructed between and The New River Tunnel (Henry E. Kinney Tunnel) NEW RIVER TUNNEL HAER No. (Page 2) carries traffic on U.S. Highway 1 (South Federal Highway) under the New River in downtown Fort Lauderdale. The tunnel extends from the north portal at East Las Olas Boulevard to the south portal at North Rio Vista Boulevard. The tunnel travels north-south with 2-lanes southbound and 2-lanes northbound with a concrete wall separating the northbound and southbound traffic lanes.

There is a small pedestrian walkway on the northbound tube with aluminum railings. The width of the northbound tube is 31 -5 ; the width of the southbound tube is 26 -10 . The roadway is asphalt with historic white ceramic blocks used in the travel lanes for reflective striping. The inside of the tunnel is lined with yellow-colored, ceramic tiles, and light fixtures along the chamfered ceilings. When the tunnel was originally constructed it included a ventilation building at each portal. The approach walls to the tunnel feature Art Deco-styled distinctive rounded pilasters of concrete running vertically from the outside of the walls to approximately half-way down the inside of the walls. Figures 2 and 3 show the inside of the approach walls including the pilasters.

Figures 4 and 5 show the exterior of the approach walls. Throughout its lifespan, the tunnel has undergone numerous alterations. These alterations can be divided into three categories: engineering-related, safety/maintenance, and aesthetics. The engineering-related alterations are based on utilizing updated technology. These alterations included the abandonment (in place) of the original carbon dioxide detection system. This resulted in the removal and reconstruction of the northern ventilation building and fan enclosure. The majority of the ventilation building was demolished and a smaller building was constructed in its place in as a result of this alteration to the original engineering design. A new air conditioning system was also installed in the south ventilation building.

Alterations associated with safety include the replacement of the light fixtures (ca. and traffic signals in the tunnel. With these upgrades, sections of the original tile were removed. General maintenance alterations include replacement of the north and south pump rooms doors and frames. The south ventilation building also had some roof and soffit repairs and new doors. The tunnel passageway also received new frames and doors. Finally, the tunnel aesthetics changed over time. The most prominent was in when the tunnel was renamed from the New River Tunnel to the Henry E. Kinney Tunnel. Henry E. Kinney was a local journalist who vigorously advocated for the tunnel 1. As a result, the original signage was replaced with new signage that maintained similar stylization (Figure 6).

The color scheme of the approach walls has also changed over time 2. In the FDOT undertook a design project to rehabilitate the tunnel to address safety issues and to extend the life of the tunnel. At the same time as the rehabilitation, the City of Fort 1 South Florida Sun Sentinel, Henry E. Kinney is honored in rededication of river tunnel (Fort Lauderdale) 31 October 2 South Florida Sun Sentinel, Motorists hurl bottles, obscenities at tunnel painters (Fort Lauderdale) 28 August NEW RIVER TUNNEL HAER No. (Page 3) Lauderdale designed a project to extend the roof of the north portal to provide recreation space above the tunnel and address safety issues 3.

Both of these projects are projected to begin in History: After vigorous debate within the Fort Lauderdale community, a tunnel design was chosen to replace a movable bridge in downtown Fort Lauderdale to cross the New River in The New River Tunnel (Henry E. Kinney Tunnel) was designed by engineers Singstad and Baillie of New York. Ole Singstad was a renowned international tunnel engineer. In the late he assisted with the design of the Holland Tunnel in New York City. Later he served as the chief of engineer for the New York City Tunnel Authority. During his tenure, the New York City Tunnel Authority constructed numerous large tunnel projects including the Lincoln Tunnel and the Brooklyn Battery Tunnel. Stingstad also worked on projects in California, Maryland, and Belgium. The Henry E.

Kinney Tunnel was constructed by the Thorington Construction Company of Rhode Island 4. The design and construction of the tunnel was innovative at the time of its construction at a time in Florida when bridges were exclusively used. Engineers claimed in that the tunnel was the only vehicular tunnel that was waterproof and that it was secure enough to be utilized as a hurricane shelter. When the tunnel was opened in December the tunnel was touted as the Nation s Most Perfect Tunnel. Justifications for that title were the longevity of its service life years versus 75 years for a bridge), its use of ground-breaking engineering, and its automation. The tubes consist of a welded quarter-inch steel floor anchored to four feet of sealer and a nine-inch concrete leveling course.

Finally, the top and sides were treated with a sealant. The tunnel was also touted for its safety and use of new automation technology including the use of self-controlled water pumps, venting fans, and traffic signals. Finally, the safety components of the tunnel included four phones with direct lines to the police department, four fire alarm signals (two for each tube), 12 fire extinguishers (six for each tube), and 14 hose valves (seven per each tube). On December 9, the tunnel was officially opened by Florida Governor LeRoy Collins and local dignitaries and had a final cost of $8 million5. 3 Janus Research, Henry E.

Kinney Tunnel Rehabilitation Project: Effects Evaluation Case Study Report Tallahassee, Florida, 4 PanAmerican Consultants, 5 Fort Lauderdale News, Tunnel Topics: A Progress Report Presented as a Community Service (Fort Lauderdale): 2 November Fort Lauderdale News, Nation s Most Perfect Tunnel (Fort Lauderdale): 7 December Fort Lauderdale News, Collins Snips New River Tunnel Open (Fort Lauderdale): 9 December NEW RIVER TUNNEL HAER No. (Page 4)

Sources

213 words

Source document Quoted word for word from HAER FL-50. Not written, edited or summarised by this site.

Archaeological Consultants, Inc. The Historic Highway Bridges of Florida. Sarasota, Florida: ACI, Inc. On file, Florida Department of State, Division of Historical Resources, Tallahassee, Florida, Fort Lauderdale News. Tunnel Topics: A Progress Report Presented as a Community Service. Fort Lauderdale, Florida. 2 November Ibid. Nation s Most Perfect Tunnel. Fort Lauderdale, Florida. 7 December Ibid. Collins Snips New River Tunnel Open. Fort Lauderdale, Florida. 9 December Janus Research, State Road 5/US 1 from SR 862/I-595 to North of SR 842/Broward Boulevard: Henry E. Kinney Tunnel Rehabilitation: Additional Information for the National Register of Historic Places Evaluation of the Henry E. Kinney Tunnel, Janus Research, Tampa.

On file, Florida Department of State, Division of Historical Resources, Tallahassee, Florida, Ibid. Henry E. Kinney Tunnel Rehabilitation Project: Effects Evaluation Case Study Report. Janus Research, Tampa. On file, Florida Department of State, Division of Historical Resources, Tallahassee, Florida, PanAmerican Consultants, Recordation of the Kinney Tunnel in Fort Lauderdale, Broward County, Florida. On file, Florida Department of State, Division of Historical Resources, Tallahassee, Florida, South Florida Sun Sentinel. Henry E. Kinney is honored in rededication of river tunnel. Fort Lauderdale, Florida. 31 October Ibid. Motorists hurl bottles, obscenities at tunnel painters. Fort Lauderdale, Florida. 28 August Historians: Ginny Jones Janus Research N.

Ward Street Tampa, Florida, October 5,

Written history

942 words

Source document Quoted word for word from HAER FL-50. Not written, edited or summarised by this site.

The New River Tunnel (Henry E. Kinney Tunnel) has been determined eligible for the National Register of Historic Places (National Register) by the Florida State Historic Preservation Officer in and The Tunnel was determined eligible for listing on the National Register under Criterion A in the area of Community Planning and Development for its significant historical role in the NEW RIVER TUNNEL HAER No. (Page 5) development of Fort Lauderdale and under Criterion C under Engineering and Architecture (design) 6. The HAER documentation of the New River Tunnel (Henry E.

Kinney Tunnel) was sponsored by the FDOT and the City of Fort Lauderdale to fulfill Stipulation II in the Agreement Document for resolution of the adverse effects caused by the proposed alterations to the New River Tunnel (Henry E. Kinney Tunnel). Documentation was completed in accordance with the Secretary of the Interior s Standards and Guidelines for Architectural and Engineering Documentation (62 FR Based on Stipulation II.A in the Agreement Document, this documentation will be submitted to the U.S. Department of Interior (DOI) National Park Service Southeast Regional Office and the Florida Division of Historical Resources. A non-archival copy of the documentation will be sent to the Fort Lauderdale Historic Preservation Board (City of Fort Lauderdale) and the Stranahan House.

Large-format photographic documentation was prepared by Architectural Historians Carter Finch, and Daniel White, and overseen by Senior Architectural Historian, Amy Streelman of Janus Research. Digital photographic documentation of the interior was prepared by Marc S. Sillman of Marc Sillman Productions, Fort Lauderdale, Florida. Architectural Historians Ginny Jones and Amy Streelman of Janus Research prepared the written historical and descriptive data. Figures are current photographs (taken July of the interior mechanical spaces of the Tunnel including the ventilation system and the electrical system that are slated for replacement in as part of the rehabilitation project. Due to lighting issues, these photographs are in digital format and are not reproduced in large format.

The interior digital photography documentation was completed by Marc S. Sillman, Mark Sillman Productions, of Fort Lauderdale, Florida. 6 PanAmerican Consultants, Recordation of the Kinney Tunnel in Fort Lauderdale, Broward County, Florida, (Florida Division of Historical Resources Tallahassee, Florida, Archaeological Consultants, Inc, The Historic Highway Bridges of Florida Update, Tallahassee, Florida, Janus Research, State Road 5/US 1 from SR 862/I-595 to North of SR 842/Broward Boulevard: Henry E. Kinney Tunnel Rehabilitation: Additional Information for the National Register of Historic Places Evaluation of the Henry E. Kinney Tunnel, Tallahassee, Florida, NEW RIVER TUNNEL HAER No. (Page 6) Supplemental Material: Figure 1: Location of the New River Tunnel (Henry E.

Kinney Tunnel) on a USGS Quadrangle Map (source: USGS) NEW RIVER TUNNEL HAER No. (Page 7) Figure 2: Overview of the north portal and approach, facing south. Photography by Daniel White, Figure 3: Overview of the south portal approach, facing north. Photography by Daniel White, NEW RIVER TUNNEL HAER No. (Page 8) Figure 4: Overview of the upper tunnel wall on the north portal at SE 6th Avenue, facing southwest. Photography by Daniel White, Figure 5: Oblique overview of the upper wall of the south portal at East Avenue (right) with a scale stick, facing south-southeast. Photography by Daniel White, NEW RIVER TUNNEL HAER No. (Page 9) Figure 6: Detail of the signboard on the north portal, facing south. Photography by Daniel White, NEW RIVER TUNNEL HAER No.

(Page 10) Figure 7: Aerial overview of the Lower Level Pump Room at the South Pump Room. Photography by Marc S. Sillman, NEW RIVER TUNNEL HAER No. (Page 11) Figure 8: Detail of the Lower Level Pump Room at the South Pump Room, facing west. Photography by Marc S. Sillman, NEW RIVER TUNNEL HAER No. (Page 12) Figure 9: Detail of the Lower Level Pump Room at the South Pump Room, facing west. Photography by Marc S. Sillman, NEW RIVER TUNNEL HAER No. (Page 13) Figure 10: Overview of the Main Level of the South Pump Room, facing north. Photography by Marc S. Sillman, NEW RIVER TUNNEL HAER No. (Page 14) Figure 11: Detail of the Main Level of the South Pump Room, facing north. Photography by Marc S. Sillman, NEW RIVER TUNNEL HAER No.

(Page 15) Figure 12: Overview of the Main Level of the South Ventilation Building, facing southwest. Photography by Marc S. Sillman, NEW RIVER TUNNEL HAER No. (Page 16) Figure 13: Detail of the Ventilation Shaft in the Main Level of the South Ventilation Building. Photography by Marc S. Sillman, NEW RIVER TUNNEL HAER No. (Page 17) Figure 14: Detail of Mechanical Equipment (Standby Generator) in the Main Level of the South Ventilation Building. Photography by Marc S. Sillman, NEW RIVER TUNNEL HAER No. (Page 18) Figure 15: Overview of the Lower Level of the South Ventilation Building. Photography by Marc S. Sillman, NEW RIVER TUNNEL HAER No. (Page 19) Figure 16: Mechanical Equipment (now-abandoned Carbon Dioxide Detection System) in the Lower Level of the South Ventilation Building.

Photography by Marc S. Sillman, NEW RIVER TUNNEL HAER No. (Page 20) Figure 17: Detail of Mechanical Equipment (now-abandoned Carbon Dioxide Detection System) in the Lower Level of the South Ventilation Building. Photography by Marc S. Sillman, NEW RIVER TUNNEL HAER No. (Page 21) Figure 18: Detail of Mechanical Equipment (Electrical Equipment) in the Lower Level of the South Ventilation Building. Photography by Marc S. Sillman, NEW RIVER TUNNEL HAER No. (Page 22) Figure 19: Detail of Old Electrical Parts in the Lower Level of the South Ventilation Building. Photography by Marc S. Sillman, NEW RIVER TUNNEL HAER No. (Page 23) Figure 20: Overview of the Tunnel Interior Accessed Through the Lower Level of the South Ventilation Building. Photography by Marc S. Sillman,

In context

Fort Lauderdale, Florida The place record: every map, photograph and survey of this town.
Broward County, Florida 90 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Fort Lauderdale

5 records

The federal surveyors worked through Fort Lauderdale building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Bonnet HouseHABS FLA,6-FOLAU,1D-71 words
Bonnet HouseHABS FLA,6-FOLAU,1B-48 words
Bonnet HouseHABS FLA,6-FOLAU,1C-48 words
Bonnet HouseHABS FLA,6-FOLAU,1A-46 words
Bonnet HouseHABS FLA.6-FOLAU,1-39 words

Provenance

  • Written history. Quoted verbatim from HAER FL-50. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.