Niagara County, New York - Chapter 25: Old-Time Stage Lines on the Ridge Roadhistory of Niagara County, 1878
From History of Niagara County, N. Y., with Illustrations Descriptive of Its Scenery, Private Residences, Public Buildings, Fine Blocks, and Important Manufactories, and Portraits of Old Pioneers and Prominent Residents, published 1878. 2,424 words, reproduced complete and unedited. Source changes inside the text are labelled in place.
The text
2,424 wordsMachine-read from scans of History of Niagara County, N. Y., with Illustrations Descriptive of Its Scenery, Private Residences, Public Buildings, Fine Blocks, and Important Manufactories, and Portraits of Old Pioneers and Prominent Residents, published 1878. Nothing has been corrected: fixing what looks like a misspelled name is how an invented one gets published. Source changes are marked where they occur.
HE dependence for public conveyance previous to the completion of the canal was the stages running west from Canandaigua, either to Buffalo direct or by way of the Ridge road, Lewiston and Niagara Falls. The latter route was established in 1816. It was controlled at one time by brothers named Coe,living at Buffalo and Canandaigua,and at another by parties of the name of Hildreth. These stages ran one each way every day and did a roaring business, which was somewhat impaired by the completion of the canal and the establishment of the packet lines. In their palmy days they were always full, inside and out, of emigrants, business men, and tourists on the way to Niagara Falls, who would go west from Canandaigua by the Ridge road and return from Buffalo direct, via Batavia, or vice versa. The Coe coaches were met at Wright's Corners by a wagon from Lockport, bringing mail and passengers for the stage line. They were kept running up to about 1850. Passengers paid first or second class fare, the former only being assured of inside seats, of which there were enough for twelve persons. In winter a rectangular box on bobs took the place of the wheeled coaches. These stages ran every day in the week.
In 1828 a number of wealthy gentlemen, principally of Rochester, regretting the violation of the Sabbath involved in coaching on Sunday, established an opposition line to run on week days only, which they called the Pioneer line. Their route left the Ridge road at Wright's Corners for Lockport, where " Gid " Hersey's coffee house, which is still standing in West Main street, was the stopping place; thence it continued west to Niagara Falls, and so to Buffalo. The stages of this line aimed to leave Wright's for the east at a different hour from the Goes', both to secure a larger share of passengers and to avoid running in company with their rivals. When they did fall in with each other the drivers had a war of words, and sometimes raced their four-horse teams at the top of their speed, which the imperfect finish of the road made a dangerous proceeding. The Coe line lowered its rates, and the other failing to get the mail contract, succumbed to the competition and went down after running about two years.
At times, especially in the season of visiting Niagara Falls, neither line could accommodate the tide of travel with its regular coaches alone; both turned out extra teams and wagons, £Lnd eight or ten stages of various sorts, heavily loaded, sometimes went west in a day.
Gaines, Orleans county, was a place for changing teams and getting refreshments. The stopping place was the old Mansion House, which was succeeded by the Gaines House. Gaine? was two hundred and fifty miles from Albany by stage, and the trip required about forty-three hours, including stops.
With the advent of railroads the glory of the stage and packet lines departed. Several roads were constructed about the same time, making the three or four years beginning with 1835 an era of pioneer railroad building in America. In 1835 the Lockport and Niagara Falls company began the construction of its line. The road started at the corner of Chapel and East Market Streets, in Lockport, and running southwesterly a short distance turned across the canal at Cady's boat-yard, and by a grade which is still traceable reached the end of Glenwood street. Along that street, which was originally graded for the railroad, it wound its way up the mountain side, and after turning to the south to pass the head of the gorge a mile west of Lockport it bore away to the northwest through Pekin and nearly to Lewiston, and then turned up to what is now Suspension Bridge, whence it ran to the Falls along the cliff that overlooks the Niagara river. The track consisted of oak "mudsills," two and a half inches by twelve laid lengthwise of the road, with the ties resting across them, and upon the ties four by six inch oak timbers, on which were spiked bands or straps of iron. These irons had a tendency to work loose at the ends and turn up, forming " snakeheads," as they were called, which were ready to catch in the bottom of a car, spearing the passengers and throwing it off the track. The cats were small affairs with four wheels, holding either sixteen or twenty-four persons, those of the former class being divided into two and the others into three compartments, with seats running across, stage coach fashion. They were drawn for about two years by horses, when light locomotives came into use. They often had difficulty in surmounting the stiff grade which they encountered in leaving Lockport.
Meetings were held at Lockport in 1835 in favor of the construction of railroads to Batavia and Buffalo, but nothing was done. The next enterprise of the kind in this region was the building of a horse-car line from Medina, Orleans county, to Akron, Erie county, in 1836 by the Medina and Darien Railroad Company. It was operated but a short time, as it did not pay, and the track was taken up. In the same year enterprising Medina took meastires for the building of a railroad to the mouth of Oak Orchard creek. The Medina and Ontario Railroad Company was incorporated for that purpose, but the line was never built. The history of the Batavia, Albion and Oak Orchard Railroad scheme of 1875 is equally brief.
In July, r836, the Niagara Falls J^our/ml announced that the road from Lockport to that place was rapidly approaching completion, and that the Buffalo and Niagara Falls Railroad was in a similar forward state, cars being then running on some part of it. It was expected that the track from the Falls to Schlosser and from Black Rock to Buffalo would be in use by the first of August, with a steamboat completing the connection by several trips daily; and that both roads would be ready for the track throughout in September. The Buffalo road had been surveyed in 1834, and the grading partially done in 1835. The track, which was laid in 1836, was similar to that of the Lockport and Niagara Falls road, consisting of twoinch plank laid lengthwise as sleepers, ties resting on them three feet apart, and across these (and sunk into them for security) four by six inch oak scantling, thirty, thirty-three, thirty-six or thirty-nine feet in length, on which flat rails of iron, half an inch thick and two and a half wide, were fastened by spikes driven about fifteen inches apart. The frost heaved up this track so badly as to make it unsafe for engines in winter, and horses were then used to draw the cars. About 1844 the road was reconstructed, the route being also slightly changed. Heavier rails were laid, on white oak ties. The cars were like those above described, the conductor collecting fares by passing along outside on a narrow platform. The first conductor was Samuel Hamlin, and the first baggage master George Hamlin.
In the latter part of August the Buffalo Courier announced that the first locomotive had just been put on the track between Tonawanda and Black Rock, and a speed of about fifteen miles per hour attained. The part from Tonawanda to the Falls was not then finished, but must have been soon after. The first engine was the " Little Buffalo," and the next the " Niagara." The first was run by one Ford, and the other by an engineer named Barney.
On the loth of December, 1850, the Rochester, Lockport and Niagara Falls Railroad Company was organized. It bought out the Lockport and Niagara Falls company in 1 85 1, and the latter's track was abandoned and taken up. Local subscriptions Tvere made along the proposed line amounting to $225,000. The first board of directors consisted of Joseph B. Varnuni and Edward Whitehouse, of New York; Watts Sherman, of Albany; Freeman Clarke, Silas O. Smith and A. Boody, of Rochester; Alexis Ward and Roswell W. Burrows, of Albion; and Elias B. Holmes, of Brockport. Mr. Varnum was elected president, Mr. Ward vice-president, and Mr. Clarke treasurer. The directors and a few others passed over the road June 25th, 1852, and regular trains began running on the 30th. The first one between Rochester and Lockport was drawn by the engine Niagara," and made fifty miles per hour part of the way. The new road and the other lines running through central and western New York were consolidated, May 7th, 1853, to form the New York Central. The branch from Lockport junction to Tonawanda was built by the Rochester, Lockport and Niagara Falls Company in 1852, and opened in January, 1853.
At the same time with the Central there was organized a company which built the Canandaigua and Niagara Falls Railroad. The line was opened to the Falls July ist, 1853, and to Suspension Bridge October ist, 1854. March 22nd, 1857, it was bought by 'James M. Brown and other parties in Europe, to whorti it was heavily mortgaged, who changed the name to Niagara Bridge and Canandaigua Railroad, and immediately leased it for ninety-nine years to the Central company, which changed its original broad gauge to the standard gauge of four feet, eight and a half inches. The first president of the road was a Mr. Bond, of Honeyoye Falls; and the first superintendent, Mr. Lapham, of Canandaigua.
The Suspension Bridge and Erie Junction branch of the Erie railway, from Buffalo to Suspension Bridge, was built in the fall and winter of 1870 and 1871. Freight trains were run over the road in the winter of 1870-1. The road was not formally opened for the transaction of all business until May isth. 187 1. Passenger trains commenced running on that day. The first train for Suspension Bridge left Buffalo at 5.55 A. M., drawn by engine 189, with A. Hale, engineer - -Kirse fireman, - Davis baggageman; - Collins brakerhan and I. A. Waldron conductor, and arrived at Suspension Bridge at 7. 1 5 A. M. The first for Buffalo left Suspension Bridge at 5.50 A. M., drawn by engine 413, James Gates engineer, A_ L. Gire fireman ; - Whitman was baggageman, - Decker brakeman, and J. C. Davenport conductor. The train arrived at Buffalo at 7.24 A. M. The first superintendent of the division was H. C. Fisk, of Buffalo. The present superintendent is R. G. Taylor, of Buffalo. The first station agent at North Tonawanda after the road was opened was W. H. Upson, who is the present agent.
On the 9th of September, 1852, the Niagara Falls and Lake Ontario Railroad Company was incorporated to build a line from Niagara Falls to Youngstown. Benjamin Pringle was president, John Porter vice-president, Bradley D. Davis secretary and William S. Mallory treasurer. This road, so remarkable for the amount of rock cutting required in its construction, and for its position in part on a narrow shelf in the cliff that towers above the rapid waters of the Niagara between the' Devil's Hole and Lewiston, was graded and opened down to that village in 1854. On the 2ist of October, i8's5, a train was run over the line to Youngstown, and soon' afterward work on this part of the road was suspended and the track taken up. Had the project been carried forward and the Hne put in operation, Youngstown would probably have been the port for the Lake Ontario steamers, and would have taken much of the business which now centers at Lewiston and Niagara Falls. The portion of the road that was built was subsequently leased and is now operated by the Central company.
In May, 1874, the " Niagara River and Air Line Railroad Company " elected directors from Lockport, Medina, Albion, HoUey, Brockport and Spencerport, and as president J. W. Helmer, of Lockport; A year later the company voted to disband.
In the spring of 1870 the Lake Ontario Shore Railroad Company was organized at Oswego. The road which the company was formed to build was intended to be part of a future trunk line from Boston to the west. The town of Kendall, Orleans county, gave its bonds for $60,000 worth of the stock ; Yates, $106,000 ; Somerset, Niagara county, $90,000 ; Newfane, $8^,000 ; Wilson, $117,000 ; Lewiston, $152,000. The work of construction proceeded slowly. Litigation over the town bonds checked their sale, and crippled the company so that it could not complete the road. In May, 1874, the Rome, Watertown and Ogdensburg company assumed the undertaking. The road was then principally graded, but it was more than a year later before the bridges on the western part of the line were finished. The road through Orleans and Niagara counties was graded by Hunter & Co. of Sterling Valley, Cayuga county. In the latter part of July, 1875, the track was laid twenty miles west of the Genesee river, and was carried through Orleans county during the autumn and to I-ewiston in the following spring. The first passenger train ran over the western portion June 12th, 1876. The road was built at an average cost of $20,000 per mile. The wrought iron bridge over Eighteen-mile creek rests on twelve piers, and is 390 feet in length and 78 feet above the water.
In 1876 the Lockport and Buffalo Railroad Company was organized, with T. T. Flagler president, B. H. Fletcher vice-president, and Elisha Moody, Lewis S. Payne and Benjamin Carpenter in the directorship. A. R. Trew was the chief engineer, and M. Lally contractor. Lockport gave bonds for $100,000 worth of the stock. Early in 1877 the grading and bridge building were substantially finished from Lockport to Tonawanda, and ties distributed along the line. In that state the enterprise remains. The Central company resisted the crossing of its track by the proposed road, but was beaten in the courts. At a meeting of the stockholders on the 9th of July, 1877, the following board of directors was chosen: T. T. Flagler, B. H. Fletcher, J. A. Ward, John Hodge, James Jackson, jr; Benjamin Carpenter, Lewis S. Payne, J. L. Breyfogle, Josiah H. Helmer, Elisha Moody, J. C.
The first two were re-elected president and vice-president, Mr. Ward secretary, and Mr. Hodge treasurer. A road from Lockport to Olcott was contemplated in connection with the Lockport and Buffalo, but nothing was done toward its construction.
Provenance
Text from History of Niagara County, N. Y., with Illustrations Descriptive of Its Scenery, Private Residences, Public Buildings, Fine Blocks, and Important Manufactories, and Portraits of Old Pioneers and Prominent Residents, published 1878, in the public domain in the United States and digitised by the Internet Archive.