BlockBefore

Oswego County, New York - Chapter 17: Oswego As a Village and City, |, 1895 (part 2 of 5)

From Landmarks of Oswego County, New York, published 1895. 15,757 words, reproduced complete and unedited. Source changes inside the text are labelled in place.

Contents

1 section

The section headings the book prints inside this chapter. Each one jumps to where it begins.

Parts

The book prints this as one long chapter. It is split here so no single page grows too heavy to load; the text runs continuously across the parts and nothing is omitted.

The text

15,757 words

Machine-read from scans of Landmarks of Oswego County, New York, published 1895. Nothing has been corrected: fixing what looks like a misspelled name is how an invented one gets published. Source changes are marked where they occur.

Fire continued its destructive work in the city, burning on the 13th of August, 1858, the Empire elevator (built in 1854), with 60,000 bushels of grain, owned by F. T. Carrington and P. Rathbun ; and on August 17, the Ontario elevator was destroyed with 135,000 bushels of grain, mostly wheat, causing a loss of $120,000. The Canadian schooner Mary was burned at the same time. The elevator was the property of F. T. Carrington.

In i860 the population of Oswego was 16,816, and during the war period the growth scarcely slackened, the census of 1865 giving the number as 19,288.

An act, dated March 31, i860, authorized the sale of lot 27, block 1 18 (East side), which was designed as a site for an armory, and the application of the proceeds towards building and furnishing the regimental armory, in addition to $3,000 theretofore appropriated. Supplementary to this measure an act was passed April 28, 1 870 authorizing the construction of an armory or arsenal at Oswego, whenever the city should purchase a site, and providing for a State appropriation of $20,- OOO. Timothy Sullivan, of Oswego, and the quartermaster- general were appointed commissioners. Under this act and with subsequent appropriations, the present armory was erected on East First street, be-

1 Robert Gordon came to Oswego in 1853, and became the senior partner of the dry goods firm of Gordon & Purse; a few years later Mr. Purse retired and Mr. Gordon continued alone until 1885, when he removed to Canada. He died at Chatham, Ont., September 27, 1891.

Capt. Charles Parker, who died December 29, 1874, was a prominent vessel master and owner, and somewhat prominent in city affairs ; held the offices of police commissioner and alderman, and carried on at one period the business of marine brokerage and insurance.

tween Oneida and Mohawk. The building is 170 by IOO feet. The larger p irt of the structure is devoted to a drill room, which is 70 by 170 feet and extending to the roof. In front of this drill room are various company rooms on the lower floor, with others and the regimental and brigade headquarters on the second floor. The 48th Regiment, which had its headquarters in Oswego, disbanded in 1882. (See later history of the Oswego Guards.)

It is impracticable in these pages to follow the various charter amendments made for the better government of the city. They are accessible to all in the session laws of the several years in which they have been enacted. In April, i860, changes were made in the charter in relation to several of the departments of the government; and in 1861 further changes were made, one of which authorized an increase in the police force. Sweeping changes were made in February, 1872, requiring a two thirds vote of the aldermen in ordering local improvements of importance; fixing methods of payment for such improvements; providing for grading, macadamizing, building sewers and collecting ! payment for the same; fixing the highway fund at $15,000, which might be increased to $25,000 by a two-thirds vote of the council ; fixing the contingent fund at $20,000, which might be increased to $25,000 by a similar vote, and other changes of less importance. The act of May 20, 1876, changed the police provisions of the charter, making the number not less than twelve nor more than sixteen.

There is little to add to what has already been written in Chapter XII on the war period, 1861-65. The city was the headquarters of military affairs for the whole county, and among the leading families were many patriotic men and women who performed well their share in the great struggle for the maintenance of the Union with the same zeal and self-sacrifice which characterized the valorous deeds of the soldiers in the field. All this has been adequately described. Oswego city sent to the front 873 soldiers, many of whom rose to eminence in the various organizations, and very many more never returned to their friends, or came back maimed and crippled.

The commercial treaty between Canada and the United States, before alluded to, which had been largely instrumental in advancing the material prosperity of the city, was abrogated in 1866. To supplement this came the reduction of tolls on the Erie Canal by fifty per cent in 1872, and their final abolishment in 1882, than which no measure could have been devised that would have been more disastrous to the commerce of Oswego, diverting as it did the vast commerce from the upper lakes and the West at Buffalo to the free waterway, while such vessels as passed through the Welland Canal for Lake Ontario, were forced to pay a heavy toll.

The necessary steps were taken in 1866 to build a new bridge at Utica street Requisite legislation having been procured, the city undertook the work, and the present substantial iron structure was finished in 1868 at a cost of $100,000. An effort was made to secure State aid for the maintenance of the bridge, but it was not successful.

The population of the city in 1870 was 20,910, indicating a slower growth; but during the succeeding five years there was a considerable increase, the census of 1875 giving the number as 22,428, the highest figures ever re'ached.

A charter amendment of April 15, 1870, divided the city into eight wards, with boundaries (slightly changed in 1881) as shown on the later city maps. The number of aldermen from each ward was continued as before, making sixteen in the board. This number was reduced to eight by act of February 25, 1887. An act of April 20, 1870, authorized the Common Council to borrow not to exceed <£60,000, with which to pay the city indebtedness to March 1, 1870, bonds for the amount to be issued, and an annual tax levied to gradually retire the bonds. May 3, 1877, further similar legislative authority was conferred to borrow $.50,000, and on May 27, 1885, by another act, authority was given to borrow $60,000.

A circular published by the Board of Trade, prepared by H. C. Stillman, gives the following list of elevators in the city with their capacity in 1872 :

Northwestern, Irwin & Sloan, capacity 450,000; Marine, Mollison & Hastings onehalf and George Ames one-half, capacity 150,000; Merchants', B. Hagaman one-half, Penfield, Lyon & Co., one-half, capacity 220,000 ; Columbia, Moses Merick and Jesse Hoyt, capacity 200,000 ; Washington, Penfield, Lyon & Co., capacity 250,000; Corn Exchange, C. C. Morton one third, Delos De Wolf one-sixth, C. G. Harger & Son onehalf, capacity 220,000; Continental, W. H. Herrick one-third, Delos De Wolf onesixth, E. Root one-sixth, John R. Noyes one-sixth, capacity 225,000; Reciprocity, Che- ney Ames, capacity 130,000 ; Empire, Jenkins & Doolittle, capacity, 90,000 ; Lake Ontario, Howlett, Lathrop & Co., capacity 120,000. Total capacity, 2,055,000 bushels. Of all these elevators, only the Northwestern is now standing and in use. The Reciprocity, Empire and Lake Ontario were burned July 24, 1879 ; all the others May 20, 1892.

The topography of Oswego, with its situation on high ground on either side of the river, has contributed to give it excellent drainage; for which and other reasons, no complete system of sewerage was established until 1871, when Thomas Evershed, a capable engineer, was authorized to make a map for a sewer system. Since that year very considerable additions have been made to the sewerage of the city, and at the present time there is little to be desired in this respect. In 1876 extensive amendments were made to the city charter. In the following year by act of April 14, a Board of Public Works was created, with provision for the election of four commissioners, two from each side of the river. The subsequent labors of this board have been on modern lines and with material results.

The present substantial iron railroad bridge across the river was constructed in 1876, the first train passing over it on April 14, of that year. It was constructed under a charter of 1872 to the Oswego Railroad Bridge Company.

In 1880 the population of the city had fallen off slightly to 21,116, since which date there has been a slight increase. In 1892 the figures were 2 1 ,842.

One of the most disastrous fires that has ever visited this city occurred on May 20, 1892, sweeping away six large mills and elevators and causing a loss of about $300,000. The property destroyed comprised the Washington Mills, the Columbia Mills and elevator ; the Merchants' Elevator, owned by W. D. Smith's estate and W. D. Matthews; the Corn Exchange Elevator, owned by Gaylord, Downey & Co.; the Marine Elevator, owned by the Oswego Starch Factory ; and the Continental Elevator. The character of the buildings consumed in this fire, the immense timbers and other wood work of which they were con structed, aud their dry condition, after having stood many years, rendered the conflagration one of the most impressive and destructive ever seen in the city. None of this burned district has yet been rebuilt.

in Oswego have been alluded to. The city saw its highest prosperity during a few years at about 1870, and the lowest ebb was, perhaps, about 1885. At the present time there are evidences of a brighter future. In 1893, largely through the instrumentality of Oswego men, the tolls on the Welland Canal were reduced about one-half, and there is a fair prospect of a still further reduction or their entire extinction.

The consequences of this change were promptly apparent ; an occasional great vessel loaded with grain began to appear on Lake Ontario with Oswego harbor as her destination, and during the season of 1894, several cargoes came in from the West, among them that of the Lewiston, which arrived October 28, consisting of 75,000 bushels of barley from Duluth, the largest cargo that ever came into the port.

We refer to the fact with evident pride, because it is a striking evidence of Oswego's increased facilities for handling large traffic and her ability to compete with Buffalo.

We are able to do this because of the deepening of our harbor and the improvement in our elevator service. Two years ago a cargo of 55,000 bushels of barley came to Perot & Sons. The then depth of water would not permit the steamer to go to the elevator and nearly half the cargo had to be unloaded in lighters. Yesterday the Lewiston carrying 75,000 bushels, found plenty of water and went up to the elevator without the slightest difficulty, where she is to-day being unloaded.

We trust that the coming of the Lewiston is but the beginning of a larger trade in this line and which we feel certain would come to us instead of stopping at Buffalo, were it not for the burdensome tolls on the Welland ^Canal. The people of Oswego have earnestly urged in the past that the Welland should be as free to our vessels as the Soo Canal is to Canadian vessels. Their efforts should be continued to this end.

There has been some improvement in the matter of discrimination, but there is altogether too much of it yet. The freedom of the Welland Canal will fill our harbor with boats like the Lewiston.

The large and increasing malting interest of the city demands immense quantities of barley, and at the same time there is encouragement to believe that with the hoped-for early reductions in Welland Canal tolls, wheat will again come to Oswego with something like the oldtime abundance, and here be ground in mills yet to be built.

In other respects also, the future of Oswego looks brighter than it has before in twenty years past. Through efforts of her leading citizens, who realize that if the city can be made the seat of large manu- facturing industries, renewed growth and prosperity are sure to follow, several large manufacturing establishments have been located here and others which are seeking sites with good shipping facilities, water power, etc., are looking in the same direction. The city certainly possesses all the requisites necessary in a large manufacturing and trade center - healthful surroundings, unlimited water power, extensive railroad, lake and canal connections, a school system unexcelled in the State, a high level of morality, and social life, with a class of citizens in every way equal to the task of establishing and maintaining a prosperous business community.

City Hall. - The first public hall in the village of Oswego was built by the village in 1S35-6, at a cost $13,247.13. While the village continued it was known as Market Hall. On the incorporation of the city it became known as, and was used as, the City Hall and so continued until the present City Hall was erected. The present City Hall was erected in 1869-70, at a cost of about $100,000. It is built of Onondaga limestone, three stories in height, with mansard roof, and is architecturally a handsome structure. In the lower story is the city police cells and offices ; on the second floor the offices of the various departments of the city government, while the upper floor is devoted to the offices of the Board of Education and the Council Chamber.

City Hall Corner-Stone Laid June 21, 1870

An act of the Legislature passed May 6, 1872, authorized the Common Council of the city to borrow $40,000 on city bonds, with which to pay off the indebtedness on the City Hall.

under the immediate care of an overseer of the poor, a plan which eventually caused a good deal of dissatisfaction, particularly on account of the heavy expense attending it. The subject was discussed in the public press and by leading citizens, and the agitation resulted in the establishment in the spring of 1866, of the Commission of Charities, consisting of four members. In 1868 the city purchased 136 acres of land, with some old farm buildings thereon, about three miles west of the city, and in the following year erected a brick structure of sufficient capacity for its purpose at that time, costing about $14,000. The original cost of the land was $65 an acre. In 1874-5 the buildings were considerably extended to meet increasing demands for inmates, at a cost of $13,000. The farm and buildings are now in excellent condition and every facility is provided for the humane care of the unfortunate at a minimum cost. In 1886-7 steam heating, with ample water supply, was provided at a cost of about $1,300. The present value of the real estate is reported at $17,000. Total inventory 1894, $22,250.64. In 1895 there are forty-four inmates, equally divided in sex. Cost of maintenance varies from $1.45 to $1.70 per week for each person. Products of the farm, chiefly hay and butter, are sold each year to the amount of about $2,000. The Commissioners of Public Charity for 1894-5 are Chester Penfield and James Dunn, west side ; Joseph Longheway, and E. D. Stacy, east side. Edmund Kelly, clerk ; George M. Dunn, bookkeeper.

Hotels. - Mention has already been made of some of the very early public houses of Oswego and their proprietors. It will not be out of place here to record brief notes of some of those hotels of later date which became widely known and popular with the public. Most of these were built or established between 1840 and i860, while others had a still earlier existence.

The Fitzhugh House, known for many years by this name, was known at first as the Oswego Hotel, and in later years as the Munger House. It was built in 1828 by Gerrit Smith and kept for a time by E. A. Huntley. The hotel portion was originally on the second and upper floors, with stores below which were occupied by Truman Wyman and Milton Harmon. In 1835 Moses P. Hatch purchased the hotel for $25,000, built the verandas and added a cupola, with other improve- ments. He sold it in the following year to a Mr. Baldwin for about $120,000, but the sale was not perfected, and the property again passed to Mr. Smith, who about 1855 sold it to O. G. Munger, an experienced landlord who had previously kept the Niagara House. Mr. Munger died November 12, 1877. The Fitzhugh House was demolished August 22, 1887, to make room for the new block of the Second National Bank.

The Niagara House just mentioned was the direct successor of the Rideau House, and stood on the site of the present Grant block. It was called the Franklin House during a period prior to its being named the Niagara, and had various proprietors. It was burned August 30, 1859, while in possession of Mr. Grant, and he built on the site the block yet known by his name.

The old Welland House was a very popular hotel and was the scene of many public gatherings. It was built by Joel Turrill on the corner now occupied by the Worts bakery and took its name from the then recently projected Welland Canal, from which Oswego hoped so much. It was occupied by various landlords from the time of its erection down to 1857 when, on May 11, it was burned. Among its proprietors were William D. Stewart and Albert Bronson, the latter leasing it in June, 1855. Soon after 1857 the new Welland was erected, at the corner of West Second and Cayuga streets, and not serving its purpose as a hotel, it became the Normal School Boarding House.

The United States Hotel was built quite early on Seneca street, between Sixth and Seventh streets. It was a commodious and convenient structure, but on account of its distance from the active business center, or for other reasons, attained only a limited degree of patronage. It was burned December 22, 1841, but rebuilt soon after, and the site is now covered by the Normal School buildings.

A hotel on the east side that was well known in early years was the old Eagle Tavern, which stood on the site of the present Hamilton House. It was burned in 1853 and the present house was erected in 1855.

The Frontier House stood on Seneca street, between Water and First streets, west side, and was erected by a stock company and finished in 1854. It was then claimed (by the company at least) to be the leading hotel of the city.

The well known Lake Shore Hotel was built by Myron W. Pardee in 1858, and was opened in the following year by S. W. Luce, who conducted it about one year. About the year 1874 the three-story part of the building was extended westward by the R. W. & O. Railroad Company. The house has had many proprietors, the most prominent and successful being J. G. Bennett, now of the Doolittle House, who kept it about fifteen years, but not continuously, and left it the last time in 1 886. The present proprietor of the house is C. E. Keyes, who took it on March 12, 1894, under a five-year lease. Mr. Keyes is a landlord of wide experience and has already made the Lake Shore a favorite stopping place for the traveling public.

The Doolittle House was erected by Sylvester Doolittle and opened in 1874, with a public demonstration, by John E. Bowden. Mr. Doolittle had already developed the Deep Rock Spring, which is directly under the hotel structure, and hoped to make a great popular resort. The building is of brick, four stories in height, and one of the largest and most expensive hotel structures in Central New York. Mr. Doolittle expended nearly $250,000 in the project ; but its success has never warranted the great outlay. J. G. Bennett succeeded Mr. Bowden as proprietor for about a year, after which it had various landlords until July, 1892, when Mr. Bennett returned to the proprietorship and so continues. The house is well kept and receives a large share of public patronage.

City Officials and Supervisors from the City. - 1848 - Mayor, James Platt; recorder, Orville J. Harmon ; clerk, John M. Casey ; city attorney, Levi Beardsley ; treasurer, Isaac L. Merriam ; aldermen, first ward, Gilbert Mollison, Hunter Crane ; second ward, George S. Alvord, John Boigeol; third ward, Stephen H. Lathrop, Robert Oliver; fourth ward, Samuel R. Taylor, William S. Malcolm ; supervisors, first ward, John McNair; second ward, James Lyon ; third ward, Cyrus Carrier; fourth ward, Simeon Bates.

1849 - Mayor, De Witt C. Littlejohn; recorder, Orville J. Harmon; clerk, John M. Casey; attorney, Levi Beardsley; treasurer, Wm. B. Buckhout ; aldermen, first ward, Gilbert Mollison, James M. Hart; second ward, George S. Alvord, Florello Meeker; third ward, S. H. Lathrop, Cyrus Carrier; fourth ward, Samuel R. Taylor, Isaac L. Merriam; supervisors, first ward, John McNair; second ward, Alvin Osborne ; third ward, Hamilton Murray ; fourth ward, Robert Simpson.

1850 - Mayor, Leander Babcock; recorder, Orville J. Harmon; clerk, John M. Casey; attorney, John C. Churchill; treasurer, Erastus P. Burt; aldermen, first ward, James M. Hart, Cortland C. Cooper ; second ward, Florello Meeker, Willis Sumner ; third ward, Cyrus Carrier, Robert F. Child; fourth ward, Isaac L. Merriam, Ezra M. Mead; supervisors, first ward, Joel B. Penfield ; second ward, Portius F. Parsons ; third ward, John Thurman ; fourth ward, James H. Lyon.

first ward, Cortland C. Cooper, Geo. S. Weeks ; second ward, Willis Sumner, Heman Wilcox; third ward, Robert F. Child, Ira S. Dutcher; fourth ward, Ezra M. Mead, Albert F. Smith ; supervisors, first ward, Sebastian Y. Crolius; second ward, Portius F. Parsons; third ward, Andrew Van Dyck; fourth ward, Zina D. Stevens.

1852 - Mayor, John Thurman; recorder, Orville Robinson; clerk, John M. Casey ; treasurer, Erastus P. Burt ; attorney, Daniel H. Marsh ; aldermen, first ward, Geo. S. Weeks, Elisha H. Mack ; second ward, Heman'jWilcox, John L. Pool ; third ward, Ira S. Dutcher, James M. Brown ; fourth ward, Albert F. Smith, Wm. 0. Hubbard; supervisors, first ward, J. B. Penfield ; second ward, Henry H. Cozzens; third ward, Abner C. Mattoon ; fourth ward, Alvin Osborn.

1853 - Mayor, James D. Colver; recorder, Orville Robinson, resigned in August, and John Thurman elected; clerk, John M. Casey; attorney, John C. Churchill; treasurer, Wm. H. Wheeler; aldermen, first ward, Elisha H. Mack, Thomas Dobbie ; second ward, John L. Pool, George S. Alvord ; third ward, Jas. M. Brown, Morgan L. Reynolds ; fourth ward, William 0. Hubbard, Ira Garrison, jr.; supervisors, first ward, J. B. Penfield ; second ward, Henry H. Cozzens ; third ward, Abner C. Mattoon ; fourth ward, Alvin Osborn.

1854 - Mayor, James D. Colver; recorder, John Thurman; clerk, John M. Casey; treasurer, Herbert M. Harmon, resigned in May, and Milton Harmon appointed ; attorney, Albertus Perry ; aldermen, first ward. Thomas Debbie, Benj. Isaacs; second ward, Geo. S. Alvord, John L. Lake; third ward, Morgan L. Reynolds, Jame"s N. Brown; fourth ward, Justin B. Colwell, Ira Garrison, jr. The latter resigned in May, and Wm. Curtis was elected. Supervisors, first ward, Gilbert Mollison, resigned and John C. Churchill appointed ; second ward, David B. Blair ; third ward, A. C. Mattoon ; fourth ward, Alvin Osborn.

attorney, Daniel H. Marsh; treasurer, Milton Harmon ; aldermen, first ward, Benjamin Isaacs, George R. Rodgers,' second ward, John L. Lake, Benjamin J. Denton; third ward, James N. Brown, James Bickford; fourth ward, Justin B. Colwell, Hanford Colburn ; supervisors, first ward, John C. Churchill ; second ward, Portius F. Parsons; third ward, David Harmon ; fourth ward, Roland P. Crossman.

1856 - Mayor, Lucius B. Crocker; recorder, John Thurman; clerk, John M. Casey; treasurer, Charles N. Baker ; attorney, Albertus Perry ; aldermen, first ward, Geo. R. Rodgers, Leander Babcock; second ward, Benj. J. Denton, Geo. Ames; third ward, James Bickford, William I. Tozer; fourth ward, Hanford Colborn, Hiram Allen ; supervisors, first ward, John Crolius; second ward, Portius F. Parsons; third ward, Dwi

1857 - Mayor, Lucius B. Crocker ; recorder, John Thurman ; clerk, William F. Mas^u, attorney, W. T. Curtis ; treasurer, Hiram Perry, jr.; aldermen, first ward, Leander Babcock, Jesse M. O'Leary; second ward, George Ames, John M. Barrow; third ward, William I. Tozer, James M. Crolius; fourth ward, Hiram Allen, John L. McWhorter; supervisors, first ward, John B. Leverich; second ward, William Tiffany; third ward, Dwight Herrick ; fourth ward, Edwin M. Hill.

1858 - Mayor, Lucius B. Crocker; recorder, Orville J. Harmon; clerk, William F. Mason; attorney, W. T. Curtis; treasurer, George Seeley; alderman, first ward, Jesse

M. O'Leary, John E. Lee ; second ward, John M. Barrow, George S. Alvord ; third ward, James M. Crolius, Alfred B. Getty; fourth ward, John L. McWhorter, William H. Goit ; supervisors, first ward, Edwin Allen; second ward, Yolney K. Burr; third ward, Dwight Herrick ; fourth ward, Daniel L. Couch.

1859 - Mayor, Henry Fitzhugh; recorder, Orville J. Harmon ; clerk, Henry L. Davis ; attorney, J. A. Hathaway ; treasurer, Erastus G. Burt; aldermen, first ward, John E. Lee, Wm. H. Herrick; second ward, George S. Alvord, Thomas Moore; third ward, Alfred B. Getty, Harmon S. Wilber; fourth ward, William H. Goit, John McAmbley ; supervisors, first ward, Mannister Worts; second ward, Yolney K. Burr; third ward, Sobieski Burt ; fourth ward, Daniel L. Couch.

1860 - Mayor, Henry Fitzhugh ; recorder, Orville J. Harmon ; clerk, Henry L. Davis ; attorney, J. A. Hathaway; treasurer, Erastus P. Burt; aldermen, first ward, Wm. H. Herrick, Norman M. Andrews; second ward, Thomas Moore, George S. Alvord; third ward, Harmon L. Wilbur, Geo. B. Sloan; fourth ward, John McAmbley, William H. Goit; supervisors, first ward, Mannister Worts ; second ward, Yolney K. Burr; third ward, Sobieski Burt ; fourth ward, Daniel L. Couch.

1861 - Mayor, Henry Fitzhugh ; recorder, Orville J. Harmon ; clerk, Henry L. Davis ; attorney, Daniel H. Marsh; treasurer, Erastus P. Burt; aldermen, first ward, Norman M. Andrews, Wm. H. Herrick; second ward, George S. Alvord, Charles P. Kellogg; third ward, Geo. B. Sloan, Geo. Kirk ; fourth ward, William H. Goit, John McAmbley ; supervisors, first ward, Mannister Worts; second ward, Yolney K. Burr; third ward, Sobieski Burt; fourth ward, Daniel S. Couch.

1862 - Mayor, Daniel G. Fort; recorder, Orville J. Harmon; clerk, Henry L. Davis; attorney, Daniel H. Marsh ; treasurer, William H. Wheeler ; aldermen, first ward, William H. Herrick, Frederick B. Lathrop ; second ward, Charles P. Kellogg, George S. Alvord; third ward, George Kirk, Robert Lippincott; fourth ward, John McAmbley, Charles North; supervisors, first ward, Mannister Worts; second ward, Andrew Baltes, jr.; third ward, Sobieski Burt ; fourth ward, Daniel L. Couch.

L. Davis; attorney, Daniel H. Marsh; treasurer, Erastus P. Burt; aldermen, first ward, Frederick B. Lathrop, Luke Ratigan ; second ward, Samuel Miller Orlando P. Sabin ; third ward, Robert Lippincott, George Kirk ; fourth ward, Charles North, Alonzo H. Failing; supervisors, first ward, Bradley B. Burt; second ward, George W. Harman ; third ward, Sobieski Burt ; fourth ward, Daniel L. Couch.

1864 - Mayor, Lathrop A. G. B. Grant ; recorder, Orville J. Harmon ; clerk, George W.. Harman ; attorney, Charles T. Richardson ; treasurer, Alford S. Crolius ; aldermen, first ward, Chas. Parker,. Luke- Ratigan ; second ward, Orlando P. Sabin, S. F. Y. Whited; third ward, James M. Crolius, Geo. Kirk; fourth ward, Alonzo H. Failing, Charles North; supervisors, first ward, Mannister Worts; second ward, George W. Harman ; third ward, Morgan L. Marshall ; fourth ward, Daniel L. Couch.

North, Alonzo H. Failing; supervisors, first ward, Mannister Worts; second ward, James A. Beckwith; third ward, Morgan L. Marshall; fourth ward, Daniel L. Couch.

1866 - Mayor, Maxwell B. Richardson; recorder, Wm. G. Adkins; clerk, James Doyle ; attorney, Alfred B. Getty ; treasurer, Alford S. Crolius ; aldermen, first ward, Robert F. Sage, Charles Parker; second waid, John M. Barrow, S. F. V. Whited; third ward, Oscar E. Shepard, Samuel Lippincott; fourth ward, Alonzo H. Failing, John B. Edwards; supervisors, first ward, Mannister Worts; second ward. Gilbert D. Wallace; third ward, Morgan L. Marshall ; fourth waVd, Daniel L. Couch.

1867 - Mayor, Simeon Bates; recorder, William G. Adkins; clerk, Henry L. Davis; attorney, Daniel H. Marsh; treasurer, Charles North; aldermen, first ward, Charles Parker, John Joyce; second ward, S. F. V. Whited, Frederick E. Babbott; third ward, Samuel Lippincott, Wm. A. Rathbun ; fourth ward, John B. Edwards, Ira L. Jenkins; supervisors, first ward, Bronson Babcock; second ward, Ezra Williams; third ward, M. L. Marshall ; fourth ward, Alvin Osborne.

1868 - Mayor, Charles North ; recorder, Delos Gary ; clerk, Robert S. Kelsey ; attorney, Daniel H. Marsh ; treasurer, Joseph B. Hubbard ; aldermen, first ward, 0. A. Casler, John Joyce; second ward, Benjamin Doolittle, F. E. Babbott; third ward, Robert Lippincott, Wm, A. Rathbun ; fourth ward, James H. Murdoch, Ira L. Jenkins; supervisors, first ward, Bronson Babcock ; second ward, Geo. W. Harman ; third ward, James Bickford, jr.; fourth ward, Alvin Osborne.

Charles Doolittle ; supervisors, first ward, Joseph C. Pease ; second ward, George W. Harman ; third ward, James Bickford, jr.; fourth ward, Alvin Osborne.

1870 - Mayor, Alanson S. Page; recorder, Delos Gary, died in July, and William I Lewis elected ; clerk, Thomas H. Wentworth; attorney, Daniel H. Marsh; treasurer, Sardis M. Allen ; aldermen, first ward, George Goble, Wm. Blackwood ; second ward, John Ratigan, John Edland ; third ward, M. M. Wheeler, Aaron Colnon ; fourth ward, Charles Doolittle, James H. Murdoch; supervisors, first ward, Edward M. Paine; second ward, Geo. W. Harman ; third ward, Norman Best ; fourth ward, Alvin Osborne.

1871 - Mayor, Alanson S. Page; recorder, William Lewis ; clerk, Thomas H. Wentworth; attorney, Gilbert E. Parsons; treasurer, Sardis M. Allen ; aldermen, first ward, William Blackwood, George Goble; second ward, John Edland, Miles Kehoe; third ward, M. M. Wheeler, James Gibbs; fourth ward, J. C. Wellington, Walter Stebbins; fifth ward, Aaron Colnon, Thomas Murphy ; sixth ward, James H. Murdoch," Charles Doolittle; seventh ward, Wm. W. Scribner, Daniel P. Richards; eighth ward, Oliver Mitchell, Michael Keeler ; supervisors at large, Frederick P. Eagle, Peter Lappin ; first and third wards, Edward M. Paine ; second and fourth wards, Frank J. Baltes ; !

treasurer, Timothy Sullivan ; attorney, William A. Poucher ; aldermen, first ward, George Goble, Charles Rhodes; second ward, Miles Kehoe, John Edland ; third ward, Morgan M. Wheeler, William B. Phelps ; fourth ward, J. C. Wellington, James Dowdle ; fifth ward, Thomas Murphy, Aaron Colnon ; sixth ward, Charles Doolittle, Henry Quonce ; seventh ward, Wm. W. Scribner, Daniel P. Richards; eighth ward, Oliver Mitchell, Thomas Murray ; supervisors at large, Wm. A. Rathbun, Levi Beardsley ; first and third wards, Edward M. Paine; second and fourth wards, Frank J. Baltes; fifth and seventh wards, Thomas J. Dunn; sixth and eighth wards, Washington T. Henderson.

1873 - Mayor, Albertus Perry; recorder, Wm. Lewis; clerk, John A. Barry; treasurer, John Dowdle; attorney, William A. Poucher; aldermen, first ward, Charles Rhodes, George Goble ; second ward, John Edland, Miles Kehoe; third ward, Wm. B. Phelps, M. M. Wheeler ; fourth ward, James Dowdle, J. C. Wellington; fifth ward, Aaron Colnon, Thomas Murphy; sixth ward, Henry Quonce, Elisha M. Fort; seventh ward, Daniel P. Richards, J. Adam Benzing ; eighth ward, Thomas Murray, Francis Gokey ; supervisors at large, Wm. A. Rathbun, William H. Griggs ; first and third wards, Edward M. Paine; second and fourth wards, Joseph Lee; fifth and seventh wards, Thomas J. Dunn ; sixth and eighth wards, Frederick S. Smith.

1874 - Mayor, Benj. Doolittle; recorder, Wm. Lewis; clerk, Herbert M. Harman; treasurer, John H. Oliphant; attorney, John C. Churchill; aldermen, first ward, Geo. Goble, John Parsons; second ward, Miles Kehoe, Michael C. Kane; third ward, M. M. Wheeler, Wm. B. Phelps; fourth ward, J. C. Wellington, James P. Tuttle; fifth ward, Thomas Murphy, Nicholas Sands ; sixth ward, Elisha M. Fort, Henry Quonce; seventh ward, J. Adam Benzing, Abram Buckhout; eighth ward, Francis Gokey, P. J. Cullinan ; supervisors at large, Owen Sheridan, Wm. McChesney; first and third wards, Robert Lippincott; second and fourth wards, Joseph Lee; fifth and seventh wards, John Clary ; sixth and eighth wards, Nathan M. Rowe.

1875 - Mayor, Wm. A. Poucher; recorder, John B. Higgins; clerk, Herbert M. Harman; treasurer, P. Phelps; attorney, B. F. Chase ; aldermen, first ward, John Parsons, John Navagh; second ward, Michael C. Kane, John Edland; third ward, Wm. B. Phelps, David C. Hall; fourth ward, Charles S. Newell, James P. Tuttle; fifth ward, Nicholas Sands, Thomas Murphy ; sixth ward, Elisha M. Fort, Henry Quonce ; seventh ward, Abram Buckhout, Frank Haven ; eighth ward, Patrick J. Cullinan, John K. Smith ; supervisors at large, John Gardenier, William McChesney; first and third wards, Bronson Babcock; second and fourth wards, John Smith, sr.; fifth and seventh wards, John Clary ; sixth and eighth wards, Nathan M. Rowe.

1876 - Mayor, Wm. A. Poucher; recorder, John B. Higgins; clerk, Herbert M. Harman; treasurer, Chester W. McElroy ; attorney, Albertus Perry; chief of police, Joel A. Baker ; aldermen, first ward, John Navagh, Geo. W. Goble ; second ward, John Edland Patrick Hartney ; third ward, David C. Hall, Wm. B. Phelps; fourth ward, Charles S. Newell, Nelson S. Stone; fifth ward, Thomas Murphy, James Hennessy ; sixth ward, Elisha M. Fort, Joseph B. Hubbard ; seventh ward, Frank Haven, Christopher Cusick; eighth ward, John K. Smith, P. J. Cullinan; supervisors at large, Washington T. Henderson, John Gardenier; first and third wards, Bronson Babcock; second

1877 - Mayor, Edwin Allen; recorder, John B. Higgins ; clerk, Herbert M. Harman; treasurer, J. B. Phelps; attorney, P. W. Cullinan ; aldermen, first ward, George W. Goble, Edward Hendrick ; second ward, Patrick Hartney, Joseph Kinney ; third ward, William B. Phelps, Daniel Lyons; fourth ward, Nelson S. Stone, Orrin Meeker; fifth ward, James Hennessy, Thomas Murphy; sixth ward, Joseph B. Hubbard, William S. Turner; seventh ward, Christopher Cusick, Abram Buckhout,; eighth ward, P. J. Cullinan, George H. Stone; supervisors, first ward, John H. Staats ; second ward, James Rogan ; third ward, Bronson Babcock; fourth ward, Lorenzo W. Tanner ; fifth ward, Jeremiah O'Brien; sixth ward, William McChesney ; seventh ward, Justin H. Mongin ; eighth ward, Michael Kelly.

1878 - Mayor, Thomas Pearson; recorder, John B. Higgins; clerk, Herbert M. Harmon; attorney, William A. Poucher; treasurer, Leverett A. Card; aldermen, first ward, Edward Hendrick, John O'Brien; second ward, Joseph Kinney, John O'Brien ; third ward, Daniel Lyons, Emerson J. Hamilton; fourth ward, Orrin Meeker, Hardin K. Davis; fifth ward, Thomas Murphy, James Hennessey ; sixth ward, William S. Turner, Byron D. Houghton ; seventh ward, Abram Buckhout, Curtiss D. Cooper ; eighth ward, George H. Stone, Anthony Culkin ; supervisors, first ward, Morris Daly ; second ward, John O'Brien; third ward, Leverett C. Adkins; fourth ward, Lorenzo W. Tanner; fifth ward, Jeremiah O'Brien; sixth ward, William McChesney; seventh ward, Justin B. IP Mongin ; eighth ward, John B. Fayette.

1879 - Mayor, Moses P. Neal ; recorder, Alfred B. Getty ; clerk, Herbert M. Harmon ; attorney, S. M. Coon ; treasurer, Frederick B. Lathrop ; aldermen, first ward, John O'Brien, George L. Munroe; second ward, John O'Brien, Joseph Kinney; third ward, Emerson J. Hamilton, Warren D. Gardner; fourth ward, Hardin K. Davis, Adelbert Cropsey ; fifth ward, James Hennessey, John Scanlon; sixth ward, Byron D. Houghton, William S. Turner; seventh ward, Curtiss D. Cooper, Abram Buckhout; eighth ward, Anthony Culkin, Patrick J. Cullinan ; supervisors, first ward, Amasa Stowell; second ward, John Young; third ward, Leverett C. Adkins; fourth ward, John Smith, 2d ; fifth ward, Stephen King, jr.; sixth ward, Henry Quonce ; seventh ward, Hampton Himes ; eighth ward, David H. Judson.

1880 - Mayor, Emerson J. Hamilton ; recorder, Alfred B. Getty ; clerk, Herbert R. Harmon ; attorney, S. M. Coon ; treasurer, Frederick B. Lathrop ; aldermen, first ward, George L. Munroe, John O'Brien ; second ward, Joseph Kinney, John O'Brien; third ward, Warren Gardner, R. J. Oliphant; fourth ward, Athelbert Cropsey, John Phillips; fifth ward, John Scanlon, Thomas Murphy; sixth ward, William S. Turner, George S. Benz; seventh ward, Abram Buckhout, Justin B. H. Mongin; eighth ward, P. J. Cullinan, Anthony Culkin; supervisors, first ward, Maurice Daly; second ward, Obadiah Wiley; third ward, L. C, Adkins; fourth ward, John Smith, jr.; fifth ward, Florence McCarthy; sixth ward, Henry Quonce ; seventh ward, Hampton Himes : eighth ward, David H. Judson.

1881 - Mayor, Alonzo H. Failing; recorder, Alfred B. Getty; clerk, Herbert M. Harmon ; attorney, S. M. Coon ; treasurer, George Goodier ; aldermen, first ward,

John O'Brien, George L. Munroe; second ward, John O'Brien, John Terrott; third ward, Richard J. Oliphant, Warren D. Gardner; fourth ward, John Phillips, Athelbert Cropsey ; fifth ward, Thomas Murphy, Christopher J. Sculley ; sixth ward, George S. Benz, William S. Turner; seventh ward, J. B. H. Mongin, Fred E. Sayer; eighth ward, Anthony Culkin, Patrick J. Cullinan ; supervisors, first ward, Maurice Daly ; second ward, Obediah Wiley ; third 'ward, Leverett C. Adkins; fourth ward, John Smith, 2d; fifth ward, Florence McCarthy ; sixth ward, Henry Quonce ; * seventh ward, John Cusick ; eighth ward, David H. Judson.

1882 - Mayor, Clark Morrison; recorder, Alfred B. Getty; clerk, Bronson Babcock; attorney, S. M. Coon ; treasurer, Thomas Crawford ; aldermen, first ward, John O'Brien, George L. Munroe ; second ward, John O'Brien, John Terrott; third ward, Charles Rogers, Warren D. Gardner; fourth ward, Amasa A. Brown, Athelbert Cropsey; fifth ward, William Galvin, Christopher J. Sculley ; sixth ward, George S. Benz, William S. Turner; seventh ward, Alfred Lovelace, Fred E. Sayer; eighth ward, Michael Crimmins, Patrick J. Cullinan ; supervisors, first ward, Daniel Hourigan ; second ward, Obediah Wiley ; third ward, D' Albert Earl ; fourth ward, John Smith, 2d ; fifth ward, Florence McCarthy; sixth ward, Henry Quonce; seventh ward, John Cusick ; eighth ward, Hugh McGraugh.

1883 - Mayor, Max B. Richardson ; recorder, Charles N. Bulger ; clerk, Bronson Babcock; attorney, James R. O'Gorman ; aldermen, first ward, John O'Brien, James Dunn; second ward, John O'Brien, Michael McGowan; third ward, Charles Rogers, Edward Coy ; fourth ward, Amasa A. Brown, Edward Doyle; fifth ward, William Galvin, Michael B. Crawford ; sixth ward, George S. Benz, William S. Norton ; seventh ward, William Robinson, Alfred Lovelace; eighth ward, Michael Crimmins, Thaddeus Wilbur; supervisors, first ward, Daniel Hourigan; second ward, Obediah Wiley; third ward, D' Albert Earl ; fourth ward, John Smith, 2d; fifth ward, Thomas Murray ; sixth ward, Henry Quonce ; seventh ward, 0. E. Shepherd ; eighth ward, Charles Murphy.

1884 - Mayor, James Dowdle; recorder, Charles N. Bulger; clerk, Bronson Babcock; attorney, James R. O'Gorman ; treasurer, Thomas Crawford; aldermen, first ward, James Dunn, Henry D. McCaffrey ; second ward, Michael McGowan, John Carroll; third ward, Edward Coy, Thomas Findlay; fourth ward, Edward Doyle, Amasa A. Brown; fifth ward, Michael B. Crawford, James G. Sharp; sixth ward, William S. Norton, Frederick L. Griggs; seventh ward, William Robinson, Dennis Donovan; eighth ward, Thaddeus Wilber, John Nacey; supervisors, first ward, Daniel Hourigan; second ward, John Woods; third ward, William Hyde; fourth ward. Robert Long; fifth ward, Timothy Shea ; sixth ward, Henry Quonce ; seventh ward, John G. Comerford; eighth ward, Charles Murphy.

ward, John Nacey; Michael O'Gorman ; supervisors, first ward, William Bonner; second ward, John Woods; third ward, Anthony Salladin, jr.; fourth ward, Robert Long ; fifth ward, Michael Murray; sixth ward, Henry Quonce ; seventh ward, John G. Comerford ; eighth ward, Charles Murphy.

1886. - Mayor, Charles North; recorder, Charles N. Bulger; clerk, John H. Mackin; attorney, William J. Boggs; treasurer, Thomas Pearson; aldermen, first ward, William Muldoon, Peter Griffin; second ward, Hugh McGinn, John Ryan ; third ward, Charles Rogers, Fred D. Wheeler; fourth ward, William Marsh, Martin Higgins; fifth ward, James G. Sharpe, John Quinlan ; sixth ward, William S. Norton, Ariel J. Murdoch; seventh ward, J. Adam Benzing, Hampton Himes; eighth ward, Michael O'Gorman, Robert Wright; supervisors, first ward, William Bonner; second ward, James Morrissey; third ward, Anthony Salladin, jr.; fourth ward, Patrick Dowd; fifth Ward, Michael Murray; sixth ward, Obediah Wiley; seventh ward, Fred Sayer ; eighth ward, Charles Murphy.

1887. - Mayor, Charles North; recorder, Charles N. Bulger; clerk, John H. Mackin ; attorney, Elisha B. Powell ; city chamberlain, George De Forest ; aldermen; first ward, Peter Griffin; second ward, John Ryan; third ward, Fred D. Wheeler, fourth ward, Martin Higgins; fifth ward, James G. Sharpe; sixth ward, Ariel J. Murdoch; seventh ward, Curtiss D, Cooper; eighth ward, Robert Wright; supervisors, first ward, Stephen Murphy; second ward, James Conners ; third ward, Anthony Salladin, jr ; fourth ward, Alfred A. Wellington ; fifth ward, Benjamin Baker ; sixth ward, Obediah Wiley; seventh ward, Fred E. Sayer; eighth ward, John Horan.

1888. - Mayor, H. D. McCaffrey; recorder, Charles N. Bulger; clerk, T. B. White; attorney, John D. Higgins ; city chamberlain, George De Forest; aldermen, first ward, John Parsons; second ward, John Ryan; third ward, George H. Hunt; fourth ward, Martin Higgins; fifth ward, Thomas R. Rowan; sixth ward, Ariel J. Murdoch ; seventh ward, William Drumm ; eighth ward, Robert Wright; supervisors, first ward, John A. Howey ; second ward, Patrick M. Reynolds; third ward, William D. Allen; fourth ward, Alfred A. Wellington ; fifth ward, Dennis J. Sweeney; sixth ward, Edgar E. Frost; seventh ward, Chester 0. Case; eighth ward, John Horan.

1889. - Mayor, James K. Stock well; recorder, Charles N. Bulger; clerk, Thomas B. White; attorney, Thomas H. King; city chamberlain, John Dowdle ; aldermen, first ward, John Kehoe ; second ward, Michael McGowan ; third ward, Frederick A. Glynn ; fourth ward, Florence F. Wilcox ; fifth ward, Thomas F. Rowan ; sixth ward, Oren F. Gaylord; seventh ward, Thomas Drumm; eighth ward, John Coleman ; super-? visors, first ward, John Donovan ; second ward, Martin Connors; third ward, William D. Allen ; fourth ward, Alfred A. Wellington ; fifth ward, Dennis J. Sweeney ; sixth ward, Edgar E. Frost; seventh ward, Curtiss D. Cooper; eighth ward, Michael Griffin.

1890. - Mayor, Edward Mitchell; recorder, Charles N. Bulger; clerk, Thomas B. White; attorney, Thomas H. King; city chamberlain, John Dowdle; aldermen, first ward, John Kehoe ; second ward, Michael McGowan ; third ward, Frederick A. Glynn ; fourth ward, Florence F. Wilcox ; fifth ward, Daniel Donovan ; sixth ward, Oren F. Gaylord; seventh ward, Samuel Scott: eighth ward, Anthony Mullany; supervisors, first ward, John Donovan; second ward, Martin Connors; third ward, W. D. Allen; fourth ward, Alfred A. Wellington ; fifth ward, Dennis J. Sweeney; sixth ward, Edgar E. Frost; seventh ward, Cnrtiss D. Cooper; eighth ward, Michael Griffin.

1891. - Mayor, John D. Kehoe ; recorder, Charles N. Bulger; clerk, John H. Kelley; attorney, Thomas H. King; city chamberlain, John Dowdle; aldermen, first ward, John Clancy; second ward, John Woods; third ward, George Hay; fourth ward, William Burns; fifth ward, Patrick Sheehy ; sixth ward, Oren F. Gaylord ; seventh ward, George Rowland ; eighth ward, Timothy Sweeney ; supervisors, first ward, John Donovan; second ward, Martin Connors; third ward, William D. Allen; fourth ward, Alfred A. Wellington; fifth ward, Fred J. Delisle; sixth ward, Edgar E. Frost; seventh ward, Curtiss D. Cooper; eighth ward, John Carey.

1892. - Mayor, William D. Allen; recorder, Charles N. Bulger; clerk, John H. Kelly; attorney, Bernard Gallagher; city chamberlain, John Dowdle; aldermen, first ward, John Clancy ; second ward, Patrick H. Moran ; third ward, George Hay ; fourth ward, Alfred E. Rice; fifth ward, Patrick Sheehy; sixth ward, Arthur E. Miner; seventh ward, Michael Galvin ; eighth ward, Timothy Sweeney ; supervisors, first ward, James Redmond; second ward, Charles H. Donoghue; third ward, David S. Stone; fourth ward, Alfred A. Wellington; fifth ward, John Woods; sixth ward, Edgar E. Frost; seventh ward, John Werner; eighth ward, John F. Kelly.

1893. - Mayor, William J. Bulger; recorder, Chas. N. Bulger ; clerk, John H. Kelly; attorney, Bernard Gallagher; city chamberlain, Bart L}mch ; aldermen, first ward, John Clancy; second ward, Patrick H. Moran; third ward, Robert H. Jones; fourth ward, Alfred E. Rice; fifth ward, James Dalton; sixth ward, Arthur E. Miner; seventh ward, Edward Sculley ; eighth ward, Timothy Sweeney ; supervisors, first ward, James Redmond ; second ward, Chas. H Donoghue ; third ward, David S. Stone ; fourth ward, Alfred A. Wellington ; fifth ward, Timothy Mahoney ; sixth ward, Edgar E. Frost; seventh ward, John Werner; eighth ward, John F. Kelly.

1894. - Mayor John D. Higgins; recorder, Charles N. Bulger; clerk, Fred D. Wheeler; attorney, Frank E. Hamilton ; city chamberlain, Bart Lynch; aldermen, first ward, Alfred Moran, jr.; second ward, Patrick H. Moran ; third ward, John Thompson ; fourth ward, Benjamin Denton ; fifth ward, Robert Long ; sixth ward, Thomas A. Smith; seventh ward, Henry Fleischman ; eighth ward, Charles Bechstedt; supervisors, first ward, Peter Dougherty ; second ward, John Young; third ward, David S. Stone; fourth ward, Alfred A. Wellington ; fifth ward, John Woods; sixth ward, Edgar E. Frost; seventh ward, Fred E, Sayer ; eighth ward, Joseph Wilbur.

The charter of the city, with its various amendments, has been carefully revised and rewritten during the present year, making substantially a new instrument, which became a law April 24, 1895. Municipal elections in Oswego are hereafter to be held in November of each odd numbered year.

Oswego Harbor - The following history of the improvements in Oswego harbor from 1727 to 1895 has been prepared for this work from the records of the United States Engineers' office, and is authoritative and exhaustive;

The history of Oswego harbor dates from the time of the first occupation of the place by the English in May, 1727, when Governor Burnet sent workmen from New Y ork who built "a stone house of strength . . . sufficiently strong against an attack of small arms." 1 For protection against the French or Indians, the workmen were accompanied by a captain, two lieutenants, and sixty soldiers, and it was " intended to keep an officer and twenty men always in garrison." About 200 traders took immediate advantage of this opportunity for a safe convoy and profitable and protected trade, and built seventy cabins close beside the stronghold ; constituting an "armed Militia ready to join in defense of the building and their Trade."

This fortified settlement was on the west side of the harbor, close to the shores of both river and lake, fronting upon the sheltered "cove" formed behind the point of gravel and stones which forms the nucleus of what is now known as the " Upper Island " and lies just north of the line of Schuyler street. The trading post was located at this place because this was the natural terminus of the interior waterways of the State, and especially of the waterway from the Hudson River at Albany to the Great Lakes and the West. This natural route was by the way of the Mohawk River to its head at Fort Stanwix, where there was a five-mile carrying-place across the summit to Wood Creek, down which boats ran to Oneida Lake and thence by the Oneida River and the Oswego River to Lake Ontario at Oswego. This primitive route of the early bateaumen will undoubtedly be again followed by a great ship canal, whenever one shall be built to connect the lakes and tidewater.

The construqtion of the trading-post at Oswego made it the depot at which was stored the cargoes of bateaux which came from Albany ; those goods which were designed for the West there awaiting favorable conditions of weather and of trade for the hazardous trip along the lakes. Oswego was thus the first harbor, and the starting point of commerce on the Great Lakes. Its possession was considered by the English (who called it Oswego) to be of the first importance, while the French (whose rendition of the same name was Chouaguen) considered that unless the English post could be destroyed, their own possession of the lakes was endangered. These opinions led the English to strongly fortify and garrison the place until 1756, when the French equipped a stronger force who captured and destroyed it, and with it a fleet of English vessels and bateaux which must have quite filled the little harbor. The history of these operations has been elsewhere given.

A French map of the place made in 1727 by M. Chaussegros de Lery, shows the entrance to the river to be 190 feet wide, and the river itself at about Cayuga street, to be 512 feet wide, which is almost precisely its present width at this point. The gravel point which then sheltered the west cove was smaller than the present " Island wharf," of which it forms the nucleus ; the wharf having been made by surrounding the point with cribs and then filling behind them with the material obtained by cutting away the neck which joined the point with the west shore. The cove which was sheltered by this point was then about 150 feet wide and 320 feet long. The navigable depth of the entrance to the harbor was seven and one-half feet and of the harbor within the river-

B Eleva tion of said. Redout C Twenty Butte aux belonging to the English jD Eight Barit- Canoes E 70 Cabins belonging to the English a,ml JJutclo Traders mouth was probably about ten feet at the extreme low-water level of the lake, the cove being probably less, with shelving sides on which the bateaux were hauled up to be unloaded. These bateaux which traded between Albany and Oswego were of a capacity of 1,200 to 1,500 pounds of freight each, and usually made the trips in fleets of 200 to 600 boats as a security from Indians. No larger craft used Oswego harbor until 1755, when an English schooner of forty feet keel was built and launched here. Five others were built here in 1756, making in all an Oswego-built fleet mounting seventy guns.

Up to this time, the English commerce upon the lakes was much hampered by the hostility of the French and of the Indians whom they controlled. But the campaigns of 1758, 1759, and 1760 (which were conducted from Oswego as the English base for all operations as far east as Montreal), destroyed the French power in Canada, and opened the lake to an unrestricted English commerce, and from this time the importance of Oswego harbor increased with the general growth of trade. This growth was greatly accelerated by the building in 1821 of a stone lighthouse upon the high bank on the east side of the river-mouth, near Fort Ontario, and by the construction of the government breakwaters and piers at Oswego in 1827, 1828, and 1829, forming an artificially sheltered harbor with good anchorage, where[there had formerly been only an open roadstead outside of the river-mouth. Until this time, the natural harbor had been within the river-mouth, where it had been directly exposed to northerly winds and waves, from which the breakwater gave perfect protection. At this time and until 1847, the entrance ,to the river-mouth was obstructed by a gravel bar stretching across the channel of the river, at the north extremity of the upper island, upon which bar there was only seven and one-half feet depth at extreme low water. The original survey upon which the construction of the harbor was based was made under a paragraph of the River and Harbor Bill of 1826 appropriating " $200 for making a survey of Oswego Bay and Harbor for ascertaining the expediency and expense of constructing piers to improve the navigation thereof."

The operations under this act were assigned to Captain John Lind Smith of the U. S. Corps of Engineers, who engaged Augustus Ford, civil engineer, to make a survey of the bay and river, with a plan and estimate for the proposed works of improvement. This was done during September, 1826, and the map and estimate were received and approved by Captain Smith on September 27. The estimated cost was $33,348.64 and on March 2, 1827, an appropriation of that amount was made by Congress.

On April 26, 1827, Capt. J. L. Smith came again to Oswego, had a model made of the proposed crib-work, and on April 30 received proposals for building the piers in accordance therewith. A contract was made with the lowest bidder, Moses Porter Hatch, to furnish all material and to complete the work for $13.26 per lineal foot of pier. Daniel Hugunin, jr., was appointed the superintendent of the work, under the local supervision of James Cochran, John Grant, jr., and Henry Eagle as commissioners, with Capt. J. L. Smith as non-resident engineer. The work was in progress during 1827, 1828, 1829.

In the fall of 1827, the incomplete work received extensive damages, for the repair of which an appropriation of $9,583.39 was made on May 9, 1828. During 1828, the harbor works were examined by Capt. Theodore W. Maurice, of the Corps of Engineers, who approved of them, but recommended " as an additional security," that a mole of random stone be formed on the outside of the work next the lake." In 1829 the originally planned crib-work breakwaters were completed by contractor Moses P. Hatch, and the formation of the mole was begun and was continued from 1830 to 1837. It consisted of a mass of loose stone, thirty to forty feet in width, rising in a regular slope from the lake-bottom to three to five feet above water at the breakwater against which it rested. This mass was [paved with large blocks of Chaumont limestone of about three tons each, and the foot of the slope was secured with larger blocks about two and one-half feet square on the ends and about ten feet long, weighing about five tons each. This mole was damaged by every storm, and its only effect on the crib- work was to guide the waves up the slope and to increase their destructive force in wrecking the pier and in throwing sand and gravel over it into the harbor.

started from the shore of the lake at the foot of West Third street, and extended out into the lake 250 feet to where the depth was about ten feet. Here it turned eastward for about 1,200 feet, to where a pier-head was formed in about twenty- one feet depth, and an opening of 250 feet was left opposite the river channel, for the passage of the current and for the entrance of vessels. (The channel opening was later widened to 357 feet, by the destruction of 107 feet of the east breakwater.)

The east breakwater formed a prolongation of the same line for 660 feet eastward, where it turned toward the shore under Fort Ontario for 170 feet. These structures enclosed a triangular shaped area, outside the original lake shore line, about one-half mile from west to east, and about one-quarter mile from north to south, of about forty acres' extent, which area was gradually surrounded and more or less occupied by wharves and piers for the loading and unloading of cargoes of vessels and canal boats, The original structure was composed of cribs of timber each thirty feet wide and thirty feet long, which were filled with loose stones and were sunk end to end upon the natural lake bottom as closely in contact as was practicable. The cribs were formed of round logs hewn flat, framed together and bolted with iron drift bolts and wooden treenails. They had floors of slabs and were allowed to settle upon the natural bottom for a part of the season before building upon them the continuous superstructure of 12 by 12 hewn timber. This superstructure was built to a height of seven feet above extreme low water level, or two feet above extreme high water level ; was sheathed on its lake face with vertical plank three inches thick, and its top was covered with a deck of three-inch pine laid across the pier. The natural depths in which the cribs were placed, increased gradually from nothing, at the origin of the shore-arm on the west side of the mouth of the river, to about twenty-one feet (at extreme low water level) at the pier head next the river channel. After leaving an opening, as above described, between the west and the east breakwater, the depths in which the cribs forming the east breakwater were placed gradually decreased from about eighteen feet next the channel to nothing at the east shore line.

The original Oswego and Syracuse Canal, four feet deep, with locks 90 by 15 feet^ connecting Oswego harbor with the Erie Canal, had been completed in 1828, and in 1829 the original Welland Canal (Canadian), eight feet deep, with locks 110 by 22 feet, connecting Lake Ontario with Lake Erie, was completed and opened. The immediate effect of these works was to stimulate the growth of commerce upon the lakes, and no place was so much affected by this growth as was Oswego,

In 1828 the total tonnage of vessels owned at Oswego was 180 tons. In 1829 the total number of arrivals of vessels by lake was about 200, with a total tonnage of about 37,000 tons, the value of imports being about $150,000, and of exports about $127,000. The canal tolls collected at Oswego were $14,660. At this date the population -of Oswego was 1.400.

Up to this time the only lighthouse had been the original one built in 1821 on the east side of the river near the fort. The small stone house still standing there was the lighthouse keeper's dwelling and adjoined the lighthouse. In 1834 the construction of the present cut-stone lighthouse on the west pier-head was begun, and it w^as completed and lighted in 1836. In 1837 the construction of a permanent superstructure of cut-stone masonry was begun upon the shore end of the west pier at the foot of Third street. In 1837 the population had more than trebled since 1828 and the volume of commerce had more than doub'ed. The canal tolls collected at Oswego in 1837 were $31,564.

The arrival of the canal packet boat was the daily event of greatest importance, and the bugle notes which announced its approach were the signal for a gathering at the landing place " to see the packet come in," while the horses which towed it made a spurt for the finish. The landing was at the east end of the lower bridge, to which the packets came down in the water-power canal or mill race, and landed their passengers on the level of Bridge street opposite the Arcade Block. The canal boats bound to and from the harbor were locked down into the present canal basin from the powercanal by two combined locks, whose remains are yet visible half buried in the bank between the power-canal and the present first lock. This arrangement of the canal terminus was changed in 1850 to 1854 by the construction of the present locks and of the wall forming the canal basin.

The following is the summary of the commercial statistics given by Capt.Wm. Smith- Fraser of the Corps of Engineers in his annual report for 1837 :

In 1840 the construction of a permanent superstructure, formed of concrete faced with cut-stone masonry, was still in progress upon the shore end of the west breakwater, using for it blocks of limestone, which, between 1830 and 1838, had been placed in front of the west breakwater to form a mole. From October 11, 1838, the work was in charge of John W. Judson, U. S. civil engineer, on whose recommendation the maintenance of the mole was abandoned in 1839, as its only effect had been to guide waves up its slope and to destroy the crib-work.

His annual report for 1841 to the chief topographical engineer at Washington is the only available and accurate record of the state of Oswego's harbor and commerce at that date, and might profitably be reprinted in full The following quotation shows the commercial growth :

In 1828 the Oswego Canal was opened, and the harbor improvements had begun to give some shelter to the shipping. In that year the tonnage of the port amounted to 180 tons. In 1840 she had three steamboats and seventy-six rigged vessels whose aggregate tonnage was 7,586 tons.

Engineer Judson's report goes on to give a description of the various mills, factories, and ship-building facilities, and makes the following statements and prophecy which are of interest : 1

It is thus shown that Oswego harbor was the birth-place of lake steam screw navigation,2 as well as the building place in 1755, of the first English sailing craft, and the original starting point in 1727 of English lake commerce itself.

In 1838 the water level of the lake was phenomenally high, having ever since been referred to as "the high water of 1838," and having only once (1870) been equaled.

Up to this time no attention whatever had been given to the periodic changes of level of the waters of the Great Lakes, and Mr. Judson at once saw the importance, to all future harbor works on the lakes, of definite and accurate knowledge on this subject ; especially as to what might be the extreme low water level. By careful research and examination of natural water marks and of ancient quarries along the lake shore, Mr. Judson determined that the extreme low water level of former years had been four and ninety-five one-hundredths feet below its high stage in 1838, and he established the United States gauge wTith its zero at that point, and had its foot-marks and figures cut in the east face of the stone pier fifty-five feet north of its south end, where they I

1 This report forms Appendix A of the Report of the Chief of Topographical Engineers to the Secretary of War, dated November 15, 1841 ; also part of Senate Document No. 56, 1st Session, 25th Congress, and of House Document No. 2, 2d Session, 27th Congress.

A vessel is now on the stocks and will be ready for service in the month of July, 1841, in which the spiral or Ericsson's propellors are to be employed. She is designed for the upper lake trade and will test the merits of this application of steam-power to the coasting trade of our inland waters. The recent experiments in the case of the steam packet Clarion, accounts of whose I the merits of the invention. . . . Should these experiments prove successful, the propellors will be generally adopted. We may then anticipate a revolution in the trade of the lakes equal to that already wrought by steam power on our navigable rivers and on the Atlantic. By giving to lake navigation celerity and certainty of arrival, the steam-coasters will maintain the current of western trade toward Lake Ontario in defiance of every obstacle.

Nearly sixty years of daily observations have confirmed the accuracy of Mr. Judson's judgment, for the water level has never gone below this zero, though it reached it for a few days in 1846, 1848, 1872, 1891 and 1895. All other gauges on Lake Ontario are set to agree with it. This zero mark is seven and seventy-nine one-hundredths feet below a point on the top surface of the edge of the cut limestone pavements of the pier at the point before described. The mean level of the lake has been found to be two and four-tenths feet above zero. In 1875 government engineers connected this zero by a line of minutely accurate levels, with mean tide level in New York harbor, and found it to be 244 and twenty-one one-hundredths feet above the latter.

During the period from 1837 to 1849, the general government was under an administration which was opposed to the policy of internal improvements, and there was a general cessation of appropriations for the care, preservation or extension of harbor works on the lakes. For Oswego harbor, appropriations were made in 1838, in 1844, and not again until 1852. The works which had been built at great expense were allowed to be gradually destroyed, the small appropriations made in 1844 being expended in partial repairs and maintenance from time to time. During this period, the harbor works and the limited operations for their maintenance continued in the charge of John W. Judson as United States agent, and his report for 1847, together with that of the collector, George H. McWhorter, gives full information as to the continued growth of commerce even under this blighting policy. This growth was largely due to the liberal policy of the Canadian government, whose commercial wisdom was and still is in striking contrast with the short-sighted folly of our own government. Between 1841 and 1846 the original Welland Canal was enlarged and all the locks entirely rebuilt, the original wooden locks 110 feet long by twenty-two feet wide and eight feet deep being replaced by masonry locks, each 150 feet long by twenty-six and one-half feet wide and nine feet deep.

At this time (1846), and for many years afterward, the commercial rivalry between Oswego and Buffalo was great. Buffalo being the Lake Erie terminus of the Erie Canal, and Oswego the Lake Ontario terminus of the same canal, freight bound for tide-water could go by way of either place, Buffalo offering the inducement that its freight need not pass through the Welland Canal and Lake Ontario, which Oswego offset by the fact that the cargoes transferred to canal boats at Oswego had then 168 miles less of canal to traverse to reach New York and proportionably less canal tolls to pay than from Buffalo. The canal trips from Oswego required twenty per cent, less time than the canal trip from Buffalo. The enlargement of the Welland Canal was therefore of the greatest advantage to the Oswego trade ; permitting as it did the passage of much larger vessels. It was fully utilized by Oswego, although the object of the enlargement was to provide a continuous Canadian route to Montreal and tidewater; the St. Lawrence canals, with the same depth, but with larger locks, being also completed and opened in 1846.

Buffalo, 1,884,292 barrels. Salt shipped, Oswego 380,761 barrels ; Buffalo 133,438 barrels. Vessels and steamers arrived, omitting- daily steamers to and from Canada at each place. Oswego, 2,406 in number with a tonnage of 511,425 ; Buffalo, 3,430 in number with a tonage of 822,528

The first dredging done in the harbor was in 1846 and 1847, when the original gravel bar with seven and one-half feet depth which crossed the channel near the foot of the upper island, was removed at private expense.

In 1848 the business of the place was increased by the opening of the Oswego and Syracuse Railroad connecting with the New York Central Railroad at Syracuse, and in the same year the city was incorporated. The great increase of trade made a constantly increasing demand for more harbor room, and in 1852 a board of U. S. engineers made a project for an outer breakwater 700 feet in advance of the original one. Nothing, however, was done towards its construction. Up to this time the only wharves in the harbor outside the river mouth were on the west side and under the shelter of the west pier.

In 1852, in order that the sheltered area might be fully utilized, the city authorities made a permanent lease to private parties of the land under water which was sheltered by the east pier, and which was known as Grampus Bay, being so named after the barque " Grampus " wrecked there in 1847. This land under water the city obtained by grant from the State in 1851. The lease was transferred to Gerrit Smith, and under its conditions the partly wrecked east pier was rebuilt by him and was extended up stream along the east side of the channel for 900 feet, forming the east channel pier. This entirely enclosed Grampus Bay on the exposed sides, and in the sheltered area thus formed were built the six large wharves, with an aggregate length of 2,100 feet and an average width of 100 feet, which have ever since formed the "east-cove lumber district," from the rentals of which Gerrit Smith received large sums annually for many years. The rentals were said to be 160,000 per year at one time.

The construction of the east channel pier reflected westerly waves into the western half of the harbor, as was to be expected, and this made necessary the building of the west channel pier, as the present lower island was then called. It was 530 feet long and was also built at private expense by the consent of the city authorities.

On July 5, 1853, all the mills and elevators on the east side of the river were destroyed by a great fire which swept that part of the city. The greatest energy was shown in rebuilding them, Penfield, Lyon & Co. making contracts for the necessary timbers for their great mill before the fire had burned itself out. All were rebuilt and working in May, 1854

On May 10, 1854, a steam dredge was built and completed at Oswego for use on the Lake Ontario harbors, but there was no money available for much needed deepening at Oswego harbor, and the dredge was sent to Little Sodus. This dredge was sold in 1861 for want of funds to operate it, and was converted into a floating gram elevator, which was afterwards taken to New York harbor.

The large gains in wharf- room which these improvements in 1852 and 1853 afforded were not enough, and on May 20, 1854, a joint commission of the property owners and the Common Council made a contract with William Baldwin to build a coffer dam in the middle of the river, and to deepen the west half of the channel from Cayuga street to Albany street. The contract price for the coffer dam, pumping and excavation and all necessary work, was $55,000, of which the city was to pay one-quarter and the owners cf the water front property three-quarters. The required depth of excavation was not stated, but it appears to have been three to four feet, making the depth ten feet at low water. This work was in progress during 1854 and 1855, but only a portion of the proposed work was then done. The water was pumped from within the coffer dam in a peculiar way. At the east end of the lower bridge a turbine water wheel was set in a flume drawing from the east power canal, and connecting with a line of shafting about 500 feet long, leading across the bridge to its west end where the coffer dam pumps were geared to it, and thus kept the work clear of water. The contract resulted in a law suit growing out of the lack of authority by the city to levy assessments for such purposes, and the work was not then completed, but was resumed in 1867. The present D, L. & W. R. R. tunnel leading to the river side at Utica street, and also their tracks along the river to Bridge street, were built in 1854 and 1855 by the Oswego and Syracuse R. R. Co., as a part of this improvement.

The removal of the bar across the river channel, which was begun in 1846 at private cost and completed in 1855 by the United States dredge at the cost of the city, was also a marked improvement, adding greatly to the available harbor room by making it possible for vessels of ten feet draft to enter the river and to reach the wharves on each side, and the mills and elevators which were built upon them.

The commercial statistics for the fiscal year ending June 30, 1855, are given as follows in the report of the chief of topographical engineers to the secretary of war :

During the period from 1852 to 1869, there were no operations of importance for the improvement of the harbor by the government. Such work as was done was merely for the repair and maintenance of the existing west pier and for the deepening to twelve feet depth of the area sheltered by it, by dredging out the sand and gravel which the waves threw over the west pier and through its frequent breaches. In 1868 the tower of the main lighthouse was made twenty feet higher, and one of the most powerful lights on the lakes was substituted for the one then in use. These operations were in local charge of Moses Porter Ha'ch in 1852 and for some years after, and then were directed by William Schuyler Malcolm until 1867, both of whom were citizens of Oswego whose families were prominent, but neither of whom was a civil engineer.

Meantime the commercial business of the harbor had steadily increased under the influence of a Reciprocity treaty with Canada, which was ratified on September 9, 1854, and contiuued until March 17, 1866, and under which the principal articles of international commerce were free of duty. Added to this was the effect of the completion in 1862 of the enlargement of the Erie Canal and the Oswego Canal, which had been in progress since 1836, and which made them seven feet deep with locks 110 feet long and eighteen feet wide ; capable of passing boats of 240 tons burden. The immediate result was that 5,483 canal boats cleared from Oswego in 1862, carrying property valued at $18,104,493 and paying canal tolls of $586,759.

from making advantageous use of their tunnel and river front tracks, and on November 7, 1866, contract was made by the railroad company for the complete excavation of the same portion of the Oswego River channel.

The remains of the 1854 coffer-dam, which had stood in the middle of the river for many years, had gradually been washed away, and another was built in the middle of the river to enclose an area about 110 feet wide extending from Cayuga street for 1,550 feet up stream. The present middle wall of massive masonry, seven feet wide and fifteen feet high from the river bed, was built just within this coffer-dam, on the edge of the excavation, between 1867 and 1869 ; extending from the draw-bridge pier, 1,100 feet up stream and 400 feet down stream. This work was in progress during 1867, 1868 and 1869, and one of its results was the discovery of the now famous Deep Rock Spring, whose water ran from crevices in the rock of the river bed when blasted during this excavation. During the time that the coffer-dam was kept dry, the spring was visited by constantly increasing numbers of citizens, and in 1869 it was decided to drill for the water on shore a hundred feet or more west of the point where it appeared in the river bed. In pursuance of this purpose, Sylvester Doolittle (who was the builder in 1841 of the first propeller on the lakes, as has been described elsewhere) bought from Moses Porter Hatch (who has been referred to as the contractor who built in 1827 the first piers at Oswego harbor) his residence on West First street, which was removed, together with many large fruit trees and ornamental shrubs, to make room for the Doolittle House, which was there built about 1872. The excavation of the river channel was continued by the railroad company during 1867, 1868 and 1869. It was repeatedly delayed by breaks in the coffer-dam and by the difficulties of keeping the area free from water. The work was finally completed and during the period of extreme high water which chanced to prevail in the lake during 1870 and 1871, the new channel gave good access for vessels to the coal trestles built along the water front above the bridge.

In 1872 began a period of low water in the lake, and this disclosed the fact that by some unaccountable error on the part of the railroad employees, the depth made was twelve feet below average water level instead of below extreme low water level, and that the new channel was therefore two feet or more shallower than it was meant to be. It was also found that the deepened area was about 400 feet too short at its lower end, and during 1872 and 1873 further excavation was attempted without a coffer-dam by hand drilling from a float, using common powder as the explosive, the present improved methods used in 1893 for excavating submerged rock being not then known. The operations by the railroad company in 1872 and 1873 were costly and ineffectual, and the lack of proper depth in the channel has prevented its ever being fully useful except during periods of high water. At extreme low water level its depth is nine and three-fourths feet over the rock bottom.

Up to 1869, the total sum which had been expended in Oswego harbor improvement by the United States was $473,362. The duties collected in a single year at this time were nearly three times this total sum, showing the investment to have been a good one. In 1869, the resident engineer at Oswego in charge of the government works here and elsewhere on Lake Ontario was Major Nicholas Bowen of the United States Corps of Engineers.

During 1869 there was built the extension northward of the lighthouse pier, which was 432 feet long and thirty feet wide. Its object was to shelter vessels from westerly make its further repairs unnecessary. In pursuance of this project, a detailed survey of the harbor and of the lake front and lake bottom, for a mile each side of the harbor and for half a mile in width, was made in September, 1869, by William Pierson Judson, civil engineer, upon the large map of which survey the proposed breakwater was planned by a Board of Engineers convened for that purpose. This board made a plan, which was afterwards approved and carried out, for the construction of a breakwater placed generally upon lines parallel to those of the old west breakwater and 1,100 feet in advance of it; starting from the shore of the lake about a mile west of the river mouth, running out into the lake 900 feet, to a point where the depth was about twenty feet, and thence running generally parallel with the shore for 4,900 feet, where the low water depth varied from twenty-eight feet to sixteen feet ; thus enclosing about 100 acres ontside of the twelve foot curve at lowest stage of water. The details for the construction of the breakwater provided for framed timber cribs thirty- five feet square, each divided into nine compartments by four bulkheads, all filled with loose stone; each crib having a grillage bottom formed of timbers crossing each other and screw-bolted together and planked ; the cribs united above water by a continuous superstructure six feet high of timber, also filled with loose stone and covered with a deck of three-inch plank laid across the work. The timbers were all of hemlock below water and of white pine above water, and were all twelve inches square. The estimated cost was $1,161,682, but the actual cost of construction (not including maintenance) was considerably less than that. That so large an expenditure was justified in order to foster and accommodate the business of the port is indicated by the single fact that the duties collected by the government in that year were $1,282,884; more than the total estimated cost of the outer harbor. The subject was strongly presented, the approval by Congress of the plan was secured, and the first appropriations therefor were obtained by the Hon. John C. Churchill, who then represented the district in Congress. This method of construction was used throughout the entire work (whch occupied eleven years) with slight modifications. Experience has shown that the cribwork was lacking in the strength and stability which the exposed location needed.

Extensive repairs were made during the progress and after completion. The superstructure when decayed has been in part replaced by a different design, costing no more, but needing no repairs whatever, until decayed. The cribs below water, though not subject to decay, are not so readily accessible and may from time to time require more or less repair.

There were at this time (1869) fronting on the inner harbor, eleven large grain elevators and sixteen dour mills. During this year (1869) the New York and the authorities at Washington the necessity for providing better facilities for the growth of Oswego commerce, by building an outer breakwater under the shelter of which a large outer harbor would be formed, which would wholly include the old harbor and

Midland Railroad was opened for one-half the distance to New York, and the Lake Ontario Shore Railroad Company was organized to construct a railroad to Niagara. In January, 1871, Major John M. Wilson, Corps of Engineers, U. S. A., took charge of the harbor works. On March 3, 1871, an appropriation of $100,000 was made for the proposed outer breakwater, and on July 5, 1871, operations were begun at the shore end; 640 lineal feet of the shore arm were built that season. The extension of the breakwater kept pace with the annual appropriations of varying amounts which were made for it. Both the completed and incomplete work were subject to frequent and extensive damages by storms, which required immediate repair at a great cost.

In 1873 there was an unusual ice formation upon the lake, and for some time the waters, which are usually as open in winter as in summer, were entirely covered by heavy floes, extending beyond the range of vision. Advantage was taken of this opportunity to make numerous borings to determine the character of lake bottom upon which the rest of the breakwater was to be built : Some of the borings were made through twenty-five feet of floating ice and fifteen feet of sand, and valuable information was obtained for subsequent operations.

In 1874, the breakwater reached a total length of 2,716 feet; 916 feet being the shore arm, and 1,800 feet being lake arm. The latter was located in water twenty to twenty-eight feet in depth, including the deepest portion of the structure. This length was sufficient to shelter some useful harbor room, and the first wharves on the lake front were built in 1874.

In 1876, Major Walter McFarland, Corps of Engineers, U. S. A., relieved Major Wilson of the charge of the harbor works, and continued the construction of the breakwater upon the same plans ; Congress making annual appropriations for the work.

In 1881 the lake arm was nearly completed and the D. L. & W. R. R. Co. built at the foot of West Fourth street a large wharf, 100 feet wide and a 1,000 feet long, upon which they erected a trestle and pockets for the storage and shipment of coal. When this was building, Major McFarland considered that the outer 225 feet would prove to be an obstruction to the harbor, and forbade that this portion be built, but without effect. The subject of compelling its removal was then put in the hands of the U. S. district attorney and is still open in 1894, when the rebuilding of the portion of the structure which is above water is in progress.

In November, 1881, the iron lighthouse, which had marked the outer end of the lighthouse pier extension since 1876, was taken apart, and was erected on the beacon crib, behind the eastern end of the outer breakwater. It was built and lighted by the United States assistant engineer in thirty hours, which was much the shortest time on record for such work. In 1882 the west breakwater was completed, with a total length of 6,033 feet; 916 feet for the shore arm, 4,871 feet for the lake arm, and 246 feet for the channel arm. The channel arm and the last 1,400 feet of the lake arm were not sunk on the natural bottom, as was the rest of the work. The borings made in 1873 disclosed the existence hereof fifteen or more feet of fine sand, and in this was dredged a trench four to ten feet deep which was filled with stone upon which the cribs were placed. Upon the completion of the west breakwater in 1882, the construction of a similar east breakwater was begun. It was located upon the same line prolonged, an opening of 352 feet being left for an entrance between it and the eastern end of the west breakwater, directly opposite the entrance, 357 feet wide, to the inner harbor.

The first section of the east breakwater, as then built, consisted of a channel arm thirty-five feet long and a lake arm 213 feet long, the project providing for extending the latter 2,760 feet eastward. This extension was never built. The whole of the succeeding appropriations were required to renew superstructure and to repair and maintain the west breakwater, and in 1889, by a very mistaken and short-sighted policy, the construction of an east breakwater was abandoned, and the section built in 1882 was dredged out and removed. Since then the entrance has been in a most unsatisfactory condition, and is very difficult for vessels to make during northwesterly gales.

At the close of navigation in 1882, the State removed all tolls from the Erie Canal and its branches. Ever since the completion of the enlargement in 1862 there had been a steady diminution in the rates and the amount of tolls collected, without making any appreciable change in the volume of business which used the canals, and from about 1872 they had been fixed at a rate merely sufficient to make repairs. In 1882 the tolls collected were only one-eighth those collected in 1862, while the tonnage was almost identical in amount, as shown by the following figures :

So long as goods passing through the canal paid tolls in proportion to the length of canal traversed, Oswego could compete with Buffalo for a share of the western trade; but as soon as all tolls were removed from the Erie Canal, while they were still exacted on the Welland, Buffalo had a great advantage, which resulted in the loss by Oswego of most of the western grain trade. A little later when the Canadian government, in defiance of treaty rights, made a discriminating charge against vessels bound to American ports, Oswego's western grain trade entirely disappeared, not to revive until 1894. Oswego had been the shipping place for Syracuse salt for the western markets ; but the development of the Michigan salt regions put an end to this trade. Oswego had also been the great depot for receipt and distribution of Canadian lumber, and between 1865 and 1875 it far exceeded any other lake port in the quantity handled. It was the demands of this business which called most loudly for increased harbor room. Changes in the lumber trade by making shipments from Canada by all-railroad routes instead of by vessel and canal, and gradual exhaustion of some of the Canadian timber limits which had shipped their product by the way of Oswego, gradually reduced the quantity of lumber which came to Oswego, and the harbor was thus relieved of its greatest pressure for more space.

The new outer western harbor was not, therefore, at once occupied by lumber wharves, as it was expected that it would be, and consequently there was no need for the creation of an eastern outer harbor. The combined effect of these various adverse conditions made a material reduction in the lake commerce of Oswego, but a large trade still remained to be provided for. In 1884 it was as follows:

During the working season of 1884, the operations at Oswego harbor were under the charge of Maj. H. M. Robert, Corps of Engineers, who in 1883 had relieved Major McFarland. These operations consisted in dredging to fifteen feet at the extreme low water in the river channel from the lighthouse up to Schuyler street, and in rebuilding the superstructure upon the greater part of the lake arm of the outer breakwater, 3,000 lineal feet being thus rebuilt in parapet form, a parapet thirteen feet high above low water level being built along the exposed face for one-third of the width, while the remaining two-thirds on the harbor side was eight feet lower. This took the place of the original superstructure, which had a flat deck uniformly eight feet above extreme low water level. The change was a marked improvement, but it still needed and frequently received extensive repairs.

As soon as the season's work was finished, in October, 1884, signs of yielding were observed in the superstructure 400 to 700 feet eastward from the western angle, the whole upper work down to about nine feet depth, sliding inward upon the substructure two to three feet, under the force of the first heavy storm. Buttresses were at once built at each side of the yielding section, and during the next gale of December 11, 1884, 140 feet of the superstructure was forced into the harbor, leaving an opening about nine feet deep. The buttresses and braces limited this breach to its original size, and it is still unchanged in 1894. This opening caused so marked an improvement in the sanitary condition of the harbor, and was so convenient an entrance for vessels and tugs, that it has not been rebuilt, and will be made a permanent opening.

The waves which made this breach were closely observed at the time by Wm. Pierson Judson, U. S. civil engineer, and the record of the observations is considered to be a valuable addition to knowledge of the subject of wave forces, as their measurements were found to exceed those of any previously recorded fresh-water waves, showing that Oswego's location on the lake is such that an excessive wave force must be pro- vided for. A leveling instrument was so placed upon the slope of the lake bluff that the level of still water within the harbor could be seen for reference, and also that the approaching waves could be observed before they reached, or were affected by, the northwest angle of the breakwater. The instrument was then gradually moved up the slope of the bank until it was found to be on the same level with the tops of the maximum waves. The solid tops of the waves which actually made the breach, as well as of many hundreds of others which were observed, proved to have a height, exclusive of their foam crests, of nineteen feet above the still water level within the harbor. The wave valleys were twelve feet below this level, making total wave fronts of thirty-one feet which moved at a speed of thirty-four miles per hour before a northwest gale of seventy- eight miles per hour. A set of three dynamometers was also used to register the actual force of impact of the waves, but it was doubted whether the full force was recorded, though 940 pounds per square foot was indicated at eight feet above water level. The maximum force appeared to be about five to six feet above still water level. It was considered that the increased height of the parapet reflected the waves in such a way as to make the entrance more difficult, and in 1885 a spur-crib was built and sunk outside the breakwater and 250 feet westward from the eastern end. This spur was 100 feet long and forty feet wide, and was placed with a ten-foot opening between it and the breakwater, so that driftwood should not lodge in the corner and batter the works to pieces. It is still in place and in good condition, although wave action has undermined its west face which has sunk seven to eight feet lower than the east face.

Up to 1887 the draft of vessels passing the Welland Canal had been limited to twelve feet, and no greater depth was needed in any Lake Ontario harbor. But in 1887 the canal depth was made fourteen feet and a similar increase was needed in the inner harbor at Oswego. In 1887 it also became necessary to rebuild the superstructure of the shore arm of the outer breakwater. Although it was the oldest part of the work it was not rebuilt in 1884, because it had received such extensive repairs annually as to have been partly renewed thereby.

Experience had given repeated proofs that the previous methods of construction were unequal to the demands, both the original method and also that adopted in 1884 having been extensively damaged. A design entirely different from any before used was made by Assistant Engineer Wm. Pierson Judson and adopted by Capt. Carl F. Palfrey, of the Corps of Engineers, U. S. A., who was then in charge, and upon this model the shore arm was rebuilt in 1887. It consisted of a parapet nine and one-third feet high above extreme low water for one-third the width, with the inner two-thirds five and one-third feet high. Its timbers were held together by screw-bolts and vertical oak posts, instead of by drift-bolts and tie-heads.

Deck joists were omitted, and four-inch pine deck plank were laid longitudinally and tight together upon the top set of cross ties. It cost no more than the work which it replaced, and it has neither needed nor received any repairs whatever during the eight years which have passed since it was built.

In 1889 a second spur-crib was designed and built by the same assistant engineer, and was sunk midway of the length of the lake arm of the breakwater. Its size was greater than the first spur, being 150 feet long, forty feet wide and thirty feet high.

Provenance

Text from Landmarks of Oswego County, New York, published 1895, in the public domain in the United States and digitised by the Internet Archive.