Various Plans for Internal Navigation - State Roads - Plank Roads - Steamboat Navigation - Marine Railway - The Northern Transportation Company - The Ogdensburg Transit Company - Port of Transfer - The Northern Railroad - The Rome, Watertown and Ogdensburg Railroad - TheUticaand Black River Railroad - The Gouverneur and Oswegatchie Railroad - Street Railway.

rROM an early period attempts were made to improve the navigation of the St. Lawrence along the south shore, from St. Regis up to Indian Point in Lisbon. Several acts were passed authorizing surveys, and privileges granted to build locks. By an act passed April 9, 181 1, R. Atwater and R. Hopkins were appointed commissioners, and authorized to expend $600 in building a tow-path on the shore along the rapids from St. Regis to Lisbon, which is supposed to have been carried out.

Another project was started in 1833, and endorsed by a convention held at Canton that fail, to cut a canal from the head of " Long Saut " to Grass River, and a subscription was raised to procure a survey. Also a petition was circulated to be sent to Congress asking suitable appropriation to carry out the project. The north shore had always been preferred by voyagers to ascend the rapids, but on account of the fact that the Canadian government had undertaken to improve navigation by building canals and locks on the north shore, this enterprise ended.

Another scheme was agitated to build canals, locks and dams on the Oswegatchie and Grass Rivers, in order to navigate Black Lake, and to extend the same to Gouverneur and by the way of Natural Canal to Canton. A company was incorporated April 25, 1831, for that purpose, the capital to be $15,000, and the work to be accomplished within five years. In 1835 the capital stock was raised to $100,000. In the petition which procured the passage of the above act, it was stated that at Heuvel locks had been begun and might be completed at small expense ; that the expense of dams and locks to improve the natural channel of the Oswegatchie would not be to exceed $12,000, and that steamboats might be built for $5,000 sufficient to meet the business of the proposed company. The fall at Canton Falls is eighty feet, and at Cooper's Falls in De Kalb about six feet, which being overcome by locks, would render the river navigable as far as the Ox- bow in Jefferson county. A dam across Grass River and a short channel near the eastern end of Natural Canal would bring Canton in navigable communication with the St. Lawrence at Ogdensburg. It is evident that no actual improvements were ever undertaken under these acts.

The plan of extending the Black River Canal to Ogdensburg was brought forward in 1839, ^"^ a survey executed by E. H. Broadhead, which embraced the several improvements above proposed, but no further action was taken.

Several acts have been passed for preventing the obstruction of the channels of our rivers by declaring them public highways. Racquet River from its mouth to Norfolk, and St. Regis from the province line to the east line of Stockholm were so declared April 15, 1810; the Oswegatchie was made a highway April 16, 1816, to Streeter's Mills in Rossie, and its obstruction forbidden under penalty of $100. By a recent act this limit has been extended on the East Branch to Cranberry Lake. An act was passed April 10, 1850, declaring Racquet River a highway from its mouth to the foot of Racquet Lake in Hamilton county, and an appropriation of $10,000 was made to be ex- pended in removing obstructions and improving the channel, by shutting up lost channels and straits around islands, also creating piers, dams and booms.

The want of a cheap and direct communication between the navigable waters of the St. Lawrence and the seaboard was felt from the first, but more especially during the War of 1812. Shortly after the close of the war, plans for uniting Lake Champlain with the Connecticut River were discussed and attempted.

Judge Raymond and Benjamin Wright, while surveying the country before its settlement, had formed projects for improving the natural channels of the river, and to them belongs the merit of the idea of inland navigation. A meeting of the citizens of Clinton, Franklin and St. Lawrence counties convened at Ogdensburg August 28, 1823, to adopt measures for a canal to reach Lake Champlain from Ogdensburg. They appointed B. Raymond, of Norfolk ; S. Partridge, of Potsdam ; J. A. Vanden Heuvel, of Ogdensburg; William Hogan, of Covington; Thomas Smith, of Chateaugay; and Asa Hascall, of Malone, who prepared and published a lengthy report for distribution in the sections to be most benefited by the work. The preliminary survey made by Judge Raymond was to use Oswegatchie Natural Canal and Grass River to Canton. The petition and the friendly influences towards these works led to an act for a survey under the direction of the canal commissioners. The expense was limited to $1,500. The summit was found to be 811 feet above the St. Lawrence at Ogdensburg and 966 feet above Lake Champlain. This work was commended to the Legislature by De Witt Clinton in his annual message in 1825, but the work was found to be impracticable and the idea was abandoned.

State Roads. - Attention was early directed towards opening roads from St. Lawrence county to various places in the State. After the State road leading from Ford's Mills on the Oswegatchie to Carthage was authorized and worked, as mentioned in a preceding chapter, various other roads were built. By an act passed April i, 1808, a road was made from Canton to Chester in Essex county, the land through which it passed being taxed for the purpose. Further appropriations were made by acts passed in 1810 to 1814. On the 19th of June, 1812, a road was directed to be opened from near the foot of sloop navigation on the St. Lawrence to Albany, and again in 1815 a further tax was laid with which a road was opened from Russell southward and made passable for teams, but like the ones before mentioned, it soon fell into decay. A law passed April 5, 18 10, imposed a tax on the adjacent land to repair and construct a road from the Northwest Bay to Hopkinton. Further tax was laid for the road in 18 1 2 to 1824. The several towns were also to be taxed four years for its support, when it was to be assumed as a highway. In April, 18 16, commissioners were appointed to lay out a road from Ogdensburg by way of Hamilton to Massena ; from Massena through Potsdam to Russell ; and from there to Columbia village, on to Hamilton, at the expense of the adjacent lands. On the i6th of April, 1827, commissioners were directed to survey and level a route for a road from Lake Champlain to Hopkinton, and in 1829, $25,836 were applied for its construction, and a toll collected for its support. In 1833 * ''"^ of stages started between Port Kent and Hopkinton. An act passed April 18, 1828, directed a road to be opened from Canton to Antwerp at the expense of the adjacent lands. The first turnpike was made by the St. Lawrence Turnpike Company, incorporated April 5, 18 10, which ran from Carthage to Malone ; in 18 1 3 it was relieved from the obligation of finishing it beyond the line of Bangor. After the war the road was abandoned by the company.

The Ogdensburg Turnpike Company was formed June 8, 18 1 2, was incorporated with $50,000 and built a road from Wilna to Ogdensburg by way of Rossie. In April, 1826, the road was abandoned to the public.

The Parishville Turnpike Company was incorporated February 5, 18 13, with a capital of $50,000, running from Ogdensburg through to Canton, and Potsdam to Parishville. In March, 1827, the road was given up to the towns through which it passed. In April, 1831, the part between Ogdensburg and Canton was directed to be improved by a tax upon the three towns of $500 for two years. With this sum and tolls collected for its support, an excellent road was kept up for several years. In 1850 the road was directed to be planked at the expense of the three towns, when at length the route was abandoned to the public.

Plank Roads. - ^The plank road craze struck St. Lawrence county about the year 1848 and covered all the available territory within a short time. By a special act the Ogdensburg and Heuvelton Plank Road Company with a capital of $5,000 was incorporated, with the privilege of raising their capital to $20,000. The road was opened in September, 1849. The earnings at first were about $2,000 per year. After the first planking gave out the company was permitted to gravel its road bed and thus was enabled to hold its charter until it expired by limitation.

The Gouverneur, Somerville and Antwerp Company was formed under the general law December 30, 1848, and finished its road in 1850. The length was twelve miles and 124 rods; the capital $13,000. Six miles of this road were in Jefferson county.

The Canton plank road, extending from the village of Canton to the town line of De Kalb. was built under a special act passed March 27, 1849, which authorized a tax on the town of Canton of $6,000 for the first year and $1,500 annually for three successive years after, the road to be owned by the town.

The Canton, Morley and Madrid Plank Road Company was formed in January, 185 i, and its road finished in August of that year; length eleven and a quarter miles.

The Potsdam Plank Road Company was formed October 17, 1850; length of road five miles and 154 rods, from Potsdam village to the Northern Railroad; cost $6,439.43; finished October 8, 185 I.

The Hammond, Rossie and Antwerp Plank Road Company was formed January 13, 1 850, and the road finished in December following; the length twenty miles; capital $35,000. Seven miles of this road were in Jefferson county. The Rossie Hill cut was forty-one feet deep and the deepest rock cut was twenty- two feet.

The Morristown and Hammond Plank Road Company was organized in July, 185 I ; length of road ten miles and a quarter. Capital, $10,- 000; finished in May, 1852. This with the preceding formed a continuous plank road communication with a route leading to Utica, Rome, Watertown, etc., and terminating on the St. Lawrence River in the village of Morristown.

The Heuvelton and Canton Falls Plank Road Company, originally organized, had a length of about ten miles; it was continued to the road from Canton to Hermon by the same company, and designed to be continued to Edwards.

The Hermon Plank Road Company was formed March i, 1851; capital, $4,000 ; length of road four and a half miles, extending from Marshville to the town line of Canton, connecting with Canton Falls road leading to Ogdensburg. It was finished in July, 1852.

Heuvelton and De Kalb Plank Road Company was organized February 6, 1849, the road extending to intersect the Gouverneur and Canton road about three miles east of Richville. Its length was thirteen miles, to be completed in 1853.

The Norfolk, Raymondville and Massena Plank Road Company was organized February 14, 1851, and the road finished in the following year. Length, ten miles and forty-four chains; capital, $8,500. It was a continuation of the Potsdam road.

Steamboat Navigation. - Sailing craft had, been in use more or less on the river and lakes since the discovery of these waters by Jacques Cartier. The first attempt at steamboating on the river and lakes was made by a company composed of C. Smith, D. Boyd, E. Lusher, A. Van Santvoord, J. I. De Graff, and several others, who made an unsuccessful attempt to incorporate the Lake Ontario Steamboat Company with a capital of $200,000. They claimed to have purchased of the heirs of Robert R. Livingston and Robert Fulton the right to the exclusive navigation of the St. Lawrence. The Ontario was built in 1 8 16 under the direction of Hunter Crane, one of the owners, the place not stated, but supposed to have been Sackett's Harbor. Her length was no feet, width twenty-four feet, depth eight feet, and measured 237 tons. She had one low pressure engine of thirty-four inch cylinder and four feet stroke. She was modeled after the Sea- horse, then running on the Sound near New York. The first trip was made in the latter part of the summer of 18 17, and her arrival was celebrated at all the ports on the lakes and river with the most extravagant demonstrations of joy, and hailed as a new era to the commerce of our inland seas. In every village that could muster a cannon, and from every steeple that had a bell, went forth a joyous welcome, and crowds of eager citizens from the adjoining country thronged the shores to salute its arrival. Bonfires and illuminations, the congratulations of friends, and the interchange of hospitalities signalized the event. The trip from Lewiston to Ogdensburg required ten days. The cabin fare was $i6; deck fare, $8. The Ontario seldom exceeded five miles an hour. She continued to run on the route till 1832, and was finally broken up at Oswego.

The Frontenac, a British steamer at Kingston, and The-Walk-inthe- Water on Lake Erie followed soon afterward. The Martha Ogden was built at Sackett's Harbor before 1819; she was lost in a gale off Stony Point, but the passengers and crew were saved ; the engine was recovered and placed in the Ontario. The Robins was a .schooner built over into a steamer. The Black Hawk was built at at French Creek (now Clayton), was used several seasons as a packet, sold to Canadians, and name changed to the Dolphin. The Paul Pry was built at Heuvelton in 1 830, and ran for a time on Black Lake to Rossie. In 1834 she with great difficulty was passed down the Oswegatchie to the St. Lawrence and used as a ferry between Prescott and Ogdensburg until the affair at the windmill in 1838, when she became obnoxious to the Canadians, and was run on Black River Bay afterwards. The Lake Ontario Steamboat Company, capital $100,000, was incorporated January 28. 1831, to expire in 1850, having fifteen directors with head offices at Oswego. The company built their first boat, the United States, at Ogdensburg, and launched her in November, 183 1. She was finished and made her first trip July i, 1832, under command of Elias Trowbridge; length 142 feet; width twenty-six feet beam, fifty-five feet over all; depth ten feet; engines, two low pressure ones of forty inch cylinder and eight feet stroke ; cost $56,000, and was the finest steamer at the time on the lake ; she ran on the through time till 1838, when, having become obnoxious to the Canadians on account of the use made of her in the affair at the windmill, she was run upon the lake only afterwards, and was finally broken up at Oswego in 1843, and her engines transferred to the Rochester. This was the first and only boat owned by this company. The Oswego was built at that place in 1833 of 286 tons; was used several seasons on the through line, when her engine was transferred to the steamer St.

Lawrence and her hull changed to a sail vessel and shortly after lost. The Brownville was built on Black River, below the village of that name. In moving her down to the St. Lawrence she took fire and was burned. She was afterwards rebuilt and ran a while, and subsequently lengthened at Sackett's Harbor and her name changed to the William Avery, and ran between Ogdensburg and Niagara ; she was dismantled in 1835. The Charles Carroll was built at Sackett's Harbor and ran between Kingston and Rochester in 1834. Afterwards she was lengthened and her name changed to the Anierica, and ran from Ogdensburg to Lewiston. The Jack Downing was a small steamer built at Carthage in 1834, taken to Sackett's Harbor on wheels, launched and fitted up for a ferry, and ran at Waddington, also from Fort Covington to Cornwall. Her engine was in 1837 transferred to the Henry Burden, a boat on a novel principle, being supported on two hollow cylindrical floats and a wheel between them. It was used a short time on the ferry at Ogdensburg. The Oneida, of 227 tons, was built at Oswego in 1836. She was employed by the government from 1838 to 1840, after which she made regular trips from Ogdensburg to Lewiston until 1845, when her engine was used in the British Queen and her hull fitted up as a sailing vessel. She was lost on Lake Erie. The Telegraph, a steamer of 196 tons, was built near Dexter and came out in the fall of 1836. She was employed by the government in the fall of 1838, the whole season of 1839, and a part of the spring of 1840. The St. Lawrence, of tons, was enrolled at Oswego in 1839, but was rebuilt in 1844 ^"d the tonnage increased to 434 tons, costing $50,000. She was run most of the time on the through line, and dismantled at French Creek in 1851. The George Clinton and the President ^^rt. small boats, built at Oswego in 1842 ; the former was lost in 1850. The Lady of the Lake of 432 tons, was built by a company in 1842. She was used on the through lines until 1852, when she was chartered as a ferry in connection with the railroad from Cape Vincent to Kingston. This was the first American boat that had state rooms on the upper deck. The Rochester, built at Oswego in 1843, of 354 tons, was run on the lake and river until 1848, since which she ran from Lewiston to Hamilton. The Niagara., pf 473 tons, built at French Creek in 1845 ; length 182 feet; beam twenty-seven and a half feet ; total breadth forty- seven feet ; hold

Seven and a half feet. Her engine was forty inch cylinders, eleven feet stroke ; wheels thirty feet in diameter. The British Queen was built on Long Island, opposite Kingston, in 1846, using the Oneida's engine. The British Empire was built at the same place. The Cataract came out in July, 1837; her tonnage 577 ; length of keel 202 feet; breadth of beam over all forty-eight feet ; forty-four inch cylinders, and eleven feet stroke, and cost $60,000. The Ontario was built in 1847 ; length of keel 222 feet ; deck 233 feet, and over all 240)^ feet ; breadth of beam over all fifty-four feet eight inches ; depth of hold twelve feet; cylinders fifty inches, and eleven feet stroke ; tonnage 900 ; cost $80,- 000. Bay State came out in 1849; tonnage 935 ; length 222 feet ; breadth of beam over all fifty-eight feet ; depth in hold twelve feet ; cylinders fifty-six inches; eleven feet stroke ; wheels thirty- two feet in diameter. The Northerner was built at Osw^ego and came out in May, 1850 ; has a tonnage of 965 ; lengt>h 232 feet; beam over all fifty-eight feet ; depth of hold twelve and a half feet ; cylinders sixty inches with eleven feet stroke, and cost $95,000. The New York was the largest American steamer on the lake, She was built and came out in, August, 1852, with R. B. Chapman, master; cost $100,000; tonnage 994; length 224 feet; beam over all sixty- four feet; cylinders sixty inches, with twelve feet stroke, and wheels thirty- four feet diameter. There were also built and run on the river and lake the John Marshal, Utica, Caroline, Prescott, Swan, Express, Gleaner, and a few others, mostly small. It is a singular fact that since the first steamer was started on the line in 1816, down for forty years, not a single accident has ever occurred on any American steamer on the lake or river which has caused the death or injury of a passenger. This is not due to chance so much as to skillful management.

Marine Railway. - The want of some convenience to take vessels and steamers out of the river for repairs had long been felt, but no definite action had been taken until the 29th of September, 1852, when a party of Ogdensburg capitalists met and organized a company named "The Ogdensburg Marine Railway," with a capital of $15,000, to be enlarged at pleasure. The following officers were then chosen : Henry Van Rensselaer, E. N. Fairchild, E. S. Allen, Edwin Clark and Allen Cheney, trustees ; H. Van Rensselaer, president ; W. B. Allen, secre- tary. The plan for the machinery was made, and the materials required gathered during the winter, and work was begun early in the following spring. The plant is situated on the bank of the St. Lawrence, about half a mile above the mouth of the Oswegatchie River at the southwest corner of the city limits. The bank is low and gradually slopes into the water, which is sufficiently deep a short distance from the shore to float the largest vessel on the lakes. The plant was finished in the fall of 1853, and was of sufficient capacity to take out the largest vessel then made or likely to be made. Connected with the railway is an extensive shipyard, with all the necessary shops and appurtenances for building and repairing all classes of craft. The company operated the plant successfully until i860, when it was leased to E. B. Allen & Son, who continued building boats and propellers for two years The property was then sold to H. C. Pearson, who operated it until 1870, when it was again sold to the Northern Transportation Company. This company built a number of their large propellers there, and repaired vessels of all kinds, doing a good business until they went into bankruptcy about the year 1879. The works were run on repairs only until they were burned in the fall of 1883. In 1884 a stock company was formed under the name of the St. Lawrence Marine Railway Company, with a capital stock of $25,000. The property of the old company was purchased, the plant rebuilt, and it has since continued to do repairing of all kinds.

The Northern Transportation Company. - On the completion of the Ogdensburg and Lake Champlain Railroad it formed with others a through line to Boston, greatly stimulating the traffic on the lakes. This led to the formation of the company in 1855 under the laws of the State of New York, styled the Northern Transportation Company. It was reorganized under the laws of Ohio in 1862. This company operated two lines of propellers, the boats of one company plying between Ogdensburg and Lake Erie, and those of the other between Lake Erie and Lake Michigan. Fifteen boats were at first employed on the line, and the number v. as soon afterward increased to twenty-one. At that time the boats on the upper lakes were much larger than those of the N. T. Co , and could not pass through the Welland Canal as it then existed. A scheme was started in i868 to increase the capital of the company to $100,000, in shares of $100, Philo Chamberlain being president of the company. Flaming hand- bills were distributed in city and village, " From Boston via Ogdensburg to the most distant port on the route." The bills contained a fabulous account of the earnings of the line, thus preparing the way for what was to follow. The claim was made that more boats were required to carry the grain and the flour from the west and the merchandise from the east. The New England business passed mostly by the way of Ogdensburg, therefore an increase in this line would greatly benefit all places on the route, and especially this port. The company owning the Marine Railway here and one in Cleveland, was prepared to build or repair their boats at a nominal cost. All of this had the appearance of prosperity. The additional stock was taken by parties who were e^ger to benefit the places in which they lived as well as their own pockets, hence certificates were issued by the company from half a share up to any amount called for, to be paid by installments. The company continued its business on the same plan as before for a few years, without any apparent increase, while the new stock was being paid in ; but meantime no dividends were declared. In 1875 the company collapsed. The property went into the hands of a receiver, was leased to the Central Vermont Line in 1876, and was run under the management of that company about three years ; but they could not make that class of small boats pay in competition with the larger ones that were fast coming into use, and therefore gave them up. The whole outfit of the company was then sold to Philo Chamberlain, who resold the boats to various parties in 1880, thus closing the legitimate business of the Northern Transportation Company.

The managers of this company, not being satisfied with the amount already swindled from the people, made an attempt to collect the face of the certificates issued in December, 1868, to increase the stocky claiming the right to do so under the laws of Ohio. Some of the more timid ones settled these claims, while others were sued. When the hungry attorneys saw there would be no more money voluntarily paid them they proposed to settle the claim in each case for a portion of their legal fees. This proposition was accepted and the disgraceful affair closed. For six or seven years after the closing up of the old

Northern Transportation line there was no American line of propellers in operation, except that occasionally a few boats were " run wild," as the sailors would say.

The Ogdensburg Transit Company. - In the winter of 1886-7 t^^ managers of the Ogdensburg and Lake Champlain Railroad obtained the privilege by act of Legislature of building and running a line of boats on the river and lakes in connection with the road. A company was formed with the above title, and several boats were purchased or leased and put in operation. This company made an agreement with the Detroit Dry Dock Company to build them three boats. The first one, named Governor Smith, was delivered and made a trip, arriving at Ogdensburg September 12, 1889. This boat is 254 feet over all, fortytwo feet beam, sixteen feet eight inches depth of hold, and can carry 2,250 tons. She is equipped with all the latest improvements; has steam windlass, capstan and running gear, and the rooms are heated by steam. She has compound fore-and-aft engines, cylinders thirty- eight by fifty- two, with forty inch stroke and two Scott boilers. She makes twelve to fourteen miles an hour, and carries 200 tons of coal. Her load was 70,000 bushels of corn and 250 tons of deck freight. The other boats are to be built after the same pattern. These boats can carry about four times as much as the old style propellers, at about the same cost.

Port of Transfer. - The large boats employed by the Ogdensburg Transit Company in connection with the Vermont Central Elevator (the new one of 1,000,000 bushels capacity finished in July, 1890 ; the old elevator was burned in the fall after), makes Ogdensburg preferable to Kingston for transferring grain. The freight rates from the various ports in the west to this place are nearly as low as they are to Kingston, while the barge rates from the latter place to Montreal are much higher than from Ogdensburg ; besides, grain can be stored at the Vermont Central Elevators and await the arrival of foreign vessels at Montreal, to be met by barges on short notice. Hence the new export route has caused some sharp bidding as to rates for large lots of grain seeking a foreign market, which proves advantageous to Ogdensburg.

great relief to the little settlement at Ogdensburg at that early day ; but as population and business increased, a still greater want was felt for a direct communication between the navigable waters of the St. Lawrence and the seaboard, but more especially so after the steamboat lines were in successful operation. The railroad system was being generally discussed about this period, when a large and representative meeting was held at Montpelier, Vt., February 17, 1830, to consider a plan which had been favorably reported upon by a committee to build a railroad from Ogdensburg via Lake Champlain through to Boston. A similar meeting was held in Ogdensburg, March 17 following, and a committee of twelve appointed to collect certain information, and an application was also made to Congress for aid in constructing the work, which failed. A petition was next forwarded to the State Legislature, but this also failed. Another enthusiastic meeting was held at Malone, December 17. 183 1, to promote the object in view. Meetings of this kind were continued at stated periods until May 21, 1836, when "The Lake Champlain and Ogdensburg Railroad Company " was incorporated with a capital of $800,000, and a commission named to open books for subscription to the stock ; but this movement failed by limitation. At- a convention which met at Malone, August 8 1838, a committee was appointed to collect statistics in order to show the necessity and uses for a road. The reported freight tonnage that would seek an outlet over this road of produce from the farms and various factories of St. Lawrence county, as given by this committee, would amount to nearly $118,000 annually, which estimate was considered by some very extravagant ; but it was proved to be far below the actual facts. The other two counties exhibited similar probable results. To further strengthen the cause, the opinion of military men was procured as to the importance of the road to the nation in case of war. All these measures failed, as they were met by the powerful opposition of the friends of the Central route. Still courageous, at the session of 1845, a bill to incorporate the Northern Road was introduced and passed the Assembly, but was delayed in the Senate till near the close of the session, as four other similar bills were then before the Legislature ; but through the influence of friends of one of these bills (desiring similar aid), the Northern Road was incorporated for fifty years with a capital of $200,000, in shares of fifty dollars, which received the governor's signature only twenty minutes before adjournment. In May, 1845, several commissioners were named (D. C. Judson, of Ogdensburg, being one), to receive stoclc, when great efforts were made to secure pledges to the same, there being at that time upwards of $10,000,000 railroad stock on the market In June, 1846, a company was organized in Ogdensburg, with George Parish president, to let contracts for grading and building the road bed. Work was commenced in March, 1848, at the deep cut at this end of the route, which is 239 feet above tide- water. The summit below Chateaugay is 1,146 feet, and at Rouse's Point eighty- four feet above tide- water. The work was pushed with vigor, and by fall a portion of the road was opened. In the spring this work was continued with the same energy for about two years to its completion, when the first train of cars passed over the entire road September 20, 1850, arriving at Ogdensburg at 4 P. M., John Scharier being the engineer. This was followed by the accommodation train, which arrived about eight hours later, J. R. Ames being the engineer.

Word has been passed about the village that the first through train with the officers and distinguished guests aboard, would come through to Ogdensburg on the 20th, but the hour of arrival could not be given. In absence of a telegraph the following plan was adopted to notify the people in time to assemble and view the arrival of the first train of cars to reach Ogdensburg. A cannon was stationed on the hill above the depot, a second one some three miles below on the road, and a third one (Long Tom) was sent on a platform car down to Lisbon Center. When the train came in sight Long Tom was fired, then the second and third guns were discharged, then the people in the place, many of whom were from the country and Prescott, assembled at the depot as the cars arrived, covered with bunting, amid the waving of flags, shouts of joy, ringing of bells, bands playing and firing of cannon. A procession was formed and marched through the principal streets, with music and waving banners. A supper was served free to all who desired it. In the evening speeches were made and congratulations extended, during a beautiful display of fire -works. This was truly a gala day for the people of Ogdensburg and vicinity. The opening of the Northern road, connecting with others reaching to the seaboard, was of greater benefit to this section of country than all other improvements that came either before or since. Property in many instances advanced 500 per cent, and farming lands at least 100 per cent.

The advent of the Northern road corrected a great evil by doing away with the barter exchange which had been in vogue since Nathan Ford opened a store in the old barracks. Farm produce was exchanged principally for dry goods and groceries ; all classes of labor were paid in " store- pay ; " and the young men who could gather a dollar or two in change for a Fourth of July celebration were considered lucky. The farmer who dM not begin early in the year to save dimes against tax gathering was not considered wise. Black salts, or potash, was legal tender in those days and with West India pipe staves were the only produce that would command part cash in payment. The railroad brought the cash system and a seaboard market to the farmer's door, and whatever he had to dispose of brought cash. Therefore, the men, such as Judge Anthony C. Brown, and a few others who labored under the trying and discouraging circumstances for a series of years to accomplish the opening of this thoroughfare, may be truly called benefactors.

R. W. and 0. Railroad. - It has been said that the extension of this road from Watertown to Norwood originated principally through the dissatisfaction felt by the people of Potsdam and Canton with not having the Northern Railroad pass through their villages. Be this as it may, at this period all railroad lines felt more or less the necessity of extending or building branches as feeders to increase their business. The difficulty of obtaining a charter for a road at that time has been " very much lessened.

At a meeting of the friends of this road held at Gouverneur January 3, 1852, a favorable report of a survey having been presented, a company was organized under the general law. From this time vigorous efforts were made to secure sufficient stock, $5,000 per mile according to a special act passed April 7, 1852, to commence grading the road. In October of that year, the necessary stock having been taken, the contract for the completion of the road called " the Watertown and Potsdam branch " was given to a Massachusetts company, the contract stipulating that the road should be finished by July i, 1854. This extension completed a line from the New York Central at Rome to Watertown, Cape Vincent, Canton, Potsdam and Norwood, connecting at the latter place with the Northern road. Although the road passed through a fertile country, which furnished a large freight and passenger patronage, it soon became evident that for the interests of the road, a branch should be extended to Ogdensburg. Thie construction of this latter branch having been decided upon, it was finished in September, 1862, thus making a southern outlet, which proved a great convenience to the country along its line and especially to Ogdensburg. The several lines north from Rome were consolidated under the name of " The Rome, Watertown and Ogdensburg Railroad."

Utica and Black River Railroad. - A portion of the line of this road between Carthage and Morristown was first finished and called the " Black River and Morristown Railroad." It was subsequently consolidated with the Utica and Black River Railroad, and under the management of the last named company it was found necessary to extend the road to Ogdensburg, where a better winter ferry could be secured, and the latter extension was finished in the summer of 1878, forming a second southern outlet for the city of Ogdensburg. This road then came into direct competition with the Rome, Watertown and Ogdensburg road, causing not a little strife in securing freight and passengers for two years, when the two lines entered into an agreement and pooled their earnings. In 1885 the Utica and Black River road was leased on a long term to the Rome, Watertown and Ogdensburg Company and has been run under their management up to the leasing of the same to . the New York Central Railroad Company. The interest of the Rome, Watertown and Ogdensburg Railroad, also of the Utica and Black River and Morristown Companies, was transferred to the New York Central Company, who took possession of the property March 14, 1891, and have since been under the control of that organization.

The Gouverneur and Oswegatchie Railroad. - This branch road is the outcome of an agitation which began several years ago by Robert Dodge and others interested in the talc mines and mills along or near by its route. In the fall of 1891 the firm ofMoffett, Hodgkins & Clarke of Syracuse, through the encouragement of the New York Central people and the right of way guaranteed by the friends of the road, began to grade the bed along the route over which it was to pass to Edwards village. The road was finished and turned over to the New York Central, August I, 1893. The first regular train, consisting of two passenger coaches and four freight cars, left Edwards at seven o'clock A. M., and arrived at Gouverneur at nine o'clock, making the trip in two hours including the stops on the route. The Edwards Cornet Band was aboard and discoursed music along the way. People from Fine, South Edwards, and the neighborhood surrojmding Edwards, and the places along the road, took advantage of the long looked for opportunity to go to Gouverneur by rail.

Street Railway. - Only one street railway has been put in operation in the county, and is located in Ogdensburg. A company was organized by outside parties who secured the right of way from the Common Council ; also the consent of the freeholders living on its line in the winter and spring of 1886. Work was begun on the track on the ist day of July following, when a few rods were laid on the upper end of New York avenue in order to hold the franchise. The project then rested for a time, as a hitch occurred between the company and a few citizens of the place concerning the amount of stock they were to take. The outcome was the formation of the Ogdensburg Street Railway Company who purchased from the projectors their entire interest in the road. The work of construction was then pushed with vigor and a portion of the road, from the ferry dock to the cemetery on the Heuvelton road, was finished that fall, and the remainder, from the upper end of New York avenue to the railroad bridge on Ford street, was completed in the early part of 1887. Branches were laid to the R. W. & O. Railroad depot ; also to the L. C. & O. depot. It is also intended by the company to extend the track in the near future to the hospital grounds.