BlockBefore

Cohoes Company, Gate House No. 1, On Mohawk River, north end of canal abutting east bank, Cohoes

Cohoes Company, Gate House No. 1, On Mohawk River, north end of canal abutting east bank, Cohoes, Albany County, NY. Surveyed as HAER NY,1-COHO,3B-, with a 5,140-word written history.

From the record

“In addition to its practical function as a gate house controlling the flow of water to the canal, the head gate house was conceived romantically as a Romanesque Revival, brick bastion at the head of the power canal where it is fed by the Mohawk River.”

Written record, HAER NY,1-COHO,3B- survey. Machine-read text.

Surveyed by the federal HAER program as HAER NY,1-COHO,3B- · the record runs 5140 words · one of 156 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

114 words

Source document Quoted word for word from HAER NY,1-COHO,3B-. Not written, edited or summarised by this site.

North end of the power canal abutting the east bank v. Cohoes, Albany County., New York Latitude: k2 Vf' ^3" N. Longitude: T3 U21 52" W. Date of Erection: Designers: William Worthen, C.E., and David Van Auken, C.E. , architect Present Owner and Occupant: Niagara Mohawk Power Corporation On the Mohawk River, 3.6 miles upstream from its mouth, Colonie, Albany County, New York Date of Construction: On Mohawk River, north end of canal abutting east bank Cohoes, Albany County, New York Gate House No. 1 is located at latitude: longitude: The point was obtained from Google Earth. There is no restriction on its release to the public. Date of Construction: Engineer: William E. Worthen

Present Use

48 words

Source document Quoted word for word from HAER NY,1-COHO,3B-. Not written, edited or summarised by this site.

Head gate house for hydroelectric station The superstructure of the T section has no present or intended use. The substructure is utilized as an impoundment structure. The projected date of demolition of the superstructure of the T section is on or about August 6, Gatehouse for hydroelectric facility

Significance

1676 words

Source document Quoted word for word from HAER NY,1-COHO,3B-. Not written, edited or summarised by this site.

In addition to its practical function as a gate house controlling the flow of water to the canal, the head gate house was conceived romantically as a Romanesque Revival, brick bastion at the head of the power canal where it is fed by the Mohawk River. PART I. HISTORICAL INFORMATION A. Physical History: 1. The inscription on the builder's stone formerly inset on the front of the central tower reads: COHOES COMPANY ALFRED WILD, President T. G. YOUNGLOVE, Agent DIRECTORS ALFRED WILD, WILLIAM T. GARNER, CHARLES VAN BENTHUYSEN, DAVID J. JOHNSTON, SAMUEL W. JOHNSON, WILLIAM W. NILES, TRUMAN G. YOUNGLOVE. STONE DAM ERECTED I865 HEAD GATES AND GATE HOUSE ERECTED WILLIAM E. WORTHEN, ENGINEER. DAVID H. VAN AUKEN, Assistant Engineer. JOHN BRIDGFGRD, Contractor.

First Dam Erected Partially Destroyed by Ice and Repaired Same Year. Second Dam Erected $4 STE^V, COHOES COMPANY POWER CMAL$%, HEAD GATE HOUSE HAER N . (Page 2) R 3&- 2. Original purpose and construction: According to.one source, "the cost of the dam and appurtenances [i.e., the head gates and head gate house] was (A. H. Masten, History of Cohoes) David Van Auken-, assistant engineer for the head gate house, was the architect for Harmony Mill No. 3 which began its operation in as well. 3. Alterations and additions: The square, crenelated tower on the central part of the head gate house has been removed as well as the liipped roofs of the flanking, two-story towers, which now are flat-roofed, as the center, tower had been. In when the entire power canal system was abandoned in.

favor of hydroelectric power transmission, the stem of the T-shaped building was extended by a slightly higher, one-story brick addition housing the. additional gates necessitated by the widened "canal (headrace). B. Sources of Information: 1. Old view: Photograph of the original front elevation. This print also provides the information incised on the commemorative builder's stone. From Niagara Mohawk Power Corporation. 2. The style of architecture displayed in the superstructure of Gate House No. 1 appears to be an adaptation of early mill styles. While the superstructure may be somewhat unique (i.e., twin towers and brick arches), other examples of the brick corbeling and masonry details are displayed on the remaining gated section of Gate House No.

1 as well as other structures in the Cohoes area (i.e., Harmony Mills). Prepared by: E. M. Paolini Designer Niagara Mohawk Power Corporation Hydro Generation - Design June 12, Transmitted by: Jean P. Yearby, HAER, Cohoes Company, Gate House No. 1 HAER No. NY- 8 (Page 6) PART I. HISTORICAL INFORMATION A. Physical History 1. Date of erection: as evidenced by a date stone located on the southwest foundation wall and a "plaque" located in the gated section of Gate House No. 1. 2. Engineer: William E. Worthen 3. Assistant Engineer: David H. Van Aukeh 4. Contractor: John Bridgford 5. Original and subsequent owners: Gate House No. 1 was constructed in on land owned by the Cohoes Company in the town of Colonie, Albany County, New York.

The subsequent owners are as follows: Deed; the Cohoes Company to the Cohoes Power and Light Corporation by deed dated December 31, as recorded in the Albany County Clerk's Office in Book 669 of Deeds at page Consolidation; the Cohoes Power and Light Corporation consolidated with the New York Power and Light Corporation as filed with the Corporations Bureau of the Secretary of State - October 26, Consolidation; New York Power and Light Corporation consolidated with Niagara Mohawk Power Corporation as filed with the Corporations Bureau of the Secretary of State - January 1, 6. Alterations and additions: Gate House No. 1 has been altered substantially since originally constructed in The original Gate House No.

1 consisted of a 120 foot long gated section, placed perpendicular to the power canal and a 100 foot T section positioned 90 degrees to the above 120 foot section and defining the east boundary of the same power canal. The original 120 foot long gated section included a tower at the western end. Cohoes Company, Gate House No. 1 HAER No. NY- 8 (Page 7) This tower was demolished around when an 80-foot long taintor gated section was added to the original 120-foot long section making up the present 200-foot long gated section. Also, sometime between and the present, the peaked slate roofs (with ornamental wrought iron work) on the two towers of the existing 100 foot long T section were removed and replaced with flat roof decks. The parabolic brick arch on the south end of Gate House No.

1 was also reinforced with the addition of three (3) concrete buttresses. B. Historical Context The original use of this 100 foot section of Gate House No. 1 is assumed to have been to provide shelter for two mechanical gate operators used to dewater the forebay and the power canal respectively. The gate utilized to dewater the forebay (north end of 100 foot T section) has been abandoned and the operator partially removed. Another assumed use of this 100 foot section was to house a Pelton-type waterwheel which propelled the gate operating mechanism controlling water flows into the power canal. This system has since been replaced with a gasoline driven operator.

The second operator on the south end of the 100 foot T section is presently utilized to control a mud sluice which dewaters the north end of the power canal. The deteriorated condition of this equipment as well as the operating constraints caused by the confined work area and restricted access impose a severe hardship in the use of this gate. The present significance of Gate House No. 1 - T section and use of same bears no resemblance to the assumed use and significance discussed above. Its physical size feet by 10 feet), as well as its design (i.e., two parabolic brick arches which restrict heavy loading) prevent it from being useful today even as a storage facility.

Its only use in recent times has been to allow access to the adjoining stoplog waste sluice located along the power canal immediately adjacent to the Gate House section in question. Cohoes Company, Gate House No. 1 HAER No. (Page 8 ) PART II. ARCHITECTURAL INFORMATION A. General Statement: The Gate House No. 1 structure consists of a T-shaped building. One section is approximately 200 feet long by 13 feet wide and contains twelve canal head gates. This gated section of the building is placed across the power canal and will remain intact. The other section of the building is approximately 100 feet long by 10 feet wide (outside dimensions) containing two arch sections and flat roof towers and is placed perpendicular to the previously mentioned section. This section will be demolished. 1.

Architectural character: Gate House No. 1 has a limestone masonry block foundation with brick superstructure. 2. Condition of fabric: The 100 foot by 10 foot section is considered deteriorated. B. Description of Exterior: 1. Overall dimensions: 100 foot long by 10 foot wide (7 foot wide inside dimensions) 2. Foundation: Constructed of limestone masonry block with rubble fill, sitting on shale. 3. Walls: Constructed of common bond unreinforced brick masonry with extensive brick corbeling throughout its exterior. 4. Structural system framing: Unreinforced brick with timber ceiling and roof rafters. 5. Decorative features: a) Towers: There are two flat roof towers approximately x lO'-O" x high placed on both ends of the 1O0 foot long section.

b) Arches: Between the tower sections are two 27 foot + long parabolic brick arches, one of which has been reinforced with three concrete buttresses. c) Porches: One metal frame porch approximately 4 foot long x 3 foot wide with located on the east side of the building. Cohoes Company, Gate House No. 1 HAER No. (Page 9') 6. Openings: a) Doors: Three wooden exterior doors approximately three feet wide x seven feet high with semicircular brick arches above. b) Windows: Sixteen wood windows approximately 2 feet wide by 7 feet high with semicircular brick arches above. Six-over-six double hung. c) Shutters: The tower sections contain eighteen wooden shutters, sixteen of which ares apprximately l1 6" wide by 10' high. The remaining two shutters are approximately 2' wide x 6' high.

The shutters are located in the upper section of the towers. 7. Roof: a) The two tower sections have flat concrete panel roof decks with built-up roofs and brick parapet walls. The section between the towers (approximately 52' long and 10' wide) has a gabled slate roof. C. Description of Interior 1. Floor plans: See pages 7 and 8- 2. Flooring: Concrete 3. Walls: Painted brick masonry 4. Ceilings: Pressed fiber board (painted) nailed to wood deck 5. Openings: a) Archways: Two interior archways approximately 3' wide x 7' high. b) Doors: Two interior wood panel doors approximately 3' wide by 7' high. 6. Mechanical equipment: a) Lighting: Individual incandescent bulbs. x- , b) One rack and pinion mechanical gate operator, remains of *- others. Cohoes Company, Gate House No. 1 HAER No.

(Page 10) D. Site: Gate House No. 1 is located on the west end of a foot long masonry dam across the Mohawk River. This gate house is at the north end of a foot long canal which provides water to the five turbine-generators in the powerhouse at the School Street Hydroelectric development. PART III. SOURCES OF INFORMATION A. Original architectural drawings: None available. B. Early views : None C Interviews: Niagara Mohawk Power Corporation Regional Operations personnel were canvassed but none could lend any historic information to augment what was already known. D. The existing head gate house was built in two sections.

The section closest to the Mohawk River was built for the Cohoes Company's system of canals in while the section closest to North Mohawk Street was built in when the power canal was enlarged for the current hydroelectric facility. Each section of the head gate house contains its original set of gate operators. The building thus shows two early, but very different, approaches to controlling the water that enters a power canal.

Bibliography

841 words

Source document Quoted word for word from HAER NY,1-COHO,3B-. Not written, edited or summarised by this site.

Masten, Arthur Haynesworth. History of Cohoes, New York, from its Earliest Settlement to the Present Time. Albany: Joel Munsell, Weise, Arthur James. City of Troy and its Vicinity. Troy: Edward Green, Prepared by R. Carole Huberman Historian Historic American Engineering Record Robert M. Vogel Curator of Mechanical and Civil Engineering Smithsonian Institution August PART II. ARCHITECTURAL INFORMATION Material below obtained from secondary sources listed above, as the building was inaccessible at time of initial survey. A. General Statement: COHOES COMPANY POWER CANAL^ HEAD GATE HOUSE HAEH N . (Page 3) 1. Architectural character: A Romanesque Revival, ^ ,1 "brick structure founded in the water and over the headgates of the canal. 2. Condition of fabric: Good.

Detailed Description of Exterior: 1. Over-all dimensions: According to Arthur H. Masten, History of Cohoes . . . , p. "It is 2l8 feet, long; and the front tower is 31, and the main towers are ^3 feet in height." 2. Plan: Symmetrical T. 3. Foundations: Stone masonry. k. Wall construction and finish: Brick running bond with decorative, corbelled arcade at cornice and beltcourse levels. 5. Structural system: Probably solid brick masonry con- struction. 6. Openings: a. Doors and doorways: An arched brick doorway in the center of the building with substantial, diagonally panelled, double wood doors. b. Windows: Within tall, narrow and shallowly hooded and bracketed brick arches are wood frame 6-over-6 double-hung windows with fanlights. c.

Ventilators: Slender arched apertures with hori- zontal louvres and shallow brick hood and bracket detail, on the upper level of the end towers. 7. Roof: a. Shape and covering: The original section of building, aside from the tower areas, has a low-pitched, slated roof. Originally, the end towers boasted steep roof peaks of slate shingle crowned with ironwork at the ridge. The new section has a flat roof with a raised brick parapet. COHOES COMPANY POWER CANAL^ HEAD GATE HOUSE HAER NO. (Page k) b. Cornice: The brick cornice is delineated and deco- > ratively accented "by corbelled arcades which are heavier at the end tower roofs. Originally, there was a central tower with a crenelated termination. Prepared by R. Carole Huberman Historian Historic American Engineering Record August PART III.

PROJECT INFORMATION These records were prepared as part of the Mohawk-Hudson Area Survey, a pilot study for the Historic American Engineering Record which was established in under the aegis of the Historic American Buildings Survey. The project was sponsored jointly by the National Park Service (Historic American Buildings Survey) , the Smithsonian Institution (National Museum of History and Technology), the American Society of Civil Engineers (National Headquarters and Mohawk-Hudson Section) , and the New York State Historic Trust. The field work and historical research were conducted under the general direction of Robert M. Vogel, Curator of Mechanical and Civil Engineering, Smithsonian Institution; James C. Massey, Chief, Historic American Buildings Survey; and Richard J.

Pollak, Professor of Architecture, Ball State University, Project. Supervisor.; and with the cooperation of the Department of Architecture, Rensselaer Polytechnic Institute. ADDENDtJM Cohces Company, Gate House No. 1 HAER No. (echoes Company Power Canal System: Head Gate House) On the Mohawk River, 3.6 miles upstream from its mouth Cohoes VU^_p. Albany County ^<o New York \ Addendum to Cohoes Company Power Canal System: Head Gate House N. end of the power canal abutting the east bank Cohoes Albany County New York PHOTOGRAPHS WRITTEN HISTORICAL AND DESCRIPTIVE DATA Historic American Engineering Record National Park Service Department of the Interior # Washington, DC 1 HISTORIC AMERICAN ENGINEERING RECORD Cohoes Company, Gate House No. 1 HAER No.

(Page 5) Niagara Mohawk Power Corporation files. E. Likely sources not yet investigated: None could be identified. PART IV. PROJECT INFORMATION Agencies Involved: New York State Office of Parks, Recreation and Historic Preservation Department of the Army - New York District Corps of Engineers Federal Energy Regulatory Commission Niagara Mohawk Power Corporation City of Cohoes School Street Hydro Development - Rehabilitation (the name of the project causing demolition) INOU.239 .cnoes omDany, "ate ;-'ouse HAER No. 91U dO [NV"U ^SyvlN'aycy 2XHS__CU._^3d3aj (Page 11} Cchoes Company, Gate House ",Q KA R Mo. Page 1?) ,i & Ml X vO J 0 4-t 2 Ui 1 i\ J 0 al < 1 cO UJ i_ 0 0 < c 0 0 2 O uJ 2 0 V- 0 Ul v/) ^ T V- o ca ADDENDUM TO: HAER COHOES COMPANY, GATE HOUSE NO.

1 HAER NY,1-COHO,3B- (Cohoes Company Power Canal System, Head Gate House) Harmony Mills On Mohawk River, north end of canal abutting east bank Cohoes Albany County New York PHOTOGRAPHS WRITTEN HISTORICAL AND DESCRIPTIVE DATA HISTORIC AMERICAN ENGINEERING RECORD National Park Service Interior Region 1, North Atlantic - Appalachian U.S. Department of the Interior Market Street, Floor Philadelphia, PA ADDENDUM TO: COHOES COMPANY, GATE HOUSE NO. 1 HAER No. (Page 13) HISTORIC AMERICAN ENGINEERING RECORD COHOES COMPANY, GATE HOUSE NO. 1 (Cohoes Company Power Canal System, Head Gate House) This report is an addendum to a 4-page report and an addendum 8-page report, both previously transmitted to the Library of Congress.

Written history

2353 words

Source document Quoted word for word from HAER NY,1-COHO,3B-. Not written, edited or summarised by this site.

Under the terms of a new license from the Federal Energy Regulatory Commission, the present owner will replace the original gate operators with modem operators. The original portion of the head gate house contributes to the significance of the Harmony Mills National Historic Landmark, including the gate operators. No other alterations are proposed. To mitigate the adverse effect, the National Park Service stipulated documentation of the head gate house. Prepared by: Bruce G. Harvey Senior Cultural Resources Specialist Kleinschmidt Associates Liverpool, NY December 12, COHOES COMPANY, GATE HOUSE NO. 1 HAER No. (Page 14) Summary Description The head gate house was constructed in two phases.

The first part of the head gate house was constructed by the Cohoes Company in as part of a hydromechanical complex. This complex, an upgrade from the initial complex of the early was designed to take advantage of the flow of the Mohawk River and the elevation drop of Cohoes Falls in order to power a range of factories in Cohoes. A more detailed history of the Cohoes Company and the manufacturing plant in the City of Cohoes can be found in the report of the pilot HAER project on the Mohawk-Hudson Area (Allen Huberman Rezneck Additional descriptive information can be found in the Addendum to the original HAER report, which was prepared in prior to the removal a the "T" section of the original head gate house that lay on the east side of the power canal.

This section, which formed a "T" on the east bank of the power canal closest to the Mohdwk River, was demolished in In the original design of the head gate house, this section housed two gates and a turbine that provided hydromechanical power to the head gate operators. When constructed in the head gate house consisted of a one-story brick building that was constructed on a masonry foundation across the head of the Cohoes Company's power canal, immediately downstream of the dam that also was built in The original head gate house was approximately long and 13' wide, and rested on a masonry foundation that contained nine gate openings through which water entered into the power canal.

The "T" section was approximately long and 10' wide, and rested on a masonry and parabolic brick arched foundation. The interior of the original section featured unarticulated spaces in both the part that crossed the canal and the "T" section on the east bank of the power canal. The interior of the part that crosses the canal is dominated by the machinery that is used to operate the slide gates, which are lifted to allow water to flow into the power canal and closed to stop water from entering the power canal. Each of the nine gates is controlled by its own operating machinery. With relatively limited modifications as described below, this historic configuration has remained intact.

The interior of the "T" section, as originally designed and constructed, housed two sets of gates and machinery. One set of gates was used to dewater the forebay, while the other set was used to power a small Pelton-type water wheel. As described below, this water wheel provided hydromechanical power to the nine gate operators in the part of the head gate house that crosses the canal. The second section of the current head gate house was constructed in by the Cohoes Power and Light Company.

The Cohoes Power and Light Company had built a small hydroelectric facility near the base of Cohoes Falls in using the existing power canal as enlarged by the Cohoes Company in In the Cohoes Power and Light Company constructed the existing hydroelectric complex consisting of the powerhouse, lower gatehouse, upper gatehouse, and power canal. In order to provide enough water to power the larger generating units of the new powerhouse, the Cohoes Power and Light Company enlarged the power canal, making it both wider and deeper. In order to accommodate this widened power COHOES COMPANY, GATE HOUSE NO. 1 HAER No. (Page 15) canal, the Company added a new section to the existing head gate house. The new section, like the original section, is 13' wide and approximately 80' long.

The floor of the new section also is approximately 2' higher than the original section, a difference in elevation that is visible both in the different roof lines and in the slope of the concrete floor inside the head gate house. This section, which extends from the western end of the original head gate house to the west bank of the power canal, houses three tainter gates. Each of these gates is controlled by its own hydraulic lift mechanism.

Head Gate House Operators The original head gate operating machinery has been in use, first for the Cohoes Company's power canal to power the hydromechanical machinery in the city's textile mills and later to power the School Street hydroelectric station, since they were installed in Although the power source for the gate operators has changed, the way that they work has not. The gate operators in the Cohoes Company's head gate house were an ingenious solution to the problem of lifting and dropping the heavy timber gates that were necessary to control the large amount of water flowing into the power canal. The design of these gates appears to have been created by William E. Worthen, a civil engineer based in New York City.

Worthen, born in Amesbury, Massachusetts, in literally grew up in the world of hydraulic engineering. His father, Ezra Worthen, was instrumental in the development of the water power in the City of Lowell, Massachusetts, in the early nineteenth century, and served as the first superintendent of the Merrimack Manufacturing Company. Worthen was educated at Harvard College, receiving a bachelor's degree in and immediately began work as a civil engineer with special attention on hydraulics and hydrology.

Worthen's obituary in quotes "an authority" who wrote, in "As a hydraulic engineer he has designed and constructed masonry dams across rivers, for the establishment of water-powers, and the canals, mills, and shops connected therewith." According to the builder's stone in the head gate house, William E. Worthen served as the engineer for the Cohoes Company's redevelopment of its dam and head gatehouse in Although no information survives regarding the designs for the gate operators, it is important to note that Worthen also served as the engineer for the Ousatonic Water Power Company when they constructed a dam across the Housatonic River between Shelton and Derby, Connecticut, in the late (See HAER No.

for documentation of Ousatonic Water Power Company, Dam and Canals.) This new dam provided water for power canals on each side of the river (Silvio and Artemel At the time the dam was built, each canal was controlled by a wooden gate house. Between and however, each of these wooden gate houses was replaced with a new brick building. The existing gate operating machinery in the Shelton Canal gate house on the west side of the Housatonic River is similar to that used in the Cohoes Company's head gate house. The gate operators at the Shelton Canal gate house no longer have the vertical iron posts as at the School Street head gate house; it is unclear whether the operators at the Shelton Canal gate house were designed that way, or if the vertical iron posts were removed.

Although the report that documents the Ousatonic Water Power Company s facilities does not provide any details on the machinery, it is likely, given Worthen's connection to the Cohoes Company facility, that he designed both. COHOES COMPANY, GATE HOUSE NO. 1 HAER No. (Page 16) The gate operating machinery was powered initially by a Pelton-type water wheel located in the "T" section of the head gate house on the east side of the power canal; this section was removed in The water wheel drove a series of shafts that extended along what was then the length of the head gate house, and provided power to each operator. A beveled friction gear at each gate allowed the lifting mechanism to draw power from the shaft. An study by the U.S.

Census of the Water Power of the United States (Porter provide a more detailed description: The machinery for raising and lowering the gates is very easily operated and satisfactory in working. The turbine .. .is at the river end of the bulkhead, and operates three lines of shafting; one of these, 2 1/4 inches in diameter, runs in at right angles to the stream and connects with the head-gates; the other two run in either direction parallel to the stream and connect with the waste-gates. Each gate has attached to it two vertical iron posts with racks.

Opposite one post of each gate is a pair of beveled friction-wheels revolving in parallel vertical planes; a third wheel, revolving in a plane at right angles to these, can by a small hand-wheel be brought in contact with either accordingly as it is desired to raise or to lower the gates. The turbine is started and sets in motion the long horizontal shaft and the odd friction-wheels; in the manner just described the motion is now communicated to one of the adjacent friction-wheels, which is thus made to revolve, and with it its iron shaft, having a worm-gear; this turns a large vertical toothed wheel, on the axle of which is a smaller toothed wheel directly engaging the rack, which is firmly connected to the gate.

On the same axle is another toothed wheel, opposite to, and engaging, the other rack of the same gate. It is unclear when this method of powering the gate operators was removed, though it appears to have been in the early- to mid-twentieth century. The preparers of the Addendum to the original HAER report interviewed Regional Operations personnel from the Niagara Mohawk Power Corporation, the owner of the School Street Hydroelectric Project at the time, but none was able to provide useful historical information on the power source for the head gate house. The first change was to replace the water wheels as a source of power with a gasoline engine. This gasoline engine remains in place, located between gates 5 and 6 in the head gate house.

At some point in recent decades, though, the use of this gasoline engine has been discontinued; the gate operators are now powered by an electric motor. It is important to note, however, that though the power source has changed over the years, the way that the power is applied in the operation of the gates remains as it was in The head gate house was altered in when the present hydroelectric powerhouse was constructed. As noted above, the need for vastly larger amounts of water for the new powerhouse required a wider and deeper canal; the new size of the canal in turn required a gate COHOES COMPANY, GATEHOUSE NO. 1 HAER No. (Page 17) house that would span it.

Photographs recently acquired by the Mohawk-Hudson Industrial Gateway in Troy, New York, provide partial documentation of the construction of the new section of the head gate house. The addition of the new section in included the removal of the original crenellated tower at the west end of the gate house above the western-most bay; the builder's plaque, which originally was inset in the west wall of the tower was salvaged and attached to the interior wall of the original section of the head gate house. Other than this tower and the removal of the western wall, however, the addition of the new section required no alterations in the existing head gate house, including the gate operating machinery.

By the hydraulic and civil engineering had progressed such that timber slide gates were no longer the most efficient. Instead, the new section of the gate house used steel tainter gates to control flow into the canal. Tainter gates, which had been invented in by Jeremiah Burnham Tainter, featured a convex curve that faced the flow of water; the gate was rotated upward around a pivot point behind the gate's face to allow water to pass, while the weight and shape of the gates allowed the passing water both to assist them in opening and closing. The section of the head gate house features three tainter gates. Instead of the hydromechanical and gasoline-engine power sources for the original timber slide gate operators, the new gate operators were powered by a unique hydraulic system.

A riveted steel tank, which contains the hydraulic fluid, is located at the junction of the and sections of the head gate house. The hydraulic fluid is pressurized using a large three-cylinder pump powered by electric motors located adjacent to the tank. The pressurized fluid passes through metal pipes to a control mechanism located above each gate; when opened, the pressurized hydraulic fluid raises and lowers two tall stanchions at each gate. Chains attached to the top of each stanchion then rotate around a drum at each side of the gate; chains attached to these drums then rotate the tainter gates open and closed. COHOES COMPANY, GATEHOUSE NO. 1 HAER No. (Page 18) References Allen, Richard S. Power Canals Cohoes Company, Cohoes. In Robert M.

Vogel, ed., A Report of the Mohawk-Hudson Area Survey. Smithsonian Institution Press. Washington, DC. Huberman, R. Carole Head Gate House Cohoes Company, Cohoes. In Robert M. Vogel, ed., A Report of the Mohawk-Hudson Area Survey. Smithsonian Institution Press. Washington, DC. Porter, Dwight Reports of the Water-Power of the Hudson River Basin and the Lake George Outlet. In Trowbridge, ed., Statistics of Power and Machinery Employed in Manufactures. Department of the Interior, Census Office. Washington, DC. Rezneck, Samuel Cohoes: The Historical Background In Robert M. Vogel, ed., A Report of the Mohawk-Hudson Area Survey. Smithsonian Institution Press. Washington, DC. Silvio, Terri, and Janice G.

Artemel Ousatonic Water Power Company: Dams and Canals, Derby Dam, Shelton Canal, Derby Canal (Derby Hydroelectric Project). Typescript MS and photographs. Library of Congress, Prints and Photographs Division, Historic American Engineering Record No. Washington, DC. Unknown William E. Worthen Dead. Obituary in The New York Times, April 3. New York, NY.

In context

Cohoes, New York The place record: every map, photograph and survey of this town.
Albany County, New York 194 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Cohoes

9 records

The federal surveyors worked through Cohoes building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Erie Canal (Original)HAER NY-33711,652 words
Cohoes Company Power Canal SystemHAER NY,1-COHO,3A-6,203 words
Erie Canal (Enlarged)HAER NY,1-COHO,5A-4,891 words
Harmony Manufacturing CompanyHAER NY,1-COHO,2-3,881 words
Cohoes Company StableHABS NY,1-COHO,3B-1,072 words
198-200 Saratoga Street (House & Commercial Building)HABS NY,1-COHO,6-894 words
Eagle's Nest Creek CulvertHAER NY,1-COHO,5B-790 words
Wessel Van Schaick HouseHABS NY,1-COHO,1-89 words
Harmony Manufacturing CompanyHAER NY-54435 words

Provenance

  • Written history. Quoted verbatim from HAER NY,1-COHO,3B-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.