Under the terms of a new license from the Federal Energy Regulatory Commission, the present owner will replace the original gate operators with modem operators. The original portion of the head gate house contributes to the significance of the Harmony Mills National Historic Landmark, including the gate operators. No other alterations are proposed. To mitigate the adverse effect, the National Park Service stipulated documentation of the head gate house. Prepared by: Bruce G. Harvey Senior Cultural Resources Specialist Kleinschmidt Associates Liverpool, NY December 12, COHOES COMPANY, GATE HOUSE NO. 1 HAER No. (Page 14) Summary Description The head gate house was constructed in two phases.
The first part of the head gate house was constructed by the Cohoes Company in as part of a hydromechanical complex. This complex, an upgrade from the initial complex of the early was designed to take advantage of the flow of the Mohawk River and the elevation drop of Cohoes Falls in order to power a range of factories in Cohoes. A more detailed history of the Cohoes Company and the manufacturing plant in the City of Cohoes can be found in the report of the pilot HAER project on the Mohawk-Hudson Area (Allen Huberman Rezneck Additional descriptive information can be found in the Addendum to the original HAER report, which was prepared in prior to the removal a the "T" section of the original head gate house that lay on the east side of the power canal.
This section, which formed a "T" on the east bank of the power canal closest to the Mohdwk River, was demolished in In the original design of the head gate house, this section housed two gates and a turbine that provided hydromechanical power to the head gate operators. When constructed in the head gate house consisted of a one-story brick building that was constructed on a masonry foundation across the head of the Cohoes Company's power canal, immediately downstream of the dam that also was built in The original head gate house was approximately long and 13' wide, and rested on a masonry foundation that contained nine gate openings through which water entered into the power canal.
The "T" section was approximately long and 10' wide, and rested on a masonry and parabolic brick arched foundation. The interior of the original section featured unarticulated spaces in both the part that crossed the canal and the "T" section on the east bank of the power canal. The interior of the part that crosses the canal is dominated by the machinery that is used to operate the slide gates, which are lifted to allow water to flow into the power canal and closed to stop water from entering the power canal. Each of the nine gates is controlled by its own operating machinery. With relatively limited modifications as described below, this historic configuration has remained intact.
The interior of the "T" section, as originally designed and constructed, housed two sets of gates and machinery. One set of gates was used to dewater the forebay, while the other set was used to power a small Pelton-type water wheel. As described below, this water wheel provided hydromechanical power to the nine gate operators in the part of the head gate house that crosses the canal. The second section of the current head gate house was constructed in by the Cohoes Power and Light Company.
The Cohoes Power and Light Company had built a small hydroelectric facility near the base of Cohoes Falls in using the existing power canal as enlarged by the Cohoes Company in In the Cohoes Power and Light Company constructed the existing hydroelectric complex consisting of the powerhouse, lower gatehouse, upper gatehouse, and power canal. In order to provide enough water to power the larger generating units of the new powerhouse, the Cohoes Power and Light Company enlarged the power canal, making it both wider and deeper. In order to accommodate this widened power COHOES COMPANY, GATE HOUSE NO. 1 HAER No. (Page 15) canal, the Company added a new section to the existing head gate house. The new section, like the original section, is 13' wide and approximately 80' long.
The floor of the new section also is approximately 2' higher than the original section, a difference in elevation that is visible both in the different roof lines and in the slope of the concrete floor inside the head gate house. This section, which extends from the western end of the original head gate house to the west bank of the power canal, houses three tainter gates. Each of these gates is controlled by its own hydraulic lift mechanism.
Head Gate House Operators The original head gate operating machinery has been in use, first for the Cohoes Company's power canal to power the hydromechanical machinery in the city's textile mills and later to power the School Street hydroelectric station, since they were installed in Although the power source for the gate operators has changed, the way that they work has not. The gate operators in the Cohoes Company's head gate house were an ingenious solution to the problem of lifting and dropping the heavy timber gates that were necessary to control the large amount of water flowing into the power canal. The design of these gates appears to have been created by William E. Worthen, a civil engineer based in New York City.
Worthen, born in Amesbury, Massachusetts, in literally grew up in the world of hydraulic engineering. His father, Ezra Worthen, was instrumental in the development of the water power in the City of Lowell, Massachusetts, in the early nineteenth century, and served as the first superintendent of the Merrimack Manufacturing Company. Worthen was educated at Harvard College, receiving a bachelor's degree in and immediately began work as a civil engineer with special attention on hydraulics and hydrology.
Worthen's obituary in quotes "an authority" who wrote, in "As a hydraulic engineer he has designed and constructed masonry dams across rivers, for the establishment of water-powers, and the canals, mills, and shops connected therewith." According to the builder's stone in the head gate house, William E. Worthen served as the engineer for the Cohoes Company's redevelopment of its dam and head gatehouse in Although no information survives regarding the designs for the gate operators, it is important to note that Worthen also served as the engineer for the Ousatonic Water Power Company when they constructed a dam across the Housatonic River between Shelton and Derby, Connecticut, in the late (See HAER No.
for documentation of Ousatonic Water Power Company, Dam and Canals.) This new dam provided water for power canals on each side of the river (Silvio and Artemel At the time the dam was built, each canal was controlled by a wooden gate house. Between and however, each of these wooden gate houses was replaced with a new brick building. The existing gate operating machinery in the Shelton Canal gate house on the west side of the Housatonic River is similar to that used in the Cohoes Company's head gate house. The gate operators at the Shelton Canal gate house no longer have the vertical iron posts as at the School Street head gate house; it is unclear whether the operators at the Shelton Canal gate house were designed that way, or if the vertical iron posts were removed.
Although the report that documents the Ousatonic Water Power Company s facilities does not provide any details on the machinery, it is likely, given Worthen's connection to the Cohoes Company facility, that he designed both. COHOES COMPANY, GATE HOUSE NO. 1 HAER No. (Page 16) The gate operating machinery was powered initially by a Pelton-type water wheel located in the "T" section of the head gate house on the east side of the power canal; this section was removed in The water wheel drove a series of shafts that extended along what was then the length of the head gate house, and provided power to each operator. A beveled friction gear at each gate allowed the lifting mechanism to draw power from the shaft. An study by the U.S.
Census of the Water Power of the United States (Porter provide a more detailed description: The machinery for raising and lowering the gates is very easily operated and satisfactory in working. The turbine .. .is at the river end of the bulkhead, and operates three lines of shafting; one of these, 2 1/4 inches in diameter, runs in at right angles to the stream and connects with the head-gates; the other two run in either direction parallel to the stream and connect with the waste-gates. Each gate has attached to it two vertical iron posts with racks.
Opposite one post of each gate is a pair of beveled friction-wheels revolving in parallel vertical planes; a third wheel, revolving in a plane at right angles to these, can by a small hand-wheel be brought in contact with either accordingly as it is desired to raise or to lower the gates. The turbine is started and sets in motion the long horizontal shaft and the odd friction-wheels; in the manner just described the motion is now communicated to one of the adjacent friction-wheels, which is thus made to revolve, and with it its iron shaft, having a worm-gear; this turns a large vertical toothed wheel, on the axle of which is a smaller toothed wheel directly engaging the rack, which is firmly connected to the gate.
On the same axle is another toothed wheel, opposite to, and engaging, the other rack of the same gate. It is unclear when this method of powering the gate operators was removed, though it appears to have been in the early- to mid-twentieth century. The preparers of the Addendum to the original HAER report interviewed Regional Operations personnel from the Niagara Mohawk Power Corporation, the owner of the School Street Hydroelectric Project at the time, but none was able to provide useful historical information on the power source for the head gate house. The first change was to replace the water wheels as a source of power with a gasoline engine. This gasoline engine remains in place, located between gates 5 and 6 in the head gate house.
At some point in recent decades, though, the use of this gasoline engine has been discontinued; the gate operators are now powered by an electric motor. It is important to note, however, that though the power source has changed over the years, the way that the power is applied in the operation of the gates remains as it was in The head gate house was altered in when the present hydroelectric powerhouse was constructed. As noted above, the need for vastly larger amounts of water for the new powerhouse required a wider and deeper canal; the new size of the canal in turn required a gate COHOES COMPANY, GATEHOUSE NO. 1 HAER No. (Page 17) house that would span it.
Photographs recently acquired by the Mohawk-Hudson Industrial Gateway in Troy, New York, provide partial documentation of the construction of the new section of the head gate house. The addition of the new section in included the removal of the original crenellated tower at the west end of the gate house above the western-most bay; the builder's plaque, which originally was inset in the west wall of the tower was salvaged and attached to the interior wall of the original section of the head gate house. Other than this tower and the removal of the western wall, however, the addition of the new section required no alterations in the existing head gate house, including the gate operating machinery.
By the hydraulic and civil engineering had progressed such that timber slide gates were no longer the most efficient. Instead, the new section of the gate house used steel tainter gates to control flow into the canal. Tainter gates, which had been invented in by Jeremiah Burnham Tainter, featured a convex curve that faced the flow of water; the gate was rotated upward around a pivot point behind the gate's face to allow water to pass, while the weight and shape of the gates allowed the passing water both to assist them in opening and closing. The section of the head gate house features three tainter gates. Instead of the hydromechanical and gasoline-engine power sources for the original timber slide gate operators, the new gate operators were powered by a unique hydraulic system.
A riveted steel tank, which contains the hydraulic fluid, is located at the junction of the and sections of the head gate house. The hydraulic fluid is pressurized using a large three-cylinder pump powered by electric motors located adjacent to the tank. The pressurized fluid passes through metal pipes to a control mechanism located above each gate; when opened, the pressurized hydraulic fluid raises and lowers two tall stanchions at each gate. Chains attached to the top of each stanchion then rotate around a drum at each side of the gate; chains attached to these drums then rotate the tainter gates open and closed. COHOES COMPANY, GATEHOUSE NO. 1 HAER No. (Page 18) References Allen, Richard S. Power Canals Cohoes Company, Cohoes. In Robert M.
Vogel, ed., A Report of the Mohawk-Hudson Area Survey. Smithsonian Institution Press. Washington, DC. Huberman, R. Carole Head Gate House Cohoes Company, Cohoes. In Robert M. Vogel, ed., A Report of the Mohawk-Hudson Area Survey. Smithsonian Institution Press. Washington, DC. Porter, Dwight Reports of the Water-Power of the Hudson River Basin and the Lake George Outlet. In Trowbridge, ed., Statistics of Power and Machinery Employed in Manufactures. Department of the Interior, Census Office. Washington, DC. Rezneck, Samuel Cohoes: The Historical Background In Robert M. Vogel, ed., A Report of the Mohawk-Hudson Area Survey. Smithsonian Institution Press. Washington, DC. Silvio, Terri, and Janice G.
Artemel Ousatonic Water Power Company: Dams and Canals, Derby Dam, Shelton Canal, Derby Canal (Derby Hydroelectric Project). Typescript MS and photographs. Library of Congress, Prints and Photographs Division, Historic American Engineering Record No. Washington, DC. Unknown William E. Worthen Dead. Obituary in The New York Times, April 3. New York, NY.