A symbol of the importance of the railroad to the City of Cortland and a good example of the design attention given to stations of this period. PART I. HISTORICAL INFORMATION A. Physical History: 1. Original and subsequent owners: Lehigh Valley Railroad until - Purchased by Wickwire Brothers, November 30, recorded Book page 161 at County Clerk's office, Court House, Cortland, New York. - Sold by Wickwire Brothers. - Purchased by Nick Deloisio. 2. Date of erection: cost (letter from H. F. Reilly, Chief Engineer, Lehigh Valley Railroad Company, 425 Brighton Street, Bethlehem, Pennsylvania February 17, 3. Architect: J. J. McCleece. 4. Builder, suppliers, etc.: The builder is listed in Cortland Standard, March 29, as John Bender, Corning, New York.
In another news item it is John Benzer of Corning. But Mr. Gifford Harrington, 48 Union Street, Cortland, New York, still at the Lehigh Freight Station in reports conver- sations with Mr. John Benger, then of Cortland, concerning his building of the "new" station. There is a Benger Block on South Main Street, Cortland, and other building in the city is attributed to him. Electrical supplier Southwick & Company, Cortland, New York; furniture by the Peck Furniture Company of Cortland, New York; and large clock LEHIGH VALLEY RAILROAD STATION HABS No. (Page 2) from A.
M* Jewett, Cortland, New Yersey (Gortland Standard, March 29, Original plans, construction etc*: Partial transcript from Gortland Standard, March 29, "NEW LEHIGH VALLEY STATIONS OPENED Formally, on Tuesday, April 4--Public invited to Gall and Inspect Them,.. The Passenger Station The passenger station is 155 feet long and 50 feet wide, including the pavilions or projecting roofs over the plat- forms and is two stories high. It is constructed of brown vit rified rockfaced brick for the base course extending up to the window sills, where there is a belt course of hummel stone, brown-stone trimmings. From the belt course to the roof, including the second story, the walls are com- posed of hollow tiles with cement stucco finish.
The brackets* canopy beams, etc., are of yellow pine stained Flemish green and varnished. The canopy lanterns are of black iron. On the ground floor is the general waiting room, 23 by 25 M feet, a women's retiring room twelve-and-one-half feet square, a smoking room and a ticket office 26 by thrrteen- and-onp ha^f feet. The waiting room is finished with paneled wainscoting and beam ceilings done in chestnut, stained Flemish green and finished flat* The floor throughout is of marble terrazzo. The settees match the wainscoting and are heavy in construc- tion. The walls are tinted cream color and the paneling is painted green.
The lighting fixtures, which were installed by Southwick & Company of Cortland, who did all the electrical work, include square bronze electroliers and side brackets finished in Pomoian [sic] green. The women's room is finished similar to the general waiting room. On the west wall is a handsome full length pier glass mirror, which will be appreciated by all women patrons of Che road. The room is also furnished with mission chairs, table, etc. West of the rooms described is a passageway extending across the building separating the main part of the station from the baggage room, which is 15 feet wide, 25 feet long, well lighted, provided with sliding doors and a concrete floor. LEHIGH VALLEY RAILROAD STATION HABS No.
(Page 3) On the second floor are four offices, two either side of a dividing hall, for train dispatching, telegraphing, admini- stration purposes, etc. The station is provided with a tile roof finished with terra cotta hip and ridge rolls. On the east or Main Street side the canopy or roof extends for 34 feet over the platform. A cellar 18 by 26 feet under the central part of the station furnishes the necessary room for the heat apparatus, etc. The station is heated by steam throughout and lighted by electricity, and standpipes and an abundant supply of hose provides fire protection. A concrete platform surrounds the station." It is said (Cortland Standard, between July 2 and July 6, Blodgett Scrap Book, vol.
19, page Cortland Gounty Historical Society) that some of the brick used in the construction was probably originally used in the old County Jail and Court House on Court House Hill which was demolished in the brick then being used above the 4 first ten feet in the smokestack of the Cortland Horseshoe Nail Company, later bought by the Lehigh Valley Railroad for car shops. 6. Alterations and additions: When rented to Progressive Printing Company by Wickwire Brothers, the partitions surrounding the ticket offices were removed. B. Historical Events and Persons Connected with the Structure: The formal opening on Tuesday, April 4, was celebrated with gifts of postcard pictures of the station and a lengthy article in the Cortland Standard, the local paper.
Arrivals and departures of noted personages were also reported by the papers. C. Sources of Information: 1. Old Views: An enlargement of what was probably the souvenir postcard distributed on opening day, is a view of the south or track side of the buildings. 2.