Erie Railway, New Jersey, New York, Pennsylvania, Deposit, Broome County, NY. Surveyed as HAER NY,4-DEPO,2-, with a 110,858-word written history.
From the record
“This important American railway system was the first such system to reach into .the interior of the northeast and link the lower Hudson with Lake Erie.”
Written record, HAER NY,4-DEPO,2- survey. Machine-read text.
Surveyed by the federal HAER program as HAER NY,4-DEPO,2- · the record runs 110858 words · one of 39 surveyed structures published for this county.
Source document
Quoted word for word from HAER NY,4-DEPO,2-.
Not written, edited or summarised by this site.
This important American railway system was the first such system to reach into .the interior of the northeast and link the lower Hudson with Lake Erie. It had several engineering and operational firsts in railroading and boasted additional civil engineering advances.
Written history
110737 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HAER NY,4-DEPO,2-.
Not written, edited or summarised by this site.
Bruce Seely, NOTES TO RESEARCHERS: The Erie system cuts through three states. Specific sites along the railway system have been assigned a HAER number according to the state in which they are located and do NOT fall under These sites are listed in order by their HAER number in Appendix 0 284-288),.and a list of captions for selected photos of most of these sites is provided in Appendix E for convenience. However, each site has its own photo index filed with the photos and negatives under its HAER number. Some sites were also documented with measured drawings.
Many photographs referred to by cardinal numbers in the text and footnotes of this report are filed in the HAER collection under HAER numbers; the rest are filed under their cardinal numbers with numerous other old Erie photos in a supplemental collection called Erie Railway: Historic Photographs and Supplemental Graphic Materials, Library of Congress Lot Nos. and The Transposition Table in Appendix C shows where specific photos are presently filed, however, the photos from the supplemental collection used in the report have been xeroxed in order by their reference numbers in Appendix F for ease of use. Appendix G gives an inventory of the entire supplemental collection.
It is understood that access to HAER material rests on the condition that should any or it be used in any form cr by any means, the author(s) of such material and the Historic American Engineering Record of the National Park Service at all times be given proper credit. ERIE RAILWAY SURVEY HAER (Page / )
Table of Contents
List of Tables lc CHAPTER I: Building the Erie Railroad 2 CHAPTER II: Growth of the Erie 19 CHAPTER III: Tunnels 49 CHAPTER IV: Bridges 57 CHAPTER V: Viaducts 76 CHAPTER VI: Erie Railroad Shop Facilities 93 CHAPTER VII: Shops - Part II 119 CHAPTER VIII: Minor Shops 145 CHAPTER IX: Erie Stations 163 CHAPTER X: The Termini 193 Footnotes 214 Bibliography 259 Appendix A - Shop Tools 264 Appendix B - Maps ,. 277 Appendix C - Transposition Table for Report Photo Nos 280 Appendix D - HAER Numbers of Erie Sites Recorded by HAER.. 284 Appendix E - Captions of Selected HAER Photos 289 Appendix F - Reference Photos, Supplemental Collection....
302 Appendix G - Inventory of Supplemental Collection 464 ERIE RAILWAY SURVEY HAER (Page /C ) LIST OF TABLES TABLE I: Steam and Diesel Locomotives on the Erie 44 TABLE II: Wood and Iron Bridges on the Erie in 60 TABLE III: Bridges Replaced by Steel, or in Process of Replacement, 62 TABLE IV: Piermont Shops, 95 TABLE V: Dunkirk Shops, 97 TABLE VI: Susquehanna Shops, 106 TABLE VII: Homell Shops, 129 TABLE VIII: Shops 146 TABLE IX: Port Jervis Shops, 158 ERIE RAILWAY SURVEY HAER (Page 2. ) Building the Srle Railroad The Erie Railroad probably enjoys the least enviable reputation of any major American Railroad.
While the Pennsylvania Railroad is re- membered as che "Standard Railroad of the World," and che Baltimore and Ohio claims to be the oldest line in the country, the Erie's historic significance has been said to lie in the scandals resulting from the financial manipulation of such "scoundrels" as Jay Gould, James Fisk, and Daniel Drew.
Yet there is a great deal more to the history of the Erie on a more positive note- When the Erie began through operations to Dunkirk, New York, in the railroad became the first trunk line to reach into the interior and afford service between the lower Hudson and Lake Erie, Other "firsts" for the Erie include a number of oper- ating practices and engineering procedures that marked significant innovations in American railroading; similarly, the Erie can boast- a number of structures that were important advances in civil engineering. This report will proceed with these contributions in mind. After a discussion of the initial construction of the railroad and a brief business history of the company, the paper will turn to the various buildings and engineering features of the Erie.
The structures are classified by general type- There are discussions of bridges, tunnels, viaducts, shops and stations, and terminals. This approach requires an artificial separation of facilities at the same geographic location (artificial in the sense that all of the facilities at a given point relied upon each other and thus formed a system). Unfortunately, other means of arrangement would make the paper disconnected and unwieldy In a similar way, since the Erie was a constantly growing entity, the task of identifying just what comprised the old Erie is not an easy one. But with only a few exceptions, this survey comprises the Erie Railroad main line after when the terminals included Jersey City, New Jersey and Piennont, New York, in the east end and Buffalo and Dunkirk on the west end.
Initial Construction Like most early railroads in the United States, the Erie enjoyed a long gestation period between its conception and the beginning of actual operation. [1] The financial success of the Erie Canal and the resulting prosperity for citizens along its banks was one of the primary forces leading to the formation of the railroad. Farmers and businessmen- in the Southern Tier of Nfew York counties-wanted their own outlet to New York City and the outside world. Toward this end, a pamphlet by William Redfield in entitled "Sketch of the Geographical Route of a Great Railway . . . opening thereby a free communication at all seasons of the year between the Atlantic States and the great valleys of the Mississippi," aroused local attention.
Certainly this publication helped lay the groundwork for the Railroad Convention held in Owego on December 20, The meeting attracted ERIE RAILWAY SURVEY HAER [Page 3 ) people from zhe. Southern Tier counties. Railroad fever ^riooed "he state in i 21 and other railroads emerged. 3y 13 raiiroaas had been chartered in New York, but only 2 had actually opened. In the state legislature received 12 new charter applications. Out of this flurry emerged a vague charter for the New York and Erie Railroad, dated April 24, Amendments passed the following year permitted the company to organize when only one of the ten million dollars required had been subscribed. That portion of the money was raised by August 9, when Eleazor Lord was elected president of the company.
[2] The new company began its own survey for a route to upgrade the piecemeal efforts made up to that date. At the same time, the officers appealed for grants of land along the potential right of way. The inability to finance a comprehensive survey resulted in an appeal to Andrew Jackson for federal funds, but to no avail. Benjamin Wright undertook the survey anyway, and employed as chief assistants James Seymour in the east and Charles Ellet, in the west. Lack of money prevented a thoroughly comprehensive survey, and later plans had to correct numerous difficulties. But the name of Judge Benjamin Wright, builder of the Erie Canal, on the report served to allay any suspicions of legislators who viewed the work as a total waste.
Wright submitted his report to the Secretary of State on January 20, It is clear that Wright's survey was a mere summary of the more technical reports of his two assistants. The route proposed included steep grades, especially between Middletown and Deposit. Wright's plan eschewed the easy route down the Neversink River to the Delaware River and then westward up the Delaware Valley. Political reasons in part accounted for this choice.
[3] But Wright also avoided the Delaware River because, in Wright's words, "It (the railroad) might come into collision with the Delaware and Hudson Canal, and perhaps divert some of its legitimate and fair business, and in construction it might interfere with that important and very useful work, for the execution of which its enterprising directors deserve to be gratefully considered." [4] Wright's concern for the D. & H. Canal may also have stemmed from Wright's parti- cipation in the canal's construction as chief engineer. No doubt Wright owned some of the canal company's stock. Whatever, it was clear to all subsequent engineers that Wright's choice of a route was too beset by torturous grades that rendered both construction and operation unfeasible.
Wright had also agreed with Ellet's proposal for an inclined plane with a stationary steam engine to reach the lake at Dunkirk. Both engineers doubted the ability of the locomotives to climb the hill at that point. This choice seems confusing, as the Rainhill Trials in England in had proven that locomotive could manage such grades. Even more confusing was the fact that Wright had been one of the first American engineers to experiment with steam locomotives in [5] ERIE RAILWAY SURVEY HAER (Page ^ ) These choices were only two of the proposals chat later engineers had to altar.
As Edward Mott, an historian of the Erie, commenced, although a railroad built according to the plans and over Che route provided in would have been one utterly impossible of practical utility, that survey stands today a wonderful exhibit in railroad engineering, and shows an originality of thought, and a peculiar application of scientific principles to a work then almost unknown to the engineering world an application which established a precedent for all future engineering of thac kind." [6] Mott may tend to exaggerate the importance of this survey. The plans were clearly preliminary, inadequately financed, and done in haste. Not the least of the difficulties was the cost estimate.
Wright projected "for grading, for track superstructure, and che directors added for vehicles, company expenses and engineering, and contingences. [7] This $6 million figure actually amounted to one- fourth of the actual final cost. The Wright survey served a vital public relations function, convincing the legislature of the feasibility of the railroad. For this purpose, no better name could have been chosen than Benjamin Wright's. But the survey does little to enhance the reputation of this early American engineer. Construction work commenced on November 7, at Deposit, New York, with a small ground-breaking ceremony. Actual construction started on 44 sub-divisions along the Delaware River between Callicoou and Deposit on November 15. Some 40 miles of grading were thus under contract.
But the work was cut short. A disasterous New York City fire on December 16, ruined many Erie backers and others were hurt by the Panic of The Erie's finances fell apart, and additional contracts for the 69 miles between Owego and Deposit, and 48 miles from Callicoon to the Neversink River, although advertised in April, were rescinded in May, With the Panic, the engineering department was reorganized. Wright remained as consulting engineer, but the actual control of the work was divided between E.F. Johnson from New York to Painted Post, and Captain Andrew Talcott, [8] from Painted Post to Lake Erie.
Johnson immediately recognized the need for line changes to take advantage of the Delaware Valley route between Port Jervis and Callicoon, and of the Susquehanna Valley from Susquehanna, Pennsylvania, to Binghamton, New York. But before any work could begin on these new lines, the company rescinded all contracts and suspended all work in the Delaware Valley during March and April, because the railroad ran out of money. The Erie even had to discharge all of the engineers in addition to the contractors. [9] A year later, the company hired a new group of engineers to carry out a more complete survey. Major Thompson S. Brown was appointed Chief Engineer of the Western Division and Edwin F. Johnson filled the same post on the Susquehanna Division Chaving been rehired).
Hezekiah Seymour ERIE RAILWAY SURVEY HAER (Page - ) bossed the Eastern Division and Celim L- Seymour became resident engineer of Che Delaware Division. Like Che Erie Canal, the Erie Railroad was to serve as a training ground for a great many engineers, as these men received their first experience with railroad surveying ..and construction. The Erie's engineers proved to be an interesting group. Major Brown was an graduate of West Point who spent 11 years on various govern- ment projects, including a survey of Western rivers and an inspection report on the Cumberland Road.
After resigning in to go into public works, Brown came to the Erie in where he became Chief Engineer of the whole road in In the meantime, Brown accompanied the dele- gation sent to England in to purchase rails for the line from Piermont to Goshen. This was the Major's first experience with railroads and served him in good stead after when he went to Russia to replace Major Whistler as engineer in charge of that country's railroad building program. Silas Seymour was one of the lesser engineers in but his career typifies the route which many men followed in the process of becoming engineers. Beginning as a rodman on the Delaware Division in Seymour advanced to the position of Assistant Engineer on the Western Division a year later. From June, to June, he served as Resident Engineer.
In this last post, Seymour controlled the surveys from Dunkirk to Cold Spring, 40 miles. During Brown's absence in England, Seymour controlled all Western Division surveys. -In June, he was promoted to Superintendent.of Construction. He finished his Erie career as Chief Engineer of Construction from to Seymour moved on to the Buffalo and New York Railroad as Chief Engineer and later General Superintendent of that line, which connected to the Erie at Hornell. Seymour designed and built the Portage Bridge, discussed below. As a contractor or consulting engineer, Seymour later worked on several other rialroads, including the Louisville and Nashville and the Union Pacific, where he took part in the ceremony of driving the Golden Spike.
He also served as New York State Surveyor-General, chief engineer of the Potomac Bridge for the Washington and Alexandria Railroad, and consulting engineer, and later chief engineer for the Washington Aqueduct. Knowledge was gained by experience, not schooling. To Silas Seymour must go most of the credit for the location of the Western: Division. Again, this was a common pattern in the early days of American engineering, where a famous engineer often presided as the chief engineer but left much of the actual work up to his subordinates. The other notable division engineer was Hezekiah C.
Seymour, whom Mott called, one of the early prominent civil engineers of this country." Hezekiah Seymour stood as the dominant force on the Erie until Until that time, as Mott commented, "The Company's affairs were ERIE RAILWAY SURVEY HAER (Page 6 ) then virtually in control of the Chief Engineer rlazekiah C. Seymour and his assistant Post. It was the common saying of the day that "Seymour ran the directors, and Post ran the road." With thorough- going control, most of the technical decisions concerning the roadbed, grading, and so on, were made by these two men. As Mott explained, Seymour . . , and Post were the original controlling minds, in Erie practical affairs." For this reason, Seymour is remembered as the father of the broad guage on the Erie.
He favored the 6-foot width from the start and bulldozed the idea past later opposition, thereby saddling the Erie with this anomaly. Only with the appointment of Silas Seymour as Construction Superintendent in was Hezekiah Seymour's influence moderated at all. Even after when Thompson "Brown replaced Hezekiah as Chief Engineer, the older engineer retained his dominating influence with the Board of Directors. Not until did he relinquish his post as engineer of the Eastern Division, and only then to accept an appointment as New York State Engineer and Surveyor. He had an interest in contracts on western railroads until his death in Celim L.
Seymour was the Delaware Division's Resident Engineer, coining to the railroad after working as a surveyor for the Delaware and Hudson Canal, the Mount Carbonaale Railroad, the Pennsylvania Canal, and the Great Western Mail Route, Vincennes to St. Louis. Seymour favored the interior route advocated by Wright, and loudly denounced the Delaware River route. This very mixed group of engineers comprised the main individuals responsible for the construction when work resumed in August, Construction started on the line from Piermont to Goshen, and on 10 miles east of Dunkirk, while the company ordered surveys from Binghamton to the Genesee River, and in Allegany County. This plan proved overly ambitious, for in 23 of the 48 contracts were cancelled because of money problems.
Nonetheless, the Erie managed to lay its first rails in using the 6-foot guage. As mentioned, Hezekiah Seymour backed this decision, which Eleazar Lord favored in about These men argued that most British engineers supported the broader guage. They also believed the broad width would better support heavier loco- motives and thus carry greater loads on the Erie's steep grades. But a political motive also influenced this decision. The company's charter prohibited any connections with other railroads outside of New York, in order to prevent the diversion of traffic from New York City. Lord decided the broad guage would help enforce this charter provision. Thus the Erie embarked on a course that ultimately cost the company over S25 million in conversion costs.
But the Erie did become an innovator, as it became the first American railroad to use a 6 foot guage. ERIE RAILWAY SURVEY HAER (Page 7 ) The company let bids for materials for the "rack, structure in November, Cross ties were durable oak, chestnut, or butternut, 9 feet long and 7 1/2 to 9 inches in diameter. Rails- were of white, pin, or rock oak, 6 by 3 inches and 15, 20, or 25 feet long. Sills of pine, oak, chestnut, hemlock, 5 by 10 to 12 inches and as long as the rails, and piles 20 feet long and 7 to 8 inches around were also specified. The company ordered English iron rails 3 1/2 inches high, 4 inches on the base, and weighing 56 pounds to the yard.
These materials were assembled in a unique way which offers an interesting insight into how the early engineers were groping for -solutions to the difficult problems that confronted them. First the sills were laid down and scarphed at the ends, to prevent any irregularities at joints. At 6-foot intervals on curves and at 8- foot intervals on tangent track, cross ties were countersunk into the sills, and secured with 2-inch oak treenails. The rail itself rode in a notch cut into the sill and was held down by brad-headed spikes 5 1/2 inches long at 18-inch intervals. Cast iron chairs secured the rail at the joints. The rails were English-made to Erie specifications, probably established by Thompson S. Brown.
The specs required puddled bar iron, rolled into 18-foot rails, with 10% 12 to 15 feet long. As actually rolled, the rails weighed 51 1/2 pounds per yard, and were H-shaped. The British Iron Company produced these rails tons for and 300 tons of rail chairs. There are interesting points about the rail installation. The builders had learned stone ties were not suitable as a track carrier, since an proposal for the installation of track upon stone blocks 32 inches off the ground had been rejected. The lessons of strap rails were also absorbed. In both instances, the difficulties ex- perienced by the New Castle and Frenchtown Railroad in Delaware were not repeated on the Erie.
However, the engineers had not yet realized that a continuous sill was not needed to support the entire length of the rail. Likewise, countersinking the ties in to the sill was unnecessary. Operation, of the locomotives over the line soon showed the adequacy of the rails alone without the sill, but as late as some of the track from Piermont to Suffern still had the original installation. Learning just what type of track structure best served the purpose was very quickly done and the corrections were easily made. But a more costly mistake was made regarding the roadbed for long stretches of the Susquehanna and Western Divisions. In the company decided to erect ERIE RAILWAY SURVEY HAER (Page 3 ) :he rails upon a piled roadway, rather Shan grade "he land for a usual roadbed.
General Charles 3. Stuart, when asked, had recommended this plan to the company after his experiences building the Syracuse and Utica Railroad in Stuart wrote, "'piled roadbed was an improvement destined to facilitate the completion of those vast links in the chain of internal improvements throughout our State and the Union ... It - is not alone in economy of construction that the advantages of the piling system consists in the Northern clime. It is not liable to derangement by frost; it is free from the dangers of floods and rains, and settling when set up in soft bottoms. . .
The interest on the money by building a pile road instead of a graded road will renew the piles, if necessary, every'five years.'" Stuart considered the pile system suitable for all land where there was a good supply of timber. It could be erected faster than a graded road and the purchase of timber could arouse local interest in the railroad, and the Erie adopted Stuart's idea. The first piles were driven at Owego on May 13, commencing the construction of some 20Q miles of piled roadway. White oak was used for the 8 to 10-foot piles, each 10 to 16. inches around, while chestnut or oak was specified for the cross ties. Workers drove the piles in pairs, 4 feet apart, every 5 feet. The contractors used 8 Crane steam pile driving machines, because of the hard ground condition's.
Each machine needed a 13-man crew, and a horse and cart to draw water. Weights of to pounds fell 30 feet. Four hand-driven pound hammers were used for driving bridge piles. The ground was often so hard that pits had to be excavated to permit the workers to start the piles. In soft earth, where longer piles had to be used, the posts were pin-connected. Except where flooding was a possibility, the piles were cut off above the ground only four inches high, using a circular saw mounted right on the pile-driver. The next step consisted of cutting a tenon into the top of the post, 2 inches high and 9 inches deep, the same width as a tie- The tie was then morticed into the tenon, while the upper side of the tie was notched for a sill. ' Wedges driven into the pile held the sill' in place.
These sills were joined by overlapping a plank below the joint, to make the board continuous. The construction of the pile roadway continued through and while the company struggled with financial difficulties. By the latter year, 450 men and 60 teams were at work. One hundred miles of work was contracted between January and June.' Also, crews laid rails to complete the 10-mile stretch eastward from Dunkirk. But saw the second collapse of the company from lack of funds. In November, the Erie warned contractors not to expect further payment. The estimate of the final cost had now risen to $9 million.
Grading costs were projected at an increase of million over Wright's projection, while track cars, ERIE RAILWAY SURVEY HAER (Page S ) structures, 2nd contingencies added nr.orher Un or tun at sly , the money was just not available, and on April 1, the company de- faulted on interest due the state, and for 4 years the property stood abandoned. The work completed to was considerable. Some 410 miles of -the line had been placed under contract. The line to Goshen was the only section in use. Grading between Goshen and Middleton was almost complete, while the 40 miles from Callicoon to Deposit was ready for rails.
Two- thirds of the Susquehanna Division boasted a completed pile superstructure, minus rails, while half of the Western Division was graded, using a super- structure between Cuba and Olean. Ten miles of rail were down east of . Dunkirk. There was one exception to this bleakness. In May, the citizens of Middletown completed the track between their town and Goshen, using the rails originally put down near Dunkirk. This additional 7 miles opened on June 7, and was used by the Erie until the company could repay the town. But while 7 miles opened, some 1Q0 miles of piles rotted, at a loss of a million dollars. By the time the work was halted, the engineering department had changed from its appearance as new faces came in.
Edward Miller had become the Chief Engineer, with Major Brown the Associate Engineer and Western Division Engineer. George Hoffman took over the Central Division (Western) , having moved up from superintending engineer of the Eastern Division, where since his duties had included charge of the superstructure and machine shops, and the purchase of cars and locomotives. Hezekiah Seymour remained as Eastern Division Chief, but Charles B. Stuart had assumed control of the Susquehanna Division with his expertise in pile construction. Alvin C. Morton took over the Delaware Division. Morton had come to the Erie in after beginning work on the Lehigh Canal as an assistant engineer. Further experience included the Pennsylvania Canal, Raritan Canal, and the Harrisburg and Lancaster Railroad.
For the Erie, he assumed control of the surveys in Orange and Rockland Counties, and then in became Resident Engineer in Orange County. Morton later became Chief Engineer of the Atlantic and St. Lawrence Railroad, and then a contractor with the Sacramento Valley Railroad before he returned to the Atlantic and Great Wester. The Erie was continuing to serve as a school for American engineers. Not until late in did bankruptcy begin to stir again. Unless work had resumed by April 1, the property was to be sold under forclosure. Under this threat, the board revived a contract west of Middletown in December, with the hope of favorable legislative action in the coming year. The only work prosecuted through and ERIE RAILWAY SURVEY HAER (Page /O ) was the 3 crecch from Middlecown and Otisville.
The actual rasumDCion of major construction began lace in Io<+6. In August, the directors shifted Che line to Che Delaware River Valley, along Che route proposed by Edward Johnson and now- backed by Alvin Morton. The original route had called for a roller-coaster ride over che Shawangunk Ridge, where one section descended 454 feet in 1 1/2 miles, then climbed 71 feet in che next mile before making yet another steep descenC- A commission of outside engineers -Moncure Robinson and Jonathan KnighC recommended a sceep cunnel with a lOG-fooC grafe, scationary engines and inclined planes. Compared co chese complicacions, che river route was far simpler, although longer. Unfortunately, the company *s charter seemed to prevent using the easy route.
The Erie had co remain within che boundary of Hew York. Even if Che legislature agreed Co amend che charCer, chere remained the difficulcy of obcaining a Pennsylvania charter, since che line would run in this neighboring state for some distance. Local support in Pike County, Pennsylvania, won the company a qualified "Pennsylvania charter in The rail company had to maintain a public bridge over the Delaware at Port Jervis, Also, che company had to allow any railroad chartered in Pike County to make connection with the Erie. Finally, the Erie had to pay the state of Pennsylvania annually. The most difficult restriction was the need to avoid interfering with che Delaware and Hudson Canal.
The Canal retained priority in Che valley, but a permanent injunction that the canal had won over the railroad's use of the valley was rescinded. The matter now rested in the hands of the New York, legislature, where pressure from interior towns in Sullivan County, away from the river, on the original route, accounted for resistance. But after a hard fight, the legislature gave in and amended the charter, giving formal approval to Che necessary alteration in route. The company had authorized construction toward Port Jervis from Otisville in August, , before the state government had approved the charter alteration. Service to Otisville began on November 1, making a total of 62 miles of track in service. Grading contracts for 130 miles of line between.
Port Jervis and Binghamton were awarded to 22 contractors. A new president succeeded in attracting new capital to the firm, and che construction was moving again. By men and teams were employed on the section west to Binghamton. The rail contract that far west had also been let. The order for the rails constituted a departure from past procedure* As far as Otis-ville, the company had used imported English rails. But the expense and the uncertainty of delivery handicapped the company. So the Erie turned to George tf. ScTanton who had founded a small iron works ERIE RAILWAY SURVEY HAER (Page // ) where the town bearing his name now stands, With the aid from one of the company's directors, Scranton outfitted his small mill to roll rails.
He received an order for tons of rails which he shipped out over the Delaware and Hudson's gravity railroad and canal. From Otisville, the iron traveled by team to Port Jervis. Mott commented, "The rails that were to be put down from Otisville wesCi were the first American T-rails for which any* actual order for extensive use of them had ever been given. Up to that time, England supplied this country with rails." It was also from Otisville chat the company abandoned the old practice of sills under the rails, adopting instead the use of ties, as is still current practice. As the company finally began to move west of Otisville, the terrain encountered became increasingly rough, proving to be the hardest ob- stacle on the entire route.
On December 31, the 13 miles between Shawangunk Summit, at Otisville, and Port Jervis were completed but only with a major effort. At the summit, a 2500-foot long rock cut 5Q feet deep had been excavated. A mile further on a heavy embankment several hundred feet long, support by 50-foot retaining walls carried the tracks over a defile. Another cut, feet long and 30 feet deep followed immediately while only a 1/2 mile on another embankment with 50-foot walls was built. Halfway to Port Jervis another rock outcropping was conquered with a cut 40 feet deep and 3/4 mile long. Another embankment and yet another cut followed. Almost all of the construction crew were newly-arrived Irish immigrants, while Silas Seymour had overall charge of this project.
This 13 mile section required the excavation of cubic yards of rock, and yards of earth. pounds of powder were expended in the process, and yards of retaining walls held up the embankments- The contractor's work was rigidly specified as well, by detailed contracts. Grading for single-track sections had to be 20 feet wide through cuts and 17 feet on side hill cuts. Double track cuts had to be 32 and 29 feet respectively. The cuts had to be taken down to feet below grade level and refilled with gravel. Rock from the excavations had to be used for fill. These and other specifications ensured a uniform roadbed despite the myriad number' of contracts let by the company. Resident engineers were charged with maintaining the requisite standards.
Port Jervis to Binghamton By the Erie had made steady progress, opening its new connection to Port Jervis. The company operated 74 miles of track with 10 Locomotives and 9 passenger cars: 147 other cars; a machine shop at Piermont; 42 miles of track in the Port Jervis yard; and 182 men in the Transportation Department. Only 1/6 complete, the bill already amo-unted to ERIE RAILWAY SURVEY HAER (Page /Z ) The company continued pushing "lie line up the Delaware Valley, crossing to the Pennsylvania side at Saw Mill Rift, above Port Jervis. The D. & H. Canal owned the only suitable passage on the New York bank. Although the valley offered a low grade path, the workers had to struggle to use that path.
In many sections, cliffs dropped sheer to the water's edge, so that men drilled holes for blasting . while hanging in baskets suspended from a windlass. Lighting the fuses h d to be a very trying experience. Explosions often carried rock and debris all the way across the river into the canal, leading to many lawsuits. In other places along the river, contractors had to build sections of retaining wall to reinforce the tenuous hold the tracks had upon the cliffs. Near Shohola, these works consisted of almost 3 miles of rock cuts and retaining walls, with one section of wall reaching 90 feet into the air and containing cubic feet of stone. Portions of this wall remain visible today, where the side hill cuts are still prominent features of the main line up the Delaware River.
As far as Deposit the rails followed the river, then veered away to the southwest to meet the Susquehanna River at Susquehanna. Like the Shawangunk Ridge between Middletown and Port Jervis, the Randolph Hills between Deposit and Susquehanna presented a barrier requiring steep grades and tight curves, with higher operating costs resulting from lower tonnage capabilities. The initial survey of envisioned a 45-ndle long connection between those two cities with two summit level crossings of 905 and feet. A route 16 miles shorter faced the prospect of two 728 foot climbs , and a third alternative called for 3 tunnels of and feet. This last alternative was 37 miles long, with a total climb of feet.
None were satisfactory Then during an survey, an engineer traced a route that all of the others had missed. Only 39 miles long, it offered grade of only 66 feet per mile westbound and 70 feet going east. To drop the grade to this level, a 1/2-mile rock cut was excavated, 200 feet deep at the center. Only single-tracked, the cut cost Because of its depth, a wind always whistled through this gap, raising havoc with snow drifts. Cascade and Starrucca The other obstacles to reaching Binghamton were two creeks that had gouged deep valleys in the path of the railroad. They stook about 2 miles apart just as the line approached the Susquehanna River above Lanesboro, Pennsylvania. The first was called Cascade Creek.
John Fowler designed a wooden arch span to carry the single track over the ERIE RAILWAY SURVEY HAER (Page /3 ) gorge. The resulting bridge was "in its day regarded as one or the engineering wonders of the world." The span was 275 feec, and Che rail ran 175 feet above the creek- Begun in the spring of the bridge took 1 1/2 years to build. First the loose earth and stone for the foundation were removed. Two courses of ashlar masonry, 28 feet wide, 3 feet thick and 14 feet deep served as the skewbaks for the cast-iron shoes used for arch bearing. The superstructure consisted of a wooden trussed rib arch with a rise of 45 feet. Eight white oak ribs 2 feet square formed the arch. Both wooden and iron braces, interlaced the structure.
The cement and gravel-covered deck was 31 feet wide and was covered by 2-inch pine planks caulked with oakum and painted with three coats of red lead. Likewise the sides were covered. Five trestle approach spans formed the ramp at one end, while a single trestle made up the opposite ramp. The builder assembled the arch ribs in a nearby yard, knocked them down, and then reassembled the arch upon a falsework. The bridge cost and was the longest single span wooden bridge built in this country.
David Plowden, author of Bridges: The Spans of North America, called the Cascade Bridge "America's most remarkable wooden arch The Cascade Bridge became an immediate tourist attraction, with people watching in amazement as the gossamer-thin struts and braces carried the fully loaded trains across the gorge. Inspections had pronounced the span fit in and but failed to allay some of the people's fears about the span's safety. As Harper's New York and Erie Railroad Guidebook noted in "Some persons think the Cascade Ravine might have been crossed in a less expensive and more enduring way by filling it in. A glance at the chasm should surely convince them of their mistake.
Imagine the lump of mother earth necessary to fill up the deep wrinkle in her fair cheek' Reflect on the requisite wealth of such a mound and what a culvert "nay a bridge would need to perforate it as a vent to the stream when to a torrent of resistless volume! In- stead, then of a clumsy embankment, with a culvert, perhaps, unsuited to the wants of the creek, here we have a strong and enduring bridge a monument of skill an arch of triumph a wonder of the world not marring but heightening by contrast the romantic beauties of the ravine." But by the company began to surrender to the pressure and considered erecting a high embankment pierced by a culvert.
The Annual Report for noted, "the expediency of this change, as its adoption will entirely remove the anxiety which must always exist so long as the present location is continued; and which grows out of the fact, that it involves the necessity of depending upon a perishable structure, the destruction of which would interrupt the transportations ERIE RAILWAY SURVEY HAER (Page /4 ) of freight tor months, and thus subject Che company to a loss . . .' [5* > Therefore, the company began filling the chasm a short distance above the wooden arch. Started in the work was completed in But the engineers fell into a trap predicted in the Harper's Guidebook, by not designing a large enough culvert.
The result was that on August 18, , a freshet washed out a 225-foot section of the 400-foot long and 150-foot high embankment. "Repair crews opened a temporary trestle 4 days later, but not until the middle of November was the huge gap filled in. A steam shovel and two work trains and crews toiled for two months on this project. They enlarged the culvert at the bottom and built re- taining walls to prevent future washouts. The other obstacle in reaching Binghamton was the valley of Starrucca Greek at Lanesboro. There the valley was more than a quarter of a mile wide, and initial plans for an embankment were ridiculous from the start. The quantity of material required and the time to raise it would have been prohibitive.
Apparently Julius Adams produced the plans, as drawings by George Duggan in his book on American railroads credit Adams with the bridge. However, James P. Kirkwood has traditionally received mention as the designer of the Starrucca Viaduct. Both men were distin- guished engineers. Adams, nephew of Major William Whistler, attended West Point from to but did not graduate.
He came to the Erie as Superintendent of Engineering in with previous experience on the Paterson 6c Hudson River, Stonington & Providence, Norwich & Worcester, Western of Massa- chusetts, and Albany & Schenectady Railroads, and also served as engineer of the Brooklyn Navy Yard in After leaving the Erie, Adams pursued a varied and successful career, with highlights including edited Appleton's Mechanics' Magazine and Engineers' Journal; designed America's first sewer system for Brooklyn in 185 7; served as the chief engineer of the Brooklyn Department of City Wroks from to and construction engineer of the New York City Department of Public Works from to A founder of the ASCE, Adams served as the society's vice-president from to and president in Adams was clearly capable of designing the Starrucca Viaduct.
The traditional story, as- told by Mott, is that three contractors tried and failed to build the bridge. In desperation, the company turned to Kirkwood, who promised to erect the span " 'provided you don't care how much it may cost.'" More likely is the story related by David Plowden. "It has always been assumed that Kirkwood himself designed the bridge. But this contention has recently been challenged. Kirkwood had been previously asso- ciated with Adams (in fact they were brothers-in-law) and according to William S. Young, the undisputed authority on the structure, it was Adams, not Kirk- wood, who was responsible.
If the plans had already been drawn before Kirkwood appeared on the scene, obviously his role would have been in the construction of the viaduct rather than its conception and shape." ERIE RAILWAY SURVEY HAER (Page /T ) This interpretation does not denigrate the accomplishment of Kirkwood. He was a Scottish-born engineer who immigrated in His escperience began with, the Norwich & Worcester, Boston & Providence, and Stonington & Providence Railroads, the last of which employed Kirkwood as Resident Engineer while Adams was the Assistant Engineer.
The path of the two men also may have crossed on the Western Railroad of Massachusetts in Kirkwood also served as engineer for the construction of a naval depot at Pensacola in Employed by the Erie for the Starrucca project in and as Superintendent the following year, Kirkwood later designed a number of important water works projects, including supervising various alterations to the Croton Aqueduct- Another founder of the ASCE, he was the society's president in To limit Kirkwood's role in the Starrucca to that of builder by no measure reduces his accomplishment. Adams simply turned to one of the foremost engineers of the day to build his bridge. The bridge these two engineers built was.a 17-span stone arch valley crossing, feet long and 110 feet above the valley floor.
Each span was 51 feet, with piers 7 feet thick, at the springing line and 22 feet long. The abutments were 30 1/2 feet thick. Interior spandrel walls were made from local bricks. Construction began in the spring of and by the close of the year, 12 pier foundations were poured, using cubic yards of masonry and yards of concrete. These foundations consisted of a leveled 8-foot deep trench with a poured concrete footing 3 feet deep, in 4 to 9 inch layers. Then walls were built; rubble stone laid in courses in full beds of concrete. A depth of only 8 feet was remarkably shallow for a structure this size, but the foundation has served more than adequately to the present day.
During the winter of workers cut timber for the falsework and opened a quarry 4 1/2 miles away to supplement the source of stone used the first year. Work resumed on April 14, and on August 7 the workers began the turning of the arches. All centering was built in place, and not reused because of the need for haste* Screws, not wedges, tightened the scaffolding into place. The last arch was closed October 10. A total of 21, 259 cubic yards of brick, stone and concrete masonry made up the structure. The actual construction was pushed as fast as possible. Apart from individual centering arches, a rail system was used to move material into place quickly. A branch ran from the quarry onto the north hill and out onto a scaffold half-way up the structure.
Derricks unloaded the cars which then ran off the scaffold onto the sonth brill and then ERIE RAILWAY SURVEY HAER (Page /e ) back co the quarry- A second layer of Che scaffold carried the cars once work had proceeded above the first track. Once the arches had been completed, the parapet walls were built up and an iron railing added- Three feet of ballast carried the actual track. Adam's pro- vision for drainage consisted of 1-foot square cast-iron grates in each pier, served by a three-inch lead pipe. Mott noced that 800 men labored on this project, in Hay, as they pushed the job to completion- On November 23, they completed the viaduct.
As photographs illustrate, Kirkwood and Adams created a structure of eye-catching beauty, as the tracks vault over the valley well above the level of the tree tops. That the builders did their job well is evidenced by the almost complete lack of maintenance re- quired by the span. Designed for the small, light locomotives of the the viaduct today handles the heaviest trains without any weight restrictions. In the company took advantage of the option provided them by the builders and added a second track across the bridge. But actual repair work has been limited to pressure grouting the parapet walls and brick spandrel in and the arch rings in Apart from its longevity, theStarrucca Viaduct stands as a signficant landmark in the history of American civil engineering.
At the time of its construction, it was the longest stone bridge ever built and the most expensive bridge of any kind. David Plowden made two additional points concerning this structure. Importantly, "The first authenticated use of plain concrete as a structural material in the United States was in the foundations of the Starrucca Viaduct. The Erie was a pioneer in a number of concrete uses, and this structure began those experiments with this new material. The viaduct also deserves notice as one of the last stone viaducts to be built as an original structure on the site, in the manner of British practice- By the , a uniquely American style of railroad construction was emerging, characterized by lightweight wood and iron structures of a less than permanent nature.
Stone bridges for railroads faded from the American scene until the turn of the century, when the wealthy Eastern railroads, notably the Pennsylvania, returned Co stone as a structural material. No doubt the symbolic qualities' of these solid, monumental, long-lasting bridges led to the choice of stone then. But in Che Erie could not afford very many Starrucca Viaducts. For the above reasons, the American Society of Civil Engineers declared the starrucca Viaduct a National Historic Civil Engineering Landmark on October 14, 19 73. ERIE RAILWAY SURVEY HAER (Page /7 ) With Che completion of these two bridges, one so permanent, the other so transient, the way was clear for the opening of the line to Binghamton.
The tracks followed the Susquehanna River for some 20 miles into the city, and the path presented no construction obstacles. On December 27, the first train rolled into Binghamton, some 16 years after the company had obtained its charter. The road was not even half-finished. But the worst part of the construction had been completed. As the Annual Report to the stockholders said, x *Those who will carefully examine this portion of the line, including its large and expensive bridges, its heavy rock excavations, for miles cut into the face of precipitous rocky bluffs its high retaining walls its massive masonry in abutments, piers, culverts, etc . . can easily understand that it must have cost upon an average more than per mile.
Probably no railroad in our country has ever been carried through a more difficult and expensive route, or where obstacles of greater magnitude have been met and overcome/'[65] It is not an exaggeration to call the construction of the 125 miles of track between Middletown and Susquehanna one of the great civil engin- eering accomplishments. No British railroad faced such obstacles. Rather the achievement of the Erie should rank with those of the Baltimore & Ohio, the Pennsylvania, and the Western of Massachusetts. All confronted difficult terrain that led to accomplishments representing engineering triumphs, but the Erie should perhaps stand in the forefront, simply because the Erie faced its severest tests before the others.
Completion From Binghamton westward, the Erie encountered far easier country. But the Erie also faced a deadline: unless the line opened to Dunkirk by the property would be sold at auction. So a race against time began. By June 1, Owego was reached, and the tracks reached into Elmira on October 2. Pushing forward, the line followed the Canisteo Valley to Hornellsville, but not until September 1, did a locomotive cross the bridge into that town. All along the line, the road utilized the natural paths of the rivers the Susquehanna, the Chemung, the Canisteo. The tracks also followed the lines of the abandoned piling, the million dollar folly of By the time construction resumed, the piles had rotted and become unusable.
Thus even on the stretch of route where there had been piles, the usual graded roadbed had been built. ERIE RAILWAY SURVEY HAER (Page /g ) From Rome 11svilla, the line of Che railroad had to cross the ridge of the Alleghany Mountains to reach Lake Erie. A number of heavy cuts and long embankments one fill a mile long was the longest and deepest on the road had to be made. But on the whole, the ridges were less steep than those in the east, and the work proceeded from both directions The rails reached Cuba Summit on the ridge on February 15, and' on April 19 the last spike was driven. With the formal opening celebrations of May 14 and 15, the road opened for through service.
The ceremonies were truly a gala occasion, as such notables as President Millard Fillmore and Daniel Webster joined the company's officials in traveling the entire length of the^ line. Speeches and parties followed at every major point along the route. One can discount some ofMott's comments as partisan loyalty, but nonetheless his statement below holds much merit. "The completion of the railroad was at that time the most important event in the history of railroad building. This may be better appreciated at this day when it is known that but one really great railroad had been completed either in this country or abroad . . - the line between St. Petersburg and Moscow . . .
Hence the completion of the New York and Erie Railroad marked the first epoch in rail transportation of really national importance." The Erie became the first trunk line in this country to reach its .western terminus, finishing ahead of the B. & 0., the Pennsylvaniar~an~d .the still-splintered New York Central. In the last was~stilT"a~ collection of disjointed pieces. The Erie also stood out as the longest railroad operated by one company, running some 445 miles between Piermont on the Hudson and Dunkirk. The line as built had of curvature, feet of ascending and descending track with an average gradient of 18 feet per mile. Some tons of iron west into the rails. A total of lineal feet of the line were bridges, with half of that distance repre- sented by spans of 150 feet or longer.
The company had large machine shops at Piermont, Susquehanna, and Dunkirk for locomotive repairs, 5 smaller shops elsewhere, and 35 enginehouses with a total of more than 10Q stalls. There were 14 passenger stations and refreshment saloons, 29 freight houses and 46 combined stations. The Erie was a going concern. ..As Ernest S. Cronise, an engineer, wrote of the Erie, "The property must always be regarded as a monument to the engineering skill and commercial enterprise of its proprietors, scarcely equalled in this country, if in the world." ERIE RAILWAY SURVEY HAER (Page /? ] Chapter II. The Growth of the Erie Like all railroads , the Erie did not remain unchanged after its opening.
The Erie grew like a living organism, pushing our new branches, taking over other companies, improving its own right of way. This constant movement made it difficult to pin down what was meant by the original Erie. Even before the Erie opened through to Dunkirk, three railroads had connected with the Erie; the Canadaigua & Corning at Elmira, the Lackawanna & Western at Binghamton, and the Buffalo & State Line Railroad at Dunkirk. Two other lines were under construction- the Buffalo & New York City Railroad between Buffalo and Hornellsville, and the Cohocton Valley Railroad. The Erie absorbed the latter as its Rochester Division, while the former shortly became the Buffalo Division.
Work on the Buffalo & New York City had begun in and the line opened through Attica in Silas Seymour had assumed the chief engineer's duties after and its was on this branch that he erected the Portage Viaduct in (See below, Viaducts.) But in the Erie had taken over the operation of the" line, which was in financial straits. The most important additions to the Erie's holdings were the Paterson & Ramapo and the Paterson and Hudson Railroads, leased by the company after It had quickly become apparent that the choice of Piermont as Eastern terminus had not been the wisest of decisions. Piermont was 25 miles up the Hudson, and serviced only by steamboat. As the majority of the road's traffic moved through New York City, this upstream terminus proved less than satisfactory.
The lease on the two New Jersey railroads helped solve this problem. A one mile connection from Suffern to the New York state line joined the New Jersey lines to the Erie's mainline. As a result, the Erie gained a direct access to Jersey City. Very quickly, this addition, with the Buffalo Division, became the primary traffic axis of the company, displacing the original alignment of Piermont and Dunkirk. With the chartering of the Long- Dock Company at Jersey City in , the ascendency of the New Jersey complex was complete- The Long Dock Company began to develop the water front facilities oh the Hudson that eliminated the 25-mile connection with Piermont. The heart of this new venture was a tunnel through Bergen Hill an extension of the Palisades that gave access: to the river.
A ferry linked New York and Jersey City. (See below, Tunnels and Terminals.) These moves assured the viability of the railroad as a trunk line connection with the Midwest., although com- pared with the New York Central, the Erie was handicapped with its water connection with New York City. But the connection of the Michigan Southern and Lake Shore Railroads onto the Erie at Dunkirk gave the Erie access to Chicago. This western tie helped to offset the short- comings of the Eastern terminus. ERIE RAILWAY SURVEY HAER (Page 0 ) Changes and growth of this type helped to exacerbate a problem inherent with the operation of the Erie from the start. The Company was too large for one man to control.
No other enterprise in this country had ever been forced to deal with the problems of business on such a scale. More employees and more equipment spread over a huge tract of real estate; knowing when to move them and to where; what rates to set; all of these situations were unique to the large railroads, and the Erie became the first to confront these problems on a large scale. In trying to solve the problem of size, the Erie served as a pioneer in developing new forms of corporate management. The person most responsible for these ideas was Daniel C. KcCallum. [70a] In his "Superintedent's Report," in the Annual Report, McCallum first laid out an organisational structure that provided a flow of detailed information to the company's decision makers.
McCallum first spelled our responsibilities for each administrative officer, and also em- phasized the role of. the telegraph in providing information quickly. Alfred D. Chandler, Jr. , commented in The Railroads; The Nation's First Big Business , ""McCallum's achievements assured effective and continuous control over and coordination of the multifarious operations of a large railroad." The system developed by McCallum served as the pattern for most Corporate structures throughout the century, and provided the basis for J. Edgar Thompson's divisional structure on the Pennsylvania Railroad* McCallum also established some of the first work rules as another facet of his efforts to bring order to the workings of such a large enterprise.
Here he met with less success- After becoming General Superintendent of the Erie in he put into effect a set of rules he had devised earlier. These held the engineers responsible for the safe operation of the locomotives. A 10-day strike in June ended with a compromise on the new regulations. But in September, another strike began with the firing of an engineer for running onto a switch that had been incorrectly turned. McCallum left the company before the strike could be settled. The Erie had to give in to the strikers and rescinded McCallum's orders.
Despite these early additions of track and organizational structure* the Erie had lost none of its financial problems, and these finally forced the company into receivership in April, As the early years of the railroad had shown, the question of solvency had dominated the construction plans and had acted as the limiting factor on the actual progress of construction itself. Once the entire line had opened, the same financial difficulties continued to plague the Erie, this time in the guise of heavy interest payments. In the company went under and fell into the control of a receiver for the second time in 18 years.
ERIE RAILWAY SURVEY HAER (Page & ) Always, financial affairs controlled the workings of this railroad, effectively limiting the ability of the company to maintain its roadbed, rolling stock, and facilities. Likewise, the Erie was never free to embark upon new additions and purchases without worry. The line had persistent money problems, right down to the present day, and the ebb and flow-of the Erie's financial status served as the guideline and indicator of the engineering capabilities of the company. Always, when considering the Erie's building programs, the financial condition of the company must be kept in clear view. The Erie Railway The Civil War and the beginnings of a heavy coal traffic from north- eastern Pennsylvania insured the survival of the Erie.
In December, the company was reorganized as the Erie Railway Company. The war years were good for the railroad; heavy traffic meant large profits. Also, the Erie effected the best western connection in its history when it tied into the Atlantic & Great Western Railroad. The A. & ran between Salamanca and Cleveland by with a branch to Oil City, Pennsylvania, and eventually laid a line to Dayton where it connected with other broad guage lines running to the Mississippi River. Until the Erie had an all broad guage route to St. Louis. But.after that date, the connecting lines began to convert the standard guage and the Erie was left with the necessity of breaking bulk or transferring cars for through shipments.
The Erie was increasingly isolated as an adherent to the 6-foot width of its tracks. The A. & and the Erie quickly developed along similar lines under the control of the same individuals, so the history of the companies _was__cl sely intertwined. James McHenry, promoter of the A- & , played a leading role in the financial manipulations that rocked the Erie through the and In turn, the Erie actually leased the A. 5c at intervals when the newer line developed money problems. This happened in and again in Ultimately, the Erie purchased the A. & outright in as part of the consolidation of the line through to Chicago.
While the Atlantic and Great Western proved to be the major component of the Erie's expansion into the Midwest, the Erie Railway made several other additions to its property throughout the All but one were branches constructed by the company itself. /The Erie, like so many other railroads, felt the need to open new areas of service in order to expand its traffic, and joined in the wave of branch line construction that continued through the end of the century. The shortest of these new lines was the Newburgh Short-Cut, built in to provide a direct tie between Newburgh and New York City. More important were two branch lines into Pennsylvania that opened the ERIE RAILWAY SURVEY HAER (Page , ) anthracite coal traffic to the company.
The Hawley Branchj between Hawley and Lackawaxen, tied the Erie to the gravity line, operated by the Delaware and Hudson Canal Company, ran over the ridge between Hawley and Scranton. The Jefferson 3ranch, chartered the same year that the Hawley Branch opened in ran from Starrucca to Carbondale, with a branch to the Erie at Lanesboro. This line opened in with the entire length complete in The only addition not built by the company as original equipment was the Bradford 3ranch. Xn the Erie purchased the Buffalo, Bradford, & Pittsburgh Railroad, and extended it into the adjacent coal fields, in part owned by the Erie. This branch proved most valuable from onward, as oil in quantity began to flow out of northwestern Pennsylvania.
All of these additions funneled freight traffic into the Erie main line, and by and large, justified their existence. The tenure of the Erie Railway Company also witnessed the era of Jay Gould, Jim Fisk, and Daniel Drew. Much of the Erie's historical mention derives from the notorious financial manipulations of these men. The accounts of trie skulduggery by Charles Francis Adams, are the means by which most people even know the Erie.
The doings of the Erie's officers captured a great deal of attention, as Railroad Gazette noted, "Everything concerning this railroad is supposed to partake of the mysterious and the unaccountable, and consequently its operations excite more interest than those of other companies equally or more important, which, never do anything out of the common way, and consequently are marveled at and watched and investigated." Little more needs to be said of the dealings of the villains of Adam's piece beyond this comment on the result of their manipulations. Gould and Company directed their attention as company officers to concerns other than the operation of the railroad and the maintenance of the property, with a resulting deterioration in roadbed and facili- ties.
Secondly, the financial condition of the company worsened because of the hefty increase in interest payments, again due to the dealings of Gould and Fisk. Most importantly, they lessened the ability of the firm to raise additional capital, because of the stigma they left attached to the Erie. For many years, the New York and London money markets considered the Erie's offerings in the light of scandal. Another direct result of their financial dealings was the third bankruptcy of the railroad in May, Finally, from a historian's perspective, the unparalleled manipulations have served to overshadow all other achievements of the Erie.
As Railroad History commented, with the beginnings of Daniel Drew's reign on the Erie board in "An era of shameful plunder begins that will overshadow the line's every achievement, even to the present day." [73a] ERIE RAILWAY SURVEY HAER (Page 23 ) The New York, Lake Erie & Western The Erie emerged from the ashes of receivership in June, as Che New York, Lake Erie & Western Railroad. The company, while still controlled by the receiver, had begun a ten year improvement program to upgrade the property and repair the damage caused by years of neglect.
Through constant maintanance, Hugh Riddle, General Super- intendent, had been able to report in "I feel warranted in saying that the Erie Railroad is in better condition and better equipped, than at any previous period during the last ten years." But Riddle's task had not been easy, as railroad maintenance required constant attention, especially when the materials used were not o high quality. The company had learned this fact early on, when the roadbed was found to be in bad shape in The brittle cast-iron rails wore badly, causing 30 serious accidents that year. Yet the area with the greatest problem was the Delaware Division, where the rails were only 5 years old.
The situation had worsened by as heavier trains and more traffic, combined with less attention,left the company's property in horrendous condition. The company releamed that growth meant maintaining the old as well as expanding into new areas. A Captain Tyler arrived in the United States from Britain in to inspect the property for the British bondholders. Sis published report of recommendations listed the following needs: 1. Double-tracking with steel rails and durable ties. 2. Gradient improvements 3. Change to standard guage. 4. Improved terminal facilities 5. Iron bridges to replace wooden spans. 6. New connections to outside lines.
Tyler s cost estimate placed the total for improvements at million- million to change the guage, $3 million for grade reductions, million for new bridges and for new depots. In trying to convince the directors of the need to make those improvements, E. S. Bowen, General Superintendent, wrote in *lI cannot neglect this opportunity to refer to the necessity that exists for important modifications of the property o the company.
You are struggling to compete for a common business with parallel lines of railways having double tracks of steel rails, abundant equipment, adequate shops, and convenient depots for the transaction of their business; while you are limited by a single track on a large portion of the road, the shops inconvenient in arrangement and insufficient in capacity, many miles of iron ERIE RAILWAY SURVEY HAER (Page 2& ) rails that rapidly fail under the heavy traffic, and damage by cheir Imperfections the rolling stock, which is in itself inadequate, when all of it is kept in service.
The exceptional guage is also an element of constant cost, while it also largely tends to limit the amount of revenue, by limiting the amount of property that will be entrusted to you for transportation while the possibility of transfer exists. Estimates of the cost of this undertaking have been prepared in detail from time to time, and while the amount of money required is large, it is certainly believed that the return from the investment will be more than ordinarily remunerative."[77] By the work of rebuilding had been started, and it continued for the next 7 years. Probably the most important part of these improvements was the reduction of the Erie's track to standard guage.
Daniel McCallum had run a battery of tests on adhesion and friction during his stay with the Erie, and spent 10 pages of the Report showing the large advantage of lower friction on 6-foot guage tracks. McCallum even argued that uniform guages did not necessarily offer the most economical system for all railroads. In some respects, McCallum's thinking on this subject was like that of Hezekiah Seymour different guages meant you could not lose freight to neighboring rail lines. But if railroad engineers had been almost unanimously in favor of the standard guage in by there was no doubt remaining. Vice president Diven had inaugerated a survey for the improvements, including a third rail, in But not until could the work begin.
The initial step began with the addition of the third rail from Elmira to Suspension Bridge, north of Buffalo. The third rail permitted the accommodation of standard guage cars from the Lehigh Valley Railroad. Through the company gradually extended the third rail eastward to Binghamton, Susquehanna, Port Jervis, and into Jersey City, by December 27. The first standard guage train ran through on 3 January, With the reduction of the Western Division to the standard . guage on 22 June, the Erie finally joined the ranks and eliminated one of the most costly follies of the line's designers. The next step of the improvements involved the removal of the old 6-foot guage rails, and converting all of the locomotives and cars. This was a major task, handled mainly by the company's own shops.
But even in several branches and the Delaware Division maintained the third rail. Several broad guage switchers continued to operate in the Jersey City yard at least through that date, ERIE RAILWAY SURVEY HAER (Page 2S} The unfortunate aspect of the need to change the Erie's guage was the cost. Mott placed the figure at $25 million, money chat was needed to resolve other problems. The company did work at double-tracking long sections of the line after spending in alone. But the financial drag of reducing the guage stretched out double- tracking through , and in general pushed the Erie further behind her competitors in upgrading.
Nonetheless, the company did undertake some of the major efforts, like the extension of the Bradford Division to Johnsonburg, Pa., in the early Likewise, the Bergen Short-cut, a low-level by-pass around the congestion in northern New Jersey, opened in The Erie & Wyoming Valley Branch between Rawley and Pittston was in use by Another addition, although at a slightly later date, was the leasing of the Chicago & Erie Railroad in In con- junction with the A. & reorganized as the New York, Pennsylvania, and Ohio Railroad in , the lease on the Chicago & Erie, finally gave the Erie direct access to Chicago. A wish dating back to Jay Gould had been fulfilled. Overall, these improvements constituted an impressive attempt to resolve the many equipment and track problems the line faced.
During the ten years of work, "The Erie /was/ generally placed in position, as far as its physical condition was concerned, to compare favorably with the best railroads of the day." Unfortunately, this statement is a slight exaggeration. With the approach of the the Erie, like many other American railroads, was caught in the tangle of increasing competition that led to the flurry of mergers and bankruptcies during and after the Depression of Not only did all improvement work grind to a halt; in July, the Erie went under for the fourth time. This time, a reorganised company did not emerge until November, the Erie Railroad.
The Erie Railroad One of the first projects undertaken by the new management was the consolidation of the many divisions and wholly-owned companies into a streamlined "corporate "structure that greatly eased many administrative headaches. Secondly, the company struggled to get its equipment back into condition. After every receivership, the company faced the same problem of a worn down roadbed, and this time proved no exception. One of the major difficulties involved the substitution of 90-pound rail for the lighter rails then in use. There was also talk of building a third and fourth track from Jersey City to Suffern. The company also began its first major grade-^crossing elimination programs in Buffalo ERIE RAILWAY SURVEY HAER (Page 26 ) and Jersey Cicy.
Finally, the Erie leased che New York and Greenwood Lake Railroad in to supplement its already extensive commuter traffic into Jersey City. [84a] Unfortunately, the Erie in faced a number of major difficulties which simple maintenance alone could not alleviate. The Erie lived on its freight traffic, in competition with the other East Coast trunk lines, from Chicago.
But the Erie did not have the shortest line between New York and Chicago, nor did it have the cheapest route to operate- As the Railroad Gazette observed in ""Reduction of grades and curvature, so as to cheapen the expense of operation for through freight, is the road's most serious problem, both in size and the long time which will be necessary to carry it through to a satisfactory conclusion." With a low-grade freight line between Jersey City and Chicago, the Erie would enjoy a distinct advantage over its competitors, primarily because fewer locomotives could handle longer trains without the help of pushers. Operating costs would be correspondingly lower, to the Erie's advantage.
Unfortunately, the Erie's financial status again intervened to hinder the implementation of any massive improvements. The terrain traversed by the railroad offered, potentially, the most satisfactory line between New York and Chicago. But the money to effect the changes and realize that potential was not at hand in the and Even when the Erie did find some money, it had to be earmarked for more fundamental work, like the guage reduction and the double-tracking. By the Erie's competitors the New York Central and the Pennsylvania had long been double-tracked, and boasted the most suitable gradients they could manage.
The Erie, on the other hand, found itself about a decade behind its main rivals, and falling further back, in providing the major line changes and grade reductions needed to remain competitive. To compound these difficulties, neither the Pennsylvania nor the New York Central had the problems obtaining capital that bothered the Erie. Despite these difficulties, the management attempted to move ahead, and even before 19O0 the Erie began laying plans to deal with the road's alignment problems.
In 189 8, surveys began for a 2 3/4 mile long bypass at Goshen, involving several cuts and embankments, although work did not commence until Some efforts were actually_ started to reduce the grades on the Allegheny-the old Westem-Diyision, between Hornell and Dunkirk, and in the vicinity of Howells on the New York Division. But the work at this stage consisted more of planning than construction, as this announcement in the Sixth Annual Report made clear.
Surveys were under way, it said, "to determine definitely the best plans to be adopted for the reduction of the many heavy grades still remaining in the roadbed of the main line between Chicago and Jersey City, and to ascertain as closely as possible the actual cost of doing such work, so that a correct estimate can be made wftetheT the traffic of the road, making a liberal ERIE RAILWAY SURVEY HAER (Page Z7 ) allowance for future increases, would warrant the expenses involved and finally increase Che net revenues . . .
The results obtained from these explorations and the actual experience gained from the detached improvements made in former years undoubtedly prove that the cost of transpor- tation on the Erie Railroad can be reduced and its capacity for larger traffic can be sufficiently increased to justify a large and liberal expenditure for grade reductions. The Erie in In Frederick D. Underwood became president of the Erie Railroad, and under his tenure, the company emerged ,as a modern railroad with up-to- date facilities and an economical gradient. Underwood faced the same financial difficulties as his predecessors. Just as during the initial construction of the road, the improvements after stopped and started depending upon the cash position of the company.
But Underwood was a professional railroad man, coming to the Erie from the B. St 0. , where he had occupied the position of general maanger. J. P. Morgan had asked Underwood to take the Erie job, in effect guaranteeing that money would be available to the company. These advantages augured well for the new "president' s chances of success . Underwood was president until In the 26 years he held that office, the company spent million on improvements. The line east of Meadville was virtually rebuilt, giving an almost water-level route between that point and Jersey City, some 516 miles distance. Ruling, grades on the line dropped from to thus on the New York Division, the grade eastbound fell to 26 feet per mile, from 74 feet before, and from 75 to 53 feet per mile westbound.
As a result, trains formerly able to pull 556 tons could pull tons. Similar programs improved the grades on the Allehany Division, while new motive power provided further increases in train size. All of these elements combined to drastically improve operating efficiencies, while at the same time permitting more traffic to be moved. Thus, freight haulage jumped 99% between and from ton-miles to At the same time, revenues rose from $40 million to million, due in large part to an 11% drop in operating costs. The Erie needed these improvements. Although extensive rebuilding had characterized the period, this earlier work had been con- fined to reconstruction and refurbishment of the original line.
Nothing had been done in the way of realignment, yet this type of effort was essential for economical railroad operations. The figures above provide graphic proof of the benefits afforded by grade-reduction programs. Such' line improvement permitted fewer locomotives and men to move more tons at a lower cost. "Money problems hampered the program all along. As Railroad Gazette noted in ERIE RAILWAY SURVEY HAER (Page 23 ) "The Erie , , , is the typical example, financially, of a railroad company which in its earlier history was subject to the notorious kind of bad management, a handicap which was by no means cleared, away at the time of the most recent reorganization . . .
Because the reorganization was not more drastic and compre- hensive in its terms the Erie has been handicapped in developing the many and varied activities, included in its various mileages. With the gradual enlargement of its credit, which has come with the general prosperity of the last ten years, a way has been found to provide funds for important improvements to put the roads in efficient condition according to modern standards, toward which, a beginning had earlier been made by small appropriations. Gradient reduction was not the only area where the Erie still lagged. tn the Erie still utilized a large number of wooden bridges on branches and the less heavily used lines. The shop facilities needed to be updated, as did the yards.
The Erie was overdue, in all of these areas, for modernization. The doubling of ton-miles in the first decade of the century pro- vided the greatest indication of the value of Underwood's improvement program. America's railroads entered their golden age in the first quarter of the century, reaping large profits and erecting some monumental civil engineering works. But these works paid-off, in terms of providing the capability to handle larger and heavier loads and greater tonnage. During the World Wars this new capacity enabled the railroads to stay in operation under heavier traffic than ever before experienced. Especially the "First World War tested the Erie, for the line's primary freight commodity remained hard coal, a vital war material.
Underwood's improvements alone stood between the total inundation of the road. On a railroad without the broad four-track main lines of the Pennsylvania and the New York Central, low-level routes were essential for the movement of heavy tonnages, and Underwood provided chat capabilit/ Un de rwoo d * s Imp r ovement P r o gr am As noted above, the company had initiated plans to improve the grades before Underwood arrived in primarily survey work. Underwood moved ahead with, these plans, starting work, on simpler programs of cutting and filling to lower the slopes. By the company awarded contracts for such work, on the Allehany Division, The work continued in this vein for the next couple of years, as Underwood completed his reorganization and consolidation of the financial position.
Railroad Gazette discussed the status- of the work ERIE RAILWAY SURVEY HAER (Page Z9 ) in the great development which has been made on the Erie has been intensive rather than extensive . . . the improvement of the transportation plant rather than the building or buying of new railroad lines." The Erie followed this formula throughout its improvement program. The work begun in included two major segments of track.. Be- tween Cuba and Salamanca, miles, alignment corrections and additional double tracking got underway, while the company authorized the initiation of grade and alignment improvements on the mile sector from Howells to Hunts. [9 3] These were the important main line sections in the overall scheme of building a water-level route.
Freight Cut-offs The idea of internal improvements also guided the decision to relocate several stretches of roadbed. J. MY Graham, tfce vice-president for engineering,had laid out three freight relief lines designed to provide substantial grade reductions when compared with the existing main line. The Twelfth Annual Report in said that the bypass from Cuba to Hunts, 33 miles, was already underway, with the plan calling for a single track low-grade line. Formally called the Genesee River Railroad, the name was usually shortened to the River Line. The company announced another cut-off project at the same time. This addition, the Columbus and Erie Railroad, ran for some 13 miles from Columbus, Pa-, to Lalewoodj just west of Jamestown.
Construction of this single track line was not yet begun, but the authorization had the intention, "To further reduce the cost of operation by reducing the grades and improving the alignment, all in conformity with the general plan looking toward the eventual establishment of a grade not exceeding east and west between Port Jervis and Chicago The final improvement project, and the furthest east of those started by was chartered as the Erie & Jersey Railroad, and ran from Highland Mills to Guymard, just west of Otisville. As well as bypassing Goshen, the gradient of the new line dropped from a maximum of to about with only a small increase in distance.
This addition was the stepchild of the previously mentioned Goshen Cut- off, whose plans were begun before Together, these three lines afforded the railroad the definite advantage of bypassing sections of mainline with particularly troublesome grades. James Marshall Graham was the engineer responsible for the final location and execution of much of the work. Educated at Kentucky State, Graham worked for a number of railroads before coming to the Northern Pacific & Manitoba in as superintendent of the Dakota Division, By he had advanced to the general manager's post. Grafram remained onlr breifly before moving to the B. & 0, where he became chief engineer in under Frederick Underwood. When Underwood took up the Erie's presidency, Graham moved over with him.
ERIE RAILWAY SURVEY HAER (Page 30 ) Even with the establishment of engineering schools during the second half of the nineteenth century, most engineers of the period still gained much of their knowledge from experience gained while moving from job to job. Graham was not an exception to this rule, and his career showed the railroads still provided the training grounds for sharpening the skills of civil engineers. No longer did' unschooled youths rise from rodmen to chief engineers, as had Silas Seymour. But more served at least an apprenticeship on the railroads. The construction of the cut-offs proceeded fitfully at first.
The Erie & Jersey, or the Guymard Cut-off, was the only one still working in but even there work came to a halt from March until June because of money problems occasioned by the recession. All of the improvement came to a complete stop for much of But before work stopped altogether on the Guymard Line, good progress had been made on the most difficult engineering project of the entire improvement plan, the Otisville Tunnel. (See below, Tunnels.) The tunnel was the key to the grade reduction, for it carried the line over the Shawangunk "Ridge 100 feet below the old main line. With the resumption of the work late in the line progressed quickly as far as Howells from Guymard.
This was a difficult stretch of line and presented several major rock cuts, with an average of cubic yards of excavation per mile. The total cost stood at million for this 12 mile stretch chat opened October 21, With the completion of work on this most difficult stretch, the major hurdle was behind them. The other 30 miles on the Guymard Cut-off in- volved cuts of cubic yards and required cubic yards- of concrete for culverts, piers, and abutments. The deepest cut was 95 feet, and the contractor excavated yards of earth and sand. Fortunately, steam shovels could handle most of the actual digging, as the loose earth and rock required little blasting. The Guymard Cut-off also featured two viaducts, one over the Walkill Kiver, the other spanning Moodna Creek.
Both bridged wide.- valleys and represented a continuation of a definitely "Erie" style of bridge. (See below, Viaducts.) An interesting aspect of the construction of the freight bypasses, not just the Guymard Cut-off, was the use of mechanized construction equipment. One of these tools was the Hurley automatic track laying machine. The Hurley consisted of a machine car 55 feet long with a 60 foot cantilevered boom made up of two steel trusses. On a raised platform at the rear of the car stood a boiler and 2 stationary 100 horsepower steam engines. A tender with the water tank was hooked on as the second car in the train and then a string of material cars.
ERIE RAILWAY SURVEY HAER (Page 3/ ) Each of these material cars was fitted with a set of rollers on the outside edges of the cars to facilitate the movement or materials to the front of the unit. The rails were removed from piles on the material car and connected into a long chain so the steam engines on the machine car could pull the whole string forward. Steam-driven friction rollers provided the force to move the rails. While two chains of rails moved forward from the rearmost cars on the train, the ties were moved for- ward in a .like manner. The ties were pulled off the stacks on the cars directly behind the water tender and placed perpendicular to the lines of moving rails, atop the string. Thus the ties- rode to the machine car on the rails.
Once at the machine car, an endless chain lifted the ties off the rails and carried them along the top of^the boom. The ties dropped off the boom roughly into place on the roadbed. Since the train moved forward at a speed of about 20 to 30 feet per minute, Che ties fell into place in, sequence. While the ties thudded into place, the rails- at the front of the string were disconnected from the chain and grasped fay a pair of hoisting tongs as each rail ran out of the friction rollers and under the boom. The workers then ran the rail out to the full extension of the boom and dropped the rail into place on the waiting ties, A crew of spikers immediately went to work securing the rail to the ties , working back from the furthest point on the new rail.
Because of the 60 foot span of the boom, the spikers (ideally) finished their work just as the machine car was ready to roll on the new rail. Thus, the train could move along without stopping,, being fed by a constant stream of materials. The Hurley really was a fascinating piece of apparatus, representing an effort to bring the assembly line to the railroads. This particular machine first saw use in on the Bessemer St Lake Erie. The Hurley was only the most recent in a long line of attempts to automate track- laying, for other machines date back to the The machines offered no great advantage in terms of speed or labor savings, did not work well on curves, and were best suited for long stretches of tangent track.
The self-propelled Hurley did eliminate the expense of a locomotive for power, and all of the tracklayers saved some time in material" handling. Labor gangs did not have to be quite so large when this kind of machine was used, but the expense of an operating engineer wiped out the labor savings. M. W. Camp, writing in saw little advantage in using this machine, although he recognized the spread of this type of power apparatus. He commented, "It is the tendency of the age to substitute machinery for flesh and blood," The Erie became one of the first half-dozen railroads to try out this new technology when the Erie used one on the River Line and Guymard Cut-off.
ERIE RAILWAY SURVEY HAER (Page 32 ) The 42 miles of the Guymard Cut-off opened in January, To honor Graham, the Srie renamed that stretch the Graham Line at the time of the engineer's death just before the line opened. .the Graham Line could not, however, claim 'first honors for opening. The Columbus & Erie, although started after the others, opened first, for the con- struction was completed on December 2, Only 12 miles long, this cut-off was the shortest of the lines. But like the others, it offered a decidedly bettex gradient. The Genesee River Railroad opened on October 1, as the last of the relief lines. Rough terrain had hampered the execution of this 'project.
By building two major viaducts (see below, Viaducts) and a series of cuts and embankments, the 36-mile long track avoided a series of 1% grades east of the Genesee River Valley. Bad soil conditions also hindered the work there; the loamy soil refused the hold, despite tree plantings and honeysuckle. As late as the constant shifting of the ground remained a problem. But the difficulty of construction was justified by the results, for the new line, although 10 miles longer, had a summit level 200 feet below the old route. Mechanized equipment was also a prominent feature of the construction work on the River Line. Photographs show the Hurley track layer, as well # as the American Railroad Ditches, at work near Cuba.
The ditcher, built by the American Hoist and Derrick Company, was a steam-powered shovel mounted on a set of flanged wheels. The whole unit ran on a track laid on the bed of several standard flat cars. The ditcher thus ran along the cars, digging drainage channels and depositing the soil on the flat cars. Movement of the train itself could thus be kept to a minimum. Mechanized ditchers were more widely used than the track layers. A number of side scoop trenchers had appeared, but they had to be pulled along by a moving train. The American Railroad Ditcher was first used on the Missouri, Kansas & Texas Railway in June, and apparently became the most widely used mechanical trencher on American railroads.
The unit offered rather extraordinary flexibility, coming with its own sections of movable track that the ditcher could put into place itself. Uses besides ditching included coaling locomotives, laying track, removing snow, and working as a normal locomotive crane, steam shovel, pile driver, and wrecking crane. In a booklet entitled Building A Railroad, American Hoist & Derrick illustrated the ditcher performing every task involved in the construction of a rail line. The wide variety of uses and the labor saved by this machine the Idaho & Washington Northern discharged 2Q0 laborers after they purchased one of these units in ditching offered decided economies for the Erie. Mechanization was beginning to make an impact upon the railroads, hut Hr.
Campus comment afrout the Hurley track layer applied equally well to the American Railroad Ditcher, ERIE RAILWAY SURVEY HAER (Page 33 ) The Ganesee River Railroad opened on October 1, completing the system of freight relief lines. With the culmination of the simpler line improvement work between Hornellsville and Hunts , and between Cuba and Salamanca in freight traffic moved over a vastly improved track. The new grades allowed 40% heavier trains to move aastbound, and 52% heavier trains westbound, while using the same -motive power as before. With the new lines tn operation, and the other sections boasting improved alignments, the Erie had made a major step toward modernizing its facilities.
The work accomplished during the first decade of Underwood*s presidency has continued in service to the present day. tn the Graham Line became the main line for the Shawangunk Ridge crossing section, for the company downgraded the original track to a freight spur. The low-level route offered much greater economies for operation. I111] In the end may finally have arrived for the River Line, as Conrail planned to close that stretch of line in July as part of its termination plan for redundant facilities. The freight cut-offs represented only one facet of Underwood's re- building schedule. The company also began to construct a major access route through Bergen Hill into Jersey City in (see below, Tunnels') .
Double-tracking and line revisions continued between Marion, Ohio and Chicago, and also west of the Columbus and Erie Railroad. The last project was a very ambitious one, as Railway and Locomotive Engineering reported in "Perhaps one of the largest pieces of railroad reconstruction work that has ever been done in the world is that which has been going on on the Erie railroad for several years and which bids fair to be completed during the present year. It embraces two hundred and sixty miles of second and third track on its lines west of Salamanca . . .
The reconstruction of so large a section of the road has a double purpose which not only makes it possible to afford facilities for the rapidly in- creasing volume of traffic, but the complete reduction of the numerous grades to a minimum will make the reconstructed railroad literally a water-level road , . . The result will be not only a large increase in the capacity for traffic but also in a marked improve- ment in the capacity for speed." The company built one entire new line, for which a new survey was carried out. This new single track often ran several hundred yards away from the old line, especially in thfe vicinity of French Creek east of $eadvi\Ll&.? Pa.
The company' did not alter the existing alignment of the old route, which" was the original main line o the old Atlantic and Great Western Railroad, The engineers did choose-to reduce the gradient on that route drastically. When they finished, the Erie had two single track lines, one for each direction even though the tracks often diverged from each other, "Forty-eight steam shovels- worfced on this route, speeding ERIE RAILWAY SURVEY HAER (Page 34- ) the construction of several long cuts and deep embankments, including line fill over 3 miles long- Fortunately the general terrain did not present the rough features encountered on the eastern end of the Erie. But this fact by no means reduced the magnitude of the company's accomplishments.
Finished just before America's entry into World War I, the wisdom of the building plan was proven by the Erie's ability to move prodigous quantities of war material. Grade*Crossing Eliminations Frederick. Underwood's tenure as president also encompassed the primary era of grade-crossing eliminations on the Erie. During the last decade of the century there was increasing pressure from polit- ical reformers in the Progressive mold to improve the safety of railroad operation. The forced adoption of air brakes stands as only one aspect of this movement that was closely interconnected with the efforts to force government to regulate the railroads.
With increasingly more powerful locomotives permitting longer, heavier, and faster trains, crossings at grade, especially in cities became much more dangerous. That American railroads only rarely possessed entirely separate rights-of-way was another legacy of the American standards of rail- road construction. The British practice of railroad building called for. a roadbed removed from the street. But the expense of constructing the bridges and elevated tracks required for such separations led American engineers to eschew this practice. Instead, they chose the easy way, running trains through the city streets at grade, and likewise crossing almost all other roads at grade.
Like the curve-riddled routes, the rickety wooden bridges and trestles, the cheap roadbed, and the flexible American-style locomotive, street crossings became an identi- fiable feature of the uniquely American manner of building railroads. Nonetheless, the mounting toll of lives, the widespread adoption of the automobile, and the confusion and congestion caused by trains on city streets finally combined to force the railroads to begin efforts to raise either the streets or the tracks and thereby separate the crossings. The Erie, running as it did through the center of a number of fair-sized population districts, felt the reformers' pressure and responded with a number of efforts to remove crossings.
Not only did the population of the cities benefit from the new rights-of-way, but the Erie did also, for separated tracks permitted higher operating speeds and fewer delays. The number of law suits also declined with the number of accidents. The Erie clearly- gained from these efforts, despite the expenses involved. ERIE RAILWAY SURVEY HAER (Page 3$ ) The first major program to eliminate street crossings began on the Erie in Buffalo and Jersey City were the two cities most closely affected by the Erie tracks , so that year the company began work in Buffalo to elevate the tracks, while talks continued toward devising plans for Jersey City. The company noted in the annual report for that year that the need to eliminate grade-crossings in the cities was obvious to all observers.
Within 2 years work had commenced in Jersey City, with the incorporation of the Penhorn Greek Railroad to carry out the work. Work continued in Buffalo so that by only 2 streets remained to be carried over the tracks. Construction activity spread to other smaller towns after the turn of the century. The standard practice in most elimination work called for the elevation of the railroad on an earth embankment, while the streets were slightly lowered. Plate girder bridges then spanned the streets- Occasionally the streets crossed the tracks, if there was sufficient room for the erection of approach ramps, or where the elimination work involved only one or two streets . The Erie almost always adhered to the first pattern, as the work started in illustrated.
(Although involving at most streets in any one town, the Erie built its tracks over the roads in Clifton, Montclair, Waverly, Attica, Inghamton, and Elmira.) By the next year, the company had added Suffem, Middletown, Salamanca, Niagara Falls, and Verona, to the list, while the work ground on, seemingly interminable, in Buffalo, as the scope of the project there widened as more streets were added to the list. Once started, the elimination of street crossings spread to almost every town and village along the Erie. As the company reported in "the elimination of grade crossings in the past ten years has called for an expenditure of one and a quarter million dollars." In most of the small towns , it usually required a year at most for the completion of the needed bridges.
But other projects were on a much larger scale. Buffalo and Jersey City have been mentioned, and these cities saw the largest of the elimination efforts undertaken before World War I. The war temporarily halted many plans, but during the work resumed in earnest. Jamestown, was one of the cities that saw the resumption of construction after the war. Initially started in the work in the city involved three street crossings and a one mile elevation- Perhaps the primary impetus to the work was the severe winter weather that made the streets extremely slippery. Stopping at the crossings was at times an uncertainty. During the next couple of years, feet of retaining wall, 25 yo 30 feet high, were built.
The narrow right- of-way through town, closely adjoined by industries and spur tracks, pre- vented the use of a wide, sloping embankment. One street crossing was bridged before the war intervened to stop the work. Not until August, did the construction resume, and then on a larger scale. ERIE RAILWAY SURVEY HAER (Page 36 ) With permission to change its plans, including the ability to close 2 streets instead of bridging them, the Erie planned an extension of the elevated section further co the east. The primary difficulty remained the same--the roadbed could be only 75 feet wide because of the surround- ing industrial buildings, while the tracks had to be 16 feet above the ground.
Even a retaining wall and earth fill would not suffice in this situation, because the construction method for raising the wall would not have permitted the movement of traffic through the construction area while the wall was going up. A temporary trestle running through the adjoining street posed too many problems and cost too much. The engineers solved their difficulty by erecting a concrete trestle for main line traffic through the work zone. The trestle was feet long, interrupted only by a 60-foot gap for a plate girder bridge. Seventy-six cast-in place piers, set 14 feet apart, carried the roadbed on concrete slabs strung between the piers. Once the trestle began to carry traffic, the company then filled in under the trestle, and to one side.
More slabs held the fill in place and prevented the earth from cascading out onto the adjacent tracks remaining at the ground level. When the fill reached the proper height, tracks were laid on the embank- ment, so that the company now had 2 sections of main line through the town. By repeating the procedure on the other side of the trestle, the remaining two lines were brought up to the requisite level. Using 12- yard dump cars, the contractors moved cubic yards of fill. The advantage of the trestle was the mariner in which it helped to anchor the embankment on the river side of the elevation where there was no retaining wall. The company had to build only 4 bridges in Jamestown, all of them plate girder structures.
On one crossing, the outside girders were encased in a layer of concrete, given a brush-hammer finish set off by a rubbed-finish paneling effect, in order to enhance the appearance of the bridge. By the company could announce the completion of the project, although in it was further decided to extend the elevation to eliminate another crossing. Another large project the company began in the was in Paterson, The Erie initiated work there in as well as in Jamestown, Toungstown, and Buffalo (again), with the statement, "The demand for the elimination of highway crossings is growing." The Paterson effort was typical of these larger projects.
It involved extensive alter- ations, with miles of elevation eliminating 15 crossings, using 1 highway, 10 steel girder railroad spans, and 3 automobile subways. Included in the plan were three new passenger stations or platforms, a new coach yard, and an engine terminal facility. The company divided the work into 5 section and used the old alignment with only minor alterations. Erie Railroad Magazine described the project in this manner, ERIE RAILWAY SURVEY HAER (Page 37 ) "While basically a filling project incident to elevating the tracks, the work had many interesting phases, owing particularly to Che narrowness of the right-of-way at points, the necessity for maintaining unbroken track for the operation of approximately 150 . . . trains . . .
daily, and the variety of bridge construction necessary at the street crossing and at the passenger stations." The construction work in Patarson lasted more than 7 years, but never interrupted through traffic. Total cost was in the vicinity of million. An expense of such magnitude pointed up the biggest difficulty the Erie faced in pursuing this type of work. The were a relatively prosperous time for the nation's railroads, but even then the Erie could not declare a dividend on its stock. As always, money problems tended to put a limit on the railroad's construction capabilities and forced the company to pursue only a few projects at one time. As a result, the crossing work dragged on for a longer period of time than its competitors.
When put in this perspective, the advances made by the Erie during the presidency of Frederick Underwood were truly impressive. Speaking in before the large grade-crossing projects began, Underwood reviewed the accomplishments since then nearly complete. 1. The construction of 87 miles of first main track. 2. The construction of 517 miles of additional main track. 3. Increasing the average weight of rail from 81 to 94 1/2 pounds. 4. Additions and improvements to terminals, stations, and bridges. 5. Continued installation of automatic signals and interlocking. 6. Numerous grade crossings eliminated. 7. Upgrading the locomotive tractive power from to million pounds. 8. Increasing freight car capacity from 1.2 to 2.2 million tons.
The work of these 15 years constitutes the most important aspects of the program, for these improvements had the most direct effect upon the company's freight hauling capabilities. This program also matched events occuring on the rest of the nation's railroads, for this was an era of renewed large construction projects. Between and American railroad companies constructed miles of track, representing a major burst of building activity. And even when new construction declined because of the Panic of the major roads continued major efforts aimed at upgrading the existing lines. For example, the Pennsylvania Railroad spent million on its tunnel and station complex in New York City.
The difference between ERIE RAILWAY SURVEY HAER (Page 36 ) Che Erie and Che Pennsylvania was thac while Che wealthy Pennsylvania could afford the frills of maturity and prosperity like the massive stone bridges and enormous stations, the Erie had to use this era of good fortune co make the initial modernizations required by necessity. The company could afford che work only because the Erie enjoyed the same burst of prosperity, generated by a rapid increase in freight haulage, as che other East Coasc trunk lines- The results of the expenditure changed the entire appearance and outlook of the Erie. While still beset by problems, the company had moved a long way from its scandal-ridden, bankr-upt position as the prodigal son of Eastern railroading.
Van Sweringen Control The final step in Che coming of age of the Erie took place in , culminating events started in In that year, the Van Sweringen Brothers of Cleveland began buying control of the company. These two men were the latest in the line of dreamers who longed to control a trans-continental railroad. The Erie became part of their system, which also included the Nickel Plate Road and the Chesapeake & Ohio. By their control of the Erie was complete and naturally they desired to appoint their own top man. He was John J. Bernet, who left the Nickel Plate to assume the Erie's presidency, arriving with a background in the operating end of railroading.
After two years, Charles Denny took over in Both of these men helped to streamline the organ- ization of the company, with Denny working especially to provide a major overhaul of che mechanical and repair layout. The primary impact of the Van Sweringen ownership was the placement, if only for a short while, of the Erie's finances upon firm ground. The two brothers from Cleveland, Oris and Mantis, had had remarkable success with their earlier purchases. In they bought out the New York Central's controlling influence in che Nickel Plate Boad, at $35 a share. By the boom in the market had ballooned the stock to In a similar manner, C. & 0.
stock jumped from $70 to between and Wood, Struthers & Company, a brokerage house in New York commented, "The Van Sweringen's success in "Nickel Plate" and Chesapeake and Ohio is no doubt partly the result of the timeliness of their purchases, but more particularly, it reflects their ability as railroad operators. Aggresive traffic departments have increased business while efficient operating heads have reduced the cost of handling it; meanwhile they have gained important banking support for the necessary financing of their properties," The last comment highlighted the key feature the new owners brought to the Erie, for even more than J. P.
Morgan in the Van Sweringens could tap needed financial connections- ERIE RAILWAY SURVEY HAER (Page 39 ) It is well that Chey could do so, for the Erie faced continued high costs for internal improvements. Despite the accomplishments of Under- wood, much remained to be finished. Compounding the problems were Che drastic increases in the weight and si2e of locomotives and cars. The roadbed required constant attention, and new, heavier weight rails were a necessity. Other factors also entered the picture, as shown by the' following comment in the report.
"Because of Che use of heavier power and increased train lengths, considerable work was done during the year in constructing and extending passing sidings and in the strengthening of bridges," The other expensive alterations that faced the Erie were the con- tinuing grade-crossing elimination projects. As Erie Railroad Magazine - observed in these constituted the most expensive projects confronting the Erie in the next few years. And as the work, centered in the larger cities, the cost rose even higher. Among those projects planned for were Youngstown, with an estimated cost of $5 million; Akron at $2 million; Elmira, with a $4 million price tab.'; million in Passaic; and $1 million earmarked for Binghamton.
And on top of these local projects, the Erie announced it would spend another $27 million for a series of improvements in the operating department. This last program of modernization was designed to keep the facilities of the railroad as up-to-date as possible. Just as had happened 25 years earlier, other railroads beside the Erie embarked upon similar p-rojects at this time. The technology of railroading was adjusting to the in- creasing size and weight of all the components of railroad operations. Railway Age, in describing the Erie's plans*made a clear point that the Erie did not stand alone in embarking upon these major expenditures. "The Railway Age so far in has published a number of announcements of improvement programs of different railroads which run into millions of dollars.
There is considerable satisfaction to be found in these announcements by both those who look to them as evidence of continuous .effort on the part of the railroads to keep their properties at a high standard of efficiency and those who look at such announcements from the point of view of equipment, the supply and the construction industries as well as from that of the economic welfare of the country in general. The latest of the railroads to join the list of those spending more than the usual amount of money is the Erie. . .
It plans to spend for locomotives, freight, and passenger cars, for new construction, installations and signals, and improvements to track and roadway, thus carrying on its rehabilitation program begun last year," The work included all aspects of the road's operating facilities. Thirty- five new locomotives Berkshires 600 box cars and new passenger cars; all were on the agenda with new shop machinery and the installation' of automatic block signals between Salamanca and Meadville. ERIE RAILWAY SURVEY HAER (Page 4& ) The Erie announced these latest improvements at an opportune time, for the late saw record revenues for the company..
Income increased from million in to million in In that last year, the majority of the company's upgrading was completed, bringing the road's physical condition to its best shape ever. While the grade-crossing elim-" inations continued, the company could boast of facilities equal to those of any other railroad in the country. The Erie had reached a new plateau just in time for the Depression. The Depression The economic downturn of followed by the worsening Depression was the first problem the new president, Charles Denny, had to face. Very quickly the impact of the Depression made itself felt. Revenue fall from its high to $90 million in and to $73 million in a figure that barely sufficed to cover operating expenses.
By the railroad had felt the crunch to such an extent that the company abandoned 9 miles of track between Ringwood Junction and Sterling Forest on the Greenwood Lake Division in New Jersey. Closing this stretch of line because it was unprofitable began a process of retrenchment that has not yet ended, even under Con rail. There was only one type of construction or improvement work the company continued during the Depression, and that was grade-crossing elimination. Even here the only way the company could afford the work was through New York State aid provided under a constitutional amendment, and through Industrial Recovery Acts financing.
The federal money had arrived only after while state money had been available throughout the In the company reported that in the past ten years it had eliminated 150 crossings, 82 of them in New York. The Erie's expen- diture exceeded $10 million as its 50% share. The continuing effort that all American railroads had to make to eliminate street crossings certainly stands as one of the largest engineering projects, when considered- collectively, undertaken in the first half of this century., The largest Depression-era elimination project on" the Erie occurred in Elmira. The company bridged 13 streets, rebuilt a bridge over the Chemung River, relocated an engine terminal, and erected a new station platform.
Begun in April, the first section opened on October 2, with the project totally completed eight months later. The old situation through Elmira had become intolerable, as between 60 and 70 trains passed through the city daily. High water had also inundated the right-of-way on occasion, while the old bridge stood only feet above flood stage, leading the company to elevate the tracks through Elmira. ERIE RAILWAY SURVEY HAER (Page -^/ ) There was the usual problem of space in constructing the elevation through the center of town. For much of the distance, the company erected a simple earthen embankment, with a concrete retaining wall on only one side, A similar structure had to be put up at the station.
But through the business district downtown buildings crowded too close to the tracks for even a wall and earth fill construction. Instead, the company again resorted to a concrete viaduct, utilizing that material because of its better appearance and sound absorption characteristics, as opposed to steel. The tracks ran on concrete slab panels supported by two-column bents with flared column heads. Some piles, driven by a Vulcan 5000-pound single-acting hammer with a three-foot drop, supported the columns.-' foundations. The actual viaduct, from the found- ations, went up in only 58 days. In the meantime, the company's own bridge crews were at work raising the bridge over the Chemung River to the new elevation.
The design and layout of the work caused a minimum amount of incon- venience and traffic disruption, with the only major problem resulting from the need to run trains through adjoining streets during the viaduct construction. Such planning was typical of the way the Erie and all American railroads learned to build large, imposing structures in tight quarters with little fuss. The solution to this problem in Elmira was rather unique, enough so that engineering students at Cornell visited the work to observe the concrete viaduct under construction. Unlike the elevation in Jamestown, the concrete trestle was not filled in. Grade-crossing eliminations involved a variety of problems , as often general improvement programs were tied into the street crossing efforts.
All of these works also entailed great expense. But the results, when the company had completed the entire program, were separated roadbeds through nearly every town on the line, and many rural crossings disappeared as well. The Erie and the Last Beginning The Erie survived the initial difficulties of the. early but just barely continued to keep its head above water. The Van Sweringen brothers died in and just as their paper empire defaulted arid fell apart. The Erie struggled on until when even the best efforts of Charles Denny failed to secure additional financing. At the time, the. Erie joined the ranks of railroads bankrupt or in receivership, a list that included 31% of the total rail mileage of the country. The company's longest period of solvency had ended.
ERIE RAILWAY SURVEY HAER (Page 42L ) The reorganization cook until when war time traffic again revived the railroad. With a reduced debt service and good revenue, the road was able to return to a satisfactory operating picture- The situation resembled the manner in which the Civil War had revived the old Erie Railway. And just as during World War I, the Erie had to handle an enormous volume of heavy traffic. That the Erie and other railroads managed as well as they did is a tribute to hard work, good management, and the load-carrying capacity the roads possessed. The Depression had forced the railroads to the brink of dissolution and had led to the deferral of needed maintenance; many locomotives sat on sidings, for all intents and purposes abandoned, for nearly ten years.
Other facilities had decayed or come near to total disrepair. To suddenly face the need to gear up for a period of record tonnage after such a stagnation severely tested the ill-prepared facilities and motive power of American railroads. Largely because of the improvement programs undertaken by Underwood and Denny, the Erie managed, as Modern Railroading noted in in paying tribute to the Erie centennial. "That the Erie today is a thoroughly modern and efficient transportation system is by no means due entirely to the road's postwar improvement program, extensive as it has been. From an engineering standpoint, the type of physical plant required for economical operation under today's conditions has been an accomplished fact for many years.
This resulted from such projects as the construction of several low-grade freight lines, among them the 33-mile River Like between Hornell and Cuba, and the double- track 43-mile low grade route between Harriman and Graham, At other locations, grade and curve reductions were made on the main line tracks. Other major improvements carried out long before World War II now contribute greatly to the operating efficiency of the modern Erie. For example, there are the four-track open cut through the Bergen Hill to provide better passenger traffic facilities at the Jersey City terminal, the double- tracking of the main line at the western end of the system, and an extensive program of yard and terminal expansion and modernization throughout the entire system.
More recently, under the Van Swerigen regime, the Erie turned its attention to such things as stronger . . . heavier rail and better roadbed standards for new and heavier locomotives, plus the lengthening of passing tracks. Taken together, these improvements placed the Erie in an excellent position to handle the tremendous volume of traffic during the war years ERIE RAILWAY SURVEY HAER (Page ) The Erie managed so well that by Che company could embark upon a continuing program of improvements. This latest effort involved little in the way of track construction, except at isolated points, as the alignment of the railroad was finally well situated. One point that did need work was Bouchoux Hill near Pond Eddy on the Delaware River. A.
series of shale slides had plagued the railroad for years, despite the erection of a pile barrier at that location in Two serious blockages in forced the company into action. The Erie's engineers in effect moved the Delaware River 152 feet further into Pennsylvania by trans- ferring fill across the river into New York. This earth fill allowed the relocation of feet of tracks away from the base of the hill where the shale was working loose. At another project near Almond, the company excavated cubic yards of material from Canacadea Creek, near Hornell, to alleviate a flooding problem. This effort in was the last major track building work undertaken by the Erie. Another aspect of the company's post-war improvement program was one of the last grade-crossing eliminations needed on the line.
At Coming, using $11 million in state funds, the Erie moved its tracks across the Chemung River onto the right of way of the Delaware, Lackawanna & Western Railroad. By constructing seven miles of line, 19 crossings at grade through the center of the town were eliminated. The key point is that the Erie, despite the Depression, could fall back on an excellent set of facilities. The war and the post-war boom had once again proven the wisdom of the improvement efforts undertaken earlier in the century. Those programs, however, were about to pale before the extension of the Erie's post-war projects inHo the early At that time, the Erie launched the largest and most sweeping improvement program in the company's history.
The most significant aspect of the new additions in- volved a complete changeover in the Erie's locomotive roster in only 9 years, as the company switched to the diesel-electrxc locomotive. Dieselization The introduction of diesel locomotives stands out as the most property- altering and generally significant technical change aver to occur on the Erie, Moreover, the speed with which that change took place made the alteration all the more significant. Actually, the diesel electric loco- motive was no stranger to the Erie in as the company had purchased its first oil-electric switcher in and owned a number of diesel units from Baldwin, Alco, and the Electro-Motive Division of General Motors by the time the war broke out.
But the breakthrough of diesels into main line freight service began only in November, The EMD locomotive Number a four-unit, horsepower demonstration locomotive, ran on the Erie between Marion, Ohio, and Meadville, Pa., in competition ERIE RAILWAY SURVEY HAER (Page ^ ) with Che Erie's S-class Berkshires. These steam locomotives had been added to the road between and and were the Erie's newest motive power. In comparison, the 193-foot long diesel, powered by 16 traction engines, showed an 80% greater hauling capacity over the roller- coaster grades that reached 1% on the test route. As a result of that impressive demonstration, the Erie ordered its first road diesels in and took delivery in October, for use on the Meadville and Marion.
The new diesels pulled 50O0-ton trains, while the Berkshires had a limit of tons. The new engines thus represented a means of taming, the last section of 1% grade on the entire line between Jersey City and Chicago. Certainly the cost of the new locomotives, some $3 million with anvaddi- tional $1 million for signal changes, was far less than the anticipated price tag of $12 to $16 million for a construction effort required to reduce the gradients, and to double track the line. Once the diesels appeared, there was no stopping them. The Erie embarked upon one of the most aggressive programs of dieselization in the country. The annual reports for this period showed a steadily rising number of the new units in the company's service from onward.
The locomotive roster consisted of 760 steam, 9 four-unit freight "and 7-multi-unit passenger diesels, and 20 diesel switchers. By all passenger trains, commuter and through runs, utilized diesel power. The company had retired 344 steam locomotives since and acquired 160 diesels in replacement. The table below shows the pace of this changeover after Table I Steam and Diesel Locomotives on the Erie Year Steam Retired, Total Steam Diesels in Use Steam Repaired cumulative in use 698 Not Available 318 192 406 160 118 171 235 306 81 105 141 395 Not Available 96 43 472 0 23 22 472 0 22 0 472 0 This changeover occurred at an amazingly fast pace. By the company^ no tad in its annual report that the Erie boasted, ". . .
one of tfte largest percentages of diesel ownerships of any eastern railroad operating between New York.and Chicago." Only two years later, the phase out of the last steam locomotives had begun, each as their heavy repairs came due.
The last steam run occurred in The company saved 22 steam locomotives in as emergency power, but scrapped the last 8 in October, fulfilling a prophecy made in the Annual Report, ERIE RAILWAY SURVEY HAER (Page ^5 ) "In ail probability, the Erie will be the first trunk-line railroad oper- ating between New York and Chicago .to fully diesel powered." The company had expended 373 million on the new locomotives and related facilities, with an additional million budgeted for the coming year of That next year, the Annual Report listed the Erie's expenditures for dieselization, diesel facilities, and upgraded rolling stock for the previous ten years at million.
Apart from the speed of dieselization on the Erie, the pattern of the introduction of the new units, and the manner of their assignment: on the road resembled the way in which other American railroads used their diesels. Modern Railroading noted in this account of the Erie diesel program, "Actual assignment and operation of the diesels on the Erie is much like that on other American railroads. Likewise, the growth of the diesel fleet pretty much followed the pattern of its growth on other railroads. The road type of power was first assigned to cross country runs where its use would permit large tonnage trains of faster speed with fewer terminal delays." On the Erie, this pattern meant that the fast freights and passenger runs came into the domain of the diesel first.
Beginning with the Marion to Meadville route, the diesels slowly spread, taking over a division at a time, as the numbers of the new locomotives increased. One point worth remembering is that by , the Erie desperately needed new motive power, perhaps more so than any other American railroad, The last new main line steam power had been purchased in Under these circumstances the Erie's need for diesels appears less startling, although the speed of their adoption is. The company had never made such a massive investment for motive power over such a short time span. It seems reasonable to argue that one explanation for the sudden abandonment of steam power was a prestige factor. The Erie wished to boast that it was the first Eastern railroad to dieselize.
The company felt the weight of a bad reputation, a reputation for insolvency for old equipment, for being behind not only the times but also its competitors. The presence of the new locomotives proved to all observers that the Erie was a pro- gressive, modern railroad. An element of fascination with the technology might also be .detectable, on the part of the company's officer , that perhaps played as large a role in the acceptance of the diesel as did the economic arguments. Whatever, the company clearly did equate pro- gressivism with the use of mechanical apparatus. The greatest impact this new form of motive power had upon the company's property was upon the shop and repair facilities.
As shall be discussed more fully in the section on "Repair Shops, diesels needed buildings with a layout that had been designed for their specific require- ments. The company could not easily convert older steam repair shops. ERIE RAILWAY SURVEY HAER (Page 46 ) Further, there was a general visual impact upon the whole road, as noted in che Annual Report. "Almost complete dieselization has changed the entire physical appearance of the railroad. Water cranes, coaling stations, roundhouses, and other steam locomotive facilities have been torn down." In addition to the new appearance they brought to the property, the diesels also served as the most visible sign of the increasing presence of newer, advanced technology on the railroads.
In a number of ways, the Erie proved to be a pace setter in the introduction of technical inno- vations affecting railroad operations. In the company culminated a five-year program installing four way radio communications along the entire main line and on its harbor fleet in New York City. Radio gave far greater speed in the communication of train orders, served as a back-up to normal signals , and permitted engineers and conductors to remain in contact with each other while the train was in motion for the first time. The Erie became the first railroad in the country to have its entire system so equipped. Another area where modern technology and mechanisation made inroads on the Erie was in track maintenance.
Again, the Erie stood out as a pioneer in the mechanization of roadbed care and up-keep. The Hurley track layer and the American Railroad Ditcher were early indications of the company's interest in this area. But not until later did the machin- ery start to become available for the near-complete mechanization of the track maintenance procedures. From. onward, the company invested heavily - million by - in machinery for track work, including tampers, ballast cleaners, portable compressors, power jacks, bulldozers, and cranes. The Maintenance of Way Department claimed savings of million by since even with the reduction of the work week to 40 hours, the work force had remained unchanged.
By the mid-1950s, the Erie boasted the best equipped track maintenance department in the country, as shown in an article in Railway Track and Structures. The spread of technical innovation also appeared in the development of centralized train control. This invention in signaling technology offered the advantage of controlling train movements over a far broader stretch of territory than was possible with an automatic block system. The primary impetus to the installation of this new signal arrangement was the prospect of reduced track maintenance, because stretches of line with double or triple tracking could have one set of rails removed without impairing train movement. More trains could use the same set of rails than before centralized control came into use.
Because one operator knew the precise location of every train in his region, he could run trains closer together than was possible before* Even more interestingly, a single track could be made to serve two-way traffic with far less risk of accident. Thus the new single system let the company reduce the line ERIE RAILWAY SURVEY HAER (Page ^7 ) from East Buffalo to Portage to a single track in 19 51, as well as remove one of the two lines on the Graham Cut-off and the third trade on the Port Jervis hill in In this fashion, the new signals definitely resulted in major savings in track maintenance.
But while all appeared healthy on the outside, there were problems confronting the railroad, one indication of which was the continuing effort on the part of the Erie to rid itself of-unprofitable lines. The reorganization effected in had started this movement on a large scale, as the Erie discontinued service on many short branches, such as the ends of the Greenwood Lake branch, and on the Avon to Morris line on the Rochester Division. In a number of other cases, the company curtailed passenger service. In Rochester the station was sold when service was terminated. Other lines where service halted included the Newburgh branch, some ofwhich even had the track removed, Scranton, Dunkirk, Oil City, Dayton, and Cincinnati.
This policy of cutbacks continued through the especially on passenger runs- By with the exception of commuter service between Youngstown and Cleveland, no city west of Port Jervis had passenger connections. The most spectacular evidence of the cut-back in service came with the abandonment of commuter service into the Erie station in Jersey City in With vastly reduced commuter ridership, the Erie began to share the terminal of the Delaware, Lackawanna & Western less than a mile further up the Hudson at Hoboken. Economizing was the key word by the middle leading to the use of new technical innovations, efforts to share facilities with adjoining railroads, and even the sale of one whole branch line. The down- turn of the national economy in brought to light the problems facing the railroads.
Over-extended, the drop in revenues caused by lower traffic left the railroads in a tight financial position, leading to belt- tightening measures, primarily the introduction of deferred maintenance. The merger of the Delaware, Lackawanna & Western and the Erie in really offered little solution to the problem. Although the elimination of redundant facilities helped lower some expenses for the new Erie- Lackawanna, in the company entered its sixth year of deferred main- tenance policies. The problems remained all through the with only the robust, Viet Nam-bolstered economy preventing a total collapse. The ultimate, and completely foreseeable end,came on June 26, 19 72, as the Erie-Lackawanna finally gave up the effort, and like the other Northeast railroads succumbed to bankruptcy.
For the sixth time, the Erie lay in the hands of a receiver. The newest effort to resuscitate the Erie and the other roads as. well, was several years in coming. On April 1, the Erie-Lackawanna became part of the Consolidated Railroad Corporation Conrail. This federally-run regional system plans to undo the results of the self- defeating practice of deferred maintenance, and to restore the health of the Eastern railroads. One goal is to prune away lines receiving ERIE RAILWAY SURVEY HAER (Page 40 ] minimal use and facilities offering duplicate services. Many Erie structures have thus been closed, because in a number of instances the newer shops and yards of die New York Central-Penn Central offered more central locations.
Likewise, the River Line was closed in July, But the Erie mainline still serves as one of the central arteries of Conrail, and the continued viability of this route rests upon the improvements, the betterments, and Che structures and facilities added in the earlier portion of the twentieth century, These structures fall into four main categories that cover the primary features of railroad operations. These groups are tunnels, bridges, shop and repair facilities> and stations and terminals. Each group shall be dealt with in its turn in the remaining. chapters of this report. ERIE RAILWAY SURVEY HAER (Page -^ ) Chapter III.
Tunnels The Erie was not a railroad noted for a great number of tunnels, as the engineers preferred, in nearly every case, to adopt other solutions to the few terrain obstacles that might have been suitable to tunnelling. As opened in the New York Si Erie did not have a single tunnel, although several of the original construction surveys had called for such construction between Middletown and Susquehanna. Not until 50 years later did the company resort to tunnels on the Shawangunk Ridge crossing. Nonetheless, the two largest tunnels that, were eventually built on the mainline were especially important to the Erie, for both surmounted rather troublesome hills and greatly facil- itated freight movements. One of the two is also of some note in the general history of tunnelling.
The Bergen Tunnel When the New York & Erie opened in there were no tunnels along the 454 mile length of the line. The first tunnel the company built was the Bergen Tunnel, which penetrated the Bergen Ridge to provide access to Jersey City. The ridge presented thorny problems for all of the railroads that approached Jersey City from the north or west. The solid rock wall, an extension of the Palisades, -rose sharply, so chat the. existing rail line around the hill was forced into a lengthy detour. With the chartering of the Long Dock Company in to build facilities on the Hudson River, the Erie needed an easy route over the ridge.
The detour that followed the Hackensack River south for over four miles to the end of the hill and then backtracked through the whole length of Jersey City for another four miles was not satis- factory. Instead of this laborious route, the company elected to drive a tunnel through the hill. Tn June, the New York & Erie Railway awarded the contract for the tunnel to Stanton, Mallory & Company of Newburgh, N. Y. Work began in August with the sinking of 8 shafts designed to allow a total of 18 headings to be pushed at once. Actual tunnelling began in mid-December, and by July, the contractor employed men. They anticipated breakthrough by November, But as on so many other Erie projects, money troubles intervened and forced a work stoppage in October.
Not until early did work resume, and the contractors quickly finished the work, with the two ends meeting on August 2, But misfortune dogged the work, for on September 16, a worker's strike stopped the work of lining the shaft. Then the New York & Erie declared bankruptcy, throwing the work into limbo. Not until February 6, did the tunnel open to traffic, after the company had been reorganized. ERIE RAILWAY SURVEY HAER (Page SO ) The tunnel was feet long, and more than half the distance ran through solid trap rock. The 8 shafts penetrated 80 feet to reach the level of the tunnel, and served tor ventilation afterwards. The bore was 28 feet wide and 20 feet high. Actual driving of the tunnel took, a remarkably short time, especially considering the hand methods then in use.
The speed with which the work was accomplished indicated that the contractors encountered few if any major problems. Nonethe- less, 57 men died during the construction. While not the earliest railroad tunnel built in this country, the Bergen Tunnel ranked as one of the longest constructed for a railroad before the Civil War, and as late as this was one of only three American tunnels long enough to require ventilation. Shortly after the Civil War, the corrosive action of steam and smoke necessitated the installation of a brickwork lining.
John Houston, the original construction engineer, apparently supervised the later work as well, for he read a paper to the American Institute of Civil Engineers concerning the lining on October 7, All the repair work in the double-track tunnel was accomplished at night, when the blockage of one track, by the construction train caused the fewest delays. Boring and blasting the rock walls to provide the needed room for the actual lining, the workers first cut a stone ledge for a granite springer while standing on'scaffolds built on flat cars. Bricklayers followed, building up the side walls. Once those walls reached the proper height, they moved an iron frame falsework, 27 feet long, into place.
This frame moved on rollers and did not obstruct the passage of trains through the tunnel, even when set into place. The lining varied in thickness from 16 to 36 inches and dry stone packing filled any re- maining space behind the brick. Four-inch cement pipes placed at ten- foot intervals drained the arch. Overall, the contractors installed some 500 to 600 feet of arched brick lining. In the arch of the tunnel received further attention. At that time, Octave Chanute was the chief engineer of the railroad, and he instituted the use of cement, or beton, to repair and rebuild a number of structures on the line. Along with piers on the Portage Viaduct and a large number of culverts the Bergen Tunnel became one of the structures to be repaired using the new material.
After installing falsework, a contractor coated the old brickwork and some of the fractured rock on the tunnel roof. This was the first American tunnel to receive a cement lining. The primary advantages of the material, as Chanute pointed out in the paper he read to the ASCE Convention in were the speed of repairs and the low cost. The Erie became a pioneer user of the material for masonry repairs. The Bergen Hill Tunnel served its purpose for the Erie quite well, as Henry Drinker commented in "The Bergen Tunnel of the Erie ERIE RAILWAY SURVEY HAER (Page SJ ) Railway has probably been more busily worked than any other in the country." 3y the Northern Railroad of ^ew Jersey and the Delaware, Lackawanna & Western Railroad both shared this portal into Jersey City with the Erie.
During and no fewer than 312 trains passed through the tunnel daily. Such heavy traffic produced strong- concentrations of smoke, steam, and chemicals that accounted for the repairs to the tunnel. Although the D. L. & W. opened its own tunnel in alleviating some of the smoke problem in the Erie's passage, the two tracks had reached their capacity by the end of the century. Inevitably, Che tunnel developed into a true bottleneck in the Erie's service to its busiest terminal. The growth of both freight and commuter service gave rise to more and more trains. Clearly, additional tracks were needed and another tunnel seemed in order.
The Bergen Cut The work of enlarging the Erie's access route to Jersey City began when the Penhorn Creek Railroad received a charter in permitting the Erie to begin construction work in New Jersey. The Erie's annual report that year noted that the tasks of the new company included plans to elevate tracks for miles between the Hudson .River and the tunnel portal, and to put two or more tracks through the hill either above or adjacent to the existing tunnel. The sole impetus for the work was the continuing congestion in the old tunnel. The company awarded Grattan & Jennings of Buffalo the contract for the elevation project that served to eliminate a large number of grade crossings through the city's streets.
This work was completed in The elevation work fit into a general improvement scheme for Jersey City's terminal that included a turntable, new coal and ash- handling facilities, a two-story freight house, and a passenger coach yard. The elevated structure carries 7 tracks for feet on an earth embankment held within stone retaining walls. Plate/girder bridges spanned the city streets. This section-bf the work also fit within the company's grade-crossing elimination efforts that were just getting under way at that time. Unfortunately, the Penhorn Creek "Railroad had to lie dormant after as no work was begun on the second path through the hill because of the usual money problems. Not until did work resume, as part of Underwood's general upgrading efforts.
The solution proposed differed from the one initially envisioned, with the new plans calling for an open cut carrying four tracks through the hill for passenger service. Difficulties in ventilating the old tunnel, along with the considerations for passenger comfort, lower cost, and the greater supply ERIE RAILWAY SURVEY HAER (Page SZ ) of crushed rock suitable for ballast that would result from an open cut led to Che rejection of another four track tunnel. Another reason for deciding upon the open cut was the introduction of some of the first power earth moving tools air drills, cranes, and steam shovels and the cut presented far fewer technical problems than a wide tunnel would have, despite the necessity to remove a greater amount of material.
Had the company attempted to build a cut in the project would have taken far longer than the tunnel actually did. But by this situation had been reversed. The company could choose an open cut in because of significant changes in the technical capabilities of excavating large quantities of earth. The example of - the Panama Canal stands out as the greatest evidence of the changes in technology that had taken place since the middle part of the nine- teenth century. The new route for the cut ran 40 feet above the old tunnel, with a center line 67 feet south of the old passage. The cut penetrated 40 to 70 feet into the hill, and tapered in width from 75 to 58 feet in width, from top to bottom. All told, the cut stretched for feet, of which feet were open.
Two bridges, one reinforced concrete, the other of steel, carried streets over the excavation, and four tunnels were driven in stretches where the earth could not be removed for the cut. The tunnels enabled the Erie to leave gas and utility lines undisturbed on several streets. Millard Construction Company of Philadelphia assembled a consider- able plant for the construction work. A three-foot gauge track ran the whole length of the work, carrying 8. Porter locomotives and 125 four- yard dump cars. Five balanced cable cranes and many movable derricks removed material from the interior cuts blocked at their ends by the tunnel excavations. The cable cranes spanned 240 feet with a lifting capacity of 5 tons. Some 60 Sullivan air drills were put into use, with 12 hand drills for blocking.
Blasting loosened all material, but the contractors set off charges only when the old tunnel was empty. Great skill was needed to prevent damage to the old passage. After a blast, a special inspection car fitted with powerful acetylene lamps ran through the tunnel before traffic resumed. Altogether, Millard excavated cubic yards of rock and yards of earth from the cut. -The alignment of the new route forced the shortening of the east end of the old tunnel by 224 feet, as well. Yet despite the magnitude of the work, it did not represent exceptional practice, as the Engineering Record observed.
"The prosecution of' the greater part of the work has _been_by standard methods, the rock being hoisted out of the cut in scale pans by derricks located close ERIE RAILWAY SURVEY HAER (Page 3 ) together on Che surface. These place the spoil la cars on three-foot gauge tracks, which were run the full length of the cut and terminated at the rock-crushing and screening plant, with a diverging line to spoil areas on the Hackensadc Meadows for the earth stripping. All the work, however, has been seriously hampered by its location within the city, and even more so by its proximity to the old tunnel, through which 600 trains pass every 24 hours." The rock crushing plant set up by Millard housed all of the air compressors for the work.
One number ten and four number six McCully gyratory crushers reduced all of the spoil to pieces less than inches square. An automatic conveyor carried the resulting gravel to a stocking pile 700 feet away, where a 62-foot boom on a swivel piled the rock. A 500-horsepower cross-compound engine powered this instal- lation, and four 500-horsepower water tube boilers with Sturtevant forced draft fans produced all necessary steam. The Power & Mining Company of Cudahy, Wisconsin, supplied all crushing and power machinery. Even with the advances in earth-moving technology, it remained advantageous to leave four tunnels, ranging from 220 to 574 feet in length, in the cut. These bores required special precautions in their construction that were rather unique because of the wide span of the tunnels.
Engineering Record also observed, "the treacherous in- clination of the strata, and the location close to the old tunnel," complicated the'boring of the four shorter tunnels. The safety precautions consisted primarily in the pattern for driving the head- ings of the tunnels. Working as far as possible from the line o the old passage, the tunnellers could use heavier charges. The initial heading was only 15 feet wide, running from portal to portal. Then work started on the cross cuts> each 12 to 13 feet wide, carried over to the wall closest to the line of the old tunnel. While an auxiliary tunnel parallel to the original heading was. started, the tunnellers widened the cross cuts to 35 feet.
This system left pillars 15 feet long and 18 feet wide between the cross cuts, the initial heading, and the auxiliary tunnel. The main heading was next enlarged to remove the roof section from springing line to springing line, except at the pillars. On each out- side wall, work proceeded simultaneously on a bench excavation to lower the wall to the desired floor level. Once reached, the bench walls were begun from that floor level to the level of the arched roof itself. Finally the arch could be started, working from section to section along the cross cuts. The pillars were still left in place ERIE RAILWAY SURVEY HAER (Page &$ ) at this stage.
All of the excavation work was accomplished with Sullivan compressed air drills supplied with air from three Laidlaw- Dunn-Gordon cross compound compressors. Flexible metal hoses from the American Metal Hose Company fed air to the working face. The key to all of the safety procedures was to leave the pillars of rock in place as long as possible. The roof was unstable, and in places it even needed timbering. Leaving the cores until last allowed the contractor to build the arched centering for the roof with short supports. The arch itself was poured concrete. A narrow gauge line ran into the tunnel, and one-yard cars carried the mix from the plants at the tunnel portals. A two-drum Mundy hoisting engine raised the whole cement car and poured its contents into the form.
The cut, which opened in after more than three years of labor, greatly eased the congestion at the Jersey City terminal ap- proaches. But the approach ramps to the cut forced several alignment changes by the company. The branch lines on the west side of the cut that led toward Newark were relocated, with a new draw bridge carrying the tracks over the Hackensack River. The old Bergen engine house had stood directly in the path of the new approaches, so it, too, was re- located. Overall, the company built cubic yards of embankment to carry the approach tracks into the cut. Much of the material came from the cut. On the east side of the cut, a viaduct of steel deck plate girders connected the tracks with the terminal and the ferry lines to New York City.
Built in the 38 spans, called the Penhorn Viaduct, carried four tracks for feet. Economy and ease of erection dictated the use of the steel viaduct as opposed to the usual earth emb ankment. The cut and its tunnels, the approaches , and the viaduct were part of a long term improvement project for the terminal in Jersey City, pre-dating Underwood's presidency. These improvements constituted the final step in Che renovation of the terminal, and they enabled the station to handle nearly all traffic demands placed upon it. This one group of projects was only one of many efforts guided by J. M. Graham, the Erie's engineering vice-president, but it proved to be one of the most important.
Both the old tunnel and the open cut represented first class engineering works demonstrating the construction capabili- ties of the day. Comparing the techniques used to solve the same problem 5Q years apart in time offers us a glimpse at the primary advances in engineering and technology over the last half of the nine- teenth century. We can see how technical changes, like improvements in capability to move large quantities of earth, helped to alter the way that engineers chose to solve a particular problem. ERIE RAILWAY SURVEY HAER (Page & } Once the cue was completed, however, we find the two works com- bining to alleviate the bottleneck. It has been only with the abandon- ment of the Jersey City terminal complex since the lace that the importance of these projects to the Erie declined.
The Otisville Tunnel The other major tunnelling project on the Erie Railroad began just before the Penhorn Creek. Railroad started the Bergen Hill Cut. The Otisville Tunnel, named for the town closest to it, was located on the Graham Line freight bypass. This tunnel was the linchpin in the effort to lower the gradient of the line over the Shawangunk Ridge. The earliest surveys for the line had proposed a 2,700-foot tunnel under the ridge, but the company had instead excavated a deep rock, cut at the top of the hill. But with the desire on the part of the Frederick Underwood J. M. Graham for lower gradients, a tunnel under the ridge assumed new significance. Graham laid out the cut off to include a 5,300-foot tunnel.
Late in the Otisville Tunnel became the first section of Underwood's scheme of freight relief lines to be started. Bennett and Talcott of Greensburg, Pa. s won the contract, and began by sinking a shaft 16 by 14 feet and 150 feet deep into the ridge. With work also starting at the portals, the two work, faces at the shaft provided a total of four headings being worked at once. Quicksand slowed the pace of the work at the eastern portal, which also required the excavation of a rock cut before the actual portal was reached. Work proceeded quite rapidly, with breakthrough occurring on Sep- tember 4, Except for 800 feet through good sandstone, the contractor lined the 30-foot wide bore with five brick rings "backed """ by dry stone and concrete grouting.
A concrete "plant" utilizing a Haines mixer stood at one portal, as did a blacksmith shop and a small hospital. On October 1, the company carved the last rock at the west portal entrance. With the laying of the single track through the tunnel, the railroad began running trains through, the new passage in February, The company chose not to install ventilating equipment, and even closed the central shaft. Certainly, the traffic through the tunnel never approached the levels experienced through the Bergen Hill Tunnel. No serious problems resulted from this choice, except for heavy- wear on the tunnel lining. The work took somewhat longer than the 18 months specified in the contract, but was well worth the expense and the effort.
By ERIE RAILWAY SURVEY HAER (Page S6) lowering the summit of the line 165 feet, the Otisville Tunnel was one of the most interesting and significant aspects of the Graham Line. The tunnel has remained in good shape as an integral part of what is now the Erie's main line. In the company awarded a contract to the Pneumatic Concrete Corporation of Providence to repair the brick lining. The contractor removed the outside layer of brick, and strengthened the remaining rings by grouting. For further protection, the whole lining was coated with a further layer of concrete. All applications were made by the gimite method. In addition, the company replaced the rails in with thermite-welded foot sections of 131-pound rail.
The Erie became the second railroad to make this type of installation, following the lead of the Denver & Salt Lake Railroad in its Mbffat Tunnel. The welding was done in the tunnels taking only ten days to make the 268 welds. Projects like these have constituted the only repair efforts needed in the tunnel. Both stemmed from the heavy corrosion in the locomotive-polluted atmosphere. Before the installation, the Erie had replaced the rails only seven years earlier, a fact which illustrates the problems facing tunnel maintenance during the era of steam power. Otherwise, the Otisville Tunnel has suffered little over its 70 year life, and the introduction of the diesels has lessened the corrosion to the rails. The Dayton Tunnel The only other tunnel on the Erie is at Dayton, New York.
Built c this short, 15-foot, single-track underpass carried the tracks of the Buffalo and Southwestern Railroad under the Allegany, or Western Division of the Erie. The bore was located at milepost on the B. & S. W., which was opened in to connect the Atlantic and Great Western with Buffalo. The Erie acquired control, of this line when it took over the A. & G. W. The portal is nicely dressed stone masonry, and the stone arch lining was run through the whole length of this passage. ERIE RAILWAY SURVEY HAER (Page ^7} Chapter IV. -Bridges It is universally recognized Chat the needs of the railroads were the single most important factor in bridge development during the nine- teenth century. Since the in both Britain and America, the railroads demanded strong and durable bridges.
The earliest designers, usually millwrights or carpenters, had to build structures able to withstand heavier loads and shifting stresses not before encountered. Importantly, the bridges they built were based upon past experiences and not scientific knowledge. Under these conditions, the Erie's early bridges closely resembled those built on other American railroads in the The builders recognized that stone offered the most solid and stable material. By 158 arch, 603 box, and 53 open stone culverts were in use on the Erie. Also, the company had constructed three stone viaducts 15 to 30 feet long, as well as the Starucca Viaduct. But these spans crossed, with the exception of Starucca, short distances like the bridge over the Hackensack River at Blauvelt, N. Y.
This larger-than- average span dated to stretched for 30 feet, and remained in excellent condition on the Piermont Branch, in 19 77. Yet bridges like the one at Blauvelt were exceptional because of the time and expense involved in masonry construction. To borrow the words of David .Plowden, "Part of the genius of the early builders was their ability to find solutions that would best satisfy the needs of. the impatient young nation, so eagerly striving to conquer its ter- ritory.
In almost every instance, this was to be the fastest and most economical approach." Plowden finished, "With few exceptions, impatient America has not chosen to take the time to lay up a stone bridge where an alternative was available." On the Erie, money problems seemingly determined that stone bridges be used only for the very short spans. Few builders were given the assurance that cost did not matter, as supposedly, happened to Kirkvood on the Starucca Viaduct. Instead, the Erie became one of the railroads that adopted the wooden spans and trestles that exemplified the American style of railroad construction. Frail, flimsy-looking systems of struts and braces, such as the Cascade Bridge, spanned many rivers and valleys, to the marvel of Americans and Europeans alike.
But these bridges worked despite their apparent weakness. Wood as a structural material had its problems; fire and water or ice ruined wooden bridges. But as Plowden commented, "Although in the long run the wooden bridge was. not practical, it was so initially. Priorities, lack of capital, and the quality of available tools in the early days ERIE RAILWAY SURVEY HAER (Page & ) outweighed Che obvious drawback." The Erie was no exception to the rule in adopting wood for use in bridges. .An accounting of listed 146 truss bridges of lineal feet, and 48 trestle, 66 stringer, and six pile spans, with a combined length of feet. The railroad quickly discovered that bridge maintenance consumed a hefty sum of money.
The expenditure for that purpose in 18 52 was and the annual reports bear continuous witness to the con- stant attention wooden bridges needed. 3y the report of the chief engineer noted that several major spans on the Delaware Division desperately needed renewal after only ten years of service. Maintaining the bridges on the line remained a major and constant priority of the company. The Erie used a changing array of patterns for its first wooden bridges. Mott claimed the Erie first chose the Bunn almost certainly he meant the Burr and covered all of the spans. Later, the Fowler pattern, which used an arched truss similar to the Cascade Bridge, and the McCallum patented truss came into use. The McCallum truss originated with the road's superintendent in the early Daniel C.
McCallum, whom we met in Chapter I. At the time he patented his bridge, McCallum was engineer of way and structures. Appleton's Mechanics' Magazine and Engineers f Journal commented very favorably on this pattern in We have no hesitation in affirming, that of all the timber bridges patented in this country, there are none, in point of strength, economy, (in which we include ultimate durability) , facility of repair, and uniformity of action, to be preferred before this plan of bridge... McCallum built a large number of these so-called inflexible arch spans on the Erie, and many other railroads adopted this bridge pattern as well. Apparently, McCallum derived an income of" up to annually from royalties on his patent during the , indicating the extent of the bridge's popularity.
The truss was a composite structure utilizing iron truss rods as tension members between the upper and lower chords, which were of wood. Equally important from the on, and the primary truss pattern used by the Erie after the Civil War, was the Howe truss, which became the typical bridge of the era on most railroads. Invented in "...the Eowe truss was the dominant form of wooden railroad structure for many years." The Howe pattern began to appear on the Erie in the early along with the McCallum, as replacement spans for bridges on the Eastern end of the line. Naturally, with McCallum as the ERIE RAILWAY SURVEY HAER (Page 39 ) Erie's superintendent, more of his bridges were arected.
By the road utilized 62 McCallum bridges, with 12 others carrying a second tract at Howe truss spans; 43 Howe crossings; 20 Burr arched-truss es , mostly on the Western end of the Erie; a single Pratt truss; and one Whipple span. But by a survey of the company's bridges showed that the Howe had become the predominant style of wooden bridge on the Erie. [19 7] With the railroad's continual impoverished position, wooden spans remained in use on the Erie far longer than usual for eastern railroads, In fact, the company dismantled its last Howe truss quite late, in November, where it stood on the Mahoning Division near Niles, Ohio. [19 8] While the use of the Howe truss by the Erie was typical, the length of time that such wooden spans could be found on the company's property was not.
During the and iron bridges began to appear in numbers on the nation's railroads. The Erie, however, was slow to adopt iron as a structural element for bridges. Ironically, though, the Erie had b^en one of the first American roads to experiment with iron bridges. In only four years after the country's first iron railroad span went up on the Philadelphia & Reading Sailroad, the Erie installed three iron truss spans. Nathaniel Syder built these bridges across Westcolang Creek, and over the Delaware Kiver near Mast Hope, Pa. But on July 31, a livestock train collapsed the bridge at Wastcolang. Plowden observed, "After this disaster, the Erie ordered its remaining bridges taken down and replaced with wooden ones.
The line's faith in iron was not restored until some fifteen years later." Not until did the Erie again build iron bridges. At that time, the company installed the first iron bridge built by Simeon S. Post, after a pattern he had patented in We met Post earlier in the story of the Erie; he came to work on the railroad in as resident engineer at Piermont, and by he had become Hezekiah Seymour's assistant. As chief engineer through at least he di- rected work concerning the initial construction of the Erie. From to he supervised the Long Dock project and the Bergen Tunnel work, both in Jersey City. By the Civil War, Post had left the company to concentrate his energies to bridge design. It was his bridge pattern that gained Post a measure of fame.
The first installation of this type came on the Erie's Newburgh Branch at Washingtonville in The Post truss appeared in at least two variants, with either perpendicular or inclined compression members and double intersection tension members tightened by tumbuckles. The pattern was widely used, according to Theodore Cooper, who wrote, ERIE RAILWAY SURVEY HAER (Page 60 ) "Between a large number of bridges on this style were built. From its particular form, the counter system of web members consisted of a single system, which met at the center of the direct web members, thus rendering the strains ambiguous.
Much of its early popularity was due to the apparent stiffness of this form of truss under moving loads the truss being put under an initial strain by the counter system which extends the whole length, of the truss." The extent to which the Erie can be considered a pioneering railroad in the in- stallation of iron bridges is very limited, however, despite the presence of this early Post truss. Again, money severely constrained the railroad's capabilities, and the process of erecting iron bridges and later steel bridges, moved ahead very slowly on the Erie. Some figures help illustrate the status of Erie's bridges in the last quarter of the-nineteenth century.
Octave Chanute, chief engineer, called for bids for 25 iron bridges in and among the contract awardees were the Watson Manufacturing Company, the Phillipsburg Manufacturing Company, the Baltimore Bridge Company, and the Detroit Bridge Company. Yet the inspection tour of Captain Tyler for the British bondholders in found 183 timber and only 48 iron bridges over 20 feet long, and 33 of the.
latter had been built since By of bridges, 58 were iron, and the following breaks down the number for Table II Wood and Iron Bridges on the Erie in Wood Iron Eastern Division 46 of feet 21 of feet Delaware Division 24 of feet 14 of feet Susquehanna Division 42 of feet 30 of feet Buffalo Division 16 of feet 9 of feet Rochester Division 67 of feet 3 of 181 feet Western Division 61 of feet 2 of 154 feet In the late and early the newly reorganized company decided to redo the line's bridges, as part of the general improvement program. By 272 of the line's 335 bridges were iron. By the end of the decade, the company had even replaced some of the earliest iron bridges with stronger iron spans. The Erie bridges building programs were guided by a set of specifi- cations drawn up by Theodore Cooper.
After inspecting at least 37 iron truss spans and 25 riveted girder bridges in Cooper established a series of suitable bridge loadings that became the first such guide- ERIE RAILWAY SURVEY HAER (Page &/ ) lines Co bridge design, a note of historic importance in civil engineer- ing. His specifications embodied: [Cooper's] experience in the designing of bridges, their [Erie1s] shop construction, the testing of material and the study of existing bridges and their defects [and] was the first general specification cov- ering the designing, proportioning, and detail of construction with that completeness necessary to give the railroad company the full advantage of the competitive method, with a certainty that the result- ing structure would in all ways be up to the advanced state of the art.
It was the first paper on bridge construction in which that relic of ignorance, "The factor of safety," was entirely omitted. It definitely specified the working strains to be allowed on the different parts of the structure ac- cording to the service they were to perform. While aiming to obtain the best results for the railroad company...it left to the contractor perfect liberty of selecting his own plan of structure, as to form of truss, relative proportions of depths and panel lengths and methods of detailing. These specifications were adopted very widely. They have been modified and extended from time to time, by the author and other engineers, as advancing knowledge and experience justified.
Largely as the result of Cooper's guidelines, and aided by a pro- gram of regular bridge inspections inaugurated in the Erie experienced no disastrous bridge collapses during this era of notorious iron bridge failures. Nonetheless, by the time the Erie completed its program of wooden bridge replacement, the age of steel had dawned. Like all American railroads, the Erie hung back before building any bridges using the new structural material. But the rapidly increasing weight of both cars and motive power forced the adoption of steel with its undoubtedly superior strength. The Erie could not afford the luxury of stone, which some Eastern rail lines used.
The Pennsylvania Railroad was the prime example of this course of action, with its pro- gram of monumental stone bridge construction, exemplified by the Rockville Bridge over the Susquehanna River and Harrisburg. The expense of masonry bridges continued to preclude their construction on the Erie. ERIE RAILWAY SURVEY HAER (Page 62 ) Instead, the Erie began a program of replacing iron bridges with steel. As the Annual Report announced in "Heavy expenditures have been made for Repairs and Renewals of Bridges and Culverts, the object being to ultimately place these structures in a practically permanent condition." Under this program, continued by Frederick Underwood, a number of the Erie's largest spans were rebuilt, and chese bridges remain in use today.
The heavier equipment coming into use demanded these alterations. The following table shows the progress of the company's replacement efforts. Table III Bridges Replaced by Steel, or in Process of Replacement Year No, Year No. Year No 36 99 10 55 29 14 48 28 7 10 61- 18 29 60 20 73 54 20 190 7 61 51 31 62 59 45 60 48 48 Clearly, the company made a major commitment to bridge maintenance. The number of spans involved reflected the expansion of the Erie's main line to Chicago, and no doubt by the late many bridges rebuilt in had been rebuilt again. The results of the program were gratifying, as noted by an inspection report done for Wood, Struthers & Company.
"The road for a number of years had used very heavy power on its lines, so that its bridges are strong enough to take the newest locomotives without reinforcement. All structures of this type are of permanent nature and constructed to the highest standards." A issue of the Erie Railroad Magazine noted there were almost no wooden bridges left on the property, although a few stood on branch"sidings. By and large, the Erie's bridges were well maintained and strengthened through the and 19 to meet the needs of heavier locomotives. In fact, bridge work was almost the only maintenance requirement not deferred during the Depression.
The company considered such work to be one of the major improvements for the years and Because of the steady effort made in this direction over the years, Conrail continued in 19 77 to depend upon a number of major spans the Erie built between and that remained fully serviceable without limitations. Their continued importance is a tribute to the builders, the maintenance forces, and engineering department of the Erie Railroad. ERIE RAILWAY SURVEY HAER (Page 63 ) Hackensack Drawbridges The Erie Railroad's approaches to Jersey City faced a number of obstacles apart from the-Bergen Hill, primarily the Passaic and Hacken- sack Rivers. Both rivers skirted low marshy ground the Hackensack Meadows that complicated the erection of bridges.
In the nineteenth century, pile foundations carrying trestles with wooden drawspans of- fered the only solution. But as the weight of trains increased, and iron and steel became available, the history of later bridges in this area traced, in microcosm, the development of subsequent types of movable bridges. Within a radius of two miles, the three main types of moving bridges swing, vertical lift, and bascule lift could be found on the Erie's five bridges over the Hackensack and Passaic Rivers. The Erie's initial route out of Jersey City crossed the Hackensack River, ran into Rutherford, and then on to Paterson- The earliest river crossing was a 1,686-foot trestle with two double-crack truss spans in the center.
The draw span was 57 feet in the clear and 60 and 1/2 feet overall, while the other truss was 49 feet long. Both trusses utulized Pratt-type patterns with arched top chords, the only Pratt trusses on the entire road at that time. Built in December, this basic configuration lasted until the with substantial repairs at intervals, as in when the company used feet of timber to repair the trestle. A similar effort replaced the floor on feet of the span in By the wooden draw span had become inadequate for both the railroad and the river traffic. The company rebuilt a trestle feet long, and installed an iron swing span. The greatest difficulty came in founding the masonry, because of heavy silt deposits.
Caissons, resting on clusters of piles driven 60 feet to hard bottom, supported the masonry piers for the draw span. This two-armed Pratt truss span was 210 feet long and gave two 60-foot openings for river craft. The new swing section presented a radical improvement over the 39 foot opening in the old wooden swing span. But this bridge was soon outgrown, and by the crossing again needed renewal. As part of Underwood's improvement program the- company had built a low-level by-pass from above Paterson to Rutherford. At the same time, company engineers rebuilt the Hackensack crossing. The pro- vision for river traffic remaining, the new span consisted of a series of steel plate girder deck spans with a vertical lift bridge.
Construc- tion began in and the whole line opened November 1, with the 1,095-foot span over the Hackensack serving as one of the integral elements. This crossing, Bridge on the New York Division, remained in use in The lift span was still the most interesting feature.- Its 151-foot through truss raised 38 feet to provide passage for river ERIE RAILWAY SURVEY HAER (Page & ) traffic. This Erie bridge was located near a cluster of lift spans, all of them across the Hackensack River. Similar spans on Che old Penn- sylvania and Delaware, Lackawanna & Western Railroads give this short stretch, of river an unusually large collection of vertical lift bridges.
The other Hackensack River crossing on the Erie carried the Newark Branch of the New York Division and the Greenwood Lake Division toward Newark. This was Bridge listed on the Greenwood Lake Division. It, too, was basically a woodpile trestle with a draw span, but was erected at a later date than the other Hackensack crossing. Like the main line span, the bridge required constant attention, but as late as the draw span of 68' foot distance was still wooden. Heavy traffic, however, soon demanded a stronger structure, and several un- dated photographs, no doubt from the showed the construction of a new iron swing span on the bridge. Two floating cranes helped move the iron work into place.
The bridge served less than 20 years before realignment of the approaches into the new Bergen Cut forced the relocation of the span. The new crossing, still in use, opened in and consisted of a through truss draw span and six girder deck spans. The girders spanned distances of 78 and 79 feet, while the draw was 264 feet long, for a total of 736 feet. The firm of HcMullen and McDermott contracted the substructure, including concrete abutments on pile foundations, while American Bridge fabricated and erected the bridge itself. The old bridge' stood until the company removed it in Passaic River Bridges The Passaic River formed the other water boundary to the Erie's route out of Jersey City into Newark and Paterson.
The Passaic was not as wide, nor was it surrounded by marshy ground like the Hackensack River, so long trestle approaches were not required.. The earliest Erie- built bridge, replacing the original span of the old Paterson & Hudson Railroad, went up in December, It consisted of. two 146-foot Mc- Gallum trusses and a 52-foot draw span, also on the McCallum pattern, giving a total length of 350 feet. This bridge, like all of the bridges on this Erie line, was double-tracked. The most recent structure on this site, Bridge on the New York Division, was a through Penn swing truss, 201 feet long, with a 143-foot through truss for the approach. The merger of the Erie and the Delaware, Lackawanna & Western in gave the company a plethora of approaches into Jersey City.
This swing span was considered ex- pendable, mainly because of its age. Built in the company removed it in ERIE RAILWAY SURVEY HAER (Page The other two Passaic River 3pans carried the Greenwood Lake Division and Che Newark, branch into Newark, about a half-mile from each other. Bridge on the Greenwood Lake line was the middle of the three Erie draw spans over that river. An undated photograph, almost certainly taken in showed the erection of the bridge. High stone piers carried the plate girder swing span, while four approach spans of girders completed the structure. Two wooden travellers were used. The photos clearly show the stone piers had been erected to carry the ap- proaches, although the girders had not been installed when the photograph was taken..
The traveller set the girders into position, and the trestle scaffolding was then removed. The combined length of this steel deck plate girder and deck draw span was 534 feet, and it carried trains 43 feet above the water. In 19 77, Conrail continued to use this crossing at West Arlington. The third Passaic crossing carried the tracks of the Newark branch. The first crossing there dated to with the installation of a wooden draw (swing) span on the new line. The bridge, as shown in an view, resembled a modern cable-stayed span. Cables ran from a tower in the center of the draw span to the end of the Howe strusses, in order to prevent sagging. Only nine years later a steel draw span replaced the double-tracked wooden bridge.
This through truss swing bridge re- mained in service until but between and a Straus-type Bascule lift bridge had to be built, as the older span was simply inade- quate to the demands placed upon it. The Bascule section of the new span was a single leaf, 180 feet long, rising 82 degrees at full tilt. Two concrete blocks 32 feet wide, four and 1/2 feet thick, and 52 feet high, served as the counter weights, one on each side of the tracks. This span remained in service in 19 77. Bridge Greenwood Lake Division Wanaque, N. J. A photo taken by Robert Vogel of the Smithsonian Institution in July, 19 71, showed this bridge near Wanaque, N- J. The crossing used to be on the Greenwood Lake Division, over the Wanaque River, one mile east of the old Haskell Station.
The stretch from Wanaque to Midvale was abandoned on November 14, as part of the reorganization effort of that time. Since then, apparently, the bridge has not been used. A steel through Pratt truss, the single span of 139 feet, carried the tracks 30 feet above the river. The Kellogg & Maurice Bridge Company erected this span, with pin-connected eyebars for the lower chords in This bridge was not that firm's only contract for the Erie. Undated company drawings show that Kellogg & Maurice also fabri- cated Bridge at Chemung, N. Y., a 132-foot, three-inch Pratt pin- connected eyebar span. ERIE RAILWAY SURVEY HAER (Page 6& ) Bridge New York Division Ramapo, N. Y. Located miles east of Ramapo Station, this steel through- lattice truss supported the main line tracks over the Ramapo River.
- The double-tracked span was 140 feet long and 30 feet high. Built in as part of the Underwood improvement program, the bridge continued to serve Conrail in 19 77. Bridge Delaware Division Mill Rift, Pa. This bridge was the span that carried the Erie across the Delaware River into Pennsylvania, enabling the company to follow the relatively level Delaware River valley. The Erie built the original five span crossing in February, using Burr arched trusses. One span was 151 feet long, three were 155 and 1/2 feet, and the last stretched for 168 feet, bringing the total length of the bridge to 792 feet. Only 11 years later, however, this bridge four miles west of Port Jervis had to be reconstructed. On March 17, an ice jam ripped out the iron bridge that had replaced the wooden crossing.
Only one of the five spans remained, but the piers were undamaged, despite the ice that backed up into a jam 30 to 50 feet high. The replacement by the Watson Manufacturing Company of Paterson used three Post trusses, one of 163 feet and two of 152 feet. The new span opened by Hay 1, with the lower chord ten feet higher than previously, to eliminate similar damage in the future. This Post bridge remained in use until when heavier train weights required another renewal. The steel, pin-connected deck trusses put in then stretched 64 7 feet over the river and rose 56 feet above the water. The Pratt trusses carried two trades on four spans y as the older fifth span over the Delaware & Hudson Canal had been filled in.
This bridge has survived to the present in fine shape, with the ravages of deferred maintenance being corrected in 19 77 and 19 78 by Conrail*s engineering department. Bridge Delaware Division Shohola, Pa. At Shohola, Pa., one of the larger masonry culverts built on the Erie can still be seen, although structurally the masonry arch no longer serves any useful purpose for the railroad. The line crosses Shohola Creek as that stream runs into the Delaware River. The earliest bridge was a covered. Burr arched truss 109 feet long. By 185 7, the span had ERIE RAILWAY SURVEY HAER (Page 67 ) been strengthened, but still needed replacement. [ The major improvement at this bridge occurred in with the erection of a stone arch culvert.
As The Railroad Gazette reported, "The mason work of the stone arch over Shohola Creek on the Delaware Division, which has been over a year in construction, is completed. The filling in and laying the track will not be completed until spring. "[240a] The resulting structure was a striking example of the beautiful bridges constructed with stone. The arch was 49 feet, eight inches wide at the bottom, and more than 60 feet high from the water. The bridge floor was 26 'feet, two inches wide and carried two lines of tracks. The arch itself consisted of 75 voussoirs and rose about 25 feet from the springing line. The wing walls were massive structures, angling back along the creek for more than 50 feet on each abutment.
The bridge provided steady service for the railroad until A.ugust 24, when Hurricane Diane washed out part of the arch. Apparently the water in Shohola Creek backed up behind the culvert, because the railroad embankment acted like a dam. The water rose above the level of the arch, knocking out sections of the arch. The impact of the flood can be seen in photographs before and after the flood, for the Delaware River side of the arch escaped unscathed. Rather than replace the arch, the company chose to put a 110-foot single-track plate girder span over the top of the stone arch. Then in May, the old arch was filled in to pre- vent further washouts. This girder span has continued to carry the main line tracks following Conrail's take over of the property.
Bridge Delaware Division Lackawaxen, Pa. At Lackawaxen, the Erie had to cross Lackawaxen Creek and the Delaware & Hudson Canal. The original bridge was a Burr truss built in December, George Duggan, in his volume on American railroads, showed two 127-foot deck spans, and one through span over the canal, for a total length of 381 feet, but his distances were clear spans. In February, a McCallum bridge of 142 feet replaced the canal span, and in October, the company finished the replacement.'with three 134-foot McCallum spans, for a final length of 548 feet.
The New York & Erie report for the year noted the bridge had burned and the reconstruc- tion cost Like the other main line bridges, iron spans soon had to be erected, Theodore Cooper inspected the Lackawaxen Bridge in He found three 130-foot Post deck trusses, pin-connected, with a 30-foot shore span at the west end and a 45-foot approach span on the east. He commented, "Bridge in pretty good shape generally (for a Post Truss)-.." The sway rods were overstrained, however. The bridge over the canal was a foot truss, set on a 33 degree skew. The company filled this particular section in after the canal closed in 189 8. ERIE RAILWAY SURVEY HAER (Page 6S ) The three-span ?ratt-type deck truss in use today was built in Two plate girder approaches bring the length to 431 feet.
Like many other Erie bridges, the lower chord consists of pin-connected eyebars. A. series of photographs taken in October, showed work in progress to rebuild the river pier on this bridge. A traction engine and another steam engine with an upright boiler ran pumps to drain the foundation for the new concrete pier. Temporary pile bents supported the trusses. The bridge has also been strengthened since its erection, no doubt in the late with the installation of additional members, shown clearly in photos 70 and 71. But the original bridge remained in excellent condition right to the present, handling the heaviest trains at the highest speeds, even in 19 77. Bridge Delaware Division Tusten, Pa.
The bridge from Tusten to Narrowsburg, N* Y., carried the Erie back into New York after a 23 mile run in Pennsylvania. The original span there consisted of four 130-foot wooden trusses, but in February, 185 7, an ice jam washed away several of the trusses. The river refroze, and then another jam tore out the replacement already under construction. The eventual replacement was a McCallum bridge with end spans of 109 feet, and central spans of 157 feet, for a total length of 545 feet. The current 550-foot four-span bridge was built in It was a through truss and plate girder crossing. Bridge Delaware Division Hancock, N. Y. At Hancock, the Erie main line left the East Branch of the Delaware River. Initially, a BurT truss bridged the East Branch, with three foot spans.
By the time of Theodore Cooper's inspection, an iron bridge crossed the river, on three 123-foot trusses. But this pin- connected span had no sway system and Cooper urged major strengthening. Apparently, the company took Cooper's recommendation, for a later notation on Cooper's notes said the bridge was replaced in That year the Annual Report mentioned the new bridge at Hancock, and that span was still in use in A two-span, double-track, Pratt-type truss 402 feet long, the steel crossing had a lower chord of pin-connected eyebars. The bridge was slightly skewed.
run of bridges between Port Jervis and Hancock offered an interesting look, at some of the early steel spans on the Erie Railroad, all built in the All were plain, unadorned structures that matched the rough terrain of the valley and the free-flowing river they crossed. All existed in fine shape as their ages approached or exceeded 80 years. ERIE RAILWAY SURVEY HAER (Page 69 ) Bridge Delaware Division Deposit, N, Y. At Deposit, the Erie left the level valley of the Delaware to begin crossing the Randolph Hills to the Susquehanna River. The last crossing over the Delaware's West Branch was initially built in February, with two Burr arched-trusses spanning 273 and 1/2 feet. Yet after only ten years, the company reported the bridge was in bad condition, despite a roof.
In a Eowe-pattern bridge crossed the Delaware at this site, but in as part of the New York, Lake Erie, and Western's reconstruction program, the company put up a metal span. In its turn, a new steel structure replaced the earlier iron crossing in 190 3. A lattice-type truss with two spans, this bridge closely resembled the bridge over the Ramapo River, at milepost on the New York Division. Like that bridge, this span in Deposit was still in use in 19 77. Some 23 feet above the creek, the bridge was 276 feet long. Bridge Delaware Division Deposit, M. Y. The Erie main line veered sharply westward at Deposit, in order to run toward Susquehanna, Pa. As it did so, the railroad encountered Oquaga Creek.
The initial bridge gave way_ to a .McCallum truss 142 feet long, installed in December, An identical span for a second track, ^followed in August^ The current lattice-type truss closely^ resembled "trie bridge only a mile to the east, as it should, for they. were built only three years apart, with this 135 foot span going up in Photo 76 provided a clear view of the lattice pattern used by the company for these truss bridges built about The diagonals were combined compression and tension members , as was possible only with steel construction. Also, these' bridges stood out because of the riveted connections, as opposed to the more usual Erie choice of pin- connected eyebar spans, which cost less.
With the change in truss pattern and fabrication methods, the Erie was truly entering the era of steel bridges. With these structures, the company began applying forms and techniques suitable only to steel, rather than transferring the patterns familiar to iron bridges to the new material. Bridge and Culvert Delaware Division Lanesboro, Pa. After leaving the Delaware valley, the Erie ran over the steep ridge of hills via the Gulf Summit Cut, Cascade Bridges, and the ERIE RAILWAY SURVEY HAER (Page 70 ) Starucca Viaduct Csee Chapter I). The Canawacta Creek Bridge at Lanesfroro was the third major crossing on the ridge, and stood less than a mile west of the Starucca Viaduct.
Julius Adams' designed the earliest span, a flimsy, covered wooden trestle 550 feet long, that was erected in December, George Duggan illustrated the cross- ing in his book on. American railroads, showing tapered wooden bents supporting 17 simple truss spans 30 feet apart. By the an iron bridge with steel pins and eyebars built by the Union Bridge Company spanned the creek. Four 113-feet, nine-inch Pratt deck, trusses were erected, each fixed at one end and mounted on a roller for expansion at the opposite end. The four spans carried the track 58 and 1/2 feet above the water of Canawacta Creek. Probably because the bridge was iron, the company chose to re- place it in as part of the Van Sweringen's upgrading and strengthening program.
No doubt, the purchase of the new Berkshire locomotives required the stronger span. The company erected a rein- forced concrete arch bridge instead of the usual metal crossing. By moving the line of the tracks slightly,, the old bridge was kept in service during the construction. The plans also called for creating an embankment to reduce the length of the span, so a 25-foot concrete culvert was provided for the creek proper. The two-ribbed main arch spanned 120 feet, with spandrel arches cut out. Steel trusses formed the falsework for the culvert, while wooden centering sufficed for the forms elsewhere. A concrete mixer at the site aided the con- struction effort, and dump boxes handled by crawler cranes filled the wooden forms. The approach spans were formed by a series of smaller.
arches that were filled in after the bridge was finished. The new bridge opened in 19 30, and the old bridge was scrapped in The same contractor reduced the old stone piers to ground level in This new bridge was the only major reinforced concrete bridge on the entire Erie main line, for few localities were suited for the arch form employed. The ornamental pillars on the bridge railings bespeak the influence of the "Memorial Bridge Craze" of the first three decades of this century, mentioned by David Plowden. By the bridge was slowly decaying, although still struc- turally sound. The concrete had been spailing for some time photos taken in (photo 86) showed the extent of the erosion at that time and the condition has not improved itself since then.
Conrail was attempting to begin efforts to restore the bridge, but at this writing, more important problems have a higher priority. Bridges and Susquehanna Division Susquehanna, Pa. The original crossing over the Susquehanna River lasted only four years before it had to be replaced in November, Engineer ERIE RAILWAY SURVEY HAER (Page 7/ ) of Way and Structures Daniel McCailum built the first of his inflex- ible arched truss spans on this site as Che replacement. Trie tests of his 199 and 1/2 foot long bridge helped account for its subsequent popularity.
Appleton's Mechanics' Magazine and Engineers' Journal re- viewed the bridge enthusiastically, noting that the pine trusses con- sisted of "less than the ordinary proportion of iron rods, bolts and castings." In the course of the testing, McCailum subjected his pattern to four locomotives weighing tons which produced a deflection of only feet. This success prompted the installation of a large number of McCailum's bridges on the Erie, One such example was the replacement of the other half of the Susquehanna span with four McCailum trusses, each 158 and 1/2 feet long, in January, The report further claimed that the original McCailum span over the Susquehanna had needed no repairs at all up to che time of the report, a remarkable record for a wooden bridge.
As good as the McCailum truss may have been, replacement neces- sarily followed, apparently with a four-span Pose truss on the long side of the river crossing, a total of 660 feet. This bridge boasted some nice ornamental features, like the knee braces and especially the builder's plate. Theodore Cooper inspected the four 156 feet, four inch spans in and recommended stiffening the truss and installing a new floor. But this structure lasted no more than 20 years before the company had to replace it; the single-track span proved a bottleneck. The new double-track span cost more than presumably for new spans on both sides of the island chat divided the river at this crossing.
The bridge was a simple Pratt truss entirely of wrought iron, unlike its predecessor that had boasted a cast-iron top chord. The Railroad Gazette noted that the new bridge was part of an effort by the road to replace all pin-connected bridges, but the new span itself used pin connections.. Likewise, the current bridges at this point utilized pins instead of rivets to join the various members, although the controversy between American and British engineers over the better connection had been re- solved in favor of rivets. The single span section nearest the town went up first, in 190 7. American Bridge fabricated this steel through truss, using a Pratt pattern 204 feet long.
The four-span section on the other side of the island was an identical match, but was erected in This new span stretched for 636 feet. Both spans were contained in Underwood's improvement plan, and have served the Erie well In excellent condition, they remained in use in Bridge Susquehanna Division Elmira, N. Y. The Erie crossed the Chemung River as it entered Elmira, the largest city in the southern tier in Initially, a long covered ERIE RAILWAY SURVEY HAER (Page 72. ) bridge carried the tracks over the river and the island that split the river into two channels.
But by April, four 136-foot McCallum spans were in place over the river, and three similar sections 64 feet long replaced the old island trusses in August, The bridge was an important one, as indicated by the early iron truss span that needed replacement in The company erected three newer iron trusses that year. But by a steel bridge was standing across the river, 733 feet long in seven spans four through trusses and three deck girders. The existing bridge dated to the Elmira Grade Crossing Elimination Project. The old seven-span structure had to be raised 14 feet to the new track level, and was reduced to six spans. Four 135-foot and two 95-foot deck girder spans were built by the company's own bridge crews on the old piers, which had only 2 and 1/2 feet of new masonry added to them.
One track on the old bridge remained in use during the construc- tion, and a temporary timber trestle served traffic moving in the opi- posite direction. The new structure was 777 feet long, since the new approach ramps needed to reach the bridge from the new elevation. The double track structure remained in service for Conrail in Bridge Bradford Division The Bradford Division paralleled the tracks of the B. & 0. out of Salamanca, and where the two lines crossed the Alleghany River, there were a pair of Pratt through truss bridges. The Erie's was the smaller, older span, a single-track steel bridge, 189 feet, four inches long,. built about the turn of the century. The Erie bridge presented an il- lustrative contrast of the later, bulkier B. & 0.
structure, graphically demonstrating the impact of heavier locomotives upon bridge design and appearance. Bridges and Meadville Division Vicinity Miller's Station, Pa. Bridges and Meadville Division Cambridge Springs, Pa. These four bridges carried the Meadville Division as it crossed and recrossed French Creek north of Meadville. They came into being as part of the Underwood program of reconstructing the whole division be- tween Corry and Meadville during But rather than widen the right of way, the engineers chose to build a wholly separate new line, so traffic in each direction ran on its own alignment. Thus there were two separate bridges at each creek crossing with eastbound traffic using the higher of the two. The company's bridge crews performed all con- struction work.
ERIE RAILWAY SURVEY HAER (Page Z3 ) The pair of bridges known as the diverging French Creek 3ridges was in the vicinity of Miller's Station, The eas tbound span was Bridge Che 524 foot deck span. Two 150 foot: Prate-type, pin- connected steel trusses comprised the main spans, while two 106 and 1/2 foot steel girders carried the approaches. The center pier rose 67 feet above the water and rested on 40 foot high pile foundations. The westbound span followed the old alignment, running across the creek on a new, two-span, steel lattice through truss 298 feet long, and only 30 feet above the water. The other pair of Bridges, and were called the Parallel French Creek Bridges. Located 1/4 mile east of Cambridge Springs, the two lines ran parallel at this point.
The eastbound main used the deck truss bridge 442 feet long and 50 feet over the water of the creek. The through truss for westbound traffic was only a foot shorter but 20 feet lower. Three spans comprised each bridge. The deck span had two 152 foot and one 138 foot span, while the lengths of the through trusses appear to have been nearly identical- Interestingly, each of the deck trusses resembled not only each other, but also the older deck spans at Lackawaxen, Mill Rift, and Canawacta Creek. The through trusses likewise seem patterned after the two bridges in Deposit, for all of them used a lattice-type truss. Still in good condition, these Erie bridges on the Meadville Division continued to carry heavy traffic in 19 77. Bridge , Niagara Falls Division Martinsville , N. Y.
This pin-connected Pratt-type truss span crossing Sawyer Creek in Martinsville was one of the oldest extant spans on the Erie. The 113 foot span, now with only one track, was erected in .x The lightness of the bridge's members demonstrated the early date of the structure. Other Bridges V-, The Erie Railroad obviously had a great many more bridges than those recorded here. The list of important structures ran to.. more than six pages on bridges alone. The intention has been to \' cover the most important and interesting spans in New 'York, New Jersey, and Pennsylvania. However, in the course of compiling material for this report, a number of old photographs were reviewed, many of them now contained in Library of Congress Lot Nos.
and entitled "Erie Railway: Historic Photographs and Supplemental Graphic Materials". The following list gives some of the structures for which old photographs were found: ERIE RAILWAY SURVEY FIAER (Page 7^- ) Bridge 2 36. 71, Susquehanna Division, Owe go , N. Y. Shown under construction. Two steel through trusses, 256 feet long. Date, c. Bridge Susquehanna Division, Cheraung, N. Y. Shown under construction, July, Two views; steel through trusses, three spans, 685 feet long. Old eyebar truss in one picture. Bridge 2 86. 84 , Susquehanna Division, Corning, N. Y. Five views of bridge under construction, Three steel through Pratt trusses, 466 feet long. Bridge in use in was reconstructed after a flood washed out three spans in May, Bridge Meadville"Division, Oil City, Pa.
Three span, Pratt through truss, shown burning on November 4, Bridge Rochester Division, Rochester, N. Y. Seven views; one double intersection Pratt through truss, five Pratt deck trusses, two short Pratt spans. Crosses the Genesee River. Photos dated and Total length about 777 feet. Ap- parently replaced. Bridges on the Jefferson Division The seven bridges of this division shown in old photographs are especially interesting because of their uniformity. In the New York, Lake Erie, and Western announced that it planned to double track the whole division and replace the wooden bridges with iron. The photos showed these bridges, four of them lattice deck trusses, and three of them lattice through trusses. All are crossings over the Lackawanna River, whose route the line follows.
On all spans, the company adopted the same truss pattern. The bridges thus illustrate a comprehensive planning effort by the company to utilize a standard form with standard size materials. But these iron bridges, even though of heavy construction, proved too light under the pounding of coal trains, and between and plate girders replaced all the iron truss bridges. Since the Delaware and Hudson Railroad has actually owned the Jefferson Division, and continues to use those steel girder bridges. Bridge Lanesboros Pa. Deck span, 87 and 1/2 feet long, replaced in ERIE RAILWAY SURVEY HAER (Page Bridge Forest City, Pa. Through truss, 84 feet, 3 and 1/2 inches long. Replaced in 19 31. Bridge Forest City, Pa. Deck truss, 82 feet long. Re- placed and Bridge and Carbondale, Pa.
Identical through trusses, 87 feet long. Replaced at same time in Bridge Carbondale, Pa. Deck truss, 101 feet long. Replaced in Bridge 36. 33, Carbondale, Pa. Deck truss, 9 7 feat long. Replaced in ERIE RAILWAY SURVEY HAER (Page 7 ) Chapter V. Viaducts The viaduct as a bridge form represented a genuine American solution to the problem of bridging broad, steep valleys. The Erie ' ran through territory that was uniquely suited to the use of viaducts, for much of the countryside it penetrated was marked by gently rolling hills and rather broad valleys carved by small streams- Such geography threatened Che railroad builders with a series of roller-coaster grades that would have hampered easy operation.
In quest of the level route at the lowest possible cost, early American railroad engineers developed the viaduct, a high bridge across a valley that consisted of short truss or girder spans carried on a series of towers or bents. The Romans and other ancient engineers had constructed viaducts in stone, but the ap- plication of the form to wood and then metal represented one of the most characteristic elements of the American style of railroad con- struction. The Erie was not alone in adopting this particular bridge form. But the Erie was a-particularly prominent pioneer in the develop- ment and subsequent use of viaducts. The history of the various spans on the Erie trace the history of viaducts in general. The forerunner Co the railroad viaduct was the timber trestle. J. E.
Greiner, writing-in commented, "The viaduct followed a gradual course of development, indications or suggestions of certain features being distinctly traced to the earliest timber trestles." A trestle is not a viaduct, as a comparison of old Bridge on the Meadville Division with any of the subsequent photos will prove. In the crestle, the towers do not form discrete structures. As David Plowden commented, "...Whereas a trestle is a very specific type of structure executed in wood or metal only, a viaduct is more loosely defined..." But the basic concept of both types of bridges was similar, and with minor modifications, the two have often merged in the thinking of many people.
The first Canawacta Creek Bridge, in photo 77, illustrated clearly how the towers in viaducts differed from those in a trestle. The only advantage of a wooden trestle over other bridge types was the initial low cost of construction. As a result, metal spans came to replace these early wooden spans relatively quickly on most rail- roads. Plowden said of these second generation bridges, "A uniquely American bridge form is the metal railway viaduct." The key to the development of this form lies in a factor which has been mentioned above. British engineers faced the same types of geographic con- straints as American railroad builders, and the viaduct would have sufficed to provide valley crossings.
But in almost every case, the British builder resorted to the stone viaduct on the model of the Roman aqueduct. American railroad companies simply lacked the funds to lavish on these masonry structures. ERIE RAILWAY SURVEY HAER CPage 77 ) The B, & 0. built the first iron viaduct in the Cheat River Valley in under the direction of Benjamin Latrobe, Albert Fink, and Wendell Bollman. By the the Cincinnati Southern Railroad had embarked upon a building program that produced what Plow den'called "perhaps the greatest: set of iron viaducts." The first true viaduct in metal was the Bullock Pen Viaduct, built in on that line.
By the form had reached its full development, and present viaducts differ not at all in their construction and configura- tion from spans built then, the only change occurred with the intro- duction of steel as a structural material during the and v. Bridge Buffalo Division Portageville, N. Y. The Portage Viaduct The history of the Portage Viaduct can serve as a perfect case study for the evolution of the viaduct form, through wood, iron, and then steel. The initial span over the Genesee River gorge at Portage- ville was a wooden structure designed by Silas Seymour in Seymour had worked on the Erie, then moved into the position of Chief Engineer of the Buffalo & New York City Railroad, later absorbed into the Erie system.
This bridge was one of the transitional structures between a simple trestle and the viaduct form. J. E. Greiner com- mented, "...as the depth of ravines or depressions increased, the general character of trestles was modified somewhat, the most striking example being the old Portage Viaduct, a structure 350 feet long and 234 feet high..." The towers built by Seymour resembled those of the Canawacta Creek Bridge at Lanesboro, Pa. But the greater height of the Portage span the tallest bents climbed 190 feet above the piers necessitated the struts and additional bracing Seymour built into his bridge. The base of each of the 13 towers consisted of 21 vertical posts 14 by 14 inches. The towers tapered to 15 posts only 12 by 12 inches each at their tops.
Timbers 6 by 12 inches composed the bracing b/etween the towers. The piers on which the towers rested were se.t at 50 foot intervals, and built of sandstone from the gorge, lay in a bed of Rosendale cement. Each pier was 15 feet wide and 75 feet long. The truss spans of 50 feet consisted of three individual wooden trusses 14 feet deep, with the ties placed directly on the top chords. A large boom derrick facilitated all of the construction, which the company contracted to Laurman, Rockafellow & Moore. Completed on August 9, at a cost of the bridge had required board feet of timber, the equivalent of 300 acres of pine forest, and pounds of iron.
At the time of its completion, this bridge was the highest wooden span in the world, and ERIE RAILWAY SURVEY HAER (Page 70 ) Greiner said, "...it was always considered the boldest attempt aver made in timber trestles." But as Llewelyn Edwards added, "It involved nothing new or novel either in design principles or in con- struction methods." The original wooden structure lasted an amazing 23 years, although it must be doubtful that any of the original timbers survived for the entire time. At the time of construction, a conference of engineers had agreed on the plans , which had included provision for changing any of the structural members without risking the bridge during the actual transition.
The Erie made good use of this allowance, for like all wooden spans, the viaduct needed constant attention. In and the company spent each year to replace bad timbers and make extensive repairs. In the era before cresote and other wood preservatives, the life expectancy of wooden railroad structures was very short. But even creosote would not have protected the span from the other bane of wooden bridges, fire. On May 6-, the entire viaduct was destroyed by a blaze, leaving a large gap in the line to Buffalo. Quick replacement was a matter of the highest priority. The Watson Manufacturing Company, a favorite Erie bridge contractor, agreed to erect an iron span in 45 days. The new bridge was a true viaduct with totally separate towers.
Plowden observed that after the Bullock Pen Viaduct, "The next and final step in the development of what is referred to as the modern American railway viaduct was the new Portage Viaduct. .." George S. Morison designed the bridge to match the old dimensions as closely as possible, but he did change the location of several of the piers, and rebuilt those he reused. Three of the piers in the center of the gorge he abandoned, and those on the west bank of the river were moved 18 feet from their old locations. Likewise, Morison erected new abut- ments . Morison was to become one of the most noted engineers in the United States, and perhaps the preeminent bridge builder in the country, Yet he had no formal training as an engineer.
Rather, his degrees at Harvard were a Bachelor of Arts, and in a Bachelor of Laws. He worked with Octave Chanute on a bridge over the Missouri at Kansas City, and then joined Chanute on the Erie in as- the principal assistant engineer. In this capacity, he supervised the construction of the Portage Bridge. Later highlights of Morison's life included construction of the then largest metal bridge in the world at Cairo, Illinois, in the erection of the longest truss span in the United States at Memphis in and membership on the Ishmian ERIE RAILWAY SURVEY HAER (Page 79 ) Canal Commission that led to Che choice of Panama for the American canal. The successful Portage Bridge helped launch Morison on his career.
The company chose to repair the piers damaged by the fire using1 beton supplied by the New York & Long Island Coignet Stone Company. As Octave Chanute noted in a paper cited above, this new, relatively unused material offered decided savings in cost and time without any loss of strength. Moreover, the choice of becon represented a pioneer- ing step in the use of structural concrete. There was some delay in receiving the iron from Watson, caused by a fire in the works in Paterson, N. J. But on June 13, the con- tractor raised the first column, and completed all iron erection on July 29. Rails went down the next day and on July 31, the bridge opened.
Morison had changed the configuration of the bridge by using six pairs of four-column towers, instead of the 13 single section bents adopted by Seymour for the original structure. The bridge now had 13 spans, 10 of them 50 feet, two of 100 feet, and one 118 foot section. The towers were inclined perpendicular to the track with a batter of one in eight, so that the towers were 20 feet wide at the top. Diagonal tie rods and vertical braces connected the bents at 25 foot intervals up the tower. The highest towers were 203 feet, eight inches from the base of the rail to the piers, a third was 162 feet high, and three others were less than 50 feet high. Pratt-type trusses carried the track, itself over the gorge. This particular structure was significant for two aspects of its construction.
As Edwards noted, this was the first all wrought iron viaduct built. The Verrugas Viaduct in Peru had used this material except for the cast-iron joint blocks and pedestals. But the Portage Viaduct was all wrought iron. The pedestal blocks incorporated rollers into one leg on each tower to allow for expansion. The Portage span was also the first viaduct to include towers of two bents only when carrying spans of different lengths. For 28 years, this wrought iron structure served all the needs of the Buffalo Division. But heavier loads necessitated strengthening in and the addition of girders for a second track eased a potential bottleneck.
This work came as part of Underwood's improvement program, but more truly belonged to the efforts made through the to re* place main line iron bridges with steel. The company replaced each of the wrought iron deck trusses with steel plate girders on the 50 foot spans, and installed new steel deck trusses for the three longer spans. ERIE RAILWAY SURVEY HAER (Page g& ) The strengthened span proved adequate until when the ton Berkshires were shifted from the Marion to Meadville run, as diesels replaced them, to the Buffalo Division. The Portage Viaduct had not been built for locomotives of this size, especially if they were double-headed. Only war-time material priorities prevented the. erection of an entirely new bridge. The repairs proved to be inter- esting.
The Railway Age, commenting about the work, noted, "Owing partly to the nature of the repairs and partly to the extreme height of the towers, the tallest being nearly 200 feet high, many difficult problems were encountered in carrying out the strengthening work, which was confined entirely to the towers." The engineers found the trusses and girders in satisfactory condition, and most of the wrought iron in the towers was in good shape. But the high towers especially had suffered wear at the column joints, column bases, and roller nests. As it was, the construction crews needed only 275 tons of steel to bring the bridge up to the requisite strength. They replaced the old laced girders with solid places, and renewed almost all of the struts.
They also riveted the new struts, rather than bolting them into place as had been done pre- viously. The engineers also added half again as many diagonal braces as there had been before. New slide bearings with bronzed surfaces replaced the old roller nests , after the masonry under the bearing place was renewed. The height of the 200 foot towers made the replacement of the old - members an interesting challenge. Work proceeded from tower to tower, using a cantilevered erection truss installed perpendicular to the tracks at the top of the tower undergoing repairs. The truss carried sheaves for the hoisting cables used to raise new structural steel into position. Four air and one gasoline winch did all of the lifting and unloaded all the steel.
Prefabricated tubular scaffolding gave a spider web appearance to the work, but provided working platforms at all levels. Further complicating the progress of the repairs.was the need to keep the viaduct in service during the course of construction. Struts could not be removed until temporary members were added. The hoists then raised the new braces into place- in two separate pieces that were field-spliced in place. The main columns proved less complicated to strengthen, with cover plates being welded over the inside faces to serve as the'connections for the transverse struts. Riveted connections characterized all of the new work..
Because of this major renovation, costing the Portage Viaduct remained in service in Since that work, the masonry ERIE RAILWAY SURVEY HAER (Page $/ ) piers have received attention in after- damage caused by Hur- ricane Agnes. "Then in the Erie had to put down new ties. An indication of the escalating burden of bridge and maintenance costs in general can be found in the cost of that last repair job $80 The double-tracked bridge needed long ties , as both sets of rails ran on the same ties. Apart from these minor efforts, the Portage Bridge has not required further attention. Because of the quality of the repair efforts, the viaduct has continued to serve Conrail in without: weight restrictions, and the bridge carries the standard speed limit or 25 miles per hour. To .
borrow from David Plowden again, "Since the completion of the Portage Viaduct, the design of metal viaducts has changed little, and it is for this reason that the bridge is often called the exemplar of this characteristically American form. Even though the bridge deck was replaced in by girders of sufficient width to accommodate double tracks, for which the original towers had been proportioned, it looks essentially the same today as it did in Bridge Bradford Division Mount Jewett, Pa. Kinzua Viaduct Easily as famous as the Portage Viaduct, but without such a long history, was the Kinzua Viaduct. Located over Kinzua Creek near Mount Jewett, Pa., the bridge formed one of the key elements in the extension of the Bradford Division into the coal fields owned by the Erie- in Elk County.
In the company built 64 miles of roadbed from Alton, Pa., and the viaduct represented the largest single feature of this expansion. David Plowden has written of this span; Seven years after the completion of the Portage, the Lake Erie & Western Railroad.. .built what was then America's greatest iron viaduct the Kinzua crossing the valley of the Kinzua Creek in the wilderness' of northwestern Pennsylvania- The Kinzua Viaduct towered 302 feet above the creek, and for a short time it re- mained the highest bridge in the world. More notable was that its designer, Octave Chanute, had decided to use two continuous wrought iron trusses for the entire foot length of the bridge.
The trusses were supported by bents employing the well-known Phoenix column patented by the bridge's contractor, the Phoenix Bridge Company. Clark, Reeves & Company, as Phoenix was properly known, accepted the contract for the foot long structure in March, The ERIE RAILWAY SURVEY HAER (Page 3 ) wrought iron span chat this company erected had 20 four-column cowers. The designers rested che Phoenix column on move able plates Co allow for expansion. The cowers had a steep batter, running from 103 by 38 and 1/2 feet at the piers to 10 by 38 and 1/2 feet at the level of the trade. Each column rested on its own stone pier. The track was carried on 21 lattice girder spans made into a continuous cruss. The individual spans were fitted into place in 61 fooc sections be- tween the cowers.
Oval bolt holes on the tower members permitted che crusses to have room for expansion. The construction of che towers was relatively simple. The con- tractor shipped the Phoenix columns in sections 30 feet long. At the site, wrought iron sleeves and bolts joined che column sections of column, eliminacing the need for flanges. The horizontal lattice struts and diagonal tie rods also connected at the sleeve. A tempor- ary Crack ran through the ravine co distribute the materials on the site. Then on each stone pier, the contractor put up a 60 foot mast derrick, guyed to trescles. Each mast raised a column, into position for bolcing to the pier.
Horizontal braces were attached to the four columns .to form the base to the tower, and then the mast was raised another 35 feet, using the newly installed column as a foundation. By repeating the process , each column section was fit into place using the sleeves to join the pieces. For the short piers, those pro- cedures worked excellently. But the taller piers proved too difficult to complete in this fashion. So the traveller crane that placed each of the trusses between the cowers raised che last section of the columns into place. The traveller advanced from tower, moving forward on the girder and truss sections chat it placed becween and within che towers. This crane eliminaced the need for scaffolding.
Two steam hoisCing engines provided the muscle for che lifts, using 30 miles of manila rope. The construction took a 125 man crew four months, from May 10 to August 29. The viaduct was heavily constructed to carry che heavy coal trains expected on this line. Chanute designed the bridge to hold a train of coupled Consolidation locomotives weighing pounds on a wheel base of 45 feet 3 inches, or pounds spread over 14 feet 9 inches, A 50 pound wind loading was assumed as well. But within 20 years, Che structure required complete reconstruc- tion in order to withstand the demands of the heavy coal traffic.
Nothing better illustrated Che amazing growth of traffic requirements in the last decades of the nineteenth century that led Che company co replace iron spans wich steel than the short life of the original Kinzua Viaduct. As The Railroad Gazette observed; ERIE RAILWAY SURVEY HAER (Page S3 ) At Che time of its construction in this viaduct was one of the notable structures of the world, exceed- ing both in height and Length anything.of its kind that had, up to that time, been built.
It was designed to carry the heaviest locomotives and cars that were in use and was admirably adapted to the purposes for which it was intended, this purpose being carrying the soft coal traffic of a section of northwestern Pennsylvan- ia...but the increase of our capacity brought about by the introduction of the steel car coupled to the engines of enormous engines that are now used to haul them, has added stresses that the structure was incap- able of sustaining. Gustav Lindenthal noted that the need to replace the bridge after only 20 years was directly attributable to the American style of rail- road construction. Moreover, Lindenthal, a noted bridge builder, felt that this style of construction cast an indictment on American engine- ers.
The famous bridge engineer explained the problems with the American pattern of viaducts, as opposed to bridges of similar character in Europe. The old structure (at Kinzua) was typical of the American form, as distinguished from the European form, of metallic viaducts. In the latter, the aim was always to obtain great rigidity, so that trains could pass over them with- out diminution of speed. Compact towers, continuous girders, and longer spans were the leading features. Long span arches also occur as parts of viaducts over deep ravines, as in the Garabit Viaduct in France, and the Munster Viaduct in Germany.
It is a singular fact that in American bridge specifica- tions, up to this date, as far as known to the writer, there are no provisions insisting upon rigidity of structure- If obtained, it is accidental, or the result of extra provisional care by the designing engineer, which he is under no obligation to give. The old Kinzua Viaduct complied in all respects with the old Erie speci- fications, which were then considered among the best. Nevertheless, it was a swaying structure, unfit for trains at ordinary speeds, and inferior to similar structures in Europe, built ten and twenty years earlier.
The engineer of the second viaduct did not solve all of the problems raised by Lindenthal, who further stated, "The new structure, under these conditions, should have been designed to be a permanent ERIE RAILWAY SURVEY HAJER (Page 3 ) one, to last for centuries." Lindenthai was referring to the rapidly increasing weight of rolling stock as "these conditions." Sut as always in American engineering, especially railroad engineer- ing, longevity was balanced by cost, and the Kinzua could not escape being placed in the same scales. Nonetheless, C. R. Grimm designed a strong bridge that incorpor- ated a number of radical innovations in viaduct design. Xn fact, Grimm's presentation of his.
design provoked a lively discussion in the American Society of Civil Engineers Transactions, for a number of engineers disagreed with Grimm's design, and they raised a number of objections . The primary departure from normal practice made by Grimm was the elimination of the secondary bracing normally necessary to rein- force the wind bracing of the towers. He chose this course because the weight of the towers with all of this bracing, was too great. Grimm explained, "The original problem consisted of the design of the towers with stiff members throughout, together with secondary struts and diagonals for the taller towers, lying in a longitudinal vertical plane, coincident with the axis of' the structure, and forming a support for the very long members of the wind bracing.
A design for the tallest tower, in conjunction with an estimate of its weight was prepared...but the weight proved to be excessively great, even after many changes in the design had been introduced." So Grimm tried "a radical change," since he "thought that this purpose (wind bracing) could be attained more simply and more directly by building the wind bracing^ strong enough to cake care of itself with- out the support of a secondary bracing, and likewise, he thought that the tower legs, being the real supporters of the railway, should stand out boldly, instead of looking rather slender and more or less over- shadowed by a mass of bracings.
But columns of large size meant a considerable increase in the height of the stories, fewer members to build, a quicker erection and a great reduction in field riveting." Grimm compensated for the lack of bracing by using the heavier columns and by adopting "portal bracing" at the intersection of the transverse members and the columns. Thus each story of the tower was braced like the portal of a normal truss bridge might be. The result- ing towers thus differed markedly in appearance from those of the old viaduct. First, they were heavy looking and solid. The spindly spider web of was gone. ERIE RAILWAY SURVEY HAER (Page &S ) The reasons Grimm chose such a design are worth examining more closely.
He clearly felt chat the appearance of the structure was an important design criterion, perhaps as important as economy of con- struction and materials. Grimm's choice even seems to have been guided by his personal esthetic concerns, not just by engineering factors. Grimm's statement is one of the clearer pronouncements of the importance of esthetic concerns in bridge design. It is not the only such example. The use of brackets to strengthen the connection between the horizontal struts and the columns also changed the appearance of the towers. The brackets gave a distinctive rounded shape to the openings between members at each story of the tower. Structurally, such brackets were not new, as Mr. L. S.
Moisseff pointed out, "Not that this method of providing for wind stresses is entirely unknown or un- tried; it has been used very frequently, and with some reluctance, for sway bracing of through bridges, for wind bracing of high steel- skeleton structures, and in portals." Moisseff considered their use on the Kinzua Viaduct "surprising," because the resulting towers were less stiff than a bent braced by tie rods. The Kinzua Viaduct thus had a striking appearance, but one that resulted in controversial divergences from normal practice- Moisseff and Lindenthal were not the only critics; the discussion section fol- lowing Grimm's paper contained a lively series of comments.
The general thrust of criticism, was that strength alone did not suffice to produce a successful bridge, for stiffness also counted for much. George Morison nicely summarized the feeling. For immediate safety, strength is all that is needed; for long life of structure, stiffness is at least: equally important. This objection may be raised to some special forms of trusses, favored because of their economy of material, in which much greater variations occur in the strains of individual members than in dif- ferently designed trusses containing a little more metal. As compared with a viaduct of the usual design, every- thing would seem to indicate that the transverse deflec- tions under strain, and even the distortion of the posts under compression, would be large in the new Kinzua Viaduct.
If this be so, it is not probable that this design will be repeated. The objection to diagonal rods in the panels of such a viaduct, with pin and turn- buckle connections, is perhaps more theoretical than real, and, in structures with the rigid and excellent details of the one described, they certainly could do no harm. It would be an interesting thing to put such rods in one of the tall towers of this viaduct, and ERIE RAILWAY SURVEY HAER (Page SB ) then compare the stiffness of this tower with the adjoining tower whenever an extraordinary storm passes through the valley. Al.though none of the critics said so directly, their opinion might be interpreted to mean that Grimm's esthetic concern for ridding the structure of braces damaged the integrity of the viaduct.
The proof of such an argument was not available in but lay in the future. In this case, Grimm seems to have won, albeit conditionally, for Kinzua stood the test of time. Until the Erie retired the bridge in the Kinzua Viaduct handled the heavy coal traffic of the Bradford Division without a major renewal. The lack, of stiffness did affect the bridge, however, for a speed limit had to be imposed on the struc- ture. But the bridge did meet the needs of the railroad for 60 years, and at a reasonable cost. Certainly the design met all of the reason- able qualifications of a successful design. The Kinzua Viaduct discussion in the ASCE Transactions is also interesting for what it says about the way in which engineering decisions are made.
Mot only did the discussion point up the fact that there are discernable national styles of engineering, but this example also illustrated that there are also subjective and personal decisions being made by designers that do not fall into the category of science or objectivity. The erection of the new steel towers and deck spans proved as interesting as the design features. The firm of Grattan k Jennings of Buffalo, N. Y., won the contract for the erection work and employed two special traveller cranes for all lifting and hoisting. Each crane was fashioned from two 160 foot Howe trusses of heavy timber con- struction. They were long enough to span the distance between three of the towers, so that the middle of the three towers was under the traveller.
The crane had no floor, so that by straddling a tower, the hoisting engine on the crane could lift out all of the old iron work and re-erect the new steel tower. An overhead track ran the length of the crane, carrying two lorries that transported material within the traveller. Two jib cranes helped load and unload the new members from the rail cars onto the crane itself. After each tower was rebuilt, the new deck spans were set into place by the traveller so that the crane could run forward onto the next tower, and repeat the process. One crane began at each end of the viaduct, and the two units rebuilt all 20 towers and 41 deck spans. The towers consisted of four columns as before. Each column was made up of two plates two feet wide and four six-by-four inch angles.
The lacing consisted of five-by-three-inch angle bars. Rivets 7/8 of ERIE RAILWAY SURVEY HAER (Page 7 ) an inch in diameter fastened the lacing Co che beams. The horizontal struts were similarly made up of box lattice girders, of decreasing depth as the struts rose higher above the ground. The diagonals con- sisted of two laced channels. The plate girder deck, spans were of two different sizes. Between the towers, girders 61 feet long and six and 1/2 feet in depth car- ried the track. Within the tower, girders 38 and 1/2 feet long and only four and 1/2 feet deep sufficed. The work moved ahead at a rapid pace. The Elmira Bridge Company, which actually supplied the steel, experienced no delays in delivery.
The travellers did not lift all of the old iron work up to the level of the track, but rather raised each column section only high enough to clear the lower members, and dropped it. A. derrick car raised all this scrap only after the work was completed. As anticipated by Grimm, there was little field riveting required, no falsework, and no accidents. Each story of the tower was 62 feet, which meant, as Grimm commented, "an increase in height of about 100 percent over that which is common in viaducts." This provision also meant that there were only half as many connections to be made in the process of linking the struts and columns together to form a tower. Grattan & Jennings carried out the work very quickly after the Erie took the viaduct out of service on May 14, 19O0.
One hundred twenty men worked ten hour- days, and returned the bridge to the rail- road by mid-September. Approximately 6.7 million pounds of steel went into this structure. Significantly, The Railroad Gazette, in its comments concerning the structure, noted the appearance of the viaduct, just as Grimm would have wished. "The new viaduct, therefore, stands ready to carry the modern train load with an ample factor of safety-' to allow for such increases of weight of load as the future may bring forth. It stands in sharp contrast, in the substantial character of its ap- pearance, to the slight and slender framework of its predecessor..." The Kinzua Viaduct provided admirable service to the railroad through two world wars, with a minimum of maintenance.
Throughout the and the masonry foundation piers were renewed in concrete, and in the Erie put down a new floor for the span. But apart from a new coat of paint every seven years or so, the company did not alter the viaduct. ERIE RAILWAY SURVEY HAER (Page S& ) I In as part of the Erie's effort Co cut: maintenance expenses, Che company received ICC approval co share the 3. & 0. right of way between Mount Jewett and Limestone, M. Y. The B. & 0. line was much newer and crossed cCinzua Creek several miles east of Che viaduct, where the valley was not so steep-sided. So the Erie abandoned most of the Bradford Division, including the viaduct, but not because of any weak- ness in the structure.
Under any conditions, sharing the cost of maintaining a normal roadbed ranked far below that of keeping a foot long steel viaduct in good condition. On December 14, the Erie sold che Kinzua Viaduct to Koval- chick Salvage Company for But Nick Kovalchick persuaded the State of Pennsylvania to buy che area surrounding the bridge and convert it into a park. Thus, che Kinzua Viaduct still leaps across che creek at the breath-taking heighc of 300 feet, alchough che rails are long gone. David Plowden adds, "Since then, nothing has been done to attract tourists, and che bridge stands rusting in a wild and lonely place; a derelict monumenc from another time." Other Viaducts The Erie Railroad boasted a number of other viaduct spans, most of them built at the turn of the century.
While these bridges did not include the daring innovations shown in the Kinzua Viaduct, they stand as fine examples of che builders' art and the viaduct form. Bridge Jefferson Division Starucca, Pa. This viaduct was the oldest of the surviving example of this form of bridge on the Erie. It crossed Starucca Greek and a road one and 1/4 mile west of Starucca. This metal deck span was 480 feet long and 90 feet high over the creek. The tracks ran on 22 deck girder spans. Initially there were two lines of rails, but relatively recently the viaduct was reduced to a single track running down the center of the bridge. Built in the span had to be reinforced in But as the viaduct was built to handle heavy coal trains, the strucutre re- mained adequate in 19 77.
The Delaware & Hudson bought the old Jefferson Division in and has continued to maintain this span. Bridge Buffalo & South Western Division Water Valley, S. Y. Bridge Buffalo & South Western Division Eden Valley, N. Y. Bridge Buffalo & South Western Division Lawtons, N. Y. ERIE RAILWAY SURVEY HAER (Page &9 ) These three viaducts were erected in on this wholly-owned Erie branch chat ran from Buffalo to Jamestown, crossing the Allegany Division of che main line at Dayton. The bridges represented two different solutions to the problem of carrying che tracks between the towers. The only difference between these and other viaducts was the straight towers utilized, as opposed to the tapered towers else- where. The relatively low height rendered battered towers unnecessary.
Bridge represented the standard means of carrying the tracks used after the plate girder spans. Bridges and utilized the older method, adopting deck truss spans. Photo 120 is of interest, for it shows the old Pratt-type truss on the original The lightness and generally shakey character of the span made this bridge an especially good example of early viaducts. The current span clearly demonstrated the impact of steel construction on the ap- pearance of bridges and viaducts. A. lattice truss and broad-based, four column towers have appeared, completely altering the appearance of the viaduct. Bridge was 269 feet long, while Bridge was 285 feet long. The final span, Bridge reached 269 feet across Clear Creek.
Apparently the Erie decided to rebuild most of the bridges on the Buffalo & South Western branch at this time as part of its effort to renew iron spans with steel. This line served as the route for the shipment of coal from the Bradford Division to Buffalo. As was the case at the Kinzua, heavier engines and rolling stock forced the company to rebuild these shorter viaducts. The company probably chose deck lattice truss spans because of the long length of each of the three spans on Bridges and None of the spans were very high was only 52 feet over 18-Mile Creek, while at 87 feet, was the tallest. The Clear Creek Viaduct was only 71 feet at its highest point. All three spans remained in service in 80 years after their construction. Bridge Graham Line Salisbury Mills, N. Y.
Moodna Creek Viaduct The Graham Line was one of the major improvement projects under- taken during the first decade of the twentieth century by Frederick Underwood. The key reason for these lines was the necessity of low- level lines for freight traffic. To push the track through the rolling hills traversed by the line east of Goshen, the company erected two major viaducts. The smaller, near Woodbury, N. Y., was a 589 foot steel deck viaduct. Crossing a creek and two branch lines , this span stood 72 feet in the air. ERIE RAILWAY SURVEY HAER (Page $0 ) But the Woodbury Viaduct pales beside the other major span on the Graham Line, the Moodna Viaduct. Begun in this span was the longest bridge ever erected by the Erie.
The bridge carried the Erie tracks feet over Moodna Creek, a highway, and a branch line, on 53 spans. At its highest point, the base or the rail towered 196 feet above the valley. As Edward Hungerford observed, the Moodna Greek span was, "in size quite comparable with the huge bridges al- ready existent upon the property." The span, although built only six years after the new Kinzua Viaduct, did not follow the pattern .adopted by Grimm. Perhaps Morison's criticisms were corxect after ail. Instead, the steel towers at Moodna were built with diagonals between all four columns and not just between each bent. Graham thus returned to the older style of winding bracing. Also, the height of each story was once again set at 30 feet. The use of portal bracing was not repeated.
Alternate deck plate girder spans of 80 and 40 feet carried the single track over the valley. The long girders between towers had a depth of nine feet, and every other one had an expansion joint. The short girders, within the towers were only five and 1/2 feet deep. Just as the viaduct, was a monster, so too was the traveller construction crane. This crane spanned 200 feet, stood 30 feet high and 19 and 1/2 feet wide, and weighed 100 tons. Designed as a canti- lever with its jib cranes extended, the traveller could hurdle material 125 feet from the last completed tower. Within the traveller, a 15 foot monorail carried material from the center to the outer end of the cantilever. An I-beam 18 feet off the floor comprised the track for this small hoist.
The firm of McClintic-Marshall of Rankin, Pa. , which built the lock gates for the Panama Canal, won the contract for the viaduct, let by the Erie in March, Work came to a temporary halt in April, as the Panic left Che Erie with cash flow problems. A further delay stemmed from difficulties in purchasing .necessary land at one end of the viaduct. By May, only five towers stood incomplete, with the bridge opening when Che rest of the Graham Line began service in October. The steel viaduct has worn very well over the years. A provision for double-tracking was never needed, and the bridge has carried only a single track. Strengthening in brought the bridge up to current standards, and was the only major overhaul required.
With the acquisi- tion of the line by Conrail, normal maintenance began in With the Graham Line serving as the Erie's main line since the mid this span, along with the Otisville Tunnel, has become even more im- portant to the operation of the railroad. It remains one of the greatest engineering achievements on the Erie. ERIE RAILWAY SURVEY HAER (Page $/ ) Bridge River Line Fillmore, N. Y. Rush Greek Viaduct Bridge River Line Belfast, N. Y. Genesee River Viaduct Underwood's improvement program of freight: cut-offs led to the construction of two other viaducts during the first decade of the twentieth century. Both stood on the River Line. Both aided signifi- cantly in enabling that low-level freight cut-off to traverse the steep valleys in the vicinity of the Genesee River.
These bridges, like the Moodna Creek Viaduct, were cut from the same design mold, with near-uniform and standard-sized parts. The Rush Creek viaduct was the shorter of the two River Line viaducts. With an elevation of 155 feet over Rush Creek, the 32 span bridge ran for feet. The steel girders carrying the track alternated between 40 and 30 feet., as on the other two viaducts built at this time. Fifteen full and one single bent tower supported the deck girders. The Genesee River Viaduct was a carbon copy of the other two viaducts with minor exceptions. At feet, the viaduct was only 80 feet shorter than Moodna Creek, and 47 feet lower. The same pattern of 40 and 80 foot steel deck girders was copied here for the 50 spans over 25 towers.
The towers also were a standard pattern used for all three bridges. Photo 132 highlights the riveted connections, the plates for the main columns, and the laced girder diagonals and horiaontal struts. The Genesee River span differed from the other on the river crossing itself. This viaduct was the only one to cross a significant body of water. Because of the river's width, the normal 80 foot span was not long enough. Instead, a narrow, straight tower was used to support two 120 foot girder spans over the river. The actual erection of the span went very smoothly, as seen in photographs 130 to A 190 foot traveller facilitated the con- struction of the towers. The hoisting engine was incorporated into the cantilevered crane.
Two jib cranes at the front carried out the actual lifts, A hoist within the truss moved materials to the front of the traveller. To shorten the distance of the viaduct, a lengthy earthen embank- ment served as an approach span on the one side of the river. A long wooden trestle was built out to the concrete abutment, and thousands of cars of earth dumped off the trestle. At all times, mainte- nance of an embankment ranks far below that of a steel bridge. ERIE RAILWAY SURVEY HAER (Page S ) These steel viaducts have served the company well. But the need for strengthening the Genesee River Viaduct came in the as it had for the Moodna Creek span. The work in and involved taking out the old top flange cover plates on the deck, and pulling new pieces into place using airhoists.
Along with rebuilding the side- walk, the company also painted the span. The flange plates had suf- fered extensive corrosion from farina dripping off the refrigerated fruit cars crossing the viaduct. Produce for New York City was one of the largest traffic items on the road. The Erie provided the major conduit for Pacific and Midwestern fruit into the city. The cost of repairs reached Apart from these repairs, the spans have needed little attention. But the end may be in sight for the Rush Creek and Genesee River Viaducts, as Conrail closed the River Line in July, 19 77. With the availability of the old New York Central lines, the River Line became a redundant facility. ERIE RAILWAY SURVEY HAER (Page 33 ) Chap car VI.
Erie Railroad Shop Facilities Maintenance of locomotives and rolling stock has always been one of the primary headaches for railroads. Providing for the mechanical failures and breakdowns with adequate shop space and necessary tools became a constant battle. In the case of the Erie, with its continual money problems, maintenance needs often threatened to turn into true bottlenecks. Fred Westing observed, When there is no money in the till, locomotives have to be maintained and run far beyond their normal life span, so Erie's fleet of power could boast the greatest average life of any engine of any Class I roads in the entire United States of America. But the price of age was more frequent repairs and greater expense, which meant larger shops.
Yet when the company lacked money for locomotives, it certainly had no additional resources for improving its shop facilities. The lack of shop space in turn worsened the condition of the rolling stock. The vicious circle continually re- peated itself on the Erie, and the annual reports of the company pro- vided a running account of this cycle. Just as the maintenance capabilities of the Erie reflected the company's internal money problems, the development of Erie shops re- sponded to the internal influence of maintenance practices and facilities on other American railroads. Initially, the Erie served as the pacesetter in the development of railroad maintenance facilities. The Erie had always made some provision for repairing its locomotives and cars, unlike many other early railroads.
The Erie's president would never say, as the president of the Philadelphia, Wilmington & Baltimore Railroad did, that his company in did not own facilities to fix up even a wheel and axle for a car or locomotive. The Erie had from the start made a small provision for repair buildings and tools in its expenditure plans. In this regard the company was unusual, since most roads never considered the need for repair space. The B.. & 0., the Pennsylvania, and other larger railroads had begun to grapple with this problem by the and larger machine and erecting shops slowly developed.
For example, the Pennsylvania built a machine shop, erecting ship, and engine house at Altoona in But the Erie probably made the most comprehensive effort of any of the Eastern railroads to develop adequate repair facilities and made that effort earlier than its counterparts. By the Erie boasted three main machine shops Piermont, Susquehanna, and Dunkirk worth and outfitted with in tools.
As the ERIE RAILWAY SURVEY HAER (Page 34- ) company noted in its Annual Report two years later, these shops were "fitted up with Che most complete set of tools and conveniences for repairing and fitting up locomotives, etc., and extensive shops and buildings similarly equipped, for repairing and manufacturing cars." By the company also listed five smaller machine shops, at Paterson, Newburgh, Port Jervis, Owego, and Hornellsville, and a car shop at Elmira. The Erie required extensive planning for such facilities because of its size; the Erie was the longest railroad in the world and had the largest number of cars and locomotives of any railroad. In this light, most of the early efforts of the Erie in the area of mainte- nance served as pioneering examples for other railroads.
Thus when the Erie began building its own locomotives, prodded to this course of action by the large numbers of locomotives needed, and perhaps by its broad gauge, the Erie helped set precedents followed by many large railroads until the end of the nineteenth century. Likewise, the manner in which the Erie scattered its shops became the standard dis- tribution pattern. The Erie was not the only railroad wrestling with the problems of maintenance on a new scale.
But the Erie had a stage of action larger than most other railroads until the Also', the efforts of Daniel fctcCallum, whose organizational framework greatly improved the ease and speed of information transmittal, the vital factor in running and maintaining a railroad, first tied maintenance responsi- bilities into the overall company hierarchy. With major facilities at either terminus on the line, another roughly in the center, and with smaller shops scattered for making minor running repairs, the Erie's, arrangement proved adequate to the task. The Piermont Shops deserve special notice for they stood as one of the larger repair complexes in.
the country in the late By the machine department employed 70 men, while 30 others worked in the car department that constructed 200 cars that year, A 28-stall engine house, with Gothic styling, dominated the scene. Engravings portrayed the shop buildings with bat elemented walls and a, turret tower. Such grand architectural details clearly befitted the shops of the largest irailroad in the world. By the listing of buildings at Piermont was quite impressive for the time, but now numbers, and not styling, reflected the facility's status as the main building and repair shops of the Erie. As should be clear from Table IV, the buildings represented a potpourri mixture of types, materials and sizes, added on an ad hoc basis whenever the rail- road found some new problem to meet.
ERIE RAILWAY SURVEY HAER (Page S&} Table IV Piermont Shops , Buildinz Dimensions Material Date of Construction Car Shop 29 x 52 Brick July, Car Shop 29 x 201 Brick July, Car Shop Sawmill 45 x 70 Brick July, Lumber Shed 12 x 30 Wood July, Lumber Shed 23 x 110 Wood July, Machine Shop 24 x 62 1/2 Stone July, Machine Shop 28 x 72 Stone July, Engine House 95' diam. Brick October, Turntable 25 f diam. Wood October, Machine Shop 21 x 31 Stone October, Machine Shop 24 x 62 1/2 Stone October, Machine Shop 28- x 72 Stone October, Brass Foundry 21 x 31 Stone October, Wheel Shop 29 x 52 Brick October, Machine Shop 29 x 201 Brick October, Offices, etc.
41 x 45 Brick October, Freight House 12 x 18 Wood October, Passenger Depot 26 x 41 Wood October, Freight Depot 12 x 26 Wood October, Dwelling 16 x 31 Wood October, Dwelling 32 x 100 Brick October, Boiler Shop 35 x 192 Wood October, Engine House diam. Brick October, Seven Projections to Engine House 16 x 18 Brick October, Tire Shop 18 x 32 Wood October, Turntable 46' diam.
Wood October, Iron Foundry 36 x 61 Wood October, Paint Shop 35 x 325 Wood July, Oil & Sand House 22 x 50 Wood July, Car Shop 22 x 37 Wood July, Car Repair Shop 24 x 189 Wood July, Blacksmith Shop 22 x 45 Wood July, ERIE RAILWAY SURVEY HAER (Page S6 ) Table IV (continued) Piermont Shops, Building Dimens ions Material Date of Construction Supply Store House 17 x 63 Wood July, Car Shop 18 x 20 Wood July, Iron Shed 10 x 65 Wood October, Iron Shed 11 x 26 Wood October, Box Grinding Supplies 16 x 26 Wood October, Blacksmith Shop 50 x 121 Brick October, The Erie was not the only railroad- to facilitate maintenance in such an unplanned fashion. The railroads were learning as they went and making changes and additions as needed.
But the impact of poor finances obviously limited how the Erie could make those additions. The most striking evidence of this hindrance lies in the material used for construction. Nearly all of the earliest Piermont shops had been stone or brick, but wood predominated in all additions made aftar The use of timber for buildings offered an initial savings, but wooden buildings deteriorated far more quickly. Usually their decay added to the space problems in only a few years. The Dunkirk shops exhibited the same manner of random growth.. By this site, too, boasted a large group of buildings. (See Table V.) Likewise, the same type of random growth was evident at Dunkirk.
The initial cluster of brick buildings was soon flanked by wooden frame structures, added to meet unexpected maintenance needs. Although the Erie had exercised some semblance of planning' for shop locations, within the individual shop complex no such, forethought existed, as everything was too new. The sheer size of the company compounded matters and forced de- centralization. It must be counted a fortunate circumstance that the railroad had developed its divisional operating structure by this time. The breakdown in responsibilities brought about by McCallum represented a major advance in business management and corporate structure.
This organization also meant, though, the reduplication of locomotive repair facilities at each division point, and the scattering of car repairs in a similar fashion. Thus, by along with 13 repair shops, the Erie owned 35 engine houses scattered over the line. ERIE RAILWAY SURVEY HAER (Page 37 ) Tab le V Dunkirk Shoos, Building Dimensions Material Date of Construction Tank House 20 x 20 Wood October, Turntable 46' diam..
Wood October, Depot, Saloon 85 x 300 Brick October, Offices 30 x 180 Brick October, Engine House, 21 Stalls, each 14 x 65 Brick October, Machine Shop 100 x 297 Brick October, Wing, Blacksmith Shop 52 x 100 Brick October, Wing, Engine Room 28 x 43 Brick October, Wing, Gar Shop 50 x 100 Brick October, Foundry 54 x 75 1/2 Wood October, Foundry Storehouse 20 x 27 1/2 Wood October, Carpenter & Paint Shop 30 x 75 Wood October, Ice House 20 x 30 Wood October, Wood Shed 40 x 500 Wood October, Blacksmith Shop 16 1/2 x 65 1/2 Wood October, Watch House 10 x 12 Wood October, Store Room 18 x 29 1/2 Wood October, The Erie tried to develop a comprehensive maintenance policy in the mid-1860s:, but the distraction of the management by financial manipulation prevented the implementation of all the necessary steps.
The company never followed up on the beginnings it had made. As a result, the railroad found itself in the midst of a nearly continuous program of piecemeal expansion and upgrading of its shop facilities. Occasionally, however, significant results emerged. The program begun during the Civil War deserves special attention since the Erie began its shop improvement effort with this announcement: ...the shops of the Company were found inadequate to repair engines when they could be spared for that purpose, and it has been found absolutely necessary to provide more shops and larger accommodations for the repairs of engines and cars.
ERIE RAILWAY SURVEY HAER (Page 3Q ) The rail traffic generated fay the war released money for improvements, and out of this expensive program emerged new shops at Salamanca and Susqueharma. The Susquehanna shop represented a major advancement in shop design and practice. At this same time, the Atlantic & Great Western Railroad was building through northwestern Pennsylvania and, Ohio. Included in that construction were shops at Meadville, Pa. Meadville and Susquehanna faced similar difficulties and were meant to solve identical problems. A comparison of the two shops offers an interesting insight into the manner in which the two rail- roads chose to handle their maintenance needs, This comparison also points up the great advance represented by the Susquehanna facility.
An interesting sidelight is that with the Erie's purchase of the A. St G. W, in after years of on-and-off leasing, the Meadville shops became part of the Erie system. Two of the earliest coordinated railroad shops in the United States thus ended up on the same railway. However, one or two new shops did not constitute a maintenance policy. Like all railroads in the post-Civil War era, a decentralized network of repair facilities remained the primary means of providing needed service. The Erie was not alone in failing to centralize its shop and maintenance facilities (large coordinated shops were a late nineteenth century development).
Because of their money difficulties, keeping up with the enormous growth in mileage and tonnage occurring at this time should have meant the inclusion of new repair facilities in the expansion programs. The shops needed to grow with the railroads, but only rarely did they keep pace with the growth in track mileage. The concern all too often was for more crack, and not for care of property already owned (only with profit problems at the end of the century did most railroads begin to realize the value of a good shop system) . Thus, the Erie, which had 40 shops and engine-houses in had grown to include eight car shops and an equal number of machine shops, along with 44 engine houses only seven years later.
Unfortunately, this expansion in numbers was not coordinated and con- tained no changes in organization. Nor did Susquehanna, the logical candidate for central shop on the- line, increase in size or capacity. Instead, the old pattern of piecemeal growth continued. Gould boasted of the improved shops opened during his tenure as president. By and large, the shops suffered from the same benign neglect during this period as the rolling stock and roadbed. Although the company called Susquehanna its main shop, a truly centralized repair organization never developed at that pioneering facility. The other shops re- mained small, old, redundant, and uneconomical.
As the report of the company counted, the 44 engine houses held 321 locomotives, bu.t.:the.company owned Most of these houses were wooden, com- bustible, and in the wrong places. ERIE RAILWAY SURVEY HAER (Page _29 ) The revived New York, Lake Erie & Western Railroad of immediately embarked upon a program to remedy these problems. Paralleling its bridge renewal program, the new administration began a major shop construction program, with the following announcement: the Repair Shops are not adapted to the present requirements of economical management, and a radical rearrangement will have to be made, which will involve the erection of a principal shop with all the modern facilities of improved machinery, for the accuracy and promptness of work, and the saving of labor.
Some changes will also have to be made in the secondary shops. Safe and commodious buildings must be erected to house and protect from injury the locomotives when not in service. The round houses, imperfect as they are, are insufficient to hold the locomotive engines now in use. The result is not only injury to the machines from the continued exposure to the weather in summer and winter, and therefore greater costs of repairs, but increased costs of repairs in keeping up fires during the winter months. The company might have copied this statement from the report, which had pointed out similar difficulties. In 15.years, the company had come full circle.
The new company embarked upon a large program, expending on shops and on machinery in and Buildings went up at Bergen City, Buffalo, Dunkirk, Jersey City, and Homellsville, while the company purchased tools for Elmira, Jersey City, Salamanca, East Buffalo and the Buffalo car shops. By the company seemed to be in relatively good condition vis-a- vis maintenance. But the pioneering advantage gained by the success- ful Susquehanna shop had been lost- The Erie's facilities now were typical, not exceptional. Advances in layout and tools came to the Erie from outside rather than from within. The goal of establishing a principal shop was not met. The Erie made continual efforts to keep up with the maintenance headaches caused by rapid growth in both the size and amount of equip- ment.
But changes in rolling stock and locomotives came so quickly that the company had to initiate yet another upgrading effort by the just to stay even. The bankruptcy of the New York, Lake Erie & Western had also caused neglect of the existing facilities at a critical time, aggravating the problem. The report noted a major facility was under construction at Kent, Ohio, including a round ERIE RAILWAY SURVEY HAER (Page house and repair cracks. But not until the administration of Frederick Underwood did major improvements begin. The old pattern of decentralization continued in practice, even in That year the Erie's locomotives were serviced in sizable repair shops at Jersey City, Susquehanna, and Dunmore, Pennsylvania.
Other shops in use were in Buffalo, Meadville, Cleveland, Galion, and Huntington, Ohio, while major car shops were at Port Jervis, Buffalo, and Kent. The shop system had become unwieldy and expensive. The Railroad Gazette in announced the beginning of the Erie's effort to enlarge and replace old facilities. The Erie awarded to outside contractors, including the Baldwin Locomotive Works, the job of repairing 600 locomotives. The company utilized the relatively profitable years between and to update several shops, mainly by additions rather than new construction. The year was typical. The annual report noted, "The increase of in ""Repairs and Renewals of Shop Machinery and Tools'"* was largely caused by extraordinary expenditures.
in connection with improvements of round houses and shops." Sus- quehanna, for example, and Hornell, received major attention at this time, in order to reverse years of minimal attention. Yet the Underwood years also saw major problems. In in the wake of the Panic of the shops closed completely and the company laid off mechanics and by the end of the year all track laborers. The company still had not surmounted its money problems. Then, with the upsurge in traffic in and Under- wood authorized major expenditures of and consecutively, for additions and betterments to the shops. The shops rode on a yo yo with Underwood. In the he again reversed the shops' status by contracting the work of servicing locomotives to private firms that used the railroad's facilities.
Although labor costs - shrank, which pleased the Erie's president, "The loss in morale apparently did not come into his reckoning. While the road was making some money, no substantial improvements either in methods, motive power, service, or facilities were being made to it." As always, the lack of money was behind the Erie's problems. The situation by was such that the Erie, which had once enjoyed great prestige from ownership of the Susquehanna and Meadville shops, was reduced to the roll of a follower in implementing new shop practices and facilities. The Erie shops weren't bad. Dunmore, for example, was an excellent, modern facility. But the railroad also continued to use 50 and 60 year old buildings that became smaller and less adequate as motive power became longer and heavier.
ERIE RAILWAY SURVEY HAER (Page /#/ ) Among the other changes Che Erie later adopted was Che ins tall a- tion of electrical drive equipment for powering machine cools. Few railroad machine shops readily adopted Che new source of power. For one thing, Che cost of a complete generating station proved a deter-~ rent to the introduction of electricity. Nonetheless, articles chat pointed out the potential advantages of eleccrically driven machine tools appeared in The Railroad Gazette after But in that journal still fait required to write: ...it may be well to call attention once more to a few points in which an extension of the system will be profitable.
A railroad shop is particularly well suiced Co Che electric drive, and Che case described in another column is only one example in che long list of shops where the management has decided Chat conditions are favorable to its adoption. In this class of work, large buildings are invariably required and, when the power is transmitted mechanically from a central source, long lines of shafting with the resulcanc high frictional resistance are required. Rush repair jobs are of frequent occurrence, demanding overtime and Sunday work, in which but a few machines, requiring a small amount of power, are used.
Under chese conditions the mechanical transmission of the power is wasteful, in that heavy weights of shafting and hundreds of feet of belting have to be kepc in motion in order to reach the single point where the work is being done. It is here that Che electric drive manifests its great superioricy, since che losses from crans- mission are small, and the amount of power generated can be closely adjusted co chac actually used. More- over, railroad repair shops usually consist of a number of separate buildings in each of which, under old conditions, it was necessary either to install boilers and incur the expense of special attendance, or to convey steam long distances Co the engines.
The cost of power is not, however, the ranking item in railroad shops, and were this to stand alone, the rate of introduction of the electric drive would probably have been much slower than it has been. The advantage of the new method lies in its adapt- ability or flexibility to all the requirements of a varied service, and particularly to che fact that the machine can be taken to the work instead of the work to the machine, as in the case of most old style machine shop operations, ERIE RAILWAY SURVEY HAER (Page A.
publication by Railway Master Mechanics also observed that railroad shops, until recently, were "extremely conservative in the matter of taking up new ideas, and [were] probably working to less advantage Chan, any other manufacturing establishment, for the reason that: railroad repair is practically devoid of competition." But by some progressive roads had made great strides in the use of electricity to power machine cools, following the lead of other industries. The Erie, like most railroads, began using electricity to drive machine tools during this first decade of Che twentieth century, only after electricity had proven itself suitable to their needs. In the matter of centralizing repair facilities, the story was somewhat different.
Here the Erie lagged even further behind the other comparable railroads. Comparing the individual Erie shops with the Altoona Shop of the Pennsylvania Railroad is instructive in this regard. The Erie was nor as big a railroad as the Pennsy, so one would not expect the Erie Co need a facility the size of Altoona. But nonetheless, in the Erie had only begun to develop a centralized repair and erecting shop. Altoona, with its five separate sections The Altoona Machine Shops, Altoona Car Shops, Juniata Shops, South Altoona Foundries and the Test Department handled the majority of the heavy repair and erection work for the entire Pennsylvania system, four times larger than the Erie.
By the Pennsy was one of the few railroads still erecting its own motive power, and the only one building its own prototypes. Altoona employed men, sprawled over acres in 122 buildings, and used machine tools and 94 overhead cranes. No other railroad in the world had a repair shop like Altoona in and the Erie, for one, did not require such a complex. But the Erie's archaic shop system could have been much better. In the Handbook of American Railroad Repair Facilities listed 13 engine houses or shops in New Jersey, 17 in New York, and nine in Pennsylvania. The same decentralized structure of eight major and minor shops still existed. The Erie simply had no facility comparable.to Altoona where the concentration of most heavy repair chores was in one complex.
The obvious benefit gained from a central shop was the reduction in the number of tools, buildings, and men to perform those jobs. The early Erie managers attempted some developments in the direction of large shops to handle heavy or large scale operations. Susquehanna, discussed further below, was the outstanding effort to centralize heavy locomotives' repairs and erecting work. But Susque- hanna never became the company's main repair center. Elmira became the company's facility for maintenance of its passenger car fleet. A 70 x 70 foot addition in to the original car shop, 41 x 198 feet, served as the quarters for this effort. By a single building housed a wood shop, 225 x 75 feet, and a 73 x 75 foot paint shop.
ERIE RAILWAY SURVEY HAER [Page / &) Improvement plans called for erecting a separate dry house, store room, and store room for castings. Because its output was the deluxe passenger cars, it attracted more attention from a visiting New York- Herald reporter than the Susquehanna repair shops. Yet the Elmira facility never worked very well, perhaps because of its distance from Jersey City and Buffalo. The improvements of centered on the engine house, which provided service for trains on the Tioga Division. The car shops received new tools about this same time, but subsequently neither facility received any attention until they closed in After the company did not mention the Elmira shops in the Annual Reports.
Susquehanna and Hornell as- sumed the car and locomotive repairs, respectively, eliminating the value of the Elmira Shops. The Owego Bridge Shop was a far more successful venture into a central shop arrangement. This facility was the earliest central facility, and by the bridge shop was housed in an 80 x: 218 foot wooden structure with a 40 x 150 foot wing. This facility served the vital purpose of framing and fabricating the company's lumber for its numerous timber bridges. The Erie, like all railroads, consumed prodigious quantities of wood for structural and roadbed purposes in this era before creosote. A central sawmill offered great potential savings, as well as a uniform product.
Thus in the mill turned out: feet of sawn timber feet planed feet buraetized feet lath sawed That year the Owego carpenters framed 35 truss bridges, collectively feet in length. The recollection of an employee at Susquehanna that the roof trusses for the big shops there came from Owego seems very plausible. Owego lasted only as long as the use of wooden bridges was pre- valent. The lessons learned there should have demonstrated the value of concentrating similar activities under one roof. But not until the twentieth century would the Erie again successfully implement a cen- tralized shop policy. With the arrival of the Van Sweringen management to the Erie, however, the company finally began to move in that direction.
Various minor repair chores, like signal maintenance, had already been coordinat- ed by but little else. The Hornell shop that was upgraded in received new tools and more up-to-date equipment as part of the improvement program. Also included in this retooling were Port Jervis , ERIE RAILWAY SURVEY HAER (Page Buffalo, and Meadville* But aot until the changes made under Charles Denney's direction in 19 35 did the Erie really begin to develop a comprehensive shop policy. Hornell thus became the main locomotive shop handling all heavy erection and repairs. Car shops remained scattered and as late as eleven different loca- tions performed car repairs. " As the Erie railroad entered the a new kind of motive power, the diesel, appeared on the line, with a completely new set of servicing needs.
Diesel-electric locomotives operated on an installment-type maintenance program, with the replacement of parts at set intervals to eliminate downtime. Diesel maintenance followed a mile cycle of scheduled repairs, with a four-day check at miles to replace the engine, generator, and air compressor. These requirements represented a radical change in engine service. Unlike the steam locomotive that needed constant small ad- justments, the diesel could run for days with little attention. The Erie discovered that the old shop arrangement did not always suit diesel locomotives and the new structures designed by the Erie for diesel service made them an innovator in shop facilities. Marion, Ohio, was the site of the Erie's first all diesel shop, the first in the United States.
The Marion facility was a facility, 220 x 100 feet, of steel with brick and glass- block walls. With cleaning and reconditioning bays, a sanding and fueling tower, a 25-ton overhead crane, a 60-ton Whiting drop table, and a complete array of machine tools, the shop "is considered to be the most complete and modern shop of its kind, containing several novel features and has been entirely practical and efficient in operation." With additions made in and again in the Marion repair center became the largest diesel maintenance facility in the country. Some idea of the differences in the repair requirements of steam and diesel locomotives can be gained by comparing'the list of tools at Marion in and those at the older steam shops, listed in Appendix A.
The diesel appeared to be a simpler locomotive to main- tain. But in a different fashion it was an even more complex machine. The story goes that if a steam locomotive failed, it required fifteen minutes to find the problem and eight hours to repair, while with a diesel, a failure led to eight hours of work finding the difficulty and fifteen minutes of repairs. By and large, the maintenance require- ments of diesels emphasized greater cleanliness and far greater pre- cision than steam locomotive repairs, while less heavy shop work and fewer machine tools were involved. ERIE RAILWAY SURVEY HAER (Page Ironically, after finally developing a central locomotive shop during the the introduction of diesel-electric locomotives made decentralized shop organization economically feasible again.
Because diesels required almost no daily maintenance, fewer total shops were needed, but those that were had to be able to handle similar problems. The distinction between running repairs and overhauls almost disappeared; likewise, the differences between minor and major diesel shops were not the great gulf found in the case of steam locomotive shops. By the mid-1950s, only one old freight car shop and one passen- ger car shop existed with the four new diesel shops. These changes also reflected the new realities of American railroading. Passenger service was dying. Also, and as part of that trend, the number of locomotives declined.
Whereas in Glass I American railroads operated steam and diesel locomotives and in the number had dropped to By only .locomotives operated on American railroads. The Erie ended its days in the 19 70s with the repair situation relatively unchanged from that of the mid-1950s. With steam loco- motives gone, the shops looked more commonplace and less spectacular, but remained as important as ever* The bankruptcy in followed by consolidation under Conrail, presented a potentially more damaging prospect to the remaining repair facilities than had dieselization, Marion was symbolic in this respect. In this first all-diesel shop closed when Conrail decided not to utilize that facility. In . the Erie-Lackawanna receivers still retained control over the now unused Marion shop.
Susquehanna Shops One of the key determinants in the proper location of' railroad repair facilities, has been the running range of a locomotive. The earliest railroad organizational structures were based on the division of 100 to 150 miles, the distance a steam locomotive could run before it required attention. Susquehanna grew up at one of these points where a natural dividing line occurred. Situated 200 miles from Piermont, and at the end or beginning of the steep grades over the Randolph Hills that caused much wear and tear on the locomotives, the company needed a shop in that location. In February, the Erie purchased the land for what became Susquehanna, and began the erection of its first shop buildings, as shown in Table VI.
There was nothing outstanding about them the only brick building was the station engine house. But the facility was ready when the first trains ran through to Binghamton after the Starrucca Viaduct opened.
ERIE RAILWAY SURVEY HAER (Page /<^ ) Table VI Susquehanna Shoos, Building Dimensions Material Date of Construction Repair Shop 30 x 60 Wood February, Machine Shop 39 x 69 Wood Feb ruary, Machine Shop 40 x 153 Wood February, Machine Shop 33 x 169 Wood February, Painter Shop 20 x 52 Wood February, Spring-Making Shop 20 x 30 Wood February, Scation Engine House 30 x 41 Brick February, Blacksmith Shop 36 x 127 Wood February, Boarding House & Wings - Wood February, Five Dwelling Houses October, w/Wings Added Wood October, Circular Engine 64' deep House 28 stalls Wood January, Turntable 46' diara.
Wood January, Boiler Shop 25 x 60 Wood February, Bioler Shop IS x 60 Wood February, Office 22 x 28 Wood August, Store & Drawing Room Coppersmith Shop 30 x 69 Wood October, Foundry 66 x 67 Wood October, Storehouse & Pattern Room 30 x 25 Wood October, Storehouse for Cas tings 20 x 40 Wood October, . Lumber Shed 20 x 71 Wood October, Lumber Shed, Addition 12 x 20 Wood October, Tool House 12 x 14 Wood December, Hide House 25 x 49 Wood May, Tank House 18 x 18 Wood Nay, Oil Room 18 x 25 Wood May, Two Wood Sheds 40 x 185 Wood October, Car Repair Shop 30 x 60 Wood October, Addition to Blacksmith Shop 28 x 36 Wood September, ERIE RAILWAY SURVEY HAER (Page Like ics counterpart at Dunkirk and Piermont, the Susquehanna shops grew quickly in an unorganized fashion.
By the facility spread over five acres, with double the number of buildings. From 60 people in the work force had grown to 350 by An map shows the facilities included the 3/4 circle of a round house with a long extension off to the east, housing the actual repair shop. The most interesting feature added in the was Che foundry, built in October, The presence of a forge shop meant that the Erie had already begun manufacturing its own materials, al- though the company had not yet begun to build its own locomotives. Apparently the first Erie-built steam locomotive rolled out of Sus- quehanna in" By though, the company had installed its first steam hammer, with a second added a year later. [36 3] The two hammers gave the shop the capability of dealing with larger, heavier forgings.
The organizational arrangement worked out for the railroad by McCallum in the certainly aided the railroad's repair efforts, if by nothing else than speeding up the flow of information about what had to be done, where, and when. But McCallum had little to do with the internal organization of the shop buildings. The economic downturn of the late that precipitated the company's bankruptcy presented only another stumbling block to further additions at Susque- hanna. The Civil War revived not only the company but also emphasized the shortcomings' of the haphazard arrangement.
An historian of Sus- quehanna County observed that, "The increasing business of the road required greater and better facilities for keeping the motive power in order than these shops provided." Also, the Erie's penny- wise choice of wooden buildings necessitated replacement of many of the buildings, as the danger of fire was very high. By the ^company's revenue flow permitted the expenditure of considerable sums to improve its shops. The company focused those efforts at Susque- hanna, primarily because of its location near the geographic and traffic center of the Erie. James B. Gregg, master mechanic of the shops, claimed credit for developing the plans and supervising the work of building an entirely new shop facility at Susquehanna.
But in Angus Sinclair, an Erie engineer himself, credited John M. Derrick and Major Thompson Brown, chief engineer of the Western Division, with the ideas behind the Susquehanna Shops. Both accounts agreed that Charles Minot, superintendent at the time, asked for the plans. Minot, a wise railroad man, probably deserved more credit than any man. Sinclair, who seemed the more impartial judge, placed Gregg in charge of the actual construction, a responsibility more in keeping with his title. Between and the Erie railroad expended on a main building and an additional for tools at Susquehanna. ERIE RAILWAY SURVEY HAER (Page /^) The resulting structures were impressive architecturally and repre-' seated a major step forward in the shop design.
This was the first integrated railroad maintenance complex in the United States that made some provision for coordinating the movement of locomotives and parts within the facility. Equally important was the permanent construe-. tion. The buildings were constructed with solid brick or stone walls and wood and iron roof trusses. Roof coverings were slate, tin, or iron. The company built the shops to last, by greatly improving their fire resistance. Especially interesting is the manner in which the designers dealt with the problems imposed upon the Susquehanna site by geography. The key geographic determinant was the narrowness of the site, which lay between the main street of Susquehanna and the river.
So the largest building of the complex, the erecting shop, was laid out with the long axis paralleling both the river and the main line tracks. This building then served as a central core about which the remaining structures were clustered. Without any similar facility to turn to for guidance, the designers had managed to create a plan that would provide the precedent for 40 years. The erecting shop was called the Long Shop because of its dimensions, 711 feet long by feet wide. The designers divided the building into three long aisles. The central bay was 53 feet wide and topped by the curved lantern roof. A line of wooden posts divided the shop into rooms while at the same time supporting the iron and wood roof trusses.
The span of the roof at Susquehanna over three bays was not exceptional. Nonetheless, these Howe trusses with curved top chord running in rank after rank for more than 700 feet presented an impressive sight. Flanking the main room were two 40-foot side aisles running the length of the building. The south bay, paralleling the town's main street, carried the steam- propelled transfer table, the key feature of the shop's operation. Use of a transfer table permitted the central bay to be divided into a row of 28 erecting pits perpendicular to the building's.: long axis. Without the table, a wide fan of tracks would have been needed to provide access to each pit.
Arranging the pits along the building's other axis would have wasted space and made it impossible to move a single locomotive without disturbing a whole line of engines. The transfer table solved that problem. Three features of this building became standard elements in railroad shop design through the nineteenth century. The primary element copied elsewhere was the use of the transfer table as the means of moving locomotives within the shop. Railway Shop Up To Date, a volume published by Railway Master Mechanic in noted that, "In earlier shops the use of the transfer table was the principal factor ERIE RAILWAY SURVEY HAER (Page in determining the most practicable layout in providing communication among che buildings." Until the importance of the transfer table remained undiiainished.
The Susquehanna Shops were the first to make an attempt to logically group the structures within the limits of the geography of the site. Secondly, the actual design of the Long Shop established a pat- tern that other shops subsequently followed. Railway Shop Up To Date commented that, "Modern [locomotive erecting] shops bear no resemblance to the antiquated structures once used for locomotive repairs." Susquehanna1s erecting building, although old, began the development of the three bay erecting shop with the transfer table connecting a transverse row of erecting pits. This style became the closest thing to a typical locomotive shop - Finally, Susquehanna's designer successfully dealt with a problem that later designers found crucial to successful shop operation lighting.
With dormer windows on the roof, multiple windows, sky lights, and monitors,, the Long Shop exhibited every element used until the introduction of electric lighting reduced the dependence upon natural light. The only variation widely adopted by not utilized at Susquehanna was the sawtooth type of roof. The other major buildings at Susquehanna were built off the north wall of the Long Shop, toward the river. The boiler shop and blacksmith shop were at the west end of the facility. Along with the machine shop set up in the north bay of the Long Shop, these two buildings handled all the heavy repair and machining operations for: steam locomotives. The original boiler shop was a brick structure 84 feet by 190 feet, with wooden trusses, like all of the wings off the erecting shop.
The interior photograph taken in demonstrated just how well lighted these buildings were with skylight-s and cleve- story monitors. The blacksmith shop was a slightly smaller copy of the boiler shop, This brick building was 170 feet by 68 feet* with similar windows and monitors. An undated photograph depicted the interior of this shop. The dominant features were two large steam hammers, and forges and anvils for smaller work. Jib cranes moved materials within the shop. The power house and boiler room stood almost half the way down the length of the Long Shop. The boiler room was about 95 feet by 95 feet, with the 45 foot by 25 foot engine room between it and the Long Shop. A 112-foot masonry stack towered over the low buildings.
The size of the original engine is not known, but the 80 horsepower engine and two boilers shown in an Sanborn Company Map may be the same source of power used in The power house also provided the space, alongside one wall, for the wash room and lavatory facilities. ERIE RAILWAY SURVEY HAER (Page //O) Kext Co Che power house stood. Che rod shop, a brick building about 116 feec by 50 feet. This shop became che first facility to open, in a full year before che rest of the shops. The stone carpenter shop and brick paint shop were the other main buildings. The carpenter shop was 124 feet by 68 feet, while the paint shop was 20 feet narrower. Both were two story structures with slate roofs.
Why the company used stone for the Long Shop and the carpenter shop and brick for che paint shop and loco- motive auxiliary shops at the opposite end is curious. Possibly che woric force completed che stone buildings first, as the Annual Report in said chat the shops were put up the next year, when che report listed the following buildings as finished: Boiler shop Blacksmith shop Foundry, sand, and annealing house Round house - 4/5 compleCe Gas house Hide house Dispatcher's office Ice house Brakemen's room The provision made at the west end of the Long Shop for the round house represented another practice which later became wide- spread on other railroads.
Almost invariably, the large erecting shops of the various railroads came to be sicuated at division points already having engine houses to provide the daily running repairs for steam locomotives. To prevent inundation of the large shops with the small maintenance chores, these division facilities were kept for running repairs. At Susquehanna, the old round house assumed che responsibility for daily repair work. Probably one of the last additions to che shop facilities was the hammer shop, located approximately 200 feet east of the Long Shop; its foundation of piles and dry masonry went in during The foundry was another building disconnected from the main complex.
In the latter case, the 200 foot long building stood between the shops and the main line tracks just north of the shops, shown as it existed in the in photograph By the Susquehanna Shops surpassed ail other repair facilities in the country, except perhaps the Meadville Shops of Che Atlantic & Great Western. The new Susquehanna complex represented a major advance in railroad shop engineering. Mr. Gregg, never afraid to pound his own drum, but correct in this instance, said in "The buildings, cov- ERIE RAILWAY SURVEY HAER (Page ering eight acres, are acknowledged to be the most extensive of their kind in the country., and also the most complete in their arrangements for economizing labor and facilitating work.
This is the testimony of railroad men from all parts of this country, as also of our visitors from England." This was high praise. It was also Che closest the Erie came in the nineteenth century to having a central shop complex, Gregg ob- served, "In the construction of new locomotives, the rebuilding and repairs of old ones and, indeed, for the care of the road in all particulars, this shop has now become largely responsible." Within five years of completion, between 650 and 700 men worked at the shop, and the foundry was turning out materials for use system- wide. Again, to turn to Mr. Gregg, "The number of steam hammers is now increased to six, and with these I am now supplying forged work, axles, etc., and all iron work for bridges for all parts of the road and its branches.
I have also very largely introduced the manufacture of cast-iron drilled wheels for engines and cars for the whole line of the road, the annual number supplied from this shop averaging about wheels." With the removal of the foundry located at Jersey City to Susquehanna in the foundry built in was a true central facility. An output of wheels annually entailed the use of a truly sizable quantity of iron. But one large foundry cost far less to operate than two smaller plants. But while the foundry functioned as a system-wide facility, other shops duplicated the equipment and operations at Susquehanna. Elmira had the largest car shop, while Jersey City, Buffalo, and Dun- kirk all built locomotives.
In short, the repair facilities remained scattered along the Erie much as they had been before Only some manufacturing operations were concentrated at Susquehanna. But if the facility there did not become the Altoona of the Erie, Susquehanna did serve a very important role in the railroad's main- tenance effort. Susquehanna was the largest shop and probably deserved the title of the main Erie maintenance center.
The shops played the major part in the conversion of rolling stock and locomotives to standard gauge during the early The enormous task had to be accomplished quickly, and Susquehanna bore the major burden, beginning in A partial accounting indicated that in Susquehanna built 38 locomotives and rebuilt 31 locomotives, while the following year 61 new and 15 rebuilt engines rolled off the transfer table. The conversion work included providing new boilers, frames, cylinders, and fireboxes. ERIE RAILWAY SURVEY HAER (Page It is, perhaps, too severe to criticize the Erie for nor developing Susquehanna into an Altoona-cype complex. No other rail- road moved in that direction for 25 years.
The point does remain, however, that the Erie had an excellent basis upon which to build a complex for all heavy repairs. But several factors conspired to prevent that occurrence. One, as usual, was lack of money. Another was an unawareness of the economics of scale offered by a larger central facility. Most problematic were the geographic limitations of the site at Susquehanna, where the hill and the river squeezed the shop onto a narrow flat. The first major changes in the Susquehanna shops did not come until the management of the newly-reorganized New York, Lake Erie & Western initiated its improvement program.
The report cata- logued the following changes at Susquehanna: Important and expensive changes have been made in the location and arrangements of existing structures- A liberal supply, of improved modern cools has been added, and these shops are now well equipped for the economical building and repairing of locomotives, with a capacity of 12 new engines per month. An electric light plant has been put in of sufficient capacity to light the main shop. Among the changes were a large coaling platform, with three feed tracks, and narrow-gauge hopper cars to fill the tenders. Another feature notable at the time was an oil-mixing house. Operating from June, to March, Che facility allowed the Erie to mix its own lubricating mixtures. The oil house was the kind of installation advocated by Walter G.
Berg and other railroad economists. But the Erie abandoned the idea in an effort to move out of the material manufacturing aspect of operations. The facility was intended to serve the whole system, and was equipped with steam pumps and a hoist for handling liquid and barrels, and automatic mixing paddles. Gas light illuminated the interior. But the operation apparently saved little, if any, money for the Erie. The efforts at improvements continued chrough Che later be- cause the shops needed a major overhaul. The Railroad Gazette in announced that the Erie planned "extensive improvements," including a large iron foundry to serve the whole system. The company had bought new land, perhaps along the river.
There was no record of the construction of a new foundry at chat cime, and it may be that che failure of the New York, Lake Erie & Western stopped any plans for the foundry. But the need for new facilities and improvements to the old ERIE RAILWAY SURVEY HAER (Page // ) shops remained. Just as with bridges, the increasing length and weight of the locomotives made the old shops obsolete. The 38-foot transfer cable could not handle all of the locomotives on che company's roster by Upgrading had co wait, however, until the latter half of che brought renewed prosperity. As always, the tempo of Erie construction depended upon the Erie's financial status. The company managed the first step in 189 8 and constructed an office building.
The structure had stone basement walls, with two upper floors in brick. The office was almost square, a little over 40 feet on a side.. The peak of the four-cornered roof was capped by a clock and bell tower. The' company located the building against the southwest end of the Long Shop, blocking the transfer table's exit at the far end of the shop. The next improvement became the first structural addition to the actual repair capabilities of the shop since The company filled the space between the old boiler shop and the blacksmith shop with an extension to the boiler shop. Constructed of brick like the other shops around it, the structure differed little in appearance from the older buildings on either side of it. What did change was the height of the building.
The walls were built to permit the installation of an overhead crane, 51 feet across. The runway, set on girders at 26-foot intervals, was erected by American Bridge in Elmira. The Shaw Electric Crane Company installed the lift, which had a 40-ton capacity, and a five-ton auxiliary hoist. This type of installation was typical, and Shaw supplied a great many cranes to railroad shops. By installing the crane, the Erie was making an effort to over- come the inability of the shop to move long, heavy loads. But the Long Shop, not the boiler shop, was in even more desperate need of such a crane. In talking about the shop's layout in Angus Sinclair observed, "...the cross pit plan first introduced in these Susquehanna shops has more than held its own.
If the roof of these shops could be raised to provide room for overhead travelling cranes, the establishment would compare favorably with any railroad repair shop on this continent." Unfortunately, the company could not feasibly raise the roof, so the shop remained outdated. An indication of the difficulties caused by Susquehanna's shortcomings was the huge Mallet triplex locomotives used in pusher service between Susquehanna and Gulf Summit that had to go to Dunmore or the Lehigh Valley Railroad's Sayre Shops for overhauls in the 19 The inability to install overhead cranes was the single largest structural failing of the Susquehanna Shop.
As Railway Shop Up To Sate observed, travelling cranes allowed a completely new type of layout that dis- pensed with the transfer table as the primary mover of engines and ERIE RAILWAY SURVEY HAER (Page cars. Cranes replaced the cable as the key component about which shops were arranged. "The introduction of the powerful overhead travelling crane, capable of lifting the heaviest locomotive, is shown to have modified the arrangement of buildings.
This is especially noticeable in the locomotive department, though the variation is evident in repair and building plants as a whole." Railway Shop Up To Date accorded the crane a high place, along with electricity as one of the "prominent features in the evolution of the railway shop to meet the demand- of the constantly growing motive power and rolling equipment." Susquehanna, though, would never have such a piece of machinery in the Long Shop. Still, the continuing improvements did benefit the shops. The power house received a major reconstruction during The new 440 horsepower Babcock & Wilcox boilers the standard installation went in one room of the expanded boiler house, while a second room housed the pumps, compressors', and heating coils.
The heating system for the shops consisted of a 210-inch blast fan, housed in the compres- sor room. The building itself was altered to include 22 louvered monitors of yellow pine over the boilers. Large coal bunkers on the second level, coal conveyors, an ash tunnel and electric traveller for the ash cart, and a crane for the cinder car track completed the alterations. The one unusual feature of this steam plant was the installation of mechanical draft equipment. The power house had a 120-inch fan to provide the necessary boiler draft.
Railway Shop UP To Date observed that, "Comparatively few power stations operated in connection with railway shop plants are equipped with apparatus for providing arti^ ficial draft." Yet the advantage of such equipment lay primarily in the capability of burning more coal, hence generating more steam, from fewer boilers. Mechanical draft equipment needed shorter stacks; the one at Susquehanna was only 20 feet high. Lower grade fuel burned in the stronger draft, offering further savings. Innovations- of this kind, in fact the entire layout and machinery complement of the Sus- quehanna power house, made this particular installation one of the most modern railroad steam plants. "" Other improvements made in included the rebuilding of the round house adjacent to the Long Shop.
Of greater importance to Susquehanna was the construction of a new 29-stall round house. The Railway Gazette commented that "the buildings are all of the standard type adopted by the Erie for intermediate engine terminals." The Erie had just finished a similar facility at Hammond, Indiana, and basically followed a standardised plan. The company built this structure, known as the Hew Engine Terminal, between the main line tracks and the river. The only novel features were the ventilating and heating systems, sup- plied by Buffalo Forge. A large system of ducts in the ceilings and a ERIE RAILWAY SURVEY HAER (Page pipe network in the pics could change ail Che air in Che building in twenty minutes, moving million cubic feet.
The shop also used the standard Erie smoke jacks chat were among che best designed. The final additions to che Susquehanna shops included a general storeroom built in and a modern cinder handling plant probably put in a year or so earlier. A track hopper with sloping sides and water trough received the clinkers. A special Brown Hoiscing Machinery Company crane scooped out these ashes for loading into hopper cars. "Work that was formerly regarded as a nuisance moves as automatically as a well-regulated clock. Several other railroads have adopted the system and it is growing into popularity." This equipment represented another example of the Erie's tendency to re- place men with mechanical apparatus.
New additions and improvements made during the first decade of the twentieth century by Frederick Underwood- improved the capability of the Susquehanna Shop to accept longer and larger locomotives; geographic limitations of the site hampered total expansion of the facility. The narrow width of the bays in the erecting shop also precluded a total redesign of the shop. The clear span under the wooden trusses used in had become much too short by Be- cause the company could not rectify this problem, the future of the shops was limited. Over the next twenty years, the maintenance work at Susquehanna represented efforts to keep the shops from decaying.
The Erie renovated ten pits with concrete in the New Engine Terminal in and the USRA put in a brick oil house, rest house, and tanks in front of the old terminal in The shops' capacity remained about the same. The old round house handled basic repairs and boiler cleaning for 32 locomotives daily, while the new terminal serviced 50. Increased locomotive size rendered the engine houses, as well as the erecting shop, progressively inefficient. New turntables solved this problem in the round house. In a 100-foot steel through girder table was installed at the New Terminal by American Bridge. Electrically driven by a Nichols tractor, the turntable could accommodate any locomotive on the road.
Minor alterations to the pipe and wheel shops in and an extension to the tool room at the new terminal, were the only changes until when, in June of chat year, the company eliminated Susque- hanna as a standard turning point for locomotives. Salamanca, Kent, and Huntington were similarly downgraded, leaving only Port Jervis, Hornell, Meadville, and Marion as division points. The economic re- organization of maintenance facilities on the line had begun. ERIE RAILWAY SURVEY HA R (Page // ) In "he locomotive shop was formally closed. However, the construction improvement program for included plans co enlarge the car shops at Susquehanna, using the Long Shop.
The plan was "to include rebuilding several existing units and the construction of additional buildings to cost, with equipment, about Finally, more than 60 years after it opened, the Susquehanna Shop lived up to the promise it had offered, by becoming a centralized repair facility. Ironically, though, it became the passenger coach repair shop, leading to the elimination of the Elmira Car Shop, and other shops at Buffalo, Kent, and North Hawthorne, New Jersey. The' loco- motive repairs went to Hornell. The major reconstruction feature at Susquehanna was the instal- lation of a new electrically powered transfer table. The 23 cross pits were filled in and replaced by tracks running the length of the Long Shop.
The short transfer table in the south bay was removed and the new table ran perpendicular to the Long Shop, which it entered between the old rod shop and the paint shop. For a dis- tance of some 80 feet, Che roof and walls of the Long Shop were torn out to provide an entrance for the new table. The design effectively divided the old erecting shop into two separated sections. George P. Nichols & Brother of Chicago, orm-ofr-the -largest suppliers of electric drive units for turntables and transfer" platforms, supplied the motor for the new table. The table at Susquehanna was 79 feet six and one-half inches long and 15 feet ten and one-half inches wide, with a 213-ton capacity. The west section of the erecting shop now housed the new car repair shop, while the east end became the paint shop.
The boiler shop became the wheel, pipe and tin shops, while the rod shop changed to the wood mill and cabinet shop. The blacksmith shop added welding at one end and the tool room and machining at the other. The old paint shop became the battery and electrical shop and the carpenter shop became the sash shop, the varnish and brass rooms, and paint storage. The foundry-turned-store house changed yet again into the upholstery shop. A new sprinkler system went into use in provided by the Automatic Sprinkler System of America. The removal of the old engine Germinal in and the installation of a 123-foot high water tower in completed the alterations. The Chicago Bridge & Iron Works of Green- ville, Pennsylvania, built the gallon tank, 28 feet eight inches in diameter and 16 feet high.
Emblazoned with the E in a diamond, the tower became the shop's new landmark. The new coach repair facilities required new tools (see Appendix A). The work force dropped to 300 men, who turned out two passenger cars ERIE RAILWAY SURVEY HAER (Page daily. The standard repair procedure called for the removal of all cushions ac the upholstery shop. Next, Che cars entered the truck shop. The old boiler shop had two Whiting car lifts, one four-jack lQQ-ton hoist, and one two-jack 50-ton hoist. These hoists raised the car body into the old Long Shop, now shortened to 525 feet. Placed on shop trucks;, the car was repaired, primed and painted, cleaned, and inspected. Then Whiting jacks again lifted the car clear so the old trucks, with their wheels and journals serviced, could be reinstalled.
Each car received an overhaul every 18 to 28 months, Steam locomotives still pulled the passenger cars and made their presence known at Susquehanna. In October, the last steam- related addition to be built at Susquehanna went in, just west of the shops, across Bridge Roberts & Schaeffer Company of Chicago built a 2,000-ton reinforced concrete coaling plant on that site, with a number of novel features.
Erie Railroad Magazine claimed, In keeping with the modern tendency toward larger power, and the consequent demand for larger and more complete facilities for servicing locomotives, the Erie Railroad operates at Susquehanna, Pennsylvania, a plant which is probably more complete, and contains more up-to-date features than any other locomotive coal, sand, and cinder handling plant in existence. The plant included the 50-foot diameter coal pocket, two Norfolk and Western-type ash handling plants, and two ten-ton overhead dry sand' bins, fed by three steam dryers. Locomotives used four separate service tracks, and could take on coal, sand, and water without moving. Two two and one-half ton "Simplex" buckets supplied the coal from a stockpile at the rate of 125 tons each hour.
After the coach shop began operating, things stayed fairly quiet at the Susquehanna Shops. In The Work Equipment Repair Shop, just west of the place where the old engine terminal.had been, put in a two ton Miles electric hoist and monorail crane, transferred from the power house. But the shop's importance was decreased- The New Engine terminal had been reduced to under ten stalls, an indication of reduced importance. There was a flurry of activity as 32 cars came out of the shop in and to go with the new passenger diesels. But by only 79 cars remained to be serviced at Susquehanna, and in it closed. A. small facility at Jersey City took its place.
The Erie kept the shops until although they stood empty and unused, when the company gave up the title to the property, and the Erie left Susquehanna. The buildings remained, however, prompting the ERIE RAILWAY SURVEY HAER (Page Susquehanna-Oakland-Lanesboro Industrial Development Agency to buy them. Solida, as it was known, in turn leased the shops to Fab-Weld, Inc., which built shipping containers for Che Army in Vietnam. Certainly the shops were under-utilized and poorly maintained,' as the interior views made by HAER demonstrated. The inevitable occurred on November 5, when a welding spark started a fire in the old truck shop. The fierce blaze destroyed both boiler shops and the blacksmith shop, and .damaged the roof on both surviving sections of the Long Shop. .
The stone and brick bearing walls, badly damaged, were torn down the next day, In the shops were abandoned. The rubble-strewn gaps where the fire raged stand out like missing teeth. The handsome stone walls on the remaining buildings seem in good shape, but the roof trusses and joists on the Long Shop stand open to the sky since the galvanized roofing is gone. In all, the faded Erie symbol on the water tank, now almost invisible, is symbolic of the fate of the Susquehanna Shops. Before the Erie arrived, there was no town of Susquehanna, and since the railroad left, the same statement seems applicable.
ERIE RAILWAY SURVEY HAER (Page //$ ) Chapter VII Shops - Part II Meadville Shops As the Erie Railroad began to build its shop facility at Susquehanna, the Atlantic & Great Western Railroad, running from Salamanca to Dayton, Ohio, was finishing the construction of its line. The A.&G.W. had an even more checkered financial career than the Erie. As Mott related in his narrative, the history of the two companies was closely interwoven. The A.&G.W. had begun construction in after a fitful nine-year money-raising effort. In 1863,'the broad-gauge line opened. Periodically leased by the Erie during various later receiverships, the A.&G.W. reorganised as the New York, Pennsylvania and Ohio in and finally became an Erie-owned addition to the main-line in Part of the initial A.&G.W.
construction effort involved the erection of shops in Meadville for the road's Eastern Division. These must have been frame structures, for the First Annual Report of the A.&G.W. said the temporary shops then in Meadville were due to be replaced shortly by "large and permanent structures" already under construction. Two main structures comprise this new shop set-up.. The largest structure was the brick erecting shop 180 feet wide and 248 feet long. The shop consisted of a center bay, 51 feet 3 inches wide, under a gambrel-type roof 66 feet 10 inches high at the peak. Two flanking aisles, 64 feet wide, were covered by sloping shed roofs, giving the structure a decidedly barn-like appearance.
Wood and iron Howe trusses spanned the three sections, carrying the 3/4-inch wooden sheathing on the roof. The steeply sloped roof provided much clear space. At one time, a row of dormers ran down the length of both the shed roofs to provide the light needed for operations, but by the dormers remained only on the north side shed. Also, no trace remained of the skylights once set into the sloping sides of the gambrel roof. The walls were plain, unadorned brick, with round-arched windows. The only stylistic details were the quoins on the building's corners, perhaps reflecting the influence of Renaissance revival architecture. More interesting were the two types of columns utilized to carry the roof trusses over the center bay.
On the north aisle of the shop, three-point columns with cast iron cores were spaced at 12 feet* inch intervals. By the the strength of iron columns had long been proven, but wooden support posts may have been added to make the connection of the column with the truss easier. ERIE RAILWAY SURVEY HAER (Page On the opposite side of the bay, the builder adopted another type of roof support, using a four-point cantilevered column to carry the large cross timbers and trusses. These wooden columns were spaced at 25-1/2-foot intervals- Only 9 sets of these columns were needed, while 17 columns supported the north bay's roof. Perhaps the location of the erecting pits in the south bay led to the use of fewer columns on that side of the shop .
Locomotives entered the building on IS tracks along the whole south wall. A broad fan of tracks led to wooden doors, perhaps like those shown in photographs. The erecting shop utilized the south and center bays. The machine shop occupied the north bay. Adjacent to the erecting shop was the blacksmith shop. This single-story brick building offered a more striking appearance than its hulking neighbor. The designer again adopted stone quoins on the corners, and continued that motif in the round-arched windows and doorways. Such architectural detailing had become increasingly unusual on industrial buildings. Especially on a railroad with the money problems the A.&G.W. had, this attention co stylistic detail was surprising.
The designer used the same wood and iron roof trusses as the erecting shop. The original blacksmith building was probably about 245 feet long and 56 feet wide, with a wing off the center forming a T. These two main buildings are the only structures currently standing. [ There was no record of a power house or round house- being built in but both must have existed. The Erie had such close connections with the A.&G.W. , that a comparison between Meadville and Susquehanna is inviting, but there seems to have been little sharing of information between sites; the designers at Meadville copied very little from Susquehanna. The builders at Meadville did not confront the severe geographic constraints the Erie faced.
Perhaps for this reason, the erecting shop at Meadville was built without a transfer table. The simpler expedient of fan tracks sufficed. The designer at Meadville also left the shops completely disconnected in separate buildings. There was no movement toward the coordinated shop arrangement as at Susquehanna. Even the construction of the buildings and their appearances differed. There were isolated similarities between Meadville and Susquehanna. The erecting shop at each site consisted of three bays, although the Long Shop at Susquehanna had better lighting. In both cases, the increasing weight and size of motive power would ultimately render them obsolete. But fundamental differences outweighed the ERIE RAILWAY SURVEY HAER (Page /ZJ ) common points.
Meadvilie was smaller, and designed without the forethought for coordination that enabled Susquehanna to continue operations even as that shop was outgrown. Meadvilie, on the other hand, was forced to expand in the older fashion of adding facilities when needed, where there was room. Thus the superiority of the Susquehanna design appears, indicating how radical a shift the Erie shop signified. Perhaps the first- major addition to the Meadvilie shops was a car shop. An promotional pamphlet warned of the pressing need for more car shops on the A.&G.W.. But they suffered from the same financial constraints as the Erie. The shakey finances may have accounted for the lack of a coordinated shop in the first place. But Meadvilie soon had its car shop.
Captain Tyler, in his Report on the Erie Railway and its Connections, wrote in that, "There are good and efficient brick car shops at Meadvilie erected two years ago." An county atlas showed the car repair facility situated directly east of the'^blacksmith, shop. The car shop was not as elaborately styled as the earlier structures. Built of brick, it lacked the quoins on the corner and the round-arched windows on the second floor. The only similar details were the stone sills, and the use of stone jamb up to th-e springing line of the door arches. But the stonework was not as elaborate, nor was it carried all the way over the arch, as at the blacksmith shop. Cars entered the base of the shop through six arched doorways, or through, similar entrances from the long wings.
The key design problem was how to support the second story while leaving clear space for six car repair bays. To achieve this end, a wood column was employed that differed from those in the other shops. Perhaps the designer took a lesson from the cars repaired in the shop. Seven sets of U-shaped, three section columns carried the ceiling beams that were trussed like the old wooden railroad cars. Other^structures were added over the next ten years, including a wing off the north wall of the erecting shop and sheds north of the blacksmithishop. The bird's eye view that depicted these additions reveals that the shops had come to dominate the local landscape of Meadvilie.
The Meadvilie Shops, just like the Susquehanna repair shop, played an important role in converting locomotives to standard gauge. The Nypano, as the road was known after finally reduced to the standard gauge at the same time as the Erie, and faced similar headaches. Between and Meadvilie turned out at least 25 new and 101 rebuilt locomotives* an amazing number for a shop this size. 3 ERIE RAILWAY SURVEY HAER (Page / ) The shops changed over Che years with minor additions and repairs, like those noted in the Erie's report - the walls and foundations of the shops had required extensive repairs. But Meadville was one of the five small repair facilities and did not attract major attention (see Sanborn Map Company Plates of Meadville). The 22-stall roundhouse on a c.
map remained, and a machine shop with a boiler room had been added off the back. This addition represented the typical provision of handling running repairs in Che engine house. All of the shops had been altered, or added to. The wing off the erecting shop housed a rod and tire shop, while in the front, several sheds housed air brake, machine, and cool shops. Between the blacksmith and erecting shops stood a five-boiler power house, flanked by an iron-clad machine shop. The blacksmith shop now included a high, steel-framed shed for Che boiler shop, and sported a 35-foot addition added in The biggest change had occurred with the elimination of the car shop . The company had converted that building into a storehouse and office space, while the wings housed a carpenter shop and a tank shop.
The company also built a second storehouse in north of the blacksmith shop. Meadville continued to serve as an important running repairs facility, servicing 60 locomotives daily, while the erecting shop had expanded to 24 pits. But the Meadville Shop was entering an era of changing times that saw some very interesting developments in the operations there. The first indication had come with the establishment of a signal repair shop in Established in a small single-story frame building, that department repaired and rebuilt relays, interlocking mechanisms, and mechanical equipment and motors for switchers and signals.
The shop also prefabricated signal poles and machine tools and met any problems encountered, ] The signal repair shop represented an effort to economize by handling more repairs and by reducing purchases of nev materials. The company also established a central scrap plant. Equipped with a 15-ton overhead crane, an alligator shears and a 4-ton electro-magnet, Che Meadville plant served the entire system. The resemblance of these two facilities to the earlier Owego shop was obvious. And despite its age and space limitations, the Meadville shop remained a locomotive repair facility. The and improvement programs helped alleviate some problems caused by the shop's age.
The additions included a number of new machine tools, such as a 36-inch Ohio heavy-duty shaper, a 90-inch wheel lathe and a 48-inch Lodge and Shipley lathe from Susquehanna, and a 4-inch upsetting machine from Kent. A second 90-inch motor-driven ERIE RAILWAY SURVEY HAER (Page / S) wheel lathe from the Putnam Machine Works arrived in along with a new cubic foot air compressor. The improvements also called for a new coaling cower like che one at Susquehanna, and a 120-foot turntable by American Bridge. The coaling station, built by Roberts & Schaefer, had a 1000-ton coal capacity and che same sand and cinder handling arrangements as the Susquehanna unit.
The turntable replaced a 7Q-*foot installation in front of the roundhouse, constructed in Both of these moves stemmed from the purchase or the new 2-8-4vBerkshires. Without these enlargements, Meadviile would have been unable to service these large locomotives. The final change of the late was the construction of a new six-stall enginehouse for finishing up engines as they emerged from the erecting shop. The new, smaller house stood directly opposite the old 22 stall house that the company retired in the late The result was that the Meadviile shop outlasted Susquehanna for locomotive service.
The slightly wider bays and the access over fan tracks instead of a transfer table explained Ironically, the lack of a transfer table, a symbol of advanced design at Susquehanna in enabled Meadviile to continue maintaining longer locomotives while Susquehanna reverted to passenger car repairs. The only limitation on the size of locomotives that Meadviile could repair was the size of the pits themselves. Yet, even Meadviile's days were numbered, for Charles Denney had made the reorganization of the Eriefs shop system one of his goals. Beginning in heavy locomotive repairs slowly ceased at Meadviile and, by the company had converted the complex into a production unit for railroad operations, tools. Shovels and lanterns were two of the items manufactured there.
This type of economizing traced its origin, to the Susquehanna foundry and oil mixing house. Many railroads developed in-house maintenance and scrap reclamation departments to reduce expenses, but the Erie's program probably was more far-reaching than that of any other line. The effort paid off during the Second World War when metal became a precious and vital commodity. In March the Erie opened a coupler repair shop that welded and annealled the forgings in the coupler knuckle to permit their reuse. Like the scrap and reclamation shop, the company located the coupler reclamation depart- ment in one of the wings of the old car repair shops.
The equipment included a straightening press and a knuckle straightening press, also ERIE RAILWAY SURVEY HAER (Page / p) a shaper for re machining the ends- These tools enabled the Erie to reuse coupler assemblies that previously would have been discarded as scrap. The production unit hit full stride during the early Four separate units made up this department, k. crane repair shop in the old boiler shop serviced derricks, pile drivers, locomotive cranes, and boilers, as well as providing heavy plate work. The old erecting shop manufactured materials mainly for the Homell Shops, such as general tool, gauge and die work, jock repairs, reclamation of electric generators, and service of oxy-acetylene torches, welding, and cutting equipment.
The blacksmith shop continued to produce heavy forgings for locomotive parts and smaller drop hammer and forgings for the machine shop. The forge shop also reclaimed track tools, and worked jointly with the crane shop to fabricate a variety of items requiring welding and hammersmith work. Finally, the air brake unit handled all such work for the whole railroad from the first floor of the old car shop. An added bonus for Meadville came because of war-time traffic loads. The shop as a whole reconditioned two locomotives per week, to relieve the load on Homell, the main locomotive shop. Such overhauls included frames, boxes, shoes and wedges, wheels, tires, springs, brake rigging, valves and cylinders, guides and cross heads.
The capability of handling such work at the shop proved to be a great boon to the Erie. Meadville received this added work, and not Susquehanna, because it was situated almost at the geographic center of the Erie system. Like Susquehanna in Meadville sat in che right location. Additional locomotive service was not the only duty that came to the old A.&G.W. shop because of its location. In the scrap and reclamation plant installed facilities to salvage worn rails for branch line use. The ends always wore out first, so the plant cut off 18 inches on each end, and produced satisfactory rail. An oxy-acetylene torch on a carriage chopped off the rail. Grinders next smoothed the line of the torch. An existing overhead crane and a feeding table with automatic rollers moved the rail.
The table had five stations, one for wire brushing, two for cutting, one for a three unit gang drill for drilling-holes for splicing, and a final section into the storage pit. Then in the Erie opened a central wheel shop in the six-stall roundhouse built in With the pits filled in and glass blocks filling in the doorway, the wheel shop turned out nearly all the wheels for the system. Older wheel shops at Homell and Port Jervis closed down, and instead Meadville shipped assembled wheels and axles to those shops. The only exceptions were Jersey City and Susquehanna, both of which still turned some new wheels and conditioned a few journals. ERIE RAILWAY SURVEY HAER (Page The production capability of che wheel shop was enhanced by efforts to minimize handling.
Railroad shops had not always adopted the best machine shop practice, and materials' flow was one area that shops often handled badly. But overhead tramways and conveyors helped solve those problems at Meadville. The shop's capabilities included: Dismounting pairs of wheels in 8 hours Turning axles on three axle lathes in 16 hours. Boring cast iron wheels in two boring mills in 8 hours Mounting 60 65 pairs of wheels in 8 hours. Turning 5-6 pairs of steel wheels in 8 hours. Turning journals on 5-6 pairs of wheels daily. Erie Railroad Magazine had cause to boast when it called this facility, "one of the most modern wheel conditioning plants in the world." The key to the. successful operation of the wheel shop lay in the planned arrangement of the work.
The tools stood in sequence of operations, connected by tramways, conveyors, and jib cranes. The work could then flow from one specialized tool to another with little interruption. In the case of many old steam locomotive facilities like Meadville, its life-expectancy in would have been low. The normal pattern was for the old steam facilities to wither away. Ironically, the coming of the diesel locomotive instead brought new life to the old shop. The Report told of plans for a new car repair shop at Meadville, with the car yard to be replaced. About an addition to the coupler shop permitted consolidation of straightening and guard work in one area. Also, the company installed two new furnaces and a jib crane for that shop, Even closing the production unit in did not hurt.
Instead, the company modernized the old erecting shop and turned it into a repair center for the maintenance of way equipment, signals, switches, and frogs for the whole line. Using assembly line methods, all heavy- equipment, air tools, and diesel and gasoline engines were serviced during the winter, a 25-ton Gantry crane helped move materials. Another wing of the old erecting shop became a locomotive drive wheel shop for mounting diesel wheels, traction motor gears, and wheel storage. The signal shop moved into the old cab shop in with welding and blacksmith equipment, a monorail crane, and fluorescent lighting. Finally, the company chose Meadville as one of the sites for a minor diesel service unit, built in Meadville's survival, and successful rebirth hinged on three factors.
It was ideally situated Co provide many services in the manner of a central shop. And with its old, but commodious, buildings, conversion into shops for light repairs and renewals was feasible. Many duties did not need overhead cranes, nor did they require the newest buildings. ERIE RAILWAY SURVEY HAER (Page /2 } Secondly, the introduction of the diesel-electric locomotive changed the whole service requirements of -the railroad and, equally important, the outlook of the road* New technical changes were readily adopted in areas from track maintenance to the wheel shop and scrap yard." Automation became increasingly important. But in order to work, semi-automated shops meant concentrating repair work, and Meadville was in the center of the system, an important consideration.
The final factor must have been financial. The conversion of Che entire motive power fleet, and constraction of three new heavy repair shops for the diesels meant a heavy drain on the company's finances. Building new shops for all the other maintenance needs was out of the question.
So,'the old buildings at Meadville remained in use, for the same reasons the company had converted Susquehanna in Meadville fared better than Susquehanna and remained in use into the The wheel shop continued to attract nationwide attention in rail circles as the company upgraded it throughout the early Railway locomotive and Cars commen ted, "While the Erie Railroad began its centralized car wheel production at Meadville, Pa., ten years ago, today's shop has changed greatly from the*facility that went into operation in The Erie was a pioneer in consolidation of wheel shop facilities and from the beginning equipped the shop for a high degree of semi-automatic production.
Even with all this, the Erie has poured well over a quarter-million dollars into the Meadville shop in the past five years. This was a shop that already could have been cited for the completeness of its facilities and its production rate."[451] The change consisted of improved machine tools that upped the production figures and permitted total consolidation of all wheel work at this one site. In a Sellers dual end-drive journal lathe eliminated 11 engine lathes used for refinishing journals at shops from Hammond to Jersey City. A year later, a Sellers profiling contour tread-truing lathe released three older tread lathes in other shops. Only two others remained in the company's shops, at Hornell and Marion, for emergencies.
The facilities in the erecting shop had also grown, so that along with diesel- wheel-and-gear sets, it could inspect Spicer drive gears and traction motors, as well as car roller bearings. Production capabilities had reached pairs of wheels mounted each month, 100 journals cut daily, and 90 pairs of new wheels bored in 8 hours. The shop used eight special cars to transport the wheels to ERIE RAILWAY SURVEY HAER (Page Hornell, Marion and Jersey City. A Yale fork lift and an Austin h Western. 5-con mobile hydraulic crane eliminated hand lifting in the yard. The last addition to Meadville made this facility as close to the Erie central shop as any other repair shop ever came. In . the Dunmore Car Shops was destroyed by severe floods.
(See below: Dunmore) The company chose not to rebuild at the old site, as it was too far removed from the main line, especially the western reaches of the system. So, the company chose Meadville as the site of the replacement car shops. Although planned for the steel frame building with galvanized sheet siding did not open until when the company announced that an "Ultra-modern car repair shop at Meadville, Pa.," began operations in September. It is interesting that the opening of the Marion diesel shop in seemed to mark a revelation in the Erie's outlook, toward maintenance. After years of unremarkable facilities, by the Erie had become a pacesetter with numerous facilities worthy of note. Many of these were at Meadville, and the newest was the car shop.
It cost $4 million, but gave the Erie a shop "which makes it possible to keep close control over car repair costs in the years ahead." The main car shop was 600 x 100 feet and two 96-foot bridge cranes served it. Each had a 15-ton main hoist with 5-ton auxiliary lifts. Three Gantry cranes were also mounted in the area. Opening off the main shop were a stripping yard, set up with permanent scaffolding, and a fabricating room and steel yard serviced by a 70-foot, 10-ton overhead crane. The company salvaged most of the tools in the shop from Dunmore. They were placed in a blacksmith shop, machine shop, tool-room, pipe shop, storeroom, and truck repair area with wheel storage. All these facilities stood to one side of the main shop.
Car servicing was completed in a sand blast shop, pits for undercoating, and a paint shed. The paint shop was equipped with one hand booth and one fully automatic Binks travelling spray paint booth. ] The shop was the equal of any freight car repair facility in the Nation. Unfortunately, the Erie opened the shop in the midst of problems, after delays caused by financial difficulties. At the time of the merger, the shop had apparently been closed as part of the deferred maintenance program. The Report of the new Erie-Lackawanna said, "In January, Meadville Shop was reopened to begin reconditioning 725 box cars " ] ERIE RAILWAY SURVEY HAER (Page Because of these additions to its plant, Meadville has outlasted Susquehanna. But the years have taken their toil.
Although they survived the era of dieselization and became the central repair facility for everything but locomotives, the shops fared less well under consolidation. Conrail closed the signal repair shop, and has decided to phase out the wheel shop as well. The maintenance of way repair shop does remain in the old erecting shop, though, and the new car shop has been upgraded into a major facility. Under Conrail, only the newest shops have been kept, as further centralization in more suitable locations has been pushed. But Meadville, once Susquehanna's stepsister lives on. Hornell Shops During the Erie's heyday in the century, there were two other large repair shops besides the two already mentioned.
Hornell, 332 miles from Jersey City and 128 miles from Dunkirk, sat at the junction of the Susquehanna, Buffalo, and Western, or Allegany Divisions. The railroad had to locate a shop there. The first repair building went up in and only a year later the company had to enlarge it to hold three engines. From this humble beginning grew a major shop complex. The company erected an addition in to hold machinery for engine repairs, and the usual pattern of continual expansion of wooden buildings began. In the company's shops at Hornellsville consisted of a. carpenter shop and machine shop, each 127 x 30 feet; an engine house with seven stalls each 61 x 61 feet; a 46-foot turntable, and two tank houses 20 x 20 feet. The new facilities were "imperatively required," the annual report for noted.
So, the company had broken ground for a new engine house and shops in and on September 4, these opened. But fire plagued the wooden buildings and destroyed the old facilities in The new facilities, listed in Table VII were damaged by fire on January 20, The company was not enthusiastic about rebuilding the shops, and until the Hornellsville remained a small, minor shop. ERIE RAILWAY SURVEY HAER (Page / &} Tablei VII Hornell Shops, Building Size Material Date of Completion Turn Table 46' diamet er Wood March, Tank.
House 20 x 20 Wood December, Tool House 12 x 16 Wood December, Wood Shed 30 x 397 Wood May, Circular Engine House 13 stalls Wood February, 7 Extensions to Engine House 18 x 60 Wood February, Blacksmith Shop off Engine House 32 x 42 Wood February, Machine Shop off \ Engine House 35 x 62 Wood February, But the location at the junction of three, divisions was too important to continue with small wooden buildings. A. humorous incident in demonstrated^ the importance of the shop. [459a] "Some embarrassment in the operation of the road was caused by a curious incident at Homellsville, where the turn-table pit was filled with water during the thaw of February 3.
The water did not run off and during the cold weather which immediately succeeded the thaw the water frozen solid, and the table could not be turned. Eighteen locomotives were thus imprisoned in the roundhouse, which the operatives were unable to extricate until Saturday." An engine house of at least 18 stalls was not small, and represented an enlargement over the structure. let, as The Railroad Gazette observed in "the present buildings are insufficient. ] The company had put in a new iron turntable in and installed the water tank in But Homellsville required a major renovation, and the reorganized New York, Lake Erie & Western made shop improvements a key priority. With acres of land, the company planned a major effort.
The Report notes that the shops, "which being old and of wood, are of little value, and located where they greatly interfere with the proper management of the yard, - should be torn down, and new shops, suitable for the needs of that important point, should be erected upon ground which has been acquired for that purpose, and the yards should be rearranged and enlarged." ERIE RAILWAY SURVEY HAER (Page Work began with Che contract to C. Berrick & Co. for the major brick construction work. The largest single.project of the reconstruction program of the NY, LE & W had begun. The new Hornellsville shops proved to be quite extensive. The company erected brick buildings with iron and slate roofs.
The" shops consisted of: Machine and erecting shop, 110 feet Transfer table in front of the shop, 520 x 50 feet Boiler shop, 155 x 80 feet Smith shop, 155 x 70 feet Tool room, 70 x 54 feet Light repair shop, 100 x 64 feet Stationary engine house, 80 x 36 feet with 80-foot chimney Two Coalsheds, 100 x 15 and 130 x 15 feet Wash house, 30 x 16 feet Storeroom and offices, 120 x 60 feet Oil house, 50 x 30 feet Dispatcher's office, 30 x 20 feet . Roundhouse, 44 stalls, 316 feet in diameter The layout of the shop followed the scheme that had been pioneered at Susquehanna, with one change.
At Hornell, the designer arranged the location of the transfer table,connecting the cross-pit erection shop so that it moved between the pits and the other shops, further smoothing the flow of work and materials. At Susquehanna, the transfer table occupied the bay at the very rear of the shop, so that communications between the table and the auxiliary shops was only through the erecting shop. The Hornell arrangement put the table between the auxiliary and the main shops, further increasing the importance of the transfer table. Since Susquehanna had been built, other railroads had begun to develop shop layouts, but the impact of the Susquehanna design remained visible.
The shops entailed a major expenditure, in and total by the time the facility opened in Building the Hornell repair center was the result of several factors. The primary impetus was the desperate need for a large repair shop at this major division point. Each division had facilities at the other end - Susquehanna, Dunkirk, or Buffalo - but Hornell needed improvement. The inclusion of the erection shop reflected the increase in traffic on the road. At the same time, the need for a facility as large as Hornell's shop provided evidence of Susquehanna's inability to expand to meet the needs of the company. The inclusion of the erection shop emphasized no development in the consolidating of all heavy repairs at one shop.
The Hornell shop was, at the least, the Erie's third ERIE RAILWAY SURVEY HAER (Page /3j ) erecting shop, the fourth if Meadville is counted, as it should be by Hornell, though, represented a fine example of railroad shop practice of the The only potential problem was the short transfer table. Transfer tables were not the only equipment railroads outgrew. The Erie had Co make continual improvements to enable its fueling capabilities to remain consistent with the needs of its motive power. In a gravity flow coal trestle went up at Hornell, Two high tracks carried dump cars raised by a stationary steam engine that filled the hoppers. Engines loaded coal through counter weighted chutes and aprons on either side of the trestle.
The facility represented a new arrangement to accommodate a thorny problem and potential bottleneck. -"Water G. Berg commented, "The system can be very highly recommended..." Nonetheless, by the company had commenced grading for a new set of coal pockets to hold tons. The old pockets had burned, so the railroad resorted to a new plan to facilitate larger locomotives. Ten years later, new coaling stations would be built at Hornellsville and Port Jervis. ] This repeated effort demonstrated the inability of the railroads to keep their service capabilities tuned to changing locomotive technology. ks during the the shops coped with piecemeal additions. In a new ice house and 10-ton house crane became part of Hornell's equipment.
(By Hornellsville had been shortened to Hornell.) The crane was a significant attempt to bring the shop'in line with modern practice. As Railway Shop Up To Date indicated, overhead travelling cranes had emerged as the single most important machine used in a repair shop. In further changes took place, with the conversion of the turntable to steam power, the construction of three drop pits, and the construction of the new coaling facility. These isolated efforts had to give way to a major renovation; they failed to keep up with the growth of locomotives. The improvement work began in as part of Underwood's reconstruction effort.
Railway and Engineering Review observed, "When the present management took charge of the Erie Railroad, it adopted broad and comprehensive plans for the development of the entire property into a modernly efficient railway system. These plans embraced extensive alterations and additions to the several shops of the system in order to enable them to respond rapidly and efficiently to the ERIE RAILWAY SURVEY HAER (Page increasing demands made upon them by the necessary additions to the rolling equipment. ... This work ... has been carried on at many different points on the system. But the most extensive single installation of modern shop equipment is at the Homellsville, N. Y., shops. " For the second time in 30 years, Hornell stood at Che focus of the Erie's effort to upgrade its shops.
The primary additions consisted of a 7-stall erecting shop with 120-ton travelling crane, a new power house, and a wide variety of machine tools with electric drive. The electrical installation and powerhouse received the largest share of attention. The new erecting shop was relatively small, and the old transfer table continued to service it. [471a] The overhead crane, though, insured the continued operation of the plant. The company added the new erecting shop to the end of the old machine shop directly behind the roundhouse. The power house was a large fireproof brick structure with a concrete roof and floor. Coal was dumped outside the building onto a conveyor running up the outside wall.
This Exeter Machine Company unit, capable of elevating 60 tons of coal an hour, dumped into a coal crusher. In turn, an endless chair carried the pulverized coal into bunkers over the boiler room. From the bunkers, coal fell into hoppers in front of the boiler, and hence onto a chain grate. Four Babcock & Wilcox 400-horsepower boilers fed steam at 150 pounds into mains equipped with Holley drip systems. The generating equipment consisted of three Ball & Wood cross- compound, high-speed condensing engines.
Two 500^horsepower engines were direct-connected to 300-kilowatt, 250-volt 3~wire DC Westinghouse generators run at 150 The third engine, 400 horsepower, turned a similar 200-kilowatt generator at 200 The engine room also housed two Xngersoll-Sargeant compound air compressors for pneumatic shop hammers. Another significant feature of the new Hornell Shops was the introduction of electricity in the machine shop. The use of electrically-driven machine tools was becoming a well established practice by The railroads, with their large repair facilities, found central power generation particularly suited to their needs.
Railway Shop Up To Date commented, "Until about fifteen years ago, power for a railway shop was generated in several boiler and engine rooms situated at different points about the shop plant. At some shops, a single boiler house provided steam for several engines situated at different points. ERIE RAILWAY SURVEY HAER (Page The latter were usually located in annexes to Che principal shop buildings and belted to line- shafts.... It is only within comparatively recent years that a single power house has been installed as the center of generation and distribution of all power for a railway shop plant."[4743 Hornell was not a pioneering installation in the use of electricity, by any means, nor was it the Erie's first. The Dunmore shop had an earlier installation.
In all its particulars, the Hornell Shop followed what Railway Shop Up To Date considered to be standard practice. The construction of the building, its size, the type of boilers, the- use of direct current, the type of stoker, and unforced draft were similar to those of other railroad power plants. Likewise, the size, number, and type of boilers, and engines followed practice at other railroad shops. Only the lack of an overhead crane in the engine room, and the choice of condensing steam engines represented departures from the norm. The Railroad Gazette characterized the power plant this way.
"This installation is an interesting and instructive illustration of the latest engineering practice for a railroad shop where the largest proportion of power is required at short distances from the power house and a large proportion of variable speed and crane load is required." The company chose direct-current after a joint study by Westinghouse and the engineering department, primarily because of the compactness of the shop. The study also led to building in a provision for future expansion. Yet, the future options proposed made it apparent that the study realized the long-term advantages of alternating current.
Along with foundations for future boilers that would double the steam capacity built into the plant, the design left room for either a new AC generator or a DC unit with an AC transformer. The large machine tools were driven by individual motors, and smaller tools were driven in groups. The fitting shop in one wing of the erecting shop, the old erecting shop, and the boiler shop all had group-drive tools.[475] The machinery roster was very extensive, demonstrating the wide array of specialized tools that had come into use. In every regard - numbers, types, manufacturers - the equipment installed at Hornell gave the Erie a plant to be proud of.
A number of railroads built ERIE RAILWAY SURVEY HAER [Page shops at the turn of the century, and Railway Shop Up To Date inventoried several of them. Comparisons of those shops with Hornell are difficult, as that publication noted. "The peculiar local governing conditions affecting the operation of each shop, together with the fact that most.shops do a certain amount of manufacturing work ... render it almost impossible to present a list of tools which will provide for any given or individual shop chosen at random." But a good guideline mentioned was between 6 to 8 tools per pit. Hornell had 17 erecting pits, and housed 158 machine tools in the erecting, machine, blacksmith, boiler, and tank shops.
This ratio of more than nine tools for each pit indicated that Hornell ranked with the best-equipped shops on any American railroad. The Hornell shop was the most up-to-date shop on the system after Only the smaller Dunmore shop was as modern. Traffic demands and the standard problem of increasing locomotive size forced further changes at Hornell only 15 years later. By the 30-stall roundhouse serviced 82 locomotives daily, and the 17 stalls in the old and new sections of the locomotive shop were not enough. Outside contractors assumed control over Hornell's operations in but this abortive experiment never worked as Frederick Underwood had hoped.
By the Erie had reinstated its own maintenance crews and had awarded a contract to Bates & Rogers Construction Company for an extension to the erection shop. The company cited the two reasons for enlarging the shop in its report: "To increase the capacity for locomotive repairs and for greater economy, a new machine shop, and an extension of the erecting shop at Hornell, N. Y., were completed, at an approximate cost of Although the project seemed less ambitious than the reconstruction, the addition of this one building insured the future operation of this facility. Hornell, after construction of the erecting shop in was a modern railroad repair shop in every sense. The addition was 408 x 108 feet, of brick with a steel frame and steel roof trusses fabricated by American Bridge Company.
The new shop housed 19 concrete pits, each 45 feet long and 3 feet 11 inches wide. The shop had the same dimensions as the old building, and the total length now reached 586 feet. Abundant natural light filtered through many windows in three stories, a roof monitor on the new section, and a clerestory on the old. The floor was paved with inch Kreolite wood blocks. ERIE RAILWAY SURVEY HAER (Page The layout of the new shop necessitated the removal of the old transfer table, which was far too short by this time. Without the transfer table, the 10 pits in the machine shop had to be removed. In the process, much-needed room was created for the machine room. The length of locomotives and advances in crane technology rendered transfer tables obsolete in erecting shops.
The older seven-stalls_ in the erecting shop had been serviced by a 120-ton crane that was becoming outdated by heavier locomotives. The Erie installed a massive 250-ton gap crane built by H. K. Ferguson Co. of Cleveland, with the assistance of Morgan Engineering Co. of Alliance, Ohio. This unit, powered by eight 220-volt direct-current motors by General Electric, had two trolleys, each capable of lifting 125 tons. These hoists, supported on four 2-wheel trucks, ran laterally on the crane track. Using a yoke and sling hitch, the locomotives could, be lifted into any pit, or out onto the access track, without disturbing the other pits. Running on a separate craneway above the gap crane were two messenger hoists, of the same 72-foot span as the large unit.
The crane installation was "contrary to common practice," according to Engineering News-Record, but offered superb flexibility. The gap crane, with two separate hoists could lift any size locomotive easily with the yoke and sling tackle. At the same time, the messenger lifts could shuttle unhindered even when the large hoist was moving locomotives. The gap crane was also an economical unit to install. The old 120-ton crane ran on reinforced track 40 feet off the floor, which could hold a 150-ton crane. But the new gap unit used a track only 24 feet high, to allow room for the messenger hoists above it. Because it ran at the lower elevation, the new crane, although able to lift twice the load, could use the old runway girders.
Only a gap crane could run at this low height and still lift a locomotive high enough to clear the work area. With its separate trolley hoists, there was ample clearance for the crane to lift steam locomotives into the gap between the trolleys. Hence, the name "gap crane.11 All told, this layout offered excellent service to the shop. Engineering News-Record observed, "The advantages of this new layout, other than the increase in the area of the machine shop and the elimination of the transfer table are twofold.
In the first place the use of a gap type locomotive handling crane results in a considerable economy in the structural steel required for the columns supporting the crane runway due to the reduction in the necessary height of such a runway as compared ERIE RAILWAY SURVEY HAER (Page with the height of runway for a suspended type crane. Also, as che new crane will be able to lift the heaviest engines in the Erie service, drop pits will no longer be necessary. In the second place the advantages from an operating viewpoint are that with the small cranes operating above the large crane, materials can be moved from.end to end of the shop without interfering with the operation of the large crane.
The use of ti^e traveling crane in place of a transfer table for all engine movements will reduce the time required for this operation from 38 1/2 minutes to minutes."[482 ] Hornell now boasted the most modern shop on Che system, and a shop whose standards and capabilities would match any other such facility in the United States. The Hornell facility worked so well that a new storehouse became the next addition, added to meet the enlarged demand of the shop facilities in Almost all new additions to shop facilities came because the railroad's equipment, such as transfer tables and car shops, outgrew the buildings. In with the purchase of the new Berkshires, Hornell required a longer table to turn the longer engines.
Bethlehem Steel fabricated a 115-foot twin-span table in General Electric motors drove the unit. To give some idea of the rapid growth of locomotives, the original table at Hornell in was 46 feet across. In the company installed a 65-foot American Bridge table, only to replace that unit in with an 80-foot diameter table, which only lasted 22 years. Railroad shops can be viewed as a constantly changing, set of structures and processes, and this conception fit Hornell perfectly from on. The major programs of and were crescendos of a gradual activity. The turntable was part of this gradual change; as were seven new stalls on the roundhouse also added in The improvement program likewise led to the installation of modern tools.
By Hornell ranked as the Erie's largest shop, a "modern up-to-date shop in every respect," while Meadville and Susquehanna ranked second and third. Nearly men worked in the Hornell Shops, using the latest equipment. Hornell had installed Whiting 50-ton Drop Pit tables by another instance of the company's ERIE RAILWAY SURVEY HAER (Page effort to keep the shop fully equipped. Susquehanna and Meadville also used this piece of modern technology, which eliminated the manual labor of blocking up the locomotive and laboriously jacking down the desired axles. All of this effort culminated in Charles Denney's reorganization of the maintenance system. 'Hornell became the Erie's main locomotive shop, intended to serve as the system's only shop for heavy locomotive repairs.
This facility, however, was not a true central shop because Meadville and Susquehanna performed other tasks. Hornell handled the locomotive work, the job one usually associates with the term railroad shop. Between and the facility overhauled locomotives, 344 in alone. Heavy locomotive repairs was a fascinating job. Pulled into the stripping pit, Che locomotive was sandblasted to remove scale, oil, and grease, and given a hydrostatic boiler test to times normal pressure: Next, the gap crane lifted the whole body off the wheels and set it onto blocks for dismantling. All parts, including the wheels, were numbered and sent for inspection and repair. Pneumatic and power tools were relied on for jobs like removing staybolts.
Journals were trued and burnished, while hydraulic presses removed the wheels and magnaglo machines X rayed them for cracks. The most skilled job involved reassembling the valve gear. One part of a thorough overhaul was cleaning the flues. For example, an S-type Berkshire had 292 flues, and only 35 could be cleaned per hour. As with other shop processes, the Erie had mechanized this operation as much as possible beginning in Cleaning flues annually became a major chore. The flues had to be cut out of the boiler and the ragged and worn firebox removed. An automatic rack gravity fed the dirty flues to a cleaner that removed scale. The cleaner consisted of ball bearings inside a cylinder "rattling" the flues clean as the cylinder revolved.
After a check for pitting, the shop welded new ends onto the flues. The ends were heated in an oil furnace, and swaged to size. When fit into the boiler, the old end was cut off at the proper length and it too was annealled and shaped in a pneumatic clamp die machiner. About the flue shop, Erie Railroad Magazine commented, "The new Hornell flue shop incorporates new machinery and original methods developed by Erie men, which are not in use by any other railroad. Methods such as the screw feed of flues through the furnaces and the application of three electric eye controls as well as complete design of the cutoff saw and numerous new applications ERIE RAILWAY SURVEY HAER (Page of usual practice were devised...
following a survey of other plants doing this type of work." The Annual Report observed that the new flue shop "improved the quality of the work and effected economies in the concentration of this work at one location." Only with central shops could these economies be attained, and it took the Erie until the to begin developing its own central facilities. In the meantime, the structural changes of individual sites continued, with the installation of power carts, a power rotator for use during swagging, and a dust and scale collector for the Hornell flue shop in The comment of Edward Hungerford made in nicely summarized the status of the shop. "Hornell shop is one of the real prides of the road. ...No longer are there seven locomotive shops of varying types and efficiency on the Erie.
Hornell today does all of the heavy work of the system, and does it well, with vast economies. It is a highly modern shop, with twenty-eight bays in which an equal number of locomotives may be in all the processes of taking down and setting up again. There is not a locomotive shop in the land that surpasses it in the extent and variety of equipment."[492] All of this effort would have been for naught if Hornell had not been able to cope with the arrival of the diesel locomotive. At first, the diesel!s coming meant only the installation of some minor facilities to service the new locomotives. Marion became the main diesel repair shop, and the new locomotives simply turned around at Hornell, or stopped for fuel on their passenger runs between Jersey City and Chicago.
On many roads, the writing would have been on the wall. But Hornell still had its fine location, so the company named Hornell as one of the three sites to receive secondary diesel maintenance shops. The decision to convert the shop to diesel work began in and by diesel facilities occupied half the floor space. The revisions began in what had been the erecting shop, with multi-level service pits, a water purification plant, and fueling and sanding facilities. The number of tracks was reduced to four entering the wing. Four new 216-foot platforms permitted access to the diesels, and a new drop pit table was installed. The existing cranes remained a vital part of the shop's operating capability.
ERIE RAILWAY SURVEY HAER (Page / $) Other buildings changed their functions to help service the new locomotives. 3y dismantling the roundhouse, direct access to the old wing of the erecting shop was provided. What had been the air brake shop became the diesel storehouse, while Che air brake department moved into tank shop. The blacksmith shop shared its quarters with, the steam heat plant. Similarly, the battery shop and a new wheel machine moved into the roundhouse machine shop. The flue shop gave way to the maintenance of way shop- Only the boiler shop remained undisturbed. By the fact of the shop had changed completely. The facility had the unique distinction of serving as a main diesel locomotive shop and the main steam locomotive shop for about two years.
When the report said, "Hornell Back Shop, where steam locomotives were overhauled, was closed on June 1, and has been converted into a modern and efficient diesel shop," it was commenting on an unusal phenomenon- Rarely did a major steam plant manage to retain any useful purpose after the coming of diesels. Hornell, however, occupied too busy a junction to be bypassed. And equally important, of the Erie's three main shops, Hornell was the newest, most flexible, best equipped, and the only old shop with overhead crane service, a must for diesels. Hornell survived; it was cheaper to change than to build another Marion-style facility. The diesels gave continued reason for the shop's existence, but the days of continued growth were gone.
The Erie finished its dieselization program just as the Korean War years ended. The Erie's money problems prevented any further growth. Perhaps the most excitement of the diesel era was the demolition of the old power house stack in after the Erie had replaced the "antiquated costly power houses," with modern boilers in [ By the company had reduced the shop's responsibilities. The E 8 diesels, EKD switches, and the Baldwin diesels received attention at Hornell. But the end was in sight, for Marion assumed more and more of the heavy diesel work. In Conrail took control of the shop, and in one swoop, accomplished what the transition to diesels had not. As part of its effort to eliminate redundant facilities, Conrail closed the Hornell shop.
Hornell had served as the Erie's main locomotive shop for 30 years, and it represented the culmination of shop design on the Erie. Hornell had pioneered unique-procedures in repair operations. But, by and large, Hornell represented the typical and the norm in shop design. Hornell accomplished its objectives with foresight and flexibility which enabled it to meet the challenges of changing technology better than any other ERIE RAILWAY SURVEY HAER (Page Erie shop. Only Meadville survived longer, but it had not retained its original locomotive servicing function. In the final analysis, location may perhaps be the most important factor in the longevity of railroad shops. Dunmore Shops Location also influenced the fate of the fourth largest locomotive shop on the Erie.
The shop at Dunmore, outside of Scranton, Pa,, was the last shop developed by the company, and it clearly stood off Che beaten track of the main line. But with Erie expansion of the Honesdale Branch into Scranton, and acquisition of the New York, Susquehanna & Western Railroad, logic dictated the establishment of an engine repair shop near the western end of those lines. The S. & W. ran from Jersey City to Scranton and Wilkes-Barre. By leasing that line, the Erie gained a hefty increase in commuter traffic from the New Jersey portion of the Susquehanna & Western. At the same time, the western end of the property tapped the coal fields of northeastern Pennsylvania. With three lines into the Poconos, the Erie became one of the dominant Eastern coal haulers.
To service the locomotives for this coal traffic, the Erie established the shop at Dunmore. The railroad apparently acquired the nucleus of the shops from the Duiunore Iron & Steel Company near the turn of the century, and the main reinforced concrete structures proved ideal for the Erie's needs. The walls were inches thick and the roof 7 1/2 inches; in both cases, the plans specified poured concrete on wire netting. The buildings utilized a steel interior superstructure. About this design by George Hill, a New York consulting engineer, Railway and Locomotive Engineering commented, "It is needless to say that this is new in wall and roof construction.
It looks like a lasting job, and certainly is neat in appearance." Skylights of indurated fabric - a transparent composition - over wire netting let in plenty of light, although why the designer chose this material over glass was not specified. The two main structures were the car and paint shop and the machine and erecting shop. The car shop was a low building with six tracks, each holding five cars, running its length. The foot interior held two tracks for the paint shop on the north side, three down the center for car repairs, and a single pair of rails through the framing shop. A partition separated the car and paint sections. The entire shop had a concrete floor. ERIE RAILWAY SURVEY HAER (Page The machine shop sat right in line with Che car shop, and was slightly larger in size.
The building was 191 feet, 2 inches wide by 24 feet, 2 inches long, and was constructed in the standard 3-bay style, with the center section roof raised for a crane runway. The north wing housed the machine shop and tool room,, especially the lighter tools, while the boiler shop and blacksmith shop split the south wing between them. Three continuous pits ran through the erecting shop, in the center bay, with a line of heavy tools spaced along a partition separating those tracks from the south wing. The tool complement ranked with any shop in the country, with a mix of New England and Middle Atlantic tool-makers represented. But of greater import was the shop's use of electricity.
The turn of the century marked the beginning of widespread experimentation with electric motors as prime movers in machine shops, as noted above. The Dunmore shop was early enough to be interesting, but it still could not be called a pioneering installation. Perhaps because electricity remained a new factor, the company gave a great deal of thought to the layout of the tools within the shops, to the great benefit of the facility. Many of the small tools were group-driven from a single motor, with only the largest tools needing individual drive units.
Such an approach remained standard machine shop practice in almost all areas of industry until at least the Railway Shop Up To Date was urging the installation of a separate motor on every tool, regardless of size in but this step was rarely taken early in the century. The use of individually driven tools was still some years away in - Dunmore's installation reflected the common manner of introducing electricity into the machine shop. In the machine shop at Dunmore, the designer put the heaviest tools in the central bay where the 35- ton Shaw travelling crane could service them, an arrangement more railroad shops would use as time went on.
With a 70-foot span and a 5-ton auxiliary hoist available,, the 48-inch lathe; a 36-inch lathe; 30-inch lathe; 37-inch boring, mill; 78-inch driving wheel lathe; 42-inch steel-tire; a 48-inch boring mill; an 8-foot boring mill; and a 300-ton driving wheel press were far more easily used. Other buildings on the property included a roundhouse with at least 10 stalls; 2 store houses; a heavy stock bin; an oil house, and separate boiler and engine houses provided power to the shop. The power house used a 100-kilowatt engine turning at 250 rpm to generate electricity, with a smaller reserve 62-1/2-kilowatt engine. This equipment was small in size and capacity compared to generating apparatus ERIE RAILWAY SURVEY HAER (Page in shops on other railroads.
An Ingersall-Rand air compressor furnished 460 cubic feet of air per minute at 9.0 psi to the wide variety of air tools used in the shop. A foundry was the other main installation at Dunmore, boasting _a daily capacity of 8 tons. Although small, the shop had an automated shaker to sieve the sand. One observer commenced, some of the smoothest castings we have seen are made." Railway and Locomotive Engineering made an interesting comment about the shops.
"Up in the mountains of Eastern Pennsylvania there is a railroad repair shop that in point of completeness of equipment to readily handle and economically turn out the work usually assigned to the average railroad shop is conceded by those competent to pass on such matters as approaching close to the ideals of Best -modern practice." In nearly eyery respect, this shop represented the culmination of 35 years of shop development on the Erie. A number of features already mentioned bear further emphasis. The shops were arranged in line, and tools were thoughtfully placed for the best flow of work possible. The electric drive embodied the best ideas then in use. The three-bay erecting shop with. 35~ton crane emulated standard design.
More importantly, the crane way extended" beyond the shop into the yard, leaving ample provision for-expansion,of the shop. The crane had an ample capacity to lift individual components, This type of hoist was never intended to lift the whole locomotive off the wheels. But it did facilitate repairs. The company arranged the pits along the main axis of the shop, a practice evolved after the introduction of overhead cranes. This layout continued to gain favor over the older system of transfer table and transverse pits-. The Dunmore plan followed the lead of some of the country *s most progressive railroads in abandoning the transverse pit arrangement, as Railway- Shop Up To Date observed.
The design also included a 10xl4-foot drop table on the center pit that greatly eased wheel work, and became a piece of "standard equipment in century shops. At Dunmore, the drop taEXa was essential, because of the small overhead cranes-. The main reason Dunmore boasted so many modern features derived from the newness of the structures. Every other major engine erection and service facility was in a building at least 25 years old by- the time the Erie built the Dunmore shops. And unlike the Jersey City shops built 20 years later, Dunmore faced on spatial or geographic limitations, ERIE RAILWAY SURVEY HAER (Page /^) Clearly, Che Erie had learned much about shop design and Dunmore embodied all the key features, A.s Railway and Locomotive Engineering observed, "These shops ...
are a practical illustration of the theory of evolution, if such theory can be applied to things inanimate, being the result of progressive steps from the early inconvenient buildings and unsatisfactory methods of getting results, up to the fine new shops ox to-day, with the best labor - cheapening devices obtainable. Dunmore represented what the Erie might have done had money problems not forced the railroad to adapt its facilities to older structures with far less flexibility than the Dunmore plant. Dunmore also represented the Erie's best efforts- to combine car and locomotive repairs in one plant. Susquehanna and Meadville By and large left car repairs to the several specialized car shops, while Hornell had no car repair facilities.
But Dunmore had one major flaw it was not centrally located. Instead, it was situated at the end of single-line branch divisions that had the worst grades on the system. That fact doomed any hope of expanding the facility into the Erie's central shop. The shop had all the proper elements But this most essential one. By only 25 locomotives received daily service,[505] although the locomotive shop had only one stall fewer than Jersey City. Largely because of its location, Charles Denney removed locomotive repairs from the shop's duty roster when he reorganized the maintenance program in But the property was too valuable to be abandoned.
So, Dunmore became, along with Port Jervis, one of the two freight car repair shops on the system, an -ideal position for "Dunmore with its by now relatively light-weight cranes. The roundhouse, up to 24-stalls, had 6 retired in and a half dozen more in reflecting this sniff to car repairs. The car shops in employed 99 men who had repaired cars between August and July The facilities included the large erecting shop, a machine shop, a riveting and stripping yard, and a finishing yard. Overhead cranes served the last two, one on the old craneway built for the possible shop expansion that had never occurred. But in the company finally exercised that option and enclosed the outdoor runways.
By covering the craneways at either end of the old machine shop, a continuous building 620 feet long resulted. ] ERIE RAILWAY SURVEY HAER (Page /^) The shop also added a second car shop between the roundhouse and the old shop. The high point of the Dunmore plant came the following year when the Erie concentrated all heavy freight car repair work there. The shop was assigned the construction of numerous special cars, ranging- from cabooses in to 125-ton Heavy-duty depressed center flat cars and hopper cars in and In Modem Railroading observed the modern asserablyline layout used for construction, with a side track utilized to move materials into position.
General repairs could be made at a rate of nine hopper cars and seven box cars daily, because the flow of materials did not interrupt the repair work.. In the shop dealt with the majority of the cars painted and 583 repaired by the company. Unfortunately, that operation survived a very short time* In the summer of Hurricane Diane deluged the East Coast, and heavy floods damaged the shop severely. Other shops, notably Hornell, were submerged as well. Because of Dunmore's location, the company decided to rebuild the heavy car shop at a more central site. The site chosen was Meadville, and the shop opened there in was a model of efficiency, utilizing many of the tools from Dunmore.
While still planning that new facility, the Erie sold the old shops to the Pine Brook Iron Works in January The Erie did maintain some of the property for the diesel facilities installed in By the company began closing that operation, but not until did the company retire the last tracks in the roundhouse. ERIE RAILWAY SURVEY HAER (Page Chapter VIII. Minor Shous The gradual trend in railroad shop development toward large central erecting shops for heavy repairs culminated in large shops like Hornell. Yet: even railroads that moved faster in this direction than the Erie still faced the problem of keeping steam locomotives running on a day to day basis.
Round houses and engine houses were necessary for that purpose at frequent intervals, especially on a line that covered as much territory as the Erie. The steam locomotive was a demanding machine. Steam buffs today "can ponder the 'monkey motion' as the aggregation of links, levers,.bars and rods dance everywhere across the huge drivers in orderly fashion," to borrow the words of Ron Ziel. BuC while a steam engine in motion is spell-binding "...what action compares to the opposed motions of main rod and eccentric, or the combination lever chasing the crosshead back and forth along the cross- head guide?" all of these parts must be maintained in order for the engine to run. The story of the four main Erie shops does not - finish this tale of the company's maintenance system.
We have already discussed the railroad's earliest shops, Piermont and Dunkirk. Only their counterpart at Susquehanna lasted beyond These shops found themselves in the reverse of the situation which favored Hornell and Meadville. By both of the original facilities were on branch lines. The company's charter placed the main line from Piermont to Dunkirk, but Jersey City and Buffalo served as the main termini. The shops at Piermont were closed first. By the tools and work of the old shops with their fine architectural details had shifted to Jersey City. Then on August 20, after "falling into decay," the shops and old round house burned. The company tore down the walls and used the brick elsewhere. Dunkirk lasted about 15 years longer in the company's service and came to a happier end.
In as part of the same improvement effort that led to the Susquehanna shop, extensive repairs were made at the machine shop and a new blacksmith shop and building for wood planers were built. The New York, Lake Erie & Western management also expended large sums there during the late but in the Brooks locomotive works purchased the shops for Jersey City The shops that replaced Piermont on the eastern end of the line were located around Jersey City. The Erie had inherited three small facilities from the Paterson and Hudson Railroad in in Pater- son, Bergen City, and Jersey City. At first, Paterson served as the main facility, as shown in Table VIII.
jjut Jersey City gained more im- portance with the completion of the Long Dock complex and the Bergen ERIE RAILWAY SURVEY HAER (Page Table VIII Shops Location and Character Dimensions Material Date Built Bergen Engine House 69 x 172 Wood October, Machine Shop 40 x 101 Wood October, Blacksmith Shop 19 1/3 x 40 1/3 Wood July, Office 8 x 13 Wood July, Jersey City Store House & Blacksmith Shop 34 x 48 1/2 Wood April, Turning Table 44 feet diam. Wood April, Turning Table 45 feet diam.
Wood April, Paterson Engine House 29 x 121 Wood May, Blacksmith Shop 20 x 32 Wood May, Carpenter Shop 12 x 14 Wood May, Storeroom 16 1/3 x 61 Wood May, Blacksmith Shop 25 x 47 Wood May, Carpenter Shop ' 30 1/2 x 94 Wood July, Machine Shop 28 x 95 Brick May, Turning Table House 47 x 47 Brick May, Turntable 40 feet diam. Wood . May, Station Engine House 18 1/2 x 30 Brick Augus t, 18 50 Station Engine House 50 x 63 Brick August, Paint & Car Repair Shop 27 x 136 1/2 Wood July, Tunnel. With the increased volume of traffic into Jersey City, it became increasingly inconvenient to service engines and cars 15 miles away in Paterson. So in the Erie Railway, as part of its shop renewal program, erected a new blacksmith shop and a car shop, 70 feet by 200 feet, at Jersey City.
Further expansion in preceded the closing of the Piermont shops, as Jay Gould made perhaps his only constructive contributions to the property. A large brick machine shop was begun, until winter stopped the work. An extensive car shop also was included in the plans, intended for both passenger and freight car repairs, and the construc- tion of 20 coal cars per day. Gould labelled the facility, "one of the largest and best appointed shops in the country." Unfortunately, the building stood for only three years before a fire ripped through the structure. The description of the building provided by The Railroad Gazette in after the fire gave a good account. ERIE RAILWAY SURVEY HAER (Page "The building destroyed had been in use hardly chree years, and was of brick.
It consisted of a front building two scories high, with two wings or exten- sions in the rear o the main building. On the first story of Che main building were the heavy planers and some large lathes; Che second scory containing che lighcar lathes and other tools. The office and drawing room were also on this floor. One of the rear extensions was cwo stories in heighc, the first story being the erecting shop, or repair shop proper. This shop contained twenty-eight pits in two rows, a large traversing Cable being used Co convey che loco- motives to and from the pics. The carpenter and pattern shops were on the second floor of this build- ing. The other rear extension was of one story and was used as the blacksmich and boiler shop.
In the shop were twenty-four locomotives, all of which were more or less damaged. The tools were all damaged so touch as to be worthless, with the exception of the steam hammer and, perhaps, one or two of the large planers. The large wheel lathes were in a separate building, which was saved. All the books and papers were destroyed, also all the drawings. This last was a serious loss." The Jersey City shop bore an amazing resemblance to the car shop built by the A. & G'. W. in Meadvilie about 'The U-shape was a common arrangement for this type of structure. The combination of locomotive and car repair work in the same structure, and the use of a cransfer table represenced other evidence of good shop practice, style.
The manner in which the railroad coped with the loss of this new facility demonstrated how great a factor finances played in deter- mining railroad construction. Initially, the company decided to re- build using wooden structures. But the Jersey City Fire Commissioners stopped chis plan. So the company, prodded by the space limitations at Jersey City, decided Co move the shops up the line. The company reopened the Paterson shops and in apparently sold some of the property adjacent to the undamaged Jersey City machine shop. But the Jersey City site was too convenient and important to ignore for long. Even with a large, new, brick round house with 29 stalls built at Bergen City in the company needed an in- town shop.
That 320-foot round house had cost over but serviced primarily che freight engines using the new yard at the west end of the Bergen Tunnel. By a report on the terminal at Jersey City showed car and repair shops, with a turntable and cwo machine shops. ERIE RAILWAY SURVEY HAER (Page The big problem at Jersey Cicy was Che lack of real estate. With a major freight yard required to hold the cars moving by car float in and out of New York City, land was at a premium. The company re- sponded by moving the shops within the yard to best utilize the available space. In the shop was located on the north side of the property. But during the company shifted the facility to the south end.
The entire Jersey City terminal was undergoing an improvement program of major proportions at the turn of the century to eliminate several bottlenecks. The Penhom Creek Railroad served as the main vehicle for the changes, and the Bergen Cut came as the last step in that program. Apart from track relocation, im- provement of the shops and coaling facilities represented one of the more important phases of the work. The company began construction of a new coal and ash plant in as one of the first features of the Jersey City Terminal Improve- ments. Both structures stood on the south side of the yards approach- ing the terminal, where the repair shops had been relocated. Link Belt Engineering Company designed both plants along the most modern lines.
The coal plant moved coal from a track hopper by bucket conveyor into the house, where a second conveyor distributed it to the 14 individual pockets. Each pocket consisted of a double V-shaped bin, with a chute off each V. Locomotives could load on either side of the building, with a mix, if necessary, of anthracite and bituminous coal. As the photograph showed, the coal chute was controlled by a hand wheel, while a lever opened or shut the gate controlling the flow of coal. (See photograph A 36-horsepower Otto #8 gas engine operated the conveyors, with a capacity of 90 tons per hour. The ash plant operated in a similar automatic fashion, handling a persistently stubborn problem. Two tracks crossed each of the two track hoppers 25 feet long into which locomotives dumped their ashes.
By means of inclined screw conveyors, the pits emptied into a central tunnel equipped with an endless bucket conveyor that ran up to the top of the ash house. The buckets emptied into a single steel hopper that held the clinkers until the -hopper could be emptied through the four chutes over two tracks. The hopper could hold the ashes of 150 locomotives, but usual procedure called fcr emptying it daily. A single, 19-horsepower gas engine drove the conveyors. Frederick Underwood's administration continued the terminal im- provements, a major feature of which was a new engine house on the south side of the Jersey City lot. The main building, 241 feet by 240 feet, had a 75-foot transfer table off to one side connecting it with the round house built nearby.
The engine house could hold 29 locomotives that entered over a 65-foot turntable powered by a six horsepower Fairbanks-Morse gasoline engine. The company called the new plant the South Side Shops. ERIE RAILWAY SURVEY HAER (Page /- ?) With the new buildings and other improvements completed by Jersey City's terminal seemed complete, but World War I forced a re- evaluation of the repair needs in the terminal. The United States Railroad Administration, which operated the railroads during the war, set abouc enlarging the facilities at Jersey City. Sot only did the USRA rebuild the South Side round house, they also reopened the old North Side facility.
Apparently that old machine shop was already in use as a locomotive shed, but an explosion destroyed it on March 26, The USRA rebuilt the structure, and added three additional shop buildings as well. The site, although compact, contained all necessary features for engine maintenance in its U-shaped cluster of buildings. The machine shop, 200 by 63 feet at the north, and 77 feet 10 inches wide at the 3outh, was brick, with a clerestory monitor that formed the base of the U. The blacksmith and boiler shops, 332 by 60 feet 4 inches, formed the north leg of the shops. An engine pit 98 1/2 feet long ran into the building, with a truck, pit extending off it. The erecting shop occupied the south leg of the U.
This last shop, 319 by 52 1/2 feet, was brick, like all the other buildings, with the same type of clere- story monitor. A transfer table provided access to this shop with its 13 bays. Three drop pits one extending over three tracks provided for wheel work. A craneway within the shop completed the shop's tool complement. Between the legs of the U was a power house 88 by 37 feet, and a tank shop 75 by 40 feet. The latter building had wooden roof trusses, the- only shop on the site so constructed. A carpenter shop stood at the far end of the erecting shop. The fact that the Erie had to have two redundant sets of shop buildings at Jersey City indicated the severe problem the company had with space at the terminal.
Evi- dently two small sets of buildings occupied less ground than a single large shop would have. As it turned out, having a second shop at Jersey City proved a fortunate occurrence, as the South Side round house burned on September 11, The company began immediately to rebuild the brick structure on October 28, but not until November 3, did the con- tractors finish the new shop. F, D. Brown Co. redid the foundations, which consisted of 308 piles driven by a double-acting steam hammer. [529a] The Austin Company constructed the actual building, with 23 stalls and an 80-foot turntable. The structure was rectangular, contrary to the design of every other round house on the property, in order to occupy as little land as possible. Thus, some stalls were shorter than others.
The building was 493 feet long, 109 feet 7 inches wide on the east side, and 195 feet 2 inches on the west end. Austin used brick and concrete to rebuild the round house, with a timber roof and wooden posts. The pilastered brick walls fronted directly on Pavonia Avenue, supporting a monitor roof with slag surface, for light ERIE RAILWAY SURVEY HA R (Page / &) and ventilation. The company also installed alternate Johns-Manvilie and Dickinson smoke jacks for a comparative test co see which style performed better. Lack of space for expansion proved to be the biggest design con- straint facing the builders. The result was a novel building for the Erie.
The Railway Age observed, "Because of Che restriction as to location and space and the necessity of non-interference with the motive power movements, the design and con- struction are both novel and interesting- The new building is a combination of a radial type 105-foot engine house and a rectangular building," The design chosen also enabled the company to reuse a number of the old shop facilities, even during the construction process. Specifically, this meant continued use of the turntable in front, the transfer table on the west end, and the general interior layout of pits. The repair shop facing the transfer table housed the drop pits. The table in turn provided access to the Long Shop, the engine house.
As the fire had not damaged the engine house, Che construction work, had to proceed in such a manner that access to the Long Shop and transfer table were not blocked. Also, once the debris had been cleared, the company had to use the tracks in the shop for locomotive storage. The Railway A.ge noted, "It became imperative that the utmost speed be developed in erecting another structure with a minimum of interference to engine movements and motive power repair requirements since,render the circumstances, the old tracks had to be continued in use.
The result was that construction and design proceeded almost simultaneously and both were largely prescribed by the existing conditions, predominant among which was the location of the turntable." That combination of restraints forced the contractor to rebuild the house in sections. The builders could block only three stalls at a time. All material needed each day came in on cars early in the day, to cause a minimum of congestion. A major effort at coordination between the operating and construction departments characterized the work. The need for speed had to be balanced by the need to keep the Long Shop open. ERIE RAILWAY SURVEY HAER (Page / / ) The company was, however, able Co make some changes in Che facilities.
The fire had extensively damaged the old timber engine pita, so che company built modern concrete pits as replacements. The eight-pit repair bay stayed in the same location, but gained four new concrete pits. This section also received a new super-structure of steel beams to carry a 15-ton overhead crane, The crane greatly improved the repair capabilities of the shop, A 200-ton Whiting' hoist on one of the drop pits enabled the whole body of a locomotive to be lifted off the wheels, again increasing the shop's capabilities. Along with six 16-foot radius post cranes* the rebuilt shop boasted modern lifting apparatus that amounted to a drastic re- vitalization. The company tucked the small but well equipped machine shop into the back, corner of the building on the west end.
This shop housed all the machine tools, the Ingersoll-Rand air compressor, and heating equipment and blowers. Two welding machines also stood in this area, but the outlets were in each pit. Four men could tap into the cables and work simultaneously. The drive system for the machine tools showed the advances that electrical technology had made. The company was able to buy power from operational lines rather than provide electricity from an internal plant. A single 50 horsepower, 220-volt, two-phase motor drove almost all the tools via a line shaft, although the larger machines had individuaX motors. The kreolite wood block floor pro- vided the company with the flexibility to rearrange the shop when necessary, while giving a long-lasting surface.
By the time the contractors finsihed in late the facility stood as a good example of the railroad's adaptation to a difficult situation. The company had to be pleased that the confusion of con- struction had ended, for Jersey City was providing service for 194 locomotives daily in. only 40 round house stalls and 12 erecting pits. To ease congestion, the company centered running repairs at the South Side round house, with, heavy repairs made at the North Side shops. To this end, the Long Shop was retired on May 8, although the transfer table and 11 of the pits formerly in the house remained in use. To compensate for the loss of the Long Shop the company erected a 34 by 19 foot lathe house on the North Side of the yard.
In this manner the Jersey City shops operated throughout the with the brief leasing to outside contractors in The improvement program led to major adjustments. The North Side shops came in for the greatest alteration, as the folly of operating a 13-stall erecting shop proved too costly, especially ERIE RAILWAY SURVEY HAER (Page j Z) with the superb facilities available at Hornell. The company rearranged the machine and erecting shops by installing new floors and new scale pits, retiring the transfer cable and redoing the roofs, Further, the wheel lathe shop was retired August 30 that year, fol- lowed the next year by the turntable, a track scale, and ash pits.
The economic problems led to the complete closure of the North Side shop by when the company remodeled the shops and then leased the machine, boiler, and erecting shops to an outside firm. The South Side shop became the only operating repair facility in Jersey City after But the only improvements after consisted of rebuilding some of the old timber pits formerly in the Long Shop with concrete. This work continued slowly through But with the Depression, there were few locomotives to keep the shops busy. The company did put a Motor Car Repair Shop in the old black- smith shop, on the North Side, and by had taken back part of the erecting shop there for a maintenance of way shop. However, not until did the shops come in for any type of significant additions.
Ironically, the diesel locomotive was the agent responsible for some of the new construction. In line with the continuing dieselization of the line, Jersey City was allotted facilities for service and minor repair of the new locomotives. But the larger effort came as the line neared the complete changeover to diesel-electrics in As was usually the case, the old round house on the South Side proved unsuitable for diesel service, primarily because of the lack of sufficient crane capacity. So the company put up a modern structure on the site of the coal and ash plant. A more ironic location could not have been found. Under its roof, this new shop housed a repair track and a truck repair track, with a Whiting drop table and 30-ton Whiting bridge crane for lifting.
Outside, a service track with a high platform completed the facility. The building was a steel frame with concrete block and brick walls. High service bays were modeled on these at the Marion Shop built in Power ventilators dealt with exhaust fumes, while a large window area provided plentiful lighting. This shop exemplified the new diesel service buildings built by American railroads, as pioneered on the Erie. The primary tasks which the company equipped the shops to deal with included the cleaning and repair of engine parts, air brakes, cylinders and cylinder heads; the grinding of valves; overhaul of trucks, including wheel changes; and repairs to steam generators and electrical equipment.
Apart from the drop table and large crane, the tool complement included the standard machine tools, a Universal valve and tool grinder, two one-ton travelling cranes in adjacent parts repair rooms, a valve degreaser, an oil reclamation room, and ERIE RAILWAY SURVEY HAER (Page J 3) an Ajadip cleaning tank.. Along with two 6,800-gallon fuel tanks , a sand house served the running needs of Che locomotives. The sand house was another modern, automated operation. Electric eyes monitor- ing the sand level in the shoppers saw to it that the storage bins remained full. Similarly controlled vibrating belts and a spiral elevator carried sand to the drying units. Overall, this facility' possessed all the elements of a modern diesel repair shop.
By the company had revitalized the North Side shop as.well, by making it an intermediate conditioning station for passenger car service. Susquehanna still performed all heavy work and modernization. But a new inspection pit with room for seven cars enabled the shop to check and repair air conditioning and running gear. The economies of a central shop had to be balanced against the ease and convenience of making minor repairs right at the terminal. Also* a Whiting car washer kept the equipment clean on the exterior. Apparently, the old blacksmith shop housed the entire operation until when the company added new facilities. A 40 foot steel-panelled building provided space for the dope room, air brake shop, battery and electrical shops, and welding room.
A jib crane in the air brake room and a monorail crane overall provided lifting service. A larger 40 by 180 foot building of similar con- struction served for the machine shop, welding and painting rooms, a storeroom, lockers, and office space. The facilities were com- pleted between-February 1, and May 31, replacing Susque- hanna as the central car repair facility. The diesel shop and new car repair plant completely replaced the older shops on either side of the yards. In the company did install some diesel service apparatus in the old South Side round house, mainly several service platforms- This expediency proved to be less expensive than adding a new addition to the diesel shop as originally planned.
As a diesel shop, the round house machine shop was reduced to half its original size, and a. locker room replaced stalls one through eight. Shortly, however, the round house went the way of the old North Side shops. With the closure of the Jersey City station to commuter traffic in and its subsequent abandonment on December 31, neither shop had much purpose. The old Delaware, tackawanna & Western facilities adjacent Che Hoboken Terminal were more conveniently situated. In the diesel shop presented the only existent structure on the once busy Jersey City lot. The older shop sites both appeared on the U. 5. G, S, Jersey City quadrant, but shortly thereafter, the ERIE RAILWAY SURVEY HAER (Page J5^ Erie-Lackawanna demolished both sets of structures.
Between the time the company closed the two shops and their demolition, the buildings had served as storage space. But by even this was no longer necessary, and the Erie-Lackawanna had the old buildings removed. In the new diesel shop still stood, for Conraii had taken pos- session of it. But it could not be used, since no tracks entered the building. The later history' of the Jersey City repair shops served as an apt illustration of the fate of most older repair buildings on American railroads. Even in cases where the location demanded the continuance of service, old structures often could not be converted to serve the new units. The Erie more than most railroads tried to modify the steam facilities, but Jersey City was one place where the management could not adopt the old to the new.
Likewise, the fate of the car shop symbolized the demise of passenger service in this country. Even new car repair shops had no place on railroads with a dying passenger business. Buffalo Shons The western terminus of the Erie was never represented by just one city, as Jersey City did on the east. While Buffalo came to overshadow Dunkirk, the demise of the old main line occurred slowly. Also, the A.&G.W. from Salamanca, southwest, grew to become even more important than Buffalo by the end of the century. But the city on Lake Erie remained a major center of traffic, thanks to lake traffic. The railroad owned the Buffalo-based Union Steam Ship line operating across Lake Erie. So Buffalo remained an important terminal.
Like Jersey City, the city required shops since it stood at the end of a busy division. And like its eastern counterpart, Buffalo's earliest repair center was not built by the Erie, but by a line the company later purchased. In the New York h Erie listed a minor repair shop for the city. The parallel between the two cities on opposite ends of the main line continued, with both receiving new car shops in and under the Erie Railway's shop improvement program. Also, Buffalo's original brick warehouse had a large wing built on to it. But as Jay Gould's report for observed, car repairs became the most important feature of the Buffalo shops, for a "large and well appointed" shop was erected.
Like all the Erie's shops, the next time the Buffalo shops be- came the target of the company's attention was under the New York, Lake Erie & Western's reconstruction effort. Brick and iron shops went up at East Buffalo between and including: ERIE RAILWAY SURVEY HAER (Page Machine Shop, 64 by 254 feat Blacksmith Shop, 70 by 200 feet Store house, 40 by 90 feet Oil and waster house, 30 by 50 feet Boiler house, 25 by 45 feet Engine house, holds 41 engines These structures replaced a smaller engine house and machine shop that the company converted into a freight house. The round house and new machine shop opened lace in but construction was not wrapped up until with the installation of the last tools. T ie ^ Report noted that this complex was similar to the new Hornell shops.
At the same time, the Buffalo Car Shops received an upgrading. This was about the last attention the car shops were to have. By The Railroad Gazette commented that the shops were "very old," but were still the largest on the Erie, for both coaches and freight cars. One key feature of the operation at that time was the exten- sive use of oxy-acetylene torches to facilitate steel car repairs. The journal observed, "As far as we have been able to find, this is- the first place where oxy-acetylene apparatus has been used for steel car repairs, if indeed it is not the only place where it is used for this purpose at the present time." The Erie in this shop again demonstrated its penchant for adopt- ing new technical innovations.
The road could not always afford the largest civil engineering or structural improvements, but many mechanical inventions were more quickly adopted. Many processes were automated as soon as possible. Perhaps this effort at mechanization represented the management's attempt to compensate for its inability to stay up to date in other areas. Thus, the Buffalo shops also con- tained automatic hoists for moving lumber and car wheels off railroad cars, spray paint apparatus, and spring testing equipment. Buffalo, unfortunately, was not one of the shops renovated during the Underwood reconstruction program. Instead, isolated items that were in dire straits were singled out for work.
In this manner, the company expanded the heating system in the round house at East Buffalo in and two years later put on a new roof while replacing one fourth of the support columns. The most interesting feature of the work was the installation of a new coaling station in The design of this facility was a wholly original idea9 representing a creative approach to a dif- ficult problem. Like many railroads, the Erie had engine service plants in locations that could not be expanded to provide needed ERIE RAILWAY SURVEY HAER (Page /5 ) storage space for Che greater quantities of coal needed. Often, the space available could not be used for that purpose because the Land was located far from the main tracks.
The standard coal plant at this time consisted of trestle with pockets holding L,00O tons. To keep Che trestles filled required 25 cars daily. During wartime, this number of cars proved to be a severe drain on the company. In the need for a steady flow of cars from mine to terminal had .caused serious congestion with resulting delays. The biggest difficulty was finding adequate space to store all the cars, since the coaling plant could hold approximately tons. An equally difficult situation arose from the sheer number of coal cars needed by the Erie for internal supply. The company could have conceivably found itself without an adequate number of cars for its paying customers' freight. So in the railroad attempted to remedy the problem.
The Railway Age announced, "The Erie is now engaged in an extensive program of reconstruction of engine coaling facilities at various terminals along its lines. These pro- jects are a part of the general improvements under- taken this year to avoid the transportation diffi- culties experienced last winter to which inadequate facilities for coaling engines contributed to a great, extent." The Buffalo portion of this program called for a storage area- away from the actual coaling tower to solve the supply problem. Cars dumped into a track hopper located on a downhill slope so that the cars rolled away from the hopper without need of an engine for power. A conveyor emptied the hopper and piled the coal into two stacks.
A conventional coal stacker ran on an aisle between the piles, and could either stack the coal, or feed another conveyor system that supplied the engine coaling plant directly. A reclaimer with a movable arm knocked coal onto a conveyor when the company wished to draw coal out of the stock- piles to serve the engine plant. The International Conveyor Corporation built the plant, which utilized the Stuart system of storage. All electric, the plant could stock 300 to 400 tons of coal per hour, and reclaim 250 to 300 tons. All manual labor was eliminated from the process. More importantly, the plant could stockpile coal in the summer to eliminate winter congestion.
This plant epitomized the automation of labor-intensive processes that had presented potential bottlenecks to the smooth operation of the railroad. Buffalo needed an assured fuel supply, for it was servicing 51 locomotives daily in the third highest total on the system. ERIE RAILWAY SURVEY HAER (Page The car shops also remained active. But Che company made little effort Co overhaul the center. A 2,600-ton wet sand station by Fairbanks-Morse went in during using a skip hoist to carry sand from a crack hopper into che building. A 20-foot extension had to be put onto the round house in 19 35, along with a new 100-foot turntable from American Bridge. Only the most essential repairs qualified during this time, and repairs necessary to handle the longer locomotives were about all that mattered..
The reason was very simple with the beginnings of the establishment of a central shop system, Hornell and Susquehanna assumed most of che duties of the cwo shops in Buffalo. The car shop closed in and by the blacksmith shop at East Buffalo had vanished from company maps. The company continued to require a facility at Buffalo, but for running repairs only. Then with the onslaught of the diesel, the whole framework shifted again. In the company began altering truck pits and building platforms for diesel service. But the site chosen was in Buffalo, noc Ease Buffalo, and by only the coaling station remained at the latter site. The demise of the old East Buffalo round house was a classic example of the impact of the new locomotive upon older facilities built for power.
The company made the point clear in its report. New "...facilities provide for more efficient servicing and maintenance of diesel locomotives and made it possible to tear down old wooden structures and round houses which were costly to maintain and not adaptable to diesel operation." Thus the round house and coaling station both closed in as diesels completely supplanted the steam locomotives on the Buffalo Division. The shop activity that remained consisted of minor diesel service and repairs after the company erected a small facility for this pur- pose in the early Yet the older buildings at East Buffalo lingered on, reminders of an age of railroading long since gone.
The round house was demolished by the Erie-Lackawanna in The concrete coal tower, a more formidable structure, still stood in Port Jervis Another of the other early repair facilities that grew with the railroad was Port Jervis. Since the Erie terminated in Port Jervis in a repair facility had to be established. This shop served as one of the most important shops until Susquehanna assumed many of its duties in the But like Susquehanna, Port Jervis was at the foot of a major grade one in each direction that Cook a toll on the steam locomotives. A provision for running repairs is still nec- essary in this location. The location of the shop again accounted for its longevity. ERIE RAILWAY SURVEY HAER (Page /.
<?) By the company had recognized that adequate structures to shelter the engines were "imperatively needed," as had been true at Hornellsville, The company thus erected a 30-stall round house 65 feet deep. This structure was one of the largest engine houses on the Erie. With the engine house were the usual structures housing , machine tools and other repair equipment, as shown in Table IX.
Table IX Port Jervis Shops, Building Dimensions Material Date of Construction Tank House 18 x 18 Wood September, Car Repair Shop 20 x 54 Wood May, Tool House 18 x 20 Wood October, Car Repairs 22 x 38 Wood August, Machine Shop 40 x 157 Wood August, Addition to Station Engine House 37 1/2 x 28 Wood August, Blacksmith Shop 18 x 25 Wood August, Circular Engine House 30 stalls Wood September, Carpenter Shop 22 x 25 Wood August, Sand House 14 x 30 Wood January, Waste Washing House - 34 x 50 Wood August, Car Repair Shop 30 x 150 Wood September, It becomes apparent from the list that Port Jervis had become a major car repair center.
This newest shop had to be the one referred to in the Report; "A considerable addition has been made to the Car Repair Shop at Port Jervis, and a Stationary Engine, with saws, planing machine, bolt cutter, and mortising machine erected therein." With car and locomotive repairs, Port Jervis was a busy place for the Erie, although it still ranked as a minor shop. One of the reasons for the shop's importance lay in the milk trade developed along the railroad, supplying New York City. In the days before refrigeration, Port Jervis was the furthest point from which milk could reach the City without spoiling. So this traffic, which grew in importance, began at Port Jervis.
The shop had its share of money allocated to it under the Erie Railway's building program of in the form of a large brick engine house. The company finished this structure in at a cost of ERIE RAILWAY SURVEY HAER (Page /&) almost The old wooden house was also repaired. With the 40-engine capacity of the new house, Port Jervi3 boasted room for 70 engines, more Chan any other location on the road. By the the shop seemed to have reached its peak.. An Beer's Atlas shows the shops had not changed since but they dominated the town from their position between the Delaware and Hudson Canal and the Delaware River. With an announcement in The Rail- road Gazette in Port Jervis seemed on the verge of becoming the railroad's largest shop complex.
The Port Jervis (New York) Gazette says, "Plans have been made for new shops in Port Jervis, which were drawn last summer, we are told, with the intention of the speedy erection of the following buildings on. the unoccupied ground known as the Germantown flats: Three new round houses with 52 stalls each; machine shop 104 by 600 feet; car shop 80 by 60 feet, with a transfer table running the entire length between the latter two shops; copper and boiler shop 80 by store house 60 by blacksmith shop 80 by oil and waste house 40 by 60; wood- working and machine shop 70 by paint shop 70 by 200 feet. On the north side of the track, about where the car-repair shops now stand, the coal chutes are to be placed.
The grounds now occupied by the shops, round houses, and other buildings, will be cleared and used for tracks and switches." Unfortunately, the dreams of grandeur never materialized as the Erie Railway defaulted the next year. Instead, the shops were to go without a significant addition until the next century, although Port Jervis remained an important part of the maintenance system. As at Buffalo, the old buildings had to suffice. By Jersey City had transferred all but the most indispensable repairs to Port Jervis, no doubt the result of the Jersey City fire.
Thecompany was still hoping to move onto the land across the tracks from the older shops, and the report for the year noted, "The shops and other buildings at this point are old and inconvenient, but may serve their purpose until suitable shops can be erected on other grounds now owned by the company." As a later Beer's Atlas showed, the old shops served a longer time than even the Erie might have expected. Except for a new coaling station modeled on the one installed at Hornellsville a year earlier, the Port Jervis shops received no notice ERIE RAILWAY SURVEY HAER NY-I24 (Page /SO') in Che company's reports after Company drawings indicate an effort to rebuild the engine house in October, buy by the turn of the century, Port Jervis was most important to che railroad as a car shop.
UnderwoodTs reconstruction effort had an impact on the shops and reversed their general decline. A plan showed only a ten-stall section of the round house existing and the car shop and machine, blacksmith, and boiler shops remained in the same structures they occupied thirty hears earlier. But additions were under way. Another coaling station with an ash handling plant had gone up during along with an air brake plant for freight cars. The blacksmith shop moved into a new building 95 feet long, while the old boiler shop was torn down in The same year, six new pits were added to the round house.
Despite this effort at renovation, the shops remained a minor facility until the In a frog shop for the maintenance of way department had been added, and a new 115-foot turntable and a new complement of tools marked the impact of the 19 28 improvement effort on Port Jervis. Not until Charles Denney reorganized the whole repair program in did major changes take place. Com- pared to the changes at Hornell, the renovation seemed small. But for Port Jervis, the renewal of the buildings brought new life. At long last, the company expanded its car shops onto the lot south of the tracks, building a steel yard, stripping tracks, wheel shop and auxiliary car shop for steel freight cars. These were small facilities but they enabled the shop to perform its functions well.
Also, the car shop north of the tracks, 75 feet by 565 feet, was redone at this time. A paint shed, paint shop, dope room, oil house, and tool room with welder and journal machine rounded out the list of structures at Port Jervis. The revitalization of the car shops lasted about 15 years, until the company continued its efforts to consolidate and-centralize shop repairs. In the company terminated heavy repairs at Port Jervis so that all freight car repair work could be shifted to Dunmore. Only the intermediate conditioning of box cars went on at the site by in the older shop north of the tracks. In the Erie closed chat facility. Port Jervis remained on the company's roster, though, partly as a minor diesel service center, utilizing the old frame round house.
But more important to the railroad was the continued operation of a facility whose founding at Port Jervis had gone unremarked in At that time, the Van Sweringen management had returned to the ERIE RAILWAY SURVEY HAER (Page / /) idea of a centralized bridge shop for che system. Not since Owego's bridge shop closed had the Erie maintained such an operation. The advantages, however, remained the same it was less expensive tor the railroad to repair and erect its own bridges than to let contracts. The buildings were simple steel frame sheds with corrugated sheet siding. The bridge renewal program of proved the value of the shop, and also led to its expansion. Bridge reconstruction work con- tinued all through the with the Port Jervis shop in che middle of things.
As Railway Engineering and Maintenance observed, "In ad- dition to the working of steel required in the bridge-reinforcing program, the shop continued to turn out fabricated members and parts for miscellaneous regular and emergency bridge repairs." The materials shortages of World War II tested the bridge shop's ability. To counter the lack, of steel, the facility cannibalized old bridges on abandoned branch lines for needed structural members. When one considered the magnitude of the task of bridge maintenance on a railroad the sise of the Erie, the facilities at Port Jervis seemed woefully inadequate three small buildings and a set of racks to hold the steel.
The large tools in consisted of a punch to make rivet holes, an eXectrical press for shearing steel, an Airco Radiograph for cutting steel to patterns, and a 60-ton locomotive crane. Grinders, jacks, air tools, and forges rounded out the tool complement. As inadequate as this layout may seem when compared to the solid brick car shops, it continues to fabricate steel for bridge repairs. Tucked in a corner of the back lot (south of the tracks, the diesel fueling tower and the half-dozen stalls of the frame engine house still standing) , these are the only buildings left at the once bustling Port Jervis shop site. The survival of the bridge plant demon- strates , however, the continued validity of the effort to centralize shop functions.
Salamanca tn Salamanca had only a 105-foot turntable to show that it used to be a major repair facility for the Erie. The initial shops had gone in along with the Susquehanna shops in In fact, Sala- manca was the second most important improvement undertaken at that time. The foundation was laid during an 11-stall engine house, a machine shop, 68 feet by 200 feet, a 60 foot by 100 foot blacksmith shop, a tank house, and freight house were completed in No doubt Sala- manca received such extravagant attention because of the newly-completed Atlantic and Great Western Railroad's connection with the Erie at that point. ERIE RAILWAY SURVEY HAER (Page By both the NYPANO, as the Atlantic and Great Western was then known, and the Erie had separate shops in Salamanca.
The Erie had the round house, machine shop, coal track., tank, and freight facilities, while the SYPANO maintained its own tan-stail engine house, blacksmith and repair shops, a coal platform, ice house, and depot. But Salamanca never served as more than a running repairs center, especially after the Erie bought the NYPANO and consolidated the two shops, Salamanca was a heavily travailed intersection, though, and provided service for the freight traffic that developed between the Mid-west and New York. The Handbook of American Railroad Repair Facilities noted chat the 16-stal4 round house there served some 60 locomotives each day during the The Salamanca shop provided a graphic example of the headaches that the railroad experienced in keeping up with the growing motive power.
A 65-foot turntable installed in had to be replaced shortly thereafter with an 80 foot-diameter table. But that unit served only until when the Erie shifted the S-class Berk- shires to the Allegany Division. A 105-foot turntable was required to handle these monsters, as Photograph 196 illustrated. The huge steam locomotives filled the whole platform. The actual process of erecting the table was rather interesting. The key constraint was to keep che round house out of service for as short a time as possible. Beginning in October, the company took out the old table, rebuilt the circle wall and installed the new unit in only three days. The trickiest part of the work was placing the table on the pivot. The longer table had originally been installed at Meadville by the American Bridge Company.
At Port Jervis the bridge shop crews lengthened the table and then installed it. Using the Department of Structures steam crane from Port Jervis and the Salamanca wrecking crane, the table was successfully placed. The main difficulty had been in controlling two cranes with different rates of lift. With the new table in place, Salamanca was equipped to handle the longer locomotives. The shop continued to perform only running repairs, but the tool complement, although minimal, was modern. A lathe, rod press, and planer were the only large tools. Special equipment included a concrete jacking pad, a 15-foot gantry crane, a one-ton crane, and a Whiting Transfer Table between two pits.
The shop managed to make the transition to diesel power, as the company needed a diesel fueling and minor service repair center there. In the company demolished the old frame round house, leav- ing; only the turntable and fueling tower. Both were being used by Conrail in ERIE RAILWAY SURVEY HAER (Page / &) Chanter IX. Erie SCations Erie Railroad stations present little-opportunity for flights'of extravagantly descriptive prose. Almost invariably, the company erected small stations reflecting the nature of the countryside through which the line traveled. The few larger towns boasted stations of more sub- stantial character, but only one large metropolitan station existed in the old Erie states of New York, New Jersey, and Pennsylvania.
These structures thus represented the most typical designs used by railroads for freight and passenger stations, rather than the occasional grandiose palaces which have usually received the attention of writers on the subject. The station buildings of the Erie offered other features that make them worthy of notice. The railroad's financial problems meant the company utilized its holdings to the fullest extent. The extant struc- tures span the entire life of the railroad, although most date to the turn of the century. One can, therefore, compare the changing styles utilized by station designers over time. The differing functions, as well as architectural treatments, that shifted as stations evolved can be found in various examples on the Erie.
By and large, the passenger and freight terminals of the railroad emerge as typical examples of station design. American Railroad Stations in General Carroll Meeks has observed that like so many other structures and practices on American railroads, the station as a form did not emerge full blown with the appearance of the railroad. Instead, the forms changed as the railroads learned just what was required in the architec- ture and design of a station. The earliest stations were extremely simple, and those on the Erie resembled those structures erected by other early railroad companies. The Erie began operations in with 14 passenger stations and refreshment saloons, 29 freight houses, and 46 combined buildings.
But as Harper's Erie Railroad Guide Book ex- plained, most were small shops, "little more than a platform for idlers and milk kettles.'1 Just as in other facets of American railroad- ing, station architecture quickly developed a peculiarly American style. Many railroads "feebly imitated European stations, vainly struggling to equal them. It was not until the when enough large cities existed relatively close enough to one another...that comparable stations began to rise in the United States." The reasons- for the new American ERIE RAILWAY SURVEY HAER (Page /^) style were, as usual, matters of economics and time.
Meeks described English practice in this way: "Just as English engineers dominated the railroad field for the first half-century of railroading, so the English stations established patterns for the whole world. In that compact country with abundant capital, pioneer lines were lavishly built. The road- beds were straight, level, and permanent; tunnels, bridges, and viaducts were constructed solidly of good masonry. Similar pains were taken over the terminal stations." American stations, on the other hand, resembled their bridges and roadbeds. They--were often rough and ready structures built with wood in a very short time. "An architect was rarely employed. Generally the company engineer provided the plans, which were then used repeat- edly, sometimes for forty years without change.
Such shelter as was provided over the platform came from the overhanging eaves extending much farther than usual; these eaves became an identifying character- istic of stations." Such a description certainly characterized the majority of American railroad descriptions. J. L. Ringwalt, in the Development of Transportation Systems in the United States, pub- lished in found little reason to change that analysis, calling most"stations "rough sheds." By and large, there was little architectural treatment in these early structures, except for some ornamental detailing on the stations put up in larger towns. After the Civil War, however, a greater concern for style began to appear in the larger towns.
Attention to architec- tural detail spread slowly to include stations further and further afield from the main eastern metropolises. This was an age of great expansion on the railroads, and an age of impressive buildings reflect- ing the booming business age. It was an age when appearances mattered, and the railroads felt this same pressure to produce structures be- speaking success. One impact of this pressure was Che adoption of architectural styles and features then in vogue for railroad structures. One of the main elements borrowed was the tower. As Meeks noted, towers assumed a significant role in European station design during the and spread to this country the fol- lowing decade. After the railroads built few stations without towers over the next 30 years.
Meeks observed how strong a feature of station design this element came to be, "In the English-speaking world the virile tower rose from every building of importance, including stations, in response to contemporary fashion; at this same time ERIE RAILWAY SURVEY HAER (Page man was adorning his person with a towering beaver hat. Later when cowers went out of fashion and the dome was revived, he made a parallel substitution of the lower, more spherical bowler for the top hat; the latter he reserved for special occasions, just as towers were'3till resorted to from time to time.
Now- adays, to the man in the street an elderly building with a tower is automatically Victorian, but in the late America was second only to England in her enthusiasm for them." The tower was not the only element of Victorian style copies by station designers in the United States, although towers remained the most easily identifiable. Marcus Whiffen, in American Architecture Since described the prevailing architecture of the late eight- eenth century in this way. "The aphitet High Victorian may be used in a general way of all the architecture of the and as well as, more narrowly, of the Gothic and Italianate of these decades. Height in the literal sense tall proportions -was one.
quality common to most buildings; others were variety of color and surface textures and a calculated restlessness. Forms from different sources in the past were often brought together in a single design." All of these features could be found in American stations at this time, especially when the railroads began commissioning stations from architects later in the century. The key determinant of a station's appearance remained its location. All railroads developed a hierarchy of stations, determined by the population of the surrounding area. The lowest rank be- longed to flag stations, variously called second, third, or fourth stations by the railroads, that served as minor passenger depots.
Often this type of structure stood on small branches with few trains, where passengers flagged down the train, hence the name. The name flag depot applied to buildings ranging from plain, open platforms to structures considered local passenger stations. As a result, a wide variety of materials and a number of designs were employed in building these minor depots. Walter C. Berg, in his volume on American railroad structures, observed that in the East flag depots were often more lavishly done than those in the North or West. "In the majority of cases, frame structures are used, sheathed on the outside with plain boards or ornamental siding and shingles, and roofed with shingles, tin, or slate.
For a substantial building, however, a brick structure with ERIE RAILWAY SURVEY HAER (Page / ) stone trimmings, slate roof, and ornamental gable-ends, cornices, ridge 'cresting and finials, is used extensively." Many of the Erie depots could be considered flag depots. There was no firm dividing line between this class of stations and the next, local passenger depots, for the two types shaded imperceptibly together Both, on the Erie at least, received the kind of artistic treatment Berg was calling for in his description of local passenger depots. "...much stress has been laid within recent years on providing artistic and picturesque structures for local passenger depots, especially at suburban points where the travel consists largely of wealthy patrons of the road.
The artistic depot designs prepared by the late Mr. H. H. Richardson, the well-known architect, of Boston, Massachusetts, and a gradually increasing demand for artistic structures at passenger stations have given an impetus to the designing of more artistic buildings, with the result that architects of established reputation have been called on by railroad managers ror designs. The architectural effect should be obtained by bold and original but graceful treatment..." By the the Erie was one of the railroads making the effort to incorporate artistic elements in their stations. Even combination depots, which handled both passenger and freight services in areas unable to support separate installations, received architectural treat- ment incorporating stylistic features of the time.
It seems possible to identify the influence of two main- architec- tural styles upon Erie stations during the later nineteenth century, although eclectic features from numerous other styles also could be found. The first of these was the Stick Style. Marcus Whiffen described that style in this way: "Stick Style buildings have tall proportions with high steep roofs, frequently of complex plan and irregular silhouette; the eaves are of considerable projection and are supported by large brackets; often there is exposed framing in the gable end of a roof. Verandas are extensive, their roofs being carried on posts with diagonal braces. Diagonal "stickwork" is one of the most characteristic features of the style.
Walls may be faced with vertical boards and battens or (in the final development of the style) with horizontal clap- boards having an overlay of other boards vertical or horizontal, and sometimes diagonal too that suggest or symbolize the unseen structural frame," ERIE RAILWAY SURVEY HAER (Page The Stick- Style flourished from to in general use, but remained current on many railroads until the end of the century. On the Erie, nearly every small flag depot and local passenger depot re- flected the influence of this design. The style lent itself easily to the incorporation of all the ornamental details mentioned above by Berg. One of the most interesting examples of this style was shown- in a July, design for a four by six foot gatekeeper's house in Paterson, New Jersey.
This tiny building incorporated every main feature of the Stick Scyle, from the ridge cresting to the ornamental siding. Another structure which also showed the same influence could be seen at a crossing gate tower at Union City, Pennsylvania, built near the turn of the century. With the larger stations, the Erie tended to build structures showing the influence of the Queen Anne Style. Again, to borrow from Marcus Whiffen, "Irregularity of plan and massing and variety of color and texture characterize the Queen Anne Style. Several different wall surfaces may occur in one building; brick, for the ground story with shingles or horizontal bands above is a common combination. There may be some half timbering perhaps only in a gable or two. Upper stories may project beyond those below.
Windows are of many forms, straight-topped or round-arched (never pointed-arched); they may be glazed with plate glass or, sometimes in their upper parts only, with small panes set in lead or wooden sash. Bay windows are much employed. Roofs are high and multiple, their ridges meeting at right angles; the rand or polygonal turret is a feature of the later phase of the style. Although hipped roofs are seen, the A roof is the predominant type. Gables, often, including a large porch gable, con- tribute much to the overall effect and are given - many different treatments.
Chimneys also are treated as important features, frequently being panelled or otherwise modeled in cut or molded brick.." After and into the the Queen Anne Style became popular, perhaps as a reaction against the high Victorian Style. But on the Erie, many of the Victorian ornamental features appeared on both the smaller flag depots and the larger, more solid stations in the Queen Anne Style. ERIE RAILWAY SURVEY HAER (Page / 8-) The influence of the Sticic Style could also be found in the one remaining category of station found on the Erie the separate local freight house. These buildings served larger towns that promised to generate enough freight traffic to justify two separate facilities.
Walter Berg observed, "It can be said that the design almost universal- ly adopted consists of a single-story frame structure, surrounded by high freight platforms on several or all sides." The Erie structures of this class followed this dictum to a tee. Where the Stick Style influence appeared was in the choice of materials. These were warehouses, but often the company added ornamental touches such as finials, gable brackets and decorative scrollwork. Board and batten construction characterized most of these depots. Norval White has noted in The Architecture Book that battens also commonly appeared on Queen Anne housing as-a purely architectural feature.
Whether the construction was functional here is not clear, but from the other features of the structures, it would seem that the designers were concerned with-appearance, not function. The company built very few passenger stations after Those that did go up were primarily located in New Jersey and suburban New York, and served the commuter traffic into New York City. The company found it financially expedient to remodel old stations rather than replace them with new structures. The Erie existed as a freight road by the turn of the century, and the railroad husbanded its resources to upgrade roadbed, not stations. So while the Pennsylvania and New York Central entered the era that Keeks called "Megalomania," the Erie continued to make do with its older frame or brick stations.
Many of the turn-of-the-century depots showed more eclecticism, as the Erie borrowed from the many styles prevalent at the time. Largely because of financial constraints and a comparatively small passenger traffic generated by small towns instead of cities, the Erie stations still standing in represented one of the larger groups of late-nineteenth century structures on any Eastern railroad. In this respect'the Erie stations resembled many of the Erie's steel bridges, and even its motive power. All of these elements of railroad property represented typical practice at the time when they were built, or used.
As Meeks and Alexander showed in the illustrations in their books, any number of stations similar to those on the Erie were erected by American railroads, many utilizing identical ornamental details. Those stations surviving on the Erie, then, were not unique. The Erie main- tained them long past their normal lifetime. As a result, the extant stations of this railroad, although most often out of service in may represent one of the largest surviving groups of late nineteenth century stations on any Eastern railroad. ERIE RAILWAY SURVEY HAER [Page /^) Susquehanna Station The Susquehanna Scation at Susquehanna, Pennsylvania, was one of Che few stations on the Erie that boasted an imposing structure of any architectural consequence.
In this building was one of the very few surviving examples of a railroad station with a dining hall and hotel. Normally, a hamlet the size of Susquehanna would never have enjoyed a structure like this one. The town owed its existence to the railroad; in fact, the railroad owned the town. A thriving freight or passenger service never developed there. Nonetheless, the town remained one of the most important on the line until the turn of. the century, thanks to the shops in town. Actually, the shops and station should be considered as integral elements of a single system. The first station, a combined freight and passenger depot,went up in August, a 27 foot by 152 foot wooden building.
The shops date to February, Once the road opened for service through to Binghamton, the two facilities grew to- gether. Fire destroyed the frame station in so when the company began construction of a major repair facility in the passenger and freight facilities also came in for upgrading. The new passenger depot and a separate freight station were designed on the same scale as the shops. The imposing size of the stations in such a small town emphasized in a very direct fashion the importance of the shops and hence the town. As a result, Susquehanna in could claim one of the largest complexes of railroad structures in the country. On a railroad of small stations, the Susquehanna stood out. Preliminary drawings of the structure closely resembling the station as built bear the name E, J, M.
Derrick, Architect, apparently an Irish architect who had worked extensively in England. If indeed the Erie did commission Derrick to design the station, that event rep- resented an early example of architectural station design. Not until the did the work of Richardson and Furness make the acceptance of railroad commissions by architects an acceptable practice. The station was 327 feet long and about 40 feet wide. The brick building on stone foundations had two stories, with a third floor under the hip roof lighted by numerous dormers. Two large gables on the track side of the station sheltered the main entrances to the building. Two Lombard towers capped the roof, and according to Carroll Meeks, these were disguised water tanks.
The use of towers fit the pattern of the age; they were needed for self-respect, said Meeks. The Neo-Gothic architectural detail represented perhaps the most eye-catching feature. The dormers were constructed with trefoil windows, while the main windows employed lancet arches. ERIE RAILWAY SURVEY HAER (Page The corbel table cornice continued the same pointed-arch motif, as did the towers. Interior details also utilized Gothic elements. The main section of the station consisted of a dining hall 120 feet long and occupied the full two and one-half story height and 40 foot width of the building. A stone ledge supported a round arch that , carried the rafters for the roof of the room.
A New York Herald reporter wrote in that the dining hall reminded him of a "baronial banqueting hall or the transcept section of a Gothic cathedral." Carved wooden balconies stood at the second floor level on the end walls, while lancet arches supported by stone columns marked the door- ways, The station was the architectural highlight of the Erie railway's building program of the mid-1860s. In addition to the dining hall, the building housed the actual station, some offices, and a large hotel, the Starrucca House. Such a grandiose structure with overnight accommodations was not especially common on American railroads, al- though English stations frequently incorporated hotel facilities.
As in so many other cases, American railroads shied away from the con- struction of such large palaces, primarily because of expense. More often, the railroads relied on a local entrepreneur to provide over- night lodging. The station at Susquehanna became one of the best examples of the few American railroads that adopted this particular English pattern. Who the company intended to patronize at the hostelry remains a mystery, but the inclusion of the hotel followed the delusions of grandeur shown by constructing such a structure in Susquehanna in the first place. The dining room was a far more characteristic feature of American stations. As soon as the railroads found themselves extending long distances, dining facilities became a necessity.
Many Erie stations had included dining saloons from the start. But Susquehanna's mammoth hall stood head and shoulders above any other eating place on the Erie in terms of size and grandiose character. Perhaps for th s reason the dining hall became a very popular feature on the line, with as many as twenty trains daily stopping at the facility.in However, the slow installation of dining cars by the removed the need for lavish dining facilities, and Susquehanna's popularity dimin- ished. In the company partitioned off a portion of the dining hall. The hotel also suffered from a lack of guests through the same period, as Pullman Palace cars and sleepers rendered railroad hotels equally superfluous.
In the Starrucca House closed its doors completely, and the company began converting the hotel and dining facilities into office space. By the Susquehanna Division offices had moved from Port Jervis. Likewise, the offices for the ERIE RAILWAY SURVEY HAER (Page /7/ ) superintendent of Che Jefferson and Delaware Divisions were located above che actual station chat remained at the eastern end of the building. The old Starrucca House became a railroad YHCA, with the cavernous dining room subdivided into three floors, for use as a gymnasium. The building provided sleeping quarters for 135 men. The general decline in passenger activity at Susquehanna paral- led the demise of the nearby shops.
The structure received minor attention occasionally, as, for example, in when the company removed the old wooden floor in the waiting room and put in a concrete replacement, At some point, perhaps when the station began to serve as offices, the two bay windows on che east wing of the station were added. The final addition came with the installation of flourescent lighting in the reading and recreation rooms of the YMCA. In che station remained standing, but in badly deteriorated condition. Along with the shop structure, the Susquehanna-Oakland- Lanesboro Industrial Association purchased the station in the late But the pace of decay continued unabated. Now empty, long sections of the cornice have fallen onto the platform.
Although placed on the National Register of Historic Places in the crumbling building was plastered with signs declaring "This Building Condemned." Meadville Although, as mentioned above, the Erie did not actually own the Atlantic & Great Western Railroad until the station at Meadville certainly deserved consideration as an Erie structure. Amazingly, just as the Meadville shops could compare with the Susquehanna Shops, so could the Meadville Station compare with the Erie station at Susque- hanna. Both were grandiose architecturally; both included hotels and dining rooms; both were located at major division points with shop facilities; and both were erected at the same'time.
-But while the Susquehanna Shops may have been the better of the two, the Meadville Station probably received more kudos than its Susquehanna counter- part. Whatever, after the Erie and its system had two of the very finest examples of railroad station-cum-hotels in the United States. The Meadville Station opened in with the completion of the A. & G. tf main line. The station itself sprawled over both sides of the three-track line, and included a huge engine barn, 66 feet wide, with large ventilators capped by tall finials.
The Crawford Democrat had reported on December 16, that, "the whole building, at least ERIE RAILWAY SURVEY HAER (Page //Z ) the main part of it, will be 327 feet in length by 127 feet in width,.." Meeks called this, "the most celebrated station of the two-sided type." The actual structure was board and batten construction, such as was "frequently and creatively used for Gothic revival buildings, including many stations of the nineteenth' century." A six-foot overhanging cornice of wooden gingerbread ornamented the buildings, which were surrounded by a 14-foot station platform. The dining room was "somewhat sketchily embellished" by thin pilasters carrying ornately carved wooden trusses on cusped brackets..
The dining area was 'as long as a train,' and windowed and roofed like the nave of an English cathedral." Some 600 people could sit in the dining area at one time, in the splendor of black walnut finishing and stained glass windows. The hotel had more than 100 rooms on two stories, with a ten-foot balcony around both floors. The structure dominated the Meadville scene-^only the huge erecting shop a short distance away could dwarf the station. As might be expected, the station and its hotel, the McHenry House, commanded a great deal of attention.
The New York Herald con- sidered this station "to rival in the style and beauty of its surround- ings any of those you may notice in the best railroads of England..." This was as the English investors planned, and no doubt their presence within the company led to the construction of an English- style station. Erie Railroad Magazine wrote in that the Meadville station, "was for many years the most noted building west of New York." But in the New York, Lake Erie & Western, at that time leasors of the line, tore down the old wooden station and hotel. The company replaced it with a fine example of the Queen Anne Style they had adopted for several stations.
Plans dated January, showed the brick building with all the ornamental regalia of the time finials, dormers, ridge cresting, gable brackets, wide plat- forms with carved roof supports, and terra cotta belts in the brick work. The elaborate carved panels in the gable ends and the wooden doors with tiny-paned windows completed the Victorian appearance. Unfortunately, the second station enjoyed the same fate as the first. Apart from repairs in the only other mention of changes came in Although passenger service would shortly end, the company remodeled the station extensively. Meadville was only one of several stations granted this facelift, which lowered the ceilings, changed the layout, and installed flourescent lighting and new toilet facilities.
No doubt this remodeling also resulted ERIE RAILWAY SURVEY HAER (Page in the new roof chat completely altered che structure's appearance. Like a once well-dressed lady reduced to poverty, the station seemed far too plain with the cowers, gables, and decorative details removed, But in even that did not matter, as the company had razed the station completely in July, Other Stations The listing of Erie stations was quite large, even though the road was primarily a. freight line. The Historic American Engineering Record owns a large number of old photographs, and many were taken in as well. These views provide an adequate record of Erie stations.
The format will be to discuss the stations working from East to West, with the exception of the Jersey City terminal, which will be discussed in a separate chapter. New Jersey and Suburban New York Rutherford ETew Jersey Built in this station presented an interesting varia- tion on the Queen Anne Style. The circular turreted pavilion stood at the end of a covered walk. The brick courses were interrupted by a belt of stone at the level of the bottom, and at the top of the windows. The windows also received decorative gratings, although there was little ornamentation remaining by Vandals tore out the pavilion wall in 19 71, which the company repaired with reinforced concrete. Rutherford Station remained standing in as a Conrail station.
Clifton, New Jersey In the old Clifton Station burned and the Erie replaced it with one of the more interesting stations on the line. The Railroad Gazette noted, "The Clifton Station will be 54 feet long and 26 feet wide, and will be broken by several extensions. It will be one story high, surmounted by a ventila- ting cupola, the roof will be slate, with terra cotta cresting, and will contain a number of odd gables. The general design of the building is irregular, and it is perhaps the most artistic ERIE RAILWAY SURVEY HAER (Page /^) little station on the Eastern division. The general waiting room will be 19 feet by 26 feet; ladies' room, 12 feet by 13 feet; ticket office, 17 feet by 11 feet; toilet room, 8 feet by 5 feet; baggage room, 96 feet by 14 feet.
It will be built of the same material as the Delavan Avenue (Buffalo) Station, both exterior and interior. The ceiling in the general wait- ing room will be decorated with a galvanized iron center piece done in fancy colors. The cost is estimated at Both stations will be heated by furnaces in the cellar." Without any major alteration, this depot stood on the Erie for 62 years. Then in the Erie chose this station as one of three to be replaced by new structures. Gorry, Pennsylvania, and Corning, New York, also gained new stations at this time, although passenger service had only a few years of life remaining on the Erie. Clifton's demise came on December 17, when.the City of Clifton purchased the unused station. .
Paterson, New Jersey Paterson had a long history of railroad stations, beginning with the Paterson St Hudson, a 17 foot by 51 foot wooden station built in May, A new depot put up in lasted until a new brick station house, 178 feet by 72 feet, was erected at a cost of in This station had a pergola and covered waiting room, which had to be removed at the time of the grade crossing eliminations through Paterson in when the company built new foot platforms. The brick station, with its tile roof, survived until when the company put up one of its very few post war stations.
The new station, which opened August 10, was a boxy building with glass block windows and remained in use by Conrail in Ridgewood, New Jersey The Erie station in Ridgewood was a nice example of Mission Style architecture transplanted miles east of its usual locale. Built in this was one of the later commuter stations built in New Jersey, and it remained standing in ERIE RAILWAY SURVEY HAER (Page Sparkill, ??ew York Opened in Spark.il! Station stood on the Northern Railroad of New Jersey line between Jersey City and Nyack. This small brick station exemplified all of Berg's ideal traits of a flag depot gable end brackets, finial, wide eaves, bay window. When the Northern Branch commuter service terminated in December, the station was closed.
The company retained ownership of the building until June 13, when the Erie retired and razed the small depot. South Nyack, New York Also on the Northern Railroad of New Jersey, this station was rebuilt in although the photograph shown probably dated from A frame structure, the closest stylistic identification might be Stick Style. Like the Sparkill Station, and Nyack as well, the station has been closed since and never came under Conrail's jurisdiction. Nyack, New York Nyack served as the terminus of the Northern Railroad, and as such once boasted an 30 foot turntable and a five-stall engine house. In 17 trains still received daily servicing there. The station employed half-timber wall construction, and extremely long gable brackets to support the accentuated eaves.
Rebuilt about the photograph may show the newly reconstructed building. Closed in the town of South Nyack purchased the structure and then tore it down in Harriman, New York The station at Harriman, on the original main line between Newburgh Junction and Graham, was built by the Erie in It resembled the Nyack depot in its adoption of half-timber construction, but like many Erie stations of this period, the company used tile as the roofing material. Although the Graham Line replaced the old main line for through service, the line through Harriman remains in use as a spur in and the station still stands. The station may have taken its name from Edward H.
Harriman, a railroad magnate who built a system that included the Illinois Central, Union Pacific, and Southern Pacific just after Harriman served as a valuable member of the Erie's Executive Committee as a director, from until his death in The Harriman Station stood not far from ERIE RAILWAY SURVEY HAER (Page /7< ) Harriman's estate near Arden, New York. In infrequent passenger service continued to operate from the small station. Chester, New York The Erie built the small board-and-batten station of Chester, on the old main line in The style illustrated Meeks' statement that once a railroad had found a satisfactory design, they used it for many years.
Used at Meadville in the same materials were repeated 50 years later at Chester, The demise of the old Erie main line had slowed traffic through Chester. Finally on July 21, the company retired and removed the old building- Goshen The Erie has had a passenger station at Goshen since when the town was the Erie's western terminus. That wooden depot, 67 feet by 120 feet, and a 34 foot by 90 foot freight depot, went up in July, The company built the existing 140 foot by 22 foot brick station in The Annual Report for noted that the work was nearly complete, and a local newspaper reported on February 7, that the company had occupied the structure a week earlier. The relatively plain brick wall was interrupted by a decorative belt course of brick with a row of dentils supporting it.
This course served as the springing line for the window arches. Other ornamental features included an octagonal ventilating tower that resembled those on the Susquehanna Station built at the same time, finials, gable brackets, and decorative brick chimneys. The interior was typically paneled with tongue and groove wood sheathing. The Goshen Station stood on the west side of the tracks, and in still housed a maintenance of way office. But by Conrail no longer made use of the facility, although it remained standing.
Middletown, Mew York Middletown1s first station was one of the few early brick stations on the original line when put up in July, This structure, like the short stretch of line between Goshen and Middletown, may have been built by the local citizens, hence the more solid construction. Dur- ing the late the station had to be replaced, as it was worn out. The Annual Report for noted that the new station was up. Yet only seven years later, in the Erie began the present station, also of brick, which it completed the next year. The eclectic ERIE RAILWAY SURVEY HAER (Page styling reflected a variety of influences, for the tile roof and ex- posed roof joists showed a Mission influence, while the Romanesque arch prevailed in the main body of the structure.
The resulting station, 126 feet long and varying from 20 to 31 feet wide, was quite striking in its appearance. Especially aye-catching was the arched entrance way with its Bellville stone footings, terra cotta window sills, and belt course - This fine treatment continued with the interior orna- mentation, the chimney, the decorative arched trusses, and the detailed paneling at the ticket office, produced a unique appearance for an Erie, station. Because the Erie-Lackawanna and Gonrail have maintained passenger service through Middletown, the station has fared far better than most Erie stations. In the station continued to serve the very few passenger trains still run by Conrail.
Pine Bush, New York This small board-and-batten structure went up in on the Mid- dletown & Crawford Branch the Erie had leased in Pine Bush was located at the end of the branch, but survived the end of passenger service in the Apparently a freight office remained in the building. But on August 21, the Erie retired the station and re-moved it. Fort Jervis, New York Port Jervis became the Erie's western terminus in and with that exalted status came a 26 foot by 177 and 1/2 foot wooden station, complete with a dining saloon and offices an the second floor. Re- modeled in that station served the railroad until when the company purchased a three-story brick building already standing- The old station was torn down, as it obstructed the freight yard.
The company added a new railroad front to the brick structure, and housed the passenger services, baggage room, express service, and offices inside. Unfortunately, a fire completely destroyed the new facility in December, so the company erected yet another depot. This brick station, 109 and 1/2 feet long and 33 feet wide,was one of the better examples of the eclectic designs that affected the Queen Anne influence. The tower, ridge cresting and finials, the stone belts, and terra cotta ERIE RAILWAY SURVEY HAER (Page ornamentation exhibited the continued importance of High Victorian features. The railroad's designer took equal pains with the interior, as shown by the elaborate ceiling panels in the general waiting room.
As in previous stations, the company put its operating offices on the second floor. The station was altered somewhat over the years. A new flagstone platform replaced the original planking in and a restaurant was added in Port Jervis was one of tour stations to receive an eating facility, after dining cars had led to the closing of older -dining rooms in other stations. Perhaps the restaurant accounted for the other wing that appeared on the station. After the second World War, the company "completely renovated and modernized" the interior, a treatment granted to a few stations. Because of this work, the station has remained in excellent repair. Many of the ornamental features still.remain, as does the decorative woodwork under the eaves and gables.
But Conrail, although providing twice-daily passenger service into New York City from this point, did not take possession of the station, and in it stood empty and for sale, Shohola, Pennsylvania The Erie constructed the Stick Style station at Shohola in Company drawings dated May, show a design for a Stick Style station with the usual decorative panels, ridge cresting, and a finial on a rectangular tower. Whether this station was actually built is not clear, for the currant station, which could date to was for plainer building. The depot's most notable feature was the half-timber construction of the walls. As was usual for the time, the company used tongue and groove interior sheathing. With the end of passenger service, this station fell on hard times.
On August 20, the company retired the depot, and the Survey found the building abandoned with all of the windows broken. By it. had been razed. Callicoon, New York The Erie reached Callicoon during without, great celebration. The station in was half the size of the freight depot.that was 56 feet by 30 feet, indicating the size of the town. The current station dated to The old station burned on November 6, but work to replace it did not begin until almost a year later, probably because the company again lay in the hands of a receiver. The frame station was a combined passenger and freight depot, with a raised freight platform at one end, and a short, 40-foot ERIE RAILWAY SURVEY HAER (Page pergola for passengers at the other.
The plans called for Che shingled walls, indicating the influence of Shingle Style. But there were no dormers, cowers, or other decorative features on the 103 foot by 25 foot station. A better example of a combined depot as described by Berg did not exist, except: for the lack of ornamentation. Because the company has maintained offices in the building, the depot remained in good shape in Hancock, New York The passenger station at Hancock may be the oldest surviving structure on the line. The Hancock Herald once ran an article about the early days of the Erie, based on the diary of a Hancock citizen of the era. The article said the "present and only passenger depot" was built in as a whiskey and grocery store.
The Erie bought it in But the Report of the New York & Erie described a depot with offices over the passenger waiting area, 34 feet by 36 feet, built in October, Whichever is correct, the station still standing in was the original depot for the Erie in Hancock. Conrail has continued to use the structure as a tool house. Deposit, New York The Deposit depot was one of the structures the Erie railway built in the mid-1860s. The kinship between this building and the Susquehanna station marked the date of the structure as The Fourth Annual "Report confirmed this estimate, and also said the building cost The brick structure replaced an earlier wooden facility, and the lancet arches demonstrate the Gothic in- fluence in this long, narrow station.
Although not as ornamental as Susquehanna* the link between the two structures is clear. The Deposit Station has continued to serve the railroad to the present day, although by it housed only maintenance of way offices in the original tongue and groove sheathed interior. Binghatnton, Hew York Binghamton served as a major rail junction for the Southern tier of New York counties, with the Erie, Delaware, Lackawanna & Western, and Delaware & Hudson Railroads all maintaining terminals there within ERIE RAILWAY SURVEY HAER (Page two blocks or each other. The Erie remodeled its original station in but ten years later the company reported the depot was worn out and needed, to be renewed or replaced.
The new station, 222 feet by 30 feet, went up In the as part of the New York, Lake Erie & Western's improvement effort. The relatively plain Queen Anne Style station boasted a four-sided ventilation tower, with two long wings off the central section. The elaborate ridge cresting, and corbel table cornice around the gabled main section provided the other decorative elements. On the street that crossed the tracks just'west of the station, a covered iron platform offered shelter for passengers and a stairway to the tracks. In the company planned major renovations at the depot, in- cluding replacement of the iron cresting with terra cotta tile cresting on the two wings, and a new brick chimney.
In the the station existed relatively unchanged, and had become a Union Station, as both the Erie and the Delaware.& Hudson used the station as their Binghamton stop. At some point, the company extensively altered the building's appearance with the addition of a second story on the west wing* with four dormers. No doubt the changes were effected at the same time the tower was removed, and three garage doors replaced the windows on the first floor. Then, with the merger of the Erie and the D. L. & W. in the new company chose to utilize the Lackawanna station.
The Erie facilities, unused, were torn down in Endicott, New York The Erie built a combined passenger and freight depot at Endicott in the Shingle Style structure shown in photograph Apparently the traffic outgrew the small depot, so the company erected a separate passenger station in By that passenger depot had been retired by the company, no doubt from lack of traffic. A second station, at Nanticoke Avenue in Endicott, proved to be more than sufficient for the town. Owego, New York This town that boasted the Erie's first bridge shop also claimed a large combined depot with a dining saloon when the company reached the town in But this 232 foot by 28 foot station apparently burned in the early and the financial straits of the Erie rail- way prevented immediate reconstruction.
Not until could the company begin work on the brick structure that opened the next year. The long station was capped by two square towers and broad gables. ERIE RAILWAY SURVEY HA R (Page ) But by the time the photograph was taken, much of the ornamenta- tion must have been removed. The station, amazingly, is still standing in as it approached the century mark. The company had retired the platforms in but still housed offices in the station. Elmira, New York The largest town on the Erie's line for many years was Elmira. The company built its initial station there in December, with a separate baggage house.
Yet not until after Binghaiaton had eclipsed Elmira as the largest town in the Southern Tier, did Elmira boast a station commensurate with its status as a major junction point and site of an important car shop. The brick station was 250 feet long and only 33 feet wide. Passengers entered the two-story waiting area through one of four tall Romanesque arches supported on brick pillars. Stone and terra cotta trim highlighted the windows. A long freight house later tied into the station so that it ran for a whole city block. Apart from new stone platforms in and a restaurant added in the large waiting rooms and the brick exterior experienced little change until the grade crossing elimination project of altered the track layout through the city.
New foot platforms protected by butterfly wooden-deck sheds served the tracks that stood 10 to 13 feet above the old grade. With the exception of new paint and a redecoration, the station itself went unharmed. But Elmira was not the important city to railroad operations it had once been. The car shop closed in and after the work in the mid-1930s, Elmira had only a new two-stall engine house, a gallon water tank, a 100-foot turntable, and a new coal and ash plant. This Roberts & Schaefer facility was of the newest design, like the Meadville and Susquehanna plants. Its coal, cinder and sand handling features met the needs of the newer equipment in use. With the introduction of diesel locomotives, even these structures became expendable.
The company remodeled the ticket office and waiting room in like the Hornell station. But passenger service soon ended, leaving only the offices and a shell of the coaling plant standing in Horseheads, New York The board and batten combined depot at Horseheads was another good example of the use of that style for a relatively minor stop. ERIE RAILWAY SURVEY HAER (Page As shown in the view, the station was to receive a remodeling the next year, although the appearance probably changed very little. Surprisingly, it has been the plain and unadorned depots that have survived the ravages of time.
The company retired the platforms sur- rounding the Horseheads depot in but a section must still have used the building in Corning, New York The Erie station at Corning stood for many years on the town's main street. Like many small towns, the double-tracked rails divided Corning in half. The original wooden depot soon gave way to a stucco station with a large rectangular ventilating tower on its roof. The building lacked any other ornamentation except for the graceful sweep of the eave braces. But in 189 7 the company greatly enlarged the station, redoing the old exterior with half-timbered walls in a mission-type structure. With a completely new facade that did away with the wooden bay window, five gables now commanded the roof where the tower once stood.
That station served Corning until when the Erie relocated its tracks to avoid running down Erie Avenue. The new Erie station was a shiny model of the concrete and glass brick school of architecture, and its boxy physique could not compare with the character of the old station. The removal of the old depot took with it the tongue and groove paneled waiting room and the delightful rack of timetables from all over the Nation in the ticket office. The new station, one of the few built by the post-war Erie, opened during the death throes of long-haul passenger service. In like most surviving Erie depots, maintenance of way forces made their offices in the building.
Painted Post, New York The Painted Post Station provided another good example of the Mission Style architecture that bloomed on the Erie about The company remodeled the building in and it served as a combined station. But on August 31, the Erie abandoned the facility, which had been closed by A state-run grade crossing elimination led to the destruction of the building, and the lack of passenger traffic did not warrant the construction of a new depot. ERIE RAILWAY SURVEY HAER (Page / &} Hornell, New York: The Erie Railroad probably cook better care of the Hornell Station than any other depot except for Jersey City. Again, like the shops, this attention may have been a function of the strategic. location of the station at the junction of three divisions.
Hornell had always had a large passenger station. Of the 24 by 327-foot wooden station put up in December, Harper's New York & Erie Railroad Guide Book commenced, "The depot buildings are rather large and imposing in their appearance." The building housed the passenger station, saloon, and dwelling. With its separate freight house, Hornell seemed more than adequately equipped. Yet in the railroad enlarged the passenger station, thoroughly repaired it, and installed steam heating and gas pipes. The station continued in use until a fire destroyed it on November 3Q, The recently revived railroad company immediately began to reconstruct the depot. The Railroad Gazette reported that A. A. Berrick and Joseph Churchy & Son won the masonry and carpentry contracts for Che new building.
At 424 feet long by only 32 feet wide, the station looked somewhat awkward. For 184 feet, a second story- rose above the passenger area, housing company offices. Begun some- time in late August or early September, the contractors finished the work in The new building was relatively plain, but the corbeled brick chimneys, the decorative pilasters set in line with those chimneys, and the gabled roof showed the Queen Anne influence. This depot has stood for nearly a century," housing the company offices and passenger waiting rooms. The depot came in for- extensive remodeling in and two years later the company extended the platform. Further repairs followed in One of the memorable features of the station was its restaurant.
Edward Hungerford, writing in remembered, "Old-time travelers still have nostalgic memories of the station restaurant at Hornellsville and the quality of waffles chat it served. With maple syrup down from Dale on the Buffalo Division and sausage up fxom Saegertown on the main stem, Hornell Station cooked its way to a firm place in the gusta- tory annals of America." Hornell continued to service the passenger trains until the Erie derailed all such traffic. In line with three or four other main stops, the company remodeled the interior in by installing better seating, flourescent lights, and bright interiors. Perhaps at this time a new roof went on and the chimneys disappeared, ERIE RAILWAY SURVEY HAER (Page although chose renovations might have taken place earlier.
But the end' of passengers left only division offices there by a clear under-utiiiaation of this long, low structure. Wellsville, New York Wellsville on the Western Division was originally known as Genesee, and had its first Erie station in October, This wooden combination depot stretched for 24 by 133 1/2 feet. The brick station still standing in was built by the Erie in one of four stations put up that year. The station somewhat resembled the Middle- town Depot, in its combination of Romanesque arches and tile roof. The stone brackets for the eave braces, the stone belt course and brick quoins completed the handsome architectural treatment.
Salamanca, New York The town of Salamanca did not even exist when the Erie's tracks searched this area of western New York in But in the Atlantic & Great Western arrived and made the town an important junction for eastbound traffic from the mid-West. In the Erie Railway company put up its first station there, and replaced it only seven years later, Until that long building with sheet metal siding and two-story end sections served the railroad's purposes. The overriding feature of the station was the tower with four dormers. In the company drew up plans for a new depot in Salamanca that showed a station 216 feet long, with a second story on the center section. The symmetrical structure had two dormers on each end of the upper floor.
In some respects, the station resembled the Hornell station, although the Salamanca Depot was less ungainly. Remodeling in as at Meadville, Hornell and elsewhere, did not stave off the end of passenger traffic, and by only offices remained there, along with a minor diesel repair facility. But the station has at least been spared the fate of the old round house that once stood nearby. Warsaw, New York Warsaw stood on the old Attica & Homellsville Railroad that became part of the Buffalo Division. Built about the depot was extensively repaired in The company completely rebuilt the freight house, wood shed, and water tank the next year, following a ERIE RAILWAY SURVEY HAER (Page / &) fire. This frame passenger station has stood for over 100 years, probably with only minor attention.
In the building still housed the signal office. Avon, New York The town of Avon stood at an important junction on Che Rochester Division, for the Attica and Mt. Morris Branches split off at that point, while the main line continued on to Rochester. By the the Erie Railway had assumed operating control of this branch, and during the renewal efforts of the company' undertook extensive repairs. As part of this work, the Erie rebuilt the station platform. The hard times of the were felt especial- ly at Avon. The station burned during and not until could the reorganized company begin construction of a new building. The structure the company built still stood in very good condi- tion in with the Stick Style design apparent.
The carved grill under the gable on the platform side of the station was the most striking detail. Smaller gables repeated the same motif. A new roof no doubt removed any roof ornaments. At the turn of the century, Avon bustled with activity, as a new five stall round house with drop pit and truck pit, a separate machine shop, boiler house, ash pit and oil house serviced the branch lines' locomotives. In 13 locomotives still received both light and heavy repairs there. But the passenger service subsequently declined and the shops were torn down in Nonetheless, the station still existed in as a tool house.
Suburban Buffalo, New York Buffalo had four of the nicest small passenger stations on the entire Erie line located on the track that circled the city as it ran to the International Bridge. Two of them dated to and almost certainly a third did as well. Those three were excellent examples of the Stick Style as used on the Erie, while a fourth showed the continuing board and batten style. East Buffalo, New York Built in the station was only 24 by 16 feet, but still contained all of the features of the Stick Style, although the plans called for horizontal and vertical panels rather than the horizontal ERIE RAILWAY SURVEY HAER siding shown in Che photograph. The interior housed only a waiting room.
In Che company divided the interior to include a ticket office, and built two 27 by 13 foot platforms, only one of which was, evidenced in the photograph. The ridge cresting continued to dominate the exterior appearance. The station eventually succumbed to the end of passenger service and the company converted the building to a truck supervisors' office. By the Erie had retired the old station but not until did the company remove the structure. Kensington Avenue Kensington had the most decorative of the Buffalo stations. When the company built it in the design earned a write-up in Railway Review, June 4, as well as in Berg's Buildings and Structures of American Railroads. The station was rectangular, with two short projecting wings and a covered porch.
The dimensions were 71 feet by 21 feet. The four-cornered tower with dormers capped the roof that also boasted cresting and another dormer. The ornamental tongue and groove siding bespoke Stick Style, and the elaborate brackets and columns on the porch even indicated the influence of Eastlake. The great pains taken to achieve a decorative appearance made this station a good illustration of small commuter passenger stations. Yet on September 21, the Erie retired the depot, perhaps due to the rise of the automobile. Walden Avenue The station at Walden Avenue, although smaller, exhibited the same types of motifs evident at East Buffalo and Kensington Avenue. The ornamental paneling and the carved fan under the gable, along with the stained glass window, were the notable features.
Like the other depot, this one, too, no longer exists. Main Street The station at Main Street represented the only, deviacion from the Stick Style stations on the road around Buffalo. A fine example of the board and batten construction, this combined depot, the only one on this stretch, handled freight and passengers* Perhaps the double duty accounted for the lack of ornamentation. Yet this plain structure lasted in Erie service until retirement on May 13, ERIE RAILWAY SURVEY HAER (Page North Tonowanda and LaSalle, New York The Erie had a branch line chat: ran up to Niagara Falls, serving largely as a commuter line. The North Tonowanda and LaSalle Stations were both board and batten combination depots like the Main Street Depot in Buffalo.
The company enlarged North Tonowanda in The semaphore signal there could be controlled from the bay window, much to the station master's convenience- The LaSalle depot was razed between and when Che Niagara Falls Branch was relocated. But the North Tonowanda station received internal improvements in As a result, the building still stood in and housed company offices. Niagara Falls, New York Niagara Falls went through a number of Erie stations in the last decade of the nineteenth century. In the company extended its tracks further into the village and erected a new station. Opened in the depot lasted until when the building burned and a new one had to be built. Again in relocation of the tracks caused by a grade crossing elimination program led to another station.
This must be the depot shown in a photograph. The resemblance to the Kensington Avenue Station in Buffalo was striking. Similar cresting, gables, a tower with dormers, Stick Style construction, all were similar to the earlier Buffalo station. The Niagara Falls relocation project of the early also accounted for this building's destruction, as it had the LaSalle depot. Suspension Bridge, New York When rhe company extended the line through Niagara Falls at the turn of the century, the tracks ran on to Suspension Bridge, just a short distance to the north. The town took its name from Roebling's bridge over the Niagara gorge. The station, 21 feet by 40 feet on an undated company plan, sat between West Ontario and North Avenues, very near the junction into Canada.
Like the other Erie stations in populated sections, Style, with tower, cresting, shaped chimney and gables marked the appearance of the station. The depot was constructed at about the same time as Kensington Avenue in The relocation project on the Niagara Falls Branch also accounted for the removal of this depot about ERIE RAILWAY SURVEY HAER (Page / &) Collins and South Dayton, New York These passenger stations were on the Buffalo and Southwestern Railroad between Buffalo and Jamestown. The company erected both within a year of each other, in and using nearly the same pattern. These are among the best examples of Shingle Style influence on the Erie's station architecture. The Collins Station, although built first, was retired on August 1, The South Dayton depot remained standing.
Jamestown, New York Jamestown stood on the Atlantic & Great Western, which built the first station in the early After the Erie bought the Nypano, as the A&GW was known after the company began the construction of a new depot in Plans dated that year showed a brick station 115 feet long by 32 feet wide, with a ten-foot bay in the center on the track side. A second floor housed offices and an elaborate dormer-trimmed tower topped the roof- Two shorter turrets capped either end; one mounted a copper windvana, while the other sported a chimney with stone coping. Terra cotta details characterized the decoration, while passengers entered through a large Romanesque arch- way. When completed in this Queen Anne-influenced station rivaled any other station of the period.
This station served the Erie through the but the grade crossing elimination program of the had made access to the depot awkward. The company chose to build a new terminal and Erie Railroad Magazine commented, "It is of stone and brick and thoroughly modern in equipment and appointments. Its most attractive feature is the commodious waiting room with its wainscoting of Verde Antique marble and walls of Roman Travertine." The designer seemed to be influenced by the Modernistic Style that predominated in the large cities in the The fluting in the two-story facade, the lamps, the use of large blocks, and the verticality of the facade all were elements of that style.
The result was that, "Jamestown realized its dream of a modern passenger station on June when in the presence of a large crowd of its citizens, officers of the Erie Railroad opened the handsome structure with simple exercises." ERIE RAILWAY SURVEY HAER (Page / p} The Jamestown Station had no imitators on the Erie. In fact, ic was the only new station built between and The Erie also installed che first escalator in any of its stations at Jamestown in Because the building was so new, it has remained in use, housing company offices after passenger service ended. But in the company closed off most of the building as the ceilings, were collaps- ing and the large waiting room made heating the building expensive and difficult. Mt.
Jewett, Pennsylvania The Bradford Branch served mainly as an Erie coal-hauling route. However, the line also had passenger service until the middle of this century. The Mt. Jewett station demonstrated, the primacy of freight by the dominance of the freight section in the combined depot. The company enlarged the depot in but.did not add any architectural details beyond the steep gable over the waiting room. The board and batten structure served the railroad until the late A. derail- ment damaged the structure, so the B & 0, which used the line jointly with the Erie, replaced it with a steel office.
Conrail did not take over the station, and the Srie-Lackawanna Trustees retained ownership in Cambridge Springs> Pennsylvania Another original Atlantic & Great Western station, the Erie replaced the depot at Cambridge Springs in after the old structure burned. The broad eave-covered platform was the dominant feature of this station, which appeared to be of frame construction. The decorative details were consistent with Stick Style stations built elsewhere. The station stood until when the company demolished the s tructure. Cochranton, Pennsylvania The Erie combination depot at Cochranton was one of the earlier surviving structures. The board and batten construction resembled that used by the A. & G. W.
at Meadville, but this structure probably dated to This pleasing building was a nice example of this type of station architecture in its earlier phase, as the brackets were still gracefully curved, and a finial marked the peak of the roof. The ERIE RAILWAY SURVEY HAER (Page structure remained standing in somewhat surprisingly. Although it went out of Erie service in the local Agway continued to lease the building from Che Erie-Lackawanna Trustees. Freight Houses The Erie utilized separate freight houses in many locations that could furnish enough business to the railroad.
Berg commented on che design of local freight stations in "It can be said that the design almost universally adopted consists of a single-story frame structure, surrounded by high freight platforms on several or on all sides." The Erie followed this formula quite strictly. The Erie also served1 as an example of a railroad following Berg's ideas on the construction of local freight facilities. "...it can be said that a substantial brick or stone building is not essential, as the increased cost of the large number of similar structures along a line compared with the value of the small amount of freight stored in one building...would hardly warrant the extra expense unless a road is in a very flourishing condition...
Frame structures, therefore, sheathed on the outside with galvanized corrugated iron and roofed with tin or slate, or sheathed on the outside with weather- boarding or upright boards and battens and roofed with tin, slate, shingle or roofing felt are warranted according to the importance of the building, the class of material in general use in each section of the country, and the financial status of the road." On the Erie, board and batten construction appeared in almost all local freight houses. In small towns all over America, this type of building probably represented the typical railroad depot. Hancock, New York The freight house at Hancock was an early example of the type, built at a time when prestige overcame cost factors.
The brick building clearly resembled the architectural style used on the Susquehanna Station and Freight House (see below) and the Deposit ERIE RAILWAY SURVEY HAER (Page / /) Station. The building must data from the mid-1860s. The pointed arch doorways and windows under the eave provided the clearest clues, although the other decorative elements were lacking. In the building remained standing and in use by Conrail for a tool shed. Susquehanna, Pennsylvania The freight house at Susquehanna showed a clear resemblance to the station next door. The same ornamental motifs and forms appeared, including the corbelled cornice and lancet arched doors and windows. Built in the brick building with slate roof measured 45 feet by 152 feet. A high platform provided access on the track side.
In the southwest corner stood an office 25 and 1/2 feet by 14 and 1/2 feet, heated with a stove. At a later date the company added two wings on the east side, one apparently in But the need for the facility declined with the fall in Susquehanna's importance, so that in 1971.the structure was demolished. The loss of this building, that blended so well with the station in both purpose and design reflected the sorry state of the Susquehanna site. Binghamton, New York Binghamton had boasted a freight depot from the time the first trains reached the city in In the company put in an enlarged facility. The Erie apparently built the existing freight facility at the turn of the century, as an addition to the large build- ing already there.
The freight house consisted of a long brick building with a row of bays on each side for the reception and shipment of freight by wagon, rail, or later by truck. The importance of Binghamton to the company, and amount of freight generated, was indicated by the company's adaption of che more solid and substantial brick instead of the more usual frame building. Likewise, the attention to architectural detail marked this structure as a more prestigious facility. The office with the arched doorway, the scalloped cornice and the fancy iron stairway all helped lend a handsome air to the building.
The freight house survived all the tribulations of the Erie- Lackawanna merger, as the two railroads had already combined their Binghamton freight operations in this building, sharing quarters since Likewise, Conrail spared the building by moving offices into it in ERIE RAILWAY SURVEY HAER (Page Union City, Pennsylvania The Union City freight house showed the difference between a small town and an important city, when compared to Binghamton's freight depot. Both had second story offices in front of long sheds, but the board' and batten structure at Union City lacked the architectural details of the Binghamton facility.
The building went up in and survived in although the company retired the platforms in Apparently the Erie maintained offices in the Union City building- [669a] ERIE RAILWAY SURVEY HAER (Page / ?) Chanter X. The Termini The main termini of the Erie, at either end, were always more spectacular than the stations along the line. Fronting on the Hudson in one direction and on Lake Erie at the other, the dominant features included not only passenger terminals but also piers, wharves and large warehouses and freight storage facilities. "The growth and evolution of the Erie's various waterfront facilities paralleled the development of such centers of trade by other railroads, especially in Jersey City. The Erie's harbor-front activities were in every respect typical of its contemporaries' efforts.
Piermont and Dunkirk The initial Erie terminals were Piermont-on-Hudson and Dunkirk, as prescribed in the charter. The difficulties in bridging the Hudson on the east meant the railroad would have its facilities on the west bank, of the river, and as charter-stipulated, in New York. Piermont became the site of the initial facility, largely because Eleazar Land, the company1s first president, had his estate there. The key disadvantage to the site was its distance from New York, 26 miles downstream. Nonetheless, Piermont served the railroad until about The shops, station and freight houses, all built on 90 acres of filled ground, were primary centers of activity. The most striking feature was the mile-long stone pier, 300 feet wide, covered with railroad tracks.
The construction of this wharf had been necessitated by the need to transfer passengers from company-owned steamships to the trains, the shallowness of the river forced the company to extend the pier into the river. By the company had seen the need for a main terminal closer to New York City, and the Long Dock Company was chartered to give the railroad access to the Hudson at Jersey City. Piermont remained in use for a time after the new site opened, but the disclaimer at the end of this comment in the Report did not prove correct.
"It is not, however, the policy of this company to abandon the Piermont terminus, as that will undoubt- edly be required as a depot for a large portion of the freight traffic of the road, and the immense quantities of lumber, coal, iron and other heavy and bulky commodities will be carried.to and from that point as heretofore. ERIE RAILWAY SURVEY HAER NY-I24 (Page The character of Che business which will be done at Piermont will be changed, but the extent of the same will not be diminished, nor the importance of the place in the slightest degree impaired." Instead, the site was little used from until the end of the But after the New York, Lake Erie & Western realized the value of a second Hudson terminal for bulk freight.
The Erie had evolved into a heavy freight hauler by the end of the century, especially carrying coal from northeastern and north- western Pennsylvania- Handling these shipments from Jersey City proved difficult, so the company made use of the abandoned pier at Piermont for coal storage. By the a large-scale operation had been assembled on the pier. In a travelling steam hoist with three conveyors went into use. The new equipment enabled storage capacity to be increased from to tons, and handled all ship loading. In the company reconstructed the whole north side of the pier, rip-rapped the breakwater and built up the gravel floor of the pier. When planked over, and after cantilever spans were installed on the Brown hoists, the capacity of the pier was tons.
These hoists had a trussed boom running over three stocking piles. Coal carried on conveyors could move directly from pile to ship. The company had converted Piermont into an "immense coal storage yard at tide water." But the facility did not operate very long because new equipment installed nearer Jersey City proved more conven- ient. Around the company sold the pier and surrounding land. A paper company bought the property and, in Continental Container Company maintained a facility there. The advantages of a convenient waterfront site remained. Dunkirk enjoyed a very similar career in its service as an Erie terminal. Like Piermont, the most important feature was the pier, later joined by two other wharfs, that gave the railroad access to the lake steamers.
A dredged channel made the route for those ships easier. The original pier had become a coal pier by while two other docks with freight houses had been added. But no such latter-day revival characterized Dunkirk's history, and its story was marked by a gradual decline as Buffalo became the leading western terminal for Erie operations. The facility continued in service in in fact, the Erie's charter read for many years as "Piermont to Dunkirk." In both cases, almost as soon as the railroad began operations, the emphasis of traffic began to shift. Jersey City in the east and Buffalo in the west quickly bypassed the original terminals in importance. ERIE RAILWAY SURVEY HAER (Page /gig} Buffalo and Jersey City The new cities had much going for them chat Che original terminals lacked.
3oth were established centers of commerce before the railroad was constructed Jersey City because of its position on the Hudson River in close proximity to New York City and Buffalo because It stood at the end of Lake Erie on the western terminus of the Erie Canal. The Erie Railroad's choice of Piarmont and Dunkirk, although required by charter stipulations, could never have worked. The company had to gain access to those two larger cities. Buffalo was reached first when.the company gained control of the Buffalo & New York. City Railroad, constructed by Silas Seymour. The move proved more than satisfactory for the Erie, and the terminal facilities in Buffalo grew quickly to major proportions. By the Buffalo was a railroad city, honeycombed with miles of tracks.
An article in The Railroad Gazette in showed four major railroads with yards and terminals in the city the New York, Lake Erie & Western; Delaware, Lackawanna 5c Western; New York Central & Hudson River; and Lehigh Valley Railroads while many smaller lines also ended there. The main commodities handled were grain and coal. Buffalo had 38 grain elevators holding seven and one-half million bushels, while its coal tonnage in was 3.3 million. The role of the Erie in all this was typical of the larger roads. As mentioned above, a large shop complex existed in East Buffalo, with car shops in the city proper, comparable to those of other railroads. The freight handling facilities there were also typical.
The annual reports of the company documented steady growth in both yard and storage space, from the addition of stock yards in to a yard enlargement at East Buffalo in The stock yard grew throughout the century, and even as late as the company built a new feeding-iu-transit station, 527 feet by 138 feet, with a corn barn, hose house and hog drenching room, watering platform, hay barn, stock pens and ramps. The new plant could handle 150 cars every 24 hours. The expansion of the yard represented a solution to another constant problem faced by the railroads lack of adequate storage tracks. The expansion included a yard with 50 miles of sidings. The Erie also maintained a passenger station for main line traffic in Buffalo.
Located on the corner of Michigan and Exchange Streets, the company erected a three-story brick station with stone columns and decorative trim, capped by a mansard roof. Three covered platforms, 350 feet long, protected the passenger boarding area. The station was 109 feet by 46 feet, housing waiting and baggage rooms, a ticket office, a restaurant and -two floors of offices. Repaired- ERIE RAILWAY SURVEY HAER (Page /S6 ) in after a fire, and again in and remodeled only ten years later, this station remained the main Erie station in Buffalo until the end of passenger service in the But Buffalo's main duty in the eyes of the Erie remained the shipment and trans-shipment of coal, iron ore and grain.
The Erie spent almost on a coal dock in and in the railroad gained control of a 500 foot by 200 foot area known as the Minnesota Docks, for iron ore shipments. Five McMilar steam cranes, running on parallel tracks,could unload tons in a ten-hour day with pound buckets. The coal plant was similarly equipped by the railroad the follow- ing year to maintain its competitive position. William S. Grattan won a contract to add 56 coal pockets to the 1,600-foot long dock, giving it a capacity of tons, A transfer trestle and Brown Hoisting and Conveying Machine, and a Harrison conveyor moved the coal. By the Erie had spent on the Buffalo and Piermont coal plants. The western plant could stock tons, while the pier in the Hudson held tons. The results more than justified the expense, however.
In receipts from coal traffic rose and the company reported, "the facilities for storing coal, both at Piermont and Buffalo, have proved a great success and account in a great degree for the large increase in traffic." Further additions came with the addition of a Dodge Coal Storage Company system, including nine piles of tons, serviced by a complete haulage system built under Dodge patents. Finally, an anthracite handling plant built by Robbins was added in The heyday of the Buffalo coal and ore facilities passed shortly after the turn of the century, as Cleveland, closer to the iron and steel belt of western Pennsylvania and Ohio, passed the city further north on the Lake.
The revived Erie Railroad had started improvement work on the existing North Randall, Ohio, docks just outside of Cleveland in a preview of things to come. In a coal unloader there dumped cars holding tons of coal. By the North Randall dock held tons of coal. After World War I the Buffalo coal operation was doomed. In the Erie retired both the Dodge and Robbins Coal haulage systems in Buffalo because of reduced traffic. The Erie's other strong suit in Buffalo had been grain shipments. But the grain trade proved troublesome because of the hazard of fire. An elevator with a capacity of bushels lasted only until when a fire destroyed it. Similar problems, and the loss of the grain trade to all-rail connections that bypassed Lake Erie, reduced the Erie's importance in this type of haulage.
ERIE RAILWAY SURVEY HAER (Page The real blow to Buffalo's status as an Erie terminal, however, was the gradual extension of the Erie into the Midwest, via the acquisition of the Nypano (Atlantic St Great Western) and Chicago & Erie. The New York, Lake Erie & Western lavished much attention on the Buffalo terminal at the same time the management began to extend the company's track mileage. The advantage of through line service soon left the Buffalo branch almost as behind as the old Western division to Dunkirk. The new main line became the line from Salamanca to Meadville, and on west. The Erie ultimately bypassed its Buffalo terminal. Jersey City The Erie terminal at Jersey easily ranked as the largest and most interesting Erie station point, on both the old and subsequent systems.
The initial development there began in on 212 acres purchased privately by the president of the company. The old terminal of the Paterson & Hudson stood on land now owned by the Pennsylvania Railroad, and could be reached only by a long round- about route at the vest end of the Bergen Hill. Despite the problem of access, the property offered great potential. As the Annual Report observed, "The proposed terminus in Jersey City will not only supply the conveniences desirable at the principal passenger station of a great railway, but will also furnish the requisite area for sheds and standing tracks for the required number of freight cars." The Long Dock Company thus formed only assumed importance to the Erie after the Bergen Tunnel opened an easy way into Jersey City.
From on, Jersey City became the Erie's main eastern terminus. Like the Buffalo terminal, freight handling was one of the main pur- poses of the station complex, and some of the same commodities passed through Jersey City. A coal pier built in 690 feet by 34 and 1/2 feet, represented an early effort to handle bulk freight through the Hudson Terminal. A grain elevator with a 1.5 million bushel capacity built during offered the other parallel with the road's western terminus, The General Freight Agent announced, "This grain elevator is without question the most complete and substantial building of the kind in the world. Every known modern improve- ment of practical merit which would add to the convenience of working has been attached.
The water pipes and hose are so systematically ERIE RAILWAY SURVEY HAER (Page distributed through the building, and connected as they are with an immense tank located in the dome, which will always be kept full of water, renders the protection against fire almost perfect. The scales in the building on which all grain will be weighed are so perfect in their con- struction and working that we do not hesitate to assure our patrons of their receiving correct weights at all times.
This elevator has a storing capacity of bushels, and its facilities for un- loading cars and for loading vessels are not equaled by any other elevator in America." The elevator was situated on the middle of its own pier, with track space on the river side to allow for the transfer of grain directly to lighters, or for the storage of cars after unloading. In the latter case, this provision minimized the shifting of cars. Normally, 150 cars could be unloaded each day, with the help of two yard engines. For internal power, the company provided two upright low-pressure beam engines, one held in reserve. Economical cut-offs, boiler dampers and controlled boiler settings led to efficient operation of this facility. There were significant differences, nonetheless, between Buffalo and Jersey City.
No better evidence of those distinctions appeared than the improvement program which included the new grain elevator. The New York, Lake Erie & Western was rebuilding the whole line Jersey City and Buffalo were not alone in receiving attention. But the focus of the Jersey City alterations showed the differences between the two terminals, For one thing, Jersey City, operated on a larger scale than Buffalo, because it received freight from a larger geographic area. Also, Jersey shipped more of their freight by ship, and on larger ships, than Buffalo. Thus, Jersey City had a large ship basin and dock installed in to handle ocean-going grain shipments. The foot long pier, 105 feet wide, gave a berth for the largest ships of the time.
The trans-shipment of grain from rail to ocean-going ship required far more extensive facilities than Buffalo ever needed, with its smaller Lake steamers. On top of this difference, the Erie's eastern terminus handled a more varied group of commodities. Of special interest was the shipment of perishable commodities into New York City. In the ERIE RAILWAY SURVEY HAER (Page company built a atilk station with pier access and, by a bulk vegetable depot had been built. The most propitious development at the terminal was the arrival of a fast refrigerator car of the Central Pacific on June 28, The car, with 806 boxes of plums, apricots and peaches, arrived from Vacaville, California, thereby inaugurating a trade in California fruit (which the Erie dominated ' throughout its life).
Growth in ventures like che perishable foods trade and in freight traffic in general forced the New York, Lake Erie & Western management into an almost continuous building program at Jersey City. The map in The Railroad Gazette showed the station area in located on five main piers, each over 700 feet long, with large car yards and other special facilities on land. The annual reports read like a litany with all the changes, including the installation of the company's own gas works. But despite these efforts the Report observed that further accommodations for freight storage were vitally needed. Unfortunately, the business conditions in the early were unfavorable for the expansion. Not until did the necessary funds become available to start the work.
Other features of this project included the grade- crossing eliminations in the city and the new repair shop.. The company also raised the level of the entire yard. In a new electric turntable and a steam heat and electric light were added. But the key project, the new tunnel through the Bergen Hill, did not begin. The new access route provided the central focus to the terminal improvements and without the cut .the other projects seemed like disjointed fumblings. That was unfortunate, for concomitant to the expansion of freight traffic had been increased congestion. Not until could the major effort needed to bring about the new Bergen Hill Cut be marshalled. Some parts of the proposed improvements never materialized, primarily because of the expense.
A tentative master plan, published in The Railroad Gazette April 24, had called for expansion of yard facilities, removal and replacement of the passenger.station to a position that would offer less interference with freight traffic and conversion of the old passenger ferry dock into freight lighterage slips. Of these suggestions, only the first actually happened. But the alterations that did take place, primarily rearranging the freight and passenger coach yards, did increase the terminal's ability to handle the many cars that passed through on "heir way into New York City, or to one of the Erie's freight yards in Brooklyn or Queens. One reason the railroad could affort to scale back its terminal improvement plan was the development of a second freight facility on the Hudson.
ERIE RAILWAY SURVEY HAER (Page &>) This terminal at Weehawken had been in existence since the but by its importance was very obviously apparent. The Erie had begun development of the terminal, located two and 1/2 miles north of Jersey City, in with the construction of seven oil tanks at Weehawken to store the flow of petroleum beginning to move over the Erie's tracks. Especially with the Bradford Division and the Atlantic & Great Western's lines into northeastern Pennsylvania, the Erie had become the primary carrier of the new fuel to the Jersey coast.
The Railroad Gazette observed that the new tanks gave the Erie, "greater capacity for storing oil than exists at any other railroad terminus in the country." Fire all but destroyed the new facility the next July, when lightning struck an iron tank filled with oil. With in damage to tanks, tracks, trestles and the dock, and a loss in oil, the company was hard-pressed to rebuild because of financial limitations. But the New York, Lake Erie & Western's administrators realized the value of the location, especially as the oil tonnage kept rising. In barrels of crude and refined oil traversed the Erie, and barrels followed in With the addition of a coal-loading trestle for ships, offered a portent of things to come.
The key move for Weehawken's future came in when the company exchanged property elsewhere for 500 feet of waterfront on 33 acres adjoining the old oil dock. Plans called for the expenditure of for piers, bulkheads, tracks and a large stockyard. . During the , Weehawken resounded to the echo of hammers and saws as a major complex appeared on the marshland. The new facilities included a 15-acre stockyard, two piers, one 650 feet long, the other 680 feet long, a 200 foot by 185 foot cold storage warehouse, improve- ments on the oil dock, a brick cooper shop and a pump and boiler house. By the oil tanks and stockyards each occupied ten acres. The shorter pier was covered, while the other had steam hoisting apparatus in its two-story shed and could store barrels of flour.
By further improvements had begun primarily to expand the shipping capabilities of the terminal. At a projected cost of million, two more long piers 100 feet wide were under construction and two 800 foot long covered piers were planned. One of the latter was slated to have heavy cranes and derricks for freight handling. Some feet of bulkhead and a new coal pier, feet by 66 feet, had to be constructed. The company also hoped to reclaim 14 acres of land then underwater. ERIE RAILWAY SURVEY HAER (Page ZO/) Because Che Erie had completed all of this work by the end of the work did not gee stuck, when the Depression brought the rail- road to its knees in With the dredging of cubic yards of materials from the slips, the terminal had ooened just in time.
The construction of the warehouses on the five covered piers drew the attention of Walter C. Berg, in his Buildings and Structures of American Railroads. The actual building was sheathed with white pine horizontal siding, and zinc castings were used around the doors and windows tor resistance to corrosion. A tarred felt roof kept out the rain, while iron trusses supported the second story and its^load - of goods. A wrought iron plate girder carried a center track trolley, which along with a barrel elevator provided lifting capability in the warehouse. The Weehawken terminal proved its worth by handling freight cars over its float bridge in'1899 and shipping more than tons of coal two years later.
For more than fifty years the Erie Railroad made use of these facilities to excellent advantage, overcoming much of the disadvantage the Erie faced because of lack of direct access to Manhattan, the Bronx and Queens. The only real setback occurred on November 3, when fire destroyed four covered piers and a brick warehouse. To replace the piers and accompanying warehouses, the Erie built.a single pier 828 feet by 100 feet to replace the 750 foot pier. With a two-story shed, the new pier had nearly the same space as two of the old piers.
Built on Georgia pine piles, as well as the old piles, The Railway Age noted, "Pre-cast concrete, extra large timbers of Douglas fir and zinc sheathing in a design that departs somewhat from the ordinary, are the unusual features incorporated in a new pier that the Erie has recently constructed on the North River at Weehawken, New Jersey." The pre-cast concrete blocks formed the outer pedestal wall, the Douglas fir served for floor supports and the zinc afforded resistance to salt-water corrosion. The fir beams were as large as 24 inches by 34 inches around and 21 feet three and 1/2 inches long. A central bay carried lifting devices, while eight elevators provided easy move- ment within the building. A second pier followed on the same general lines.
ERIE RAILWAY SURVEY HAER (Page &Z) Changes continued over che years Co allow che Weehawken piers to handle Che heavy freight loads thac came their way. Gentry cranes on an open pier in che reconstruction of a warehouse co permit three stories on a two-story foundation; alterations in to extend the team track area, pave the driveways and add two locomotive cranes; all helped improve the terminal. But che facility became out- moded as the economy and che railroads changed.
Pipelines, crucks and containerizacion were only three faccors thaC led the Erie to close ouC its Weehawken operation completely in The two long piers remained a tribute to their durability, but che rest of the site lay abandoned in As extensive as the Weehawken docks were, the Erie had still been forced to base certain freight operations at Jersey City. In a live stockyard, live poultry yard, team tracks and a less-than-carload freight terminal existed with the passenger station. Freight storage space declined somewhat, as fire destroyed piers five and six on November 16, causing a loss of million. But with the construction of a new pier in the company more than made up for the loss.
The new pier, number nine, replaced a dock that had been entirely rebuilt in with a fireproof double deck steel warehouse to serve both lighters and steamships moored alongside. The pier, feet long and 150 feet wide, straddled the Holland Tunnels and this location complicated the construction. The contractors had to drive the piles in three closely-packed tiers, rather than in the usual equidistant groups. The unusual spacing required longer piles than normally used, 85 feet to 110 feet in length, which then bracketed the Holland tubes. The piles consumed lineal feet of timber. The connection between the pier and the Holland Tunnel was clearly indicated by the placement of one of the ventilating towers for the. tubes at the end of the tunnel.
On this foundation, the company built a six by six-inch timber deck to support a poured-in-place concrete wall. In its turn, the wall supported the side wall columns and structural steel beams for the main floor. The building itself consisted of a steel framework covered by steel siding. For easy access to the ships a total of 188 fully opening cargo doors punctuated the sides of the building. Three firewalls partitioned the structure into quarters, while 17 cargo elevators served the two floors of storage space.
The Railway Age commented favorably about the huge warehouse, observing that, "This pier...is worthy of special notice for a number of reasons, including its size and the effectiveness of its arrangement, its favorable location, the permanent type of construction employed, and the special problems encountered in its construction." ERIE RAILWAY SURVEY HAER (Page & ) Pier nine and an older facility next door, number eight, served the railroad as long as Che Erie maintained an intensive operation "at Jersey City. In fact, by these two docks were the only remnants of the Jersey City terminal still standing, although they were out of use. Having been retired in the these were almost the last features of Jersey City to remain in operation.
The operation of the freight complex had led to the construction of auxiliary facilities that made the functioning of the terminal feasible. First and foremost was the power house. Initially located near pier five, adjacent to the passenger station, two Westinghouse gas engines powered three-phase 60-cycle generators producing volts for the depot and milk platform. This small plant quickly proved inadequate, so the company replaced it with a central facility that consolidated several smaller power plants. By the the power plant was needed only for steam and compressed air, rather than electricity, which the company could purchase from utilities. So, unlike powerhouses elsewhere on the system, this new plant at Jersey City contained no electrical generating equipment.
With contracts let in construction work began on August 18 that year and concluded July 8, Bates & Rogers of Chicago constructed the steel and brick powerhouse, 98 and 1/2 feet by 60 feet, with a 30 foot by 76 foot machine room. The boiler room was 72 feet by 26 feet, A 12 foot inside diameter draft stack 200 feet high provided the draft. The building itself was constructed of brick, with stone quoins and concrete lintels over the doors and windows, the exterior matched the radial brick design of the Alphonse Custodis stack. The equipment for steam generation consisted of ten Foster marine- type boilers rated at horsepower; each was equipped with super heaters. Dutch oven type furnaces with a Detrick flat suspended arch formed the firebox for the combustion of pulverized coal.
The Economy Equipment Company supplied the crushing equipment that was- fed by an R. H. Beaumont & Co. skip hoist. The hoist raised 40- tons of coal per hour in a 60 cubic-foot bucket that dumped directly into the crusher. From the crusher the coal traveled through a Cutler- Hammer magnetic separator into a 500-ton bunker. A lorry car drew the coal out of the bunker and fed ten pulverizers with a one-ton hourly capacity. Four of these units were electrically driven while Westing- house steam turbines powered the remaining six. The air compressors were less involved. The two largest were Ingersoll-Rant units, rated at cubic feet per minute. One was steam driven, while a 265 horsepower synchronous motor ran the reserve compressor.
The whole plant gave the Erie a modern efficient facility that remained in service until the terminal closed in the late ERIE RAILWAY SURVEY HAER (Page As lace as the company redid some of Che boiler foundations, although not all tan remained in use by that data. The other auxiliary installation at Jersey City consisted of a trio of electrically-driven float bridges. Two went in during with a third added later, to replace old pontoon-type bridges. The' float bridges provided the means of loading freight cars onto the company's fleet of car floats. This tricky operation required extreme caution for the maintenance of proper balance, lest the whole barge tip. The bridges were movable to compensate for the movement of the tides on the Hudson.
The Erie, without direct access to New York City, had to maintain a massive fleet of tugs and barges to transport its freight cars around the harbor. Although complicated, this system remained far more economical than breaking bulk, and was universally used in a number of ports. The Erie maintained a similar operation in Chicago, but the New York fleet dwarfed the inland city's- maritime outfit. Each double-track bridge consisted of a pair of 110 foot long plate girder ramps projecting from a 30 foot apron, so that each track could be raised independently. The design had to contend with an 18 foot rise and fall of the tides and was built to carry 170 tons. The driving mechanism utilized a 100 horsepower motor for each pair of ramps.
The motor powered phosphor bronze nuts that actuated two forged steel screws by means of worm and worm wheel hoisting units. Designed by J. B. French, a New York consulting engineer, the float bridges provided a long-*lasting solution to the problem of decaying timber structures that had to carry heavier freight cars. Not until the early were the three bridges scrapped. All of these structures-warehouses, float bridges, the livestock. yards, grain elevators and pier spread over two separate sections of riverfront gave the Erie one of the best equipped freight handling complexes on the New York harbor.
The layout was by no means exceptional, as a glance at the Jersey City quadrant map of the United States Geological Survey presents a picture of continuous rail facilities on the Jersey shore of the Hudson. The Pennsylvania, Lehigh Valley, Central Railroad of New Jersey and Delaware, Lackawanna h Western all maintained waterfront complexes like the Erie's. But the Erie's facility was one of the first to be established, and one of the most porgressive over its lifetime-. As well as being the largest Erie terminal, Jersey City included a passenger station that was the Erie's only claim to fame in terms of large-scale passenger depots. ERIE RAILWAY SURVEY HAER (Page Jersey City Passenger Depot The Erie, as the above chapter should make clear, existed primarily as a freight line.
Partially because of its route through the sparsely inhabited Southern.Tier, and partially because the road lacked direct access into Slew York City, the Erie attracted fewer long distance passengers than its competitors. The Erie never had any incentive to build grandiose passenger depots, that characterized many larger American cities, with one exception Jersey City. As the Largest city on the Erie, and located directly across the Hudson from Jfew York, Jersey City merited a terminal building befitting the city's stature. In the station at Jersey City consisted of a typical Erie-built station, a 24 foot by 60 foot frame building, flanked by wooden freight, express and milk depots, Not until the completion of the Bergen Tunnel had the station assumed any role of importance.
The Long Dock Company realized the value of the site for both freight and passenger service. Expansion of the passenger station formed an integral aspect of the Erie's plan, under the Long Dock Company's aegis, to develop a Jersey terminal. The key feature of any passenger terminal located on the New Jersey side of the Hudson was its ferry terminal. The Erie initiated construction of the ferry slip at the terminal during the period as part of the Long Dock program. The railroad purchased three ferries from the Brooklyn Ferry Company and on May 1, inaugurated service to Chambers Street, Manhattan. With the expansion of service to a terminal on Street, also in Manhattan, in May, the Erie was running six boats across the Hudson from three slips out of the Jersey terminal.
The rail terminal and the ferry house acted together to funnel a large flow of commuters into and out of New York City. The Greenwood Lake line, the main line to Suffern, and the Northern Railroad of Hew Jersey to Piermont, all carried substantial numbers of people in and out of Jersey City. The terminal burned on March 21, The fire began in the passenger depot and spread to the ferry house and freight houses. Naturally, the wooden structures were completely destroyed. The loss came at a bad time for the railroad company, which went under the next year. Temporary structures had to serve the company until the mid In the company began rebuilding a new set of ferry slips, just below the old ones. Not until was work on the new passenger station begun, as reported in The Railroad Gazette.
ERIE RAILWAY SURVEY HAER (Page "Work is not actively in progress on the new passenger station in Jersey City. The main building, which will contain the ticket office, waiting rooms, etc., has the frame all up, and will be enclosed in another week. It is close to the ferry house and cannot fail to be a great improvement on the rickety and dirty shed which has served, for a depot for several years. The new station is of wood and is a temporary building only, not being expected to last more than two or three years, or until the company can build, a suitable permanent structure." The immediate question of the construction of a permanent pas- senger station remained unresolved until after but this situation was not true of the ferry houses.
In the company had opened a new ferry house in Jersey City, its Pavonia Station, so named for Pavonia Avenue that ran into the station. At that time, the Chambers Street Station in New York was only sis years old, having been rebuilt in while the original Street house still stood. These facilities proved very adequate for the time. The Pavonia Terminal was a long frame structure with three slips for the ferries, with elaborate wrought iron gates. Gables with glass panels marked the entrance gates for each particular route. The build- ing was basically a shed, supported by metal roof trusses. The two and 1/2 story Chambers Street Terminal was more imposing, as the designer adopted the Second Empire Style with its characteristic mansard roof and dormers.
But compared to the passenger station about to be built in Jersey City, the ferry house paled. The company let contracts in to begin construction of the long-delayed permanent passenger depot. By this time, the building was badly needed. The Railroad Gazette wrote that the company planned "to replace the present very shabby temporary structure, which has long been insufficient for the business and was indeed never fit to be used as the terminal station of a road with the business of the Erie." No such statement could be made about the permanent structure built in The station represented one of the finest examples of American Stick Style as carried to its fullest development. Three rectangular towers, the tallest 115 feet high, were capped by copper finials, one of them 15 feet long.
The decorative panels of frame siding, and the use of shingles and dormers all denoted the architectural details of the Stick Style. The building was 127 feet long by 120 feet wide, with a 24 foot eave all around. ERIE RAILWAY SURVEY HAER (Page 07) The appointments were lavish. The outside panels were painted "parti-color to accentuate the details." The tallest tower sported a six foot diameter clock tace lit by electricity. The main waiting room was 100 feet by 66 feet, and 50 feet high in the clear. Stained glass windows in a clerestory let in sunlight to the hardwood finish and maple floors of the main room. A gallery opened off the main room into offices for the operating department, car record clerks and depot master.
The company supplied electric lighting and steam heat came through 60 Burndy radiators. A large train shed covered the eight passenger tracks. The shed spanned 140 feet, in sections of 37 feet, 66 feet and 37 feet. Some 600 feet long, the shed also reached a maximum height of 56 feet. The framework was wrought iron with walls sheathed with wood and galvanized iron. This shed was the most interesting feature of the station. As Carroll Meeks has pointed out, the covered train shed was strictly a nineteenth century phenomenon and for him represented one of the greatest architectural and engineering achievements of the age. In- novation and invention led to sheds of increasingly greater span throughout the century.
The inevitable competition developed, as the railroads vied to boast of the widest span train shed. Meeks said, "The railroad companies took pride in their colossal halls and lavished their funds upon the, presumably motivated in part by considerations of publicity and prestige." The Erie entered this competition with its station. Although not the longest or widest of the train sheds built, it remained, none- theless, an impressive engineering accomplishment. The whole station, and not just the shed, was Che forerunner to a group of stations built on the Jersey side of the Hudson in the The Pennsylvania Railroad and Central Railroad of New Jersey both built stations with ferry connections into the city. But as Meeks noted, the Erie's was the first.
"Two of the three maritime terminals made no great effort at size or dignity. There was little need to make a great architectural show, since all three stood in an industrial neighborhood and served primarily as a transfer point for travelers whose eyes were on more remote objectives. The earliest was built for the Erie Railroad. Its main span was constructed in the French manner." Meeks was too harsh in his comments concerning the architectural features of the station. But he was more correct in his earlier ERIE RAILWAY SURVEY HAER (Page statement that the layout adopted by the Erie train shed, head house and ferry terminal in sequence was the scheme used for the. other two stations built facing the Hudson River in the The station cost the results, however, were striking.
As The Railroad Gazette wrote, "The Erie [was] in possession of the most commodious and best passenger station of the railroads terminating * [in Jersey City]." The improvement program of the New York, Lake Erie St Western encompassed more than just the new terminal. All of the ferry houses came in for some attention. The Pavonia Terminal had new landing bridges installed, with iron spans replacing the old Howe truss crossings. Chambers Street received general repairs, but the greatest alteration occurred at the Street Ferry House. Improvements begun there in led to a nearly new structure completed the next year at a cost of The company's comment about the 23rd-Street. .
Terminal in could have characterized all of the Erie's ferry facilities: "[This improvement] provides this company now with the most excellent freight facilities at that point, and is securing a large addition...to traffic " These buildings demanded constant attention and the annual reports plotted the company's efforts to keep pace with the decay caused by- salt water. In a new ferry waiting room at Pavonia Avenue completed the company's terminal improvements of trie By the extensive overhaul of the ferry racks at all three terminals had to be undertaken, while the station and shed also were repaired. The major alteration of the late was the removal of the train shed.
The need for additional trackage and the heavy expense of maintaining the shed led to the installation of wooden platform sheds on ten tracks, an increase of two tracks over the original design. The company also renewed the floors, foundation timbers and gangways in the station. One of the interesting features of this post-Depression expansion was the inclusion of an emigrants' waiting room. The Erie had started direct service between Castle Garden and Jersey City in late or This connection enabled the new arrivals to bypass New York* By and almost certainly earlier, the company had set aside a special area for their reception. Apparently the railroad felt that the emigrants could not share quarters with the normal passengers.
According to a photograph, the waiting room was placed on the second floor of pier five and was furnished with rows of wooden benches. The company had rebuilt this dock in after a fire and perhaps installed the waiting room then. The other guess might be that as part of the terminal improvements of ERIE RAILWAY SURVEY HAER (Page &9) onward, Che company redid the pier for the emigrant: room. The photograph does show a nicely done, very fresh looking corrugated iron shed on pier five, so might be the year the company opened that particular facility. When-it opened, on November 16, piers five and six burned and the emigrant waiting room was completely destroyed.
By the freight float bridges went in there.- (See below.) The increasing traffic that accompanied the return of business confidence in the late soon caused the company to begin efforts to replace most of these waterfront: facilities with new modern structures. These plans came as part of the newest terminal improve-. iaent project that included the Bergen Cut. But as noted above, the company's plans, as announced in the April 24, Railroad Gazette, proved too ambitious. Of the proposed three new ferry houses and the replacement of the Jersey station, only the two Manhattan ferry terminals were actually reconstructed. The company prepared plans for the Chambers Street ferry house in that resulted in a structure resembling the Pennsylvania Railroad's terminal there.
The structure fronted on the river for 160 feet, held two ferry slipss and extended back, off the river 282 feet. The main waiting room was 82 feet wide, with a second floor waiting room that had ramps reaching the upper decks of the boats. The Street Terminal underwent a similar, equally thorough rebuilding. The company chose to construct a new steel frame building that was part of a four railroad ferry complex. The Central Railroad of New Jersey, the Delaware, Lackawanna & Western.and the Erie all shared a complex designed by Kenneth M. Murchison of New York, while the Pennsylvania had its own adjoining terminal. All four separate structures were grouped on a broad cobblestone plaza. The concentra- tion of ferry landings made Street the center of such activity on Manhattan.
The Erie house, with two slips, stood on the upstream side of the Lackawanna house that formed the center of the grouping. Like the others, ornamental sheet copper sheathed the steel framework. This type of construction was common in New York ferry terminals the Hobcken Station of the Delaware, Lackawanna & Western also used these materials. Likewise, they can still be seen on the Governor's Island ferry house at the Battery. The copper lent itself easily to shaping for the ornate designs used for ornamentation. The houses were designed to eliminate a hood and the ferry ran into the house itself. This arrangement simplified the construction of the ramps for access to the second deck of the boats.
With the construction of a shed feet long and 50 feet deep that extended along the front of the terminals, ample provision was made for inclement weather protection of passengers. ERIE RAILWAY SURVEY HAER (Page The company let bids in June, and by the next February, the Street Terminal was in service with large waiting rooms on two levels and the usual baggage and ticket facilities. Interior decoration consisted of sheet metal, painted and trimmed with wood, while the floors were maple or pine. The team gangways were made of three-inc spruce boards. One of the advantages to the new ferry terminals on the New York side was the provision for an upper deck transfer bridge that allowed for faster turn around, as passengers could exit on two more gangways.
This design forced the Erie to build new boats with a second deck, which the company began to do in Up until that time, the boats. used by the railroad probably differed very little from this one, built in "A new ferry-boat, with iron hull, for the ferry from New York to Jersey City, has just been completed. The boat, which was designed by Mr. Theodore Allen, naval engineer, and built by John Roach & Son, of New York, is of the follow- ing general dimensions: Length between perpen- diculars, 180 feet; length on deck, 193 feet; beam over hull, 36 feet; beam over guards, 64 feet. The hull has been designed to give great stiffness, with unusual strength to resist ice.
The longitudinal framing is much heavier than is generally used in iron vessels of this size, and at the ends the plating of the hull is made thicker, intermediate frames and breast hooks are added, with the intention of rendering it so strong that even when the full force of the engine is exerted it will be perfectly safe to drive the vessel into the thickest fields of. fresh- water ice. For additional safety there is, about twenty-five feet from each end of the vessel, an iron water-tight bulk-head.
The boat is driven by- a beam engine of 46 inches diameter of cylinder and 11 feet stroke of piston, driving paddle-wheels of 22 feet diameter; the steam is supplied by a boiler of the drop-return flue type, the engine is hand- somely finished, the engine room neatly painted, and the floor laid with encaustic tiles of neat design. In addition to the usual steam pump for feeding the boilers, there is a large size Woodward steam fire- pump, with hose connections in hold, on main deck and hurricane deck.
A vertical tubular boiler of sufficient capacity, in which steam can be quickly ERIE RAILWAY SURVEY HAER (Page // ) raised, is provided for use when the boat is not running, thus affording great protection in case of fire, both for the boat itself and also for the company's wharves and property. The cabins are roomy and high; the floors and seats are of black-walnut and ash in narrow strips. The boat is to be lighted with gas and has the usual provision of life-boats, life-preservers, etc." This boat, in terms of size and propulsion equipment, differed little from some of the standard Hudson River steamers. The beam engine and covered side guards also marked the ferry as an Eastern steam boat.
The Susquehanna, a noted Erie ferry, seemed to match very closely the ferry described by The Railroad Gazette. ^e Susquehanna was built in for the Erie as the fifth company ferry, and the second new one. She was a typical ferry on New York's harbor, with, single deck, twin pilot house's and coal burning boilers. In the company" rebuilt her as one of the earliest renewal efforts by the newly reorganized railroad. At the turn of the century, the Erie had amassed a sizable fleet, as had all the railroads terminating on New York harbor. Not only did the Erie use eight ferries to conduct its passenger service, but the railroad also had to provide the means of transporting all its freight cars across the Hudson and East Rivers.
In this effort required 12 tugs, 24 car floats* 3 steam hoists, 29 covered barges, 18 open barges and 3 steam barges. By three new ferries and four tugs had been added to the roster. The Susquehanna, with its beautifully decorated passenger area, remained in service, although after she served only as a passenger ferry. Only with the end of ferry service was the Susquehanna retired in The maintenance of this fleet required a dockyard repair facility which, until the , was at Weehawken. But the Navy requisitioned it during the war. After a fire destroyed pier one and the grain elevator at Jersey City in May, the marine repair unit took over that space.
By the late a drydock floated in Harsimus Cove, alongside the standard shops carpenter, machine and boiler, store- house, mooring rack and lumber yard. The company considered this shop with its 400 men "one of the most efficient units of the system." It is well this was the case, for by the Erie owned 236 floating units, the third largest fleet on the harbor. Among these were 111 covered barges, 82 lighters, 26 car floats and 12 tugs. ERIE RAILWAY SURVEY HAER (Page / ) The growth in river traffic early in the century guaranteed che Jersey City station's importance and assured its maintenance. The company never built che new station it had planned in but the old one remained more than adequate.
In extensive repairs at the station were undertaken, while a similar effort in raised the level of che floors and platforms, and installed new platform gates and train indicators. An interior remodeling followed in with a new toilet using chrome-plated furniture of the latest style, paint- ing, new light fixtures and a new newsstand capped this renewal. The new ferry terminals came in for far lass attention. The only exception was the reconstruction of the Chamber Street structure after fire destroyed it on March 26, The other problem arose from the gradual decline in ferry ridership as the century progressed.
From a total of 24 million commuters in the mid 19 20s about people a day--the number of people passing through the Jersey City station dropped to in The station remained very busy even then, as a c. photograph illustrated. During the rush hour peak from to 30 trains pulled out of the terminal on five different routes. But the number of riders were not adequate to support the Street Ferry, which discontinued service on July 5, The continued decline in commuters down to in led the money-conscious company to push for the discontinuance of ferry service over th.e lone remaining route. By the company hoped to marge its terminal operations on the Jersey side of the river with the Delaware, Lackawanna & Western's in Hoboken.
The Erie terminated its trains there in but the New York., Susquehanna & Western also shared the Pavonia Avenue Terminal, forcing the Chambers Street boat to run until December 31, Only people used the ferry daily by then, so the ICC gave permission for the Erie to close the station completely. The Erie hoped to save annually, With the closing of the Erie's Jersey City station, the only ferry service across the Hudson was-operated by the Delaware, Lacka- wanna & Western from Hoboken. The Jersey City terminal survived only nine months after it was closed before the company demolished the station and all but two piers and a water tower. By the end of October, only bare tracks and rubble marked the station's site.
The Jersey City Terminal remained in use as a freight handling center after the railroad demolished its passenger terminal. But even that use was jeopardized. The St. Lawrence Seaway altered certain traffic patterns, and geographic and demographic shifts also altered shipping routes. Overall, the Erie's freight tonnage dropped. ERIE RAILWAY SURVEY HAER (Page By the mid not only'was che Erie's utilization of its Jersey City terminal lower, the railroad had retired and sold its Weehawken complex. The whole Jersey City waterfront, not just the Erie section, entered a period of sharp decline through the By abandoned piers outnumbered those still in use.
The Erie still used a part of the yard as an entry point for foreign automobiles, and the Bergen Tunnel remained in use in 3ut like the E-in-a-diamond symbol of the Erie on the water tank behind pier eight, the railroad has faded from the Jersey City scene. ERIE RAILWAY SURVEY HAER (Page FOOTNOTES [1] Edward H. Mott, The Story of Erie (New York., , remains the most thorough source for the early history of the company. Less detailed and relying heavily upon the work of Moct is Edward Hungerford, Men of Erie (New York, which is much shorter but also more readable. Because of the adequacy of these works, there is no need for this survey to go inco great detail concerning the events lead- ing to the founding of the railroad. Most of the material for this chapter was drawn from these two books.
[2] Moct, The Story of Erie, pp. [3] The company's charter required the railroad to serve New York State and prohibited the road from connecting with any out- of-state rail line. This clause was fatal to the route up the Delaware River, for such a route necessitated crossing over to the Pennsylvania bank for long stretches. The Delaware and Hudson Canal Company occupied the New York bank. 03 Mott, The Story of Erie, p. 27. [5] American Society of Civil Engineers (ASCE), Biographical Dictionary of American Civil Engineers (New York, pp. (Hereafter cited as Biographical Dictionary.) [6] Mott, The Story of Erie, p. 31. [7] New York & Erie Railroad Company (NY & E Report of the Directors for the Year p.
17 (Hereafter cited as NY & E RR with the year of the report.) [8] ASCE, Biographical Dictionary, pp. 98, Johnson had been Chief Engineer of the Auburn and Syracuse. Railroad before coming to the Erie. Along with him came Simeon S. Post. Captain Andrew Talcott was an graduate with fortification work for the Army before superintending con- struction of the Dismal Swamp Canal from to By he was a Captain in the Engineering Corps and had developed a means of determining terrestial latitude. After resigning his commission he went to the Erie but only worked there until Talcott went on to work for a number of other railroads and for the Delta improvement project at the mouth of the Mississippi. [9] Mott, The Story of Erie, p. ERIE RAILWAY SURVEY HAER (Page Ibid. . p. Ibid. Ibid. p. Ibid, , p.
44. , Ibid. Ibid. P* Ibid. , PP . Mott, The Story of Erie. pp. This choice aeed not have been made. In Major Brown traveled to Europe for the specific purpose of learning the newest English advances in railroad construction. He reported that British engineers now disapproved of the broad gauge and several railroads had changed from it. But the directors refused to support a move to reduce the gauge of the line already down some 54 miles at the time from Piermont to Middletown, at a cost of Hezekiah Seymour was the only engineer still in favor of the broad gauge, but the directors backed the older engineer. Not until the did the company reduce the gauge. Ibid., p. Ibid., p. These were not strap rails. Ibid., pp.
This system was intended to aid in snow removal and prevent the blockage of the track by an ordinary fall. See HAER Report, DE-18, on the New Castle and Frenchtown Rail- road, by Larry D. Lankton, Delaware Survey, NY &-E RE, Report, p. 28. Mott, The Story of Erie, p. m & E RR, Report, p. 15. Mott, The Story of Erie, p. Photograph 1 shows an engraving of one of these machines. Supposedly wheels on the unit enabled the whole assembly to move from pile to pile. ERIE RAILWAY SURVEY HAER (Page /&) Photograph 2 shows an company drawing of this pile supers tructure. Mott, The Story of Erie, pp. NY k E RR, Report, p. 19. Mott, The Story of Erie, p. Ibid- Ibid., pp. Ibid., p. Ibid., p. Ibid., pp. Ibid., p. Ibid., pp. Ibid., p. Ibid. Harper's New York and Erie Railroad Guidebook (New York, p. 62.
(Hereafter cited as Harper's Guidebook.) George Duggan, Specimens of the Stone, Iron and Wood Bridges of the United States Railroads (New York, . This infor- mation was drawn from a standard Erie grading contract reproduced in Duggan's book. (Hereafter cited as Specimens.) Mott, The Story of Erie, p. *23 Ikil* PP* Photographs 3 and 4, taken above Saw Mill Rift, give some idea of the problems faced by the company's engineers and the contractors' laborers in this area. Harper's Guidebook, pp. 90. Photographs 5 and 6 show the type of terrain encountered through the valley, while Photographs 7 and 8 show the retaining wall east of Shohola. In concrete buttresses had to be added to brace the old stone walls, as shown in Photograph 9.
ERIE RAILWAY SURVEY HAER (Page < /7) Mott, The Story of Erie, p. Ibid. Photograph 10 shows the cut in.1971, while Photograph 11, taken in gives a better feel for the depth of Che cutting. Ibid. , pp. Information concerning the bridge is also drawn from the Collection of Llewellyn Nathaniel Edwards, C. E., D. of E. presented to the United States National Museum, Hay, (Hereafter cited as Edwards Collection.) Copies in the Erie Railroad File, National Museum of History and Technology Robert Vogel, Curator of Civil Engineering. (Hereafter cited as Erie RR File, Robert Vogel, CE Curator.) See Photographs David Plowden, Bridges: The Spans of North America (New York, p. 34. (Hereafter cited as Bridges.) Harper's Guidebook, p.
See also "Report of James Laurie Civil Engineering, of his Examination of Certain Bridges on the Railroads of the State of New York," January 4, Report made to the Board of Railroad Commissioners of New York. NY & E RR, Report, pp. Ibid., Report, p. 31 Mott:, The Story of Erie, p. Railroad Gazette, Volume 7, August 28, p. Ibid., September 18, p. 390 and November 20, p. Photographs 15 and 16 show the embankment as rebuilt, with the culvert and retaining walls clearly visible in Photograph 16. Duggan, Specimens, Plates VXII-X; see Photographs 17 and 18. ASCE, Biographical Dictionary, pp. Mott, The Story of Erie, p. Plowden, Bridges, p. 29. Duggan, Specimens; see Photographs ERIE RAILWAY SURVEY HAER (Page / ) William Wehner, Conrail Engineer of Bridges, Buildings and Structures.
Conversation held in Philadelphia July 25, Mr. Wehner was extremely helpful, providing a wealth of information on the current disposition of many of the old Erie structures. (Hereafter cited as William Wehner, Conrail Engineer.) New York, Lake Erie & Western Railroad Company, Report of the Directors to the Stockholders, p, 32. (Hereafter cited as NY, LE & W RR with the year of the report.) Plowden, Bridges, p. 29 and William Wehner, Conrail Engineer. Plowden, Bridges, p. NY & E RR, Report, p. 10. Mott, The Story of Erie, pp. Ibid*, p. 94. NY & E RR, Report, pp. Ernest S. Cronise, "The Erie Railroad System," The Bond Record, Volume IV, March, p. Mott, The Story of Erie, pp. and Railroad History, Bulletin Autumn, "Outline History of the Erie,'1 pp.
see also Maps in Appendix B for the location of the various towns and cities named. [70a] Mott, The Story of Erie, pp. McCallum was an interesting individual who also developed an inflexible wooden arched truss bridge that was heavily used on the Erie and elsewhere. After leaving the Erie he superintended the military railroads of the Union Army during the Civil War. During the course of the war McCallum built miles of road, repaired 640 miles more and erected 26 bridges. Also a poet, his best known composition was "The Water Mill." McCallum is a typical example of the many engineers who possessed widespread and eclectic interests, and who learned to build the nation's transportation network as they went. Alfred D. Chandler, The Railroads: The Nation's First Big Business (New York, pp.
See Map 1 in Appendix B for a layout of the whole Erie system. ERIE RAILWAY SURVEY HAER (Page J3) "The Erie Railway Report," Railroad Gazette, Volume 3, December 28, p. [73a] ' Railroad History, Bulletin p. 7. Erie Railway Company, Fifth Annual Report, p. 24. Mott, The Story of Erie, p. lb id., pp. see Captain Tyler, Report on the Erie Railroad and its Connections (London, NY, LE h W RR, Report, p. 21. NY & E RR, Report, pp. Railroad Gazette, Volumes The majority of the coverage is in the last volume, as the project neared completion. Ibid., Volume 12, June 25, p. and July 2, p. The Western Division never had a third rail since the Dunkirk, branch never had the traffic to warrant it. Almost all through traffic ran to Buffalo or via Salamanca to the A. & G. W.
Ibid., Volume 17, January 30, p. 80. NY, LE & W RR, Report, p. 9. Railroad Gazette chronicled all of these additions. Mott, The Story of.Erie, p. [84a] rie Railroad, Second Annual Report, p. 15. Railroad Gazette, Volume 41, December 14, p. Ibid., Volume 30, September 23, p. Volume 33, February 15 and April 3, pp. Erie Railroad, Fifth Annual Report, p. 18. Ibid., Sixth' Annual Report, Hungerford, Men of Erie, pp. Railroad Gazette, Volume 41, December 14, p. ERIE RAILWAY SURVEY HAER [Page J 0) Ibid., Volume 35, September 19, ?. Ibid., Volume 41, December 14, p. Erie Railroad, Twelfth Annual Report, p. 17. Ibid. Ibid., p. 16. Ibid., Thirteenth Annual Report, p. 16. M. B. Wakefield, "Graham Gut-0f ," Railroad Magazine., Volume 55, September, pp. Erie Railroad, Thirteenth Annual Report, p. 17.
Wakefield, Railroad Magazine, pp. Railroad Age Gazette, Volume 45, November 6, pp. Wakefield, Railroad Magazine, p. 44; see Photographs which show Hurley track machines at work on the River Line. Material on the operation of these machines comes from W. M. Camp, Notes on Track (Chicago, pp. Camp, Notes on Track, p. Wakefield, Railroad Magazine, p. 48. Erie Railroad, Fourteenth Annual Report, p. 16. Uungerford, Men of Erie, p. Photograph 31 shows the kind of problem faced here with the loamy soil. Photograph 32 depicts the standard procedure for erecting an embankment, as used on all of these freight cut-offs. A trestle work was filled in with earth to make a solid earth wall. See Photographs 33 and 34; Camp, Notes on Track, p. and Trade Catalogs of the American Hoist and Derrick Company.
Ibid. Erie Railroad, Fifteenth Annual Report, p. 16. Ibid., Sixteenth Annual Report, p.. 16. ERIE RAILWAY SURVEY HAER (Page Ibid., Fifteenth Annual Report, p. 16. LU1] Railway Age, Volume February 22, p. 74. William Wehner, Cotirail Engineer, discussion July 25, Hungerford, Men of Erie, p. Railway and Locomotive Engineering, Volume 26, May, p. Erie Railroad, First Annual Report, p. 17. Ibid., Third Annual'Report, pp. The Penhorn Creek Railroad is discussed in the section on Tunnels. Ibid., Fourth Annual Report, p. 17. Ibid., Sixth Annual Report, p. 20. Ibid., Seventh Annual Report, p. 17. [ Ibid. , Eighteenth Annual Report, p. 14. By the next year, the work, was completed in Narrowsburg, Barton, Corning, Collins and Gowanda, and underway at Naneut, Gtisville, Jamestown and Buffalo.
Nineteenth Annual Report, p. 14. Ibid., Nineteenth Annual Report, p. 14. Railway Age, Volume 82, February 26, pp. Erie Railroad, Thirty-first Annual Report, p. 14. The Railway Age, Volume 83, August 6, p. Erie Railroad, Thirteenth Annual Report, p. 14. Erie Railroad Magazine, Volume 28, January, pp. 40. Ibid. Erie Railroad, Thirty-first Annual Report, p. 14. Railway Review, Volume 75, September 20, pp. John Stover, American Railroads (Chicago, pp. ERIE RAILWAY SURVEY HAER (Page Hungerford, Men of Erie, pp. Ibid,, pp. Wood, Struthers b. Company, "Erie Railroad Company; Its Prospects Under Van Sweringen Management" (New York, Introduction. Erie Railroad, thirty-third Annual Report, p. 14. "Looking Forward on the Erie," Erie Railroad Magazine, Volume 14, March, p. 14.
Railway Age, Volume 84, April 28, p. Hungerford, Men of Erie, p. Ibid., p. Erie Railroad, Forty-first Annual Report, p. 8. Erie Railroad Magazine, Volume 32, February, p. 10. Ibid., Volume 30, May, pp. 9, 38. "Erie Eliminates 15 Grade Crossings at Elmira, New York," Railway Age, Volume 98, June 29, pp. This wall can be seen in photograph 281 of the Elmira Station. Stover, American Railroads, p. Ibid., p. Modern Railroading, Volume 6, May, p. Erie Railroad Magazine, Volume 39, October, pp. and Erie Railroad, Annual Report, p. 19. Modern Railroading, p. Ibid., p, see Photograph 35. Frederick Westing, Erie Power (Medina, Ohio, pp. Hungerford, Men of Erie, pp. Ibid., p. ERIE RAILWAY SURVEY HAER (Page Erie Railroad, Annual Reports. Modern Railroading, p. 43. Erie Railroad, Annual Report, p. 7.
Ibid., Annual Report, p. 3. Modem Railroading, pp. "Panoramic View of Maintenance of Way Policy," Railway Track and Structures, Volume 51, December, pp. Erie Railroad, Annual Report, p. 8; Annual Report, p. 10. Hungerford, Men of Erie, pp. Erie Railroad, Annual Report, p. 17, Railway Age, Volume April 25, p. 14. In the Erie sold the Jefferson Branch to the Delaware & Hudson Railroad, which provided 90% of the lines' traffic. Under an agreement the Erie retained use of the line, just as the Delaware & Hudson, since had had access to it under Erie ownership. Erie Lackawanna Railroad, Annual Report, p. 13. William Wehner, Conrail Engineer, discussion. Matt, The Story of Erie, p. Ibid., p. and Railroad Gazette, July, p.
12; also see Photographs 34 and 35 showing the portal of the tunnel in and Henry S, Drinker, Tunnelling, Explosive Compounds and Rock Drills (New York, p. The only tunnel longer was the Hoosac Tunnel in Massachusetts; also see Photograph 36. John Houston, "Arching Bergen Tunnel on the Erie Railroad," ASCE Transactions, Volume 8, pp. Octave Chanute, "Repairs of Masonry the Use of Beton." Paper read by Octave Chanute at ASCE Convention, and Railroad Gazette, Volume 13, December 2, pp. ERIE RAILWAY SURVEY HAER (Page agp) Drinker, Tunnelling, pp. Railroad Gazette, Volume 30, April 22, p. These contractors also erected the second K-inzua Viaduct. Erie Railroad, Fourth Annual Report, p. 16; Fifth Annual Report, p. IS. Photograph.
37 shows a pile driver used in the construction of that elevated route. Railroad Gazette, Volume 35, April 24, p. "The New Four-Track Engrance of the Erie Railroad into Jersey City," The Engineering Record, Volume 57, April 18, pp. Information on the cut is drawn from this article, while information on the tunnels in the cut comes from, "The Bergen Hill Four-Track Tunnels," the Engineering Record, Volume 60, December 18, pp. see also Photographs 38 and 39. Ibid. , p. Photograph 40 shows one of the cable cranes at work, with the derricks: in the background. The ventilators showing to the left in the picture are from the old tunnel, showing how delicate 'the work was. Photograph 41 shows the drills, dump cars and Porter locomotives. Ibid. Photographs 42 and 43 show the Penhorn Viaduct.
Harper's Guidebook, p. 53. Railroad Gazette, Volume 39, September 22, pp. Railroad Age Gazette, Volume 45, November 6, pp. and M. B. Wakefield, "The Graham Cut-Off," Railroad Magazine, Volume 55, September, pp. See Photographs 44 and 45 for views of the portal of the tunnel; also construction photographs in Erie RE File, Robert Vogel, CE Curator. The Railway Age, Volume October 22, p. "Erie Welds Otisville Rails in Track by Thermite Full-Fusion Process," Railway Engineering and Maintenance, Volume 40, July, pp. Erie Railroad Records, "Statement of Conspicuously Important Structures..." March 30, see Photograph 46. ERIE RAILWAY SURVEY HAER (Page NY h RR, Report, p. 28; see Chapter I for decails on che Starucca Viaduct. Ibid., Report, p. see Photograph 47. Plowden, Bridges, p. 9. Ibid., p.
32. lb id.; see Chapter t for details; also see Photographs Plowden, Bridges, p. 33; H. Austill, writing in for Che Centennial Volume of ASCE Transactions, observed: Economic condicions required chat railroads be pushed through at the least possible cost and that the development of traffic with resulting revenue be depended upon to improve the plant. The use of this system worked 'admirably. Further, it was plentiful and readily available'; it possessed structural qualities both unique and serviceable... When railway engineers learned the limita- tions of wood and adjusted designs to fit, the results were gratifying. H. Austill, "Use of Wood on American Railroads," Paper No. ASCE Transactions, Volume CT, p. NY & E Report, p. 52. Ibid., Report, p. 28.
Ibid., Report, "Report of the Chief Engineer," "McCallum's Patent Timber Bridge," Appleton's Mechanics' Magazine.and Engineers' Journal, Volume II, April 1, Engineering News and Contract Journal, March 10, pp. Plowden, Bridges, p. 39. NY & E RR, Report, pp. Theodore Cooper, "Plans and Elevations of Bridges, West Central Division, New York and Erie Railroad," Copies in Erie RR File, Robert Vogel, CE Curator. ERIE RAILWAY SURVEY HAER See Photographs 48 and 49. Mott, The Story of,Erie, p. Plowden, Bridges, p. 61. ASCE, Biographical Dictionary, p. 98. Theodore Cooper, "American Railroad 3ridges," ASCE Transactions, Volume 21, pp. Ibid., p. 16. Basically the Post resembled a hybrid between a Pratt and a Warren. The Railroad Gazette, Volume 5, August 16, p. Ibid., September 27, p.
Tyler, Report on the Erie Railroad, pp. Erie Railway, Annual Report, p. 15. NY, LE & W RR, Annual Report, p. 63. Ibid., Annual Report, p. 18. Inspection notebooks in Erie RR File, Robert Vogel, CE Curator. Cooper, "American Railroad Bridges," ASCE Transactions, p. 22 m, LE & W RR, Annual Report, p. 27. Erie Railroad, Fourth Annual Report, p. 9. Ibid., Annual Reports. Erie Railroad Magazine, Volume 14, March, p. 11. Ibid., p. 14. Erie Railroad, Forty-first Annual Report, p. 7; and Forty-second Annual Report, p, 7. NY & E RR, Report, p. 45. Erie Railway, Fourth Annual Report, p. 18. ERIE RAILWAY SURVEY HAER (Page BJ) SY, LE h W RR, Report, p. 64. lb id. , Report, p. 27; and The Railroad Gazette, Volume 19, November 25, p. Erie Railroad, Fifteenth Annual Report, p.
16; and Sixteenth Annual Report, p. 16. The changing 'length of the bridge is almost certainly due to filling around the trestles, which shortened the length of bridge proper. William Wehner, Conrail Engineer. NY, LE & W RR, Report, p. 64. This shows a draw span on the Newark, branch rebuilt in wood. See Photographs 50 and 51 showing the bridge center pivot and wheel drum. The Railroad Gazette, Volume 44, May 15, p. William Wehner, Conrail Engineer, confirmed that the bridge built in remains in use. NY & E RR, Report, p. 45. William Wehner, Conrail Engineer. Erie Railroad, "Statement, of Conspicuously Important Structures..." William Wehner, Conrail Engineer; and Photographs 52 and 53. See Photograph 54. Ibid.; Erie Railroad Magazine, Volume 44, December, pp.
10 11; see Photographs 55 and 56. Erie Railroad, Forty-fifth Annual Report, p. 11. Ibid., "Statement of Structures..." see Photograph 57. Ibid.; see Photograph 58. NY & E RR, Report, pp. see Photograph 59. Ibid., Report, p. 7; Report, p. 31. ERIE RAILWAY SURVEY HAER (Page Mott, The 5Cory of Erie, p. The Railroad Gazette, Volume 7, March 27, p. May 1, p. Erie Railroad, "Statement of Structures..." see Photograph 60. NY k E RR, Report, p. 47, [240a] The Railroad Gazette, Volume 6, January 24, p. 31. Dimensions from HAER field notes; field photographs also show details of the structure (material in HAER files) ; also see Photographs 61, 62 and 63. See Photographs 64 and 65; also company drawings showing the new span and the washout in are in NMHI Erie RR File, Robert Vogel, CE Curator.
Duggan, Specimens, Plates XII and XIV; see Photograph 66. NY & RR, Report, pp. 29, 65; Report, p. 47. Cooper inspection notes, See Photographs These are remarkably clear prints, picturing the bridge in great detail. In July, the author saw a five-unit diesel cross the- bridge with a loaded coal drag in tow at better than 30 miles per hour. NY h E RR, Report, p. Mott, The Story of Erie, p. NY & E RR, Report, pp. 7, 47; Harper's Guidebook, p. 77. NY h E RR, Report, p. 47. Cooper inspection notes, NY, LE h W RR, Annual Report, p. 10; see Photograph 72. NY & E RR, Report, p. 47, and "Report of the Chief Engineer," p. 7. See Photographs 73 and 74. ERIE RAILWAY SURVEY HAER (Page &) NY St E RR, Report, p. 47; see Phonographs 75 and 76. Duggan, Specimens, Place XLXII; and NY & E RR, Report, p.
47; see also Photograph 77. Erie Railroad Drawing, May, Bridge (old No. 25, Delaware Division); see Photograph 78. See Photographs 79 and 80, The whole series of pictures provides excellent details of the formwork involved and of the reinforcing rods and or the construction equip- ment. Other photographs remain in Che HAER files. Appleton's Mechanics' Magazine and Engineers1 Journal, Volume 2, April 1. see also Civil Engineer and Architect's Journal, Volume 20, p. In this journal an article by Captain Douglas Galton on American railways included a drawing of the McCallum truss at Susquehanna. NY & E RR, Report, pp. 9, 47. The bridge is split into two sections in the center by an island. Photograph in Erie RR File, Robert Vogel, CE Curator; Cooper inspection notes, also see. Photograph 87.
NY, LE & W RR, Annual Report, p. 7; Annual Report, pp. 14, 27; also see Photograph 88. The Railroad Gazette, Volume 19, April 1, p. See Photographs 89 and 90. The bridges are also shown in the background of Photographs 136 and Harper's Guidebook, p. NY & E RR, Report, p. 49. LE & W RR, Annual Report, p. 26. Erie Railroad, "Statement of Structures..."" The Railway Age, Volume 90, June 29, pp. and Erie Railroad Magazine, Volume 38, November, p. 8, Erie Railroad, "Statement of Structures..." see Photograph 91. ERIE RAILWAY SURVEY HAER (Page^<?) Ibid. ; and The Railway Gaze tea, Volume 56, January 16, p. also see Photographs 9 2 and 93. Ibid.; see Photograph 94. William Wehner, Conrail Engineer; also see Photograph 95. J. E.
Greiner, "The American Railroad Viaduct Its Origins and Evolution," paper read at ASCE Convention, in The Railroad Gazette, Volume 23, June 5, p. See Photograph 96. Plowden, Bridges, p. 70. Ibid. Plowden, Bridges; and Greiner, "Railroad Viaduct." See Photographs 97 and 98. Construction details from Edwards Collection in Erie RR Files, Robert Vogel, CE Curator; and Mott, The Story of Erie, p. Greiner, "Railroad Viaduct," p. Edwards Collection in Erie RR File, Robert Vogel, CE Curator. Erie Railway, Annual Renort, p, 21; Annual Report, p. 22. The Railroad Gazette, Volume 7, Hay 15, p. Plowden, Bridges, p. 70. Construction details from George S.
Morison, "The New Portage Bridge," ASCE Transactions, Volume 5, Edwards Collection in Erie RR File, Robert Vogel, CE Curator; and see Photographs ASCE, Biographical Dictionary, pp. The Railroad Gazette, Volume 7, July 31, p. Edwards Collection in Erie RR File, Robert Vogel, CE Curator. Greiner, "Railroad Viaduct," p. ERIE RAILWAY SURVEY HAER (Page The Railway Age, Volume no. 5, August i, p. also see Photographs 101 and Information on Che strengthening program is from the same article. Ibid. See Photograph 103 for the erection truss. Photograph 104 shows the truss and cables over the sheaves, Photographs 105 and Photograph 107 pictures the work on the new bearing plates and Photograph 108 shows the span before work started. Modem Railroading, Volume 6, May, p.
William Wehner, Conrail Engineer, gave information on the current status and recent improvements, July 27, Plowden, Bridges, p. 71. Ibid.; see Photographs The Railroad Gazette, Volume 14, December 8, pp. Ibid., Volume 14, December 15, pp. lb id., Volume 22, September 19, p. Ibid., Volume 32, no. 48, November, p. "The Kinzua Viaduct of the Erie Railroad Discussion," ASCE Transactions, Volume 46, December, p. 55, Ibid., p. 56. Ibid., p. 22. Ibid. Ibid., p. 44. Ibid., p. 40. Railroad Gazette, Volume 32, no. 48, November 30, pp. and Fred A. Talbot, "The Building and Rebuilding of the Kinzua Viaduct," Cassell's Railways of the World, Volume 1 (New York), pp. also see Fhotographs which show, the traveller at work. ERIE RAILWAY SURVEY HAER (Page See Photograph C. R. Grimm, "Kinzua Viaduct," p.
23; also see Photographs The Railroad Gazette, Volume 32, no. 48, November 30, p. Erie Railroad Magazine, August, pp. 30; company drawings in Erie RR File, Robert Vogel, CE Curator. Erie Railroad, Annual Report, p. 10. Company drawings. Plowden, Bridges, p. 71. Erie Railroad, "Statement of Structures..." and conversation with Dave Hoadley, Engineer of Bridges and Buildings, Delaware & Hudson Railroad, Albany, New York, August 12, 19 77; also see Photograph William Wehner, Conrail Engineer; also see Photographs The Railway Age Gazette, Volume 45, no, 23, November 6, p. Wakefield, Railroad Magazine, pp. and Erie Railroad, "Statement of Structures..." also see Photographs Hungerford, Men of Erie, p.
Erie Railroad, "General Data of Principal Viaducts and x Tunnels on the Erie Railroad System," October 24, Company drawings in Erie RR File, Robert Vogel, CE Curator; also see Photographs 125 and Erie Railroad, "General Data..." and Railway Engineering and Maintenance, Volume 44, no. 12, December, pp. also see Photographs especially Photographs These pictures demonstrate the length of the traveller. Photographs show the trestle, while 128 pictured the approach as seen in Photograph 134 illustrates the usual means of trestle construction. ERIE RAILWAY SURVEY HAER (Page Modern Railroads, Volume 6, May, p. Fred Westing, Erie Power (Medina, Ohio, p. 7. Philadelphia, Wilmington & Baltimore Railroad, Thirteenth Annual Report, p. 20. IVC & E RR, Report, p. 7. Ibid., Report, p. 23.
Harper's Guidebook, p. 17; and Correspondence File, Charles E. Peterson to Robert Vogel, CE Curator, May 19, H 5.E RR, Report, pp. Ibid., pp. Erie Railway, Third Annual Report, p. 13. Ibid., Twenty fourth Annual Report, p. 8; and Report to the State Engineer and Surveyor of New York, p. 6. Ibid., Report, p. 17. NY, LE & W RR, Report of the President, p. 34. Ibid., p. 27; p. 18. Ibid., p. 19. Erie Railroad, First Annual Report, p. 13. Hungerford, Men of Erie, p. The Railroad Gazette, Volume 37, no. 11, August 26, p. 270 Ibid. , Volume 43, no. 15, October 11, p. Erie Railroad, Eleventh Annual Report, p. 8. Hungerford, Men of Erie, p. Erie Railroad, Twenty-third Annual Report, pp. and Twenty fourth Annual Report, p. 8, Hungerford, Men of Erie, p.
ERIE RAILWAY SURVEY HAER (Page The Railroad Gazette, Volume 41, no. 24, December 14, p. Railway Shop Up To Date (Chicago, p. 46. H. W-. Schotter, The Growth and Development of the Pennsyl- vania Railroad Company, December, pp. Handbook of American Railroad Repair Facilities (New York, pp. 117 and (Cited as Repair Facilities.) NY & E RR, Report, p. 36; Erie Railway, Fourth Annual Report, p. 9; Erie Railway, Company Drawings, July 30, in Erie RR File, Robert Vogel, CE Curator; Hungerford, Men of ""Erie, p. NY, LE & W RR, Report, p. 8; Report, p, 18; and William Wehner, Conrail Engineer. See Map in Appendix B. NY & E RR, Report, pp. Erie Railway, Fifth Annual Report, oral interview, HAER Survey Team source unknown; and William Wehner, Conrail Engineer.
Erie Railroad Magazine, Volume 13, June, p. 43. Hungerford, Men of Erie, p. Erie Railroad Magazine, Volume 38, October, p. 7. Modern' Railroading, Volume 6, May, pp. The Railway Age, Volume no. 24, June 10, p. and Volume no. 23, June 8, pp. Erie Railroad, Report, p. 9. Modem Railroading, Volume 6, May, p. NY & E RR, Report, pp. Harper's Guidebook, p. and Emily C. Blackman, History of Susquehanna County, Pennsylvania (Philadelphia, p. 107 See Map in Appendix B. Gerald M. Best, "All Time Erie Locomotive Roster," Railroad History, Bulletin Autumn, p. 38. This was a American-style locomotive, with inch cylinders, built in Blackman, History of Susquehanna, p. ERIE RAILWAY SURVEY HAER (Page &) Rhamanthus H. Stocker, Centennial History of Susquehanna County Pennsylvania (Philadelphia, p.
Blackmail, History of Susquehanna, pp. and Angus Sinclair, "The Susquehanna Shops of the Erie Railroad," Railway and Locomotive Engineering, Volume 22, August, pp. Tyler, Report on the Erie Railroad, p. 34. Railway Shop Up To Date noted the vital importance of fitting the shop to the particular geography of the site. The builders at Susquehanna had already recognized that of all the factors involved, geography imposed the largest limitation upon their design. Photographs give general views of the complex, both historic and recent. Photographs and HAER Drawings show'the end of the structure;, with the three-room arrangement plainly visible in Photograph Photographs showed these trusses'quite clearly in Also see HAER Drawings.
Photographs show the arrangement of the pits within the center bay of the Long Shop. Railway Shop Up To Date, p. 7. Ibid., p. 36. Ibid.; also see photographs, especially See Photograph 146 for interior view of the machine shop. See Photographs Photographs Sinclair, "The Susquehanna Shops," pp. See Photograph 153 and aerial views of complex. Erie Railway, Third Annual Report t pp. 9, 13. Ibid., Fourth Annual Report, p. 2. ERIE RAILWAY SURVEY HAER (Page 2^) Photograph 154 showed the relationship of the roundhouse to the shops-. The roundhouse in Photograph 154 was not the original. The brick structure of served for many years. Ibid., Fifth Annual Report, p. 19. Blackman, History of Susquehanna, p. Ibid, , p. Ibid. The Railroad Gazette, Volume 5, October 25, p.
and Best, "All Time Erie Locomotive Roster," p. 14. NY, LE & W RR, Report, p. 19. This would have been a relatively early electric light installation. Walter G. Berg, The Railroad Gazette, Volume 15, October 5, p. Walter G. Berg, Buildings and Structures of American Railroads (New York, pp. The Railroad Gazette, Volume 20, September 28, p. See Photographs and Maps in Appendix B. See Photographs Company drawings at Erie RE File, Robert Vogel, CE Curator, dated Sinclair, "The Susquehanna Shops," p. Westing, Erie Power, p. Railway Shop Up To Date, p. 7. Ibid. , p. The Railroad Gazette, Volume 42, no. 4, January 25, p. Company drawings, Erie RR File, Robert Vogel, CE Curator, dated also see Maps in Appendix,. B.
Photograph 154 showed the roof of the newly rebuilt roundhouse ERIE RAILWAY SURVEY HAER (Page The Railroad Gazette, Volume 42, no. 4, January 25, p. Volume 41, no. 24, June 15, p. also see Photographs 136 and 161 and see Map in Appendix B. Erie Railroad, Thirteenth Annual Report, p. 8. "The Development of the Railroad Cinder Pit," Railway and Locomotive Engineering^ Volume 22, pp. Company drawings, dated February 29, Ibid., September 26, to October 11, Repair Facilities, p. Company records, "List of Turntables." Erie Railroad Magazine, Volume 14, June, p. 29. The Railroad Gazette, Volume 86, no, 11, March 16, Erie Railroad Magazine, Volume 25, April, 19 29, p. 39. See Photographs also see Maps in Appendix B. Company drawings, June 14, lb id.; also see photographs.
Erie- Railroad Magazine, Volume 25, June, pp, and Whiting Corporation, "Modern Methods in Repair Shops," Whiting equipment set the standard for hydraulic jacks and hoists. Erie Railroad Magazine, Volume 29, November, p. 9; The Railway Age, Volume 90, no. 10, March 11, pp. D also see Photographs Erie Railroad, Report, pp. 3 Ibid., Re_port, p. 11. Binghamton Sun-Bulletin, Friday, November 7, p. 3; and Correspondence File, F. Qerard Hough, Secretary- Treasurer, Borough of Susquehanna Depot, to Robert Vogel, November 7, ERIE RAILWAY SURVEY HAER (Page 33) ^ 18] Mott, The Story of Erie, pp. John Earle Reynolds, In French Creek Valley (Meadville, p. and Atlantic & Great Western Railroad, First Annual Report, p. 13.
See Photographs 167 and Dimensions are from the HAER Survey and Drawings, Photograph Photograph Photograph Photographs 172 and Circa map of the Meadville site in Company drawings, also see Map in Appendix B that shows the whole complex. Photographs and HAER Drawings. See Photographs The Atlantic & Great Western Railway: Connections, Distances, etc. (New York, p. 60. Tyler, Report on the Erie Railroad, p. 68; also see Map in Appendix. See Photographs and HAER Drawings. See Photograph Unidentified bird's-eye view of Meadville, Best, "All Time Erie Locomotive Roster." NY, LE & W RR, Report, p. 38; also see Map in Appendix B. Erie Railroad, Fourteenth Annual Report,, p. 8; also see Map in Appendix B. Repair Facilities, p. "Erie Operates Efficient Signal Shop," Railway Signalling, Volume 9, no.
9, September, pp. Appendix A lists the tools. ERIE RAILWAY SURVEY HAER (Page 39} Erie Railroad Magazine, Volume 24, December, p. 33; Volume 25, April, p. 36; and Volume 25, May, p. 44. the Railway Age, Volume 84, no. 17, April 28, pp. and Volume 86, no. 16, April 20, p. Erie Railroad Magazine, Volume 25, November, p. 40; Photographs show it in 19 71. . Hungerford, Men of Erie, p. The erecting shop housed Che main production unit. Erie Railroad, Report, p. 17; Erie Railroad Magazine, Volume 39, April, pp. 9, 21; and Modern Railroading, Volume 6, May, p. Erie Railroad Magazine, Volume 39, June, pp. Ibid., Volume 46, pp. Ibid., Volume 45, January, pp. and Modem Railroading, pp. also see Map in Appendix 5. Erie Railroad, Report, p. 10. Modern Railroading, p. Ibid., 136 and 3 Ibid., p.
Along with the signal shop, the tin shop, test department, and maintenance of way equipment repair facility were located in the wings off the storehouse. The Railway Age, Volume no. 26, December 24, p. 44; Erie Railroad, Report, p. 8; and Report, p. 8. "Erie is Centralizing all Whell Production," Railway Locomotive and Cars, Volume no. 5, May, p. 43; also see diagram in Appendix B , and Photographs 185 and 187 Ibid., pp. The Railway Age, Volume no. 17, October 24, p. and Erie Railroad, Annual Reports, and ERIE RAILWAY SURVEY HAER CPage^^?) Ibid. , Volume no. 7, February 16, pp. 35, 38; and "Erie Opens New Freight Car Shop," Railway Locomotive and Cars_, Volume no. 2, February, pp. Erie-Lackawanna Railroad, Report, p. 9.
William Wehner, Conrail Engineer, gave details on the current status of the shops; also see Photographs for aerial views of the shops in Little has changed since then. Erie Railroad Magazine, Volume 29, October, p. 11; Mont, The Story of Erie, p. and NY & E RR, Report, p. 69. NY & E RR, Report, Table K, pp. Ibid. , Report, p, 37. [459a] The Railroad Gazette, Volume 7, February 20, p. 78. t46 } Ibid., Volume 11, June 20, p. Erie Railway, Annual Report, p. 15; and NY, LE & W RR, Annual Report, p. 70. NY, LE & W RR, Report, p. 22. Ibid. , Report, p. 30. The Railroad Gazette, Volume 13, March 18, p. NY, LE & W RR, Report, p. 18; and Report, pp, Berg, The Railroad Gazette, Volume 15, October 5, p. Ibid., Volume 20, September 28, p. and NY, LE & W RR, Report, p. 21. Ibid., Volume 30, no.
7, February 8, p. Erie Railroad, Fourth Annual Report, p. 9. Ibid., Sixth Annual Report, p. 20. Railway and Engineering Review, Volume 46, December 1, p. [471a] Ibid., pp. The Railroad Gazette, Volume 41, no. 24, December 14, pp. and the Engineering News- Record, Volume 90, no. 22, May 31, p. ERIE RAILWAY SURVEY HAER (Page^/) This assumption made from examining phonographs of further construction in Powerhouse shows Photograph 190 in Railway Shop Up To Date, p. See Appendix A for tool list. Railway Shop Up To Date, p. 50. Pages offered a great deal more information on the proper equipment of locomotive shops. Repair Facilities, p. The Railway Age, Volume 71, no. 26, December 24, p. Ibid., Volume 73, no. 1, July 1, p. 45.
Erie Railroad, Twenty-ninth Annual Report, p., 14; also see Photographs "Erie Railroad Improvements for Engineering News- Record, Volume 90, no. 22, May 31, p. and "Erie Completes Modern Addition to Hornell Shop," The Railway Age;, Volume 76, no. 2, January 12, pp. also see Map in Appendix B. Engineering News-Record, p. also see Photograph Erie Railroad, Thirtieth Annual Report, p. 14. Company records, "List of Turntables." The Railway Age, Volume 83, no. 8, August 20, p. and Volume 84, no. 17, April 28, p. Erie Railroad Magazine, Volume 24, March, p. 11. Ibid., December, p. 50; and Whiting Corporation, "Modern Methods in Shop Repair," p. 34. Hungerford, Men of Erie, p. Erie Railroad Magazine, Volume 38, August, pp. 9, 24. Erie Railroad, Annual Report, p.
16, ERIE RAILWAY SURVEY HAER (Page &0 ) Erie Railroad Magazine, Volume 40, March, pp. Hungerford, Hen of Erie, p. Erie Railroad, Annual Report, p. 16; Annual Report, P- 13; Annual Report, p. 9. The Railway Age, Volume no. 11, September 9, p. 39; Modern Railroading, Volume o, May, p. and Company Maps, August 10, and November 20, Erie Railroad, Annual Report, p, 10. Ibid., Annual Report, p. 8; also see Photograph Westing, Erie Power, p. also see Photographs "Erie Railroad Shops, Dunmore, Pennsylvania," Railway and Locomotive Engineering, Volume 15, February, pp. The article discussed new features in the shops and although the shop clearly was operating in the obvious cone of the article implied that the Erie had only recently put in its repair faci'lities.
See diagrams and plan in Appendix B. Ibid., p. 65. Ibid., p. 64. Appendix A contains a complete Tool List. Ibid., p. 65. Ibid., p. 64. Ibid. Repair Facilities, p. Ibid, Hungerford, Men of Erie, p. Company drawings, Erie Railroad Magazine, Volume 38, October, pp. lbid., Volume 45, April, p. 18; Erie Railroad, Report, p. 13; also see Photographs ERIE RAILWAY SURVEY HAER (Page 43) Erie Railroad, Annual Reports. See Photographs Ron Ziel, The Twilight of Steam Locomotives (New York, pp. Mott, The Story of Erie, p. The Railroad Gazette, Volume 6, September 5, p. and Volume 7, January 23, p. 38; Erie Railroad Magazine, Volume 28, July, pp. 18, 45; and HAER Photographs.
Piermont's long pier in the Hudson housed a large coal stacking and shipping facility at the turn of the century, utilizing modern Brown hoisting equipment. However, in a boxboard manufacturer set up a plant on the pier, a facility still operating in by Consolidated Can Company. Erie Railway, Fourth Annual Report, Report, p. 36; NY, LE & W RR, Annual Report, and Westing, Erie Power, p. 44, shows a photograph of the main shop; also see Map in Appendix B. NY & E RR, Annual Report. Erie Railway, Fourth Annual Report, p. 9. Ibid. , Eighth Annual Report, p. 13. The Railroad Gazette, Volume 4, August 3, p, Ibid., Volume 5, September 20, p. [520i Ibid., Volume 4, September 21, p. and Volume 6, October 24, p. Ibid., Volume 11, August 8, p. November 28, p. NY, LE & U RR, Annual Report, p.
27; Annual Report, p. 18; and Annual Report, p. 18. Mordecai Gratz, Report on the Terminal Facilities..., p. 48. The Railroad Gazette, Volume 17, September 4, pp. Volume 35, no. 17, April 24, p. also see Map in Appendix B. Ibid., Volume 31, no. 15, April 4, pp. also see Photograph ERIE RAILWAY SURVEY HAER (Page See Photograph The Railroad Gazette, Volume 37, no. 14, General News Section, p. 89; Photograph 202 is of the South Side Shops; also see Hap in Appendix 3. U. S. R. A. Report, Erie Railroad, Report, p. 27; Company drawings, also see Map in Appendix B. See Photographs 203 and also see Hap in Appendix B. The Railway Age, Volume 73, no. 20, November 11, pp. "Power and Lighting Facilities on the Erie," Railway Electrical Engineer, Volume 13, no. 11, November, pp.
Company drawings, also see Map in Appendix B. [529a] The hammer had a striking weight of pounds, a foot piston stroke with square inches of piston area. It operated at 90 p.s.i. The Railway Age, Volume 73, no. 20, November 11, p. Ibid., p. The steel came from an old bridge over the Susquehanna the company had recently dismantled. See Diagram in Appendix A for placement and listing of tools. in the South Side Shop. The Railway Age, Volume 72, no. 6, February 11, p. Company drawings, Erie Railroad, Report, p. 9. Ibid., Report, p. 8; Modern Railroading, Volume 6, May, pp. Erie Railroad Magazine, Volume 47, November, pp. 16. Modern Railroading, Volume 6, May, p. Erie Railroad, Report, p. 8; and Company drawings, m & E RR, Report, p. 25.
ERIE RAILWAY SURVEY HAER (Page 4 } Erie Railway, Fourth Annual Report, p. 13; Fifth Annual Report, pp. 9, 22; and Eighth Annual Report, p. 15. NY, LE h W RR, Annual Report, p. 22; Annual Report, p. 18; Company drawings, April 18, The Railroad Gazette, Volume 11, March 7, p. April 4, p. and November 28, p. "Car Repair Shop Notes from the Erie Railroad at Buffalo," The Railroad Gazette, Volume 48, no. 8, May 6, pp. Company drawings, "A New Design for Engine Coaling Facilities," The Railroad Gazette, Volume 65, no. 14, November 4, pp. also see Diagram in Appendix B. See Photograph which shows the Hawley trestle in Although smaller than normal, the trestle ramp and pockets show how these structures worked. Ibid.; also see Map in Appendix B. Repair Facilities, p.
Company drawings, Modem Railroads, Volume 6, May, pp. Erie Railroad, Report, p. 8. NY & E RR, Report, p. 69 Ibid., Report, p. 30. Ibid., Report, p. 30. Erie Railway, Fourth Annual Report, p. 9; and Fifth Annual Report, pp. 9, 18. See Map in Appendix B. The Railroad Gazette, Volume 6, October 24, p. Ibid,, Volume 10, July 5, p. ERIE RAILWAY SURVEY HAER (Page NY, LE h. w RR, Report, ?. 70. Ibid., Report, p. 25. Hungerford, Men of Erie, p. and Company drawings, Repair Facilities, p. Company drawings, also see Photograph By a new roundhouse entirely had appeared on the site a frame structure with 32 stalls. The Railway Age, Volume 84, no. 17, April 28, p.
Company drawings, Appendix A lists Che tools in Frog Shop as of Company drawings, also see Appendix A for tool lists and Appendix B for Maps. Erie Railroad, Report, p. 7; Modern Railroading, Volume 6, May, p. and William Wehner, Conrail Engineer. "Bridge Shop in the Erie Proves Worth in War Time," Railway Engineering and Maintenance, Volume 40, May, pp. also see Map in Appendix B. See Photograph Erie Railway, Third Annual Report, p. 9; Fourth Annual Report, p. 9; and Sixth Annual Report, pp. 9, 21 Company drawings, Erie Railroad, Seventh Annual Report, p. 9. Erie Railroad, Report, p. 10; Company drawings, and Erie Railroad Magazine, Volume 41, November, p. 9. See Photographs Modern Railroading, Volume 6, May, pp. Carroll Meeks, The Railroad Station (New Haven, and Edwin P.
Alexander, Down at the Depot, to (New York, provided a visual reference with which to compare Erie stations. ERIE RAILWAY SURVEY HAER (Page NY & E RR, Report, p. 29; and Harper's Guidebook, p. 29. Meeks, The Railroad Station, p. 26. Ibid., p. 28. Ibid. , pp. J. L. Rxngwalt, Development of Transportation 'Systems in the United States (Philadelphia, p. and Meeks, The Railroad Station, p. 49. Meeks, The Railroad Station^"p. 94. Marcus Whiffen, American Architecture Since (Cambridge, Mass., , p. 87. Berg, Buildings and Structures..., p. Ibid.; also Photographs offer a range of types of stations, taken .from Erie plans, c. that illustrate Berg's comments. Ibid., pp. Whiffen, American Architecture, p. Photographs show good exaiaplex of Stick Style, from Company drawings.
See Photographs 220 and Whiffen, American Architecture, p. also Photographs 222 and 223 are good examples from the Company drawings. Berg, Buildings and Structures..., p. Norval White, The Architecture Book (New York, p. 28. NY & E RR, Report, p. 33. Photograph 224 clearly shows the Susquehanna complex of shops, freight and passenger station. Imagine the missing roundhouse,and the massive scale of the improve- ments at Susquehanna becomes clear. See also HAER draw- ings. Chester Liebs , on the HAER. Survey, provided a helpful guide to certain sources of information. ERIE RAILWAY SURVEY HAER (Page the Builder, Volume 19, October 26, p. also drawings at Cleveland seen by the HAER Erie Survey team.
Derrick apparently was a European architect who died in His obituary in The Builder contained the pertinent details of his life. "The late Mr. J, M. Derrick, Architect...Re was a native of Ireland; and at one time had a lucrative practice as an architect, chiefly in ecclesiastical works, in the North of England and in Ireland; having at one time establishments simultaneously in London, Oxford and Dublin. Failing health and other causes induced him to retire from practice, but he was again compelled by losses to resume his profession; and at length he went practiced as an architect till his death." See Photographs Meeks, The Railroad Station, p. 73. See Photograph 230 and HAER Drawings. Ibid.
Hungerford, Men of Erie, p, also Photographs showed the arch in HAER drawings show a section through the building, with the vaulting plainly visible. Photograph also HAER drawings. Stocker, Centennial History, p. NY, LE & W RR, Inventory Books, June 3Q, Susquehanna to Great Bend; and Erie Railroad Manuscript Collection, George Arents Research Library, Syracuse University. Erie Railroad Magazine, Volume 23, September, p. 24. Company drawings, Chester Liebs, Draft Report, "Susquehanna Station," HAER Erie Railroad Survey, (in HAER files). Company drawings, ERIE RAILWAY SURVEY HAER (Page Reynolds, In French Creek Valley, p. also see Photograph Meeks, The Railroad Station, p. 70. Ibid. , p. 71. Ibid. Reynolds, In French Creek Valley, p.
New York Herald, February 6, and Hungerford, Men of Erie, Erie Railroad Magazine, Volume 30, August, p. 8. . Photographs Erie Railroad, Seventeenth Annual Report, p. 8. Modern Railroading, Volume 6, May, p. Photograph Erie Railroad, Second Annual Report, p. 8; also see Photographs The Railroad Gazette, Volume 22, January 10, p. 25; NY, LE & W Report, p. 10; also see Photograph 242 Erie Railroad, Annual Report, p. 17; also William Wehner, Conrail Engineer. NY & E RR, Report, p"l 25; Report, p. 11; NY, LE h W RR, Report, pp. 23, 68; Erie Railroad Magazine, Volume 28, January, p. 40; Volume 45, October, pp. also see Photograph showing the pergola in Erie Railroad, Report, p. 1Q; The Railway Age, Volume no. 11, September 9, p, 89.
Photograph 244;'and Erie Railroad, Twenty-second Annual Report, p. 8. Nyack Journal-News, December, also see Photograph ERIE RAILWAY SURVEY HAER [Page Erie Railroad, Twenty-first Annual Report, p. 3; also see Photograph Repair Facilities, p. Company records, See Photograph also Correspondence between Mary ft. Proper, Reference Librarian, the Nyack Library, and Beverly Baynes, HAER, August 6, Erie Railroad, Sixteenth Annual Report, p. 8; Stover, American Railroads, pp. also see Photograph Erie Railroad, Twentieth Annual Report, p. 8; William Wehner, Conrail Engineer, also see Photograph NY & E RR, Report, p. 29; Erie Railway, Fifth.Annual Report, p. 17; Photographs and Correspon- dence, Harold H.
Jones, Town Historian, Goshen, New York, to Beverly Banes and Douglas Griffin, July 18, 23, 24 and September 5, NY & E RR, Report, p. 30; NY, LE & W RR, Report., p. 21; Erie Railroad, First Annual Report, p. 8; Second Annual Report, p. 8; Correspondence, Edward Dougherty, City Historian, Middletown, New York, to Beverly Banes, HAER, Company drawings, also see Photographs Erie Railroad, Second Annual Report, p. 8; also see. Photograph NY & E RR, Report, p. 30; Erie Railway, Fifth Annual Report, p. 8; NY, LE & W RR, Report, p. 21; Report, p. 10; Company drawings, June, Erie Railroad, Seventeenth Annual Report, p. 8; Report, p. 12; also see Photographs for copies of Company designs of the station and Photographs for views. NY, LE & W RR, Report, p.
8, 32; Company drawings, also see Photographs Erie Railroad, First Annual Report, p. 12; Second Annual Report, p. 8; Company drawings, Correspondence, Mary Curtis, Callicoon, New York, with Beverly Banes, HAER, also see Photographs ERIE RAILWAY SURVEY HAER (Page /) NY & RR, Report, ?. 32; Correspondence, Ms. Agnes Whitaker, Town Historian, Hancock, Co Beverly Banes, August 6, also see Photographs NY & E RR, Report, p. 32; Erie Railway, Fourth Annual Report, p. 9; also see Photographs The Binghamton Public Library found a photograph of the station dated Correspondence, M.. C. Miller, City Historian, to Beverly Baynes, HAER, August 13, Erie Railway, Fifth Annual Report, p. 19; Report, p. 18; Edwin Alexander, Down at the Depot (New York, p.
Company drawings, also see Photographs Erie Railroad, Tenth Annual Report, p. 8; Eighteenth Annual Report, p. 8; also see Photograph Erie Railway, Report, p. NY, LE & W RR, Report, p. 68; Report, p. 20; also see Photograph NY & E RR, 185 7 Report, p. 36; Alexander, Down at the Depot, p. Erie Railroad, Seventh Annual Report, p. 9; Seventeenth Annual Report, p. 8; Report, p. 9 ; Company drawings, The Railway Age, Volume 93, no. 5, July 30, p. Volume 98, no. 26, June 29, p. also see Photograph Erie Railroad, Nineteenth Annual Report, p. 8; also see Photograph NY & ERR, Report, p. 36; Erie Railroad, Second Annual Report, p. 8; Report, p. 17; File Kotes, Beverly Baynes, HAER, also see Photographs Erie Railroad, Eighteenth Annual Report, p. 8; New York.
State Department of Public Works photograph, taken May. 10, also see Photograph Hungerford, Men of Erie, p. NY & E RR, Report, p. 37; Harper's Guidebook, p. Erie Railway, Fourth Annual Report, p. 23; Mott, The Story of Erie, p. The Railroad Gazette, Volume 12, August 6, p. NY, LE & W RR, Report, p. 27; Report, p. 27; Erie Railroad, Fifth Annual Report, ERIE RAILWAY SURVEY HAER [Page SZ) p. 9; Seventh Annual Report, p. 9; Seventeenth (con'c) Annual Report, p. 8; Report, p. 12; Modern Railroading, Volume 6, May, p. also see Photographs Erie Railroad, Sixteenth Annual Report, p. 8; also see Photographs Erie Railroad Magazine, Volume 41, December, p. 6; Company drawings, Modern Railroading, Volume 6, May, p. also see Photograph Erie Railway, Fourth Annual Report., p.
21; Fifth Annual Report, p. 22; also see Photograph Ibid., Report, p. 18; NY, LE & W RR, Report, p. 20; Company drawings, Repair Facilities, p. also see Photographs 7. Company drawings, also see Photograph NY, LE h W RR, Report; Company drawings, Berg, Buildings and Structures..., p. also see Photograph See Photograph See Photograph See Photographs MY, LE h W RR, Report, p. 32; Report, p. Report, p. 10; Erie Railroad, Sixth Annual Report, p. 21; also see Photograph NY, LE & W RR, Report, p. 21; Company drawings, also see Photograph Erie Railroad, Fifteenth Annual Report, p. 8; Sixteenth Annual Report, p. 8; also see Photographs 3O6-307. Erie Railroad Magazine, Volume 28, July, p. 13; also see Photographs Ibid. Atlantic h Great Western, First Annual Report, p.
26; Erie Railroad, Second Annual Report, p. 8; Third Annual Report, p. 9; Thirty-seventh Annual Report, p. 6; Company drawings, Erie Railroad Magazine, Volume 40, October, p. 11. ERIE RAILWAY SURVEY HAER (Page Hrie Railroad, Fifth Annual Report, p. 9; File Notes, James Peters, Signal Maintenance Engineer, to Beverly Baynes, HAER, 19 75; also see Photographs NY, LE & W RR, Report, p. 32; Correspondence, Ed Ledrick, Edinboro College, to Beverly Baynes, HAER, also see Photograph See Photographs Berg, Buildings and Structures..., p. lb id. ,. p. also see Photograph Corning Freight House, and Photograph Avon Freight House, for good examples of typical freight house construction.
See Photograph Erie Railroad Collection, Inventory, Susquehanna to Great Bend, George Arents Research Library at Syracuse University; Company drawings, HAER File; also see Photograph See Photograph also undated photograph shows the building under construction, although the office at the end had not been erected at the time of .the photograph, c. NY & E Report, p. 34; Erie Railway, Eighth Annual Report, p. 15; Erie Railroad, Report, p. 10; also see Photographs [669a] Erie Railroad, Fifth Annual Report, p. 9; also see Photograph Mott, The Story of Erie, p. also see Photograph Unfortunately, the Survey did not photograph the pier NY & E RR, Report, p. 16. NY, LE & W RR, Report, pp. Report, p. 25; Company drawings, The Railroad Gazette, Volume 22, January 3, p. 12.
The Railroad Gazette, Volume 22, January 3, p. 12. ERIE RAILWAY SURVEY HAER F. W. Beers, Illustrated Historical Atlas of Che County of Chautagua, New York. (New York., p . 44; Corps of Engineers, U. S, Army, "Survey of Northern and North- western Lakes, Chart of Dunkirk Harbor," issued March 25, also see Photographs The Railroad Gazette, Volume 18, January 8, pp. Erie Railway, Fourth Annual Report, p. 21; NY, LE & W RR, Report, p. 15. Company drawings, Erie Railroad, Thirty-third Annual Report, p. 14. The Railroad Gazette, Volume 13, September 6, p. Ibid., Volume 11, March 7, p. April 4, p, September 12, p. NY, LE & W RR, Report, p. 20. The Railroad Gazette, Volume 48, no.
13, April 1, p, Erie Railroad, Seventeenth Annual Report, p.- 8; Company drawings, January 3, NY, LE & W RR, Report, p. 16; The Railroad Gazette, Volume 21, January 18, p. 40, NY, LE & W RR, Report, p. 22; Report, p. 12; Report, p. 10; The Railroad Gazette, Volume 21, January 11, p. 33. The Railroad Gazette, Volume 28, May 8, p. and Company drawings, Erie Railroad, First Annual Report, p. Fourth Annual Report, p. 10; also Company drawings, NY, LE & W RR, Report, p. 10; The Railroad Gazette, Volume 14, September 1, p. NY & E RR, Report, p. 16. Erie Railway, Fourth Annual Report, p. 9. The Railroad Gazette, Volume 11, January 24, p. 53; Volume 12, March 12, p. May 14, p. July 2, p. July 16, p. ERIE RAILWAY SURVEY HAER [Page & ) Ibid. , Volume 12, July 16, p, also see Photographs Ibid.
, Volume 17, September 4, pp. also see Photograph 327 and Map in Appendix B. Ibid., Volume 11, July 25, p. NY, LE & W RR, Report, p. 29. Harsimus Cove was the ship basin. NY, LE & W RR, Report, p. Hungerford, Men of Erie, pp. By 99% of New York's perishable food reached the city on the Erie. The Railroad Gazette, Volume 30, no. 41, October 14, p. Erie Railroad, Fourth Annual Report, p. 9; and NY, LE & W RR, Report, Chapters tl, III and VIII. These chapters give information on the cut, shops and the grade crossing programs. Ibid., Volume 35, no. 17, April 24, pp. Ibid., Volume 5, November 1, p. Ibid., Volume 6, July 18, p. and NY, LE & W RR, Report, 27, 69. NY, LE & W RR, Report, p. 21; Report, pp. Report, p. 16; Report, p. 20; The Railroad Gazette, Volume 14, August 11, p.
Volume 17, September 4, p. The Railroad Gazette, Volume 22, July 4, p, NY, LE h W RR, Report, p. 25; Report, p. 14; Report, p. 12; also see Photograph Berg, Buildings and Structures..., p. Erie Railroad, Fourth Annual Report, p. 10; Sixth Annual Report, p. 12. The Railway Age, Volume 74, no. 17, March 31, pp. Ibid., Erie Railroad, Twenty-ninth Annual Report, p, 14. ERIE RAILWAY SURVEY HAER (Page 2 ~) Railway Review, Volume 75, no. 12, September 20, The Railway Age, Volume 90, no. 7, February 14, 19 31, pp. and Erie Railroad, Report:, p. 10. Railway Review, Volume 75, no. 12, September 20, p. The Railway Age, Volume 77, no. 21, November 22, p. Erie Railroad, Sixth Annual Report, p. 17.
Photograph 330 shows a pile driver at work, placing the plies in the usual pattern (Pier 21 in Manhattan in The Number 9 Pier in Jersey City spaced the piles very closely together in three rows. The pile driver pictured was typical for harbor work, although Pier 9 used steam hammers that rested on the caps of the older piles already in place. The Railway Age, Volume 84, no. 3, January 21, p. and Erie Railroad, Thirty-first Annual Report, p. 15; and Erie Railroad Magazine, Volume 24, March, p. 32. Photograph 331 shows Pier 8 in the background. Railway Electrical Engineer, Volume 13, p. Custodis built a large number of high draft stacks along the East Coast at the turn of the century. Erie Railroad, Thirtieth Annual Report, p. 14; Company drawings, The Railway Age, Volume 77, no.
14, October 4, p. "New Power Plant for Erie at Jersey City," Railway Electrical Engineer, Volume 17, no. 11, November, pp. also see Map in Appendix B* Photograph 332 shows a car float between Piers 20 and 21 in Manhattan. Erie Railroad Magazine, Volume 24, December, p. 15; Erie Railroad, Thirty-third Annual Report, p. 14; Correspondence, William Wehner, Conrail Engineer, Co Robert Vogel, January 25, in Vogel's Erie RR File; also see Photograph which shows the supporting structure for the float bridges in October, as Che terminal around it was demolished; and Photograph which shows one ramp in the far left side of the picture. ERIE RAILWAY SURVEY HAER (Page 7) NY & E RR, 185 7 Report, p. 25. Mott, The Story of Erie, p. The Railroad Gazette, Volume 5, March 29, p.
Ibid., Volume 12, November 14, p. Volume 10, November 15, p. Ibid., Volume 11, February 28, p. NY, LE & W RR, Report, p. 30. See Photograph. 335 for Pavonia Ferryhouse; Photograph 336 shows on drawing of Che grate; and Photographs include the layout of the terminal. See Photograph 337 for the Chambers Street Terminal. The Railroad Gazette, Volume 18, February 5, p. Ibid., Volume 19, May 6, pp. Berg, Buildings. Meeks, The Railroad Station, p. 35. Ibid., p. 88. Ibid., p. 82. Berg, Buildings and Structures..., p. The Railroad Gazette, Volume 19, April 1, p. NY, LE & W RR, Report, p. 32; Report, p, 27; Report, p. 34; Report, p. 21. Photograph 348 shows the Street Terminal some time before the end of the century. NY, IE & W RR, Report, p. 21; Report, p.
20; Erie Railroad, Third Annual Report, p. 16. The Railroad Gazette, Volume 5, November, p. Erie Railroad, First Annual Report, p. 12; The Railway Age, Volume 77, no. 21, November 22, p. also see Photographs The Railroad Gazette, Volume 35, no. 17, April 23, pp. also Company drawings, ERIE RAILWAY SURVEY HAER (Page<2i^) The Railroad Gazette, Volume 37, no. 2, June 17, General News Section, p. 7; Volume 38, no. 5, February 3, pp. Erie Railroad, NTinth Annual Report, p. 17; also see Photographs The Railroad Gazette, Volume 35 , no. 7, April 24, p.. 296 Ibid, , Volume 5, August 9, p. Mott, The Story of Erie, p. Erie Railroad, Second Annual Report, p. 14; Fourth Annual Report, p. Ninth Annual Report, p, 11; Twelfth Annual Report, p. 9; also see Photographs of the Susquahanna.
3 Erie Railroad Magazine, Volume 39, Hay, pp. Hungerford, Men of Erie, pp. Erie Railroad, Seventeenth Annual Report, p. 8; The Railway Age, Volume 74, no. 15, March 17, p. Volume no. 20, November 11, p. Company drawings, Modern Railroading, Volume 6, May, p. 63; Hungerford, Men of Erie, pp. Erie Railroad, Report, p. 15; also see Photograph Modern Railroading, p. 63, Hungerford, Men of Erie, pp. The Railway Age, Volume no. 20, November 14, p. 8; Volume no. 9, September 1, p. 32; Erie Railroad, Report, pp. Report, p. 14; Report, p. 10. See Photographs ERIE RAILWAY SURVEY HAER CPage BI BLIOGRAPHY Books Alexander, Edwin P., Down at the Depot: American Railroad Stations from to New York, Clarkson N.
Potter, Inc., Berg, Walter G., Buildings and Structures of American Railways, New York, Reprinted in Train Shed Cyclopedia, Novato, California, Newton K- Gregg: Part 1, pp. March, Part 2, pp. September, Part 3, pp. May, Part 4, pp. October, Part 5, pp. June, Part 6, pp, December, Blackman, Emily C, History of Susquehanna County, Pennsylvania, Philadelphia, Camp, W. H., Notes of Track, Chicago, Published by author, Chandler, Alfred, D.
The Railroads: The Nation's First Big; Business, New York, Harcourt, Bruce EWorld, Inc., Committee on History and Heritage of American Civil Engineering, ASCE, A Biographical Dictionary of American Civil Engineers, New York, Drinker, Henry S., Tunnelling, Explosive Compounds and Rock Drills, New York, Duggan, George, Specimens of the Stone, Iron, & Wood Bridges of the United States Railroads, New York, Handbook of American Railroad Repair Facilities, New York, Published by Railway Mechanical Engineer, Harper's New York & Erie Railway Guide Book, New York, Harper & Brothers, Hubbard, Elbert, The Romance of the Railroad: Being the Story of the Bergen Cut.
East Aurora, New York, The Roycrofters, Hungerxord, Edward, Men of Erie, New York, Random House, ERIE RAILWAY SURVEY HAER Books (continued) Meeks, Carroll V., The Railroad Station, New Haven, Yale University Press, Mordecai, Grat2, Terminal Facilities of the Port of New York, New York', The Railroad Gazette, Mott, Edward Harold, Between the Ocean and the Lakes: The Story of Erie, New York, Tickler Publishing Company, Plowden, David, Bridges: The Spans of North America, New York, The Viking Press, Railway Shop Up to Date, New York, Crandall Publishing Company, Reynolds, John Earle, In French Creek Valley, Meadville, The Crawford County Historical Society, Stocker, Rhamanthus M., Centennial History of Susquehanna County, Pennsylvania, Philadelphia, Stover, John F., American Railroads, Chicago, University of Chicago Press, Talbot, Frank, Cassell's Railways of the World, Volume I, New York, Simmons-Boardraan Publishing Company, Tyler, Captain, Report on the Erie Railroad and its Connections, London, Harrison & Sons, Westing, Frederick, Erie Power, Medina, Ohio, Alvin T.
Stauffer, Whiffen, Marcus, American Architecture Since A Guide to the Styles, Cambridge, Massachusetts, The MIT Press, White, Norval, The Architecture Book, New York, Alfred A. Knopf, Wood Struthers & Company, "Erie Railroad Company: Its Prospects Under Van Sweringen Management," New York, Ziel, Ron, The Twilight of Steam Locomotives, New York, ERIE RAILWAY SURVEY HAER (Page 2&n Periodicals (The reference to individual articles is in the end notes.) American Society of Civil Engineers, Transactions. Appleton's Mechanics' Magazine and Engineers' Journal. Bond Record. Engineering Record and Engineering News-Record. Erie Railroad Magazine. Modern Railroads, Volume 6, no. 5, May, Erie Centennial Issue.
Railroad History, Bulletin Autumn, Erie Issue, "All Time Erie Locomotive Roster." Railroad Magazine. Railway and Locomotive Engineering. The Railway and Engineering Review. Railway Electrical Engineering. Railway Engineering and Maintenance. The Railway Review. Railway Signalling. Railway Track and Structures. The Railroad Gazette, later The Railway Age Gazette, then The Railway Age. Easily one of the most informative sources of information on the affairs of American railroads. Steam Shovel and Dredge.
Corporation Records Annual Reports The Atlantic and Great Western Railroad: The New York and Erie Railroad Company: The Erie Railway Company: ERIE RAILWAY SURVEY HAER (Page Corporation Records (continued) Annual Reports (continued) The New York, Lake Erie, and Western Railroad Company: The Erie Railroad Company: The Erie-Lackawanna Railroad Company: 7.
Philadelphia, Wilmington, and Baltimore Railroad Company: Erie Railroad Company, "Bigger Than the Panama Canal; Given by the Erie Railroad Company, being Reconstructed to a Water Level Grade," New York, Erie Railroad Company, "General Data on Principal Viaducts and Tunnels on the Erie Railroad System," Office of the Engineer of Structures, Cleveland, October 24, Erie Railroad Company, "Statement of Conspicuously Important Struc- tures on Important Transportation Routes in (Varied States) Which Would be Used for Troops, Munitions, and Other Supplies," March 30 and April 17, American Hoist and Derrick Company, "Auxiliary Uses American Railroad Ditcher," "On Line With the American Railroad Ditcher," Building a Railroad, St.
Paul, Minnesota, Ditcherology: The Science of Ditching and Ditcher Maintenance, St. Paul, Whiting Corporation, "Modern Methods in Repair Shops," Material in the National Museum of History and Technology Collection of Llewellyn Nathaniel Edwards, C, E., D. of E., Presented to the U. S. National Museum, May, Erie Railroad Engineering Drawings. The Division of Mechanical and Civil Engineering in the under the care of Robert M. Vogel, has a massive collection of at least drawings of Erie structures. The drawings range from the to the and include elevations, plans, and sections of buildings, stations, bridges, and even machinery and river ferries Some are complete sets of designs for a particular structure, while the majority are loose sheets. All contain information of value to the historian.
The material is in the process of being catalogued, but that work is a slow and time-consuming effort. Any research work on Erie structures should, however, begin with a perusal of these drawings. References in the notes that refer to Company Drawings indicate information obtained from these drawings. ERIE RAILWAY SURVEY HAER (Page.263) Material In the National Museum of History and Technology (continued) Erie Railroad Engineering Drawings (continued) Along with the drawings , the has acquired some additional material. Included are some notebooks that belonged to Theodore Cooper, relating to his bridge inspections for the Erie in and Also, the Museum has an imcomplete set of photographs of Erie stations taken by J. E.
Bailey of Meadville, Pennsylvania, for the Company between and A number of these views are reproduced with this paper. Additional Material The groundwork of this paper was laid by the HAER Survey Team. They produced the drawings of the Erie structures at Meadville and Susquehanna, and assembled most of the old photographs accompanying this text. Chester Liebs , Project Historian, also produced a first draft report on Susquehanna that led the author to several sources. Some information, including several photographs, came from the DeGolyer Library, Southern Methodist University. Perhaps the most vital source of all was William M. Wehner, Chief Engineer Bridges and Buildings, Design and Construction for Conrail. Formerly with the Erie in Cleveland, Mr.
Wehner now works out of the Philadelphia headquarters of Conrail. Mr. Wehner supplied all of the information concerning the current status of the structures studied in this report, and their recent history. Without his endless patience and constant willingness to answer a stream of questions, the paper would have been entirely lacking in material concerning the present condition of the Erie. Moreover, Mr. Wehner is the individual responsible for the material in the collection, alluded to above. As various structures were retired and the drawings no longer needed, Mr. Wehner funnelled this wealth.of drawings to Robert Vogel in the Smithsonian, where it remains available to scholars. Without Mr. Wehner's attention, all of these drawings would have been lost.
His contribution to this paper is greatly appreciated. ERIE RAILWAY SURVEY HAER Appendix $
Shop Tools
Tools, Marion Diesel Shop* Parts Room 2 cleaning vats served by 1/2 ton jib crane Oil filter cleaning tanks served by 400 monorail crane Parts Conditioning Room Emery Wheel Small metal band saw Cylinder honing fixture Portable drill press Repair Shop 60-ton Whiting drop table 0 25-ton overhead crane Hydraulic pinion puller 17-inch portable drill press 4-foot radial drill 14-inch portable metal band saw 18-inch by 10-foot engine lathe 36-inch by 16-foot engine lathe 20-inch emery wheel 2-inch pipe threading machine 70-ton rod press, hand-operated Spray paint booth Armature baking oven Air blowing cleaning booth Armature vacuum impregnator Combination induction pinion heater and Magnaflux transformer Armature horses Armature saddles Armature cooling stands Induction heater for applying and removing roller bearing journal sleeves Storage for 57 pairs of mounted wheels *The Railway Age, Volume no.
23, June 8, pp. ERIE RAILWAY SURVEY HAER (Page & ) Appendix/4 Susquehanna" Tool List, Car Shop After Cabinet Shop and wood Hill Heater room for gluing Glue press Stick and moulder Jointer Variety saw Grind stone Brand saw Rip saw ^ .. Cut-off saw Morticer Wood shaper Tennoner Borer Jointer and sticker Double cylinder surfacer Wood lathe Sander Knife grinder Band saw/sharpener Circle saw/sharpener Machine Shop and Blacksmith Shop .
2 small grinders (1 forging machine ' 1 16" lathes 1 24" lathe 3 drill presses 1 new emery wheel 1 punch 3 shapers 1 swing grinder 1 blacker hammer 1 hack saw 1 bolt cutter 1 punch and shear 1 bolt shear- 1 bar shear 3 double forges 1 Bradley hammer 1 single forge Company drawings; wiring plans show placement and layout ERIE RAILWAY SURVEY HAER (Page g ) Appendix /$ Machine Shot; and Blacksmith Shop (continued) 2 bull dozers 1 steam hammer 4 furnaces 2 j ib cranes X cooling tank Pipe and Tin Shop 1 jib crane Steel tire lathe Journal lathe Shear Drill press 3 benches Layout table Uphols tery Shop 4 cylinder planer Swinging Cut-off saw Table rip saw Hollow chisel morticer Swing borer Dry kiln Large work benches Cushion repair and drying areas Sewing machines Cutting tables Moss picker Meadville Signal Shop* Equipment 2 coil winding machines home-made No.
2 Cincinnati milling machine with 1 tool maker vice Gould and Eberhardt 20" shaper 14" swing lathe, 40" between center Dolton six lathe (accurate work) Marvel high-speed power hack saw machine Radial drill press, vertical traverse of spindles - 36" Sensitive drill press with Morrow drill chuck - for 1/4 driil ^Railway Signaling, Volume 19, pp.
ERIE RAILWAY SURVEY HAER (Page Appendix A Equipment (continued) to 2 and pipe threading machine Brush wheel (cleaning material) Grinder - 1 and to 10" wheel Tools Air Compressor Blacksmith forge Gas welding outfit Electric hand drill - - drill 2 electric soldering irons 2 Roller Smith ohm meter type SS, reads ohms 2 Roller Smith volt meter 1 Megohmeter Motors 3 hp 220 volts AC 1/4 hp 110 volts DC 1/2 hp 110 volts DC 110 volts DC Hornellsville Shops Tools* Old Erecting Shop Section 1, Group-Driven Tools - 50 hp Constant Speed Motor 100 ton wheel press 300 ton wheel press Car wheel borer ^ Double car axle lathe Single car axle lathe 4 spindle drill Horizontal boring machine 24" engine lathe 80" engine lathe 2 16" engine lathes 18" engine lathes 13" engine lathes 10" slotter No.
4 plain milling machine A Railway and Engineering Review, Volume 46, pp.
ERIE RAILWAY SURVEY HAER (Page 8) Appendix W Section I (continued) 53" vertical boring mill 42" vertical boring mill 37" vertical boring mill 36" upright drill 28" upright drill 24" pillar shaper 32" x 32" x 8' planer 1 and x 24" turret lathe 90" quartering machine Duplex enemy grinder 7 spindle nut trapper 40" upright drill Small flange punch Section 2, Group-Driven Tools - 30 hp Constant Speed Motor 2 16" engine lathes 1 and bolt pointer 60" x 60" x 19' planer 5' radial drill 41 radial drill 18" slotter 2 2" double bolt cutters 1 and staybolt cutter 12" slotter 2 spindle centering machine Slab milling machine 40" drilling, facing and tapping machine Duplex emery grinder Triple head slotter 40" upright drill Section 3 Group-Driven Tools - 50 hp Constant Speed Motor 42" x 42" x IS* planer Ring turret lathe 48" upright drill 42" engine lathe 30" engine lathe 24" engine lathe Crank planer - 20" x 20" x 24' 2" x 26" turret lathe 2 36" engine lathes 2 horizontal boring machines 14" engine lathe ERIE RAILWAY SURVEY HAER (Page Appendix/4 Section 3 (continued) 2 engine lathes 42" vertical boring machine 40" upright drill 32" x 32" x 8' planer 5 foot radial drill Double head traverse shaper No.
4 plain milling machine 26" engine lathe 30" engine lathe Section 4, Group-Driven Tools - 30 hp Constant Speed Motor 16" engine lathe 24" engine lathe 24" pillar shaper Friction drill 36" x 36" x 10* olaner 36" x 36" x 8' planer 32" x 32" x 8' planer 20" engine lathe 18" engine lathe 16" engine lathe 24" engine lathe Cylinder boring machine No.
17 Landis grinding machine 42LI vertical boring mill 36" upright drill 28" upright drill 48" upright drill 36" engine lathe 30" engine lathe 2 Fox turret lathes 86" vertical boring mill Duplex emery grinder Section 5, Group-Driven Tools - 30 hp Constant Speed Motor 2Q" American brass lathe 24" engine battle 18" slotter Key slot milling machine 30" engine lathe - piston rods 36" x 36" x 10' planer 2" x 26" turret lathe ERIE RAILWAY SURVEY HAER (Page Appendix /$ Fitting Shop, Group-Driven Tools - 30 hp Constant Speed Motor 28" upright drill 30 ton Arbor press 36" x 36" x 8' planer 37" vertical boring mill 3 18" engine lathes 2 16" engine lathes 1 30" engine lathe 11" bench speed lathe 24" pillar shaper 20" x 20" x 2V crank planer 40" upright drill 15 ton Arbor press 2 spindle centering machine Buffing wheel Small emery grinder Surface grinder Guide grinder Polishing tape and wheel Swing grinder Friction drill New Erecting Shop Individual-Driven Tools, Constant Speed Motors Planer - 20 hp 600 ton wheel press - 13 hp Moves tail stock of driving wheel lathe [Niles] - 7 and 1/2 hp Individual-Driven Tools, Variable Speed Motors Vertical miller for side rods - 7 and 1/2 hp 90" boring mill [Niles] - 20 hp and 6 hp Driving axle lathe [Niles] - 20 hp Crank pine lathe - 7 and 1/2 hp 90" driving wheel lathe - 40 hp Truck tire lathe - 25 hp Tool Room, Group-Driven Tools - 20 hp Constant Speed Motors Yankee twist drill grinder Duplex emery grinder - 8" wheels No.
3 Landis Universal grinding machine Sellars tool grinder Reamer and Cutler grinder Gardner disc grinder Carpenter Shop, Group-Driven Tools - 50 hp Constant Speed Motors Hollow chisel morticer and boring machine Gaining machine 2 spindle shaper Moulding machine 24" x 14" x 9' Daniels' planer Plain morticer and borer 8" x 14" planer - 3 cutters 18" rip saw 12" rip saw 48" band saw 12" cutting off saw Single horizontal borer Tenoning machine 15" turning lathe 15" swing vertical borer 4" pipe cutter 3" pipe cutter Blacksmith Shop, Group-Driven Tools - 30 hp Constant Speed Motors 2 power hammers Light bar shear Small bolt header 1 and bolt header 2 and bolt header Alligator shears Ear iron shears Hot saw 50 hp motor direct connected to No.
9 Sturtevant fan Boiler Shop Group-Driven Tools - 7 and 1/2 hp Constant Speed Motor 2 Hartz flue welding machines 2 Flue cutting machines ERIE RAILWAY SURVEY HAER (Page 72) Appendix /\ Individual-Driven Tools, Constant Speed Motors Flue Ratler, 48" diameter by 22' long, 20 hp motor 20" punch and shears [Hilles and Jones], 7 and 1/2 hp Plate rolls, 25 hp Horizontal punch, 10 hp Lenox bevel shears, 7 and 1/2 hp 36" punch and shears, 10 hp Tank Shop, Group-Driven Tools - 20 hp Constant Speed Motor 36" single shear 36" single punch 10 and 15 hp motors geared to plate rolls Roundhouse Machine Shop, Group-Driven Tools, 20 hp Constant Speed Motors 16" engine lathe 26" engine lathe 32" x 32" x 8' planer 24" pillar shaper 40" upright drill Duplex emery grinder 15 ton Arbor press Motors in Miscellaneous Applications Fan for roundhouse heating system, 70 hp, constant speed Fan for erecting shop heating system, 10 hp, constant speed Roundhouse turntable, 7 and 1/2 hp, variable speed Coal conveyor in coaling station, 50 hp, constant speed Ash conveyor in ash pit, 30 hp, constant speed Alligator shears in scrap bins in yard, 7 and 1/2 hp, constant speed Transfer table, 25 constant speed Dunmore Shops Tool List, Framing Shop - individual motors Atlantic Works, tenoning machine, 15 hp Gseenlee Bros., mortising and boring machine, 10 hp Greenlee Bros., cut-off saw, 7 and 1/2 hp ^"Locomotive and Car Shops at Dunmore, Pa.," Railway and Locomotive Engineering, Volume 15, February, pp.
ERIE RAILWAY SURVEY HAER (Page Appendix /) Framing Shop (continued) Greenlee Bros., four-spindle boring machine, 10 hp H. J. Perkins, saw, gummer and grindstone, 1 hp Atlantic Works, band saw, 7 and 1/2 hp Atlantic Works, 20" jointer, 13 hp Greenlee Bros., rip saw, 15 hp Atlantic Works, four-cylinder planer, 12" x 30 hp Richardson, Merriam & Co., matcher and planer, 17 hp Blacksmith Shop Hilles & Jones, No. 3 combined punch and shear, 5 hp Ajax bulldozer, 10 hp Ajax, bolt header, upsetter and forging machine, 2 and 10 hp Sellers, bolt and rod shear, 10 hp Oliver Bros.
& Phillips, bolt header, 10 hp Bradley, cushioned hammer, 60 10 hp Boiler Shop - Group-Driven Tools New York Steam Engine Co., 8" x 32" drill press, 5 hn Silver Co., 19" x 5" post drill, 5 hp Hartz, flue welder, 5 hp Bethlehem Shear Co., rotary shear No. 4, 5 hp Grindstone, 5 hp Boiler tube rumbler, 5 hp Industrial Works, combined punch and shear, 3 hp Long & Allstatler, combined punch and shear, 5 hp Hilles & Jones, bending rolls, 10 hp Bending rolls, 5 hp Machine Shop J. T. Shaffer Co., 300 ton hydraulic wheel press, 5 hp Sellers, four-foot wheel boring machine, 3 hp Pond, 42" car wheel lathe, 7 and 1/2 hp Pond, 8!
x 4' boring mill, 7 and 1/2 hp Sellers, 6' 4" wheel lathe, 5 hp Sellers, 30" x 23 and x 12' lathe, 3 hp Niles, 37" boring mill, 3 hp Pond, 36" x 30" x 12* lathe, 5 hp Pond, 49" x 41" x 24' lathe, 5 hp Sellers, 160 ton hydraulic wheel press, 5 hp Sellers, 50" wheel boring machine, 15 hp Sellers, 16" x 10" x 7" axle lathe, 15 hp ERIE RAILWAY SURVEY HAER (Page Appendix rf Machine Shop (continued) Niles, 10" x 4 and x 20" turret lathe, 15 hp ' Acme, 3/8 to 2" 3-head bolt cutter, Acme, 6-spindle nut tapper Sanders, 2and to 8" pipe cutter 20" x 11 and x 6' lathe, 15 hp 24" x 13 and x 11' 6" lathe, 15 hp Sanders, 1/4 to 3 and pipe cutter, 15 hp 30" x 21" x 14' 6" lathe, 10 hp Pond, 22" x 31" x 18' lathe, 10 hp Reed, 24" x 13" x 7* 6" lathe, 10 hp New Haven, 27" x 18 and x 12' 6" lathe, 10 hp Pond, 5' radial drill, 10 hp Pond, 2' 6" x 30" x 8* planer, 10 hp Gould & Eberhardt, 24" x 18" shaper, 10 hp Pedrlck & Ayer, 12" x 36" x 16" milling machine, 10 hp Builders Iron Foundry, 18" emery grinder, 10 hp Diamond, No.
1 benchx grinder, 10 hp Sellers, 36" x 36" x 10' planer, 10 hp Gould & Eberhardt, 37" drill, 10 hp Dunmore Shop grinder, 10 hp Sellers, 8 and x 14" x 18" slotter, 10 hp Challenge, 14" hack saw, 10 hp Sellers, 10" x 28" shaper, 10 hp Prentice Bros., 20" drill press, 5 hp Reed, 16" x 10" x 7' lathe, 5 hp Diamond, No. 1 bench grinder, 5 hp Atlantic Works, No. 2 knife grinder, 5 hp Gisholt, tool grinder, 5 hp Sellers, twist drill grinder, 5 hp Brown & Sharpe, universal tool grinder No.
3, 5 hp Gould & Eberhardt, 16" shaper, 5 hp Pond, 60" x 60" x 72" planer, 25 hp Silver Co., 19" x 5" post drill, 10 hp Leonard & Clark, 12" x 18 and x 7 and lathe, 10 hp Fitchberg, 10" x 20" x 7 and lathe, 10 hp Sellers, 12" x 24" x 20" slotter, 10 hp 14" x 9" x 4' lathe, 10 hp American Twist Drill Co., 14" emery grinder, 10 hp Baker Bros., No. 3 key seater Yonkers, 8" x 26" drill, 10 hp Gould & Eberhardt, 32" drill, 7 and 1/2 hp Dunmore Shop grindstone, 7 and 1/2 hp Diamond, No.
1 bench grindstone, 7 and 1/2 hp Reed, 9" x 18" x 32" lathe, 7 and 1/2 hp Sellers, 20" x 4T lathe, 7 and 1/2 hp Prentice Bros., 18 and x 13" x 6' 7" lathe, 7 and 1/2 hp Dunmore Shop, centering machine, 7 and 1/2 hp ERIE RAILWAY SURVEY HAER (Page 75) Appendix A Pattern Shop Dunmore Shop grindstone, 10 hp Atlantic Works, 16" rip saw, 10 hp Atlantic Works, 16" jointer, 10 hp Atlantic Works, small face-plate lathe, 10 hp Atlantic Works, 37" band saw, 10 hp Atlantic Works, 19" x 6' planer, 10 hp Atlantic Works, 28" x 33" x 16' lathe, 10 hp Atlantic Works, saw filer and setter, 10 hp Atlantic Works, large face plate lathe, 10 hp Atlantic Works, to 2" wood borer, 10 hp Miscellaneous Motors Coal pockets, 20 hp Car shop heating stack, 20 hp Blacksmith Shop heating stack* 20 hp Blacksmith Shop blower, 10 hp Blacksmith Shorn exhaust fan, 10 hp Drop table, 10 hp Machine Shop heating stack, 10 hp Foundry rumbler, 3 hp Foundry blast, 15 hp Framing Shop exhaust fan, 25 hp Shaw electric crane, 35 ton main hoist, 30 hp Shaw electric crane., auxiliary hoist, 17 hp Shaw electric crane, bridge motor, 25 hp Shaw electric crane, carriage motor, 5 hp Jersey City South Side Shop Tool List, Machine Shop Group-Driven Tools - 50 hp, 220 volt, two-phase GE motor 60 ton rod press 4 and 1/2 foot Mueller radial drill press 28" Smith & Mills shaper 20" x 3" double end emery wheel grinder 42" drill press 24" Bollard vertical turret lathe, 7 and 1/2 hp Westinghouse Motor 42" Colburn vertical boring mill, 15 hp Westinghouse Motor *"Power and Lighting Facilities on the Erie," Railway Electrical Engineer, Volume 13, no.
11, November, pp. See map for diagram. ERIE RAILWAY SURVEY HAER (Page Z76 ) Appendix ^ Machine Shop (continued) 14" x 6' Cisco engine lathe 17" x 8' National engine lathe 18" x 8' National engine lathe 28" x 12 and 1/2 foot Boxe & Emmes engine lathe 36" x 20' New Haven engine lathe 3 and Adams bolt threader Trip hammer Buffalo forge blower Double blacksmith's forge Two anvils Two Wilson arc welders Ingersoll Rand air compressor 'ERIE RAILWAY SURVEY HAER (Page Appendix B SUBURBAN LINES ATLArmC OCON ERE RAILROAD BRANCHES S CONNECTIONS CHtaSTMTI C JgTTtOlCfi, WW1 SOftQ, LCSTEKTOUT. fl . ERIE RAILWAY SURVET ERIE RAILWAY SURVEY ERIE RAILWAY SURVEY HAER (Page Appendix B MEACMLLE WHEEL SHOP- EAST BUFFALO SHOPS- t UAAC "! '-' **9 r.
CUNMQRE SHOPS-1902 ' -" a- -ci *niu r*i f#*i_ conMUdw ms i, nv m i.TI~*. E .^ArtrtfVTrv^H3 1 1 i IT^ cwii7iAn e.Fttno .oa wwi n OP* UESICRHOUT; wa EftlE RAIliVAY SURVEY ERIE RAILWAY SURVEY ERIE RAILWAY SURVEY HAER Appendix B DUNKIRK - Ca. PORT JERVIS SHOPS SUSQUEHANNA SHOPS SUSQUEHANNA SHOPS SUSQUEHANNA CAR SHOP LAYOUT - !>* *? hntfM4TiA 4U#( *rf j IU vujm. wmwwi jf4arm.TV?hi<H>>iiM*i&HrDC MEADVILLE SHOPS CHUiTUJi t. flcrncLDa iur-An io& ugiTtftwaur. ERIE RAILWAY SURVEY ERIE RAILWAY SURVEY ERIE RAILWAY SURVEY HAER (Page $C) Appendix C
Transposition Table
When the report for the Erie Railway Survey was prepared in a cardinal number system was used to refer to all accompanying photographs and photocopies. Those made by HAER were later reassigned HAER numbers (e.g. "PA-8-1") while those donated by the Erie or other sources retained their old numbers and were placed in a supplemental collection entitled "Erie Railway: Historic Photographs and Supplemental Graphic Materials" under Library of Congress Lot Nos. and "EC" (for "Erie Collection") in the table below indicates photos filed in the supplemental collection; numbers are inked on the photo backs. Photaswhich have been lost are noted as "missing".
Xerox copies of all numbered "EC" photos appear in Appendix F for convenient refer- ence, however, the supplemental collection contains several dozen old photo- graphs never given numbers for use in the report. An inventory of the entire supplemental collection is provided in Appendix G . Photo Present Photo Present Photo Present Number in Number or Number in Number or Number in Number or Report Collection Report Collection Report Collection 1. EC 21. PA-6-7 41. EC 2. 22. PA-6-8 42. EC 3. missing 23. EC 43. EC 4. missing 24. EC 44. 5. PA-44-2 25. PA-6-12 45. 6. PA-44-3 26. PA-6-14 46. 7. PA-44-1 27. missing 47. EC 8. EC 28. missing 48. missing 9. missing 29. EC 49. missing 10. missing 30. missing 50. EC 11. EC 31. EC 51. EC 12. EC 32. EC 52. EC 13. EC 33. missing 53. EC 14. PA-18-1 34.
missing 54. NY-25A-1 15. PA-18-2 35. missing 55. 16. See PA-18-1 36. EC 56. EC 17. EC 37. missing 57. missing 18. EC 38. EC 58. EC 19. PA-6-1 39. EC 59. EC 20. PA-6-2 40. EC 60. PA-23-1 ERIE RAILWAY SURVEY HAER (Page Appendix C # Photo Present Photo Present Photo Present Number in Number or Number in Number or Number in Number or Report Collection Report Collect ion Report Collection 61. PA-43-3 PA-10 A~2 62. PA-43-4 PA-10A-3 63. PA-43-5 EC PA-10A-4 64. PA-43-1 EC EC 65. PA-43-2 EC EC 66. EC EC EC 67. EC EC PA-10C-2 68. EC EC PA-10E-2 69. EC EC and PA-7-27 PA-10D-3 70. PA-24-17 EC EC 71. PA-24-18 EC missing 72. EC EC missing 73. EC EC PA-10B-2 74. EC EC 75. EC EC 76. PA-7-9> EC 77. EC PA-7-13 PA-10F-1 78. EC EC PA-10F-2 79. EC EC PA-10E-l 80. EC EC PA-10D-2 81. EC EC EC 82. EC.
EC PA-10--4 PA-11B-10 100 EC PA-10A-1 PA-11B-12 ERIE RAILWAY SURVEY HAER (Page Appendix C Photo Present Photo Present Photo Present Number in Number or- Number in Number or Number in Number or Report Collection Report Collection Report Collection PA-HB-2 See 220 EC PA-11C-3 EC EC PA-HC-5 EC PA-11C-6 PA-8-10A PA-11-1 PA-8-1 PA-11-2 PA-8-2 PA-11-4 PA-8-9 PA-42-1 PA-11-3 PA-8-10B PA-42-2 see 185 PA-8-20 EC EC PA-8-4 EC PA-8-5 EC PA-8-6 EC PA-8-7 EC PA-8-8 EC EC EC EC EC EC EC EC EC EC EC EC missing EC EC EC EC missing EC EC EC missing EC EC EC EC EC EC EC EC EC EC missing EC EC EC EC EC EC EC EC EC EC EC EC EC PA-47-1 EC ERIE RAILWAY SURVEY HAER (Page S3) Appendix C Photo Present Photo Present Photo Present Number in Number or Number in Number or Number in Number or Report Collection Report Collection Report Collection EC missing EC missing PA-46-1 missing EC missing EC missing EC EC missing missing EC missing EC EC PA-21-1 missing PA-21-3 EC PA-26-2 missing PA-29-1 missing PA-29-2 334.,EC EC EC missing EC PA-9-1 EC EC missing missing ERIE RAILWAY SURVEY HAER [Page Appendix &
Erie Railway Survey New Jersey
Clifton Station, Clifton, Passaic County Bergen Hill Open Cut, Jersey City, Hudson County Ferryboat "Susquehanna", Jersey City, Hudson County Pier 5 Immigrants Waiting Rood, Jersey City, Hudson County NJ-25A N^ Y. Div., Bridge Newark, Essex County .. N. Y. Div., Bridge c. Newark, Essex County Paterson Station, Paterson, Passaic County NEW YORK Otisville Tunnel, Otisville, Orange County Port Jervis Station, Port Jervis, Orange County Port Jervis Roundhouse, Port Jervis, Orange County Port Jervis Rock Cut, Port Jervis, Orange County Deposit Station, Deposit, Broome County Oquaga Creek Bridge, Deposit, Broome County Delaware Div. Bridge, Deposit, Delaware County Clear Creek Viaduct, Lawtons vie.
Erie County Binghamton Station, Binghamton, Broome County Binghamton Freight Station, Binghamton, 3roome County ERIE RAILWAY SURVEY HAER (Page 2g ) Appendix & Horseheads Interlocking Tower, Horseheads, Chemung County Hornell Station, Hornell, Stsuben County Home 11 Erecting Shop, Hornell, Steuben County 5 Corning Side Hill Cut, Corning vie, Steuben County itfY-36 Elmira Station, Elmira, Chemung County Salamanca Station, Salamanca, Cattaraugus County Salamanca Turntable, Salamanca, Cattaraugus County Allegany Div.-, Bridge (Rush Creek Viaduct), Fillmore vie, Allegany County Allegheny Div.
Bridge (Genesee River Viaduct), Belfast vie, Allegany County Dayton Tunnel, Dayton, Cattaraugus County Hancock Station, Hancock, Delaware County Hancock Freight Station, Hancock, Delaware County Warsaw Passenger and Freight Station, Warsaw, Wyoming County Avon Station, Avon, Livingston County Avon Frieght Station, Avon, Livingston County Buffalo Div., Bridge (Portage Viaduct), Portageville vie, Wyoming/Livingston Counties Goshen Station, Goshen, Orange County Middletown Station, Middletown, Orange County Jamestown Station, Jamestown, Chatauqua County Moodna Creek Viaduct, Salisbury Mills vie, Orange County Callicoon Passenger and Freight Station, Callicoon, Sullivan County East 3uffalo Station, 3uffaIo, Erie County
Erie Railway Survey
IiAER MY-I24 (Page 86 Appendix^ Kensington Ave. Station, Buffalo, Erie County Main Street Station, Buffalo, Erie County Walden Ave. Scation, Buffalo, Erie County- 6 Corning Station, Corning, Steuben County Central Avenue Pier, Dunkirk, Chatauqua County Chambers St. Ferry Terminal, New York City, New York Twenty-Third Street Ferry Terminal, New York City, New York Niagara Falls Station, Niagara Falls, Niagara County La Salle Station, Niagara Falls, Niagara County North Tonawanda Station, North Tonawanda, Niagara County Sawyer Creek Bridge, Martinsville, Niagara County Nyack Station, c.
Nyack, Rockland County Painted Post Passenger & Freight Station, Painted Post, Steuben County Wellsville Station, Wellsville, Allegany County Erie Railway: (Miscellaneous photos) Collins Station, Collins, Cattaraugus County Harriman Station, Harriman, Orange County Sparkill Station, Sparkill, Rockland County Suspension Bridge Station, Suspension Bridge, Erie County PENNSYLVANIA PA-6 Delaware Div., Bridge (Starrucca Viaduct), Lanes boro , Susquehanna PA-7 Bradford Div., Bridge (Kinzua Viaduct), Mt. Jewett.
McKean Count- ERIE RAILWAY SURVEY HAER (Page 07) Appendix.^ PA-8 Susquehanna Station and Hotel (Starrucca House), Susquehanna, Susquehanna County PA 9 Susquehanna Freight Station, Susquehanna, Susquehanna County PA-10 Susquehanna Repair Shops, Susquehanna, Susquehanna .County PA-10A Susquehanna Machine and Erecting Shop (Long Shop) , Susquehanna, Susquehanna County PA-103 Susquehanna Carpenter Shop, Susquehanna, Susquehanna County PA-10C Susquehanna Balcksmith Shop, Susquehanna, Susquehanna County PA-10D Susquehanna Boiler Shop, Susquehanna, Susquehanna County PA-10E Susquehanna Boiler Shop, Susquehanna, Susquehanna County PA-10F Susquehanna Repair Shops, Office Building, Susquehanna, Susquehanna County PA-10G Susquehanna Transfer Table, Susquehanna, Susquehanna County PA-11 Meadville Repair Shops, Meadville, Crawford County PA-11A Meadville Machine & Erecting Shop, Meadville, Crawford County PA-11B Meadville Blacksmith Shop, Meadville, Crawford County PA-11C Meadville Storehouse, Meadville, Crawford County PA-12 Meadville Station, Meadville, Crawford County PA-13 Meadville Roundhouse, Meadville, Crawford County PA 16 Delaware Div.
, Bridge Lanesboro, Susquehanna County PA 17 Delaware Div., Culvert Lanesboro, Susquehanna County PA 18 Site- of. Cascade Bridge, Lanesboro, Susquehanna County PA-20 Buchanan Junction Interlocking Tower, Meadville vie, Crawford County PA-21 Mt. Jewett Station, Mt. Jewett, McKean County PA-25 Delaware River Bridge, Millrift, Pike County ERIE RAILWAY SURVEY HAER (Page Appendix P PA-24 Delaware Div., Bridge Lackawaxen, Pike County PA-25 Hawley Coaling Station, Hawley, Wayne County PA-26 Cambridge Springs Station, Cambridge Springs, Crawford County FA-27. Diverging Trench Creek Bridges, Cambridge Springs, Crawford County FA-28.
Parallel French Creek Bridges, Cambridge Springs, Crawford County PA-29 Cochranton Passenger & Freight Station, Cochranton, Crawford County PA-30 Pond Eddy Side Hill Cut & Fill, Pond Eddy, Pike County PA-42 Shohola Station, Shohola Pike County PA-43 Shohola Creek Bridge, Shohola, Pike County PA-44 Shohola Side Hill Cut & Buttressed Revetment, Shohola vie, Pike County PA-45 Union City Station, Union City, Erie County PA-46 Union'City Freight Station, Union City, Erie County PA-47 Crossing Gate Tower, Union City, Erie County ERIE RAILWAY SURVEY HAER (Page Appendix HISTORIC AMERICAN ENGINEERING RECORD PHOTO INDEX FOR SELECTED PHOTOS FROM THE ERIE RAILWAY SURVEY (Sites in New Jersey) ERIE RAILWAY SYSTEM: New Jersey, New York, Pennsylvania NOTE TO RESEARCHERS: The Erie system cues through three states.
Specific sites along the railway system have been assigned a HAER number for the state in which they are located. The negatives for the photographs are located in the state files, even though the photographs in the project record are maintained as one project file. .To order photographs from the project file, you must refer to the separate HAER number for the specific site in the state. If for instance you want a photograph of a site on the Erie system which is located in Pennsylvania, you must order it by its HAER PENNSYLVANIA NUMBER, not by its master project number NOTE ON PHOTOGRAPHS: Many original photographs and negatives of Erie sites were donated to HAER by the Erie Railroad Company and are credited by the initials "ERC" in parentheses.
Unless otherwise noted, all other photographs of the Erie system were taken by Jack Boucher during and General view of Clifton NJ Station, built (ERC). Photographer unknown, date of photograph unknown. photgraph showing Ferryboat "Susquehanna" (ERC). Photographer unknown. photograph showing interior of Ferryboat "Susquehanna" (ERC). Photographer unknown. photograph of main sitting room, Ferryboat "Susquehanna" (ERC). Photographer unknown. General view of Pier 5, Jersey City, New Jersey (ERC). General view of Immigrants' Waiting Room in Pier 5, Jersey City, New Jersey, c. (ERC). ERIE RAILWAY SURVEY HAER (Page Appendix JE NJ-25A-1 Photocopy made September 12, of original Pangbom photograph taken in of Bridge New York Division.
Draw span in shot was replaced in by second draw span which was itself replaced in the early century (ERC). Undated copy of undated photograph of Bridge New York Division (ERC). A Strauss-type bascule trunnion lift span built in ERIE RAILWAY SURVEY HAER (Page 9/ ) Appendix HISTORIC AMERICAN ENGINEERING RECORD PHOTO INDEX EOR SELECTED PHOTOS FROM THE- ERIE RAILWAY SURVEY (Sites in New York) ERIE RAILWAY SYSTEM: New Jersey, New York, Pennsylvania NOTE TO RESEARCHERS: The Erie system cuts through three states. Specific sites along the railway system have been assigned a HAER number for the state in which the site is located. The negatives for the photographs are located in the state files, even though the photographs in the project record are maintained as one project file.
To order photographs from the project file, you must refer to the separate HAER number for the specific site in the state. If, for instance, you want a photograph of a site on the Erie system which is located in PENNSYLVANIA, you must order it by its HAER PENNSYLVANIA NUMBER, not by its master project number NOTE ON PHOTOGRAPHS: Many original photographs and negatives of Erie sites were donated to HAER by the Erie Railroad Company and are credited by the initials "ERC" in parentheses. Unless otherwise noted, all other photographs of the Erie system were taken by Jack Boucher during and Aerial view of Otisville Tunnel. Near Otisville, New York, General view from east of Otisville tunnel portal. Near Otisville, New York. Passenger station, Port Jervis, New York.
General view from south, General view of passenger station, Port Jervis, New York from southwest. Tower and pediment detail on southwest facade of Port Jervis passenger station, Port Jervis, New York. Detail of northeast front entrance and sign on passenger station at Port Jervis, New York. General view from southwest of Roundhouse, Port Jervis, New York- ERIE RAILWAY SURVEY HAER [Page 29 ) Appendix General view of passenger station, Deposit, New York.. View from north. Detail of northeast end of passenger station at Deposit-, New York showing bay window. View of southeast wall, interior of waiting room, passenger station, Deposit, New York. Aerial view of bridge Delaware Division, Oquaga Creek Bridge at Deposit, New York.
Detail of truss bridge Delaware Division, Oquaga Creek Bridge at Deposit, New York. NY Aerial view of bridge Delaware Division at Deposit, New York. Steel Lattice bridge built Aerial view of bridge (Buffalo and Southwestern line) at Lawton New York. Built General view from northwest of passenger station in Binghamton-i., New York, View showing shelter and fence, street overpass level, at Binghamton, New York passenger station. View showing freight house under construction at Binghamton, New York (ERC). Photographer unknown, c. View showing freight house under construction at Binghamton, New York (ERC). Photographer unknown, c Aerial view showing Hornell Station, EorneJX, New 5ork. Aerial view showing Hornell Shops, Hornell, New York.
Aerial view showing side hill cut, near Coming, New York. Note: Old D. L. & W Line removed. Aerial view showing Elim'ra Station, Elmira, New York. Aerial view showing Salamanca Station, Salamanca, New York. Aerial view showing Salamanca Turntable and debris from Roundhouse after its destruction in July ERIE RAILWAY SURVEY HAER (Page 33) Appendix Aerial view showing bridge Rush Creek Viaduct, River Line, Fillmore, New York. Viaduct was built in and is feet long. NY Aerial view of Dayton Tunnel, near Dayton, New York. General view from west showing Hancock passenger station, Hancock, New York. General view from north showing passenger station (note freight station in background), Hancock, New York. View from west showing freight station, Hancock, New York.
NY 49 1 Aerial view showing combination freight and passenger station, Warsaw, New York. NY 52 1 Aerial view showing Avon passenger station, Avon, New York. General view from east showing passenger station at Avon, New York. NY 53 1 General view from southwest of Avon freight house, Avon, New York. Aerial view of Portage Viaduct, bridge Buffalo Division after strengthenings in and Second aerial view of Portage Viaduct, near Portageville, New York. NY 55 5 General view in waiting room from east, Goshen station. Passenger station, Middletown, New York. General view from south. General view southwest end, passenger station, Middletown, New York. Detail of southwest entrance, Middletown, New York passenger station. General view from south, interior, passenger station, Middletown,'"New York.
ERIE RAILWAY SURVEY HAER (Page Appendix > " Detail of roof truss, Middletown passenger station, Middletown, New York. Detail of ticket window, interior in west corner, Middletown.passenger station, Middletown, New York. General view from northwest of passenger station, Jamestown, New York. General view, north elevation, passenger station, Jamestown, New York. Aerial view, looking southwest, of Moodna Creek Viaduct, Bridge Built in View of Moodna Creek Viaduct, looking ,southeast, feet long, General view from northwest of Callicoon, New York depot. General view of East Buffalo Station, East Buffalo, New York. Photographer unknown, photo c. (ERC) . General view of Kensington Avenue station, East Buffalo, New York. Photographer unknown, photo c. (ERC).
Station built in General view of Main Street Station, Buffalo, New York. Photographer unknown, photo c. (ERC) . General -view of Walden Avenue Station, Buffalo, New York, c. (ERC) . Photographer unknown. General view of Corning, New York station bef ore ^remodeling. Photographer unknown, photo taken General view of Corning, New York station undergoing remodeling, Photographer unknown, photo taken c, (ERC). General view to north of Erie Pier terminal area, Dunkirk, New York. NY General view to west of pier in Lake Eire, Dunkirk, New York. C. photograph of Chambers Street Ferry Terminal and construction of Pier 21, New York city (ERC) . Photographer unknown. ERIE RAILWAY SURVEY HAER (Page 95) Appendix : C.
photograph of car float between Piers 20 and 21 at Chambers Street Ferry Terminal (ERC)- Photographer unknown. C. photograph of Chambers Street Ferry House in Hew York City (ERC). House built in Photographer unknown. General view of Street Terminal New York city(ERC). New addition under construction. Photographer unknown. Photo taken View of Street Terminal from water, New York City (ERC). Photographer unknown. Photo c. General view of Street, Ferry Terminal C. (ERC). Photographer unknown. Aerial view of Sawyer Creek bridge near Martinsville, New York on Niagara Falls Division. General view of Nyack Station, Nyack, New York, c. (ERC). Photographer unknown. C. photograph of Wellsville Station, Wellsville, New York (ERC). Photographer unknown.
Photocopied summer Pile superstructure of original superstructure for Erie RR in Original drawing in SMQ library, Dallas, Texas. View showing Erie RR route looking east toward Port Jervis along the Delaware River. General view from east to west through Delaware Valley west of Port Jervis., New York. . View showing Port Jervis Rock Cut. Typical of early engineering efforts on the Erie RR. General view looking west of Gulf Summit Cut on the Erie RR near Gulf Summit, New York. General view of suspension Bridge Station, Suspension, Bridge, New York (ERC). Photo taken c. photographer un- known.
ERIE RAILWAY SURVEY HAER (Page2 fi) Appendix HISTORIC AMERICAN ENGINEERING RECORD PHOTO INDEX FOR SELECTED PHOTOS FROM THE ERIE RAILWAY SURVEY (Sites in Pennsylvania) ERIE RAILWAY SYSTEM: New Jersey, New York, Pennsylvania NOTE TO RESEARCHERS: The Erie system cuts through three states. Specific sites along the railway system have been assigned a HAER number for the state in which the site is located. The negatives for the photographs are located in the state files, even though the photographs in the project record are maintained as one project file. To order photographs from the project file, you must refer to the separate HAER number for the specific site in the state.
If, for instance, you want a photograph of a site on the Erie system which is located in Pennsylvania, you must order it by its HAER PENNSYLVANIA NUMBER, not by its master project number NOTE ON PHOTOGRAPHS: Many original photographs and negatives of Erie sites were donated to HAER by the Erie Railroad Company and are credited by the initials "ERC" in parentheses. Unless otherwise noted, all other photographs of the Erie system were taken by Jack Boucher during and PA-6-13 View of Starrucca Viaduct looking southeast. Const. PA-6-14 View of Starrucca Viaduct from northwest. PA-6-15 View of Starruca Viaduct and surrounding area from the air- PA-6-16 Aerial view of Starruca Viaduct. PA-7-23 Bridge Bradford Division, Mt. Jewett, Pennsylvania, The Kinzua. Viaduct, an aerial view..
PA-7-26 Photocopied July from Album of Designs of the Phoenix Bridge Companyv Philadelphia: J. B. Lippincott & Co. Plate VIII. PA-S-1 General view from north of Susquetujnaa passenger station. PA-&-2 Susquehanna passenger station, general view from west. PA-&-3 Susquehanna passenger station, general view of southeast (rear) of building. ERIE RAILWAY SURVEY HAER (Page Appendix PA-6-4 Susquehanna passenger station, detail of dormer and cornice on northwest front, south end of the building. PA-8-5 Susquehanna passenger station, detail of base or arch trusses, second floor and spring block. PA-8-6 Susquehanna passenger station, detail of roof trusses, third floor, northwest side. PA 6-7 Susquehanna passenger station, detail roof trusses, looking down hall to northeast.
?A 8-8 Susquehanna passenger station, detail of entrance doors to dining hall, northeast end, southwest front of building. PA 8-9 Susquehanna passenger station, typical view from northwest showing buildings and immediate surroundings. PA 8- /OA Susquehanna passenger station and shops. Note Starrucca House. An aerial view. PA 9-1 Aerial view of freight house, Susquehanna, Pennsylvania. PA-10-1 A general view from the air of the Susquehanna Shops, Susquehanna, Pennsylvania, PA-10-2 Aerial view of the Susquehanna Shops, Susquehanna, Pennsylvania. PA 10A-1 General view of main shop from north across transfer table tracks. PA-10A-2 General view of east end of paint shop, originally part of long shop. PA-10A-3 Hatn shops, detail of northwest side of interior.
PA-1QA-4 Interior of main shop, view from southwest. -PA-1QE-1 General view from east of carpenter*s shop. PA-10C--1 General view, northwest elevation.of blacksmith's shop. PA-10C-2 General view of interior..of blacksmith"'1 s shop from north. PA-10D-1 General view of boiler shop from northwest, PA-10D-2 General view of Boiler shop from west. ERIE RAILWAY SURVEY HAER CPage 9&) Appendix PA-iOD-3 General view of boiler shop from northwest, Susquehanna shops. PA-10E-1 General view of northwest elevation of new boiler shop, Susquehanna. PA-10E-2 General view of new boiler shop interior from north, Susquehanna. PA-10F-1 East facade of office building from south, Susquehanna Shops. PA-10F-2 General view of office building and Main Shop from west, Susquehanna Shops.
PA-10G-1 General view from west of transfer table, Susquehanna Yards. PA-10G-2 Detail of transfer table cab showing control/power gears. PA-11-2 General aerial view of Meadville, Pennsylvania shops. Note wheel shop* PA-11-3 Aerial view of Meadville shops, Meadville, Pennsylvania. PA-11-4 Aerial view of Meadville shops, Meadville , Pennsylvania; note car shop and extension to blacksmith shop. PA-HA-5 General view from southeast of Erecting Shop; Meadville shops. PA 11A-6 Erecting shop, Meadville , Pennsylvania; general view from northeast of east front and north side. PA-11A-7 Erecting shop, Meadville , Pennsylvania; detail of quoins, southeast corner.
PA-11A-8 Erecting shop, Meadville , Pennsylvania; three part column ' with iron core, on machine shop side of building- PA-11A-9 Erecting shop, Meadville, Pennsylvania; four part cantilever column of erecting shop. PA HA-10 Erecting shop, Meadville , Pennsylvania; doors into pits. PA-11A-11 Erecting shop, Meadville , Pennsylvania; detail south side, tracks and entrance. PA-11A-12 General view of north end of erecting shop at Meadville from the east. ERIE RAILWAY SURVEY HAER (Page 99 ) Appendix PA-11B-8 Blacksmith shop at Meadville , general view from southeast, note decorative quoins. PA-11B-9 General view of east side of blacksmith shop at Meadville , from northeast. PA-11B-10 General view of blacksmith shop at Meadville , north end east side, from southeast.
PA-11B-11 Blacksmith shop, Meadville, Pennsylvania; detail of windows and quoins. PA-11B-12 Interior view of roof truss in blacksmith shop, Meadville , Pennsylvania. PA-11C-4 View of storehouse, Meadville shops, from southwest. PA-11C-5 View of car shop doorway, Meadville Shops. Note quoins. PA-11C-6 View of wooden column on first floor of .car shop, Meadville shops, note truss rods. PA-12-2 View of Meadville station (made from a copy negative owned by Miss Bessie McCartney, chief clerk EL Station demolished PA-13-4 General view from south of 6 stall roundhouse built in as firing up shop. Now the wheel shop. PA-13-5 General view from west of Meadville wheel shop. Note glass block in doors; and automatic scrap loader in center. PA-16-6 Bridge Delaware Division.
Concrete arch bridge-, fcoute 171 Lanesboro, Pennsylvania; general view from south. PA-18-1 Aerial view of Cascade Bridge site. Note culvert near Lanesboro, Pennsylvania, PA-18-2 Cascade Bridge site near Lanesboro, Pemxslyvania. PA-21-5 Photographer unknown. 1916.photo of Mt. Jewett Station in Mt. Jewett, Pennsylvania, Bradford Division of Erie RR(ERC). PA-21-6 " Unknown photographer. Mt. Jewett Station on Bradford Division. Photo taken in (ERC). ERIE RAILWAY SURVEY HAER (Page SCO) Appendix ? PA-23-1 Aerial view of bridge Delaware Division, Mill Rift, Pennsylvania. Bridge built in PA-24-17 Northern view from river pier of bridge Delaware Division, Lackawaxe^ Pennsylvania. Iron truss bridge. PA-24-18 Iron truss bridge, Delaware Division, Lackawaxen, Pennsylvania.
PA-25-5 photo: of Hawley Qoaling.Station, trestle with bins. Photographer unknown (ERC). PA-26-2 photo of Cambridge Springs Station, tteadeville Division. Photographer unknown (ERC). PA-27-1 Aerial view of diverging bridges across French Creek. Bridge (top) and, (bottom) on Meadville Division, near Miller's Station, Pennsylvania. Built PA-28-4 Parallel Bridges over French Creek". ""Bridge (left-)- and (right) near Cambridge Springs, Pennsylvania. PA-29-3 General view from west of depot and freight house at Cochranton, Pennsylvania. PA-29-4 Depot and freight house, detail of southeast end, Cochranton, Pennsylvania. PA-30-3 Pond Eddy, along the Delaware River, looking southwest, Note side hill out. PA-42-1 General view from south (trackside) of Shohola Station, Shohola, Pennsylvania.
PA-42-2 View of central room from north in Shohola, Pennsylvania station. PA-43-1 General view from north of side of Shohola Creek Arch Bridge (bridge Delaware Division). New plate girder built PA-43-2 Aerial view of bridge Delaware Division, (Shohola Creek Arch Bridge) . Note washed out area of arch. ERIE RAILWAY SURVEY HAER (Page SO/) Appendix ^f PA-43-3 View of bridge Delaware Division, Shohola, Pennsylvania. Built Note wing wall. PA-43-4 Shohola Creek Arch Bridge Detail of masonry east side. PA-43-5 View of west side of bridge PA-44-1 View of Shohola side hill cut and butresses. PA-47-1 Union City Gate Tower, Meadeville Division. photo, photographer unknown (ERC). ERIE RAILWAY SURVEY HAER (Page 30Z ) Appendix F NUMBERED PHOTOS from
Erie Railway Supplemental Collection
Appendix F contains copies of all numbered photos from the supplemental collection which were not later lost or given HAER numbers. This collection is stored under Library of Congress Lot Nos. and as "Erie Railway: Historic Photo- graphs and Supplemental Graphic Materials" and contains some 451 items, including old photos, photocopies and copies of draw- ings from several sources. A complete inventory is given in Appendix G. Those items accompanied by negatives are stored in Lot No. while those without negatives are in Lot No. Credit should be given to respective photographers and/or sources if any of these materials are reproduced, however, some photographs are not reproducible without permis- sion, so researchers are warned to check the backs of photo- graphs for restrictions.
Most of these materials have captions lettered on.their fronts or backs, some of which could not be reproduced in the following pages. ERIE RAILWAY SURVEY HAER (Page Appendix F &-/ ERIE RAILWAY SURVEY HAER (Page ERIE RAILWAY SURVEY HAER (Page Appendix F #/V ERIE RAILWAY SURVEY HAER (Page JM ) Appendix F #v Z. < 5 >- y.5 5 S ERIE RAILWAY SURVEY HAER (Page Appendix F m 3 .I ^ O 5 c "H t; ^ w c 1 c ERIE RAILWAY SURVEY J HAER CPage^^) Appendix F =t EC IE 3i-i 5 5 S 5 '* %/ 91 a: - i ~f ^i. *== i y * ':* i:H Y ERIE RAILWAY SURVEY HAER (Page Appendix F #"/ ?
-^J i < -s S 3 f ,i>/'tt iairbj-'MQ 2 ERIE RAILWAY SURVEY HAER Appendix F ^X3 - V in i b kiii# ' i."^'V,*-''*is * -< ."V * ^ S ^s* ERIE RAILWAY SURVEY HAER (Page $// ) Appendix F #~< -^- ERIE RAILWAY SURVEY HAER (PageJT/T) Appendix F > \ > ERIE RAILWAY SURVEY HAER (Page A"-. ERIE RAILWAY SURVEY HAER ("Page 3* Appendix F #" & Li ERIE RAILWAY SURVEY HAER M ( . ERIE RAILWAY SURVEY HAEU (Page Uu*^-.**^^^ ~j ERIE RAILWAY SURVEY HAER (Page Appendix F ! A rV 3 H a O 5? i rx,~iw J ,^; 0) f-t CD pq i o CO H t- H Pi i-4 01 a 4> I \ ii-j; ' *!
Rie Railway Survey
Art * w f\ER Page # ppendix F *"> ERIE RAILWAY SURVEY HAER (Page Appendix F J* _ B -** Bait > Mais ** . ERIE RAILWAY SURVEY HAER (Page Appendix F rMefmfgr^ra.'ii M aj... vuwnMnawi"lM:^wgiwp^^wy ERIE RAILWAY SURVEY liAER \Y-i24 Appendix r T/ ~ry VS. \J.'i.:dU r** V . : "/W,'.1->,i'i- O J s, i * :i -. ** 19 ,fc *. _ . ERIE RAILWAY SURVEY HAER (Page Appendix F ''.'TO _ __ Mm* ! 1 x _ j rf^i&tfJfe' ERIE RAILWAY SURVEY -i-- *- ",i @ i&t / r **5 c- - - .' ^' JEW J "i .-V *. .1* i * 7 ERIE RAILWAY SURVEY HAER (Page Appendix F ERIE RAILWAY SURVEY HAER (Page 20} Appendix F -*A te- -^-i * _ - t'-nut ^biA IIJPPI ! -- 1 P / *-f re-3?*- *. ^, , ^ * & f Ihftb* - " , ^ ERIE RAILWAY SURVEY I ^, HAER Appendi ^ i.- AV '"\ ^ V- ^ "*l * 1 * t i-J t * -n. * 1 1 * 1 fj I it?* V x ' .ufifafai * &*. I 1' BhMdfi.
^ *iV*- */ w r.1 ERIE RAILWAY SURVEY HAER (PageJ@0O ERIE RAILWAY SURVEY HAER (Page^gg/) Appendix F =1 ^ sm^ 3 5" fl-Ti^: lE^ i]z: > fx ""JIT' >2 3. FSOEt^^SL 'H^ JiJl ^Zli V sii ^/ '.^ '! na. -*zii IT"" ;1^ l^ -H> JiS _ S" 1' '\ C^ yj^ . "N!i1 -s ^ZX u iQ st =51 v" ^1 .23 b fe^ sz .x ~FC ZkL 2. ia za 3 iS_ -^ir ERIE RAILWAY SURVEY HAER (Page 1 - - ~- n ^ Appendix F &ss kfej rr^ ii i ^ !| ' N ^ <\ ! -^j ilr II ! 1 fcr d w IEZ; 2E 1=3 jgil ^mm - -c-iKr: Kg 5C 1 #4 3! y sx: 3d ^, ERIE RAILWAY SURVEY HAER . .- - -wryia^f-. P, r; * " * V- ^ - * - U " - ERIE RAILWAY SURVEY HAER (PageJT^) ERIE RAILWAY SURVEY HAER (Page $& ERIE RAILWAY SURVEY HAER (Page 3M) Appendix F ERIE RAILWAY SURVEY HAER (PageJ37) Appendix F #Z3 '' -:V -' r ' ,v. -a*'.
ERIE RAILWAY SURVEY HAER 5 I Appendix F T^V ^" | : t ' : , I) 1 JMM === ~"yi " 'I I" . _ ..I.., _ " n ']" 1 ^" '1 L. ! "1 ! -J l-J sr ERIE RAILWAY SURVEY HAER ERIE RAILWAY SURVEY HAER Appendix F - LANES softo, PiutiA ERIE RAILWAY SURVEY HAER Appendix F # ERIE RAILWAY SURVEY HAER ERIE RAILWAY SURVEY HAER ERIE RAILWAY SURVEY HAER '=S !"*>3W9IS3*BEJ" >--^S-*J*i ERIE RAILWAY SURVEY HAER V" X. \ -': ^f , .;' "' '"* * ft. iff * ^ * \ * * . \ , w. ( I \ v. M " K 'V ^ * x 2r*.A Nidi ^a x^ la ;** PI* tew ** v * v ^ ** \ /ir^- < iff ^ **' r ! ft ^\* ,1 1 'A - ^.J -' 1M. ERIE RAILWAY SURVEY HAER (Page &#& ERIE RAILWAY SURVEY HAER (Page^/) - *y -v *> - * e* it ^ i" \f- - ?
v ' V t - *' f -"' ERIE RAILWAY SURVEY HAER 1^ ERIE RAILWAY SURVEY HAER (Page> ?) Appendix F ERIE RAILWAY SURVEY HAER Appendix F ^ ~: ^< - T : ERIE RAILWAY SURVEY HAER (Page J#J ) \.v - , ' ' ERIE RAILWAY SURVEY HAER ERIE RAILWAY SURVEY HAER Appendix F ^S0 ERIE RAILWAY SURVEY HAER Appendix F 4 $N* -$* .* ERIE RAILWAY SURVEY HAER ERIE RAILWAY SURVEY HAER Appendix F 3* ERIE RAILWAY SURVEY HAER (Page J *7) Appendix F ERIE RAILWAY SURVEY HAER Appendix F # ERIE RAILWAY SURVEY HAER (Page Appendix F ^Q^/O^ ERIE RAILWAY SURVEY HAER Appendix F ERIE RAILWAY SURVEY HAER (Page .^ Appendix F * asS i.: hi * $$$ ^ I*fthW;! #j ^ ft t U* ^ i i^ n \ jl r, li ^: i .j fA ,A M TiTT * i! , 1 &' it* tV ERIE RAILWAY SURVEY HAER (Page ERIE RAILWAY SURVEY HAER (Page M3) Appendix F -fi^//*?
ERIE RAILWAY SURVEY HAER Appendix F -jT ERIE RAILWAY SURVEY HAER (Page Appendix F "i^Mt^SW/^'';>:' ERIE RAILWAY SURVEY HAER (Page Appendix F ERIE RAILWAY SURVEY HAER Appendix F J^A^^t^. -sea*""***-- - ERIE RAILWAY SURVEY HAER Appendix F X k t t > ! In t i i 4s kv Q V-SW-'Sfi***"^*"--'' ERIE RAILWAY SURVEY HAER (Page ^^-flr"isfi^"VT^^^/ &A27 ERIE RAILWAY SURVEY HA R ^k # ^ r^y^r^.?xiam^..' ERIE RAILWAY SURVEY HAER (Page Appendix F Ci<m<2^ .<& ^NNerNlNQ^UcV. ERIE RAILWAY SURVEY HAER (PageJ77) Appendix F z&/ 0 ERIE RAILWAY SURVEY HAER Appendix F ^ awj T^^ "? ERIE RAILWAY SURVEY HAER Appendix F 5 r/ ' ERIE RAILWAY SURVEY HAER (Pagejg#50 Appendix F 3 1 ERIE RAILWAY SURVEY HAER Appendix F jz'jyer' r/VoV*^ ERIE RAILWAY SURVEY HAER ^ ERIE RAILWAY SURVEY HAER (Page.J n Appendix F #/ < ?
^ ERIE RAILWAY SURVEY HAER Appendix F ' ERIE RAILWAY SURVEY HAER * "-iL?:! - ' " F ill - i r ".-i*HI? v '.: . . v; > <* :i ** AS^i i' * ERIE RAILWAY SURVEY HAER (Page 366 ) ERIE RAILWAY SURVEY HAER TVS m ERIE RAILWAY SURVEY HAER (Page 3 $} Annprifi-i Y P 5 ""* A W \ \ \ W \ v. I \ ** * "JIT ^ a. < *- Uj - ~J /. ST MS I - I - ^ u / */ * ** i1 /: c *- r -it > i * J v ' ; \ V I *' \ ** > ptf MHHf*>f_a.f ERIE RAILWAY SURVEY uACD 7/1 jige v., .> V- **. vA ^ ***w*iw * * " V' I 4 * -- ' - i-t i i i i i ' V | J 1 I ERIE RAILWAY SURVEY HAER Appendix F #/ / ">iakmunurji Mugwump-- ** . 1 - i.
s * * ERIE RAILWAY SURVEY HAER (PageJ^/) Appendix F ERIE RAILWAY SURVEY HAER (Page $ } Appendix F -fi^/S^* ERIE RAILWAY SURVEY HAER Appendix F ERIE RAILWAY SURVEY HAER (PageJT^) Appendix F ERIE RAILWAY SURVEY HAER (Page Appendix F - ERIE RAILWAY SURVEY HAER (PageJT^) Appendix F ^/SO ERIE RAILWAY SURVEY HAER (Page ERIE RAILWAY SURVEY HAER (PageJKP) ERIE RAILWAY SURVEY HAER (Page f&O} ERIE RAILWAY SURVEY HAER (Page ERIE RAILWAY SURVEY HAER (Page 4a?) ERIE RAILWAY SURVEY HAER (Page Appendix F &ir/&& , - # \-* * J V- sfcas ERIE RAILWAY SURVEY HAER IM (Page Appendix F ; ^Mt&atif.vntimmui-;-;' ^ammruvm* -SM * : hjw>xi.wiiiiii i!iiitiiiiw^^-.'~ a^;j,ur- ? J vA * .-Ji via ft* w. p4? A V * "' % lill W > : -iVtA' A*-i fi . > : ERIE RAILWAY SURVEY *1 1", HAER ' /> (Page Appendix F " , * .' J- .
> ,- ~- v. - t -'. 1'- A&f v>" "'. ".fji,:.^^ m&^ H **" **^ *m -" ^tfAfcttfj-k^nAfcij ERIE RAILWAY SURVEY HAER (Page * ~*U* ERIE RAILWAY SURVEY HAER (Page .ami- ERIE RAILWAY SURVEY HAER (Page Appendix F ERIE RAILWAY SURVEY HAER (Page Appendix F -fi^GS ERIE RAILWAY SURVEY HAER (Page Appendix F ERIE RAILWAY SURVEY HAER (Page ) Appendix F ERIE RAILWAY SURVEY HAER (Page 4/Z ) Appendix F OESlGN FOX G/ITE-MflNS HOUSE PJTSRSON, SOLE '/x is- Irr Office Of A/S/" f* OF M * & N. V. L. E. * W JULY it* a. FRONT ELEVATION 3/D L MTION aSSfGN N* I. , .iX-f'/ "-< Ff\ONT l. V/tr/OA/ $/Q Bl.eVATION DESIGN fij Z ERIE RAILWAY SURVEY HAER (Page Appendix F # /2. o t- ~Z z K 0 JS t- ,j rts 5 < i0 *j O --?
X or If " u o (J rt IT- - ll 1U 0 lj z til -l -2 \ 11 < j 111 < * fi _, U) J _l < > o" - -- ..a i- ERIE RAILWAY SURVEY HAER (Page Appendix F 2/3 % A IS ' - 4 3 ERIE RAILWAY SURVEY HAER (Page <ft -\ Appendix F jj rj . -U. E=-^ v/. R^. f^. rat-n^rJ FOR A^ 'I T" -e-^' |^E.-t (\ f J3 IBS* rffiini i iT-iiTirrriiTiap^TTTi FRO NT ele-VAH"! O N} rirae El_EV>rriorvl . /6' o'__ DLAN (JF^OJNI )(4 ON LiNt /* ERIE RAILWAY SURVEY HAER (Page ^/S ) Appendix F & / - 2 J Ul * ^ I Ha = J a u 10 o y &c a. 2 Z t E P i*- I- I ERIE RAILWAY SURVEY HAER (Page Appendix F QC 01 dtZ u UlW y oL Z ERIE RAILWAY SURVEY HAER (Page^ ) Appendix F c z 0 u h- AC fW L. 0 v> EC 3: ul K> 0 Ol hi o Z z.
<tf z (/) Z -t 5z o i * " 2 1UJ1 u CO CO 0 Q 0 < * < a: -J -1 3 o 1 a) ^ irf a: * * 2 ERIE RAILWAY SURVEY HAER Appendix F vx o: z 2 II J ^ u J u Q Is J in a : = u Z ERIE RAILWAY SURVEY HAER (Page Appendix F % /? z o I 'S K > 5 u - ERIE RAILWAY SURVEY HAER (Page Appendix F a 01 tr a: * EC u LiJ U J Z > UJ Z o CO o u. u o UJ O u. o o Q. o tr CC EL u z a: o a. z u ERIE RAILWAY SURVEY HAER Appendix F CHIMNEY AT JERSEY CITY SCALE: &".IFT FRONT ELIVATION ERIE RAILWAY SURVEY HAER (Page Appendix F ERIE RAILWAY SURVEY HAER A *^i PPendix F > '- V _^ ERIE RAILWAY SURVEY HAER (Page Appendix F ill. II * M i2 ERIE RAILWAY SURVEY HAER (Page 4 6 ) Kt Appendix F -1 , .1 L'J 1* L.A . *. '4 n i I I H 8 i T.> i , n if?
-J rx f : 5 *s + 3"V^.^^^iil* ERIE RAILWAY SURVEY HAER (Page-#27) Appendix F ERIE RAILWAY SURVEY HAER [Page Appendix F ^pr^fe? I ERIE RAILWAY SURVEY HAER (Page -# ?) Appendix F i$ 4/ ERIE RAILWAY SURVEY HAER (Page ERIE RAILWAY SURVEY HAER (Page '^nihi^l ERIE RAILWAY SURVEY HAER ERIE RAILWAY SURVEY HAER (Page Appendix F -?& &# ERIE RAILWAY SURVEY HAER (Page / Iff mW& *, is*--. ^ ' -" ;- ' artjw ERIE RAILWAY SURVEY HAER Appendix F *#Z & t^IiP J > Ii i I \ I L*S * . 4 ERIE RAILWAY SURVEY HAER (Page . 27) ERIE RAILWAY SURVEY HAER (Page Appendix F ffi^.&2- \ U'^"t^n:-"'*-"-Tt-*,T^.*i k '-^ri 1 : i ~d\ I b 1! :: (1 _.
7 r* ERIE RAILWAY SURVEY HAER NY-I24 (Page^g?) ERIE RAILWAY SURVEY HAER &fas%g3E^3 ^^^ ERIE RAILWAY SURVEY ERIE RAILWAY SURVEY HAER ERIE RAILWAY SURVEY HAER ERIE RAILWAY SURVEY HAER (Page-5^) ERIE RAILWAY SURVEY HAER ERIE RAILWAY SURVEY HAER (Page ERIE RAILWAY SURVEY HAER (Page ii^T-"1^*^ ERIE RAILWAY SURVEY HAER ERIE RAILWAY SURVEY HAER (Page-* ?) ERIE RAILWAY SURVEY HAER (Page -& 7) Appendix F / &** wr- a* : m* t ,j, ERIE RAILWAY SURVEY HAER (Page -^) Appendix F *=^ ERIE RAILWAY SURVEY HAER (Page Appendix F -?* X^ CO t^- * L- C 4 ^ - "*# - *; 'j " H ^ ri -4 3 *0 x - :. *> ;' '" *4 a ;' r ' ::' : j> CO ' 'I1 at .a ee- is ^ v r v *# * BBE S!KiaS> * i-t rack*.* *" " / . ' ERIE RAILWAY SURVEY HAER ERIE RAILWAY SURVEY HAER (Page ERIE RAILWAY SURVEY HAER (Page Jk&jik**.',.
ERIE RAILWAY SURVEY HAER (Page-AST) '. tf/lfe r^5 : - - i * - ^ V3T it 4,s , * * i A * J\ . JU* 1 * * - ' *- ' I . V..WI li I f( 0 '> "" *" ' iff** - 1 jj. s ^ 7 V feat fc' [, fcl . ' .-" ' X .? - . , &t -.* . \ -A.' -: Ac HJ* ' '. JStAiBOHn il 1 ! ERIE RAILWAY SURVEY HAER (Page # ERIE RAILWAY SURVEY HAER (Page 4& ) * *** Appendix F f;, ERIE RAILWAY SURVEY HAER I (Page ^ 2) Appendix F -i * ERIE RAILWAY SURVEY HAER (Page Appendix G ERIE RAILWAY SYSTEM: HISTORICAL PHOTOGRAPHS AND OTHER GRAPHIC MATERIALS HAER Lot Nos, and Page 1 HISTORIC AMERICAN ENGINEERING RECORD
Index to Supplemental Lot Nos. and
User Note: During the summer of Chester Liebs, Project Historian for the 8AER Erie Railway Survey, collected a rich assortment of original photographs, and other graphic materials from the stations and divisional offices along the Erie mainline and branches. These materials were donated to the Historic American Engineering Record by the Erie Railroad. Because of the variety of sizes, subjects and conditions of these materials, they have been organized into two groups of supplemental information and assigned Library of Congress Lot Nos. and Lot No. is a group of views for which there are no copy negatives available. Lot. No, is a group of views and drawings for which negatives are available. These materials, which consist of 394 items for Lot. No. and 57 items for Lot. No.
are supplemental to the HAER Erie Railway Survey collection of measured drawings, large format photographs and written data pages. Users are encouraged not to overlook this remarkable collection of supplemental materials as many of the sites were recorded as part of the Erie Railway Survey. At the same time that HAER was conducting the Erie Railway survey, Mr. Robert H. Vogel., Curator of Mechanical & Civil Engineering, National Museum of American History, Smithsonian Institution, Washington, DC (and project advisor to the Erie Railway survey), made separate arrangements with former Erie-Lackawanna engineer William Wehner regarding the transfer of obsolete Erie drawings to the Smithsonian. Mr.
Wehner, now with Conrail, was delighted with this unexpected, but welcome, solution So the problem of disposing of an estimated sheets of engineering and architectural drawings (ink on linen) and some photographs, of terminal structures (roundhouses, car dumpers), warehouse and storage facilities (stockyards, freight depots), passenger stations, ferry terminals and bridges. Oldest are a series of route survey and track maps drawn in the on heavy rag paper. Users are encouraged not to overlook this equally remarkable store of information when researching the Erie Railway. Viaducts Penhorn viaduct, 7 items Jersey City, NJ Portage Viaduct portageville (vie. ), MY 36 items Genesee River Viaduct, 19 items Belfast (vie.
), NY Moodna Creek Viaduct, 2 items ERIE RAILWAY SURVEY HAER (Page Appendix G ERIE RAILWAY SYSTEM: HISTORICAL PHOTOGRAPHS AND OTHER GRAPHIC MATERIALS HAER Lot Nos. Page 2 Kinzua viaduct, 16 items Mt. Jewett Cvic.), PA Starrucca Viaduct 5 items Lanesboro (vie), PA Bridges Newark Branch Old Bridge 3 items Hackensack Drawbridge Bridge over 4' items Passaic River Greenwood Lake Division 2 items Bridge (old Passaic River xing West Arlington, NJ Allegany Division - River Line Rush Creek Viaduct 1 item Fill k Slide 2 items Fill at 2 items New York Division - Graham Line Fallen Construction Trestle 4 items Near crystal Run, 7 Rochester Division Bridge 7 items Susquehanna Division Bridge 1 item Ovec owego Creek, Owego, NY Bridge 2 it-ems chemung, NY Bridge 5 items Corning, NY Bridge 1 item Over N.
Branch of 13-Mile Creek, Water Valley, NY ERIE RAILWAY SURVEY HAER (Page 4&) Appendix G ERIE RAILWAY SYSTEM: HISTORICAL PHOTOGRAPHS AND OTHER GRAPHIC MATERIALS HAER Lot Nos. Page 3 B S SW Branch Bridge 4 items Over S.
Branch of 18-Mile Creek Eden Valley, NY Old Bridge 1 item Over Clear Creek Collins, NY Delaware Division Bridge 7 items Over Delaware River, Lackawaxen, PA Old Bridge 1 item Deposit, NY Bridge 38 items Under construction, Over state Highway 296 Lanesboro, PA Bridge removal of 3 items Lanesboro, PA Culvert 10 items Under construction Lanesboro, PA Bridge Over Susquehanna River 1 item Susquehanna, PA Bridge 2 items Over Susquehanna River Susquehanna, PA Miscellaneous views taken 2 items in vicinity of Shohola, PA Jefferson Division Old Bridge (1) 3 items Over Starrucca Creek Lanesboro, PA Bridge 2 items Over starrucca creek Near Stevens Point, PA Bridge 4 items Over Starrucca Craek Mear Starrucca, ?A ERIE RAILWAY SURVEY HAER (Page 467 ^ Appendix G ERIE RAILWAY SYSTEM: HISTORICAI PHOTOGRAPHS AND OTHER GRAPHIC MATERIALS HAER Lot Nos.
Page 4 Bridge (5) 1 item Over Lackawanna River E. of Forest City, PA Bridge (6) 1 item Over Lackawanna River E. of Forest City, PA Bridge (7) 2 items Over Lackawanna River E. of Carbondale, PA Bridge items Over Lackawanna River E. of Carbondale, PA Bridge 1/2 item NYO & WRR Xing Near w. Carbondale, PA Bridge (9) items Over Lackawanna River E. of Carbondale, PA Bridge item Over Lackawanna River E.
of Carbondale, PA Tioga Division Bridge item Millerton, PA Meadville, Division {Franklin Bridge 15) item Over Oil Creek Oil City, PA Stations, Shops, Terminals, Yards S Tunnels Jersey City Terminal, NJ 17 items Bergen Hill Open Cut 22 items and Tunnel Jersey City, MJ Hornell, MY 17 items Station s Shops American Locomotive Company Foundry, Dunkirk, MY ERIE RAILWAY SURVEY HAER (Page 4 $~) Appendix G ERI2 RAILWAY SYSTEM: SISTCRICAI PHOTOGRAPHS AND OTHER GRAP5IC MATERIALS HAER Lot Nos.
12,DOS Page 5 Dunkirk, NY Marine piers 2 items susquehanna station 38 items & Shops, Susquehanna, PA Stations (Listed Alphabetically) Binghamton, NY 2 items Callicoon, NY 1 item Corning, HY 12 Items Collins, HY 2 items Endicott,NY item Hackensack, NJ items Barriman, NY item Horseheads, NY item Paterson, NJ item Pine Bush, NY item Ridgewood, NJ item Rutherford, NJ item Salisbury Hills, NY item South Nyack, HY item Sparkill, NY item Wellsville, NY items ASSORTED PHOTOGRAPHS and PHOTOCOPIES of DRAWINGS Of miscellaneous sites, 54 items structures, and objects. ERIE RAILWAY SURVEY HAER (Page [actual total=471 data; page numbering is Appendix G inaccurate due to 1st 3 pages being nurriberec as 1A, IB, 1C instead of 1, 2, 3, etc. ] ERIE RAILWAY SYSTEM: HISTORICAL PHOTOGRAPHS AND
Photocopies of Drawings with Negatives
Page 6 Drawings of Proposed, small, 15 - photographic negatives and Suourban passenger stations; prints. 3rd Class Passenger stations; and a Gate-Han's House showing plans, elevations and sections. Drawings of Proposed New Passenger 9 - photocopy negatives and Station with Perry Buildings at prints. Jersey City, NJ showing plans, elevations, sections and details.
Bridge Mahoning Division, 12 - 35 mm negatives Niles, Ohio, taken September 10, Miscellaneous track views of 15 - 3x5 negativess Gulf Summit Hill, Delaware Division, Lanesboro (vie), PA, taken January 2, Drawings for proposed new station 3 - photographic negatives and at Port Jervis, NY, showing plans, prints framing plans and sections Drawings for new station at Meadville, 3 - photographic negatives and PA, showing plans, framing plans, prints and sections
The federal surveyors worked through Deposit building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER NY,4-DEPO,2-. United States federal work, no copyright under 17 U.S.C. 105.