BlockBefore

Watervliet Arsenal, Building No. 24, Arnold Lane, South of Westervelt Avenue, Watervliet

Watervliet Arsenal, Building No. 24, Arnold Lane, South of Westervelt Avenue, Watervliet, Albany County, NY. Surveyed as HABS NY,1-WAVL,1/24-, with a 2,253-word written history.

From the record

“The building is an excellent and largely intact example of early permanent construction at the arsenal.”

Written record, HABS NY,1-WAVL,1/24- survey. Machine-read text.

Surveyed by the federal HABS program as HABS NY,1-WAVL,1/24- · the record runs 2253 words · one of 156 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1611 words

Source document Quoted word for word from HABS NY,1-WAVL,1/24-. Not written, edited or summarised by this site.

The building is an excellent and largely intact example of early permanent construction at the arsenal. As the only example of enlisted troop housing surviving on its orginal site, the building also contributes to an understanding of the arsenal's overall history. PART I. HISTORICAL INFORMATION A. Physical History: 1. Date of erection: In was appropriated for erection of a barracks at the arsenal. Construction was underway by August when the arsenal's commanding officer notified the Ordnance Department that "The walls of the Barracks will undoubtedly be finished by the end of September..." (Kyle, p. The date is also carved into the foundation on the southeast corner of the building. 2. Architect: Not known. The building was probably designed by Ordnance Department personnel. 3.

Original and subsequent owners: U.S. Army 4. Builder, contractor, suppliers: Not known, 5. Original plans and construction: No original drawings or plans were located. The map (HAER Photo No. NY-1A-79) illustrates the barracks as a rectangular, gable-roofed structure. An photograph of the building shows porches on the east and west elevations and dormers, all of which have been removed. 6. Alterations and additions: The building appears to have remained unaltered until when the porches on the east and west elevations were removed. The porches still appear on a WATERVLIET ARSENAL BARRACKS (Building 24, Operations Directorate Office) HABS No. (Page 2) photograph of the building taken on May 16, but are not shown on drawings done later in the year.

The photograph is in the collection of the Watervliet Arsenal Museum. The drawings are in the arsenal's Engineering Division. The current cast- bronze stairway and door guards on the east elevation were added at that time. The building was further altered in the The elevated and ground level wood frame passageways to Building 35 on the west elevation were added. A basement window opening in the northern bay of the east elevation was also enlarged to incorporate a door. In late all six dormers were removed and the slate roofing was replaced with asphalt shingles. Since the building was converted to office use in the early partition walls have been added dividing interior spaces.

Wall and ceiling finishes have also been changed in most of the rooms on the first floor, and fireplaces have been covered. B. Historical Context: During the nineteenth century, the building housed not only unmarried soldiers but also enlisted men and their families (Kyle, p. It served as the arsenal's barracks until when the installation's Ordnance Company was transferred to Aberdeen Proving Ground and remained vacant until at which time it was converted to offices for the Works Manager (A History of Hatervliet Arsenal, p. The building is currently the Operations Directorate Office. PART II. ARCHITECTURAL INFORMATION A. General Statement: 1.

Architectural character: Although altered by the removal of the porches and dormers on the east and west elevations, the building retains its original two-story height, rectangular shape, and massive stone walls with classical detailing. 2. Condition of fabric: The building is in good condition and is well maintained. B. Description of Exterior: 1. Over-all dimensions: The rectangular two-and-one-half story building with full basement measures 90' 7" (seven bay front) x WATERVLIET ARSENAL BARRACKS (Building 24, Operations Directorate Office) HABS No. (Page 3) 2. Foundations: Foundations are random coursed ashlar limestone above grade on the east side and below grade on the west. The water table is dressed limestone. 3.

Walls: Walls are coursed ashlar limestone with a limestone belt course at the second floor window sill level. Dressed limestone pilasters rising from the water table to the cornice accent the corners of the building. 4. Structural system, framing: Walls are load bearing, approximately 2' 9" thick in the basement and 21 2" thick on the first and second floors. The roof is supported by heavy timber trusses (HAER Photo No. 5. Porches: A pair of cast-iron and brass straight-run stairs with thin newel post and balusters lead to a platform at the main entrance at the center of the east side. 6. Chimneys: Two massive stone chimneys with corbelled stone caps straddle the ridge at the north and south ends of the building, 7. Openings: a.

Doorways and doors: The main entrance at the center of the east elevation is a transomed, six vertical panel, wood personnel door flanked by paneled pilasters and four-light sides. Doors in the second and sixth bays are French doors with outer screen doors and metal door guards. On the east elevation at the basement level, are double-leaf, glazed metal personnel doors in the center and a three horizontal panel, four-light, wood personnel door at the north end. A wood personnel door leads to the basement level on the south side. On the west elevation, there are glazed wood personnel doors in the second and sixth bays of the first floor. b. Windows: Basement windows are either eight-over-eight- light, double-hung wood sash with flat stone lintels and stone lug sills.

First and second story windows are twelve-over-twelve-light, double-hung wood sash with flat stone lintels. Second story sills on the east and west elevations are formed by the belt course. The belt course is cut away below the second story windows on the north and south. Second story windows at the center of the east and west elevations are twelve-over-twelve-light, double-hung WATERVLIET ARSENAL BARRACKS (Building 24, Operations Directorate Office) HABS No. (Page 4) wood sash flanked by narrow three-over-three-light, double-hung wood sash. Gable end windows are eight-over- eight-light, double-hung wood sash with flat stone lintels and stone lug sills. 8. Roof: a. Shape, covering: The gable roof is covered with asphalt shingles. b.

Cornice, eaves: A stone course encircles the building below molded boxed metal eaves which form capitals for the pilasters at the corners of the building. C. Description of Interior: 1. Floor plans: a. Basement: The basement door at the center of the building opens onto a central hall containing the stairs. Access to the women's locker room and restroom south of the hall and the five rooms north of the hall is through a narrow hall running the width of the building along the east wall. The men's restroom and storage room south of the central hall open off a third hall on the west wall. A long room 8' 6" wide extending the full length of the building on the west is entered only from the exterior. (See supplemental material, floor plans) b.

First floor: The first floor entrance opens onto a central hall containing the stairs. Hallways along the east and west walls provide access to the four major rooms (two on either side of the central hall). The two major rooms at the south end of the building have been divided by partition walls to % form smaller office spaces. The west door opens to a covered passage leading to Building 35. (See supplemental material, floor plans) c. Second floor: The central hall is divided into two sections containing the stairs from the first floor and those to the attic. A second hallway along the west wall provides access to the four rooms (two on each side of the central hall). The west hall is terminated on the north by four steps leading to the bridge passage to Building 35.

(See supplemental material, floor plans) d. Attic: The attic is divided by a partition wall south of the stairs. ?' WATERVLIET ARSENAL BARRACKS (Building 24, Operations Directorate Office) HABS No. (Page 5) 2. Stairways: The open straight-run stair along the north wall of the central hall has square newel posts and a plain wood balustrade. , 3. Flooring: Basement floors are concrete or concrete covered with linoleum. Flooring on the first floor is linoleum. Floors on the second floor are narrow-width boards. Attic floors are random-width boards. 4. Wall and ceiling finish: Basement walls and ceilings are either plaster or drywall. Walls on the first floor are plaster or wood paneling. Ceilings are accoustical tile. Second floor walls and ceilings are plaster.

Exterior attic walls are stone, and the partition wall dividing the attic is vertical tongue and groove boards. The ceiling is formed by the wood roof deck. 5. Openings: a. Doorways and doors: Doors are glazed wood or flush personnel set in plain wood frames. Surrounds for most doors on the second floor are architrave trim with corner blocks, b. Windows: Window trim is similar to door trim. 6. Mechanical equipment: a. Heating, air conditioning: The building is heated by steam. Fireplaces have been covered. Chimneys are connected to the fireplaces by a pair of sloped brick flues leading from the base of the chimney to the fireplaces. Arched openings are cut in the center of each flue structure (HABS Photo No. The building is cooled by window air conditioners. b.

Lighting: Lighting is provided by fluorescent or incandescent fixtures. c. Plumbing: Plumbing fixtures are modern. D. Site: The building faces east onto Arnold Lane south of Westervelt Avenue. Its original isolated position near the south end of the arsenal has been obscured by wartime industrial construction. WATERVLIET ARSENAL BARRACKS (Building 24, Operations Directorate Office) HABS No. (Page 6) PART III. SOURCES OF INFORMATION A. Architectural Drawings: Main Entrance Stairs. Watervliet Arsenal Engineering Division, Door Guards and Roof Drains. Watervliet Arsenal Engineering Division. Elevations, Section, and Plans. 8 sheets. Watervliet Arsenal Engineering Division. B. Early Views: East elevation in May Cottage for enlisted inens' family shown at right. Watervliet Arsenal Museum.

(HABS Photo No. South and east elevations before removal of porches and dormers. Taken between about and Watervliet Arsenal Museum. (HABS Photo No. Barracks, looking northwest. Dated May 16, Watervliet Arsenal Museum. Shows porch and dormers on the east elevation. C.

Bibliography

543 words

Source document Quoted word for word from HABS NY,1-WAVL,1/24-. Not written, edited or summarised by this site.

Secondary and published sources: Building Technology, Inc. Historic Properties Report Watervliet Arsenal, Watervliet, New York and Rotterdam Family Housing Area, Rotterdam, New York. January The report and inventory cards for the arsenal are filed as field records in the Prints and Photographs Division, Library of Congress under HAER No. NY-1A. A History of Watervliet Arsenal, to Modernization Watervliet New York: U.S. Army, Watervliet Arsenal, Discusses building's use in the and Kyle, Francis K. A History of Watervliet Arsenal. Watervliet, New York: Watervliet Arsenal, Quotes contemporary correspondence concerning construction and occupants of the building. Copy available in the Watervliet Arsenal Museum. D.

Likely Sources Not Yet Investigated: Records of the Office of the Chief of Ordnance, Record Group and Records of the Office of the Chief of Engineers, Record Group 77, WATERVLIET ARSENAL BARRACKS (Building 24, Operations Directorate Office) HABS No. NY-5521G.(Page 7) Navy and Old Army Branch, National Archives, Washington, should be further investigated. E. Supplemental Material: Basement, First, and Second Floor Plans, Building No. 24. No date. 3 sheets. Watervliet Arsenal Engineering Division. Current floor plans of building. Prepared by: Barbara E. Hightower Historian MacDonald and Mack Partnership February PART IV. PROJECT INFORMATION This project was part of a program initiated through a memorandum of agreement between the National Park Service and the U.S. Department of the Army.

Stanley H. Fried, Chief, Real Estate Branch of Headquarters DARCOM, and Dr. Robert J. Kapsch, Chief of the Historic American Buildings Survey/Historic American Engineering Record, were program directors. Sally Kress Tompkins of HABS/HAER was program manager, and Robie S. Lange of HABS/HAER was project manager. Under the direction of William A. Brenner, Building Technology Incorporated, Silver Spring, Maryland, acted as primary contractor, and MacDonald and Mack Partnership, Minneapolis, was a major subcontractor. The project included a survey of historic properties at Watervliet Arsenal, as well as preparation of an historic properties report and HABS/HAER documentation for 17 buildings. The survey, report, and documentation were completed by Barbara E. Hightower, historian, Minneapolis.

The photographs were taken by Robert A. Ryan and J Ceronie of Dennett, Muessig, Ryan, and Associates, Iowa City, Iowa. Drawings were produced by Gary M. Louris, Minneapolis. E. Supplemental Material WATERVLIET ARSENAL ' Floor Plan BARRACKS (Building 24, Operations Directorate Office) z HABS No. GL* | (Page 8) m > Q * ~ 3 -J O Z > 5 oBOP 0 US < 3 5 UJ O m SO - E. Supplemental Material WATERVLIET ARSENAL ' | Floor Plan BARRACKS (Building 4A Operations Directorate < mJt ja / Office) -t\ HABSNo. z } (Page ).N II at < > u .T) *- z a PLAN UALITY us > < at id LDING -i z < 0. 24 * >i a 0 zt 0 o b .1 <E O O Q h- O 0= _j < MX 1 in ? e ^30 r-UJ 0 m * o a l/ < t < at "" Ok < 5-5 OC 0 o * Supplemental Material WATKRVLlfcl ARSENAL Floor Plan BARRACKS (Building 24, Operations Directorate Office HABS No..

NY-552I G (Page 10) < z ui to DC I < o ui at Q. -J ZZ (M <Q . JO (CO > 5Z DC ui -i 5 < =! o UJ O ^ o f Of *

In context

Watervliet, New York The place record: every map, photograph and survey of this town.
Albany County, New York 194 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Watervliet

24 of 73 records shown

The federal surveyors worked through Watervliet building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Watervliet ArsenalHAER NY,1-WAVL,1/110- & 1/110A-8,020 words
Watervliet ArsenalHAER NY,1-WAVL,1-7,894 words
Watervliet ArsenalHAER NY,1-WAVL,1/38-7,368 words
Watervliet ArsenalHAER NY,1-WAVL,1/40-6,159 words
Watervliet ArsenalHABS NY,1-WAVL,1/1-4,068 words
Watervliet ArsenalHABS NY,1-WAVL,1/4-3,473 words
Watervliet ArsenalHABS NY,1-WAVL,1/10-3,453 words
Watervliet ArsenalHABS NY,1-WAVL,1/2-3,350 words
Watervliet ArsenalHABS NY,1-WAVL,1/6-3,184 words
Watervliet ArsenalHABS NY,1-WAVL,1/3-2,964 words
Watervliet ArsenalHAER NY,1-WAVL,1/135-2,876 words
Shaker South FamilyHABS NY,1-COL,11-2,250 words
Watervliet ArsenalHAER NY,1-WAVL,1/15-2,136 words
Watervliet ArsenalHAER NY,1-WAVL,1/41-2,055 words
Watervliet ArsenalHAER NY,1-WAVL,1/119-1,941 words
Watervliet ArsenalHAER NY,1-WAVL,1/22-1,886 words
Watervliet ArsenalHAER NY,1-WAVL,1/17-1,856 words
Watervliet ArsenalHABS NY,1-WAVL,1/12-1,655 words
Watervliet ArsenalHAER NY,1-WAVL,1/129-1,601 words
Shaker South Family Dwelling HouseHABS NY,1-COL,14-1,148 words
Shaker South Family Trustees' OfficeHABS NY,1-COL,15-900 words
Shaker South Family Cow & Hay BarnHABS NY,1-COL,21-883 words
Watervliet ArsenalHAER NY,1-WAVL,1/14-729 words
Shaker South Family Brothers' DormitoryHABS NY,1-COL,13-671 words

Provenance

  • Written history. Quoted verbatim from HABS NY,1-WAVL,1/24-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.