The documentation of the Lafayette Street Bridge (Oswegatchie River Bridge) was prepared by the Historic American Engineering Record (HAER), National Park Service, during the Summer of for the New York State Historic Bridges Recording Project. This project was sponsored by the New York State Department of Transportation and under the supervision of Eric DeLony, Chief & Principal Architect, HAER. This report was written by Charles Scott, with research assistance from Andrew Cole. When citing this report, please credit the Historic American Engineering Record and the authors. Lafayette/Spring Street Bridge HAER No.
Page 2 The first bridge at this site, a wooden structure linking the Town of Oswegatchie with the Village of Ogdensburg, was erected in This bridge was replaced by a five span, through truss iron bridge, 586 feet long, erected in The King Iron Bridge Company of Cleveland, Ohio erected this bridge at a total cost of with the iron superstructure costing approximately The bridge had a single eighteen foot wide roadway and two sidewalks. By the iron bridge had deteriorated and required replacement. In February, Oswegatchie residents approved, by a to 207 vote margin, a proposal to remove the iron truss bridge to an upstream river crossing and replace it with a reinforced concrete arch bridge linking Lafayette Street in Oswegatchie with Spring Street in Ogdensburg.
In October, the approval to issue of bridge construction bonds to finance the project received a somewhat less enthusiastic 264 to 25 vote endorsement by the residents of Oswegatchie. Both Oswegatchie and Ogdensburg anticipated that two additional spans would be built at the western end of the bridge to eliminate the Lafayette Street grade crossing of the New York Central Railroad tracks. With this plan for a viaduct across the river and railroad tracks, the Town of Oswegatchie commissioned the Concrete-Steel Engineering Company, consulting engineers from New York City, to design the bridge, draft the plans and specifications, and supervise the actual construction after a contractor had been selected on the basis of competitive sealed bids.
Concrete-Steel Engineering, headed by William Mueser, specialized in reinforced concrete bridge design and construction supervision. In March of William Mueser exhibited the plans for a 422 foot long, three arch span bridge crossing the Oswegatchie River and using the "Melan-von Emperger" systems of reinforcement. Josef Melan was an Austrian engineer who devised an early means of reinforcing concrete by incorporating into the arch a series of I-beams bent to the appropriate shape of the arch. Fritz von Emperger, a designer of many of Melan's bridges in America and a leading experimenter in concrete construction himself, patented in two additions to the Melan system.
Von Emperger reinforced the concrete deck slab with steel beams, and connected the arch and deck beams with steel bars in the spandrel. According to structural historian Carl Condit, the resulting bridge was almost more a steel arch bridge than a concrete bridge. The Oswegatchie's town supervisor issued a notice to contractors in April of soliciting sealed bids for the construction of the bridge in accordance with the plans and specifications prepared by the Concrete-Steel Engineering Company. The engineer's estimates for the three spans crossing the Oswegatchie River included: Lafayette/Spring Street Bridge HAER No.
Page 3 Concrete Grade A Cu Yds Concrete Grade B 353 Cu Yds Concrete Grade C Cu Yds Concrete Sidewalks 448 Sq Ft Concrete Curbs 780 Lin Ft Concrete Parapets 821 Lin Ft Angle Ribs Lbs Reinforcing Bar Lbs Earth Fill 600 Cu Yds Wood Block Pavement Sq Yds Approach Fill Cu Yds Three bids, all from New York state contractors, were received and opened on April 18, The low bidder and contract winner was Kirk, Raleigh and Company of Syracuse, New York. The iron truss bridge was immediately closed to traffic, but delays in removing the spans resulted in a month delay in the construction of the concrete arch bridge. Delays in receiving machinery and equipment further hampered progress, but by June of construction was proceeding with a cofferdam in place and pier excavations beginning.
Within two months the contractor was pouring concrete for the abutments. According to local newspaper coverage, the contractor used a novel and attention-getting system to pour the concrete in the foundations, piers, and arches. On one side of the bridge a 174 foot high tower was erected and a steel cable strung from it across the river. Concrete, mixed at a central plant on shore, was raised to the top of the tower and gravity fed to the foundations, piers, and arches through a 12 inch diameter spout hung from the cable.
The construction of the bridge was complicated by labor problems such as the temporary departure of some fifty laborers and the arrest of a construction supervisor for "padding the payroll," and by negotiations pertaining to the two western spans intended to eliminate the Lafayette Street grade crossing of the New York Central Railroad tracks. In January of William Mueser advised the Oswegatchie Town Board that the Concrete-Steel Engineering Company was prepared to present plans for the western sections of the viaduct if the City of Ogdensburg would employ them. The primary stumbling block was the inability of the New York State Public Service Commission to finance its share of the cost of the grade crossing elimination.
Again in the City of Ogdensburg petitioned the Public Service Commission to appropriate the funds. The following month the Commission approved the project and authorized the needed funding. William Mueser addressed the Ogdensburg City Council and recommended adopting the plans he had previously prepared. On March, 21, with the approval of the Public Service Commission in hand, the Council approved the issuance of of bonds to raise the City's share of the project costs. Both the New York Central Railroad and the City of Ogdensburg approved the retention of the Lafayette/Spring Street Bridge HAER No. Page 4 Concrete-Steel Engineering Company as consulting and supervising engineers for the construction of the remaining two spans of the Lafayette Street viaduct.
By July the plans were accepted by the city and the railroad and a construction contract was awarded to the Mecca Construction Company. With the final approval of the Public Service Commission on July 18 construction began. The two spans of the bridge crossing the railroad tracks were completed by May 15, The plates on the eastern end of the bridge read: Oswegatchie River Bridge Designed By & Erected Under The Direction Of Concrete-Steel Engineering Co., Consulting Engineers, New York, William Mueser, Supervising Engineer - Mark D. Ewell, Resident Engineer Built By Kirk, Raleigh and Co., Contractors, Syracuse, Oswegatchie River Bridge Erected By The Town Of Oswegatchie Supervisor Nathan T. Love joy W. H. McCadam The total length of the five span viaduct is 637 feet.
The three arches crossing the Oswegatchie River have open spandrels. Closed spandrels are used in the two spans crossing the former New York Central Railroad right-of-way. The two closed spandrel arches both have a length of 98 feet. The open spandrel arches are, from west to east, and 109 feet in length. The out-to-out width of the bridge is 46 feet and the curb-to-curb width is 30 feet, 1 inch. In plan, fifteen steel reinforcing ribs are spaced between the spandrel walls. At the crown of the arch the ribs of the intrados and extrados are separated by 26 inches. At the skewbacks, 50 inches separates the two levels of reinforcement. Lafayette/Spring Street Bridge HAER No. Page 5 BIBLIOGRAPHY "Bridges." Engineering and Contracting. XLI (April 1, 54 and (April 29, 53. Condit, Carl.
American Building. Chicago: University of Chicago Press. Everts, L. H., and Holcomb, J. M. History of Saint Lawrence County. New York. Interlaken, : Heart of the Lakes Publishing, (Reprint) New York State Department of Transportation, Bridge Identification Number File, Region 7, Watertown, New York. Odgensburg Advance and Saint Lawrence Weekly Democrat. Ogdensburg Journal. Ogdensburg Republican-Journal. Proceedings of the Board of Supervisors of St. Lawrence County. Canton, Commercial Advertiser, Public Service Commission of the State of New York, Second District. Orders and Opinions. Albany, State of New York, Record of Minutes of the Common Council, City of Ogdensburg, New York, "Spring Street Bridge," File and File Office of the City Engineer, City of Ogdensburg, New York.
Watertown Daily Times.