BlockBefore

Susan B. Anthony School, First Street & Central Park, Rochester

Susan B. Anthony School, First Street & Central Park, Rochester, Monroe County, NY. Surveyed as HABS NY,28-ROCH,41-, with a 3,125-word written history.

From the record

“Anthony School No. 27 is signi- ficant because it is named after Susan B.”

Written record, HABS NY,28-ROCH,41- survey. Machine-read text.

Surveyed by the federal HABS program as HABS NY,28-ROCH,41- · the record runs 3125 words · one of 73 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

2639 words

Source document Quoted word for word from HABS NY,28-ROCH,41-. Not written, edited or summarised by this site.

The Susan B. Anthony School No. 27 is signi- ficant because it is named after Susan B. Anthony, who was born in Rochester and a leader in the Women's Suffrage Movement, and because it was designed by architects J. Foster Warner and Edwin S. Gordon, each of whom have other major building credits in Rochester and the Western New York area. The building is typical of many early neighbor- hood elementary schools erected at the turn of the Century . Susan B. Anthony School HABS No. (Page 2) PART 1 HISTORICAL INFORMATION A. Physical History: 1. Date of Erection: through The first school bui 1 ding was erected on the site in In an addition was erected. In 1goo the first school was replaced. Additions were constructed in 1go5 and 2.

Architect: Architect for the 1goo structure and first addition in 1go6 was J. Foster Warner. Warner was architect for many buildings in Rochester and Monroe County i n c 1 u di n g: sever a 1 other pub 1 i c e 1 e - mentary schools, East High School; West High School; Monroe Country Court House; the Granite Building; George Eastman House; Wi 1 son Soule House; and the Sib- ley Tower Building. Warner was the son of architect Andrew J. Warner (1833-lglO) whose noted works include: The Power Block, Rochester City Hall; Erie County Muni- cipal Building; Corning City Hall; and Rochester Free Academy. The 1g1a addition was designed by Edwin S. Gordon who worked for J. Foster Warren for eight years before starting his own practice.

ln he was appointed architect for the Rochester Board of Edu- cation. Some of the works of Edwin Gordon include: Corpus Christi Church; Blessed Sacrament; First Church of Christ Scientist. He later formed a partnership with William Kaebler and were architects for Rochester City High Schools; Monroe, Madison, Jefferson and Ben- jamin Franklin. After Gordon and Kaebler were architects for University of Rochester buildings in- cluding Cutler Union, Eastman Theater and the School of Music among a few of their major credits. 3. Original and subsequent owners: The original owner was the City of Rochester School District. In June of the property was conveyed to the City of Rochester.

In November of the property was sold by the City to Housing Opportunities Inc., a nonprofit development Corporation, for one dollar. 4. Builders, Suppliers: a. Builder: No information available. b. Suppliers: No information available. 5 Original plans and construction: No drawings or plans of the original bui 1 ding have been 1 ocated. Pl ans attached to this survey document were supplied by the City School District and depict the building including the original bui 1 ding and subsequent additions . Susan B. Anthony School HABS No. (Page 3) There are ornamental plaques in the building describing the chronology of the construction, the architects, and names of Board of Education members who helped to guide the project development. 6.

A1 t e rat i on s and add i ti on s : Ci ty Schoo 1 Di strict records indicate two additions, one in and one in were built. The addition in was demolished to make room for the l gl8 boi 1 er room addition. Both the boiler room and north wing were added in At undetermined dates, various construction changes occured. About 68% of the original wood windows were removed in the and replaced with single pane aluminum windows. B. Historical Context: 1. The original building was constructed in lgoo as an elementary school for a cost of It was con- structed on the foundations of an old school building. lt was known as School # 27 until when it was renamed the Susan B. Anthony School in honor of the Rochester suffragette.

The addition built in cost The structure was used an an elementary school until June when it was closed by the Rochester City School District because of declining enrollment. Si nee that date it has been vacant. 2. ln the first half of the century, the school served primarily the children of ltalian descent. ln the mid-sixties, the school population became increasingly black and Hispanic. Today the site is located in a neighborhood which is 60% black, 27% Hispanic and 13% other. While the neighborhood is predominately residential, it contains several neighborhood commercial strips and the City of Rochester's public market. Most of the housing in the neighborhood is small, cottage-type frame housing built for the working class . Susan B. Anthony School HASS No. (Page 4) PART II.

ARCHITECTURAL INFORMATION A. General Statement: 1. Architectural character: The school was constructed as a neighborhood elementary school in the Central Park area of the City which developed as an ethnic area serving the early textile industries. The building and later addition was a significant structure with primary facades facing First Street and Central Park detailed with Romanesque features characteristic of many turn of the cen'.;ury public buildings. 2. Condi ti on of the fabric: The structure was evacuated as a school i n the earl y 1g8 0' s and was l e ft unheated for nearly five years. Deterioration of interior finishes caused by water and freezing temperatures occurred.

The exterior brickwork is in fair condition but is discolored by dirt and grime, and has vines on portions of the east facade which have damaged the mortar. The boiler building and chimney are in fair condition but do not have design detail consistent with the original structures. B. Oescription of Exterior: 1. Overall dimensions: The original building is a two story building with crawl space and attic. The dimen- sions of the structure are 182 feet along First Street and 76 feet along Central Avenue. The first addition added along Central Avenue was 30 feet by 32 feet. The second addition is two stories plus a full basement, but no attic. This addition takes the form of an "L" next to the original structure. It is 140 feet facing First Street and 105 feet deep. 2.

Found a ti on s: The found a t i on of the bu i l di n gs are pr i - marily a random coursed ashlar pattern using a Medina sandstone. The ig18 addition has concrete foundation walls around the north and west sides of the structure. The foundation walls are about two (2) feet thick. At the top of the foundation course is a 6" limestone belt course which runs around the building perimeter at the first floor line. 3 Wall Construction: The wall construction varies from 12" to 20" thick. The exterior brick detailing is very intricate particularly along the First Street and Central Avenue facades. The brick colors are predomi- nately red-orange with yellow quoins, arches, patterns and trim. There are stone sills at all window openings and a cast stone coping around the parapet of the Susan B.

Anthony School HABS No. (Page 5) addition. The principal entrance at First Street fea- tures stone columns, brick arches, and carved ornamen- tation. The entrance at Central Park features a rusti- cated brick wall with roman arch and keystone. There are al so roman arches in the small second floor windows over the entry. All window openings in the original building feature jack masonry arches. 4. Structural systems, framing: The structural systems used in the construction are masonry load bearing walls and wood joist floor framing. Floor joists are 2 x 10 and 2 x 12 at various spacings according to span condi- tions. The roof framing for the original structure includes rafters with heavy timber column and beam supports.

The rafters extend over the exterior masonry walls and are cut for decorative look-outs. The .roof over the addition is framed with roof rafters which are sloped to provide drainage to roof conductors. Masonry parapet walls with cast stone caps form the perimeter of the roof. 5. Porches, stoops, b a 1 con i es, bulkheads: A major porch is located at the building entrance off First Street. The porch is constructed using stone columns and masonry arch. The porch is relatively narrow, about 3 6. feet deep. and i s r a i s e d on stone steps with four risers above sidewalk grade to the entrance door. Chimneys: The existing chimney is part of the boi 1 er structure and will be demolished.

The chimney is a radial brick masonry design, tapered from an octagon form about 8 1/2 feet at the base to a circular form with 5 1/2 foot diameter. The chimney is about 75 feet high. Steel straps near the top of the chimney were installed in recent years because of deterioration of mortar and cracks in the brick. 7. Openings: a. Doorways and Doors: There are six (6) major entrances to the building, including: one along Central Park; three on First Street; one on the north side of the addition and one on the west side. There are four other secondary entrances to the building. The major entrance doors were constructed of wood with glass 1 ites in the doors. The secondary doors are now hollow metal style . Susan B. Anthony School HABS No.

(Page 6) b Windows and Shutters: There are no shutters on the buildings. dows utilized in the buildings are varied. The win- Approximately 32% of the windows appear to be original wood windows. double hung sash windows. Some of these were 1/1 Some feature three sash with leaded glass in the top fixed sash, and the lower two operable. In the original building, the windows were typically set in separate masonry openings. The 1g1a addition has both single and multiple window openings. Some of the multiple window openings include as many as six separate window frames and sashes. Approximately 2/3 of the original windows were replaced by the school di strict about years ago. The replacement windows are mi 11 finished aluminum single glazed single hung sash.

These windows will be removed and replaced with aluminum windows designed with more energy efficient characteristics, with thermally broken frame and sash, and double glazing. 8. Roof: a. Shape, covering: Th e or i g i n a 1 bu i 1 di n g f e a tu res a h i p s ty 1 e r o o f with certain flat roof sections. The Central Park west addition, and the gymnasium roof are gable style. The addition has a flat roof, pitched only to interior roof drains. The sloped roof areas are covered with asphalt shingles over asphalt based felts. The flat roof areas are covered with asphalt coated felts. b. Cornice, eaves: The cornices are detailed with masonry designs and rustications. The eaves on the sloped roof areas feature overhangs with decorative rafter ends.

Gutters are attached to fascia boards at the rafter ends. The 1g1a addition has a low parapet wall with cast stone coping. c. Dormers, cupolas, towers: There are eight dormers located on the roof. The dormers are triangular shaped with circular arch windows. A wood cupola is featured on the roof of the original structure. It functioned as an access opening to the roof and as a tower for a school be 11 . Susan B. Anthony School HABS No. (Page 7) c. Several large masonry towers are also located above the roof. The towers were used as part of the original ventilation system for the building. Description of Interior: 1. Floor Plans: Floor plans prepared in are included as exhibits to this survey. Revisions to the plans were made on several occasions.

The plans illustrate basement, first floor and second floor plans. 2. Stairways: There are severa 1 stairways included in the building. Four stairways serve as primary exits and connect all floor levels. Other stairs are used as intercommunicating stairs between two levels, or to provide access to grade, or mid levels. The primary exit stairs are constructed of metal and concrete or terrazzo and have metal pipe hand rails. Several of the secondary stairs are constructed of wood. The north central stair of the original building feature oak newells, square spindles and shaped oak handrail. 3. Flooring: The flooring used in the building is pri- marily strip maple flooring laid over floor sheathing. Some concrete and terrazzo is used in the corridor 4. areas of the addition.

Ceramic tile is used in several of the primary exit stairs. Wall and Ceiling Finish: The wall finish in the school is pl aster except in the auditorium space where brick is used. The ceiling finish includes stamped metal ceilings and plaster. Some acoustical panel ceilings were added at a later date. 5. Openings: a. Doorways and doors: The doorways in the school include oak frame and metal. Most of the doorways to classrooms and toilet rooms are constructed of oak, and include glazed transom panels with two over two obscured lites. The doors are also con- structed of oak and are detailed with recessed panels. Meta 1 doorways a re used for exit doors and smoke separation partitions. b. Windows: Windows on the exterior walls feature oak casings and mull ion covers.

The windows are set in from the inside of the wall. The wall detai 1 used bull nose corners at the head and jamb. There are interior windows used for tran- soms, s i de 1 i g ht s, and room di vi de rs . Susan B. Anthony School HABS No. (Page 8) 6. Decorative features and trim: Decorative features and trim are found throughout the building. Significant features include three fireplace mantles, oak trim arches, oak base and chair rails, built in oak cabi- nets, and radial slate panel blackboards. 7. Hardware: Hardware used includes some original brass locks. However, many of the door locks were re pl aced with newer mortise locks. Most of the hinges are brass butts. 8. Mechanical Equipment a.

Heating, air conditioning, ventilation: The heating used in the building was coal fired hot water with cast iron radiators. The boilers located in the boiler room were later converted to use natural gas fuel. There was no air con di ti oni ng system used in the school. Ventilation systems included a large fan unit located in the basement of the original buil- ding which provided fresh tempered air, di stri - buted to various classrooms by brick chases which terminated in the attic area and ventilation b. tower . Lighting: Much of the lighting found in the school is not original. New ceiling hung fluore- scent fixtures were installed and wired using exposed metal conduit. c. Plumbing: Plumbing fixtures were limited generally to common areas, separated for boys, girls and staff.

Some later additions included water foun- tains and specialized sinks. D. Site: 1. General setting and orientation: The building was set on the corner of First Street and Central Park in a residential area of small wood frame homes. The buil- ding grew along First Street because of the avail- ability of property. 2. Historic landscape design: There is little remaining of any original landscape design. Some arbor vitae and yews are grouped behind the auditorium. Most of the trees along First Street are in poor condition . Susan B. Anthony School HABS No. (Page g) 3. Outbuildings: A transportable classroom was erected on the site in the lg7o's. The building of wood con- struction and was used for additional classroom space. The building will be demolished. Prepared By: Stephen C.

Whitney, AIA Whitney & Graziano Architects 180 St. Paul Street Rochester, NY PART III. SOURCES OF INFORMATION A. Original Architect of Drawings: Drawings of the original building not available. Some drawings of the addition are avai 1 able from the City of Rochester School District, 131 West Broad Street, Rochester, NY B. Early Views: None found. C. Interviews: Rochester Landmark Society D.

Bibliography

399 words

Source document Quoted word for word from HABS NY,28-ROCH,41-. Not written, edited or summarised by this site.

1. 2. Primary and Unpublished sources a. City School District-Architecture Department Secondary and Published Sources a. The Warner Legacy in Western New York, Betsey Brayer, The Landmark Society of Western New York, c. E. Likely Sources Not Yet Investigated: Kaebler, Miller, Meyer and Ungar Architects. Prepared By: Stephen C. Whitney, AIA Whitney & Graziano Architects 180 St. Paul Street Rochester, NY Susan B. Anthony School HASS No. (Page 10) PART IV. PROJECT INFORMATION The Susan B. Anthony Cooperative wi 11 recycle the structure into a 36 unit limited equity cooperative for low/moderate income residents. A limited equity cooperative is one which rest r i ct s the i n crease i n e qui ty so that when a uni t resells, it is affordable to another low/moderate-income family.

The project will consist of gone bedroom units, 17 two bedroom uni ts and 10 three bedroom units. The boiler room and gymnasium will 'be demolished in order to provide suffi- cient open space for the residents. The project is being de~eloped by Housing Opportunities Inc., a nonprofit development corporation. When sufficient units have been sold, it will be conveyed to a cooperative corporation. Financing is provided by the Federal 312 Loan Program, the State of New York Housing Trust Fund and the City of Rochester. Prepared By: Julia B. Everitt Housing Development Specialist sba/sba City of Rochester 30 Church Street Rochester, NY --- - NIAGA~I\ :; T HABS No. 11- .. -~~ <> --' -- <'<u - f -=~tfiony ~ ---,---Susan B. J ( l l l - - - _, _ _ _ _ _ r-. <. u::. .. --l j School ..

,, ~ I ..9 i ,; r ~~- p A P. h \ ~~ G <'I. E'. A PP.1vArt ;:>noPt.Hr~-- j +I \ '0 l~ ,._ m Tof' - i I ~ ; ,' ( i'. ~ 4 . . . . . . . . . " ~ ~ 'ti. s ?: ,,_ t9tif :r: (/) :i- c ttl {ll (/l OJ ? ::l z 0 ttl . . i ...I'-c:::: I --- = -- - ' - I z :i- ><: ::l I rt lJl ::t 2. _, 0 ,-- I -, r SUSllNS.AN1HONl'SCHOOll't017 -f CITY .. 019TIU(:T ~ (/) "OC'"'fSTf. ... H Y . 'O 0 ~~ ITlM OJ ::t SCA\.. IN \:"t:.ET <.Q 0 GIOUNOI '1.AN ro 0 L --l I-'

In context

Rochester, New York The place record: every map, photograph and survey of this town.
Monroe County, New York 198 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Rochester

24 of 44 records shown

The federal surveyors worked through Rochester building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Eastman HallHABS NY,28-ROCH,42-16,439 words
First Universalist ChurchHABS NY,28-ROCH,12-6,202 words
U. S. Post Office & CourthouseHABS NY,28-ROCH,21-5,002 words
Driving Park Avenue BridgeHAER NY,28-ROCH,42-4,841 words
E. E. Boynton HouseHABS NY,28-ROCH,29-2,942 words
Lindley M. Moore HouseHABS NY,28-ROCH,11-2,900 words
Female Academy of the Sacred HeartHABS NY,28-ROCH,18-2,616 words
Patrick Barry HouseHABS NY,28-ROCH,25-2,442 words
Hervey Ely HouseHABS NY,28-ROCH,2-2,398 words
Bates-Ryder HouseHABS NY,28-ROCH,13-2,381 words
Warner CastleHALS NY-102,374 words
Charles Bissell HouseHABS NY,28-ROCH,14-2,229 words
Ellwanger & Barry Nursery OfficeHABS NY,28-ROCH,24-2,060 words
Powers BuildingHABS NY,28-ROCH,23-2,023 words
Monroe County CourthouseHABS NY,28-ROCH,15-2,011 words
New York State ArsenalHABS NY,28-ROCH,40-1,998 words
Rochester Free AcademyHABS NY,28-ROCH,36-1,933 words
St. Luke's Church (Episcopal)HABS NY,28-ROCH,28-1,901 words
George Thompson HouseHABS NY,28-ROCH,19-1,873 words
Harris-Hollister-Spencer HouseHABS NY,28-ROCH,20-1,771 words
First Presbyterian ChurchHABS NY,28-ROCH,26-1,764 words
Hiram W. Sibley HouseHABS NY,28-ROCH,22-1,672 words
Amon Bronson HouseHABS NY,28-ROCH,35-1,668 words
Ebenezer Watts HouseHABS NY,28-ROCH,33-1,622 words

Provenance

  • Written history. Quoted verbatim from HABS NY,28-ROCH,41-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.