Trenton Stsatfc'on is eligible for listing on the Na- tional'Register Q:f Historic Places. Niagara Mohawk Power CorportftJTotf propose*'station modifications in the A* a result of project review,by the Advisory Council on Historic Preservation, the New York State Historic Preser- vation Off ic* , and Federal Energy Regulatory Commis- sion (PERC), Niagara Mohawk will remove three of the four original turbine-generator units and stabilize powerhouse foundations. HAER. documentation of the station, required by revised Article 35 of FERC license prior to such actions, was conducted from February to August FroJafit, .manager ana historian: Michael S. Raber Raber Associates P.O.
Box 46, 81 Dayton Road South Glastonbury, CT Photographer and electric power historian: Gerald Veinstein Photo Recording Associates 40 West Street New York, NY William F. Johnson 112 Fountain Avenue Cranston, RI Photftgrflghgr: Thomas R. Flagg Photo Recording Associates 70 West Street New York, NY TRENTON FALLS HYDROELECTRIC STATION, DAM AND HEADVORKS HAER No. (Page 3) Part I - Historical.Information* A full discussion of th* history and significance of the Trenton Falls Station appears in HAER JSo. The station.was built at the lower end of a spec- tacular gorge or ehftsa on We*t Canada Creek, a stream fed by a series of lakes in the southwestern Adirondacks about forty miles northeast of the gorge.
Until the hydrae let trie development of the three-mile-long chasm was a series of-eights- which .dropped about 330 feet between the villages of Prospect and Trenton Palls. The Prospect Palls were the uppermost, with the others stretching over a 1.5-mile distance beginning at the present dam pond, which covers the 20-to-30-foot drop of the Rocky Heart and Cascades of the Alhambra falls. The last five falls drop 171 feet, past Village Falls below the present powerhouses. Trenton Chasm is 50-to-200 feet deep and very steep. The 30-to-20G-foot wide bottom has broad sheets of rock, pocked with numerous potholes created by tumbling, whirling boulders once suspended in the cascading creek.
Most, of the chasm consists of Trenton limestone, a 300-foot- thick series of strata of varying thickness and hardness.1 The 56-foot-high concrete gravity dam, located about 650 feet above the Hill Dam Falls and largely designed by June for Utlca Electric Light and Power Company, added 52 feet of head to the 214 feet between the foot of the Cas- cades of the Alhambra falls and the foot of Sherman Falls. In this was the highest-head hydroelectric project in the eastern United States, with nearly twice the head of the Niagara Station No. I.2 Although not espe- cially large or unusual among contemporary dams, the Trenton Falls dam was a critical component of station development, and reflects some anxiety among its designers about flood potential in the narrow gorge.
Like many dams set with- in narrow bedrock valleys, this one has a convex-upstream arched plan to in- crease stability by transmitting water thrust to valley sides.3 the dam's most unusual design feature is an auxiliary spillway cut into bedrock around the east abutment, intended to relieve high-water pressure on the dam. De- signers may have also feared erosion of the limestone gorge walls at the dam abutments, or of the dam's concrete. The dam easily withstood such tests on its own, Including a serious flood eight months after the station opened in April and the auxiliary spillway was soon regarded as somewhat superflu- ous.4 Construction at Trenton Falls began in September at the dam, and proceed- ed on a round-the-clock basis with a work force of up to 700 men.
The dam, built by the T.A. Gillespie Company required some dynamiting for the main spillway and, especially, the auxiliary spillway where cubic yards of rock were removed. Work at the dam took the lives of several men,5 There were very few changes made at the dam and headworks until the construction of the second, or "new," powerhouse. Although planning for expansion began soon after old powerhouse completion, sufficient additional water supply was not assured until after the completion of the state-owned Hinekley Reservoir, upstream on West Canada Creek, for the Barge Canal. Increased electrical Capitalized, undated references are to photographs in this documentation. .< ^^ -. .; TRENTON FALLS HYDROELECTRIC STATION, DAM AND HEADWORKS HAER No.
(Page 4) demand during World War I, even prior to formal American involvement, was a nationwide phenomenon which finally sparked the expansion of Trenton Falls Station. Utica Gas and Electric Company (UGEC), the immediate successor to the firm which built the old powerhouse, began the new powerhouse in and completed it in adding a new pipeline and additional headworks facili- ties. Water supply problems related to a lack of trashracks on some pipeline intakes at the dam delayed installation of one turbine-generator unit, until the construction of a new High Level Intake and installation of flash- board systems on the main and auxiliary spillways (see below and HAER No.
NY- In inspections at Trenton Falls revealed significant leakages from the pipeline and gate valves serving the old powerhouse, losses of head through the two intakes feeding the larger pipeline to the new powerhouse, and fric- tion losses in the latter pipeline which analysis Indicated could be overcome by opening four remaining unused intakes at the dam. After considering clos- ing the old powerhouse or running both powerhouses from the larger pipeline, UGEC rebuilt the old pipeline and completed other improvements in which increased total station capacity to some kw (a 5% increase) and upgraded safety and hydraulic control features.
These improvement included installing new trash racks at Intake pipes to add the four intakes to the 12- foot-diameter pipeline, and replacing belt-driven intake gate valve operators with individually-operated, motorized controls operable from the powerhouses and the gatehouses. Aside from a floodgate installed in the dam, there were no significant changes at the dam and headworks until replacement of two Older pipelines with a single 14-foot-diameter in Recent repairs have altered the dam's surface appearance, but not its original, design (see below and HAER No.
The Trenton Falls Station today is most significant as a fascinating study in contrasts at the powerhouses between twtfvery different generations of hydro- electrical engineering.' The 4am, mad* these powerhouses possible, and remains a monument-to the, ambitions of entrepreneurs and engineers determined to ex- ploit a high-hdftsf bS^dropower' resource eejfly in the history of large -scale hydroelectric development. TRENTON FALLS HYDROELECTRIC STATION, DAM AND HEADWORKS HAER No.
(Page 5) - Fart II * Descriptive Information Summary of Site Arrangement and Existing Conditions The dam and headworks is on West Canada Creek about 1.3 miles below Hinckley Reservoir, encompassing an area of about 2 acres in the towns of Trenton, OneIda County and Russia, Herkimer County* Trenton Falls Station as a whole covers about 40 acres along the creek (see HAER No. Dam and headworks construction has altered landforms and stream flow in Trenton Falls Gorge. Original construction required bedrock excavation on the creek bottom for the dam, and considerable blasting for the auxiliary spillway.
Tunnel projects associated with the High Level Intake involved additional excavation, and, along with vegetation clearance for access paths, has left an area of several acres open on the west side of the dam. Except during spring run-off, when water roars down the gorge, the dam and diversion of water for station use leaves the rock-bottomed canyon There are four major sets of components; the dam, including eight original Vintake pipes at the west end, the orig- inal main.spillwayrffcfHf^h* i& -5> ffloWgatje; . the auxiliary rock spillway" orf the east Vank, with a crest 1.7 feet below the main spillway, and the excavated rock channel around the east dam abutment; .
^ the headworks structure with a surface 38 feet below the west section of the dam, including the two gatehouses, the control- structure for the two waste or drain pipes, and the manifold for the 12-foot-diameter pipeline (see HAER NO. the High Level Intake northwest of the dam, from which two generations of tunnels fed, first, the 12-foot-diameter pipeline, and now the 14-foot-diameter pipeline. A large gatekeeper's house stood west of the dam until (see HAER No. NY- A dirt road from the powerhouse reaches the dam and High Level Intake area. A short, steep path from the gorge top on the west side leads to the headworks; primary access to the headworks is via a set of metal stairs at the dam's west end. One must cross the dam to reach the auxiliary spillway.
Construction of the 14-foot-dlameter pipeline replaced the High Level In- take with a new structure. The other components retain much of their original character and scale. The auxiliary spillway and the headworks structures remain little altered since the early except that pipeline replacement in the left both older pipelines and the original High Level Intake pipe cut' off and bulkheaded (see HAER No. Dam rehabilitation In removed some original sluice gate controls, replaced original limestone coping and granite upstream facing with reinforced concrete, and surfaced both sides of the dam with the same material. i " V.VMI.:-.-JI TRENTON FALLS HYDROELECTRIC STATION, DAM AND HEADVORKS HAER No.
(Page 6) Dam Main Sections and Floodgate Built into bedrock on both sides and at bottom, the 290.5-foot-long concrete gravity dam crosses the creek with a curved plan defined by an 800-foot radi- us. The dam weighs about ton*. Except at spillway or floodgate sec- tions, the dam rises about 56 feet above bedrock. The steep, straight up- stream face has a slope; curved slopes define the spillway and downstream faces. The dam base is 44 to 56 feet wide, with 8-foot-wide crests except at spillway areas.
As first completed, there were three main sections, an 83-foot-long eastern section, with 18-inch-thick limestone capstones set on dowel pins, and a 14-foot-htgh section of granite blocks set into the uppermost upstream face; a 97-foot-long spillway, set 7 feet below the adjacent sections, with a 2-foot-thick curved limestone crest about 9 feet wide above about 6 feet of granite facing on the upstream side, and with 3-foot-thick, 4-to-7- foot-high granite wing walls; a 110.5-foot western or headgate section, similar in construction to the eastern section, with headgate and drain controls described below.7 An iron-pipe guard raij.was installed around the dam top in When the first High Laval.
Xtftafce was installed, in tfGEC./built the first flashboard system across that gjfclllto^rtft lricraa*e;lItt^a^r The approximately 3-foot-high system consisted of" a ^itsjefcalj, a^ray ofe frj-lnei, channel irons, set at 5.8-foot intervals in the "spillway capstones, withJ6-foo%lQng"horizontal wooden panels hinged to the iron iti'f probably, two vertical units.. . The cam-operated flash- board sections overlapped* sp that posting one section at one end of the spillway opened a coflj^te^&i*o t%il array. Bkcfi array of horizontal sec- tions could be opened individually, from top down. Rapidly-operated and flex- ible, the flashbOard system allowed for quick response during high water con- ditions. Each section had to be closed Individually, from a plank catwalk built over the flashboards.
In th* flaahboards were raised to 6 feet and arranged in three vertical units. Corresponding arrangements outlined below were made at the auxiliary spillway. The flashboards were rebuilt with similar elevations and design in and In the early a 22-foot-long concrete stairway was added to the west end of the dam, and in a steel safety cable was stretched over the main spillway. The western feet of spillway was lowered 4' feet in for a 15-foot-wide steel roller floodgate and gate guide/platform structure.
The floodgate was initially equipped with two hand-powered hoists, but was motor- ized in it was repaired in The latest work at the dam also in- cluded upgrading of a finger-drain system designed to remove moisture from the concrete, and insertion of 25-foot-long steel pins in the bedrock south of the spillway to preclude erosion. TRENTON FALLS HYDROELECTRIC STATION, DAM AND HEADWORKS HAER No. (Page 7) Original dam construction included eight 5-foot-diameter bell-and-spigot-con- nected, cast-iron pipes running through the dam In the western or headgate section. Numbered 1*6 west to east, intakes 1-4 were set 47 feet below the dam crest at and 10-foot centers, and intakes 5-8 were set similarly 9 feet lower. These pipes run to the headwords described below.
Initial de- signs called for using intakes 1 and 2 as headgates for the 7-foot-diameter pipeline, intakes 3 and 4 for a later pipeline which as built fed the new powerhouse, and intakes 5 through 8 as waste or drain pipes. These original plans changed to tap intakes 3 through 8 for the 12-foot-diameter pipeline (see HAER No. Each intake had a 6.l-by-8.8-foot gate on the upstream dam face, hand-wheel operated,^ ibslngle'-stem, screw-and-threaded- rod lift mechanism gate with bronze guides. During, original construction, trashracks wej?e'^natatl dJ ;oBly''On intakes I and. 2. Expansion plans in included addid&tfal t or intakes X and 4, Hut not for intakes 5 to 8. Although Stakes 3 to 8 were CbnnSfeted to the 12-foot-diameter pipeline via a headwords manifold described in HAER No. nos.
4-8 could not be used untt provide^ w t;ti trashracks irv The intakes and headgates remain largely" intact, ^tto^.&^cNj&^^t i9B e*soYal of the 7- and 12-foot- diaffleter pipelines all gates except 7 and 8 were wedged shut with their hand wheels removed. Intakes 7 and 8. still operable as drains, were refurbished with new stems in Auxiliary Spillway Blasted out of the gorge's Trenton limestone, the auxiliary or rock spillway channel is about 300 feet long and at least 69 feet wide, averaging 45 in height with a bottom elevation about 25 feet below the dam crest. The foot-leng concrete spillway structure is about 15 feet wide, with a stepped profile 5 to 7.5 feet high and a crest elevation 8.7 feet below that of the dam.
The downstream, stepped face has twenty-four angled, 18-inch-thick con- crete braces.. Ten feet higher than the spillway, a 14.8-foot-long, 23-inch- concrete wall joins the east edge of the dam and the spillway's south edge. When first built, the spillway was equipped with a now-vanished system of 2-foot-high flashboards which, when Installed each spring after the snow- melt runoff, brought the spillway crest to the level of the dam spillway. In snd flashboard systems like those installed on the dam spillway were built., Xti each case 2 feet higher than those at the dam. A safety cable was installed over the flashboard catwalk in and the flashboard system was rebuilt in and along with similar work at the dam-11 TRENTON FALLS HYDROELECTRIC STATION, DAM AND HEADWORKS HAER No.
(Page 8) Headworks and Gatehouses There is conflicting data on the original headworks, but historic views and plans suggest they consisted of a 43-by-85-foot concrete platform, through which the eight intake pipes, ran, and a 16.5-by-21.5-foot gatehouse over in- takes 1 and 2. The pipes extended a total of about 55 feet from the upstream dam face to the south edge of the haadworks. The western half of the plat- form, over pipes was about 22 feet high; the eastern half over pipes 5-8 was perhaps feet lower. A 2-foot-thick concrete wall ran from the southeast edge of the gatehouse about 270 along the stream, to at least the railroad bridge, and evidently retained fill placed under the upper end of the 7-foot- diameter pipeline.
The surviving 12-foot-hlgh gatehouse has 22-tnch-thIck walls of granite block with interior brick lining, six 3.5-by-6-foot windows now boarded over, a 6-by-8.8-foot double wooden door, and a wood-framed, tin- covered, hipped wood roof. A small chimney, now removed, probably served a stove or very small boiler to prevent gate valve freezing. Two 5-foot-dlame- ter, steel Chapman gate valves controlled flows through intakes 1 end 2 to a Y-shaped connecting pipe to the 7-foot-diameter pipeline (see HAER No. NY- The non-rising, brass-stemmed valves were probably hand-operated when first installed...
During new powerhouse construction, the gate valves were apparently modified with belt drives run off a single motorized line shaft, but retained their hand-powered operators.12 Initial new powerhouse plans in early included an extension of the origi- nal gatehouse to control intakes 3 and 4 and feed the 12-foot-diameter pipe- line, and a high-level intake immediately east of the gatekeeper's house. 3 By the high-level Intake was evidently shelved in favor of a greatly expanded headworks which tapped.pipes 3-9 to feed the new pipeline. These pipes were extended 30 to 50 feet to meet ft pipeline manifold in echelon, with Y-shaped connections allowing pipes 7 and 8 to serve also as drains (see HAER No.
Around this complex nest of connections, the headworks platform was extended at the original gatehouse elevation to an irregular area of about 85 by 110 feet. A new 15.5-by-?6-fpot, 12-foot-high, steel-framed concrete gatehouse, with 12-inch-thick walls and a tin-covered, hipped wood roof, was built over intakes extending also across most of the old gatehouse's south elevation. A narrow passageway joins the two gatehouses, which were heated by a steam boiler In the new gatehouse. The gatehouse has six steel-framed, 38-by-56-inch windows, and two 4.2-by-7-foot steel doors. A wooden-slat section of floor surrounds the^rea occupied by operators for six 5-foot-dlameter/non-rising, brass-stemmed,-sfc$el Chapman gate valves.
The gate valves had hand operators as veXX as befit ^drives run off a single motor- ized line shaft. 15 * ," A 4-section steel stairway with wood steps and .iron pipe railings was in- stalled from the west edge of the dam to the headworks platform in re- placing an undocumented earlier access- Niagara Mohawk replaced the stairway in with an all-metal structure.16 TRENTON FALLS HYDROELECTRIC STATION, DAM AND HEADWORKS HAER No. <P*ga<9) In addition to the two gatehouses, there was an 11-foot-high, 28-by-40-foot, trapezoidal room submerged in the headworks for gate valves controlling drain pipe connections on pipes 7 and 8.
A small frame shed covered the lad- der access to this room, which contained two 5-foot-diameter gate valves simi- lar to the others, also belt-driven off a single motorized line shaft.17 During the extensive hydraulic improvements made at Trenton Falls Station (see HAER No. all eight gate valves in the two gatehouses were individually motorized with Westinghouse induction motors and Limitorque controls, and mada operable from the powerhouses as well as the gatehouses. These controls were later largely enclosed by plywood covers.
Electric heat was installed in each gatehouse In The vasts pipe gate valves were evidently never individually motorized, but were upgraded in with a belt- speed reducer.16 High Level Intake Following the completion of the enlarged headworks, 12-foot-dlameter pipeline, and new powerhouse, Utica Gas and Electric evidently attempted to use all six Intakes to feed the pipeline manifold.19 The continued lack of trashracks on intakes 5-8 -- a by-product of operating the old powerhouse during new powerhouse construction -- probably confounded turbine operations quickly-and inhibited installation of the third new powerhouse turbine-genera- tor unit.
The unprotected intakes were closed until trashracks were installed in Rather than close the powerhouses, UGEC supplemented the flow into the 12-foot-diaaster pipeline in 1921*Hfcfra resu*yrected High Level Intake, which took water from the west side of the pond to the pipeline, around the gatekeeper's house,. The lfl#$e included"* 4$-foot-long, 24-by-20-foot con- crete-lined twrfel through'b%aVoc%\ wSiicTi" tan into a 200-foot-long, 10-foot- diameter concre^ eutrn*!,4 wtitf a ^O-^dot^long 10'-foot-diameter pipe of inch-thick riveted boiler plftte which joined'the U-foot-diameter pipeline below the headwords.
The intake's upper tunnel edge on the pond was about 12 feet below the^M^fft'j) nd o *; :Jodt>e1<Jwvthe crest of the auxiliary spillway, A large trashrack guarded the High Level Intake, which was con- trolled from a 54-by-32-fopt, steel-framed wood gatehouse by two motor-oper- ated, 9-by-27-foot headgates set within concrete walls extending 50 to 60 feet below the surface. The gates were operable from the powerhouses as well as the gatehouse. Except for part of the pipe at its lower end, the entire High Level Intake structure was removed for installation of a new, larger intake for the 14-foot-diatneter pipeline.20 TRENTON FALLS HYDROELECTRIC STATION; DAM AND HEADWORKS HAER No. (Page 10) Notes to Parts Z and II 1. White White 2. Thomas White cf. Hay Appendix C. 3. Wegmann 46; Barrows 4.
White 5. Thomas 6. Personal communications, Robert Easterly and Robert Shantie. 7. Electrical World Thomas Niagara Mohawk Power Cor- poration 8. White 13; Niagara Mohawk Power Corporation 9. Niagara Mohawk Power Corporation personal communication, Robert Shantie. 10. Electrical World White Personal communication, Robert Shantie; Niagara Mohawk Power Corporation and Brackenridge 1899a, 189#fe, [plans]. 11. White .3; Niagara Mohawk Power Corporation and Utica Gae & Electric Co. 1922.[plans].; personal communication, Robert Shantie. 12. Electrical World Carr Niagara Mohawk Power Corporation and Brackenridge Brackenridge and 2 13. Niagara Mohawk Power Corporation, Utica Gas & Electric Company [plena]. 14. White 15.
Ibid; Niagara Mohawk Power Corporation and Utica Gas & Electric Company p] ans].*. 16. Niagara Mohawk Power Corporation personal communication, Robert Shantie. 17. Niagara Mohawk Power Corporation 18. Niagara Mohawk Power Corporation and correspondence file 19. Thomas 20. Niagara Mohawk Power Corporation and Clark [plans]. TRENTON FALLS HYDROELECTRIC STATION, - DAM AND HEADWORKS HAER No. (Page 11) Fart III - Sources of Information Original Drawings Niagara Mohawk Power Corporation has over historic or current plans and drawings, the great majority of them on microfilm, at its headquarters. Ap- proximately 115 plans document the development of the dama nd headworks.
These materials include many Contractor or consulting engineer plans prepared for original construction of the dam, headworks, pipelines, powerhouses, and substation, with a number of plans showing proposed features or equipment not installed. The earliest drawings date from Most drawings are coded with a system introduced after many of them were originally prepared. The system Is based on different site, electrical, hydraulic, and structural com- ponents. Drawings used for this documentation, with their codes, are listed below. Other drawing? are listed for HAER Nos. NY-155-A and For access, contact: Environmental Quality Services Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse, NY ATTN Scott D. Shupe, Environmental Analyst, tel.
No Codes or Illegible Codes Niagara Mohawk Power Corporation 1989a ' Constructed West Canada.Creek Project. Trenton Development. r Intake,, Pipelines and Surge Tank. Profiles, Section and Eleva- tion. License Amendment Exhibit F, Sheet 5A. Constructed West Canada Creek Project. Trenton Development. .General Plan- -.Dam and ,'Spillway. Plan, Elevations and Sec- tions. License Amendment Exhibit F, Sheet 4B. Constructed West Canada Creek Project. Trenton Development. Detail Map. License Amendment Exhibit G, Sheet 5A. Utica Gas & Electric Company Trenton Falls Extension/Profile of 12'Dia. Pipe Line, gffiRgyfll Brackinridge, W.A. Utica Electric Light and Power Company. Map showing location of Dam, Pipeline and Power House. No. TRENTON FALLS HYDROELECTRIC STATION., DAM AND HEADVORKS HAER No.
(Page 12) .Ptaii & AwtfWfflMt*. Plfag Brackinridga, W.A. 1899a Utlca Electric Light and Power Company. Vertical Section of Dam showing Waste and Motor Pipes. No. A-6 Utlca Electric Light and Power Company. Horizontal Section of Dam showing Waste and Motor Pipes. No. R5. Utica Electric Light and Power Company. Map showing location of Dam. No. 1900a Utlca Electric Light and Electric Company. Cross Sections of Dam. No. AS. Utica Electric Light and Electric Company. Rear Elevation of Dam and cross-section of Spillway. Profile on centre line of Spillway. No. Utica Electric Light and Power Company. Elevation of Dam show- ing Upstream Face [filmed in two parts]. No. I900d Utlca Electric Light and Power Company. Cross Sections of Dam. No. 74-A.
Utlca Gas & Electric Co, Proposed Flashboards for Rock Spillway. No. Ifltflk* fflrtttt.firtttl Clark, Plan and Profile, High Level Intake, Trenton Falls No. S Up*. larmqlg, ,6 Canal Murray, Thome* E./George A. Orrok Trenton Falls Extension. Proposed High Level Intake and Con- necting Pipe. No. Utica Gas & Electric Company Trenton Falls Station. Details of Upper Steel Pipe Line and Connections. No. 1574-A. TRENTON FALLS HYDROELECTRIC STATION, DAM AND HEADWORKS HAER No. (Page 13) Gatehouse * Structure Bracklnridge, W. A. Utlca Electric Light and Electric Company. Proposed Plan and Elevations for Gate House. No. A-119. Utlca Gas & Electric Company Trenton Falls Station. Elevations of Gate House. No.
[illegible title block, plans and sections of dam pipes & mani- folds, gate valves & operators]. Powerhouse - Superstructure Anonymous cl942-5a Trenton Falls Dam Building Inspection/General Plan. Historic Views There are few available photographs before the construction of the new powerhouse. Some appear in Electric*! World Niagara Mohawk Power Cor- poration has over historic views at its headquarters, in several collec- tions, including a small number of pre-1917 views. Aside from published views in White dam and headwork modifications for new powerhouse construction photographs appear rare, but after the Niagara Mohawk collection provides a very full record of changes made at the station. For access, see Original Drawings, above.
Interviews Many Niagara Mohawk Power Corporation employees provided valuable information during research* for this documentation from March to May At the Syra- cuse headquarters, engineers, designers, and analyses included Paul Bernhardt, Robert Easterly, Joseph Flood, Samuel Hirschey, Jacob Niziol, Gary Schoonmaker, Robert Shantle, Scott Shupe, and Joseph Viau. Edward Cooney, Harbor Point control supervisor, and past or present Trenton Falls Station operators George DiStefanis, Robert DoIan, Robert Jones, and Wayne Richard shared years of personal station management experience. Bibllgraphy . Barrows, Water Paver Engineering. 3rd edition. Uew York: McGraw-Hill i, Book Company. Beardsley, ' ''. Design and Construction of Hydroelectric Plants.. .New York: McGraw-Hill Book Company, Inc.
TRENTON FALLS HYDROELECTRIC STATION, DAM AND HEADVORKS ' HAER No. (Pag* 14) Carr, Should an Old Hydro Be Rebuilt? Electrical World. May 26, Dunlap, (for In E. The Trenton Falls and Prospect Water Power Development. Elec- trical Engineer Electric Power Transmission Project In the Mohawk Valley. West- ern Electrician {May Electrical World The Hydro-Eleotric developments at Trenton Falls, Vol. XLV1I, 20: Ellis, David M. Palls From Favor, tiev York Alive, July/August Gollegly, Rehabilitation of the.TrMffioti Falls Hydro Plant. Electric Light tmd Pover. October 11. Hay, Duncan * A History of Hydroelectric Power in New York State. Report prepared for the New York State Museum and Niagara Mohawk Power Corporation. New York State Museum. Mead, Daniel V. Water .Power Engineering. 2nd Edition.
New York: McGraw-Hill Book Co. Miller, Geology of the Remsen Quadrangle, New York State Museum Bulle- tin' Niagara Hudson Power Corporation Plant Data Book.. Mimeograph. On file, Niagara Mohawk Power -Corporation-, Syracuse, NY, Niagara Mohawk Power Corporation Trenton Falls Hydra Plant, Continuing Property Records, PR I916-3>fr2. Pratt, Harjorle K. Cultural "Resource Survey of the Trenton Hydroelectric Develop- ment on Wast Canada Creek, tferklsjt* and OneIda Counties, New York. Report prepared for-NJjgara Hphawk Power Corporation. Pratt and Pratt Archaeological'Consultants, Inc. TRENTON FALLS HYDROELECTRIC STATION , DAM AND HEADWORDS HAER No; (Page 15) Synopsis of Eligibility for Che Trenton Falls Hydro-Electric Station, He rk inter end One Ida Counties, New York.
Report pre- pared for Niagara Mohawk Power Corporation. Pratt and Pratt Archaeological Consultants, Inc. Historic Mitigation Plan, Trenton Falls Hydroelectric Station, FERC Project Oneida County, NY, Phase I Report. Report prepared for Niagara Mohawk Power Corporation. Pratt and Pratt Archaeological Consultants, Inc. Rushmore, David B., and Eric A. Lof Hydro-Electric Power Stations. New York: John Wiley & Sons, Inc. Thomas, Howard Trenton Fells, Yesterday and Today. Prospect, NY: Prospect Books. Uegmann, Edward The Design and Construction of Dams. 6th edition. New York: John Wiley & Sons. White, Byron S. Trebling the Capacity of a Hydro-Electric Plant During Opera- tion. Engineering News-Record Trenton Falls Yesterday and Today.
The Synchronizer Sources Hot Yet Investigated More intensive use of available plans and historic views might reveal addi- tional structural or station history details, presumably minor in nature. Further interview* with past and present station (Operators would yield useful information on^equi tit performance or hydraulic problems since at least as wfilNM , ir*t-tiafdt fcersjtee-fcives on^operator staffing and organiza- tion patterns... ^ RAE^NV^-TREN, l&- TRENTON FALLS HYDROELECTRIC STATION, DAM AND HEADWORDS , . HAER No. (Pagft 16) / / -' /Iff i III II / TRENTON FALLS HYDROELECTRIC STATION ON WEST CANADA CREEK (base map: Remsen U.S. Geological Survey 7 5"Minut* Quadrangle Sheet)