Crescent Dam, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. The dam maintains the Crescent Pool between locks E6 and E7. Description: The Crescent Dam is located near the junction of the canalized portion of the Erie Canal and the Mohawk River.1 A gravel access road provides access to the west end of the west dam section. Crescent Dam consists of two, curved fixed-crest dams separated by a rocky island in the Mohawk River. At the west end of the west section of the dam is a New York State Electric and Gas Corporation (NYSEG) power plant, built after the opening of the Barge Canal. To the west of the power plant is a Tainter gate with a steel superstructure on concrete abutments and a steel and reinforced-concrete counterweight.
The Tainter gate allows the water in the Crescent Pool to be drawn down and is in good condition. The east section of the dam has a steel plate apron and spalling concrete abutments. To the east of the dam just downstream of the abutment is a foundation of what was once a powerhouse as revealed in a map of the site.2 A riveted-steel pipe leads to this foundation. Arched openings for the penstocks are visible at the water level. Noble Whitford provides a detailed description of the site as it existed in The gravity dam was actually two dams, separated by a rocky prominence. He went on to state: one section spans the former river channel while the other crosses low land, which after completion was submerged.
The entire semi-circular dam had a radius and a total length of A third dam was built at the front on low land and was consequently at a lower elevation. This dam maintained a pool which may serve as a water-cushion to break the fall of water spilling over the crest and prevent erosion of the rock at the foot of the main dam. The dam crest measured 39' above the apron, which had a 40' width. The base of the dam was 42' wide and at the top. The largest power-station as yet constructed on the canal was located at the eastern end of the dam, generating power to operate the two guard gates and five locks on the Waterford Flight and to light this portion of the canal.
Head-gates were located at the western end of the dam.3 1 Description of current conditions is based on a site visit made by the HAER recording team in summer 2 Series New York State Archives, Albany, New York, Eastern Division, Erie Canal, Section 1, Sta. 293 to Sta. approved March 29, 7. 3 Noble Whitford, History of the Barge Canal of New York State (Albany: Lyon Company, Printers, NEW YORK STATE BARGE CANAL, CRESCENT DAM HAER No. (Page 2) History: Acme Engineering built the Crescent Fixed Dam as part of Contract 14 beginning in March with the construction of a cofferdam. Once that was in place, the contractor started excavation.
The project was divided into three sections: Dam A crossed the Mohawk River from the head of the Waterford Flight to the rocks, Dam B was built in the and Dam C was built below Dam B. The concrete pouring for the west half of Dam A ceased for the winter on December 24, Work then resumed the following May with the construction of a cofferdam to enclose the east half of this section. The abutments and headgates were under construction in as well. In the contractor worked on the east end of Dam A, which included an adjacent abutment with a forebay for generating power, as well as the west end of Dam B, which had two abutments. By Dam B had been closed, and the east end sections of Dam C and a portion of the abutment of Dam C had been completed.
The state issued an injunction, however, so the contractor removed their plant from the site and left the job unfinished. Completion of the dam required closing the six openings that had been left in place to allow the Mohawk River to flow until navigation began. The dam was eventually completed under Contract 4 A power plant was constructed at the east end of Crescent Dam under Contract 91, which was awarded in January to The Holington Company. Excavation began April 1, but an unsuitable and inefficient plant and management slowed the contractor s progress. By excavation of the site, along with the construction and installation of the masonry structure, penstocks, and turbines had been nearly completed. The electrical equipment had been delivered but not yet installed.
By October the governors were nearly installed. New governors evidently had to be acquired, as Contract 91A was let in November to Lord Construction Company for new governor equipment.5 Until there was much discussion among canal officials about utilizing the surplus water on the canal. In the New York State legislature determined that canal waters should not be leased, sold or otherwise disposed of until the canal should be completed, nor thereafter until authorized by a statute which should specify conditions and restrictions to govern such lease or sale as part of Chapter Chapter 273 passed in and allowed the State Engineer to take control of the canal waters, but utilization of these waters was stymied.
Finally, in New York State established the Water Power Commission and granted it the authority to issue 4 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 83; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 58; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 61; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.
1 (Albany: Lyon Company, 50; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 5 Annual Report, 49; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 78; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 95. 6 Whitford, NEW YORK STATE BARGE CANAL, CRESCENT DAM HAER No. (Page 3) licenses for the development of power at places where the State owns the power rights, the license carrying with the privilege of using such water-power upon the payment of equitable rent.
The Superintendent of Public Works had to certify that any developments on the canal would not hinder navigation, which proved problematic as the Superintendent refused to authorize certificates, arguing it was the job of the Public Works Department to develop water power and should not be granted to private interests. In the legislature transferred the authority to develop water power to the Department of Public Works and appropriated $1 million for the construction of power plants at Crescent and Vischer Ferry dams.7 The New York State legislature authorized a series of contracts between and for the construction at Crescent (under Contract 1-A was for the hydraulic turbines and governor equipment, while Contract 4-A was for the tail-race.
The powerhouse was B-3 with the excavation and rough grading included in The final contract was A-5 for surplus water. The Contract A-2 was for two water-wheel driven generators and other electrical equipment; A-3 was for the powerhouse; B-4 was for the superstructure; B-6 was for the tailrace; and B-7 was the surplus power. The Annual Report indicates that a new power plant was under construction at the site to replace the original powerhouse on the east side of the Mohawk River that provided power to the Waterford Flight.8 Additional work on the power plant occurred in when the electric substation was converted from kilovolts to 34 kilovolts. This involved installing new transformers, circuit breakers, and insulators, as well as disconnecting various switches.
New relays and controls were installed in the powerhouse. The work was contracted to a local utility who bought the power produced at the dam. The sluice gates were rebuilt in It is unknown when the powerhouse was dismantled.9