Lock E7 and Vischer Ferry Dam, located on the Erie Canal, are components of the nationally significant New York State Barge Canal. Description: Lock E7 is about 11 miles east of Lock E6 on the Mohawk River.1 Vischer Ferry Dam extends northeasterly from Lock E7 across the Mohawk to Goat Island. The lock site and dam are accessed by an asphalt approach driveway extending from Rosendale Road. The driveway leads directly to two parking areas: one is asphalt and the other is gravel. A gravel secondary driveway leads to the lockhouse. The lock site consists of the lock and associated structures, powerhouse, lockhouse, and auxiliary buildings like a storehouse and storage shed. Lock E7 has a 27' lift with normal pool elevations of below and above.
The concrete chamber walls have been resurfaced and have cast-iron quarter-round coping. The north wall of the chamber on the river side is exposed concrete while the south wall has earth banked against it. There are double-leaf, steel miter lock gates at each end of the chamber, operated by spars and gear trains powered by electric motors. The flow of water through the culverts in the chamber walls is controlled by valves also operated by the electric motors. The control stand shelters are located on the west side of the lock at both the upstream and downstream ends. The shelters are single-story, flat-roofed structures constructed of metal and Plexiglass. They are in fair condition. A combination of pipe railings and chain-link fencing are located at the ends of the locks.
Modern lighting fixtures illuminate the chamber, which is in good condition. At the downstream end of the lock are two sets of concrete stairs with pipe railings that are in good condition. The powerhouse is a single-story concrete structure with a hipped asphalt-covered roof and concrete chimney. It is located on the north side of the lock, between the lock chamber and the adjacent Vischer Ferry Dam. The entry bay is a simple wood screen door with a four-light transom. The structure has nine-over-nine-light wood windows and three-light windows in the eaves. There is some exposed foundation on the riverside that abuts the dam. On the northeast side of the building is a metal and wood-planked platform.
Some of the original electrical 1 Description of current conditions is based on a site visit made by the HAER recording team in summer NEW YORK STATE BARGE CANAL, LOCK E7 AND VISCHER FERRY DAM HAER No. (Page 2) equipment is extant in the powerhouse but is no longer operable, along with 1970s-era machinery. The crane is also extant. The powerhouse is in fair to good condition. The lockhouse is a single-story frame structure clad in clapboard siding that sits on a concrete foundation. It is located on the south side of the lock chamber, and was built after as it does not appear on a map dating to that period.2 The gable-front roof is covered with asphalt shingles and has exposed rafter tails. The entrances are pane-and-panel doors with a gable-front hood with metal brackets.
The fenestration consists of modern one-over-one-light vinyl windows and eight-over-eight-light wooden windows with wood screens. The lockhouse is in good condition. The storehouse, located immediately adjacent to the lockhouse, is a single-story concrete building on a concrete foundation. The hipped roof is covered with asphalt shingles and has decorative exposed rafter tails. The entrance is a pane-and-panel wood door, but the window openings have been infilled. There is a low shed extension with clapboard siding over a frame structure on the end of the storehouse facing the lockhouse. The storehouse is in good condition and is indicated on a map of the site. A storage shed is also located at the site.
This single- story frame structure sits on a concrete foundation and has a gable-front roof clad in asphalt shingles. The building has a hollow door and a wood pane-and-panel garage door. The shed is in fair to good condition. The northeast concrete approach wall exhibits signs of severe spalling and breakage, and there is a rubber bumper along a section of the wall. Concrete-filled cast-iron bollards and modern lighting fixtures are located along the top of the wall. It is in fair to poor condition, as is the northwest approach wall, which is built of steel piers with a concrete surface. A rubber bumper is suspended by a chain. The southeast concrete approach wall shows signs of spalling. It has concrete-filled cast-iron bollards and modern lighting fixtures running its length.
This wall is in fair condition. The southwest approach wall is concrete with severe spalling and cracking and some vegetative growth. It is in poor condition. Finally, the wingwall is built of concrete block, but half the structure is falling into the water. The standing portion shows spalling and breakage. The wingwall is in poor condition. Vischer Ferry Dam (Dam 3) is a fixed-crest dam with a single concrete apron topped by flashboards. A powerhouse, originally operated by the state, is located at the northeastern end. It appears to be in good condition. Noble Whitford described the dam as it appeared in The general design and dimensions were similar to those of Crescent Dam (see HAER No.
He went on to state, the site chosen for this dam was one having two river channels encircling an island of considerable size, which had steep shores and a rock plateau-like top some twenty feet above the river. A dam was built in each of these channels, and 2 Series New York State Archives, Albany, New York, Eastern Division, Erie Canal, Section 2, Sta. 756 to Sta. approved March 29, 13. NEW YORK STATE BARGE CANAL, LOCK E7 AND VISCHER FERRY DAM HAER No. (Page 3) connecting the two sections was a third section across the island, making one continuous crest of nearly two thousand feet. Each section is straight in plan and the trace of the whole structure is roughly that of a reversed letter Z.
The crest of this dam is 36 feet above the apron; its bottom width is 40 feet 6 inches, its top width, 11 feet 5 inches, and the width of its apron, 38 feet.3 History: Construction of Lock E7 and Vischer Ferry Dam (also referred to as Dam 3) was part of Contract 14 and began in October Contract 14 included dredging a channel in the Mohawk River from Crescent to Rexford Flats and building Dam No. 2 at Crescent, Dam No. 3 and Lock E7 at Vischer Ferry, Dam No. 9 and Lock E13 at Yosts, Dam No. 10 and Lock No. E14 at Canajoharie, Dam No. 11 and Lock 15 at Fort Plain, and a retaining dam at Mindenville. Acme Engineering & Contracting Company won the contract, which was under the supervision of Bell, Assistant Engineer with the state.
At Lock E7, work began with site excavation and then construction of two coffers from the lock site to Goat Island. Excavation of the dam then started in early summer Acme Engineering & Contracting Company had 350 men divided into ten teams working eight- hour shifts at the site. By the lock and approaches were almost complete, as well as the gates, buffer beams, and lock equipment, except the valves. Work continued on the dam, whose construction had been divided into sections. The following year, the Annual Report indicates the contractor continued excavation of the prism channel below the lock and installed riprap and wash walls to protect the banks. The lock valves were installed, and the needle dams and lock gates were adjusted.
The earth dam, built with a concrete core wall to form a cut-off south of the lock, had been constructed, and the remaining sections of timber cribs and concrete upper approach walls were underway. Seven head gates were in place to develop power from the excess water at the dam. A guard gate was also installed to protect the canal in case of floods on the Mohawk River. The steelwork for the lift gate was in the process of being erected in The power plant was completed under Contract 92, awarded in to MacArthur Bros. Co. & Lord Electric Co. in The contract called for building three gasoline-electric stations at locks E8, E9, and E10. The stations would supply power to operate the locks and movable dams.
The Annual Report noted that work had not yet started at Lock E8, but it had been completed by 3 Noble Whitford, History of the Barge Canal of New York State (Albany: Lyon Company, Printers, 4 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 83; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 80- 81. 5 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.
1 (Albany: Lyon Company, 6 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, NEW YORK STATE BARGE CANAL, LOCK E7 AND VISCHER FERRY DAM HAER No. (Page 4) Until there was much discussion among canal officials about utilizing the surplus water on the canal.
In the New York State legislature determined that canal waters should not be leased, sold or otherwise disposed of until the canal should be completed, nor thereafter until authorized by a statute which should specify conditions and restrictions to govern such lease or sale as part of Chapter Chapter passed in allowed the state engineer to take control of the canal waters, but utilization of these waters was stymied. Finally, in New York State created the Water Power Commission and granted it the authority to issue licenses for the development of power at places where the State owns the power rights, the license carrying with it the privilege of using such water-power upon the payment of equitable rent.
The Superintendent of Public Works had to certify that any developments on the canal would not hinder navigation, which proved problematic as the Superintendent refused to authorize certificates, arguing it was the job of the Public Works Department to develop water power and should not be granted to private interests. In the legislature transferred the authority to develop water power to the Department of Public Works and appropriated $1 million for the construction of power plants at Crescent and Vischer Ferry dams.8 Various alterations were made to the lock and dam after their initial completion.
At the dam, the Annual Report notes that the state built a commercial hydro-electric plant on the north end of the Vischer Ferry dam with a transmission line that connected the plant to Lock E7. This power plant superseded the original powerhouse at the lock. In the Department of Public Works completed plans and estimates for two new 55' Tainter gates at the Vischer Ferry Dam, along with a footbridge over the tail race and approaches to the gates, estimated to cost Plans were also completed for an additional 8,000-horsepower development at the dam. The electric substation at the powerhouse was converted from kilovolts to 34 kilovolts in which involved installing new transformers, circuit breakers, and insulators, as well as new relays and controls in the power house.
The work was contracted to a local utility that purchased the power produced at the site. The following year, the Annual Report noted an order has been reissued for the rehabilitation of Unit 4 at Vischer Ferry. This is the third phase of a program for rehabilitating water wheels and generators at the powerhouses. Unit 1 at Crescent and Unit 3 at Vischer Ferry was completed. Erection and dismantling is done by state forces; new parts, remachining, and repairs are done by the manufacturer of the original equipment. In the sluice gates at the powerhouse were rehabilitated.9 At the lock, the Department of Public Works replaced the valve rails, installed new pivots and pivot sockets, and scraped and repainted the gates and steelwork.
The lock walls were Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 7 Whitford, 8 Whitford, quote from p. 9 State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: Lyon Company, Printers, 19; State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: 92; State of New York, Department of Public Works, Annual Report, (Albany: 84; quote from New York State Department of Public Works, Annual Report, (Albany: 82; State of New York, Department of Public Works, Annual Report, (Albany: 76. NEW YORK STATE BARGE CANAL, LOCK E7 AND VISCHER FERRY DAM HAER No. (Page 5) resurfaced under Contract No.
M95 in In the lower lock gate was replaced as part of Contract The lock underwent rehabilitation in under Contract