New York State Barge Canal, Lock E8, End of Rice Road, Rotterdam, Schenectady County, NY. Surveyed as HAER NY-383, with a 2,951-word written history.

From the record

“Lock E8, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal.”

Written record, HAER NY-383 survey. Machine-read text.

Surveyed by the federal HAER program as HAER NY-383 · the record runs 2951 words · one of 64 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

2279 words

Source document Quoted word for word from HAER NY-383. Not written, edited or summarised by this site.

Lock E8, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. It is also significant for the movable dam at this site, which is one of the longest on the system. Description: Lock E8 is located 11 miles from Lock E7 on the south side of the Mohawk River.1 Lock E8 is accessed by an asphalt driveway extending from Rice Road. The driveway leads directly to two parking areas: one is gravel for visitors while the asphalt one is for staff. The lock site includes the lock and associated structures, powerhouse, lockhouse, storage shed, movable dam (Dam 4), and spillway. Lock E8 has a 14' lift to the west with normal pool elevations of below and above. The concrete chamber walls have cast-iron quarter-round coping.

There are double-leaf, steel miter lock gates at each end of the chamber, operated by spars and gear trains powered by electric motors. The flow of water through the culverts in the chamber walls is controlled by valves also operated by the electric motors. As is typical of Locks E8 through E15 where flooding was an issue, there are two-story concrete cabins at all four corners of the lock chamber to keep the electric motors and switchgear above normal flood waters. These cabins have flat roofs and steel hinged doors. Aluminum windows face the lock chamber while modern glass block windows with awning windows in the center sections comprise the remainder of the fenestration.

The two cabins on the south side of the lock chamber have sloped metal awnings over the lock control machinery, and there is a modern control panel. A modern steel railing runs along the edge of the lock chamber facing the river as well as the downstream end. Modern reproduction light fixtures illuminate the site. The lock and cabins are in good condition. The powerhouse is a single-story frame structure with a shed roof that sits on a concrete foundation on the south side of the chamber. The powerhouse is clad in shiplap siding and has a concrete chimney. The roof is covered with asphalt shingles. The framed gable entry enclosure has asphalt shingles, shiplap siding, and a wooden door.

At locks next to movable dams, like Lock E8, the powerhouses were equipped with gasoline-powered generators rather than hydroelectric plants to accommodate the lack of head in the off season. Stairs lead to the basement where the generating equipment is stored. This powerhouse is in fair to good 1 Description of current conditions is based on a site visit made by the HAER recording team in summer NEW YORK STATE BARGE CANAL, LOCK E8 HAER No. (Page 2) condition. It is a replacement building since the original powerhouse was removed post-World War II. The lockhouse is a single-story, concrete block building on a concrete foundation that was built from It is located on the south side of the chamber. The roof is covered with asphalt shingles and has clapboard siding in the gable ends.

A frame shed extension at the rear is clad in vertical board panel siding and has an asphalt-shingled roof. The entrances are modern aluminum doors while the fenestration is modern two-over-two-light metal windows with metal mesh storms. The lockhouse is in good condition.3 The storage shed, located near the lockhouse, is a single-story frame building on a concrete foundation with vertical board siding. The gable-front roof is stainless steel. The shed has one- over-one-light aluminum windows. It appears to be in fair to good condition. The approach walls are in various stages of repair. The northeast wall is concrete with a section of cast-iron quarter-round coping; the wall as a whole exhibits evidence of severe spalling and breakage so it is in fair to poor condition.

Concrete-filled cast-iron bollards and modern lighting fixtures are located on top of the wall. The buffer dam alcove is covered with a cross-hatch steel cover. The northwest approach wall has minor spalling and cracks, so it is in good condition. Like the northeast wall, it has concrete-filled cast-iron bollards, modern metal ladders and steel cleats, and modern lighting fixtures. The buffer dam alcove is also covered with a cross-hatch steel cover. The concrete southeast approach wall has steel sheeting and a rubber bumper. Concrete-filled cast-iron bollards and modern lighting fixtures are located on the wall, which is in good condition. Finally, the concrete of the southwest approach wall is severely spalling.

This wall has cast-iron quarter-round coping, concrete-filled cast-iron bollards, and modern metal ladders. The southwest approach wall is in fair to poor condition. The Mohawk River movable dam (designated Dam No. 4) is located next to the lock and extends across the river. The dam has three riveted-steel Pratt trusses supported by concrete piers measuring between abutments. The central span is flanked by spans. The movable dams have steel gate panels and fabricated steel uprights operated by chains hauled by mules (DC electric winches). At Dam 4, the central span has seven panels while the flanking ones each have five. This structure is in good condition. A nearby spillway consists of a concrete slab with a sloped concrete retaining wall over a metal gate.

The spillway directs water around the shore side of the lock and appears to be in good condition. History: Construction of Lock E8 was part of Contract 8, awarded in May to Pittsburg-Eastern Company. The contract encompassed the dams and locks to be located at Scotia, Rotterdam and Cranesville. Fidelity Construction Company began excavation of the lock 2 State of New York, Department of Public Works, Annual Report (Albany: 78; State of New York, Department of Public Works, Annual Report, (Albany: 77. 3 Note that in Hurricane Irene and Tropical Storm Lee washed away the lockhouse. Built in the replacement lockhouse is a hip-roofed clapboard sided building on a concrete foundation. NEW YORK STATE BARGE CANAL, LOCK E8 HAER No.

(Page 3) site in October building a coffer at the north span of the dam, while Pittsburg-Eastern Company began preparations to build the upper guide wall of the lock in The Canal Board suspended Contract 8 on November 28, and cancelled it in March The remaining work was included in Contract 8A, including the construction of the lock and dam, and awarded to The Foundation Company under the supervision of State Assistant Engineer Weigmann. The contractor began assembling and erecting the construction plant in July and poured the first concrete in September. In August the contractor began driving the sheet piling to enclose the lock, but work ceased while the contractor devised a way to protect the old Erie Canal bank.

Work on the dam began in July on the north span of the apron, then on the upper guide and core walls.4 The Canal Board approved an alteration to the original specifications to increase the thickness of the lock floors so they could better withstand upward pressure in April Another alteration was approved in October and called for building the south lock wall on a caisson foundation in order to protect the bank of the old Erie Canal. To construct the river wall, timber cribs with sheeting above the water surface were sunk to act as a cofferdam. Concrete was then poured underwater to form the foundation at about a 12' depth. After the concrete had set, the upper part of the crib was pumped out and the rest of the wall was built in a day.

By early July all of the caisson work had been completed as well as the north abutment of the bridge and adjacent cutoff wall. By October 1, Contract 8A had been completed, even though the contractor had been forced to stop work in January due to flooding.5 The power plant at Lock E8 was built under Contract 92, which called for construction of three gasoline-electric stations at locks E8, E9 and E10 and a hydro-electric power station at Lock E7. The stations would supply power to operate the locks and movable dams. The Annual Report noted that work had not started at Lock E8, but it was completed by Various alterations were made to the lock and dam after their initial completion.

The buffer beam, which originally was swung across the chamber, had been destroyed by ice, according to the Annual Report. Since no labor or material was available to fashion a new one, the Department of Public Works removed the buffer beam from Lock E6, where a guard gate was located nearby, and installed it at Lock E8. The eight movable Mohawk River dams were in dire need of repair by because the steel had become corroded and the chains were crystallized. 4 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 49; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.

1 (Albany: Lyon Company, 60; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 5 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 96; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 73- 74; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 63.

6 Annual Report, Annual Report, Annual Report, NEW YORK STATE BARGE CANAL, LOCK E8 HAER No. (Page 4) In the upper and lower gates were replaced, the lower sill was reconstructed, and a portion of the wall was covered with steel plates as part of an overhaul of the lock encompassed in Contract Another project was undertaken at the lock in when a back channel paralleling the main channel was excavated so that ice could be pushed down this channel rather than the main one in the hopes of relieving serious ice jamming. Finally, in the lock walls were lined with plates as part of Contract A number of alterations were made to Dam No. 4 after its initial completion. In American Bridge Division of U.S.

Steel in New York City won Contract to supply low alloy steel gates for the dam, and in Griffin Wise Company of Mt. Vernon, New York, was awarded Contract to replace the existing gates. Four years later, the Department of Public Works awarded Contract to Washbourne Construction Company of Plattsburgh, New York, which involved repairing the sill and painting the superstructure. A cofferdam was built in to seal the apron of the north span by Perry & Sons, Inc.

of Troy, New York, as part of Contract The reconstruction of part of the apron and the northeast wingwall of pier 5 was done in by Perry Sons under Contract and in they began rehabilitating the protective apron as part of Contract The dam underwent rehabilitation in under Contract It was cleaned, painted, and grouted in (Contract Contract Contract Contract Contract Originally, fixed dams were planned for construction on the Mohawk River. This was problematic as there was a great deal of development along the river and if flooding occurred due to the fixed dams, the state would be responsible for the damage. Movable dams, on the other hand, would allow ice to flow unimpeded down the river and would also achieve cost savings due to the reduced need for dredging and silt removal. David A.

Watt traveled to Europe to study the various dam types and decided upon the bridge type with Boule gates, which he had observed in Mirowicz on the Moldau River (in what is now Czechoslovakia). Noble Whitford devoted a paragraph to describing these structures in his history of the system. These dams, as they now appear in the Mohawk, seem to be bridges with abutments and piers. From the downstream side of the lower chord hang steel frames with heavy upright pieces 15 feet apart, upon which slide an upper and a lower tier of large rectangular steel plates, called gates. When serving as a dam the bottoms of the lower gates rest on a concrete sill in the river bed, the tops of the upper gates forming the crest of the dam.

When more water is to be passed one or more of the upper gates are partly or wholly raised. When all the water is to be passed, in extreme flood or during the winter, all the gates are raised and 7 State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: Williams Press, Inc., 47; State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: Williams Press, Inc., 64; State of New York, Department of Public Works, Annual Report, (Albany: quote from 82; Maintenance Contracts, March 1, August 17, 8 Contracts at Dams, June 23, Maintenance Contracts, NEW YORK STATE BARGE CANAL, LOCK E8 HAER No.

(Page 5) both gates and frames, which have a pin joint connection with the chord, are swung to a horizontal position under the bridge floor.9 These movable dams on the Mohawk River are now one of the character-defining features of the New York State Barge Canal.

Sources

360 words

Source document Quoted word for word from HAER NY-383. Not written, edited or summarised by this site.

Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1.

Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Hay, Duncan. New York State Barge Canal. National Register of Historic Places Registration Form, Maintenance Contracts, March 1, August 17, McFee, Michelle. A Long Haul: The Story of the New York Barge Canal. Fleischmanns, NY: Purple Mountain Press, Series New York State Archives, Albany, New York. Eastern Division, Erie Canal, Section 2, Sta. to Sta. approved March 29, 35. State of New York, Department of Public Works.

Annual Report of the Superintendent for the Year Albany: Williams Press, Inc., 9 Noble Whitford, History of the Barge Canal of New York State (Albany: Lyon Company, Printers, quote from Michelle McFee, A Long Haul: The Story of the New York Barge Canal (Fleischmanns, New York: Purple Mountain Press, NEW YORK STATE BARGE CANAL, LOCK E8 HAER No. (Page 6) Annual Report of the Superintendent for the Year Albany: Williams Press, Inc., Annual Report, Albany: Annual Report, Albany: Annual Report, Albany: Whitford, Noble. History of the Barge Canal of New York State. Albany: Lyon Company, Printers Historians: Laura S. Black and Jami Babb, summer

Written history

211 words

Source document Quoted word for word from HAER NY-383. Not written, edited or summarised by this site.

The Historic American Engineering Record (HAER) is a long- range program that documents and interprets historically significant engineering sites and structures throughout the United States. HAER is part of Heritage Documentation Programs (Richard O Connor, Manager), a division of the National Park Service, United States Department of the Interior. The New York State Barge Canal Survey was undertaken in summer in cooperation with the Erie Canalway National Heritage Corridor (ERIE), Beth Sciumeca, Executive Director. Justine Christianson, HAER Historian, and Duncan Hay, ERIE, served as project leaders. The staff of the New York State Canal Corporation provided access to the sites. Craig Williams of the New York State Museum provided research materials and assistance.

The HAER field team consisted of Jami Babb and Laura Black. NEW YORK STATE BARGE CANAL, LOCK E8 HAER No. (Page 7) Appendix: Images of Current Conditions Image 1: Overview of lock with control stand shelter in foreground and lockhouse and storage shed to right of view. Movable dam is to the rear. Field photograph taken by HAER recording team, summer NEW YORK STATE BARGE CANAL, LOCK E8 HAER No. (Page 8) Image 2: Control stand shelter elevation. Field photograph taken by HAER recording team, summer Image 3: Movable dam. Field photograph taken by HAER recording team, summer

In context

Rotterdam, New York The place record: every map, photograph and survey of this town.
Schenectady County, New York 87 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Rotterdam

5 records

The federal surveyors worked through Rotterdam building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Bradt HouseHABS NY,47-ROT,1-209 words
Schermerhorn HouseHABS NY,47-ROT,2-182 words
Campbell HouseHABS NY-637790 words
Van Slyck HouseHABS NY,47-ROT,3-28 words
Veeder FarmHABS NY,47-ROT,4-23 words

Provenance

  • Written history. Quoted verbatim from HAER NY-383. United States federal work, no copyright under 17 U.S.C. 105.