Lock E8, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. It is also significant for the movable dam at this site, which is one of two on the system that carry vehicular traffic. Description: Lock E9 is located 4.8 miles east of Lock E8 on the north side of the Mohawk River channel.1 It is accessed by an asphalt approach driveway that leads to multiple parking areas, including two asphalt ones for use by visitors and one concrete area next to the lock for the operators. A concrete driveway extends along the lock to a gravel parking area. The access roads and parking lots are in good condition. The site consists of the lock and associated structures, powerhouse, lockhouse, movable dam (Dam 5), and spillway.
The lock has a 15' lift with normal pool elevations of below and above. The concrete chamber walls have been faced with steel plates, and there is cast-iron, quarter-round coping. There are double-leaf, steel miter lock gates at each end of the chamber, operated by spars and gear trains powered by electric motors. The flow of water through the culverts in the chamber walls is controlled by valves also operated by the electric motors. As is typical of Locks E8 through E15 where flooding was an issue, there are two-story concrete cabins at all four corners of the lock chamber to keep the electric motors and switchgear above normal flood waters. The cabins have flat roofs and steel-riveted hinged doors.
Each one has aluminum windows facing toward the lock chamber and modern glass block windows with awning windows in the middle sections facing outward. The cabins on the landward side of the lock chamber have sloped metal awnings over the lock control machinery, and the control panel has been inset into the building. Both the chamber and the cabins are equipped with modern lighting fixtures. They are all in good condition as well. The powerhouse is a single-story frame structure clad in shiplap siding that sits on a concrete foundation, banked into a hill north of the lock to protect the generating equipment from flood waters. The side-gable roof is covered with asphalt shingles and has decorative exposed rafter tails. There is a concrete chimney.
The entrance is a wooden door, and there is an enclosed entry with a gable roof clad in asphalt shingles and walls of shiplap siding with a wooden door that leads to the lower level. The fenestration consists of six-light wooden windows with a metal 1 Description of current conditions is based on a site visit made by the HAER recording team in summer NEW YORK STATE BARGE CANAL, LOCK E9 HAER No. (Page 2) mesh storm window. At the locks next to movable dams, the powerhouses were equipped with gasoline-powered generators rather than hydroelectric plants to accommodate the lack of head in the off season. The building is in good to fair condition.2 The lockhouse is a single-story, concrete block building that sits on a concrete foundation.
It is located on the north side of the lock chamber and was finished in The gable-front roof is covered with asphalt shingles. The entrances are wooden pane-and-panel doors, and the fenestration is one-over-one-light aluminum fixed and hopper windows with metal mesh storm windows. The lockhouse is in good condition.3 The approach walls are in fair to poor condition. The northeast approach wall is concrete and shows signs of severe spalling and breaking. It is lined with concrete-filled cast-iron bollards and modern lighting fixtures. The concrete of the northwest approach wall is also spalling and breaking, although modern lighting fixtures have been installed along with concrete-filled cast- iron bollards.
The section of this wall nearest the lock gate has new concrete with metal coping along the edge. Finally, the southwest approach is concrete, with some metal sheeting covering it and metal coping along the edge. Portions of the exposed concrete are severely spalled, including the section nearest the lock gate. There are five submerged concrete barges near Lock E9 that can only be seen in periods of low water. There are also concrete cribs in such poor condition that they are falling into the water. Dam 5, a Mohawk River movable dam, extends across the river. The dam has three riveted-steel Pratt trusses supported by concrete piers. The dam measures long between abutments with a center section flanked by spans.
The movable dams have steel gate panels and fabricated steel uprights operated by chains hauled by mules (DC electric winches). The center span has seven movable panels while the end ones each have five panels. A riveted steel I-beam bridge spans the length of the dam and serves as a vehicular bridge. Dam 5 is one of only two movable dams on the system (the other is Dam 8 by Lock E12) that carry a roadway. The bridge underwent an extensive rehabilitation in late that involved replacing the original open-grate deck with a concrete one and is consequently in good condition. A nearby spillway consists of a concrete slab with sloped walls. It appears to be in good condition.
It was constructed in to keep the ground from eroding after substantial flood damage in September History: The excavation of Lock E9 and Dam 5 was part of Contract 8, awarded to Pittsburg-Eastern Company. Excavation of the lock and guide walls started in September 2 The powerhouse was destroyed in the flooding caused by Hurricane Irene and Tropical Storm Lee in and replaced in-kind in 3 This modern lock house was equipped with heat, hot water, and sanitary facilities. State of New York, Department of Public Works, Annual Report, (Albany: 81; State of New York, Department of Public Works, Annual Report, (Albany: 77.
The lockhouse was also destroyed in and replaced in with a hip-roofed frame building on a concrete foundation sited further north from the lock and the river than the original one. 4 State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: Lyon Company, Printers, 21. The spillway was swept away in NEW YORK STATE BARGE CANAL, LOCK E9 HAER No. (Page 3) Following the winter break, the contractor began encountering considerable difficulty in making the excavation and in driving the piles on account of the instability of the material. By however, the Annual Report noted that the lock and guide walls and north span of the movable dam were nearly complete and work continued on the lock and approach walls.
During Pittsburg-Eastern Company worked on the embankments and paving, grading spoil banks, placing riprap to protect the banks, and erecting the movable dam s superstructure. The Canal Board suspended the contract on November 28, and cancelled it in March Whitehead-Kales Iron Company (subcontractor in charge of erecting bridges, dam gates, and other structures) continued work under an agreement with the Superintendent of Public Works and completed the steel work. By construction was finished.5 Contract 92 covered the construction of the power plant at the site. Three gasoline-electric stations were installed at locks E8, E9, and E10, while a hydro-electric power station was installed at Lock E7 as part of the contract. These stations provided power to operate the locks and movable dams.
Excavation of the powerhouse substructure had been completed in and the building was finished the following year (aside from painting). The Annual Report noted that the machinery and electrical equipment to operate and light locks E7, E8, E9, and E10, as well as the movable dams, had been finished.6 Various alterations were made to Lock E9 and Dam 5 after their initial completion. In extensive repairs had to be made at the site because both the lock and dam were on piles and a substantial amount of material had washed away. There were additional leaks at the dam, which culminated in a large leak at the north span in due to the disintegration and breaking away of a part of the concrete sill at the west edge of the dam.
To repair the leak, a concrete seal was installed the length of the dam apron. The sills and gates of the lock were rehabilitated in under Contract US89. The upper gates were replaced and part of the upper approach walls were faced in plating in as part of Contract The installation of plating continued the following year under Contract which encompassed the lock chamber and parts of the lower approach walls. It also included installing a new buffer beam and recess. The access road was paved in along with that to Lock E8, part of Contract 5 Quote from Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.
1 (Albany: Lyon Company, 84; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 60; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 63; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 83; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 97. 6 Annual Report, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.
1 (Albany: Lyon Company, 7 State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: Lyon Company, Printers, 5; quote from State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: Williams Press, Inc., 27; Maintenance Contracts, March 1, and August 17, NEW YORK STATE BARGE CANAL, LOCK E9 HAER No. (Page 4) Contract called for the replacement of the lower gates at the dam as well as repair of the substructure of the south span and miscellaneous work. Later work at the dam included Contract which was a purchase order for steel gates that was awarded in September to Bethlehem Steel Company of New York City for just over The lower gates were replaced in by Griffin Wise Company of Mt.
Vernon, New York, under Contract Finally, the substructure of the south span and miscellaneous work was repaired in Originally, fixed dams were planned for construction on the Mohawk River. This was problematic as there was a great deal of development along the river and if flooding occurred due to the fixed dams, the state would be responsible for the damage. Movable dams, on the other hand, would allow ice to flow unimpeded down the river and would also achieve cost savings due to the reduced need for dredging and silt removal. David A. Watt traveled to Europe to study the various dam types and decided upon the bridge type with Boule gates, which he had observed in Mirowicz on the Moldau River (in what is now Czechoslovakia).
In his history of the Barge Canal, Noble Whitford devoted a paragraph to describing these structures. These dams, as they now appear in the Mohawk, seem to be bridges with abutments and piers. From the downstream side of the lower chord hang steel frames with heavy upright pieces 15 feet apart, upon which slide an upper and a lower tier of large rectangular steel plates, called gates. When serving as a dam the bottoms of the lower gates rest on a concrete sill in the river bed, the tops of the upper gates forming the crest of the dam. When m ore water is to be passed one or more of the upper gates are partly or wholly raised.
When all the water is to be passed, in extreme flood or during the winter, all the gates are raised and both gates and frames, which have a pin joint connection with the chord, are swung to a horizontal position under the bridge floor.9 The movable dams on the Mohawk River are now one of the character-defining features of the New York State Barge Canal.