Utica Terminal and Shops, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. It is one of several terminals constructed along the Barge Canal to provide points for freight transfer. In addition, the freighthouse at this site is one of the most intact on the system. Description: The Utica Terminal and Shops are located south of the Erie Canal off an artificial channel fed by the Mohawk River.1 The site is accessed by an asphalt road leading from the intersection of Wurz Avenue and Genesee Street, and there is an asphalt parking area. The site is surrounded by chain link fencing. The terminal has a 587'-long concrete terminal wall in poor condition. Sections of the wall have been blocked off, in fact, due to the danger of the wall collapsing.
Some portions of the terminal wall have cast-iron quarter-round coping. There are also concrete-filled cast-iron bollards. The terminal wall is in poor condition. The maintenance shops are located around the terminal basin. The main shop is a two-story rectangular concrete building measuring 50' x that sits on the south side of the terminal. It contains section offices at the east end and an open-bay space for maintenance activities at the west end. The gable roof is covered with asphalt shingles, and the east gable end has lettering that reads Division of Canals. The fenestration consists of large windows bays on the first story that have been infilled with one-over-one-light vinyl fixed, casement, and awning windows surrounded by vertical board paneling.
The second story and gable end first and second story windows have been filled in with aluminum siding. Steel doors and garage doors provide access to the building. Along with a brick chimney, there is a one-story shed extension on the south side of the building. The extension has been clad in aluminum siding and has one- over-one-light vinyl windows. The building is in fair to good condition. Located southwest of the main building is the carpenter s shop. This one-story rectangular building is also concrete block and sits on a poured concrete foundation. The gable ends feature horizontal board siding and doors at the attic level. Asphalt shingles cover the gable roof. The building is lit by multi-light steel windows, each with awning and fixed sashes.
Many of the 1 Description of current conditions is based on a site visit by the HAER recording team in summer NEW YORK STATE BARGE CANAL, UTICA TERMINAL AND SHOPS HAER No. Page 2 window bays have been filled in. Steel doors, a wood-paneled door, and modern garage doors provide access. The carpenter shop is in fair to good condition. Northwest of the carpenter shop is a modern pole barn, while southwest of the carpenter shop is a small frame tool shed. It is clad in shiplap siding and has a gable roof clad in asphalt shingles. The wood entrance door has a steel-mesh protected window, and there is one other wood window. The tool shed is in good condition. A second tool shed is located south of the main building.
This one is a frame structure clad in vertical board paneling that sits on a concrete foundation. It has a side-gable roof clad in asphalt shingles. The entrance is a hollow metal door. East of the harbor are three additional buildings. The freighthouse is a rectangular 32' x wood-frame one-story building clad in shiplap siding that sits on concrete piers. The gable roof has exposed rafter ends and is clad in asphalt shingles. The building is lit by two-over-two-light wood windows. Some of the window bays have been closed in with vertical boards. Wood sliding freight doors and vertical board doors provide access to the building. A shallow shed overhang and porch are located at the south end of the storehouse.
Although the building is in fair condition, it is one of the most intact freighthouses on the system and is original to the site as it appears on a map.2 A ten-bay garage is located southeast of this freighthouse. The one-story frame building is clad in corrugated-metal siding. Asphalt shingles cover the gable roof, which has exposed rafter ends. The window bays have been infilled with wood. Pane-and-panel garage doors punctuate the side facades. The building is in fair to good condition. South of the garage is the oil house. This one-story concrete building has a gable roof of corrugated metal. Multi-light steel windows have steel mesh protective covers, as do the single lights in the building s steel doors. The oil house is in good condition.
History: The Utica Terminal was constructed under Contract 15, originally awarded to Albert M. Banker on January 8, but transferred to Eastover Construction Company in The work was performed under the supervision of John R. Baxter, State Supervising Engineer. The contract covered the excavation of linear feet of channel, the construction of a lock and approaches at the junction of this terminal channel with the Barge Canal as well as the Utica Dam, and other work. Excavation began in April Drainage of the terminal site was completed under Contract in by Mohawk Dredge & Dock Company, Inc. The brick pavement, curbing, and catch basin were built under Contract awarded to Harry W.
Roberts & Company on April 19, 2 Series New York State Archives, Albany, New York, Middle Division, Erie Canal, Section 5, approved November 21, 5A. 3 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Noble Whitford, History of the Barge Canal of New York State (Albany: Lyon Company, Printers, NEW YORK STATE BARGE CANAL, UTICA TERMINAL AND SHOPS HAER No. Page 3 In addition to the terminal, the site soon expanded to include section shops for repair and maintenance of the Barge Canal and its floating plant.
The frame freighthouse was constructed along with one at Rome under Contract by William R. Kimmey. The contract was let on March 14, Additional buildings were added to the site. The Annual Report states that a 50' x shop was built for repair work (the main shop), and that the old warehouse would now be used for canal freight. Fencing was installed at this terminal under Contract in The carpenter shop was erected in and the canal shops were also rehabilitated that year with facilities added for female employees. In waterlines and a fire protection system were installed under Contract