Lock E29, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. Description: Lock E29 is located on the north side of an artificial island formed between the canal to the north and the Enlarged Erie Canal emptying into Ganargua Creek.1 The lock is accessed by an asphalt road extending from West Main Street to a single-span plate girder pony bridge that crosses the bypass channel south of the lock. This bridge sits on concrete abutments and has an open-grate deck. A plaque reads: Built by the Phoenix Bridge Co. Phoenixville, PA USA The access road after the bridge and extending to the lock is gravel.
The site consists of the lock and associated structures, powerhouse, lockhouse, boat tender shop, storage shed, Mud Creek Aqueduct remains, spillway, and park. Lock E29 has a 16' lift to the west with normal pool elevations of below and above. The concrete chamber walls are severely spalled, and some retain the cast-iron quarter-round coping. There are double-leaf, steel miter lock gates at each end of the chamber operated by spars and gear trains powered by DC electro-mechanical gate machinery. The flow of water through the culverts in the chamber walls is controlled by valves also operated by DC electro- mechanical machinery. Control stand shelters are located on the south side of the chamber at the upstream and downstream corners.
These are single-story frame buildings with horizontal fiber- cement siding and gable-front asphalt roofs. Each has sliding vinyl windows and pane-and-panel doors. Concrete-filled cast-iron bollards on concrete pads line the chamber walls, while pipe railing surrounds the public access side of the lock. Historic light fixtures illuminate the site. The lock is in fair condition while the control stand shelters are in good condition. A truss utility/pedestrian bridge spans the downstream end of the lock and is in good condition. Concrete stairs at the northeast end of the lock have pipe railings. They are severely spalled with significant breakage and were closed off at the time of the recording team s visit for repairs. The stairs are in poor condition.
The powerhouse is located at the west end of the island. It is a single-story elongated concrete building on a concrete foundation that spans the bypass channel. The foundation has three openings on the upstream side and one on the downstream side that discharge water into the tailrace. The hipped roof is covered with asphalt shingles and has a brick chimney. The 1 Description of current conditions is based on a site visit by the HAER recording team in summer NEW YORK STATE BARGE CANAL, LOCK E29 HAER No. Page 2 fenestration consists of nine-over-nine-light wood windows, many of which have been closed in with shiplap siding and plywood. The window bays under the eaves have also been closed.
A large wood double door with a four-light transom provides access to the powerhouse, which is in good condition. The lockhouse is a single-story concrete building on a concrete foundation located on the south side of the chamber. The hipped roof is covered with slate shingles, and there is a brick chimney. The eight-over-eight-light wood windows have been covered with steel mesh coverings, and there are three-light wood basement windows. The entrances are wood pane- over-panel doors with a modern gable porch over one door and a gable hood over the other. A small modern shed has been built on the west side of the building. The lockhouse is in good condition. A modern storage shed is located on the opposite side of the chamber from the lockhouse.
The shed is a single-story frame building with vertical board siding. The offset side-gable roof is covered with asphalt shingles. There are awning windows and wood doors. The shed is in good condition but is non-contributing due to its recent construction. To the west of the lock and powerhouse is the buoy tender shop. The single-story concrete building is on a concrete foundation. The gable-front roof is covered with asphalt shingles and has a concrete chimney. Shiplap siding is located in the gable ends. There are four-light and two-light steel windows with internal steel mesh coverings and a pane-and-panel wood door. A modern trailer sits next to the shop, which is in good condition. The guide walls are generally in fair condition, aside from the northeast one.
The concrete of the northwest guide wall shows signs of severe spalling and breaking in areas. Concrete-filled cast- iron bollards on concrete pads are set back from the wall s edge. Historic light fixtures illuminate this guide wall, and there is a small wood dock. The northeast guide wall is in poor condition, although metal facing has been installed on the lower section as part of a repair effort. A single concrete-filled cast-iron bollard is located on this guide wall. The southeast guide wall is also spalling. It is lined with concrete-filled cast-iron bollards and historic lighting fixtures. Finally, the southwest guide wall is comprised of spalling and breaking concrete. There are concrete-filled cast-iron bollards, modern utility hook-ups, and historic lighting fixtures.
South and west of the lock is the Mud Creek Aqueduct (also called the Ganargua Creek Aqueduct), whose intact sections include three stone arches. The aqueduct dates to and originally carried the Enlarged Erie Canal. A nearby spillway drains water from the canal into Ganargua Creek. Constructed as part of the Barge Canal construction, the spillway has two aprons, the top concrete and the bottom stone from the original aqueduct. The spillway is in good condition, as are the remnants of the aqueduct. A boat launch consisting of a gravel ramp is located at the downstream end of the lock. The nearby Aqueduct Park has modern restroom facilities, a pavilion, and a playground. NEW YORK STATE BARGE CANAL, LOCK E29 HAER No.
Page 3 History: Lock E29 was built as part of Contract 77, awarded in December to T.A. Gillespie Company of New York City. The contract covered miles from a point mile east of Port Gibson to mile west of Palmyra. Work at the site began on February 23, with excavation for the lower approach walls and lock. The concrete mixing plant was next built, and concrete work started on July 19, By the concrete work was nearly complete, and the steel work was finished.2 The power plant was part of Contract 94, awarded to MacArthur Brothers Co. & Lord Electric Co. of New York City on February 17, This contract covered the power plants and electrical equipment and machinery for operating and lighting locks E26, E27, E28A, E28B, E29, E30, E32, E33, E34, E35, and guard locks.
During that year, the Annual Report stated that the reinforced concrete sidewalk on the upstream side of the powerhouse was in place, as were the crane rail and capstan controller cabinets. The gate and valve machinery and motors had been assembled and placed, along with the generator and switchboard and gate and valve controller cabinets. The turbines had been delivered to the site and assembled and placed in the powerhouse, as well as the governors, pumps, and wiring.3 Spring floods undermined the first powerhouse, and it collapsed into the tailrace in Contract 141 was awarded in to Maas & Son and signed on March 18, to build a new one. Work began on April 2 by removing the old powerhouse with dynamite.
The contractor then excavated for the two upper wing walls, built them, and started excavating the foundation. Contract 193 covered the completion of this structure.4 Later additions and alterations were made to the site. In a new concrete lockhouse (described in the Annual Report as an office and shop building) was built to replace the frame structure.5