Lock O7, located on the Oswego Canal, is a component of the nationally significant New York State Barge Canal and is typical of the lock sites built along the canal system. Description: Located mile north of Lock O6 on the east side of the Oswego River, Lock O7 is accessed from East River Road by an asphalt-covered driveway and steel I-beam bridge that lead to an asphalt parking lot.1 The bridge sits on concrete spalled abutments. The lock site consists of the lock and associated structures, lockhouse, storage building, powerhouse remnant, and Varick Dam. The lockhouse sits on the riverside of the lock chamber on Leto Island. The single-story wood- frame structure on a concrete foundation was constructed in to replace the concrete-block one.
The gable roof is covered with asphalt shingles while the gable ends have horizontal board infill. One-over-one wood windows punctuate the walls. The entrance is a wood pane-and-panel door. The structure is in good condition. The storage shed, located to the rear of the lockhouse, is a single-story frame structure on a wood foundation. The gabled roof is offset and is covered with asphalt shingles and horizontal wood siding. It has a plywood door. The storage shed is also a replacement building dating to At the northeast corner of the lock is a remnant of the powerhouse consisting of a concrete foundation. A valve set in the concrete platform was for a feed-gate. The powerhouse was removed in the The lock has a lift to the south with normal pool elevations of below and above.
The chamber walls are faced with steel plate. There are double-leaf, steel miter lock gates at each end of the chamber. Valves in culverts within the chamber walls control the flow of water into the chamber. The valve and gate operating machinery has been replaced by hydraulic operators. The lock machinery is covered with cross-hatch, diamond-plate, and open-grated machine covers. Riveted-steel machinery electrical cabinets are at each corner of the lock. Control panels are located on the side of the cabinets and are not covered by any sort of shelter. 1 Description of current conditions is based on a site visit made by the HAER recording team in summer NEW YORK STATE BARGE CANAL, LOCK O7 HAER No.
(Page 2) The capstans are located on a raised concrete platform surrounded by a steel railing and open grates. Concrete-filled cast-iron bollards on concrete pads line either side of the chamber. Post- and-rail fencing and pipe railings surround the public access side of the lock, and it is illuminated by modern light fixtures. The lock appears to be in good condition. At the northeast end of the lock is a stairway consisting of concrete abutments and open-grated steps and lined with pipe railings. The stairway is in good condition. The guide walls are generally in good condition, aside from the northeast one which is severely spalling and breaking. Concrete-filled cast-iron bollards line this wall. The section nearest the lock gate is concrete with wrought-iron sheeting.
It is in fair condition. The northwest guide wall is concrete with wrought-iron quarter round coping and is lined with concrete-filled cast- iron bollards. A concrete spillway with a steel grate that is in good condition is part of this wall. The southeast guide wall appears to be of new concrete. Concrete-filled cast-iron bollards are set away from the wall, along with modern lighting fixtures and a small modern guide light at the end. Two concrete cribs with concrete-filled cast-iron bollards extend past the wall and cut off the basin next to the lock. Finally, the southwest guide wall extends to Leto Island. This appears to be of newer concrete. There are concrete-filled cast-iron bollards and modern street light lighting fixtures along the wall.
The section nearest the lock gate is concrete with wrought-iron sheeting. Varick Dam has a long curved crest with double aprons. Flashboards are located along the top of the dam. The eastern abutment is a continuation of the southwest approach wall of Lock O7. There are two gates located at the west end of the dam, which are accessible via a gravel road along Leto Island from Lock O7. The dam is in good condition. History: The original construction of Lock O7 was part of Contract No. 35, awarded in to Gilmour-Horton-Allen Company. The contract covered excavation of the canal, construction of locks 7 and 8, and other work. The contractor started in October, but their poor success with their coffer-dams and their failure on several occasions resulted in months of delay.
Despite the coffer dam problems, the contractor had completed Lock O7 in The power plant was part of Contract 90, awarded to D Olier Engineering Company in April There were various alterations made to the original contract, which was for furnishing and installing the equipment needed to operate and light the locks. Alteration 4 eliminated the incomplete work at locks O2, O7, and O8 where the concrete work had not yet been completed and shifted the remainder of the work to Contract 90A. This was awarded in August to Lupfer & Remick who subcontracted much of the actual construction work.
The specifications noted the contract was for the furnishing and equipment of a hydro-electric power plant at lock 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, quote from p. Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, NEW YORK STATE BARGE CANAL, LOCK O7 HAER No. (Page 3) No. 7, electric capstans at locks Nos. 7 and 8 and transmission lines, arc light poles and arc lights between lock No. 8 and the power plant at lock No. 7.
3 Repairs and alterations were made to the lock after its initial completion. In Contract US101 for the sills and gates was let. The Annual Report indicates the Department of Public Works was planning on embarking on a long-term project to lower approximately thirty- two lock sills so as to provide a minimum 13' depth and altering the lock gates to fit. The contract may have been related to this effort. Two years later, in repairs were made at the lock. Another rehabilitation was undertaken at the lock in Contract involved repairs to the upper approach walls while the lock itself was rehabilitated under Contract and Contract the following year.4