Carbon County, Pennsylvania - Chapter 12: Steam and Electric Eaileoabs, 1913

From History of Carbon County, Pennsylvania;, published 1913. 1,505 words, reproduced complete and unedited. Source changes inside the text are labelled in place.

The text

1,505 words

Machine-read from scans of History of Carbon County, Pennsylvania;, published 1913. Nothing has been corrected: fixing what looks like a misspelled name is how an invented one gets published. Source changes are marked where they occur.

The first railroad in Carbon county, and the first of any importance in the United States, was the Switchback, extending from Mauch Chunk to Summit Hill. As is well known, this was built as a gravity road, and is still in existence.

The Beaver Meadow Railroad was the first within the limits of the county employing steam as' motive power. It is now a part of the Lehigh Valley system. The Beaver Meadow Railroad and Coal Company was incorporated on April 13, 1830.

According to the provisions of its charter, the company was empowered to build a railroad from the Beaver Meadow Mines, in what is now Banks township, to the Lehigh river, at, or near, Mauch Chunk, a distance of about twenty miles.

Various difficulties beset the projectors of the enterprise, chief of which appears to have been their own lack of confidence in the feasibility of the undertaking.

Canvass White, who had been one of the principal engineers in the building of the Erie Canal, and Ario Pardee, later a millionaire coal operator of Hazleton, surveyed the route, which followed the windings of Beaver, Hazle and Quakake creeks to the Lehigh.

Trouble with the Lehigh Coal and Navigation Company concerning tolls on the canal led to the determination on the part of those building the railroad to extend the line to Easton. The tracks had already been

The railroad was opened for transportation in the fall of 1836, and Parryville was made the shipping point. It so remained until 1841, when the memorable freshet carried away all the bridges from Weatherly to the end of the line, and Maucli Chunk became the terminus, below which the road was abandoned.

In 1860 another heavy flood occurred, carrying away a number of bridges, together with the shops of the company at Weatherly and Penn Haven.

The road gained rapidly in business, however, as the mines tributary to it were developed, and it grew steadily more prosperous until absorbed by the Lehigh Valley Railroad in 1866.

The Lehigh Valley Railroad, which was the first to be constructed through the length of the region from which its name is derived, had its inception in the efforts of a few enterprising and far-seeing men in Lehigh and Northampton counties, while being brought to completion and successful operation principally through the labors and determination of Asa Packer, its former president and the architect of its greatness.

In May of that year the stock of the company was offered for subscription; but capitalists seemed to have little faith in the project. Although the promoters of the enterprise were active, it was not until August, 1847, that enough stock had been subscribed to warrant a start being made. Five thousand shares had then been taken, on each of which an instalment of five dollars had been paid. At the first election of officers, held on October 21, 1847, James M. Porter was chosen as president.

Little had been done beyond securing the right of way, when, on April 4, 1851, Asa Packer became a member of the board of managers. This was just seventeen days before the charter would have expired by limitation, and soon thereafter a mile of road-bed was graded near Allentown to forestall this embarrassment. In the following October Mr. Packer purchased nearly all the stock which had been subscribed and took steps to obtain the additional money required to finish the road, which proved to be a difficult task.

He secured the services of Robert H. Sayre, who had prior to this held a responsible position with the Lehigh Coal and Navigation Company, as chief engineer.

The line between Easton and Allentown was finished and placed in operation on June 11, 1855. Two trains were run daily between these points from that date, and during the month of September the road was completed to Mauch Chunk.

In the begining, all the rolling stock was leased from the Central Railroad of New Jersey, but before the close of 1855 a passenger locomotive and four coaches were purchased. At the close of three months, receipts from the passenger service were larger than had been anticipated, while the earnings from carrying coal and other freight were kept down from the want of cars.

Notwithstanding that the company sustained heavy damages as a result of the great freshet of 1862, the career of the road was one of steady growth and expansion, and before the close of the decade it had gained control of connecting roads in the Lehigh and Schuylkill regions and had effected an entrance to the Wyoming Valley, whence the line was extended northward to the state line of New York.

In 1866, the Lehigh and Mahanoy Railroad was merged with the Lehigh Valley. This comprised the stretch of road from Black Creek Junction, near Weatherly, to Mt. Carmel, a distance of forty miles.

That portion of the line lying in Carbon county, and now a part of the Mahanoy Division of the Lehigh Valley Railroad, was first graded by the Morris Canal and Banking Company, about 1837. The road had scarcely been completed and placed in operation when the company failed, and the rails were taken up and shipped to Pottsville. The Quakake Valley Railroad, incorporated in 1857, relaid the tracks during the following year, and the road was operated tributary to the Catawissa, Williamsport and Erie Railroad for a time. Its name was changed to the Lehigh and Mahanoy Railroad in 1861.

A branch extending from Lizard Creek Junction to Pottsville was completed in 1890. The Hay's creek ''cut-off," extending from Ashmore, near Hazleton,

Asa Packer remained the president of the company, though not continuously, until his death in 1879. He lived to see the Lehigh Valley become one of the foremost railroads of the state, more than fulfilling his fondest expectations, and fully compensating him for the trials and discouragements which he encountered in its building and extension.

The railroad to-day occupies a commanding position among the anthracite coal carriers, and is one of the leading trunk lines between New York and the Great Lakes.

The Nesquehoning Valley Railroad Company, the line of which extends from Nesquehoning Junction, near Mauch Chunk, to Tamanend, Schuylkill county, a distance of nearly seventeen miles, was organized on May 14, 1861.

This road was built principally to carry the output of the mines of the Lehigh Coal and Navigation Company, receiving the traffic which formerly passed over the Switchback Railroad and the gravity road from Nesquehoning to Mauch Chunk.

The immediate cause of the building of the Lehigh and Susquehanna Railroad was the freshet of 1862, resulting in the almost complete destruction of the Lehigh Canal between Mauch Chunk and White Haven. It was generally believed that the giving way of the dams on this portion of the canal was largely respon-

In lieu of this right the assembly of Pennsylvania granted the Lehigh Coal and Navigation Company a charter for a railroad from Maucli Chunk to White Haven, connecting with a road which had previously been built from the latter place to Wilkes-Barre.

Later, the comj^any was authorized to build the road to Easton. A¥hen completed, this railroad supplanted the canal above Maucli Chunk, while largely relieving its overburdened condition below that point.

In 1871, the Lehigh and Susquehanna Railroad was leased to the Central Railroad of New Jersey, being still operated by the latter company on this basis.

In 1861, a stretch of railroad was built by the Lehigh Coal and Navigation Company from Hanto to Tamaqua. This connects with the various collieries of that company in the Panther Creek Valley.

With a view to providing an independent outlet for its coal to th.e eastern markets, this company, in 1912, completed a line of railroad extending from Tamaqua through the Lizard Creek Valley and on to Daniel sville, Northampton county, connecting there with the Lehigh and New England Railroad. This latter road is also controlled by the Lehigh Coal and Navigation Company.

The Chestnut Ridge Railway, reaching from Palmerton to Kuukletowu, Monroe county, was built in 1898. It is a little more than ten miles in length, and is now owned by the New Jersey Zinc Company of Pennsylvania.

The first electric railway in the county was built by the Carbon Transit Company, wTiich was incorporated in 1892. Its line originally extended from Mauch

Chunk to East Mauch Chunk. In 1901, the road was built to the Flagstaff, and during the following year it was constructed to Lehighton. This company has been several times reorganized, and is now known as the Carbon Street Railway Company.

The Lehigh Traction Company, operating a line which passes through Jeanesville and Audenried on its way between Hazleton and McAdoo, was chartered in 1892.

The Tamaqua and Lansf ord street railway originally extended from Summit Hill and Lansford to Tamaqua. It was built by the Lehigh Coal and Navigation Company. In the fall of 1902 the road was opened to Mauch Chunk. It is now conducted by the Eastern Pennsylvania Railways Company.