BlockBefore

Washington County, Pennsylvania - Chapter 33: Internal Improvements, 1882 (part 2 of 2)

From History of Washington County, Pennsylvania : with Biographical Sketches of Many of Its Pioneers and Prominent Men, published 1882. 12,600 words, reproduced complete and unedited. Source changes inside the text are labelled in place.

Parts

The book prints this as one long chapter. It is split here so no single page grows too heavy to load; the text runs continuously across the parts and nothing is omitted.

The text

12,600 words

Machine-read from scans of History of Washington County, Pennsylvania : with Biographical Sketches of Many of Its Pioneers and Prominent Men, published 1882. Nothing has been corrected: fixing what looks like a misspelled name is how an invented one gets published. Source changes are marked where they occur.

In 1817 the Assembly passed an act (approved March 24th of that year) "to authorize the Governor to incorporate a company to make a lock navigation on the river Monongahela," to bear the name and style of "The President, Managers, and Company of the Monongahela Navigation Company." The act appointed Andrew Linn, Esq., and Hugh Ford, of Freeport ; James Tomlinson, Elisha Hunt, George Dawson, William Hogg, Jacob Bowman, Basil Brashear, Joseph Thornton, and Israel Miller, of Brownsville; James W. Nicholson and Thomas Williams, Esq., of New Geneva ; Charles Bollman, Joel Butler, and James P. Stewart, of Williamsport (now Monongahela City) ; Henry P. Pearson and Joseph Alexander, of Fredericktown, in the county of Washington, with seven gentlemen of Allegheny County and two of Greene County, to be commis.sioners to open books for subscriptions to the stock of the company at Pittsburgh and other points along the river. The capital stockof the company to be seventy-eight thousand dollars, in two thousand six hundred shares of thirty dollars each. As soon as five hundred shares should be subscribed the Governor was directed to issue the charter of the company, and it was enacted "that as soon as a company shall have been incorporated by the Governor to make a lock navigation on the Monongahela River, he is hereby authorized and required to subscribe in behalf of this commonwealth for one thousand shares of the stock of said company at thirty dollars for each share, to be paid upon warrants drawn by the Governor on the State Treasurer in favor of the President and Managers of said company."

By the terms of the act of incorporation, the company was required, in making their improvements on the river, " to erect at Bogg's ripple a dam of the height of three feet six inches ; at Braddock's lower ripple, a dam of the height of three feet six inches; at Braddock's upper ripple, a dam of the height of three feet six inches ; at Peters Creek ripple, a dam of the height of four feet two inches ; at Baldwin's ripple, a dam of the height of four feet three inches ; at Frye's ripple, a dam of the height of three feet ten inches ; at Forsyth's ripple, a dam of the height of three feet eight inches ; at Brownsville ripple, a dam of the height of four feet six inches ; at Smith's ripple, a dam of the height of four feet eight and a half inches ; at Heaton's ripple, a dam of the height of four feet five inches ; at Muddy Creek ripple, a dam of the height of four feet five inches ; at Gilmore's ripple, a dam of the height of three feet ten inches; at Little Whitely ripple, a dam of the height of four feet four inches ; at Geneva ripple, a dam of the height of three feet four inches ; at Dunkard ripple, a dam of the height of three feet six inches; and at Cheat River ripple, a dam of the height of three feet three inches," with the privilege of raising any or all the dams not to exceed six inches above the specified height, if it should be found necessary to do so. Owners of dams which had been erected at certain points on the river for mill purposes prior to the passage of the act were required to raise such dams to the specified height (if tliey were not already up to it), and to keep them in repair ; and for so doing they were empowered to collect tolls from boats and other craft passing them.

The company was required, under penalty of a forfeiture of their charter, to " proceed to carry on the said work" within five years from the date of the act, and to complete the slack-water navigation of the first section - from Pittsburgh to the mouth of Dunlap's Creek - in seven years thereafter, and to complete the second section - from Dunlap's Creek to the mouth of Cheat River - in twenty-five years from the passage of the act. These conditions were not complied with, and forfeiture resulted in 1822. Beyond this fact, nothing has been found to show what was the extent of the operations of the old Monongahela Navigation Company during its existence, except that the books were opened in August, 1817 ; that the Governor of Pennsylvania subscribed on behalf of the Commonwealth for one thousand shares of the stock as required, subscriptions having previously been received from individuals sufiicient in amount to authorize the chartering and organization of the company under the act. It is evident that the amount of its capital stock, if fully subscribed and paid in, was insufficient for the purposes intended, and that even if the projected improvements had been completed, as specified in the act, they would have been wholly inadequate to the requirements of navigation on the Monongahela.

In the spring of 1822, a few days after the expiration of five years from the passage of the act authorizing the Monongahela Navigation Company, an act was passed by the Assembly (approved April 2d of the year named) taking the improvement of the Monongahela into the hands of the State, and providing " That Solomon Krepps and Joseph Enochs, of Fayette County, and William Leckey, of Pitt-sburgh, be and they are hereby appointed commissioners, who shall have power, and it shall be their duty, to cause to be removed all obstructions which impede or injure the navigation of said river Monongahela, by making a slope or inclined navigation from the Virginia State line to its junction with the Allegheny River, and said improvement to commence at the mouth of Dunlap's Creek in Fayette County, and for that purpose to employ suitable persons to perform said work ;" and " That ten thousand dollars of the stock subscribed by the Governor on behalf of this Common- wealth in the stock of the Monongahela Navigation Company be and is hereby appropriated to defray the expenses of removing the said obstructions. . . ."

By another section of the act it was provided and declared " That this act shall not go into operation until the Monongahela Navigation Company shall have first settled all accounts of said company, . . . and until the Monongahela Navigation Company shall also have relinquished their shares in the stock of said company, as well those held by individuals as those held by companies, which relinquishment shall have been certified and transmitted under the hand and seal of the president and managers of said company, or a majority of them, to the Governor, stating that they relinquish all the rights, powers, and privileges in and to the navigation of the river Monongahela vested in them by an act passed the 24th of March, 1817, entitled ' An act to authorize the Governor to incorporate a company to make a lock navigation on the river Monongahela,' and from thenceforth said company shall cease and determine as if the said act had not been passed."

The persons appointed as viewers and commissioners to examine the work done on the river by the first-named commissioners, and to report to the Governor whether or not, in their opinion, the money granted by the State had been judiciously expended, were John Brownlee, of Washington, Henry Heaton, of Fayette, and John Walker, of Allegheny County. Nothing has been found showing the nature and extent of the improvements made by the commissioners under this act, or how much the navigation of the Monongahela was benefited by them, but it is evident that the expenditure of the small sum of ten thousand dollars on more than ninety miles of river channel could not have produced any very great results.

A supplement to the act of April 2, 1822, for the improvement of the Monongahela by the State, was passed and approved March 29, 1823. One of the sections of this supplementary act provided that all persons owning dams and locks on the Monongahela, which vfere built or begun to be built, or raised to the required height in pursuance of the provisions (before mentioned) of the act of 1817, authorizing the incorporation of the Navigation Company, might petition the Governor, setting forth the facts, whereupon the Governor was required to appoint three commissioners to view such locks and dams, and upon their report to the Governor that the improvements had been constructed agreeably to the terms of the act, he was required to grant to the owners of such improvements authority to collect tolls from all boats passing such locks and dams.

In 1828 a report was made to the Assembly of Pennsylvania, giving the result of a survey of the river by E. F. Gay, and favoring its improvement by the State, but nothing was done. In 1832 the late Hon. Andrew Stewart made an eflx)rt in the Congress of the United States to have the work done by the national government, as an extension, under the act of 1824, of the improvement of the navigation of the Ohio to the National road at Brownsville. Congress provided for a survey of the river to Brownsville, which was made in 1833 by Dr. William Howard, United States civil engineer. His plan was to build locks and low dams, eight in number, of four and a half feet lift, except that No. 1 would be six feet, the object being to use them only when the river was low. Congress having declined to authorize the work, a public meeting held at Waynesburg, Greene Co., Nov. 18, 1835, recommended and urged the improvement by the State. The movement was at once seconded by the citizens of Pittsburgh, Brownsville, and Williamsport, and legislation was sought and obtained.

The actual improvement of the Monongahela by the formation of a practical slack-water navigation was finally accomplished by the Monongahela Navigation Company (second of that name and style), which was incorporated under an act of Assembly approved March 31, 1836, with an authorized capital of $300,000, in six thousand shares of $50 each, with power " to increase the number of shares to such extent as shall be deemed sufiicient to accomplish the work."

The persons appointed as commissioners to receive subscriptions to the stock were Thomas H. Baird, Aaron Kerr, Ephraim L. Blaine, William Briant, Sheshbazzer Bentley, Andrew Gregg, John Bowers, William Vankirk, Samuel Beatty, William Hopkins, and James Gordon, of Washington County ; George Dawson, Benedict Kimber, George Hogg, James L. Bowman, Israel Miller, David Gilmore, E. P. Oliphant, Jeremiah Davison, Thomas Wilson, Tazewell P. Martin, George Cramer, Yates S. Conwell, Thomas Beatty, Aaron Bucher, John Harshe, Andrew Stewart, Samuel Evans, Isaac Crow, George Vance, James C. Etington, Robert Brown, James C. Ramsey, David B. Rhoads, William Everhart, Westley Frost, and Samuel J. Krepps, of Fayette County ; and a number of 'gentlemen of Greene and Allegheny Counties. When two thousand shares were subscribed the company was entitled to a charter, and might organize in not less than twenty days. Upon organization the company was empowered " to form and make, erect and set up any dams, locks, or any other device whatsoever which they shall think most fit and convenient to make a complete slack-water navigation between the points herein mentioned, to wit : the city of Pittsburgh and the Virginia State line; and that the dams which they shall so construct for the purpose of slackwater navigation shall not exceed in height four feet six inches; and that the locks for the purposes of passing steamboats, barges, and other craft up and down .said river shall be of sufficient width and length to admit a safe and easy passage for steamboats, barges, and other craft up as well as down said river." This act, like that which was passed for the creation of the old company in 1817, authorized the company to use, lease, or sell the water-power from the dams, and conferred on the individual owners of dams previously built (if by them raised to the required height) the right to collect toll from boats passing down or up the river. By the terms of the act the company w.is required to commence work within five years, and to complete the improvement to the Virginia line within twelve years from its passage, under peualty of forfeiture of charter.

During the year 1836 sufficient stock was subscribed to authorize the issue of a charter early in 1837, and on the 10th of February in that year the company was organized by the election of officers, as follows:

By the sixth section of the State act of Feb. 18, 1836, chartering the United States Bank, it was required, among other burdens imposed, to subscribe to the stock of this company, then in prospect, $50,000 at the opening of its books, and .f.50,000 more when $100,000 of stock from other sources should have been expended on the work. The State, by act of April 14, 1838, subscribed $25,000 in stock, and by act of June 11, 1840, $100,000 more.

In the summer of 1838 a careful survey of the river was made by an engineer corps, at the head of which was W. Milnor Roberts (afterwards engineer of the Northern Pacific Railroad, and now or recently engaged in the service of the Brazilian government), with Nathan McDowell and Robert W. Clarke, assistants.

From Pittsburgh to Brownsville was found to be about Soj miles, and the ascent a little over 331 feet; from Brownsville to the Virginia line, a little over 35 miles, ascent 41 feet; totals, 90i miles, and 74J feet. This would have required seventeen dams of four and one-half feet lift, - one, on an average, for every five miles, - thereby causing delays and tolls which would have been unendurably vexatious, and an expenditure in construction and attendance which would have made the work wholly unremunerative. Besides, on some of the ripples the fall was three and four feet, and one, at the mouth of Cheat River, six feet. It was soon seen that this plan must be abandoned. Accordingly the Legislature, by a supplemental act, approved June 24, 1839, authorized the company to construct the dams eight feet in height from pool to pool.

The supplemental act also repealed that section of the original act which gave to individual owners of dams on the river the right to collect tolls from boats, in consideration of constructing or raising their dams to the required height and keeping them in repair, the adoption of the later plan of higher lifts rendering these dams useless to the navigation.

At first it was thought that ten dams of eight feet in height would be required to carry the work to the State line (five below and five above the mouth of Dunlap's Creek), but by an authorized increa.se of dam No. 4 to ten feet, and those above Brownsville (three in number) to whatever height the banks would allow, it was found that seven would be suflicient.

Dam and lock No. 1, a mile above Smithfield Street bridge, Pittsburgh, was let by contract, Dec. 17, 1838, to J. K. and J. B. Moorhead. No. 2, at Braddock's upper ripple, was contracted (re-let), May 17, 1839, to Coreys and Adams. Both these dams were put in use Oct. 18, 1841, though neither was entirely completed at the time.

On the 15th of July, 1840, lock and dam No. 3, at Watson's Run, two miles above Elizabeth, was let to Bills & Foreman ; and No. 4, at Frey's Shoals, to Fen- Ion & Patton (changed in construction to Fenlon & Lonergan). The work was under the general direction of Chief Engineer Roberts. Tlie construction of Nos. 3 and 4, from the commencement of work until May, 1841, was under the personal supervision of George W. Cass. In the contract for No. 4, the company, to provide against a (not improbable) lack of funds, reserved the right to stop the work at any time, paying for what had been done. In May, 1841, for the cause which had been foreseen, they were obliged to avail themselves of this right, and for the same rea.son work on No. 3 was suspended at the same.time.

The year 1842 brought great discouragement to the company. The United States Bank broke, and failed to subscribe and pay its second $50,000. Of the second ($100,000) subscription of the State, the company was compelled to receive a large portion in State bonds, and having received them were compelled to sell them at a loss of fifty per cent. Many of the individual subscribers for stock resisted payment, while some were unable to pay. The company owed $40,000, and had no money to pay with. Everything seizable was taken and sold on execution. In 1841 an effort was made to secure further aid from the State, but this was unsuccessful, for the condition of the State treasury would not permit the investment. In 1842 a very strong eftbrt was made to interest certain Baltimore capitalists and persuade them to replenish the company's treasury, so as to complete the slack-water improvement to Brownsville, and thereby make it a feeder to the Baltimore and Ohio Railroad, which about that time was nearing Cumberland, where it was thought it would be obliged to make a long halt. But the Marylanders were too intent on pushing their great work to the Ohio to engage in any side enterprise, especially one which they could not control.

For two years the work made no progress, except to decay. The whole project became a " mortification to its friends and projectors, and a nuisance to the navigation." Its friends were almost ready to i abandon it to the mercies of the floods and of an in- dignant public, when aid came from an unexpected source. The State's financial condition had become so depressed that the Legislature, by act of July 27, 1842, and again by act of April 8, 1843, directed sales of all its corporation stocks, among them its S125,000 in this company. This induced a number of men of capital, enterprise, and of unfaltering faith in the ultimate success of the improvement to buy this stock, - of course at a low figure, - and thereupon to engage to repair and complete the work to Brownsville, upon ten-year coupon bonds, secured by a mortgage of the improvement and its revenues to be applied first to old debts, second to interest, and then to reimburse to themselves the principal of their actual expenditure. These men were James K. Moorhead, Morgan Robertson, George Schnable, Charles Avery, Thomas M. Howe, John Graham, Thomas Bakewell, J. B. Moorhead, and John Freeman. They did the work, chiefly through sub-contractors," under the name of Moorhead, Robertson & Co. Their contract with the company was made Nov. 9, 1843. It was July, 1844, before they could get effectively at work, but they went at it with such energy and skill, with Sylvanus Lathrop for engineer, and J. B. Moorhead for superintendent, that on the 13th of November, 1844, - dams No. 3 and 4 being completed, and the breach in No. 1 thoroughly repaired, - the lower division of the Monongahela improvement was formally opened from Pittsburgh to Brownsville.

At the time of the opening there had been expended on the improvement (exclusive of engineering and salaries of officers) the sum of $418,000, viz. : construction of dams and locks Nos. 1 and 2, $160,500 ; repairing of damages on same, $35,000 ; construction of Nos. 3 and 4, $222,500.

Before the work was opened to Brownsville in 1844, the Baltimore and Ohio Railroad had been completed to Cumberland. The route of travel and traffic from that place to Brownsville was over seventy-five miles of the hard, smooth National road, which then more than ever before was crowded with stage-coaches laden to the full with passengers to and from the railroad terminus at Cumberland, and the greater part of these passengers were now delivered to or received from the Monongahela River steamboats at Brownsville, and this continued during the navigation season in each year until the opening of the Pennsylvania Railroad to Pittsburgh in 1852. Here were eight years of a rich harvest for the slack-water and the eastern division of the National road. During that time the Navigation carried between Brownsville and Pitts burgh mere than two hundred and eighty thousand through passengers, a large proportion of whom passed by stage over the great road. In the same time more than four hundred and sixty-two thousand way passengers were carried between the same points; and the total passenger tolls for that period amounted to $126,100.23. From 1845 to 1847 the revenues had almost doubled, thereby enabling the company in 1847 to nearly extinguish its old floating debt, keep down the interest, and pay $13,500 of the principal of the $231,500 of bonds which had been issued to Moorhead, Robertson & Co.

About this time there arose a strong excitement in opposition to the operations of the company, and a general demand was made that the coal tolls on the slack-water should be lowered, also that the dams should be made low enough to be "jumped" at high water. Many of those interested in the navigation of the river demanded that the dams be cut down to four and a half feet, as required by the act of 1836, and they bitterly denounced the company and the Legislature of 1839, which passed the supplemental act authorizing the raising of the dams to eight feet. It was foretold, with a great deal of gravity and apparent wisdom, that " if the high dams are suffered to remain as they are the coal lands tip the river toill always be worthless !" The agitation failed to accomplish the lowering of the dams, but the company reduced the tolls on pools Nos. 3 and 4 on coal in flat-boats intended to go down the Ohio. A calm succeeded, and the people were satisfied. The relations between the company and the coal-owners became harmonious, and have ever since remained so. The latter found that their predictions of the utter worthlessness of coal lands in case the high dams were allowed to remain were baseless, but that, on the contrary, those lands were rising rapidly in value from year to year. This appreciation has been continued and rapid, especially in the later years, until the present time.

Notwithstanding that the tolls from freights and passengers continued about the same for many years, such was the rapid increase of the^coal trade that at the end of 1853 the entire indebtedness to Moorhead, Robertson & Co. was paid ; and but for new debts incurred in 1850 for some additional rights ($2000), and a second lock at dam No. 1 ($56,800), and in 1853-54 another lock at dam No. 2, costing about $50,000,' rendered necessary to accommodate the increased coal trade, and the extension above Brownsville, the company could have been free of debt.

The building of the dams above Brownsville had been postponed from time to time on account of the low condition of the company's finances. From 1848 to 1853 several aftempts were made to raise the necessary funds by obtaining new subscriptions to stock, but without success. The stock was nominally doubled in 1848, bringing it up to a total of $521,000, but this did not add to the company's available means. The Legislature, by act of Jan. 25, 1854, made it imperative upon the company to put locks and dams Nos. 5 and 6 under contract, and have them com- pleted, No. 5 before June 1, 1855, and No. 6 before Dec. 1, 1855. The improvement to the State line was required to be completed before Dec. 1, 1857, but this requirement was relaxed by act of April 8, 1857, so as not to require No. 7 to be begun until locks and dams to carry the work from the State line to Morgantown should be \mt iinder contract, and with the completion of which No. 7 was to be contemporaneous.

In compliance with the act of Jan. 25, 1854, the company promptly put Nos. 5 and 6 under contract, No. 5, just above Watkins' Bar, two miles above Brownsville, to Burns & Ross ; and No. 6, at Rice's Landing, ten miles farther up, to Messrs. Dull. They were constructed at a cost (including the raising of dam No. 4 and some dredging) of about S!200,000, and were completed and ready for use in November, 1856, thus opening the slack-water navigation to Geneva.

All the original locks are one hundred and ninety by fifty feet in the chambers between the points or mitres of the gates and the side-walls. The entire length of the walls is two hundred and fifty-two feet, and their height about twenty-five feet. They are ten and twelve feet thick, built of heavy blocks of dressed stone, laid in hydraulic cement and securely clamped. Except those at Nos. 1 and 6, which have rock bases, they are built upon heavy oak timber deeply laid and covered with heavy oak plank. Each of the old locks contains over five thousand three hundred perches of stone. The new ones (put in in addition to the original ones in locks Nos. 1 and 2) are larger and contain proportionately more. These are two hundred and fifty by fifty-six feet in the chambers, but built in other respects as were the old ones. To show the facility with which boats are passed through these locks, the following quotation is given from the report of the board of managers to the stockholders, presented January 12th of the present year (1882), viz. : " In twenty hours between midnight of the 17th of December last and the same hour of the ensuing night there were passed through lock No. 1 forty-two coal-boats, forty-six barges, ten flats, and two fuel-boats, containing together an aggregate of 1,661,000 bushels, or about 63,118 tons of coal. A correspondingly increased amount could have been passed during the twenty-four hours had not the passage of boats been suspended during four hours of that day by the refusal of the pilots of some tow-boats to pass down below out of the way of the boats seeking to leave the lock."

" The coal business on the Monongahela," says the above-quoted report, " has increased so largely in recent years that the pressure for the passage of coalboats in time of a rise of the river has become very great at dam No. 3, where there is only a single lock. As the necessity arose, a similar difiiculty at locks Nos. 1 and 2 was relieved by the construction of a second and enlarged lock at each of those points. The company has, therefore, in order to meet promptly the demands of the coal trade and afford every facility for rapid navigation, ordered a new lock, of larger dimensions than any heretofore constructed on their improvement, to be built alongside of the present lock No. 3. This work will be put under contract and completed as speedily as possible; and they have it also in contemplation to duplicate the lock at No. 4, also on an enlarged scale. These improvements will fully accommodate, for many years to come, the still rapidly-increasing coal trade out of pools Nos. 3 and 4, especially when the formation of a pool below dam No. 1 shall have been eflTected.

" The United States government, having completed lock and dam No. 9, at Hoard's Rock, in West Virginia, are now proceeding with the construction of lock and dam No. 8, near Dunkard's Creek. If this work were completed it would only require the erection of lock and dam No. 7 by this company to furnish a slack-water navigation between Pittsburgh and Morgantown, in West Virginia, a total di-stance of one hundred and two miles. This company has accordingly entered into a contract with Messrs. Harrold & McDonald for the immediate erection of lock and dam No. 7, which, unless the season should prove so unfavorable as to prevent it, will be completed during the present year, and which, by connecting with the government work now partly in process of construction and partly completed, will fulfill the obligation of the company under its charter, and furnish a complete slack-water navigation not only up to but beyond the limit of the Virginia State line. This work, when completed, will furnish on the Monongahela River the longest reach of slack-water steamboat navigation in the United States, if not in the world. . . ."

Following is a statement of the number of bushels of coal and slack shipped from the several pools of the Monongahala slack-water during each month of the year 1881,' viz. :

This gives a total of ninety million thirty-five thousand three hundred and sixty bushels of coal, coke, and slack shipped from the several pools of the Monongahela Navigation Company in the year 1881, which is a total increase of a little more than six hundred and fifty thousand bushels over the business of 1880. The passenger business of 1881 was but little more than one-third that of the preceding year, this being due to the opening of the railroad from West Brownsville to Pittsburgh in the spring of 1881. The decrease will of course continue, and grow more marked as the railroads now in process of construction penetrate southward to West Virginia. But the passenger trade is an item of small and ever-lessening comparative importance to the navigation of the river. The natural resources of the country furnish its main business, and this will be the case in the future even more than it is at pre.sent. The mineral treasures lying hidden beneath the everlasting hills of the Monongahela, and as yet hardly beginning to be developed, will sustain and swell the navigation of the river, and bring surpassing prosperity to its valley. The Monongahela improvement, which, as its opponents forty years ago prophesied, was to render the coal lands of the upper river worthless, has, instead, been largely, if not principally, instrumental in making them accessible, enhancing their value far beyond the wildest dreams of that day, and making their owners wealthy. While accomplishing this, after years of disaster and discouragement, the Navigation Company has also achieved success for itself, and its present prosperity is certainly well merited.

The presidents of the company have been : James Clarke, elected at the organization, in February, 1837, and held till October, 1840; Thomas Bakewell, pro tempore^ from October, 1840, to January, 1841, then elected and held till the following October ; William Eichbaum, pro tempore, from October, 1841, to January, 1842, then elected and held till January, 1844 ; Samuel R. Johnston, January, 1844, to January, 1845 ; John B. Butler, January, 1845, to July, 1846, when he entered the army as paymaster in the Mexican war. James K. Moorhead succeeded him as president pro tempore, holding till January, 1847, when he was elected, and has held the oflice of president of the company from that time continuously for more than thirty-five years. The present officers of the Monongahela Navigation Company are :

Steamboat navigation on the Monongahela was commenced in the year 1814, when the " Enterprise," which had been built at Brownsville by Daniel French and others, left that place under command of Henry M. Shreve, and passed down the Monongahela, Ohio, and Mississippi Rivers to New Orleans, being the first boat that ever made the trip from Pittsburgh to that city and return. The " Dispatch"' was also built by the same parties, and went down the Monongahela and Ohio not long after the " Enterprise." During the thirty years that succeeded the building of these two boats, before the opening of the slack-water from Pittsburgh to Brownsville, the Monongahela was navigated in the times of high water by a multitude of steamboats, of which it is impracticable to give the names or any connected account. Mention should be made, however, of the two brothers, Capt. William and Capt. James Parkinson, sons of Benjamin Parkinson,' natives and residents of Washington County, who were among the most famous river-men of the early days of Monongahela River navigation, and who became almost as well known on the lower Ohio and Mississippi as on the river along whose shores they played in boyhood. They both were engaged in steamboat navigation on the Monongahela long before the opening of the slack-water improvement. In Februrary, 1841, Gen. Harrison (who was then on his way to Washington, D. C, to be inaugurated President of the United States) traveled on Capt. William Parkinson's boat, the " Moxahalla," from Pittsburgh to Brownsville. The weather was exceedingly cold and damp, and the President-elect being called for at every landing, was compelled to go on shore and show himself bare-headed to the crowds which had collected to greet him. The result was a severe cold, which Capt. Parkjnson always believed and declared to be the cause of the general's death, which occurred very soon after his inauguration.

Upon the completion of ihe slackwater improvement to Brownsville, the brothers Parkinson became prominent men iu the company which placed the first line of steamers upon it, but after some years they

1 Benjamin Parkinson, father of William and James, was an extensive mill owner at the mouth of Mingo Creek, and a nephew of Benjamin Parkinson, whose name frequently occui-s in the annals of the "Whiskey Insurrection," and also of Joseph Parkinson, who founded

The first regular line boat that ran upon tlie Monongahela slack-water after its completion between Brownsville and Pittsburgh was the side-wlieeler "Louis McLane," so named for the first president of the Baltimore and Ohio Railroad. With her, on alternate days, ran the "Consul," also a side-wheeler. Both these boats were regarded as fast, the "McLane" being the more so of the two. After about four years' service she was dismantled at Brownsville, and parts of her used in the building of the Pittsburgh and Wheeling packet " Diurnal."

The two line boats above mentioned were succeeded by the " Atlantic" and " Baltic," which were both built at Brownsville, and both very fast boats. They came out in 1849. After three or four years' service the " Baltic" was dismantled, and the other was put in use as a tow-boat. After a time she too was demolished, and her material used in building the sternwheeler " Hercules." The " Baltic" and " Atlantic" were succeeded in the line by the "Luzerne" and " Jefferson." While the former was building, in 1852, the flood carried the hull off the ways and over the dams. It was caught at McKeesport, and towed into the Youghiogheny, where it was completed. The " Jefferson" was built at McKeesport, and after her tour of duty on the slack-water was dismantled at Brownsville. The " Luzerne" was taken to the Mississippi, w'here she ran between Rock Island and Galena, 111., and was finally snagged near the Iowa shore, above Lyons. About 1854 the "Redstone" was built by John S. Pringle, now of West Brownsville. She was put on the line, but ran only a few months, when she was sold to go in the lower Ohio River trade ; but her career was ended soon afterwards by the explosion of her boilers near Carrollton, Ky.

The "Telegraph," built at California by McFall, ran on the line for about twelve years, and was accounted a " lucky" boat. After her long career on the slackwater she was dismantled at Brownsville. Some of her machinery was put in the " Scotia," recently built for the Ohio. The " Geneva," sternwheeler, ran on the line for a short time about 1855. The " Dunbar" was built by John S. Pringle about 1859 for the Monongahela trade, but being a little too large to pass the locks conveniently, was sold to run on the lower Ohio and Tennessee Rivers. At the commencement of the war of 1861-65 she fell into the hands of the Confederates. After the fall of Fort Henry she with several other boats was chased up the Tennessee by the United States gunboats " Lexington," " Conestoga," and " Tyler." She passed Pittsburgh Landing and Eastport, and a short distance above the latter escaped her pursuers by running up a creek which was too shoal for the Federal gunboats to follow. But she left her bones there, for the water falling she was unable to get back to the river, and was dismantled by the Confederates, who took her machinery overland to the Chattahoochie River, where it was used in another boat.

Among the later boats running on the line between Pittsburgh and New Geneva there have been the "Franklin," the "Gallatin," the "Fayette," the "Elisha Bennett," "Chieftain," "Elector," "John Snowdon," and the present boats of the Geneva line, - the " James G. Blaine," "Geneva," and " Germania." The "Franklin" and "Gallatin" ran together on the line for a few years, after which service the " Gallatin" was sold to run as a ferry-boat between Memphis, Tenn., and the Arkansas shore of the Mississippi, and the "Franklin" was taken to pieces at Brownsville, her machinery being placed in the " Geneva," which is still on the line. The " Fayette," which was built at Brownsville, was one of the finest boats ever running on the Monongahela, as well as one of the most successful. She was sold to go in the lower Ohio River trade, between Cairo, 111., and Evansville, Ind. The career of the " Elisha Bennett" was disastrous, ending in her total loss in 1878. She was carried away from her wharf at Brownsville, in the night, by flood and ice, and crushed at dam No. 4. The " Chieftain" met the same fate at the same time. This last-named boat and the " Elector" were not put on the river to run in the regular Geneva line, but in the " People's Line," an opposition which was put on about 1867. This line was discontinued by their boats being purchased by the other company and run as boats of the regular line.

The "Pittsburgh, Brownsville and Geneva Packet Company" was incorporated under an act of Assembly passed Feb. 21, 1868, with a capital of $150,000, and authority to increase to S300,000. The corporators named in the act were " Benjamin Coursin, John J. House, Mark Boreland, William Britten, Clark Breading, Samuel H. Smith, Joseph G. Ritchie, and their associates," the object for which the company was incorporated being to run steamers for the carrying of passengers and freight on the Monongahela River, which, however, they had been doing for years before the incorporation, this being the legalization, but not the commencement, of the enterprise. The first president of the company was J. K. Moorhead, who was succeeded by George W. Cass, and he by Adam Jacobs. Nearly all the steamers already mentioned as having run on the Monongahela were of this line. The present boats of the company making daily trips each way between Pittsburgh and New Geneva are the " James G. Blaine," " Geneva,'' and " Germania." The present {December, 1881) oflicersof the packet company are: Managers, Adam Jacobs, president ; Isaac C. Woodward, Charles E. Spear, Benjamin F. Coursin, H. B. Cock, William Parkhill, George E. Hogg ; Secretary aud Treasurer, H. W. Robinson.

actual movement towards the construction of a railway Hue through the valley of the Monongahela River or any part of the territory of Washington County. That company having been incorporated by the Legislature of Maryland at their December session in the year 1826, applied to the General Assembly of Pennsylvania for authority to construct their road through this State to or towards a terminus on the Ohio. To this petition the Assembly responded Feb. 27, 1828, by the passage of " An act to authorize the Baltimore and Ohio Railroad Company to construct a railroad through Pennsylvania, in a direction from Baltimore to the Ohio River." The act recited in its preamble that " it is in accordance with that liberal course of policy which has ever been pursued by this Commonwealth to promote the facility of trade and intercourse between the citizens of Pennsylvania and the citizens of her sister States, and no doubt is entertained but the same motives of policy will govern the State of Maryland should an application at any time hereafter be made by the government of this State for leave to intersect the said railroad in the State of Maryland by the construction of a railroad by the State of Pennsylvania, or any company which may by law be incorporated for such purpose." The company was required to complete its road in Pennsylvania within fifteen years from the passage of the act, otherwise the act to be void and of no effect.

In 1829 the engineers of the company commenced the exploration of routes through Pennsylvania, and this was soon followed by preliminary surveys, extending through several years, a very thorough examination being made of a wide range of country, extending from the mouth of Dunkard Creek northward as far as the northern limits of Washington County. A report on the western part of the proposed route was made by the company's chief engineer, Jonathan Wright, Esq.. of Washington County, in 1835, and, being favorable for the construction of the road, it awakened considerable interest and enthusiasm among the people of the Monongahela Valley. In some of the newspapers of November, 1835, is found a report of a " Great Railroad Meeting," held at Brownsville on the 3d of that month, "to promote the immediate construction of a railroad between Cumberland and Brownsville, and thence to Wheeling and Pittsburgh, at which it was announced that the chief engineer of the Baltimore and Ohio Company had made an examination of this section of country, and had made his report to the effect that a railroad could be constructed between the places mentioned " without the use of any inclined plane." The meeting resolved that it was expedient to hold a railroad convention at Brownsville on Thursday, the 25th of the same month, to be composed of delegates from the District of Columbia, and from towns, cities, and counties feeling an interest in the enterprise. No report of such a convention has been found, nor does it appear that any further public action was taken in the premises. It is evident that the Brownsville meeting of November 3d did not convene for the purpose of adopting or considering any definite plan of action, but merely to express in general terms, approval of the project of a railroad line from the Potomac to the Ohio by way of Brownsville and Washington County.

The surveys of the Baltimore and Ohio Company were continued in 1836 to 1838, and a route was decided on as to its principal points. Crossing the Monongahela River at Brownsville, the route was. surveyed thence into the valley of Ten-Mile Creek, and up that valley to its head ; from that point, crossing the dividing ridge to Templeton Run, it passed down the valleys of that stream and Wheeling Creek to the Ohio at Wheeling. \ Leaving the proposed main line near the crossing of the Monongahela, a branch road was surveyed to Pittsburgh, in accordance with the requirement of the ninth section of the act of Feb. 27, 1828, viz. : " That, as a condition on which this act is granted, it shall be the duty of the said company, in case the railroad aforesaid, made in this Commonwealth in pursuance of this act, shall not terminate at the Ohio River in the vicinity of Pittsburgh, to construct a lateral railroad simultaneously, on the same principles and plans of the main railroad, and which shall connect the city of Pittsburgh with the main railroad."

The preparations of the Baltimore and Ohio Company for the construction of a railroad through Pennsylvania embraced not only the making of elaborate surveys, but also the making of contracts for the right of way, which they did with several hundred land-owners in Washington, Fayette, and Somerset Counties. But at that time the attention of the company was engrossed and their funds absorbed in the construction of their road between Baltimore and Cumberland, and as it had become apparent that they could not complete the Pennsylvania part of the road within the required time of fifteen years from the passage of the act of 1828, they asked an extension, which was granted by the General Assembly of Pennsylvania in a supplemental act approved June 20, 1839, by the provisions of which the time in which the company were required to finish their road or roads in Pennsylvania was extended four years, or to the 27th of February, 1847.

When the company had completed their road westward from Baltimore to Cumberland (in 1844) there remained less than three years in which to construct the part lying in Pennsylvania, under the requirement of the supplemental act of 1839. A further extension of time was necessary, and was applied for to the Pennsylvania Assembly; but in the mean time the Pennsylvania Railroad was being pushed westward to cross the Allegheuies and make Pittsburgh its western terminus, and now the business men, manu-

> Several other surveys were made, but this was the one which wa«. considered the most practicable, aud which was adopted by Chief Engineer Knight.

facturers, and people of influence in that city, who in 1828 and in 1839 were ready to do all in their power to Secure a railroad, even if it were but a branch from a main line, from the seaboard to Wheeling, were now, in view of the prospective direct connection with Philadelphia by the main line of the Pennsylvania Railroad (in which many of them were also stockholders), entirely favorable to that road, and as wholly opposed to the support of a competing line commencing at the Maryland metropolis, and to have its western terminus not at Pittsburgh, but at the rival city of Wheeling.

Besides the opposition of the people of Pittsburgh, the Baltimore and Ohio Company had to encounter the determined hostility of the inhabitants of the country through which their railroad was to pass. This arose principally from the belief that the proposed railway would supersede and ruin the National road, and consequently ruin themselves and the country. This opposition, added to the combined influence of the city of Pittsburgh and of the Pennsylvania Railroad, proved too powerful for the Baltimore and Ohio Railroad Company to overcome in the Assembly of this State ; and so that company, after repeated ineffectual attempts to obtain a further extension of time for building their road through the State of Pennsylvania, found themselves compelled to abandon the enterprise and complete their road from Cumberland to Wheeling through the State of Virginia. Years afterwards, however, they accomplished one of the principal objects they then had in view (the extension of their line to the city of Pittsburgh) by leasing roads already built by companies holding charters from Pennsylvania.

The " Washington and Pittsburgh Railroad Company" was incorporated in 1831, the project for building a railroad between the places indicated in the title having originated in Washington. It was first brought to public notice at a meeting of the citizens of the borough held at the court-house on the 27th of December, 1830, and organized by the appointment of John Johnson, Esq., president ; Capt. William Hunter, vice-president ; and Joseph Henderson and Thomas Morgan, secretaries. Hon. Thomas H. Baird addressed the meeting at length, and ottered the following resolutions, which were adopted :

" lieiolvtd, That llie towa of Washington, lieing situated at the extreme northern angle of the CuniberUiud Road, presents the nearest point of practicable junction with thePeunaylvania Canal at Pittsburgh.

*' Hesolved, Tliat a connection between these great commercial avenues is desirable, as respects the interests of this town and section of country, and also the interests of Pittsburgh, Philadelphia, and the intermediate

" ResolvpA, That the inclined plane of Chartiers Creek presents a practicable and direct route for a Railway, and at the least possible expense.

" Resolved, That a petition be addressed to tlie Legislature praying the incorporation of a company to construct a Railroad from Washington to Pittsburgh, or the hank of tlie Mouongahela opposite the debouche of the Pennsylvania Canal."

A committee was appointed to circulate a petition, to explore a route, ascertain its practicability, expense, local and general advantages, and to obtain relea.ses along the line. On the 26th of February, 1831, "a Friend to the Road," in an article in the Washington Examiner, gave detailed cost of material, grading, etc., for the thirty miles (which was the length of the proposed route) as 889,267. A bill was -brought before the Legislature of Pennsylvania asking for the incorporation of the " Washington and Pittsburgh Railroad Company." It pa.s.sed the House and Senate, and on the 18th of March, 1831, was approved by the Governor. Charles De Hass, a civil engineer, was employed to make a preliminary survey. Two routes were surveyed, one by Chartiers Valley, a distance of thirty-three miles ; the other "from a point near Mr. Cowan's mill up the valley of Scrub-Grass Run to the summit between that run and Saw-Mill Run, from thence by the latter run to the Ohio River near the toll-gate," this line being three miles shorter than the other route.

On the 30th of March, 1831, Mr. De Ha.ss made his report and presented plans, maps, and draft of the route, cuts, masonry, etc., with estimate of cost. Thomas H. Baird, T. M. T. McKenuan, James Ruple, John K. Wilson, Isaac Leet, John Watson, and John K. Ewing, of Washington County, and Charles Cowan, William Lea, James Herriot, John McKee, Francis Bailey, and Ross Wilkins, of Allegheny County, were appointed commissioners to receive subscriptions. Books were opened in Washington at the house of David Morris, and in Pittsburgh at the hotel of Nicholas Griffith. The amount of subscriptions obtained is not known, but it seems probable that they were not large, as Judge Baird paid for the survey outt of his private funds. Alexander Reed addressed a letter to Jonathan Knight, then chief engineer of the Baltimore and Ohio Railroad Company, asking him to lay the matter before that company (who were at that time intending to run the main line of their road through Washington County to the Ohio) and induce them to build or aid in building the proposed road from M'ashington to Pittsburgh. Mr. Knight, in his reply, said the proposition could not be entertained, as the company had use for all their funds and more, but that they would be glad to connect with the proposed road and use it as an auxiliary. The result was that the road was not commenced, and at the expiration of the specified time the charter was forfeited. On the 1st of April, 1837 another act was passed incorporating the Washington and Pittsburgh Railroad Company, by which Daniel Moore, William Hunter, Alexander Reed, James Ruple, John K. Wilson, John H. Ewing, John Cook John Dagg, Dr. John Wishart, William Smith, Dr. Samuel Murdoch, Robert Oflicer, John Watson Daniel Huston, Joshua Emery, and Samuel Hazlett, of Washington County, and eighteen gentlemen of Allegheny County were appointed commissioners to open books of subscription at Washington, Canonsburg, and Pittsburgh. The location of the road was described in the act as "beginniDg at some point within the borough of Washington, in the county aforesaid, and terminating at some suitable point at or near Allison's Run, in the township of Chartiers;" and it was provided also " that the said company shall have power, and they are hereby authorized to construct, continue, and extend in a northerly direction the line of their said railroad from the said point at or near Allison's Run to a point at or near the city of Pittsburgh." Nothing was done under this incorporating act. A supplemental act was passed April 22, 1846, reviving a part of the original act and appointing commissioners to open books for subscriptions to the stock on or before the 1st of December following the passage of the supplement. Books were opened, but this attempt was no more successful than those which had preceded it, and the result was failure to construct the road.

The Pittsburgh and Steubenville Railroad Company was incorporated under an act of Legislature, approved March 24, 1849, which conferred " power to construct a railroad commencing on the Monongahela River near Pittsburgh, and running in the direction of Steubenville, on the Ohio River, to a point on the Virginia State line," the work of construction to be commenced within three years and completed within eight years from the passage of the act. In 1852 a supplemental act was passed (which became a law April 21st in that year) authorizing the company to connect its line with that of the Pennsylvania Railroad and with any other railroad at the Virginia line, also to construct branches as deemed expedient. Another supplement was passed Feb. 24, 1853, authorizing the commissioners of Allegheny County, under a recommendation by the grand jury, to subscribe ten thousand dollars to the stock of the road. On the 20th of April, in the same year, the Pittsburgh and Steubenville Railroad Company was authorized to borrow not exceeding five hundred thousand dollars, and issue its bonds therefor, and the city of Philadelphia was authorized to subscribe four thousand shares of the stock of the company.

The construction of the road was put under contract in June, 1852, and work was commenced on it soon afterwards, but did not progress rapidly. On the 26th of January, 1854, it was announced that " the tunnel at Dinsmore Summit is progressing at a rate that will complete it by June next," but the work was suspended soon afterwards, and eleven years elapsed before it was completed. In September, 1857, it was announced that arrangements had been made with King & Thompson, by which the work would be pushed to a speedy completion. Finally, after many discouraging delays, the road was finished, the trains running for the first time over the entire length on the permanent track in October, 1865. But the affairs of the company were not prosperous, and the road was sold under foreclosure Nov. 6, 1867. In May, 1868, a consolidation was formed of the Pittsburgh and Steubenville, the " Panhandle," the Holliday's Cove (West Virginia), and Steubenville and Indiana Railroads, all being placed under one management and known as the Pittsburgh, Cincinnati and St. Louis Railway, making a line of one hundred and ninetythree miles in length, from Pittsburgh to Columbus, Ohio. The same arrangement and name and style of the road still continues. The stations on the main line within the county of Washington are McDonald, Midway, Bulger, Cardville or Burgettstown, Dinsmore, and Hanlan's.

The Hempfield Railroad Company was incorporated under an act ( passed May 15, 1850) conferring authority " to locate and construct a railroad with one or more tracks from Greensburg, in Westmoreland County, to some point or place at or near West Newton, in said county, or to some point or place not more than three miles from West Newton, by the nearest and best route ; and the said company shall have authority to extend said road or a branch thereof by the nearest and best route to some point or place on the western boundary line of Donegal township, in Washington County, and to make and erect such warehouses, tollhouses, carriages, cars, and all other works and appendages necessary for the convenience of said company in the use of said road." The company was required by the terms of the act to commence the construction of the road within three years, and to complete it within ten years from the passage of the act under penalty of forfeiture of charter. The commissioners appointed by the act to open the subscription-books of the company were S. L. Carpenter, Henry Welty, H. T. Brady, H. D. Foster, J. M. Burrell, John C. Pluraer, David Fullwood, Joseph H. Kuhns, John Morrison, A. T. King, William Jack, and H. C. Marchand.

An act passed April 12, 1851, authorized the company to construct branches with single or double tracks from any points in Washington or Allegheny County to such points as they deemed expedient, with such rights and franchises as were conferred in the act of May 15, 1850; and it also authorized the company to borrow money in amount not exceeding the capital stock, and to issue therefor bonds bearing interest not exceeding six per cent. An act passed July 24, 1852, authorized the boroughs of Washington and Monongahela City to subscribe for stock of the Hempfield Railroad Company not exceeding $50,000 each, to borrow money for the purpose, and provide for its payment by tax. The commissioners of Washington County were also authorized by the same act to subscribe for four thousand shares (at $50 per share) on behalf of the county, and borrow money and issue bonds for the amount, redeemable in not less than ten years, and payable in not exceeding twenty-five years, at a rate of interest not exceeding six per cent., payable semi-annually. The borough of Greensburg,

Application was made by the company to the Legislature of Virginia for incorporation in that State for the purpose of extending the proposed road through Its territory from the west line of Washington County, Pa., to the Ohio River. Accordingly, on the 14th of March, 1851, an act was passed incorporating the company in Virginia.

The company organized under the Pennsylvania act in January, 1851, T. M. T. McKennan being its first president. The eminent engineer, Jonathan Knight, of Washington County, was employed to examine the country with a view to selection of the most practicable route. Five different routes were surveyed, and the one selected (from Washington to Wheeling) upon which the road was afterwards built. Charles Ellet, Jr., was appointed chief engineer of the company, Mr. Knight being unable at the time to accept the position.

1851, were : Subscription by Ohio County, Va., $300,- 000 ; individual subscriptions in same county, $154,000 ; subscription by Washington County, $200,000 ; individual subscriptions in Washington County, $100,000; total, $754,000. The Washington Review of March 25,

1852, mentioned that " the Directors of the Hempfield Railroad Company met in this borough on Tuesday last and agreed to put the heavy portion of the road immediately under contract ;" and on the 13th of May following it was announced in the .same paper that " the western end of the road has been sold to contractors."

At a meeting of stockholders held at Washington, on Monday, Nov. 19, 1855, James C. Clarke, of Westmoreland County, C. M. Reed, A. W. Acheson, and William McKennan, of Washington, and Thomas Sweeney, J. C. Acheson, and Sobieski Brady, of Wheeling, were elected directors of the company, and the report of George Smith, chief engineer, was submitted, showing as follows : The first nine miles east of Wheeling was ready for laying the rails; the first rail on the line had been laid on the 23d of the preceding month. In the grading of the road-bed a maximum grade of sixty -six feet to the mile had been preserved. A locomotive had been purchased of the Norristown Railroad Company, and was in use in the construction of the road. The cost of work done up to the 1st of November, 1855, was as follows: Total expended on graduation, masonry, bridges, and railway supplies between Wheeling and Greensburg, $1,247,200. This amount included fencing, land damages, etc., but not engineers' salaries and expenses, which amounted to $58,600. The estimated cost of road between Wheeling and Washington, including stations and equipment, was placed at $1,434,000, of which the amount then expended was $983,500. Finally the chief engineer gave it as his opinion that the road between Wheeling and Washington would be completed and in running order within six months from the date of his report. The prediction, however, was not verified ; the road was not completed ready for business until the spring of 1857, when freight trains commenced running between Wa-shington and Wheeling. The first passenger trains ran over the entire length of the road between tliese termini on the 30th of September in the same year.

A considerable amount of work had been done on the eastern end of the route (between Washington and Greensburg), but this was abandoned or suspended about 1854. In 1855 the company issued bonds and mortgaged the road. In 1861 proceedings were commenced in foreclosure, and the road placed in charge of trustees. In the spring of 1871 the Supreme Court decreed the sale of the road, and in June of that year it was sold with all the franchises of the company to John King, Jr., of Baltimore (vice-president of the Baltimore and Ohio Railroad), for $131,000. The purchaser (or the persons whom he represented) held bonds of the road to the amount of about $80,000, many of which had been purchased below fifteen per cent, of their face. The trustees of the road, Joseph H. Seal, William Workman, and William O. Hughart, transferred the entire property to the purchaser, John King, Jr., and he to the Wheeling, Pittsburgh and Baltimore Railroad Company, which was the name and style adopted under the reorganization, though the road was then and still is under the control of the Baltimore and Ohio Railroad Company.

It was the intention of the new management to make the road between Wheeling and Washington a part of a new through line from the Ohio to Baltimore and Washington, and under this plan to connect it with the Pittsburgh Division of the Baltimore and Ohio Road, instead of extending it from Washington to Greensburg as had been projected by the original company, and on which route a large amount had been done. This made it necessary to locate a new route for the road east of Washington, and the change of route required a new act of incorporation, which was obtained, and under it the " Ohio and Baltimore Short Line Railway Company" was organized in February, 1872. A new route for the eastern extension was adopted, leaving the original route (from Washington to Greensburg) at a point about four miles east of Washington ; thence crossing the Monongahela at Belle Vernon, Fayette Co. (instead of at Monongahela City as by the original route of the Hempfield Road) ; thence to the Youghiogheny, crossing that stream at Dawson Station, where the connection was to be made with the Pittsburgh and Connellsville (or Pittsburgh Division of the Baltimore and Ohio) Road. Work on the extension was commenced by the company in 1873, and prosecuted with vigor until the commencement of the gre.it financial panic of that year, when it was suspended. The suspension continued for so great a length of time that it was thought best to permit the charter to lapse and reorganize under the same title. Accordingly, new articles of association were executed May 5, 1881, by the following-named corporators : William H. Smith, Andrew H. Happer, William Workman, William S. Bryson, John M. Stockdale, A. Todd Baird, Henry M. Dougan, and William C. King, all of Washington, Pa., and James B. Washington, of Allegheny, Pa. The capital stock is $1,000,000 ; company to continue five hundred years. The object of the new " Ohio and Baltimore Short Line Railway Company" is nearly the same as that of the earlier company of the same name, except that the crossing of the Monongahela is proposed to be made at Greenfield, and instead of connecting with the Pittsburgh Division of the Baltimore and Ohio Road at Dawson's Station, the connection is to be made farther up the line, at a point between Dawson and Connellsville. Immediately after the organization of the new company in 1881, operations were commenced on the extension, and were pushed with energy during the season, and for some time in the spring of 1882 ; but as they have since been suspended, the early completion of the road does not seem to be yet assured.

The " Chartiers Valley Railroad Company" was incorporated under an act of Legislature (approved Feb. 7, 1853) conferring the right "to construct a railroad from the city of Pittsburgh, in the county of Allegheny, by way of Canonsburg to the borough of Washington, in Washington County ;" also to connect with the Pittsburgh and Steubenville Railroad at a suitable point, and with the Hempfield Railroad at or near the borough of Washington. John H. Ewing, John Bausman, L. P. Hitchcock, Jacob Morgan, William S. Calahan, George S. Hayes, John Boyce, Thomas Watson, John Weaver, Daniel Houston, Robert McKnight, David P. Morgan, James O'Hara Denny, Thomas Bakewell, Henry Graff, James K. Moorhead, Frederick Lorenz, William Larimer, Jr., George Ledlie, Lecky Harper, Mansfield Brown, William M. Daniel, and Charles Paulson were appointed to receive subscriptions to the stock of the company, which was authorized to the amount of §500,000. The incorporating act authorized public subscriptions to the stock, as follows : By the city of Pittsburgh, 5000 shares ; Birmingham, East Birmingham, and South Pittsburgh, each 500 shares ; the borough of Canonsburg, 550 shares ; the borough of Washington, 500 shares.' The commissioners of Allegheny and Washington were also authorized to subscribe on behalf of their respective counties upon recommendation of the grand jury. The construction of the road was required to be commenced within three

1 At a meeting of citizens of Washington borough, held at the courthouse Dec. 31, 1853, a resulution that the borough subscribe " OOU shares of the capital stock of the Ciiurliers Kailroad Couipauy" was adopted by a vote of 84 to 3.

The route of the road was surveyed and permanently located to connect with the Pittsburgh and Steubenville Railroad at Mansfield, Allegheny Co. It was laid ofl' in one-mile sections, placed under contract, and the work of grading commenced on all parts of the line. Reports of the chief engineer (D. Mitchell, Jr.) showed that up to Jan. 1, 1856, the sum of $162,525.26 had been expended ; that from that time to Jan. 1, 1857, the further amount of $88,139.45 was expended, making a total of $250, 664.71 ; and it was believed that the grading of the road would be completed in four months from the latter date, at an estimated cost of $86,309.40, exclusive of ballasting, which, with superstructure, bridging, right of way, and incidentals, would require an additional amount of $263,525.89. Total amount required to complete the road and pay indebtedness already incurred, $382,292.62.

The usual embarrassments and delays experienced in the building of railroads were encountered in this. Finally the unfinished road was sold to William J. Howard, solicitor for the Pennsylvania Railroad Company, for $45,100. A mortgage of $500,000 was placed upon the road, with the proceeds of which it was pushed to completion. In December, 1870, the announcement was published that on and after the 19th of that month trains would run regularly between Pittsburgh and Canonsburg. On the 15th of the following May trains commenced running to Washington, and on Thursday, the 18th of the same month, the road was formally opened in its entire length by the running of excursion trains and a celebration of the event in the town hall at Washington ; the address of welcome being delivered by the Hon. George S. Hart, who made reference to the long and disheartening struggle which had been made to secure the construction of the railway which had that day been formally opened ; a struggle which had been commenced forty years before by Judge Baird, Charles De Hass, Maj. John H. Ewing, and others. Maj. Ewing, who was present, made some remarks in response, and Judge Hart's address of welcome was replied to by John H. Hampton on behalf of the visitors from Pittsbui-gh and Allegheny City.

On the 8th of December, 1871, the Chartiers Valley Railroad was leased to the Pittsburgh, Cincinnati and St. Louis Railway Company, and is still run in connection with that line as the Chartiers or Washington Branch.

The Pittsburgh, Virginia and Charleston Railway was first projected by a company which was incorporated by an act of Assembly approved April 8, 1867, as the Monongahela Valley Railroad Comi^any, with power to construct and equip a railroq,d from a point at or near Pittsburgh, along the Monongahela River, to a point at or near Rice's Landing, in Greene County,

Pa., and thence to Waynesburg, with the riglit to construct any branch or lateral road, not exceeding ten miles in length, to the coal-fields of Allegheny, Washington, Westmoreland, Fayette, and Greene Counties; the capital stock not to exceed twenty thousand dollars per mile of road constructed and equipped.

By a supplemental act, approved March 31, 1868, the company was " authorized to construct its railroad with single or double tracks from a point at or near the city of Pittsburgh, by such route as the board of directors may determine, to a point at or near Monongahela City, in Washington County, and thence up either bank of the Monongahela River to a point at or near Rice's Landing, with power to construct such branches as the directors may deem necessary, and to connect all or either of them with any railroad or railroads now constructed, and that may be hereafter constructed;" and the company was further authorized to extend its road or branches to the boundary line of West Virginia. On the 4th of February, 1870, an act was passed changing the corporate name of the company to that of the Pittsburgh, Virginia and Charleston Railway Company, which from that time became also the name of the line of road.

The survey of the route of the Monongahela Valley Railroad was commenced in the spring of 1869, and completed during that season ; but no part of the work of construction was done until after the name of the company had been changed by the act of February, 1870. Operations were commenced soon afterwards and prosecuted without much of the delay which is usual in the building of railways; and in the fall of 1873 the road was completed and opened to Monongahela City, and trains commenced running regularly between that place and Pittsburgh. The great financial panic which began in that year caused serious delays and embarrassments in the construction of the road south of Monongahela City, so that it was not until May, 1881, that the line was opened to West Brownsville, giving to that borough and to the two towns on the opposite side of the Monongahela the first railroad communication they had ever enjoyed.

In May, 1879, this road and its franchises passed to the control and management of the Pennsylvania Railroad Company, by which it is now operated as the " Monongahela Division" of its lines. The Uniontown extension or branch of the Pittsburgh, Virginia and Charleston Railroad is now in process of construction, having been commenced by the Pennsylvania Railroad Company in January, 1881. Starting from the completed road west of the Monongahela at Huntsville, it crosses that river by a bridge at the mouth of Redstone Creek, below West Brownsville, and runs from that point to Hogsett's Cut, about oue mile north of Uuiontown, where it joins the Southwest Pennsylvania Railroad. It is now very near completion, the announcement being made that it will be opened in its entire length (sixteen miles) in August, 1882.

The Pittsburgh Southern Railroad (narrow-gauge) connects Washington borough with Pittsburgh, its route being from Washington through the northeast part of Washington County, and thence through Allegheny County to Temperanceville, on the south side of the Monongahela opposite the city. The project of building this road was originated by A. C. Hays and John H. Miller in 1876. With them were afterwards associated in the enterprise M. D. Hays, T. P. Roberts, Dr. Kerr, Colin M. Reed, Sr., Joshua Wright, W. W. Smith, and George P. Hays. A company was formed to build the road, and incorporated as the "Pittsburgh, Castle Shannon and Washington Railroad Company." An amendment to the charter and a reorganization succeeded, the corporators under the amended charter being J. H. Miller, M. D. Hays, Joshua Wright, Joseph Phillips, John Rogers, West Fry, Thomas McClelland, Josiah Reamer, Dr. Kerr, and A. C. Hays.

The work of construction was commenced in July, 1877,at Finleyvilleand other points nearer Pittsburgh, and was carried forward so rapidly that in January, 1878, the track was completed from Pittsburgh to Finleyville, Washington Co., and the grading was finished from there to Munntown, in Nottingham township. In the following spring the name of the road was changed to "Pittsburgh Southern Railroad," and at the same time the plan was changed so as to make the northern terminus of the road at Temperanceville. Work was continued during 1878, and in the succeeding winter the road was completed to Washington, this making a third railway line connecting the county-seat with the Ohio River. The first regular train ran through over the entire length of the road Feb. 24, 1879. The road soon became so much embarrassed that it was sold at sheriff's sale, the purchaser being James H. Hopkins, of Pittsburgh, who, as is understood, still holds a controlling interest, and is president of the road. The stations of the Pittsburgh Southern in Washington County are Beyer's, Finleyville, Peters Creek, Anderson's, Mc- Comb's, Virginia Junction, Thomas', Gilkeson's, Brownlee's, Wyland's, Clokeyville, Zeideker, Vance's, and Washington. The length of the road is thirtyfour miles. It is in contemplation by the management of the Pittsburgh Southern to build a southern extension of the road, commencing at Virginia Junction, and passing thence by way of Bentley ville, Hillsborough, aud other points to Morgantown, W. Va. A ]>art of that line was placed under contract in June, 1878, and the grading was completed ready for the iron to Hillsborough, but operations were suspended, and nothing has since been doue towards carrying through the extension.

The Waynesburg and Washington Railroad (narrow-gauge) connects the borough of Washington with Waynesburg, Greene Co., being twenty-seven and onehalf miles in length. The company was organized in 1875, the following-named persons composing the board of managers, viz. : J. G. Ritchie (president), W. G. W. Day, S. W. Scott, W. T. Lantz, Jacob Swart, Henry Swart, Clark Hackney, W. S. Bryson, John Ross. The work of construction proceeded, and on the 6th of August, 1877, the tracklayers moving southward from Washington reached Banetown, a distance of ten miles. On the 1st of September following, fourteen miles south from Washington had been completed, and trains commenced running. On the 17th of the same month the track crossed the Greene County line, and the locomotive " General Greene" entered that county, the first locomotive ever within its boundaries. About the 1st of October in the same year the road was completed, and trains commenced running regularly over its entire length from Washington to Waynesburg. The cost of the road was $4975 per mile exclusive of equipment.

Provenance

Text from History of Washington County, Pennsylvania : with Biographical Sketches of Many of Its Pioneers and Prominent Men, published 1882, in the public domain in the United States and digitised by the Internet Archive.