| March 2010 | Flood | North Attleboro | 2 hurt, $23,580,000 | Four to eight inches of rain fell across Bristol County resulting in several small streams rising above flood stage, including the Mill River in Taunton, the Canoe River at Norton, the Wading River at Norton, and the Segregansett River at Dighton, all of which set records.||Basements flooded in Taunton, North Attleboro, Attleboro, Norton, Mansfield, and Acushnet. Numerous streets were closed due to flooding in Taunton, Fall River, Dartmouth, Norton, Dighton, Raynham, Somerset, North Attleboro, Attleboro, Freetown, Westport, Berkley, Mansfield, Rehoboth, and Swansea, including Route 6 in Westport, Interstate 195 at Exit 3 in Swansea, Route 24 in Dartmouth, and Route 140 in Freetown (exit 8). The North Attleboro Town Hall sustained $350,000 worth of damage from flooding and Richards Memorial Library was closed for several weeks after the basement was flooded with water and sewage. A pond at Capron Park Zoo in Attleboro overflowed, threatening zoo buildings. It was able to be pumped out, keeping water out of most of the buildings. One building was flooded with two feet of water, damaging boxes of gift shop items and supplies.||Route 44 on the Taunton/Raynham line was closed for the second time in a month due to flooding from the Taunton River. An amphibious vehicle from the Boston Duck Tours was called into service to ferry residents from isolated neighborhoods to nearby supermarkets and pharmacies.||One bridge (Wheeler Street) was destroyed and three others damaged in Rehoboth when the Palmer River flooded. Portions of two of the damaged bridges (Danforth and Elm Streets) were undermined and washed away and the Summer Street bridge sustained structural damage. Two people were rescued when they fell into the Palmer River while trying to rescue their dog. They were transported to Rhode Island Hospital.||Sixteen year round residents at the Canoe River Camp Ground in Mansfield were evacuated. Three apartment buildings on Riverbank Road in Attleboro were completely surrounded by water overflowing from the Ten Mile River. The Seven Mile River in South Attleboro overflowed its banks, flooding Pitas Avenue, isolating twenty homes. Six structures in North Attleboro were evacuated because of flooding.||In hard-hit Fall River: Numerous roads were flooded, including Columbia Street and Mount Hope Avenue. Storm water overwhelmed storm drains, blowing out of the manholes with such force that it ripped up pavement, gravel, and utilities. Twenty nine homes lost power and gas service when the utilities were ripped up. Bricks from sidewalks along Columbia Street floated down Canal and Columbia Streets, collecting in piles on Broadway and Anawan Street. Doran Elementary School was flooded and the sewage treatment plant became overwhelmed with flood waters. A vehicle became stuck in floodwaters, trapping the occupants. Railroad tracks were under water at Interstate 195 and at Route 6. The southbound lanes of Route 24 were closed from President Avenue to Route 195. A 25 foot wide sinkhole developed on Jackson Street. At least 300 people were evacuated from their homes. The mayor declared a state of emergency.||In Freetown: 85 school-children were taken to a shelter after flooding made it impossible for buses to take them home. The Assonet Bay Shores neighborhood (home to about 1000 people) was cutoff to regular traffic by floodwaters and the collapse of a Narrows Road/Causeway Road bridge. Eleven students at the Crystal Springs School (a learning center for children and adults with learning disabilities) were stuck at the school for an evening after the bridge collapsed. They were able to be transported back to the main part of the city when two mountain rescue vehicles owned by the state police were dispatched. The vehicles remained in place for several days to transport residents between the neighborhood and the rest of the city. A bridge 20 yards downstream from the Forge Pond Dam crumbled, leaving a four foot gap in Forge Road. Fifteen households in Assonet Village were evacuated as Forge Pond continued to rise. Schools were closed early Tuesday, March 30 and for the day Wednesday, March 31 due to flooding. ||There were three minor house fires in Mansfield that were the result of floodwaters reaching burners and electrical panels in basements. |
| March 2010 | Flood | Attleboro | $11,790,000 | Several small streams rose above flood stage in Bristol County, including the Wading River at Norton, the Mill River at Taunton, and the Segregansett River at Dighton.||Collections at the Attleboro Arts Museum were damaged by flood waters. River Bank Road in Attleboro and Franklin Avenue in North Attleboro were flooded by the Ten Mile River. Several other roads in Attleboro and Norton were flooded. Several basements in North Attleboro were flooded. Portions of Route 44 and Dean Streets on the Taunton/Raynham line were closed for several days after becoming flooded with several feet of water. Several other streets in Taunton were closed due to flooding. The Wilson Road causeway in Fall River also was closed. ||In Freetown, three families were evacuated after Long Pond overflowed its banks, threatening the homes. Two homes in Taunton were evacuated. |
| February 2016 | Thunderstorm Wind | North Attleboro | $15,000 | Multiple wires were downed throughout North Attleboro. A tree and wires on Wilmarth Street in Attleboro were downed by thunderstorm winds. |
| August 2006 | Thunderstorm Wind | Attleboro | $10,000 | no account filed |
| September 2023 | Tornado (EF0) | North Attleboro | $5,000 | An EF-0 with maximum winds of 75 mph briefly touched down in a|rural area of North Attleborough on Ellis Road which caused tree|damage south of High Street. The tree damage was limited to the|tops of three trees having been twisted off and lofted into nearby|pasture. After speaking with the homeowners they described seeing|the sheets of rain change direction before seeking shelter in|their basement. The tree damage along the path was consistent with|wind speeds between 65 and 75 mph, resulting an EF-0 rating on |the Enhanced Fujita Scale. |
| September 2018 | Flood | Attleboro | $5,000 | At 12:37 PM, heavy rain caused street flooding at the intersection of Peck Street and North Main Street in Attleboro. A car was trapped in the floodwaters. |
| February 2016 | Thunderstorm Wind | Attleboro | $5,000 | A tree and wires on Chartley Brook Lane were downed by thunderstorm winds. |
| August 2016 | Thunderstorm Wind | North Attleboro | $5,000 | A large tree on Anawan Road was downed by thunderstorm winds. |
| July 2013 | Lightning | North Attleboro | $5,000 | Lightning struck a house on Elmwood Street, igniting a fire. The house sustained minor damage. |
| August 2012 | Flood | Attleboro | $5,000 | Pleasant and Forest Streets were flooded. A car was stuck in one foot of water on Forest Street. |
| August 2016 | Thunderstorm Wind | Attleboro | $3,000 | A tree branch was downed onto wires on Gaywood Avenue by thunderstorm winds. |
| June 2011 | Thunderstorm Wind | Attleboro | $3,000 | A tree on Turner Street was downed by thunderstorm winds. |
| July 2008 | Thunderstorm Wind | North Attleboro | $3,000 | Trees and wires on Paine Road were downed by thunderstorm winds. |
| August 2019 | Thunderstorm Wind | Attleboro | $2,000 | In Attleboro, a tree was down on a house on Smith Street. A tree was down on Maple Street near Brookhaven Street. A tree was down on James Court. Trees and wires were down on Parker Street. |
| September 2023 | Thunderstorm Wind | North Attleboro | $1,000 | In North Attleboro, there were trees down on wires on Jefferson St. |
| June 2020 | Thunderstorm Wind | North Attleboro | $1,000 | In North Attleboro, multiple trees were down on High Street. |
| July 2023 | Thunderstorm Wind | Attleboro | $800 | In Attleboro, a tree was down on wires on Berwick Rd. |
| August 2023 | Thunderstorm Wind | Attleboro | $800 | In Attleborough, a tree and wires were down. |
| August 2019 | Thunderstorm Wind | North Attleboro | $800 | In North Attleborough, a tree was down on High Street and a tree was down on wires on Ash Street. |
| July 2023 | Thunderstorm Wind | North Attleboro | $500 | In North Attleboro, there was a tree down on Rt. 1 South. |
| July 2023 | Thunderstorm Wind | Attleboro | $500 | In Attleboro, a tree was down on wires near Mechanic St. |
| August 2023 | Thunderstorm Wind | Attleboro | $500 | In Attleborough, a tree was down blocking the road. |
| November 2020 | Thunderstorm Wind | Attleboro | $500 | In Attleboro, a tree was down on Willard Road where it becomes Haggerty Highway. |
| September 2023 | Flood | North Attleboro | - | In Plainville, the exterior of a home was flooded on Old Farm Rd. |
| September 2023 | Flood | North Attleboro | - | In North Attleboro, there was a car stuck in flood waters on East St. |
| September 2023 | Flash Flood | North Attleboro | - | In North Attleboro, multiple apartments were flooded on Chestnut St. |
| July 2023 | Flash Flood | North Attleboro | - | In North Attleborough, Chestnut St was closed due to flooding with cars stuck in the road. |
| July 2023 | Flash Flood | South Attleboro | - | In Attleboro there was significant street flooding at the intersection of Newport Ave and Irving Ave. |
| September 2022 | Heavy Rain | Attleboro | - | In Attleboro, a 24 hour rainfall total of 5.37 inches was reported. |
| December 2020 | Flood | South Attleboro | - | In Attleboro at 1152 AM EST, a section of Collins Street was flooded and impassable. |
| June 2020 | Flood | North Attleboro | - | In North Attleboro, a spotter reported flooding on Route 1A, which resulted from 1.5 inches of rain in 15 minutes. |
| June 2019 | Hail | North Attleboro | - | At 3:05 PM EST, an amateur radio operator reported 1-inch diameter hail in North Attleborough. At 3:10 PM EST, a member of the general public reported 1.5-inch diameter hail in North Attleborough. At 3:19 PM EST, an amateur radio operator in Attleboro reported 1 inch diameter hail. |
| August 2019 | Flood | Attleboro | - | In Attleboro, Forest Street at Field Road by flooded and impassable for a time. |
| October 2017 | Flood | Attleboro | - | Flooding in Attleboro occurred on Forest Street at the railroad underpass. |
| October 2015 | Flood | Attleboro | - | Forest Street was closed due to flooding. |
| August 2012 | Flash Flood | South Attleboro | - | Route 1A was flooded over the curbs. |
| July 2012 | Hail | Attleboro | - | Nickel to quarter size hail fell in Attleboro. |
| May 2011 | Hail | Attleboro | - | Penny size hail covered the ground. |
| April 2010 | Flood | North Attleboro | - | Four to eight inches of rain fell across Bristol County resulting in several small streams rising above flood stage, including the Mill River in Taunton, the Canoe River at Norton, the Wading River at Norton, and the Segregansett River at Dighton, all of which set records.||Basements flooded in Taunton, North Attleboro, Attleboro, Norton, Mansfield, and Acushnet. Numerous streets were closed due to flooding in Taunton, Fall River, Dartmouth, Norton, Dighton, Raynham, Somerset, North Attleboro, Attleboro, Freetown, Westport, Berkley, Mansfield, Rehoboth, and Swansea, including Route 6 in Westport, Interstate 195 at Exit 3 in Swansea, Route 24 in Dartmouth, and Route 140 in Freetown (exit 8). The North Attleboro Town Hall sustained $350,000 worth of damage from flooding and Richards Memorial Library was closed for several weeks after the basement was flooded with water and sewage. A pond at Capron Park Zoo in Attleboro overflowed, threatening zoo buildings. It was able to be pumped out, keeping water out of most of the buildings. One building was flooded with two feet of water, damaging boxes of gift shop items and supplies.||Route 44 on the Taunton/Raynham line was closed for the second time in a month due to flooding from the Taunton River. An amphibious vehicle from the Boston Duck Tours was called into service to ferry residents from isolated neighborhoods to nearby supermarkets and pharmacies.||One bridge (Wheeler Street) was destroyed and three others damaged in Rehoboth when the Palmer River flooded. Portions of two of the damaged bridges (Danforth and Elm Streets) were undermined and washed away and the Summer Street bridge sustained structural damage. Two people were rescued when they fell into the Palmer River while trying to rescue their dog. They were transported to Rhode Island Hospital.||Sixteen year round residents at the Canoe River Camp Ground in Mansfield were evacuated. Three apartment buildings on Riverbank Road in Attleboro were completely surrounded by water overflowing from the Ten Mile River. The Seven Mile River in South Attleboro overflowed its banks, flooding Pitas Avenue, isolating twenty homes. Six structures in North Attleboro were evacuated because of flooding.||In hard-hit Fall River: Numerous roads were flooded, including Columbia Street and Mount Hope Avenue. Storm water overwhelmed storm drains, blowing out of the manholes with such force that it ripped up pavement, gravel, and utilities. Twenty nine homes lost power and gas service when the utilities were ripped up. Bricks from sidewalks along Columbia Street floated down Canal and Columbia Streets, collecting in piles on Broadway and Anawan Street. Doran Elementary School was flooded and the sewage treatment plant became overwhelmed with flood waters. A vehicle became stuck in floodwaters, trapping the occupants. Railroad tracks were under water at Interstate 195 and at Route 6. The southbound lanes of Route 24 were closed from President Avenue to Route 195. A 25 foot wide sinkhole developed on Jackson Street. At least 300 people were evacuated from their homes. The mayor declared a state of emergency.||In Freetown: 85 school-children were taken to a shelter after flooding made it impossible for buses to take them home. The Assonet Bay Shores neighborhood (home to about 1000 people) was cutoff to regular traffic by floodwaters and the collapse of a Narrows Road/Causeway Road bridge. Eleven students at the Crystal Springs School (a learning center for children and adults with learning disabilities) were stuck at the school for an evening after the bridge collapsed. They were able to be transported back to the main part of the city when two mountain rescue vehicles owned by the state police were dispatched. The vehicles remained in place for several days to transport residents between the neighborhood and the rest of the city. A bridge 20 yards downstream from the Forge Pond Dam crumbled, leaving a four foot gap in Forge Road. Fifteen households in Assonet Village were evacuated as Forge Pond continued to rise. Schools were closed early Tuesday, March 30 and for the day Wednesday, March 31 due to flooding. ||There were three minor house fires in Mansfield that were the result of floodwaters reaching burners and electrical panels in basements.||Damage amounts can be found in the March Storm Data when most of the damage occurred. Rivers and small streams remained in flood into April. |
| February 2008 | Flood | North Attleboro | - | Chestnut Street was closed at East Street because of flooding. |
| June 2008 | Flash Flood | North Attleboro | - | Many locations in North Attleborough were flooded as one inch of rain fell within 20 minutes. Streets that were flooded include Route 1A across from Dunkin Donuts, Route 1 at Elm Street, Chestnut Street, and Commonwealth Avenue. |
| June 2007 | Thunderstorm Wind | Attleboro | - | Microburst occurred on the Stone-E-Lea Golf Course in Attleboro. Approximately 50 trees were downed on the course. |
| August 2007 | Thunderstorm Wind | Attleboro | - | Trees and wires down on Robinson Street. |
| June 1998 | Flash Flood | Attleboro | - | Three Mile River |
| July 2008 | Hail | North Attleboro | - | no account filed |
| June 2006 | Hail | Attleboro | - | no account filed |
| July 2004 | Hail | Attleboro | - | no account filed |
| September 2002 | Heavy Rain | South Attleboro | - | no account filed |
| June 2000 | Thunderstorm Wind | Attleboro | - | no account filed |
| June 1997 | Thunderstorm Wind | Attleboro | - | no account filed |