BlockBefore

Trinity Episcopal Church, 708 Twenty-second Street, Galveston

Trinity Episcopal Church, 708 Twenty-second Street, Galveston, Galveston County, TX. Surveyed as HABS TEX,84-GALV,17-, with a 2,364-word written history.

From the record

“The Trinity Church represents one of Galveston's earliest surviving buildings, dating from and is a notable example of the English Gothic style parish church.”

Written record, HABS TEX,84-GALV,17- survey. Machine-read text.

Surveyed by the federal HABS program as HABS TEX,84-GALV,17- · the record runs 2364 words · one of 76 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1103 words

Source document Quoted word for word from HABS TEX,84-GALV,17-. Not written, edited or summarised by this site.

The Trinity Church represents one of Galveston's earliest surviving buildings, dating from and is a notable example of the English Gothic style parish church. PART I. HISTORICAL INFORMATION A. Physical History: 1. Date of erection: 2. Architects: John De Young vas the original architect and also superintendent of the carpenter work. Nicholas J. Clayton, a notable Galveston architect, was responsible for the repairs of the storm and Stove and Stove, architects of Galveston, vere engaged for the raising operations in 3. Builder, contractor, supplier; The granite and brick vork vas executed by Frank Brown, a Galveston resident. Mr.

Bourke plastered the interior in In the raising of the church above the existing floor level vas supervised by Stove and Stove, Architects, and contracted to John Egert. k* Original plan and construction: John De Young, possibly Texas' first architect, vas in charge of the carpenter vork and superintendence of the building. F, Brown executed the brick vork. The cornerstone vas laid on November 29, but construction vas slow. In December I856 the vestry met again to adopt De Young's "draft and plan for columns and/or pillars to be placed under roof en each side to support the said roof." A committee was also appointed to solicit funds for enclosing the church. TRINITY EPISCOPAL CHURCH HABS NO.

TX-29U (Page 2) On May 25, the vestry and church trustees were authorized to borrow to complete the new church. This was done with the lender, John A. Sauter, accepting the church building and its site as security. The building was well along at the end of September I857 at which time the plastering by a Mr. Bourke was being executed. Finally on November 1 the building was opened for worship. Although it was highly regarded at the time, it remained unfinished. The Tri-Weekly News, November 21, printed the following description: "...Exterior: extreme length, 157 feet; width 63 feet. Interior: from front door to back of chancel, lU2 feet; chancel, 28 feet deep and 30 feet wide, with vestry rooms at sides, Ik by 28 feet. Width, interior, 60 feet. Height to apse of arch, about U0 feet.

150 pews, 60 of which have been rented for per annum. Roof supported by two rows of heavy cluster columns, bronzed. Side windows of enamelled glass, and chancel windows of stained glass. The tower, yet to be raised 25 feet, and exterior to be finished, which will cost about The bell is a fine one, one ton weight. The chancel windows are exceedingly beautiful and cost De Young's original plan is not presumed to have included the columns but they were demanded by the congregation from fear that the roof would fail without them. It was in December as mentioned above that this revision was adopted. The building debt prevented consecration of the church until June 17, On March 21, the Reverend Eaton was buried in a tomb under the floor of the chancel, a place of his own choosing.

Services continued in the church until September when a strong gale blew off a portion of the roof which caused some damage to the interior. The building was soon repaired and in use again. 5. Alterations and additions: By serious discussion engaged the vestry in contemplation of the poor physical condition of the building. Two arguments divided the' vestry into two groups, one desiring to build anew, the other held out for renovation of the old. No progress was made on this issue, however, but the great devastating hurricane of served to resolve the controversy. On September 8 of that year the city was inundated and over half destroyed by a tropical hurricane. Trinity Church suffered great damage, the entire south wall was destroyed and much wind and TRINITY EPISCOPAL CHURCH HABS NO.

(Page 3) water damage occurred on the interior. Repairs were quickly- underway under the supervision of the noted Galveston architect, Nicholas Clayton, and the building was again in use by May The interior decoration and the rebuilding of the tower were at that time still incomplete. During the following years little occurred to the building except for the finishing of it by Then in the vestry solicited funds for the necessary raising of the building. Stowe and Stowe of Galveston were selected as architects to supervise the work and on July 31, a contract calling for raising the church building four and one half feet above that old floor level was signed with John Egert. A separate contract of October 31 provided for a new concrete floor with heating ducts.

Additional renewal came about in June when was expended on a new copper shingle roof. In that year also a bequest provided funds for plastering the interior walls. Shortly thereafter in February contracts were signed for this work and the repair of all brick work, waterproofing and small interior changes. During June of that year a heating system was installed. B. Historical Events and Persons Connected with the Structure: The Reverend Benjamin Eaton arrived in Texas in l8Ul, landing at Galveston on January 13 from New Orleans. Eaton found the island and "city" of Galveston to be a desolate place and that little interest was expressed by the people in religious matters.

By the following month on February 6, however, sufficient numbers of persons expressed their desire for a church and at a gathering on that date they formally organized a Parish and elected a vestry. The first meetings were held in- the county courthouse building but by April Eaton was petitioning his Foreign Committee for financial assistance to erect a structure. The Galveston City Company, as was its custom, donated a site for the churchy the southeast corner of and Winnie Streets. By August of l8Ul a frame building of Gothic style was in progress of erection and scheduled for completion by the first of that year. Delays and difficulties hampered the building progress, however, and it was not until June 26, that it was opened for worship services.

Early in the morning of September l8^2.a strong north wind blew the building down. Great effort was required to rebuild but by April I8U3 the church was again finished. It was consecrated the following year. By the church membership had grown and the old building was not adequate for the times. TRINITY EPISCOPAL CHURCH HABS SO. (Page k) The meeting of the vestry September 19, resulted in a resolution to begin the new building. The site was at the opposite end of the block from the old church, the southwest corner of Winnie and Streets. The first services held in the church were on November 1, C.

Bibliography

1199 words

Source document Quoted word for word from HABS TEX,84-GALV,17-. Not written, edited or summarised by this site.

1. Primary and unpublished sources: Galveston, Texas, Trinity Episcopal Church. Church Archives. "Minutes of the Vestry of Trinity Church, Galveston", Manuscript, 2. Secondary and published sources: Morgan, William M. Trinity Protestant Episcopal Church, Galveston, Texas 18UI-1953, Houston: The Anson Press, Prepared John C. Garner, Jr. Director Galveston Architecture Inventory March IT, PART II. ARCHITECTURAL INFORMATION A. General Statement: 1. Architectural character: Trinity Church is typical of the English medieval parish churches in the Gothic style. It is a basilica plan with a central tower at the east end. The brick walls are supported by buttresses as are all corners of the building.

All buttresses project above the building and although they have flat copings it seems probable that they were never finished according to the original design. 2. Condition of fabric: The building is presently in good condition. The walls are tight and show no cracks or openings and the bricks are sound and mortar joints good. The roof is also in good condition. B. Description of Exterior: 1. Over-all dimensions: The church is 63 feet 6 inches wide and 123 feet long, and the tower is 2k feet wide and projects 2U feet 9 inches from the main facade. Height of the roof ride is 53' from the floor level while the tower is 59' from that point. 2. Foundations: The foundations are presumed to be of the same / brick as are the walls. / TRINITY EPISCOPAL CHURCH HABS NO.

(Page 5) 3- Wall construction: The walls are constructed of a light toned grayish-red brick, laid up without headers. It is readily apparent where the numerous repairs and restorations have occurred. All of the brick are hard-burned and of similar color and texture but the original brick show the characteristic soft markings of the hand molding process. Mortar Joints are thick and not tooled. The walls are 17 inches thick. Molded bricks are found in the hood-molds over door and window openings and in a string-course just below the parapet. Also the parapet with copings is-surrounded by a string course of molded brick with a cyma-recta profile. The parapet is stuccoed. k. Structural system: Exterior walls of the church are load bearing and strengthened at intervals by buttresses.

Each side facade is therefore divided into eight bays approximately 13' 6" between buttress faces. The buttresses are of the same brick as the walls. They are rectangular in section, bonded into the walls and have two coped shoulders, one ten feet from the floor line, the other twenty- four feet. They have flat copings on top but probably were intended to end with a gabled coping or decorative pinnacle. At each corner of the building there are slim octagonal towers which are in effect angle buttresses, that project above the cornice lines. Rectangular buttresses corresponding in appearance to those along the side facades radiate from each outside angle of these towers. The top sections of the towers have recessed panels in each of the eight faces.

These towers or angle buttresses terminate in a flat coping. It seems probable that they were intended to be capped in some other fashion and in their present state give the appearance of being unfinished. Internal support is provided by a series of cluster columns of wood, quatrefoil in section, that divide the space into a central nave and side aisles. These columns are spaced 15 feet center to center and support an elaborate wood hammer beam roof. The span across the side aisles is 15' 3" and across the nave it is 30 feet. 5- Openings: a. Doorways and doors: There are three front entrances, the principal entrance being located in the center of the east TRINITY EPISCOPAL CHURCH HABS NO. (Page 6) tower.

Secondary entrances are located at either side of the tover and open into the sanctuary itself in line with the side aisles. The openings are four-central arches and have corresponding molded "brick hood-molds. The pair of doors are wood and have deep-set unmolded panels on the exterior and diagonal beaded ceiling finish on the interior. b. Windows: Window openings are lancet arches. The original windows had a center mullion creating coupled lancet-shaped windows in each arch opening. Diagonal wood millions divided the glass into a small diaper pattern and a transom bar divided the area into two sections. Most windows are modern replacements and are commemorative stained glass memorials. The large window in the west wall is notable.

It was placed there in as a memorial to George Sealy, prominent Galveston businessman and financier in the nineteenth century. The window is reported to be from the Tiffany company. 6. Roof: The roof structure is a fine wood hammer beam design, typical of the medieval style. The roof itself is covered with asphalt shingles over the original standing seam metal roof and has a slope of 10 in 12. A brick parapet wall extends around the whole perimeter. Drain collectors, large bulbous copper or brass fixtures, are connected to the parapet at alternating wall buttress. Water is conducted by 5" metal leaders to the ground. C. Description of Interior: 1. Floor plan: In plan the church is that of the basilica type.

It consists of a central entrance vestibule in the base of the tover and a rectangular nave divided by two rows of cluster columns into a side aisle plan. 2. Stairway: The stair to the balcony is located on the north wall of the tower. It is a wood quarter-turn stair with winders. 3. Floor: The floor is cement throughout with carpet runners. U. Wall and ceiling finish: Walls are plastered and painted. The ceiling is beaded wood laid in alternating diagonal panels. 5. Doors: There are four doors leading from the tower vestibule to the nave, each containing four wood panels. A wood molding frames the opening in the shape of a large arch. TRINITY EPISCOPAL CHURCH HABS NO. (Page 7) 6. Trim: Wood trim around the doors only. 7.

Hardware: The entrance door has the only hardware of note, a massive iron rim lock. 8. Lighting: Modern electric fixtures. D. Site: 1. Orientation and general setting: The church occupies the southwest corner of Street and Winnie Avenue and faces east. Prepared by: John C. Garner, Jr. Director Galveston Architecture Inventory March 17, PART III. PROJECT INFORMATION The Galveston Survey was jointly sponsored by the National Park Service, Office of Archeology and Historic Preservation and the Galveston Historical Foundation Inc., and developed under the direction of James C. Massey, Chief of the Historic American Buildings Survey (HABS). This structure was measured and drawn in the summer of under the direction of Professor Melvin M. Rotsch, project supervisor (Texas A&M), John C.

Garner, architect (University of Texas), by student architects Michael D. Casey (University of Houston), Larry D, Johnston (Kansas State University), James E. Murphy (Texas A&M), and Gerald R. Rapp (Texas A&M). The historical data was written by John C, Garner, acting as the Director of the Galveston Architecture Inventory. The written data was edited for transmittal to the Library of Congress in the summer of by Kent R. Newell of the HABS staff. The photographs were taken by Allen Stross in the summer of

In context

Galveston, Texas The place record: every map, photograph and survey of this town.
Galveston County, Texas 158 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Galveston

24 of 69 records shown

The federal surveyors worked through Galveston building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Fort Point District Boat YardHABS TEX,84-GALV,44A-9,705 words
U.S. Coast Guard Cutter DauntlessHAER TX-34023,700 words
502 29th StreetHABS TX-4023,223 words
Williams-Tucker HouseHABS TEX,84-GALV,42-2,763 words
First Presbyterian ChurchHABS TEX,84-GALV,22-2,587 words
Powhatan HotelHABS TEX,84-GALV,5-2,409 words
U. S. Custom HouseHABS TEX,84-GALV,12-2,109 words
James Mareau Brown HouseHABS TEX,84-GALV,1-1,904 words
Colonel Walter Gresham HouseHABS TEX,84-GALV,26-1,818 words
Henry Rosenberg HouseHABS TEX,84-GALV,13-1,801 words
George Sealy HouseHABS TEX,84-GALV,28-1,728 words
Galveston Baggage & Cordage FactoryHABS TEX,84-GALV,23-1,726 words
Michel B. Menard HouseHABS TEX,84-GALV,3-1,547 words
Eaton Memorial Chapel of Trinity Episcopal ChurchHABS TEX,84-GALV,18-1,505 words
John Henry Hutchings HouseHABS TEX,84-GALV,30-1,478 words
Morris Lasker HouseHABS TEX,84-GALV,27-1,392 words
University of Texas Medical School BuildingHABS TEX,84-GALV,36-1,370 words
U.S. Coast Guard (USCG) Fort Crockett HousingHABS TX-34761,285 words
U.S. Coast Guard (USCG) Fort Crockett HousingHABS TX-34741,266 words
U.S. Coast Guard (USCG) Fort Crockett HousingHABS TX-34851,266 words
U.S. Coast Guard Cutter PAWPAWHAER TX-1061,263 words
Trueheart-Adriance BuildingHABS TEX,84-GALV,15-1,255 words
George Ball HouseHABS TEX,84-GALV,4-1,237 words
U.S. Coast Guard Cutter BLACKTHORNHAER TX-1071,188 words

Provenance

  • Written history. Quoted verbatim from HABS TEX,84-GALV,17-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.