Gulf Intracoastal Waterway at State Highway 124 bridge Located approximately 3 .4 miles by road north of the U. S. Highway 87 and State Highway 124 intersection in High Island, Texas; on the north bank of the waterway, east of the State Highway 124 bridge (Figure 1). Quad/UTM: United States Geological Survey, High Island, Texas quadrangle, Universal Transverse Mercator Zone 15; meters east, meters north Occupation and Current Use Data: The U. S. Army, Corps of Engineers (COE) has been the owner of the High Island Bridge Tender's Station on the Louisiana-Texas (La-Tex) Intracoastal Waterway since the station's original construction in The annual reports of the U.S.
Army Chief of Engineers (War Department various dates) indicate that the bridge tender's station and the associated Mud Bayou Railway Bridge were continuously operated and maintained between and after which time the railway crossing was discontinued. At present, the High Island Bridge Tender's Station is unoccupied and extensively deteriorated, having suffered the effects of prolonged abandonment, partial demolition and widening of the adjacent waterway. Most of the original bridge tender's station property has been redeveloped as a small petrochemical fractionation plant and storage facility.
Significance Statement: Designed by the Galveston District COE in in conjunction with planning efforts for the construction of the New Orleans, Louisiana to Corpus Christi, Texas portion of the Louisiana-Texas Intracoastal Waterway (later renamed the Gulf Intracoastal Waterway), the High Island Bridge Tender's Station was built to support the Corps' operation of a swing bridge at the Gulf and Interstate Railway Company's crossing of Mud Bayou near High Island, Texas. Resident engineers coordinated the railway bridge's movement to allow for the safe passage of commercial, military and civilian vessels traveling along the waterway eastbound and westbound from Beaumont and Galveston. The High Island Bridge Tender's Station included a bridge tender's residence (HABS No.
TX-3404-A), a powerhouse and garage (HABS No. an office, a control house, a gasoline house, a fire-hose box, a machinery house, a timber dock and concrete retaining wall system. HIGH ISLAND BRIDGE TENDER'S STATION HABS NO. (Page No. z.) Although the Mud Bayou Railway Bridge and much of the bridge tender's station were dismantled and removed following abandonment of the railway, the High Island Bridge Tender's Station, Residence and the High Island Bridge Tender's Station, Powerhouse and Garage (HABS have remained as representative examples of a locally unusual type of residential and associated building construction.
Both buildings retain a remarkable amount of historical and architectural integrity and have been determined eligible for listing in the National Register of Historical Places. Both are scheduled for demolition and removal by the Galveston District COE because they currently pose a severe navigation hazard to vessels passing along the waterway. Together the reJ!laining High Island Bridge Tender's Station buildings form an historically significant architectural complex which has been recognized as a component of the greater La-Tex Intracoastal Waterway Historic Engineering District'.
Historical Context: The construction of the Mud Bayou Railway Bridge and High Island Bridge Tender's Station at Mud Bayou near High Island, Texas came about as an integral, albeit diminutive, aspect of the COE's long standing goals to develop a nationwide system of inland waterways.
Those goals extend back in time to the COE's very beginnings in the realm of civil works, and were first envisioned for Texas with Congress' authorization of a canal route survey between Donaldsonville, Louisiana (on the Mississippi River) and the Rio Grande River in Texas2 Howell's directive to the three lead engineers for the Mississippi River to the Rio Grande survey project was "to utilize the navigable bayous, lakes, bays, and sounds or lagoons, near the coast, and make the cuts connecting them along the shortest lines available" (Alperin While various small canal projects were completed by the Galveston District COE over the next several decades, Howell's survey report of was shelved for thirty years until when Major Edgar Jadwin reviewed Howell's prior report and went on to propose two additional surveys west and south of Galveston Bay.
Subsequently, the River and Harbors Act of called for further surveys of a continuous navigation canal from Boston to the Rio Grande and a canal was completed between Galveston and Corpus Christi by It was not until the March 3, revision of that act that Congress authorized survey and construction of a canal between the Sabine River and Galveston Bay - some 50 years after Howell's initial recommendations.
The Sabine River to Galveston Bay section of the La-Tex Intracoastal Waterway, itself a component of the greater Gulf Intracoastal Waterway project, was originally specified to be 9 feet deep and 100 feet wide - thus keeping with the dimensions used by the COE for other major navigational channels along the Mississippi and Ohio rivers (Alperin Utilizing as much of the existing route of Mud Bayou near High Island, Texas, the waterway was to cross the Gulf Interstate Railway Company's route from Beaumont to Galveston-(Fi~Fe 27. The Gulf Interstate Railway Company's line was at that time For further information about this historic engineering resource, see HAER No. 2 Most of the information provided in this historic context has been derived and adapted from M.
Alperin's detailed historical studies of the Galveston District COE and the Gulf Intracoastal Waterway. The reader is referred to Custodians of the Coast: History of the United States Army Engineers at Galveston (Alperin and History of the Gulflntracoastal Waterway (Alperin HIGH ISLAND BRIDGE TENDER'S STATION HABS NO. (Page No 3 ) leased and operated by the Gulf, Colorado and Santa Fe Railway. Upon the COE's request that the railroad company improve their existing bridge at Mud Bayou in accordance with government regulations, a legal controversy arose concerning the railroad company's responsibility to provide the requested improvement. As a result of two court decisions, the COE was ultimately required to sustain the cost of bridge construction.
By planning for the Mud Bayou Railway Bridge project was well underway. By all but one mile of the waterway between Sabine River and Galveston Bay had been dredged, and all plans and specifications had been approved for construction of the bridge at Mud Bayou, a bridge tender's residence and all necessary ancillary structures. The approved bridge design was a flat Warren through-truss with diagonal end-posts, to be constructed of steel and placed on a pivoting turnstile to allow the bridge to swing horizontally3. The design of the railway bridge was probably proposed by the contracting firm and selected by the COE as the most favorable for its cost and purpose.
All components of the project were built using National Industrial Recovery Act funds allocated to the COE by the Public Works Administration (PWA) under PWA Federal Project Number The Chief of Engineer's Annual Report of anticipated costs of for the bridge with appurtenances, and for the High Island Bridge Tender's Station, Residence (War Department Regular funds anticipated for operation and maintenance costs for the fiscal year were estimated to be By August 18, the entire project had been completed at a cost of (Galveston District COE including both the bridge and the High Island Bridge Tender's Station, Residence.
Although there are no known detailed records of the bridge tender's activities in the early years, in the first full year of operation almost vessels with a partial estimate of tonnage over passed eastbound and westbound along the waterway (War Department That same year the railroad bridge at Mud Bayou was operated and maintained by hired labor at a cost of (War Department In fiscal year the Mud Bayou Railway Bridge was operated and maintained by hired labor for a cost of and vessels traveled eastbound and westbound with estimated tonnage over one million (War Department Vol. 1, p. 781 and Vol. 2, p.
During World War Il, the dimensions of the main channel had been enlarged to 12 feet by 125 feet and maintenance dredging continued as always to control sedimentation, especially within crossings of large natural bay and river crossings. By maintenance and operation of the railway bridge at Mud Bayou had risen to using hired labor (War Department and estimated annual traffic along the waterway had risen to 23 million tons (U.S. Army Engineer Districts In addition to the Mud Bayou Railway Bridge, other improvements constructed along the LA-TEXIntracoastal Waterway by the COE by that time included a sheet pile and sand dike at Galveston Bay near Port Bolivar, two sheet pile dikes at Matagorda Bay near Port O,Connor, and floodgate structures at both the Brazos and Colorado river crossings.
3 For further information about this engineering structure, see HABS No. Supplemental Data and Field Records, Mud Bayou Railway Bridge Operations Manual, Plate A (Galveston District COE, HIGH ISLAND BRIDGE TENDER'S STATION HABS NO. (Page No. ~) By maintenance and operation costs had risen to $57 (for fiscal year and an access road and protective retaining walls had been added to the facility (War Department Estimated annual traffic along the La-Tex waterway for exceeded 48 million tons, of which approximately 72 percent was within the eastern section of the waterway between the Sabine river and Galveston Bay (U.S.
Army Engineer Districts and Evidence of the site's original landscaping is apparent in a site plan that shows landscape and waterfront improvements made to the site (allowing construction of the bridge and support buildings -fFigure-3~. By the number of support buildings and structures had been greatly increased and the channel widened ~igure 4). However, by the time of recordation all physical remains of the railroad bridge and other buildings formerly located at the bridge tender's station had been lost - probably through demolition in as well as the gradual erosion of the waterway bank line.
Most of the landscape had also become overgrown in Common Reed (Phragmites australis), and only a few young, secondary- growth trees, primarily Chinese Tallow (Sapium sebiferum), remained to indicate how the landscape may have been treated. A dense stand of Black Willow (Salix nigra) was situated within the borrow ditch beside the old railroad grade and a decomposed palm tree trunk was observed near the bridge tender's residence.