Located fifty miles northwest of Galveston, Texas in the vicinity of the town of Seabrook is a single track, steel railroad bridge and two open deck pile trestle approaches that cross a waterway feeding into Galveston Bay that is known as Clear Creek.
The steel bridge is identified by Southern Pacific, its former owner, as BR It is an intact, though slightly altered example of a Center-Bearing, Through Plate Girder Draw Span that was erected by the bridge and building crews of the Galveston, Harrisburg & San Antonio (GH&SA) Railway Company in Designed in the New York offices of the American Bridge Company in and referred to in the vernacular as a "swing bridge," this span was part of a purchase order that the GH&SA made for four identical bridges--two of which were installed in Texas and two in Louisiana. Besides the site at Clear Creek, the other Texas location was miles to the southwest, at Dickinson Bayou near San Leon. In Louisiana, the company erected swing bridges at Bayou Boeuf and Mermentau.
Four other bridges--also of identical design--were ordered from American Bridge Company earlier in the same year by Morgan's Louisiana & Texas Railway Company for installation over waterways in Louisiana. They were erected at Opelousas Bay and at Bayous Teche, De Glaise and Grosse Tete. Like the spans manufactured by American Bridge Company, the swing bridge at Clear Creek is a significant example of early twentieth century railroad bridge design. It featured main drive machinery with differential gearing and two line shafts, housed within the span's steel superstructure. These were used to actuate both track locking mechanisms and signalization as well as end lift ma- GH&SA RAILWAY CLEAR CREEK BRIDGE HAER No.
(Page 2) chinery and a rack pinion assembly which rotated the bridge to an open or closed position. The swing bridge at Clear Creek provided the GH&SA with the ability to carry unimpeded rail traffic over a waterway that was becoming more and more heavily trafficked during the first decade of the twentieth century. Late twentieth century development of the waterway into a recreation area involved the dredging of Clear Creek, which brought in an influx of sea water into an area that had been historically brackish. Prolonged contact with salt water has resulted in the corrosion of some of the span's lower surfaces and many structural members, including the bottom chords, cross-girders, floor beams and lateral bracing are in an advanced state of deterioration.
The span was ordered removed as a result of the abandonment of this section of Southern Pacific's Texas routes that were included as part of the merger of that company with the Union Pacific (UP) Railroad in PART I. HISTORICAL INFORMATION A. Physical History 1. Date of Erection: 2. Engineer(s): Galveston, Harrisburg & San Antonio (GH&SA) Railway Company, Houston, Texas American Bridge Company New York, New York 3. Original and Subsequent Owners: Galveston, Harrisburg & San Antonio (GH&SA) Railway Company Texas & New Orleans (T&NO) Railway Company Southern Pacific Railway Company Southern Pacific Transportation Company Union Pacific Railroad (1996-present) 4. Builders, Contractors and Suppliers: Builder: GH&SA Bridge and Building Crews. Fabricator: American Bridge Company, New York.
Supplier: Carnegie Steel. 5. Original Plans and Construction Drawings: Copies of original engineering drawings are on microfilm and are located in the Engineering Office, Houston Division, of the former Southern Pacific Transportation Company, Houston, Texas. They are indexed as "BR include 26 frames, measuring 1 x 1 and are mounted on 3 x 7 cards. However, the documents are an assemblage of drawings for the Clear Creek Bridge and shop drawings for the span over Bayou "de Glaisse" [sic] that were produced by American Bridge Company in (i.e., Plan and Section drawings for Clear Creek are included with Floor Plate and Girder drawings for Bayou DeGlaise). GH&SA RAILWAY CLEAR CREEK BRIDGE HAER No. (Page 3) 6.
Alterations and Additions: The bridge at Clear Creek was erected in by GH&SA Bridge and Building crews. No record of alterations during the bridge's first twenty-seven years of operation under GH&SA were located during the research investigations. However, SP company records indicate that Texas & New Orleans (T&NO) maintenance crews installed spur gears in January, at a cost of and added a second-hand gasoline engine in June, for In addition, T&NO work during the included lighting which was added in March, new fenders in June, new approaches in October, and a replacement Waukesha power unit in April, Lighting was replaced by SP maintenance crews in September, and two piers were installed inside the fenders in at a cost of B.
Historical Context: The swing bridge at Clear Creek was constructed on the Seabrook to San Leon branch which was known in the vernacular as the "Galveston Line." Running from Houston to Galveston, the route originated as part of the Galveston, Houston & Kansas City Company in In the road was incorporated as part of the LaPorte Houston & Houston Railway which was purchased by Southern Pacific and operated as two subsidiaries--the Galveston, Houston & Northern and the Galveston Harrisburg & San Antonio (GH&SA) In GH&SA acquired the Galveston, Houston & Northern Railway Company, providing direct access from Houston to Galveston [3] The Clear Creek span, located at the former SP Milepost and the Dickinson Bayou span at MP were constructed by GH&SA along this route Patterned after four identical bridges that were ordered by Morgan's Louisiana & Texas Railway Company for erection over waterways in Louisiana, the bridge at Clear Creek was among four additional spans that were ordered by the GH&SA in the Fall of was chartered in and listed as Morgan's Louisiana & Texas Railroad & Steamship Company The company was under the ownership of Charles Morgan, a cousin of New York financier, Morgan, and involved in the development of shipping along the Gulf Coasts of Louisiana and Texas during the late nineteenth and early twentieth centuries.
By the the "Morgan Line" departed regularly from the ports of Galveston, Texas and New Orleans, Louisiana to New York. Whether there was any correspondence between and GH&SA railway companies about the use of swing spans can only be conjectured. However, GH&SA engineers in the Galveston Division prepared at least two plan and section drawings in September, and transmitted them by mail to the New York offices of the American Bridge Company at 42 Broadway. American Bridge Company designers prepared their initial plan and section drawings for both the Clear Creek and Dickinson Bayou bridges in December, and they were approved by GH&SA in a letter dated January 8, The Dickinson span was referenced as Order No. and the one at Clear Creek was listed as Order No.
The drawings of both bridges carried the note that indicated that they were to be "duplicate[s] of one span [from] Order Order was for three spans which were approved in October, by the Railway Company for Opelousas Bay and Bayous De Glaise and Grosse Tete. Another span for Bayou Teche was ordered by earlier in June of that year and was assigned Order No. GH&SA RAILWAY CLEAR CREEK BRIDGE HAER No. (Page 4) Shop drawings were prepared and work orders for the four GH&SA spans were sent to two of American Bridge Company's plants for fabrication in early They included Pencoyd Iron Works in Philadelphia and the Edge Moore Bridge Works in Wilmington, Delaware.
American Bridge Company had acquired both shops in a massive buyout that occurred between and At the end of that three year period, there were twenty-four steel companies and roughly fifty percent of the American steel industry that were under the control of Morgan & Company and his American Bridge Company Presumably, in early the spans were already in production and the shop drawings were reused for the GH&SA orders. They were rubber stamped in the Pencoyd and Edge Moore shops with the following information: "BR SEABROOK; BR SAN LEON ... BR B. BOEUF; BR MERMENTAU IDENTICAL." GH&SA's bridge components were completed in the Summer of and shipped to Houston.
American Bridge Company fabricated the span's components--including the cylinder piers--for assembly in the field by GH&SA Bridge and Building crews. The three lower sections of the piers were shop riveted and ready to be submerged upon arrival at Clear Creek, while the upper sections were sent unassembled for riveting on-site Top and bottom chords, girders and cross girders, floor beams and brackets, stringers and lateral bracing were shipped partially assembled to facilitate quick erection in the field. Even shafting drawings carried the note instructing the fabricators to ship "Wheels, Levers and Collars ...
[assembled] on shaft[s] where shown [with] Keys driven slightly" Following its completion, the span at Clear Creek was later identified by GH&SA in records that it submitted to the Interstate Commerce Commission, Bureau of Valuation as "Bridge Mile 32" The records also included the following information: Clear Creek bridge's substructure consisted of one concrete abutment and three concrete cylinder piers.
Underwater excavation for the removal of 94 cubic yards of soil was accomplished for a cost of wet excavation of 79 cubic yards was completed for and "common" or dry excavation of 26 cubic yards was completed for Seven cubic yards of stone masonry were used in the construction of the cylinder piers at a cost of Five hundred-fifty-four cubic yards of concrete, valued at were poured into the cylinder piers; 105 cubic yards or worth of material were used in the abutment; and an additional 103 cubic yards of concrete were also poured at a cost of Steel used in the construction of the cylinder piers totaled pounds and a cost of Ten thousand-and-one-hundred linear feet of non-treated wood piling were driven at a cost of creosoted wood piling totals were linear feet for the sum of and 202 thousands of board measure of cypress were installed as grillage at a cost of The total cost of the bridge's substructure was The bridge's superstructure, described in the valuation records as "one steel thru [sic] plate, girder draw span, 150 ft.
long," weighed pounds and cost to fabricate and assemble. Iron added to the structure weighed pounds and was valued at "Sundry items" were included in the valuation records, but were not described. They were listed at making the total costs associated with the construction of the bridge GH&SA RAILWAY CLEAR CREEK BRlDGE HAER No. (Page 5) Structural engineer, George A Hool, first described the mechanics of this bridge type in then again twenty years later. Defining it as a "Center-Bearing Swing Bridge," he wrote that: When a bridge of this type is open, each truss is supported on the end of a cross girder which rests on a center bearing ... This bearing is usually a phosphor bronze disk, from 1 to 3 feet in diameter, [which is sandwiched] between two hardened steel disks.
To prevent the bridge from tipping, balance wheels, ... about 18 inches in diameter and six to eight in number, are fastened to the trusses and floor system in such a way that they roll on a circular track. These wheels are so adjusted that they carry no load, except when the bridge is out of balance on account of wind pressure or similar causes. When the bridge is closed, the ends are raised a proper amount by wedges. Wedges are also inserted ... a sufficient amount to give the trusses a bearing on the pier independent of the cross- girder, but no attempt is made to lift the trusses at these points in order to relieve the cross-girder of any of the dead load. Thus, at the center support, the dead load is carried by the cross-girder, while the live load is supported directly by the pier.
When the bridge is open, the dead load is balanced about the center support. When the bridge is closed, the total dead load reaction is relieved, as the wedges are driven and the ends raised ... The mechanical parts of the bridge are usually designed in such a way that the end wedges, when fully driven, ...provide a positive dead load reaction somewhat greater than the negative live load and impact reaction. This insures the bridge against hammering of one end when a train comes at the other end. By this arrangement, the dead load end reactions are less than those obtained theoretically when the truss is considered as a continuous beam over three level supports. The cost of installation and operation is thereby reduced Four decades earlier, J.A.L.
Waddell, the preeminent structural engineer of the period, was intimately involved in the development of this bridge type and worked with the American Bridge Company in the production of swing or draw spans for various railroad companies throughout the country. He included an in-depth discussion of the design principles of the span in his book De Pontibus in and later, in his two-volume monograph of Bridge Engineering in Waddell described this bridge type as being one of three classes of "revolving draw bridges" that were in use in the early twentieth century. They included "rim-bearing, centre-bearing, and ... combined rim- bearing and centre-bearing" spans.
He went on to classify swing bridges by what he described as the "character of their main girders into three categories." Waddell defined bridges like the one at Clear Creek as "plate girder swing[s]," and he described them along with two other types: "open webbed, riveted girder or riveted truss swings and pin connected truss swings" Apparently, there was some debate about the merits and use of center-bearing plate girder swings among professional engineers during the period. Waddell mentioned in his book in that swing spans had been the topic of papers being presented at the annual meetings of the American Society of Civil Engineers. He also indicated that center-bearing swings "ha[d] been . . . materially improved in the [previous] two decades" Along with Professor Malverd A.
Howe, another well-known structural GH&SA RAILWAY CLEAR CREEK BRIDGE HAER No. (Page 6) engineer and writer of the period, Waddell had conducted a series of experiments in the late with center-bearing and rim bearing designs, using large scale wooden models. He said that "the results of such experiments would be of great value to both the engineering profession and [to] the railroads of America" In utilizing their calculations, Waddell and Howe published tables and formulae for computing live load stresses in swing spans.
In addition, Waddell summarized and enumerated the principle improve- ments that had been made to swing spans by the early They included (a) the use of deep drums as central pivot piers; (b) the use of additional supports (and balance wheels) for both single and double track spans; (c) adequately and scientifically designed operating machinery (rack pinion) and lifting apparatus (center and edge wedges) that were connected firmly and rigidly to the structural metalwork; (d) abandonment of ball bearings and cone shaped rollers in favor of bearing disks of ample size and satisfactory material (phosphor-bronze disks between hardened steel disks) Waddell' s treatise on Bridge Engineering provided bridge designers of the period with complete and in- depth information on swing spans.
He included "economics of swings compared with other kinds of movable spans, specifications for designing them, directions for finding the weights of metal per lineal [sic] foot of span for various portions of swing bridges, depths of trusses, panel lengths, loadings of all kinds, combinations of stresses, details of designs for various swings and their turn tables, operating machinery, power determination, and machinery houses" He concluded that "if the specifications ... be strictly adhered to, and if due consideration be given to all the existing conditions when designing operating machinery, ample strength, rigidity, and endurance will be attained without any unnecessary expenditure of metal or shop work Waddell designed swing spans for American railroads that were of immense length.
They included the 440 foot Jefferson City Highway Bridge, with a drum of 22 feet; three 225 foot swing spans for the Kansas City Southern Railroad with drums of only 17 feet; and a 520 foot swing span for the East Omaha Bridge that was also fabricated by American Bridge Company He considered the turning machinery indispensable for the success or failure of these bridges, writing that "the machinery should [always] receive due care and attention" The main drive machinery responsible for turning the GH&SA span at Clear Creek consisted of a gasoline-powered engine which-- through the use of differential gear and wheel assemblies--turned two line shafts. The first line shaft drove the wedges and released the rail locks simultaneously.
The second line shaft drove two end lift mechanisms and a rack pinion assembly which opened and closed the span. Both operations were separate and one had to be completed before beginning the next. The gasoline motor operated at a single speed and was disengaged and idled to slow the span's rotation because there was no breaking mechanism provided. In addition, the span could only turn a radius of 180 degrees. Of the four GH&SA spans built in 1907--only one erected at Bayou Boeuf--could be turned a complete 360 degrees The oral tradition of SP bridge tenders indicates that Clear Creek Bridge could also be turned manually by a crew of two men through the use of 2" x 1" x "turning levers".
These fit into a casting located on a vertical shaft above the main drive in the center of the span's deck. Clear Creek bridge was GH&SA RAILWAY CLEAR CREEK BRIDGE HAER No. (Page 7) operated by work teams that were gradually reduced in number through the At that time, a single bridge tender opened and closed Clear Creek bridge. He is reputed in the oral tradition to have been housed in a Bridge Tender's House located at Dickinson Bayou and was responsible for the operating of both bridges One SP Bridge inspector said, "He would close one span and drive ahead by truck to close the other.
He would also take a boat out to both spans and then after the train had crossed the last bridge, would repeat the operation in reverse" Despite the advances in engineering that Morgan's American Bridge Company had accomplished with the design and fabrication of swing spans in general and those produced for the and GH&SA roads during the company did not file any patents for these bridges nor any of their differential gear assemblies.
Patent applications filed by American Bridge Company only occurred between and During that period, the company was filing patents on only a minimum of railroad-related product designs including a pneumatic riveting tool a metal punching machine and a hose coupling American Bridge Company did file a patent application for a turn table center mechanism in and cited patent numbers on its shop drawings for Castings However, these numbers do not correspond with U.S. Patent Office numbers issued during this period and further research should be conducted to ascertain how American Bridge Company was protecting its designs.
Although it appears that the company was patenting individual components instead of assemblies or bridge designs during this period, in contrast, movable span mechanisms were being patented by structural engineers from as far away as Europe. An example of this was the filing of a patent application for a bridge turning mechanism by F.
D'or, in St.-Josse-Ten-Noode, Brussels, Belgium The swing bridge or "draw-span" declined in use by the Described as the "ugly duckling in the family of bridges" by Steinman and Watson in the bridge type was noted as having largely disap- peared by the The authors noted that the longest span of this type was a 525 foot long railroad bridge over the Mississippi River at Fort Madison, Iowa that had been erected in American Bridge Company continued to produce movable spans well into the One of the company's most notable examples was the Harry S. Truman Bridge over the Missouri River at Kansas City, Missouri.
Built by Howard, Needles, Tammen & Bergendoff in it included three 250 foot Through-Truss Spans, one 420 foot Through-Truss Vertical Lift Span, eighteen Deck Girder Spans of 78 feet lengths and one Plate Girder Span of 48 feet. The total length of the bridge was feet The GH&SA span at Clear Creek was maintained in continuous use by the SP until the late when rail traffic on the Galveston Line began to decrease significantly. There was intermittent rail traffic during the twenty years that followed, requiring periodic maintenance and inspections. However, rail traffic was discontinued by the early and the bridge was abandoned and locked in an open position. During that decade the area around Clear Creek was developed for entertainment and recreational use.
Prolonged contact with salt water resulted in the corrosion of some of the span's lower surfaces and many structural members. The bridge was finally ordered removed as a result of the abandonment of this section of Southern Pacific's Texas routes that were included as part of the merger of that company with the Union Pacific (UP) Railroad in GH&SA RAILWAY CLEAR CREEK BRIDGE HAER No. (Page 8) PART II. ENGINEERING STATEMENT A. General Statement: Located at Milepost is a long, Center-Bearing, Through Plate Girder Draw Span, HAER No. and one Open Deck Pile Trestle approach. Together, these structures comprise an intact early twentieth century railroad site which has been in continuous use until the late twentieth century.
The bridge crosses Clear Creek, is locked in an open position oriented north and south and is oriented perpendicular to the trackway. The span is approached from the north and south by the Union Pacific trackway and by boat. The site is located in an entertainment and recreational area in the vicinity of the town of Seabrook, Texas. It is not landscaped and the right-of-way leading to the approaches is overgrown with vegetation despite its being covered with gravel ballast. 1. History: BR was erected by GH&SA Bridge and Building Crews in and gradually altered through time from general maintenance by a series of new owners.
Texas & New Orleans (T&NO) work crews installed spur gears in January, and added a second-hand gasoline engine in June, In addition, T&NO work during the included lighting which was added in March, new fenders in June, new approaches in October, and a replacement Waukesha power unit in April, Lighting was replaced by SP maintenance crews in September, and two piers were installed inside the fenders in 2. Engineering Character: The bridge is a Center-Bearing, Through Plate Girder Draw Span (See photographic documentation, HAER No. through HAER No. B. Description of Structure: 1. Overall Dimensions: The span measures in width, is in length and is in height. 2. Substructure: The substructure consists of one cylinder pier, two rest piers connected by a steel diaphragm and a concrete abutment.
a. Cylinder piers: A diameter pivot cylinder pier is located in the middle of Clear Creek. It has been constructed of five plate steel sections, which were bent to a diameter of 22' then assembled, riveted and placed to an approximate depth of The total vertical dimension of the cylinder pier is 34' -1 Twelve individual steel plates (Plate A) measure x 84" x An additional twelve plates (Plate B), located in alternating sections, measure x 84" x The lowest section consists of six plates (Plate D) which measure x 84" x Horizontal joints are lapped at 2 and vertical joints are covered by splice plates (SAl, SA2 and which are x 6" x x 6" x and x 6" x respectively. Rivets are throughout GH&SA RAILWAY CLEAR CREEK BRIDGE HAER No.
(Page 9) The pier is entirely submerged at high tide, while approximately two feet of the pier is exposed above the water line at low tide. The pier has been filled with concrete and contains an indeterminate number of wood piles. Four steel rim angle (RAl) and four rim splice angle (RSAl) sections, measuring x 3" x 3", and bent to a radius of have been placed at the top of the pier Although shop drawings for granite coping or masonry for the span at Bayou De Glaise [sic] showed areas of the top of the pivot and rest piers to have material "dressed smooth and level," and embedded into the concrete, below [the] base of [the] rail" drawings for the Clear Creek Bridge indicated that less stone was used.
Seven pieces of granite coping were ordered for embedding in concrete at the top of the pier. They serve as bearing platforms for the central pivot, the center and end wedges and associated wedge guides. b.
Rest Piers: Two rest piers have been constructed of four plate steel sections which were assembled, riveted and placed to an approximate depth of 28' Individual steel plates measure x 84" x Horizontal joints are lapped at 2 and vertical joints are covered by splice plates which measure x 6" x Rivets are throughout Steel angle sections, measuring x 3" x 3", and bent to a radius of have been placed at the top of each pier The piers are connected by a plate steel diaphragm, whose web measures x 72" x It is stiffened on the top and bottom by 4 angles which measure x 3 x 3 and at each pier by 2 angles that are of similar dimension. c.
Abutment: A board-formed concrete abutment has been constructed opposite the rest piers at a distance of 75' -9" from the back face of the wall to the centerline of the pivot pier. It measures 22 x 10' is battered at the base, and is supported by two 12" x 12" concrete footings. In addition, the pier contains 31 wood piles of indeterminate dimension. The abutment has a projecting seat which has two steel plates embedded in it to receive the span's end wedges. They measure x d. Granite Coping: Seven blocks of granite have been embedded in the concrete of the pivot cylinder pier and the abutment. Leveled flush with the top surface of the finished concrete, they serve as bearing bearing platforms for the central pivot, the center wedges and wedge guides.
Two blocks are 18" in depth and 5' -9" in diameter, are smooth on the top face and rough pointed on the sides. Another two blocks measure x are 18" in depth and are similarly finished. One block is x and 18" in depth. It is rough pointed on the sides and finished smooth on the top face. Two blocks, rough pointed on all faces, measure x and are in depth. The top faces have been finished with a 9" bevel e. Grill ages: Three grillages were salvaged by SP Bridge and Building crews from two single track spans which were transferred to the SP Reclamation Yard in Houston. One grillage was installed on top of the rest piers of Clear Creek Bridge at an unknown date.
The grillage consists of one long wide flange (24 WF mounted on two plates which measure x 18" x Stiffener angles are installed at centers and measure x 3 x 3 f. Fenders: Wood fenders were added to Clear Creek Bridge in They consist of 96 creosoated wood piles, to in length, which have been sunk to a depth of between GH&SA RAILWAY CLEAR CREEK BRIDGE HAER No. (Page 10) and The end and corner piles are grouped in threes and wrapped with cable. Sunk at intervals, they have been capped with 8" x 12" circular sawn boards, and have three 10" x 12" wood rails attached to the sides of the piling with bolts g. Circular Rail: Eight sections of rail, bent to a radius of at the centerline, have been anchored to the top face of the pivot pier.
A typical rail section (Carnegie Section 55) measures 3 x 3 They The circular rail is supported by twenty-five steel shim plates. They measure x 6" x The circular rail has been replaced at indeterminate dates 3. Superstructure: a. Girders and Cross Girders: The span's structure consists of two girders (G2 and They measure in length and are in height. Top and bottom chords are x 8" x 8" with three cover plates (CAl, CA2, CA3) added for strength. Cover plates (CAl) are in thickness, while plates (CA2, CA3) are in thickness. They are 18" in width and of varying length. The web plates are x x Web splices are typically located at intervals and are covered by x 12" x web plates. Stiffener angles are x 3 x 5".
Rivets are throughout One set of cross girders was ordered by GH&SA in the Summer of They were located perpendicular to and on either side of the center line of the pivot pier girder at centers. The top chords was assembled of riveted plate steel. It measured x was 2'- 0" in width and in length. The bottom chord, also of riveted plate steel, measured x was also in width and in length. The length of the girder, including diagonal bracing and bearing plates was increased by 4' -3 for a total length of 18 '-6 All rivets are 7 /8" throughout One pinion girder was ordered and placed above and outside the radius of the rack. The bottom chord is battered 4' -0" on either side of a section.
The top chord measures 16' -6" in length and is fitted with a web plate that measures x 23" x It is stiffened by angles which measure x 6" x 4" and x 4 11 x 4 11 Two steel brackets, measuring 3/4 11 x 13 11 x 1/8 11 , are used to connect the top chord to the span's sides. The bottom chord rests on 10 11 x shim plates All rivets are throughout. The pinion girder is 3/4 11 in depth, is 9 clear from the top of the pivot pier, and supports the rack pinion, vertical drive shaft, and spear wheel. b. Floorbeams: Twelve floor beams two additional floor beams and and two end beams and were assembled. They are 11 in length and 1/2 11 in depth. FB2 and FB3 are located on either side of the cross girder The other floor beams are placed along the length of the span.
The top and bottom chords for are typically 11 x 6" x 6 11 and 11 in length. However, the top and bottom chords for floor beams and are x 6" x 6" x Web plates are 3/8 11 x 36 11 x throughout. The floor beams are connected to the span's sides by 32 brackets two brackets and and an additional four brackets Brackets and measure x 5' -7 7 /8 11 Web plates are 3/8 11 Bent plates are x 9 11 x 10 1/2 11 Stiffener angles GH&SA RAILWAY CLEAR CREEK BRIDGE HAER No. (Pagel 1) measure 3/8 x 3" x 4 and are 6' -4 in length. All rivets are 7 /8 throughout. Floor beams 11 11 11 11 FB2 and are fitted with cast steel bearings that carry the horizontal drive shaft, with its respective worm wheels and gears. c. Stringers: Twenty-four steel stringers run the length of the span between the floor beams.
Steel stringers S3 and S4) are located between the pinion girder and the cross girders. All are in length and 20" in depth. Four end stringers are 11 located between the end beams and floor beams at the two span ends. The stringers are connected to the floor beams, cross girders, pinion girder and end beams with 7 /16 x 6 x 6 x l steel 11 11 11 angles. Rivets are 7 /8 throughout. 11 d. Lateral Bracing: Cross-bracing for the span is provided by thirty-two 3/8 x 3" x 3" steel 11 lateral braces. 4. Mechanics: a. Shafting: Steel drive shafts, 3 and 2 are joined with cast steel couplings (Patent Nos. and respectively. b. Gears, Wheels and Sprockets: Original components have been altered through routine maintenance and repair. They included two cast steel worm wheels ([Patent No.
[right turning]), one cast steel worm wheel ([Patent No. Patent No. [left turning]), one cast steel pinion (Patent No. one cast steel bevel gear (Patent No. two cast steel spur wheels (Patent No. eight cast steel rack segments (Patent No. and one cast steel pinion (Patent No. Replacement components in included one spur wheel (with 60 teeth at 1 pitch diameter) connected to one pinion spur wheel (with 20 teeth at 1 pitch diameter). Both wheels were seated on 2 shafts. Both shafts were in length, mounted in 7 x 9" and 6" x 8 respective castings, and fitted with bronze bushings. c. Castings: Original castings included 4 cast steel levers for 8 (drive) shafts (Pat. No. 12 cast steel levers for 3 (gear) shafts (Pat. No. 2 cast steel center wedge guides (Pat. No. 2 cast steel center wedges (Pat.
No. 2 cast steel center wedge seats (Pat. No. 4 cast steel end wedge guides (Pat. No. 4 cast steel end wedges (Pat. No. 4 cast steel end wedge seats (Pat. No. GH&SA RAILWAY CLEAR CREEK BRIDGE HAER No. (Page 12)