BlockBefore

Fabens-Caseta International Bridge, Island Guadalupe Road over Rio Grande, Fabens

Fabens-Caseta International Bridge, Island Guadalupe Road over Rio Grande, Fabens, El Paso County, TX. Surveyed as HAER TX-3399, with a 8,019-word written history.

From the record

“The Fabens-Caseta Bridge is significant for its association with the Rio Grande Rectification Project, a joint effort by the United States and Mexico in straightening the Rio Grande channel to peacefully establish a rectified international boundary and reduce flooding problems for both countries.”

Written record, HAER TX-3399 survey. Machine-read text.

Surveyed by the federal HAER program as HAER TX-3399 · the record runs 8019 words · one of 45 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

61 words

Source document Quoted word for word from HAER TX-3399. Not written, edited or summarised by this site.

On Island-Guadalupe Road over Rio Grande at United States-Mexico international boundary, El Paso County, Texas. The Fabens-Caseta International Bridge is located at latitude longitude The coordinate represents the center of the bridge. It was obtained in by plotting its location in Google Earth. The location has no restriction on its release to the public. Present Owner/ Occupant: El Paso County, Texas.

Significance

143 words

Source document Quoted word for word from HAER TX-3399. Not written, edited or summarised by this site.

The Fabens-Caseta Bridge is significant for its association with the Rio Grande Rectification Project, a joint effort by the United States and Mexico in straightening the Rio Grande channel to peacefully establish a rectified international boundary and reduce flooding problems for both countries. The bridge is locally important as a link from Fabens and Tornillo in southeast El Paso County to the Dr. Porrillo Parra (La Caseta) and Guadalupe communities in neighboring Chihuahua. The bridge has provided a symbolic and physical connection between the Lower Valley communities of both countries, joining their shared economies and cultures.

The Fabens-Caseta Bridge is also significant as an example of a steel beam bridge that embodies the distinctive characteristics of 1930s-era bridge construction through its engineering and use of materials typical of its type and period. Historian(s): Sara Gredler and Richard E. Mitchell; Mead & Hunt, Inc.;

Written history

6456 words

Source document Quoted word for word from HAER TX-3399. Not written, edited or summarised by this site.

This documentation was prepared on behalf of El Paso County, Texas. El Paso County is constructing a nearby international bridge, with demolition and removal of the current Fabens- Caseta Bridge in The existing bridge is owned by the International Boundary and Water Commission (IBWC). El Paso County, IBWC, and the Texas State Historic Preservation Officer (SHPO) executed a Memorandum of Agreement in providing for HAER Level II documentation as mitigation for the removal and demolition of the existing Fabens-Caseta Bridge. El Paso County retained Structural Engineering Associates, Inc. (SEA) as its engineering consultants for the construction of the new international bridge and demolition of the existing bridge. SEA contracted with Mead & Hunt, Inc.

(Mead & Hunt) to prepare the HAER documentation. This document was prepared by Sara Gredler and Richard E. Mitchell, Cultural Resources Specialists, at Mead & Hunt. Dietrich Floeter completed the photography. FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No. Page 2 Part I. Historical Information A. Physical History: 1. Date(s) of construction: 2. Engineer: Culver M. Ainsworth of El Paso, Texas. Ainsworth was Consulting Engineer of the United States Section of the International Boundary Commission (IBC, later the IBWC). Initials on construction plan sheets indicate the plans were drawn and checked by employees of the IBC or their contractor the Austin Bridge Company.

Ainsworth served as the project engineer for the overall Rio Grande Rectification Project, of which the Fabens-Caseta International Bridge was a component, and was responsible for final recommendation of the bridge s general plans and approval of the bridge s detail plan sheets. Ainsworth initially came to El Paso in to serve as an engineer on the U.S. Bureau of Reclamation (BOR) s Federal Rio Grande Irrigation Project in southern New Mexico and far west Texas. He transferred to the position of Consulting Engineer for the United States Section of the IBC in as plans for the rectification of the Rio Grande began to take shape under the direction of IBC s United States Commissioner Lawson, who himself had been a project manager for the BOR s Rio Grande reservoir and irrigation projects.

As Consulting Engineer, Ainsworth essentially served as the agency s supervising engineer for construction projects. During the late he also served as the project engineer directly in charge of the Rio Grande Rectification Project. Ainsworth served as the IBC Consulting Engineer until his death on December 22, 3. Builder/Contractor/Supplier: Austin Bridge Company of Dallas, Texas. 4. Original plans and construction: Photocopies and archived microfilm images of the plan sheets are available at the Engineering Office of the IBWC in El Paso, Texas. A majority of the plan sheets are dated December The plan sheets were drawn by an employee of the IBC or Austin Bridge Company with the initials D. E. H. The plans were recommended for approval by IBC engineer John J. Ledbetter Jr. Culver M.

Ainsworth and Bustamante, consulting engineers for the United States Section and Mexican Section of the IBC, approved the bridge s detail plan sheets and recommended the general plan and layout sheets for approval. Final approval on the bridge s general plan and layout sheets was provided by the IBC Commissioners: Lawson for the United States and J. Pedrero Cordova for Mexico. The plan set also includes specifications for the international boundary marker and the international boundary pedestrian gate. 1 Acheson Laments Loss of El Paso Engineer, El Paso Herald Post, December 24, 10. FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No. Page 3 5.

Alterations and additions: The wooden substructure elements of the bridge, including the piles, pier caps, abutments, and sway bracing, were covered in shotcrete in a rehabilitation project. Before the shotcrete was applied, the timber elements were wrapped with roofing paper and steel wire mesh. In several locations the shotcrete is beginning to crack, exposing the timber substructure. The timber abutment and wingwall is still visible at the northwest corner of the bridge (on the U.S. side). The sidewalk was extended on the U.S. side to the crown of the levee, presumably in the rehabilitation project. A concrete slab was added at the northeast approach to the bridge before to support the Port of Entry building at that location.

Between and the Port of Entry building, which had been abandoned, was removed. While not specifically a bridge alteration, the addition of the Department of Homeland Security s border fence on the exterior side of the U.S. levee at the bridge location alters the bridge s immediate setting. B. Historical Context: The Fabens-Caseta International Bridge, known alternately as the Old Tornillo- Guadalupe International Bridge, is located approximately 5 miles southeast of the city of Fabens and 3.3 miles southwest of the city of Tornillo, in southeast El Paso County, Texas. The bridge connects Fabens, Tornillo, and nearby agricultural areas of southwest El Paso County with the communities of Doctor Porfirio Parra (La Caseta) and Guadalupe in the state of Chihuahua, Mexico.

The bridge is located in the Lower Valley, a term used regionally to describe that portion of the El Paso-Ju rez Valley southwest of downtown El Paso and Ciudad Ju rez. The Rio Grande, also known as the Rio Bravo, forms the international boundary between the United States and Mexico from El Paso and through the Lower Valley to its mouth at the Gulf of Mexico. The natural pass of the Rio Grande through mountainous terrain El Paso del Norte and the adjacent river plain has served as a focal point of activity and settlement for centuries. Permanent European settlement of the area began in with several small communities established in the late for Spanish and Pueblo Indian refugees fleeing the Pueblo Revolt in New Mexico.

The mission-based communities were situated on the south side of the Rio Grande channel, with ranches and agricultural haciendas on the opposite bank, cultivating various crops using the rich floodplain soils. 2 Through the El Paso-Ju rez Valley, the Rio Grande historically formed a shallow channel that was prone to recurring flooding after spring snowmelts and late summer monsoonal rains. The flooding was destructive, with frequent damage to buildings and crops, while also life-giving through deposition of fertile soils and provision of abundant water. Through these floods, the Rio Grande periodically meandered within the broad floodplain to form new channels, with the old riverbed relegated to a secondary channel or cut-off lake. 2 John A.

Peterson and Mark Willis, The Fabens Border Crossing Project, Texas Antiquities Permit No. prepared by John A. Peterson and Associates, Inc. for El Paso County, Texas (1 May FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No. Page 4 Around the river shifted several miles southward to a new channel, leaving several Rio Grande communities on the north side of the river. For several years water flowed in both the new and the old channels, forming an island that included the Lower Valley towns of Ysleta, Socorro, and San Elizario. 3 The meandering Rio Grande and resultant questions about land ownership took on greater importance following the Treaty of Guadalupe Hidalgo, which fixed the United States-Mexico border along the Rio Grande from El Paso to the river s mouth.

In the late the river again changed course below San Elizario, moving back northward close to the pre-1830 alignment. The channel migration resulted in an area of United States territory sandwiched between the flowing primary Rio Grande channel to the north and the international boundary along the secondary channel to the south. The area between these two channels, known as San Elizario Island or simply La Isla, was characterized both by its rich farmland and its relative isolation from more developed areas of the El Paso-Juarez Valley. La Isla was also subject to periodic droughts as well as near-annual seasonal floods.4 While many of the region s Hispanic and Indian residents chose to remain in their ancestral communities after the transfer to U.S.

sovereignty, some moved south to retain their Mexican citizenship. A group of Lower Valley residents moved to the opposite bank of the river in to establish the town of Guadalupe, while still retaining close ties with the mission-based communities on the U.S. side of the river.5 The region prospered in the mid- and late-nineteenth century, thanks to El Paso del Norte s new status as a borderland entrepot at the intersection of long-distance east-west and north-south trade routes. Several small communities on the U.S. side of the river were established in the late and and coalesced into the city of El Paso.

The established Mexican city of El Paso del Norte was renamed as Juarez in The arrival of the transcontinental Southern Pacific Railroad to El Paso, followed by the Santa Fe and Pacific and then other rail links, marked the beginning of a period of rapid regional growth, with El Paso becoming a commercial and industrial hub for the southwestern U.S. and northern Mexico.6 Agriculture, a part of the regional economy for centuries, also expanded in the late nineteenth and early twentieth centuries, with the improvement of area irrigation systems. As early as the Lower Valley settlers constructed several irrigation ditches diverting water directly from the Rio Grande.

These canal systems, usually organized on a localized, community-by-community basis, continued in use through the Beginning in the civic leaders in El Paso and southern New Mexico pushed for 3 Peterson and Willis, Timmons, LA ISLA, Handbook of Texas Online, (accessed 14 January 4 Timmons, LA ISLA. 5 Guadalupe Enciclopedia de los Municipios y Delegaciones de M xico, Instituto para el Federalismo y el Desarollo Municipal (INAFED), Secretar a de Gobernaci n, (accessed 5 January 6 Peterson and Willis, 46; Timmons, EL PASO DEL NORTE, Handbook of Texas Online, (accessed 14 January FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No.

Page 5 construction of an upstream reservoir to provide a more stable Rio Grande streamflow, thereby reducing the river s flood severity while encouraging large-scale irrigated farming. In response, the U.S. Bureau of Reclamation (BOR) undertook the Rio Grande Project, with construction of Elephant Butte Dam in central New Mexico to reduce flood dangers from snowmelt and boost water supplies during droughts. The BOR s Rio Grande Project also involved federal acquisition and improvement of the smaller private and community irrigation systems in the El Paso-Juarez Valley, including the community ditches in the San Elizario and La Isla areas. The canals were consolidated into the interconnected Franklin Canal and Riverside Canal systems.

The BOR later transferred the irrigation systems and associated drainage systems to El Paso County Water Improvement District No. 1. With a more stable water supply, the amount of irrigated acreage quickly expanded in the El Paso-Juarez region, including the Lower Valley. While Lower Valley farmers had traditionally focused on subsistence crops and vegetables, the focus of area agriculture gradually shifted to cotton cultivation. Small communities on the Mexican side of the river, such as Guadalupe, saw similar changes. 7 As the Rio Grande Project was realized, new townsites were established along the Southern Pacific Railroad, generally a few miles to the northeast to the parallel line of older established Lower Valley communities.

Fabens was first established as a railroad stop around in an area of small farms. The Fabens townsite was actively promoted beginning in and it grew quickly in the late and with refugees from the Mexican Revolution and from increased cotton cultivation resulting from the BOR canal improvements. By the late Fabens had an estimated residents.8 Nearby Tornillo had a similar trajectory, with its townsite platted in on the railroad as a trade center and shipment point anticipating the agricultural development of the surrounding area. Indeed, cotton cultivation began soon after the construction of the Elephant Butte Dam and the BOR canal extensions. Tornillo nonetheless remained a small community, with a population of a few hundred residents.

9 The increase in Lower Valley settlement and agriculture led to a need for connections between communities on either side of the Rio Grande. By the late a border crossing with associated port-of-entry linked San Elizario Island and nearby towns with La Caseta and Guadalupe. The crossing was located just east of the current Fabens-Caseta Bridge. From aerial photographs of the area, it is unclear if a small drainage structure spanned the old river channel at the international boundary, or if the road merely dipped down through the channel.10 7 Neal W. Ackerly and David A. Phillips El Paso County Water Improvement District No.

1, National Register of Historic Places Registration Form, available from Texas Historic Sites Atlas, http://atlas.thc.state.tx.us (accessed 14 January 8 Martin Donell Kohout, FABENS, TEXAS, Handbook of Texas Online, (accessed 14 January 9 Frances Segulia, TORNILLO, TEXAS, Handbook of Texas Online. (accessed 14 January 10 U.S. Army Air Corps, First Photo Section, EP-99A, aerial photograph, available at the International Boundary and Water Commission offices, El Paso, Texas. FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No. Page 6 Nascent development along the border, water rights questions, and disputes regarding the exact international boundary led to a series of bilateral treaties to help resolve these issues.

Treaties in and established the IBC (later the IBWC).11 The IBC formally organized in with separate United States and Mexican Sections, each with a single commissioner and minimal support staff. 12 The IBC operated sporadically for several decades as a mechanism to negotiate solutions to boundary questions, including jurisdiction of cut-off lands that shifted from one side of the river to the other as the river changed course during floods. These cutoffs, known as bancos, were commonplace on the Rio Grande. Between and 58 bancos had formed along the Rio Grande.

The Banco Convention provided for an exchange of the existing bancos between the two countries and developed a procedure to govern banco jurisdiction in future situations.13 The IBC widened its scope through the Banco Convention of which was the first formal Rio Grande water distribution treaty between the U.S. and Mexico.

The treaty called for construction of a reservoir to guarantee sufficient water supply for users in both counties, prompting the BOR s construction of the Elephant Butte Dam as part of its Rio Grande Project.14 Renewed problems regarding Rio Grande waterflow led to several planning studies in the culminating in the Rio Grande Rectification Project of the With its sizable reservoir storage, the Elephant Butte Dam had largely stopped the near-annual flooding dangers from snowmelt and upriver rains and therefore reduced changes in the river s course. It also ended a beneficial side effect of flooding: the periodic scouring of silt from the river channel.

Sediment from upstream reaches of the river was captured by Elephant Butte Dam; however, several streams typically carrying high amounts of sediment still flowed directly into the Rio Grande below Elephant Butte Dam. The lack of seasonal flooding encouraged channel siltation in the El Paso-Juarez Valley and also forced the river to remain within its existing channel rather than following its natural meandering process to create a new channel at slightly lower elevation. The diversion of water for irrigated farming on both the U.S.

and Mexican sides of the river further slowed the river s flow and worsened the siltation.15 11 The commission s name was changed in with the ratification of a U.S.-Mexico treaty governing water distribution rights for the Rio Grande and Colorado River between the two countries. The commission had begun to assume greater involvement in water distribution as early as 12 Charles A. Timm, The International Boundary Commission United States and Mexico, The University of Texas Publication No. (Austin, Texas: The University of Texas, 13 Timm, 43, 44. 14 Convention between the United States and Mexico: Equitable Distribution of the Waters of the Rio Grande, 21 May United States Statutes at Large Treaty Series no.

available at (accessed 15 January 15 Ainsworth and Armando Santacruz, Joint Report of Consulting Engineers, Rio Grande Rectification, El Paso-Juarez Valley, 16 July in Minute No. 129 and Engineering Reports on Rio Grande Rectification Project, El Paso-Juarez Valley, U.S. Department of State, International Boundary Commission, United States and Mexico 1 November 16. FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No.

Page 7 The problem was recognized within just a few years of the Elephant Butte Dam s construction, as relatively small rain events caused destructive flooding on the increasingly valuable and populated lands now used for cash-crop agriculture.16 Initially, local agencies on both sides of the river constructed levees for flood protection, but they soon proved insufficient. 17 Lawson, project manager of BOR s Rio Grande Irrigation Project, worked with Mexican engineers to determine recommendations for addressing the issue. In April engineers from both countries recommended a far-reaching proposal: construction of a rectified channel that would drastically shorten and straighten the Rio Grande through the entire El Paso-Juarez Valley.

While addressing siltation and flood control, the engineers noted that through exchanging land on either side of a new engineered channel, the recurring problem of cut-off bancos could finally be eliminated as well. 18 As rectification plans moved forward, Lawson was named as the U.S. Commissioner to the IBC in June Under Lawson, the IBC ramped up preliminary design for the rectification project through a series of bi-national engineering studies.19 While Lawson was certainly knowledgeable with the Rio Grande s hydrology through his BOR experience, he needed additional staff to conduct the planning and engineering studies. In September he hired Culver M. Ainsworth, a former BOR engineer who had worked on the Rio Grande Project, to serve as the new Consulting Engineer for the IBC s U.S.

Section. 20 Presumably Lawson and Ainsworth had worked closely together with the BOR and Lawson wished to continue their collaboration on this new phase of Rio Grande improvement. In July Ainsworth and his IBC Mexican Section counterpart completed their Report on Rio Grande Rectification, forming the basis for the provisions of the Treaty of February 1, The treaty called for a joint bilateral effort to rectify the Rio Grande from El Paso to Box Canyon near Fort Quitman, Texas. The rectification project also resulted in BOR construction of Caballo Dam, an additional retention structure between the Elephant Butte Dam and El Paso, to further regulate the river s waterflow.

21 The 16 Special Committee of Engineers, El Paso Chapter, American Association of Engineers, Report of Rio Grande Rectification, 5 June in Minute No. 129 and Engineering Reports on Rio Grande Rectification Project, El Paso- Juarez Valley, U.S. Department of State, International Boundary Commission, United States and Mexico 1 November 41. 17 Lawson, Rectification of the Rio Grande, and Other Engineering Work of the International Boundary Commission, United States and Mexico, Civil Engineering 7 18 Timm, 45, 47. 19 Timm, 29. 20 Boundary Engineer Officially Named, El Paso (Texas) Herald, 1 October 3. 21 Rectification of the Rio Grande, Convention between the United States of America and Mexico, 1 February United States Statutes at Large Treaty Series no.

(accessed 15 January FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No. Page 8 BOR was also responsible for reconstruction and realignment of irrigation canals, drains, and other structures to match with the new river channel. 22 The U.S. and Mexican Sections of the IBC both began work on the Rio Grande Rectification Project in February Ainsworth served as the project engineer in addition to his more general duties as the IBC s consulting engineer, with Crawford Kerr as the project s field engineer. The project straightened and shortened the river from 155 miles to 88 miles in length between El Paso and Box Canyon.

The new artificial Rio Grande channel was highly engineered, with a pilot channel of 66 feet in bottom width and earthen levees of precisely spaced 590 feet apart to create a uniform width as a floodway. The straightened alignment allowed engineers to nearly double the river s downslope gradient for improved removal of sediment and better drainage of lands adjacent to the river. The exact center of the rectified channel formed the new international boundary. As part of the rectification, each country acquired title to land that would be separated by the new channel location from its private owners and then transferred the land to the other country, thereby eliminating the cut-off bancos.

The channel itself was aligned in a manner such that each country received exactly the same amount of land from the other in the transfer. 24 The project s engineering cost was divided between the two countries, with the United States assuming 88 percent and Mexico assuming 12 percent, based on the estimated value of the farmlands and irrigation works in each country.25 The total cost for the project, including the Caballo Dam in New Mexico, was approximately On the U.S. side, the project provided 3.8 million man-hours of employment in the midst of the Great Depression. 26 The project also led to IBC growth, from five employees in to a permanent staff of 50 at the end of 27 Funding for the U.S.

portion of the rectification work was at first provided through allotments from the Public Works Administration (PWA). Beginning in July the rectification funding was shifted to direct Congressional appropriations to the State Department, which was considered a more stable source.28 The Rio Grande Rectification Project was completed on June 30, when the river s waters were diverted into the final section of the rectified channel, in the San Elizario Island vicinity. From a local and regional perspective, the Rio Grande Rectification Project had far-ranging impacts. It changed the physical appearance of the river that defined the El Paso-Juarez Valley.

Smooth angles 22 Ainsworth, Consulting Engineer, International Boundary Commission, Semiannual Progress Report on Construction Projects for the Period Ending June 30, 26 October available at the Records Management Department of the U.S. Section of the International Boundary and Water Commission, El Paso, Texas, 19. 23 Ainsworth, 3. 24 Timm, 48, 49; Lawson, 25 Rectification of the Rio Grande, Convention between the United States of America and Mexico, Timm, 48. 26 Lawson, 27 Boundary Commission Staff and Payroll Grow Greatly During Rectification Work, El Paso Times, 26 December 28 Ainsworth, 27; Furnish Funds for River Work, El Paso Times, 7 May 6. FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No.

Page 9 marked the Rio Grande s new alignment in place of the twists and bends of its natural course. The IBC engineers noted that, through the rectification project and Caballo Dam construction, the river thru [sic] the El Paso-Juarez Valley will take on more the nature of a large central drain or canal than a river. 29 The project led to flood control through the region and provided a cooperative, long-term boundary solution. In a larger sense, the Rio Grande Rectification Project reflects the wider theme of river impoundment and channelization prevalent in the American West during much of the twentieth century, goals championed by the BOR and, in this case, by the closely aligned IBC.

As part of the overall rectification project, three light-duty bridges were constructed over the new Rio Grande channel to replace previous bridges being bypassed by the project. The bridges connected Lower Valley communities on either side of the Rio Grande. In addition to the bridge connecting Fabens and Tornillo in Texas with La Caseta and Guadalupe in Chihuahua, bridges were built to connect Ysleta, Texas, with Zaragosa, Chihuahua, and Fort Hancock, Texas, with El Porvenir, Chihuahua. The Fabens-Caseta Bridge is also commonly known as the Tornillo-Guadalupe Bridge. On the Texas side of the bridge, local roads from Fabens and from Tornillo converge just north of the bridge. In Mexico, the small community of Dr.

Porfirio Parra (La Caseta) developed on the south end of the bridge, with a roadway leading to the nearby community of Guadalupe. The original bridge plans are captioned as Tornillo-Guadalupe Bridge. With the construction of a new Tornillo-Guadalupe Bridge, project correspondence since the early has referred to the bridge as the Fabens-Caseta Bridge, presumably to avoid confusion between the two structures. Certainly informal river crossings were in use near the Fabens-Caseta Bridge site since at least the mid- A aerial photograph depicts a local road crossing over the usually dry former Rio Grande channel that served as the international boundary near La Caseta.

This 1920s-era crossing was located just east of the location of the Fabens-Caseta Bridge.30 The San Elizario Island area was the last portion of the rectification project to be completed, due to lingering questions regarding the new rectified channel location. Most Rio Grande bancos were small and required relatively minor land transfers between the United States and Mexico. San Elizario Island posed a more difficult situation. The so-called island was up to 6 miles in width between the main natural river channel to the north and the international boundary along the old cut-off channel to the south, making it difficult to work out an equalized land transfer.

San Elizario Island was crisscrossed by numerous irrigation canals and drains on fertile farmlands, in contrast to the often-waterlogged and poorly drained lands on smaller bancos. Even as other portions of the rectified river channel were completed, the San Elizario Island area remained under negotiation. Representatives from the U.S. and Mexico agreed on a final channel location in August with the rectified channel generally following a straightened version of the old river channel near the international boundary. 29 Ainsworth and Santacruz, 24. 30 U.S. Army Air Corps. FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No.

Page 10 The IBC quickly intensified its efforts around San Elizario Island, with the initial goal of completing the rectified channel by June 1, before the start of the region s summer monsoon rains. In addition to the channel work itself, the Fabens-Caseta Bridge needed to be completed before the river could be diverted into the new channel. By the end of local contractor George Orr had been hired to add his resources to IBC forces in completing the channel excavation and levee construction, and through early several draglines and earth scrapers were simultaneously working in the area, excavating 2.3 million cubic yards of earth from the new channel around San Elizario Island.

31 Construction drawings for the bridge were completed in December and January and bids for the bridge s construction were opened on January 10, The IBC contracted with the Austin Bridge Company of Dallas, Texas, to construct the bridge and its approaches, under Contract No. IBM-1270. The total cost of the Fabens-Caseta Bridge was well under the originally earmarked for construction of each of the three new bridges. Contractors began work on the bridge on March 14, and completed work on June 30, With the completion of channel work earlier that month, the Rio Grande s flow was turned into the new rectified channel the day prior to the bridge s completion.

33 The completion of the Fabens-Caseta Bridge (still known as the Tornillo-Guadalupe Bridge on project documents) marked the official completion of the Rio Grande Rectification Project. 34 As the El Paso Times noted on the day of project completion, Completion of the San Elizario channel, which now makes a rectified river all the way from Cordova Island to Box Canyon, is expected to save Fabens and other Lower Valley towns from all future flood damage.

35 In conjunction with the bridge s construction, the IBC also designed and let for construction a group of small buildings to serve as a port of entry and as a maintenance office.36 At the same time, the BOR undertook relocation and reconfiguration of numerous canals and drains in the Fabens, Tornillo, and San Elizario Island areas to accommodate waterflow from new Rio Grande channel. In the bridge s immediate vicinity, the Border Intercepting Drain and Guadalupe Lateral Canal were constructed to parallel the Rio Grande channel just outside the U.S. levee. 37 31 Ainsworth, Will Build Bridge Over Land, Then Put River Beneath It, El Paso Herald Post, 28 December 1.

32 International Boundary Commission, United States and Mexico, United States Section, Rio Grande Rectification Project, Tornillo-Guadalupe Bridge Plans, available at International Boundary and Water Commission Engineering Section archives on microfilm, El Paso, Texas; Will Build Bridge Over Land, Then Put River Beneath It. 33 Ainsworth, 6. 34 While the official completion of the project was June 30, the associated Caballo Dam was completed by the BOR in September In addition, the IBC soon realized the need for construction of several grade control structures along the pilot channel to reduce erosion. These structures were constructed beginning in late but were apparently considered by the agency to postdate original scope of the rectification project.

35 Rectification Work Finished to Box Canyon, El Paso Times, 30 June 36 Ainsworth, 7. 37 Ainsworth, 19. FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No. Page 11 In general, the Fabens-Caseta Bridge and the surrounding Rio Grande channel and levees have seen scant change since their construction in Little information is available regarding changes to the bridge since its original construction. A rehabilitation project included encasement of the timber substructure elements with shotcrete affixed to metal wire mesh, as well as construction of sidewalk elements near the U.S. port of entry.38 The two-lane bridge continues to serve light-duty traffic between this portion of El Paso County and the adjoining Municipalidad de Guadalupe.

The Department of Homeland Security border fence is visually intrusive and the original port of entry buildings were replaced in the late and early however, the surrounding area remains devoted to irrigated farming on both sides of the river, as it has been for many decades. The Rio Grande, with a precisely engineered channel and a highly regulated waterflow, nonetheless continues as the region s spine of settlement and agriculture as it has for hundreds of years. 38 Howell Engineer & Co., Report on Structural and Cost Evaluation of the Existing Fabens-Caseta International Bridge, 12 January FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No. Page 12 Part II. Structural/Design Information A. General Statement: 1.

Character: The Fabens-Caseta International Bridge at the Rio Grande is a steel I-beam bridge. 2. Condition of fabric: Very good. B. Description: The Fabens-Caseta International Bridge is a 17-span, steel I-beam bridge. The bridge is aligned in a northeast-southwest direction. The Rio Grande channel is aligned from northwest to southeast at the bridge s location, and is located between two earthen levees that support the abutments. Each span is exactly 30 feet in length, for a total bridge length of 510 -0 . From each end of the bridge to the center of the adjacent levee, the length is an additional 40 , for a total length of 590 . The total bridge width, out-to-out, is 22 -3 , with a roadway width of 16 -0 and a raised concrete sidewalk with a width of 4 -9 .

An International Boundary Monument was erected at the exact center of the bridge, on the downstream (east) side. A set of gates accommodates both vehicular and pedestrian traffic and is located on the U.S. side of the bridge. The bridge was designed to be exactly symmetrical over the Rio Grande channel, which was engineered to be moved to this location. The bridge s superstructure is a 17-span, steel I-beam, with each span consisting of six steel I-beam stringers, each measuring x 7- x 30 (18 CB, 4 gauge). The steel I-beams are joined by four beam spacers (diaphrams) per span, each measuring 15 x x 4 -3 . The spacers are joined to the I-beams with seat angles by eight rivets on the spacers and four hex head bolts on the I-beam.

Each I-beam end sits on a flat steel plate with an expansion clip. Attached to the flat steel plate, but not to the bridge itself, these expansion clips utilize bolts to keep the bridge in place laterally. These steel plates sit on a timber cap and are bolted to seat angles measuring 6 x 4 x . The roadway is a 5- reinforced concrete slab with a 1- concrete parabolic crown and rests on top of the steel stringers. The roadway and sidewalk reinforcing consists of both transverse and longitudinal reinforcing in the top and bottom of the slab. The roadway is covered by a 2 asphalt surface. The bridge has a 12 camber at its midpoint. The sidewalk s concrete slab measures 4 thick. A concrete curb running the length of the bridge on the upstream side measures 12 x 1 -3 and incorporates four rebar.

On the downstream side, the sidewalk integrates two concrete curbs with the same measures and reinforcing. Drains are located on both sides of the roadway at 10 -0 centers and are made of 20 gauge galvanized steel. A reinforced-concrete monument is located at the center of the central span on the sidewalk. This monument indicates the international boundary line on the downstream side of the bridge. It is shaped like an obelisk and measures 7 -0 in height from the sidewalk. It is 12 square at the base and tapers to 9 square at the top. The monument features a name plate and a penalty plate on two sides of the obelisk, with one side in English and the other in Spanish. The international boundary line divides the FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No.

Page 13 monument in half, in keeping with the symmetrical nature of the bridge s design. The concrete monument, roadway slab, and sidewalk were all poured in place at the site. The bridge railing is located on each side of the bridge and is 3 -6 in height. It is constructed of 3 standard black pipe (as received from manufacturer) joined together by ball tees and elbows in 6 -0 sections, except for the last section at each bridge end which is a 3 -0 section. The first rail is set at 2 -0 above the curb and sidewalk, with the top rail at 3 -6 in height. The railing is secured to the curb with 4 pipe sleeves and bolts. A set of immigration gates span the width of the central span over both lanes of the roadway and the sidewalk. These gates are located on the U.S.

side of the central span, approximately 12 from the international boundary. The gate posts are constructed of 3 standard black pipe with ball pattern rail fittings. The two posts on the downstream side of the bridge at the sidewalk gate are topped with ball ornaments; the plans indicate that all of the post pipes had ball ornament ends. The gates are set into the concrete curb and sidewalk. The total height of the gate posts from the curb and sidewalk is 7 -11 . The gates are covered with 2 wire mesh fabric and attached to the gates. In addition, three lines of barbed wire were to be added to top, bottom and sides of the gates, on the exterior of the structure. The barbed wire running on the outside of the pedestrian gate is the only one that remains.

Each span is supported by a bent consisting of five 12 butt timber piles 50 -0 in length, topped by a 12 x 12 timber cap. Each bent has a set of two sway braces, one on each side of the pile, with each diagonal measuring 3 x 12 . The bracing is attached to each pile with a 1 x 18 bolt and nut. The timber substructure was covered with roofing paper, metal mesh wire, and shotcrete in A imprint is stamped in the concrete sidewalk just northeast of the bridge, near the former site of the U.S. port-of- entry building, suggesting that pedestrian sidewalks at the bridge s north approaches were constructed or replaced at that time. The bridge ends are supported by a timber bulkhead (abutment) that supports the interior wall of the earthen levees on both the U.S. and Mexican sides of the bridge.

The bulkheads are constructed of five 50 -0 long creosoted timber butt piles, identical to the bridge bents, but the spaces between the piles are covered with 3 x 12 timber beams. On the northeast and southwest corners of the bridge the bulkhead takes on the form of a larger retaining wall, measuring 21 -3 from the bridge edge before continuing with bulkhead construction. The purpose of these retaining walls was to provide a more stable location for each country s port-of-entry facilities. The original port-of-entry facility on the U.S. side was demolished between and though buildings on the Mexican side of the crossing remain in place. The earthen levees on both sides of the rectified Rio Grande channel are an integral part of the design of the Fabens-Caseta International Bridge.

The levees serve as the fill for the bridge s bulkheads and approach roadway, allowing the bridge to span the engineered channel for the Rio Grande with exactly half the bridge on the U.S. side and half on the Mexican side. The crown of each levee measures 22 5/8 . The total length from the end of the bridge to the crown of the levee is 40 . Metal fencing, FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No. Page 14 approximately 19 in height, was installed in along the exterior edge of the U.S. levee, about 50 feet from the northeast end of the bridge. C. Site Information: The Fabens-Caseta International Bridge spans the Rio Grande in El Paso County, Texas, and Guadalupe Municipality, Chihuahua, Mexico.

It is located approximately 7 miles southeast of the town of Fabens, also in El Paso County, and less than miles from the community of Doctor Porfirio Parra (La Caseta), in the Muncipalidad de Guadalupe. The international boundary between the U.S. and Mexico is located at the center of the bridge. The Rio Grande is located in an engineered pilot channel with adjacent floodways between two earthen levees. The Upper Rio Grande system begins northwest from the Fabens-Caseta International Bridge at the Elephant Butte Dam in New Mexico. The river system underwent substantial changes in the due to the Rio Grande Rectification project, which straightened the river and built the levees to prevent flooding, as well as providing a permanent, unchangeable international boundary.

The Upper Rio Grande system continues southeast to Fort Quitman and then to the head of Box Canyon, about 10 miles downstream of Fort Quitman. The rectification project reduced the length of the river from 155 to 88 miles. The bridge is located in a rural area on both sides of the border. The Fabens Port of Entry is located on the U.S. side of the bridge, with no other buildings in the surrounding area. The surrounding area is used for agricultural purposes on the U.S. side. On the Mexican side, the small community of Doctor Porfirio Parra (La Caseta) contains a mixture of commercial and residential buildings. FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No. Page 15 Part III. Sources of Information A. Primary

Sources

1293 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER TX-3399. Not written, edited or summarised by this site.

Acheson Laments Loss of El Paso Engineer. El Paso Herald Post, 24 December Acreage Added on Rio Grande By Flood Plans. Christian Science Monitor, 3 June Available in the Rio Grande Rectification vertical file at the El Paso Public Library. Ainsworth, Consulting Engineer, International Boundary Commission. Semiannual Progress Report on Construction Projects for the Period Ending June 30, 26 October Available at the Records Management Department of the U.S. Section of the International Boundary and Water Commission, El Paso, Texas. Semiannual Progress Report on Construction Projects for the Period Ending December 31, 3 May Available at the Records Management Department of the U.S. Section of the International Boundary and Water Commission, El Paso, Texas.

Ainsworth, and Armando Santacruz, Jr. Joint Report of Consulting Engineers, Rio Grande Rectification, El Paso-Juarez Valley. 16 July In U.S. Department of State, International Boundary Commission, United States and Mexico. Minute No. 129 and Engineering Reports on Rio Grande Rectification Project, El Paso-Juarez Valley. 1 November Boundary Commission Staff and Payroll Grow Greatly During Rectification Work. El Paso (Texas) Times, 26 December Available in the Rio Grande Rectification vertical file at the El Paso Public Library, El Paso, Texas. Boundary Engineer Officially Named. El Paso (Texas) Herald, 1 October 1. Bureau of Reclamation Rio Grande Project. Irrigable Area and Property Map, El Paso County Water Improvement District No. 1, Sheet 25 El Paso Valley Lower Island.

revised Available from El Paso County Engineer s Office, El Paso, Texas. Change Status of River Work. El Paso (Texas) Times, 16 February Available in the Rio Grande Rectification vertical file at the El Paso Public Library, El Paso, Texas. Convention between the United States and Mexico: Equitable Distribution of the Waters of the Rio Grande. 21 May United States Statutes at Large Treaty Series No. (accessed 15 January Furnish Funds For River Work. El Paso (Texas) Times, 7 May Available in the Rio Grande Rectification vertical file at the El Paso Public Library, El Paso, Texas. FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No. Page 16 International Boundary Commission, United States and Mexico. Map of the Rio Grande, El Paso-Juarez Valley.

Surveyed (revised Available at the Records Management Department of the U.S. Section of the International Boundary and Water Commission, El Paso, Texas. International Boundary Commission, United States and Mexico. Minute No. 129 and Engineering Reports on Rio Grande Rectification Project, El Paso-Juarez Valley. 1 November Available at the Records Management Department of the U.S. Section of the International Boundary and Water Commission, El Paso, Texas. International Boundary Commission, United States and Mexico, United States Section. Rio Grande Rectification Project, Tornillo-Guadalupe Bridge Plans. International Boundary and Water Commission Engineering Section archives on microfilm, El Paso, Texas. Lawson, L. M. Rectification of the Rio Grande. Civil Engineering 7 O.K. for River Work.

El Paso (Texas) Times, 6 May Available in the Rio Grande Rectification vertical file at the El Paso Public Library, El Paso, Texas. PWA Increases Flood Control Appropriation. El Paso (Texas) Herald Post, 13 July Available in the Rio Grande Rectification vertical file at the El Paso Public Library, El Paso, Texas. Rectification Work Finished to Box Canyon. El Paso (Texas) Times, 30 June Available in the Rio Grande Rectification vertical file at the El Paso Public Library, El Paso, Texas. Rio Grande Gets Shorter Channel. El Paso (Texas) Herald Post, 7 December Available in the Rio Grande Rectification vertical file at the El Paso Public Library, El Paso, Texas. Rio Grande Rectification Project Photograph Tornillo-Guadalupe Bridge.

18 October Available at the Records Management Department of the U.S. Section of the International Boundary and Water Commission, El Paso, Texas. River Course is Marked to Avoid Complications. El Paso (Texas) World News, 7 October Available in the Rio Grande Rectification vertical file at the El Paso Public Library, El Paso, Texas. River Work is First U.S. Project on Which No Alien Labor Used, Lawson Says. El Paso (Texas) Times, 14 August Available in the Rio Grande Rectification vertical file at the El Paso Public Library, El Paso, Texas. Special Committee of Engineers, El Paso Chapter, American Association of Engineers. Report of Rio Grande Rectification. 5 June In U.S. Department of State, International Boundary FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No.

Page 17 Commission, United States and Mexico. Minute No. 129 and Engineering Reports on Rio Grande Rectification Project, El Paso-Juarez Valley. 1 November U.S. Army Air Corps, First Photo Section. FP-99A. Aerial photograph, Available at the International Boundary and Water Commission offices, El Paso, Texas. U.S. Geological Survey. Tornillo Quadrangle, El Paso, Texas [map]. 15 Minute Series. Washington, United States Department of the Interior, USGS, U.S. to Spend for Land on River. El Paso (Texas) Times, 11 August Available in the Rio Grande Rectification vertical file at the El Paso Public Library, El Paso, Texas. Will Build Bridge Over Land, Then Put River Beneath It.

El Paso (Texas) Herald Post, 28 December Available in the Rio Grande Rectification vertical file at the El Paso Public Library, El Paso, Texas. Work on Levees to Start Soon. El Paso (Texas) World News, 21 August Available in the Rio Grande Rectification vertical file at the El Paso Public Library, El Paso, Texas. B. Secondary Ackerly, Neal W. and David A. Phillips Jr. El Paso County Water Improvement District No. 1. National Register of Historic Places Registration Form, Available from Texas Historic Sites Atlas. www.atlas.thc.state.tx.us (accessed 14 January D Antonio, William V. and Irwin Press. Fabens, Texas: A Community Study. Draft manuscript.

Notre Dame, Ind.: University of Notre Dame Department of Sociology and Anthropology, Guadalupe Enciclopedia de los Municipios y Delegaciones de M xico. Instituto para el Federalismo y el Desarrollo Municipal (INAFED), Secretar a de Gobernaci n. (accessed 5 January Howell Engineer & Co. Report on Structural and Cost Evaluation of the Existing Fabens-Caseta International Bridge. 12 January Kohout, Martin Donell. FABENS, TEXAS. Handbook of Texas Online. (accessed 14 January Uploaded on June 12, Published by the Texas State Historical Association. FABENS-CASETA INTERNATIONAL BRIDGE (TORNILLO-GUADALUPE BRIDGE) HAER No. Page 18 SAN ELIZARIO, TEXAS. Handbook of Texas Online. (accessed 14 January Uploaded on June 15, Published by the Texas State Historical Association.

Lawson, Rectification of the Rio Grande, and Other Engineering Work of the International Boundary Commission, United States and Mexico. Civil Engineering 7:7 (July Metz, Leon C.

Rio Grande Rectification Project

Handbook of Texas Online. (accessed 14 January Uploaded on June 15, Published by the Texas State Historical Association. Peterson, John A. and Willis, Mark. The Fabens Border Crossing Project. Texas Antiquities Permit No. Prepared by John A. Peterson and Associates, Inc. for El Paso County, Texas, 1 May Raba-Kistner Consultants Inc. Discussion Draft Environmental Assessment Document for the Proposed Tornillo-Guadalupe New International Bridge, Border Facilities, and Association Major Arterial Roadway, El Paso, Texas. 19 December Historical Discussion. Unpublished notes, attached to letter correspondence to Peter Ketter, Texas Historical Commission, 15 October Rectification of the Rio Grande, Convention between the United States of America and Mexico.

1 February United States Statutes at Large Treaty Series no. (accessed 15 January Segulia, Frances. TORNILLO, TEXAS. Handbook of Texas Online. (accessed 14 January Uploaded on June 15, Modified on January 30, Published by the Texas State Historical Association. Tellez, Alfonso. Tornillo-Guadalupe Bridge. Prepared for El Paso County Department of Planning, 23 August Timm, Charles A. The International Boundary Commission United States and Mexico. The University of Texas Publication No. Austin, Texas: The University of Texas, Timmons, EL PASO DEL NORTE. Handbook of Texas Online. (accessed 14 January Uploaded on June 12, Published by the Texas State Historical Association. LA ISLA. Handbook of Texas Online.

(accessed 14 January Uploaded on June 15, Published by the Texas State Historical Association. FABENS-CASETA INTERNATIONAL BRIDGE HAER No. Page 19 FABENS-CASETA INTERNATIONAL BRIDGE HAER No. Page 20 FABENS-CASETA INTERNATIONAL BRIDGE HAER No. Page 21

In context

Fabens, Texas The place record: every map, photograph and survey of this town.
El Paso County, Texas 101 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in El Paso County

24 of 44 records shown

The federal survey recorded these other structures elsewhere in El Paso County. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Fort BlissHABS TX-3339-G21,536 words
Fort BlissHABS TEX,71-ELPA,7-16,471 words
El Paso Brick Company BridgeHAER TX-34037,278 words
Rio Vista Bracero Reception CenterHABS TX-36266,582 words
El Camino de las MisionesHABS TEX,71-YSL,2-5,751 words
Mision de San Antonio de la Ysleta del SurHABS TEX,71-YSL,1-5,409 words
Fort BlissHABS TX-3339-R4,864 words
Casa RonquilloHABS TEX,71-SANEL,4-3,874 words
First National Bank BuildingHABS TEX,71-ELPA,6-3,667 words
Merrick BuildingHABS TEX,71-ELPA,5-3,415 words
Iglesia de San ElcearioHABS TEX,71-SANEL,1-2,828 words
Gregorio Garcia HouseHABS TEX,71-SANEL,2-2,614 words
Fort BlissHABS TX-3339-J2,398 words
Fort BlissHABS TX-3339-M2,385 words
Fort BlissHABS TX-3339-O2,268 words
Fort Bliss National CemeteryHALS TX-2-A2,263 words
Fort BlissHABS TX-3339-L2,254 words
Fort BlissHABS TX-3339-I2,250 words
Fort BlissHABS TX-3339-N2,193 words
Fort BlissHABS TX-3339-Q2,177 words
Fort BlissHABS TX-3339-P2,149 words
Fort BlissHABS TX-3339-K2,013 words
Rio Vista Bracero Reception CenterHABS TX-3626-F1,894 words
Fort BlissHABS TX-3339-H1,711 words

Provenance

  • Written history. Quoted verbatim from HAER TX-3399. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.