Lavender, Washington
16 topographic sheets cover this place, the earliest surveyed in 1901 and the latest in 2003. It stands in the Manastash Ridge census division. It lies in ZIP code area 98922. It stands on Big Creek. The Survey maps it on the Ronald quadrangle. It stands 2,142 feet above sea level.
Topographic sheets covering this place
7 surveys from 16 printed sheetsMatched by testing this settlement's coordinate against the published boundary of every sheet in the United States Geological Survey's historical collection. Each opens the scanned sheet at the Survey.
- 1901 USGS Snoqualmie Pass quadrangle1:125000, 2 printings
- 1903 USGS Snoqualmie quadrangle1:125000, 6 printings
- 1957 USGS Wenatchee quadrangle1:250000, 2 printings
- 1961 USGS Easton quadrangle1:62500, 2 printings
- 1975 USGS Snoqualmie Pass quadrangle1:100000
- 1989 USGS Ronald quadrangle1:24000, 2 printings
- 2003 USGS Ronald quadrangle1:24000
Fires near this place
92 since 1992Regional context, not property-specific evidence. The federal wildfire occurrence database lists 92 fires within 5 miles of Lavender between 1992 and 2020, burning about 379 acres in total. 12 started naturally. 4 were recorded as arson. Distance is straight-line from the map coordinates, so a fire counted here may appear on a neighbouring settlement's page as well.
| Reported cause | Fires |
|---|---|
| Recreation and ceremony | 30 |
| Missing data/not specified/undetermined | 17 |
| Debris and open burning | 14 |
| Natural | 12 |
| Equipment and vehicle use | 6 |
| Arson/incendiarism | 4 |
| Fireworks | 3 |
| Misuse of fire by a minor | 3 |
| Smoking | 2 |
| Railroad operations and maintenance | 1 |
The most recent of them, most recent first, with the day each was reported and the service that recorded it.
| Date | Cause | Size | Reported by | Name on the report |
|---|---|---|---|---|
| 7 September 2020 | Missing data/not specified/undetermined | 12 acres | Southeast Region-Department of Natural Resources | WALNUT LANE |
| 7 September 1992 | Recreation and ceremony | under an acre | Washington State Department of Natural Resources Headquarters | not named |
| 6 September 1993 | Fireworks | 1.0 acres | Washington State Department of Natural Resources Headquarters | not named |
| 5 September 2012 | Missing data/not specified/undetermined | under an acre | Washington State Department of Natural Resources Headquarters | BULL FROG WOODCHIP |
| 4 September 1999 | Recreation and ceremony | under an acre | Washington State Department of Natural Resources Headquarters | not named |
| 3 September 1995 | Recreation and ceremony | 1.0 acres | Washington State Department of Natural Resources Headquarters | not named |
| 2 September 2011 | Equipment and vehicle use | 1.0 acres | Washington State Department of Natural Resources Headquarters | TUCKER CREEK |
| 15 September 2015 | Natural | under an acre | Okanogan-Wenatchee National Forest | GREEK |
Settlements close enough to share some of these fires:
Mines and quarries near this place
10 of 17 shownRegional context, not property-specific evidence. The federal mineral resources record lists 17 workings within 5 miles of Lavender: 13 past producers, 2 occurrences, 2 producers. 2 still produce. What was taken out: Sand and Gravel, Construction, Silica, Stone, Crushed/Broken. Distance is straight-line from the map coordinates, so a quarry counted here may appear on a neighbouring settlement's page as well.
| Where | Site | Commodity | Status | Recorded |
|---|---|---|---|---|
| Easton Tunnel | Silica | Occurrence | ||
| Jonesville No. 2 Mine Dump | Stone, Crushed/Broken | Occurrence | ||
| Alpine Pit | Sand and Gravel, Construction | Past Producer | ||
| Borrow Pit | Sand and Gravel, Construction | Past Producer | ||
| Borrow Pit | Sand and Gravel, Construction | Producer | ||
| Bullfrog Pit | Sand and Gravel, Construction | Past Producer | ||
| Cresto Pit | Sand and Gravel, Construction | Producer | ||
| East Nelson Siding Pit | Sand and Gravel, Construction | Past Producer | ||
| Hundley Pit | Sand and Gravel, Construction | Past Producer | ||
| Unnamed Pit | Sand and Gravel, Construction | Past Producer |
Nearest settlements
The eight closest, with where each one stands in the county. Distances are straight-line, computed from the Geographic Names Information System coordinates.
| Map | Place | Distance | Sheets |
|---|---|---|---|
| Pine Glen | 1.5 miles | 15 | |
| Nelson | 3.2 miles | 16 | |
| Easton | 4.2 miles | 15 | |
| Lakedale | 4.5 miles | 17 | |
| Driftwood Acres | 5.1 miles | 17 | |
| Ronald | 5.2 miles | 16 | |
| Roslyn | 6.4 miles | 16 | |
| Cabin Creek | 6.8 miles | 15 |
Elsewhere
Matched on this settlement's Geographic Names Information System number rather than its name, so it cannot be a different place of the same name in another state.
| Wikidata item Q27988997 | The structured record the population and elevation above come from. Public domain (CC0). |
Provenance
This settlement is recorded in the Geographic Names Information System as feature 1530167. The sheet list is computed by point-in-boundary test against the United States Geological Survey's historical topographic inventory. Both are works of the United States government and carry no copyright under 17 U.S.C. 105.
Wildfire. Short, Karen C. 2022. Spatial wildfire occurrence data for the United States, 1992-2020 [FPA_FOD_20221014]. 6th Edition. Fort Collins, CO: Forest Service Research Data Archive. https://doi.org/10.2737/RDS-2013-0009.6 Collected with United States Government funding and usable without additional permissions or fees.
Mines and quarries. USGS Mineral Resources Data System (MRDS) https://mrdata.usgs.gov/mrds/ A work of the United States government, no copyright under 17 U.S.C. 105.






