BlockBefore

Highline Canal & Pumping Station, South side of Salt River between Tempe, Phoenix & Mesa, Tempe

Highline Canal & Pumping Station, South side of Salt River between Tempe, Phoenix & Mesa, Tempe, Maricopa County, AZ. Surveyed as HAER ARIZ,7-TEMP,6-, with a 169-word written history.

From the record

“The Highline Canal expanded the irrigable acreage of the Salt River Project.”

Written record, HAER ARIZ,7-TEMP,6- survey. Machine-read text.

Surveyed by the federal HAER program as HAER ARIZ,7-TEMP,6- · the record runs 169 words · one of 85 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

68 words

Source document Quoted word for word from HAER ARIZ,7-TEMP,6-. Not written, edited or summarised by this site.

South side of the Salt River, within the city limits of Tempe and Phoenix, Maricpos County, Arizona UTM: Pumping Plant - 1364311.483E/1119663.64N North Foot - 1318837.819E/1122459.316N South Foot - 1358480.251E/1119652.084N Date of Construction: Begun - Completed - Additions to pump plant - New pumping plant built - Engineers: U. S. Reclamation Service Supervising Engineer: Louis C. Hill Project Engineer: C. H. Fitch Chief Electrical Engineer; 0. H. Ensign

In context

Tempe, Arizona The place record: every map, photograph and survey of this town.
Maricopa County, Arizona 467 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Tempe

10 records

The federal surveyors worked through Tempe building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Stewart Mountain DamHAER AZ-1225,190 words
Tempe CanalHAER ARIZ,7-TEMP,7-13,834 words
Ash Avenue BridgeHAER ARIZ,7-TEMP,3-11,663 words
Grand CanalHAER ARIZ,7-TEMP,8-8,284 words
Crosscut Steam PlantHAER ARIZ,7-TEMP,5-8,095 words
Arizona Eastern Railroad BridgeHAER ARIZ,7-TEMP,2-6,461 words
Cross Cut Hydro PlantHAER ARIZ,7-TEMP,4-6,073 words
Tempe Municipal BuildingHABS ARIZ,7-TEMP,1-1,288 words
Crosscut Steam PlantHAER ARIZ,7-TEMP,5-B-47 words
Crosscut Steam PlantHAER ARIZ,7-TEMP,5-A-46 words

Provenance

  • Written history. Quoted verbatim from HAER ARIZ,7-TEMP,6-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.