North Point Pier Bulkhead Buildings, Embarcadero, Kearney & Powell Streets, San Francisco
North Point Pier Bulkhead Buildings, Embarcadero, Kearney & Powell Streets, San Francisco, San Francisco County, CA. Surveyed as HABS CAL,38-SANFRA,134-, with a 981-word written history.
From the record
“The plans for the bulkhead buildings were stimulated by the influx of goods Into San Francisco with the completion of the Panama Canal.”
Written record, HABS CAL,38-SANFRA,134- survey. Machine-read text.
Surveyed by the federal HABS program as HABS CAL,38-SANFRA,134- · the record runs 981 words · one of 382 surveyed structures published for this county.
Source document
Quoted word for word from HABS CAL,38-SANFRA,134-.
Not written, edited or summarised by this site.
The plans for the bulkhead buildings were stimulated by the influx of goods Into San Francisco with the completion of the Panama Canal. The facades, conceiv- ed as gateways to the city, lent grandeur to an area once populated by "flimsy structures, destitute of the elements of permanency" (John P. Young, San Francisco: A History of the Pacific Coast Metropolis, Vol. II, p. ~~ PART I. HISTORICAL INFORMATION A. History of Structures: While San Francisco's waterfront escaped the earthquake, by the Board of State Harbor Commissioners started rebuild- ing the entire waterfront area. This action was prompted by the expectation that the completion of the Panama Canal would greatly increase shipping into San Francisco.
In 3.6 million tons entered San Francisco, by this number had almost doubled with 6.1 million tons entering the port. An anticipated 13 million tons per annum was expected by The master plan for the waterfront was first published in as a report by the Federated Harbor Improvement Association (an association of commercial, industrial, banking, real estate, labor, and civic associations). The report, San Francisco Harbor, Its Commerce * NORTH POINT PIER BULKHEAD BUILDINGS # # 1, 3, 5, 9, 15, 19, 23, 29, 31, 33, 35, 39, and hx HABS No. CA-20^7 (Page 2) and Locks with a Complete Plan for Development, was written by- Luther Wagoner, an engineer. The implementation of the plan was started in when a nine million dollar bond issue was passed.
The waterfront was divided into two stylistic zones, the bulkhead buildings south of the Ferry were given Mission or Mediterranean fronts (these buildings are not documented by this study), while those to the north were treated in a Renaissance Revival style. This plan guided the waterfront development from about to at least the The project was implemented in phases; the piers closest to the Ferry Building generally were improved first, while the bulkhead buildings were sometimes added twenty years later. B. Source of Information: Washington, National Register of Historic Places.
Determi- nation of Eligibility File on "North Point Park Marina Eagle Cafe and Beaux-Arts Pier Facades." (by San Francisco District, Corps of Engineers) Prepared by Mary Beth Betts Historic American Buildings Survey from research compiled by Randolph Delehanty Historian The Foundation for San Francisco's Architectural Heritage March PART II. ARCHITECTURAL INFORMATION The waterfront area is composed of piers, sheds and bulkhead buildings. The facades of the bulkhead buildings form a row along the Embarcadero north of the Ferry Building between Kearney and Powell Streets. This progression of facades terminates with Pier U39 a free standing gate west of Pier Ul. These large arches are often visible at the ends of the city streets.
The bulkhead buildings are of steel or wooden frame (timber framing was used from approximately steel in the later phases) with cement plaster molded to look like stones. Each bulkhead building has a main # WORTH POINT PIER BULKHEAD BUILDINGS # 1, 3, 5, 9, 15, 19, 23, 29, 31, 33, 35, 39, and ^1 HABS No. CA-20H7 (Page 3) entrance composed of large arch with keystone and voussoir framing. This entrance is two stories with two or one-and-a-half story flanking pavil- lions. There is a battered pier on each side of the arch. This is cap- ped "by a pediment with a denticulated cornice. The pavillions have quoins and a similar row of blocks between the bays. The openings vary in shape, some being arched and others are flat.
Where there are two stories, the second floor windows are grouped by fours. Two of the bulkhead buildings, Pier 39 and Pier Ul, are scheduled for demolition. Pier 39, built in is long and lliO1 wide. The tim- ber truss roofed shed seems to have been built in the early The bulkhead building, added in has a steel frame with a cement plaster exterior. The style of the facade conforms to the description given ear- lier in the data. Pier hi was built in The shed was added in and removed in The wooden frame, cement plaster bulkhead building was constructed in The style of the structure, again conforms to the general description with the exception that the cornice is plain.
Prepared by Mary Beth Betts Historic American Buildings Survey from research compiled by Randolph Delehanty Historian The Foundation for San Francisco's Architectural Heritage March PART III_.
Project Information
This project was undertaken by the Corps of Engineers, San Francisco District, in compliance with Executive Order and a Memorandum of Agreement with the Advisory Council on Historic Preservation as a miti- gative effort in the development of a major commercial/recreational com- plex. John A. Burns, AIA, was the HABS project coordinator. The histori- cal and architectural data was based on research by Randolph Delehanty, Historian, The Foundation for San Francisco's Architectural Heritage. The data was edited in February by Mary Beth Betts in the HABS office, Photographs were taken in August and September, by Aaron Gallup. #
The federal surveyors worked through San Francisco building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HABS CAL,38-SANFRA,134-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.