BlockBefore

Hunters Point Naval Shipyard, Drydock No. 4, East terminus of Palou Avenue, San Francisco

Hunters Point Naval Shipyard, Drydock No. 4, East terminus of Palou Avenue, San Francisco, San Francisco County, CA. Surveyed as HAER CAL,38-SANFRA,195A-, with a 10,629-word written history.

From the record

“Dry Dock NO.4 appears to be eligible for listing in the National Register of Historic Places for its association with the events and patterns identified in the defense of the United States during World War II and as a significant marine engineering entity.”

Written record, HAER CAL,38-SANFRA,195A- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,38-SANFRA,195A- · the record runs 10629 words · one of 382 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

74 words

Source document Quoted word for word from HAER CAL,38-SANFRA,195A-. Not written, edited or summarised by this site.

Dry Dock NO.4 appears to be eligible for listing in the National Register of Historic Places for its association with the events and patterns identified in the defense of the United States during World War II and as a significant marine engineering entity. Report Prepared By: Steven R. Black General Engineer Mare Island Naval Shipyard Vallejo, California Date: April Hunters Point Naval Shipyard, Dry Dock No, 4 HAER No,CA-181 -A_ _ Page 2 I.

DESCRIPTION

3042 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,38-SANFRA,195A-. Not written, edited or summarised by this site.

Hunters Point Naval Shipyard is located on the west side of Central San Francisco Bay in the southeast portion of the City and County of San Francisco, as shown on page 15, The immediate vicinity of the shipyard is interchangeably known as the Hunters PoinUBayview District and the South Bayshore Area of San Francisco, It is a mixture of residential/commercial neighborhoods and industrial areas, much of which was developed to support the extensive industrial mobilization of the United States during World War II.

Dry Dock No, 4 has a southeast to northwest orientation with the long centerline axis running in this direction (see site plan, page The entrance into the dock is at the southeast end, accomplished by removal of the caisson after flooding of the dock is completed, Dry Dock No, 4 was last certified for a maximum docking capacity of 91 long tons, as documented in the Facility Certification Report for the dock, Based upon original construction drawings, its dimensions are: feet in length, 171 feet wide (at the coping), and 53 feet in depth, as depicted on pages 19 and 20, The length is nominally measured from the face of the outer caisson seat along the dock centerline axis to the rounded northwesterly end at the coping face,

Engineering Information

The Japanese attack on the United States Pacific Fleet at Pearl Harbor in the Hawaiin Islands in December of finally brought the United States into World War II. It also brought about the decision by the US, Navy to purchase the dry docks and marine repair facilities from Bethleham Steel Yard at Hunters Point and to initiate construction of what would become the largest graving dry dock on the West Coast of the United States, Construction of the largest graving dry dock at Hunters Point, eventually to become Dry Dock No, 4, began with initial site excavations in early under contract NOy-5377, The design of this dry dock was accomplished for the Navy's Bureau of Yards and Docks by renowned naval architect and engineer, Hugo Frear.

Construction was accomplished by the Pacific Bridge Company under Mr, Frear's supervision as a consultant. Excavations began in early as seen in photographs CA-181- A-2 through CA-181- A-5 and CA-181- A-9 through CA-181- A-12, and the dock was completed and commissioned on June 19, Construction included removal of Point Avisadero, rising to 130 feet. 2 Hunters Point Naval Shipyard, Dry Dock No.4 HAER NoCA-181 -A Page 3 above the elevation of the present dock-side coping (dock edge curb). Excavations below the coping were entirely into the native serpentine rock, as seen in photograph CA-181- A-10.

Over cubic yards of material were excavated and moved, some of which was used for a temporary coffer dam around the site, behind which Dry Dock No.4 was completely constructed in less than 10 months. The excavated material was also used to expand the shipyard's land mass, raising the site and creating building sites for the many industrial shops and facilities constructed during World War II, as evidenced in photograph CA- A-5. This dry dock is the largest graving dry dock on the West Coast and one of the largest in the world. Its construction in less than ten months is a significant achievement and a reminder of the extensive mobilization and build-up accomplished in the United States as a result of the country's entry into World War II.

As a comparison, the large aircraft carrier dry dock built at Puget Sound Naval Shipyard, Washington, during the period of to took almost three years to complete One point of interest is brought to the readers attention. Review of the recordation dates of the original construction drawings, dated during and after the construction period, indicates that the design and construction of the dock was most probably done concurrently. This is a reasonable assumption considering the importance of getting the dock into operation in response to the crisis created by the attack on Pearl Harbor and subsequent entry of the United States into World War II.

Part of the engineering feat reflected here is that such an engineering undertaking could be accomplished in such a short period of time without having complete design documents available throughout most of the construction period. Considering todays standards and construction practices, this must have required considerable on-site supervision by Mr. Frear and his associates. In addition, many of the engineering drawings were most likely done initially as preliminary drawings to support expeditious construction and were then completed to show actual as-built conditions. Mr. Frear also designed Dry Dock No.3 at Hunters Point and many other naval structures at various shipyards in the United States and around the world.

An engineer of international reputation, he contributed to the knowledge of naval engineering practices and advanced technology in the field through his innovative designs and related articles written about his work. 3 Hunters Point Naval Shipyard, Dry Dock No.4 HAER No.CA-181- A Page 4 Mr. Frear was awarded the prestigious title of Honorary Vice-President of the Society of Naval Architects and Marine Engineers in As constructed, Dry Dock No.4 is a fully relieved, reinforced concrete graving dock with integral flooding and dewatering systems. A utility tunnel and utility service galleries are located along both sides of the dock to provide utility services for ship-board and industrial uses. Basic dock and support system characteristics are shown on page 19.

Photo CA-181- A-35 shows the basic dock plan view at the coping level (EL. Thirteen electrically powered capstans, built by Modern Engineering Company, are positioned around the dock, 6 on each side and one at the head (northwest end). Based upon the FCR for the dry dock, three capstans (1 S, 1P and 7C) have a maximum pull rating of pounds while the remaining 10 are rated for pound maximum pull. Label plate information shows the capstans were manufactured by Modern Engineering Company and are of the reversing gypsy-head type, consisting of a barrel mounted on a vertical shaft and driven by a two-speed motor. The motors were manufactured by Fairbanks-Morse Company, with ratings of 40 horsepower(HP) for the three larger capstans and 15 HP for the remaining smaller capstans.

Power is typically 480 volt/3 phase. An array of bollards and cleats are also spaced around the dock to facilitate line handling operations when docking or undocking a ship occurs. The use of these capstans, bollards and fittings can be seen in some of the photographs included with this report. The dock floor is typically a thin reinforced concrete slab with expansion joints at 48 foot centers, with the slab placed directly upon the serpentine bedrock. When originally constructed, longitudinal drainage gutters ran along each side of the floor and transverse bilge block bearers were spaced at 12 foot centers throughout most of the dock length (see photo no. CA-181-A-34).

Although the bedrock beneath the floor does not readily conduct water, weep holes are provided through the floor to insure that excessive uplift pressures will not develop beneath the slab. These weep holes are 4 inch diameter gravel filled drains capped with a thin layer of porous concrete and are typically spaced on a 12 foot by 12 foot grid pattern in the floor of the dock. The original construction drawings are somewhat unclear on the drainage construction, but it appears that transverse and longitudinal gravel filled trenches were cut into the bedrock to provide a collector system under the floor for these drains.

4 Hunters Point Naval Shipyard, Dry Dock NO.4 HAER NO.CA-181-A Page 5 The lower, sloping portion of the dock walls (the section below the altar) is typically a thin reinforced concrete veneer over a steel reinforcing matt placed directly upon the surface of the serpentine rock. The slope is nominally 12 vertical increments to 3 horizontal increments. Uncapped weep holes at 12 foot centers are placed along the length of the dock walls at two levels and vertical expansion joints are spaced at 48 foot centers. The top of the lower wall section provides a continuous altar or walkway around the perimeter of the dock at feet above the dock floor. The upper wall section, described below, is set back at this altar level by feet.

The upper, vertical, portion of the dock wall (above the altar) is typically a counterfort retaining wall structure of reinforced concrete. Backfilled material has been placed behind the wall structures up to the level of adjacent paving. Excavations for the counterfort retaining wall structures are clearly seen in photograph CA-181-A-12. Six large and six small utility service galleries are spaced along both sides of the dock and are integrally supported by the cQunterfort retaining structures. In addition, large electrical manholes are incorporated into the structure to strengthen the dock walls in the vicinities of the large galleries.

Crane rail support struts (16 foot-8 inch spacing) tie the walls to a parallel crane rail beam which in turn is anchored into the serpentine rock (see photo CA-181-A-36). Forty foot gauge portal crane trackage runs on both sides of the dock at grade; trackage on each side of the dock is connected at the head end of the dock. Counterforts, located adjacent to the crane rail struts, are of 1 foot-6 inch thick concrete except where thickened to accommodate vertical expansion joints. Weep holes are provided along the base of the upper wall sections, at 16 foot spacing, in order to drain the backfilled material to relieve the hydrostatic pressure on the wall structure.

Dry Dock NO.4 retains a very high degree of integrity as, basically, the number of major alterations and changes made to Dry Dock NO.4 since construction that would have impacted on the primary characteristics of the dock have been few. These include: a. Bilge block slots and drainage trenches in the floor of the dry dock were filled with concrete to the elevation of the original floor. Integral floor weep holes were also raised to this new elevation and capped with porous concrete. The date of this modification is uncertain. 5 Hunters Point Naval Shipyard, Dry Dock No.4 HAER No.CA-181-A Page 6 b. In three steel pipe columns were placed in the south-side (port) utility tunnel in conjunction with the extension of the crane trackage on this side of the dock. c.

In six small (25 feet long) utility service galleries were constructed along the both sides of the dock to house fresh water services. Four of the original twelve service galleries were also lengthened. d. Various modifications were made to the utility systems servicing the dock since built. Most recently, additional salt water and electrical services were built (mid-1980's) to support docking of modern day, larger Navy surface ships. These modifications did not significantly affect the primary characteristics of the dock itself. PUMP ROOM: The pump room, flooding and dewatering chambers are located on the south side of the dry dock near the eastern end (entrance end) of the dock.

Similar to the construction of the dock proper, serpentine rock was excavated to allow forming and placement of concrete. Review of the sectional drawings included with this report (see photos CA-181-A-37 through CA-181-A-42) show that the pumps, sumps and chambers are located below the control room, where dewatering pump motors and all controls are located. Construction is essentially massive reinforced concrete formed integrally with the bedrock and the dock wall. The concrete roof structure is flush to grade and is constructed of a series of removable concrete sections, enabling pumps, motors and other large components to be removed by crane services. Discussions with Navy personnel (F.

Stivender, familiar with dock characteristics indicate that the roof structure of the pump room was engineered to withstand the direct hit and explosion of a 16 inch ordnance shell. No records are found to substantiate this; however, considering that the dock was built under war-time conditions, establishing this as a part of the design criteria is not unlikely. Page 21, taken from Military Handbook Dock Characteristics" shows that the three main dewatering pumps are vertical GPM pumps enabling the dock to be totally dewatered in 150 minutes. Two drainage pumps, located in the lower level of the pump room, are vertical 16 ", 6 Hunters Point Naval Shipyard, Dry Dock NO.4 HAER NO.CA-181-A Page 7 150 GPM pumps.

Based upon approximate dock water volumn at mean sea level, the computed pump-down rate for the 150 minutes is GPM total discharge, for an average of GPMper pump. Flooding of the dock is achieved through two flooding culverts, one on each side of the dock entrance, enabling the dock to be fully flooded in 60 minutes. Dewatering pumps are original dock equipment, manufactured by S. Morgan Smith Company. They are of the adjustable blade, axial flow type and run at a constant speed of 600 revolutions per minute Blade angle adjustment for altering pump capacity is accomplished by a hydraulic/electric control system. This system is normally controlled by manual loading of a servo-valve but may also be controlled automatically according to a load sensor.

The "variable blade angle" feature allows these pumps to (a) start unloaded, (b) more nearly utilize the full available power under conditions of varying head (pressure) and thus decrease pump-down time, (c) avoid overloading when the water level in the dock is high, and (d) pump the dock to a lower level before vortexing or cavitation begins. Lubrication of pump and shaft bearings is accomplished by using smaller booster pumps to inject fresh water from the shipyard domestic water main into the bearings. Water lubrication lines are fed to the lower and intermediate bearings through a 10 inch cast iron casing which is embedded in the concrete adjacent to each pump.

Motors for the dewatering pumps are volt, HP synchronous type, located on the upper level of the pump room (see photos CA-181-A-24 and CA-181-A-26). Motor-generator sets volt) provide exitation power to motors. Materials of construction are: suction bells and bowls, cast iron; propeller assemblies, type 316 stainless steel; bearing assemblies, babbitted stainless steel; and shaft assemblies, carbon steel. The two drainage pumps were manufactured by Byron Jackson Company as single stage, turbine type pumps operating at These pumps have enclosed, oil lubricated line-shafts and water lubricated pump bearings. Bowls and impellers are cast iron, pump shafts are type 303 stainless steel, and bearings are zincless bronze.

Drainage pumps are driven by 480 volt, 150 HP induction motors located on the lower level of the pump room (see photo CA-181-A-25). The 63 inch diameter discharge elbows for the three dewatering pumps transition into three separate 4 foot by 6 foot concrete discharge tunnels which are an integral part of the pumping plant structure. Each of these discharge tunnels is equipped with a sluice gate. Tunnels then offset upwards and 7 Hunters Point Naval Shipyard, Dry Dock No.4 HAER No.CA-181-A Page 8 transition to 4.5 feet by 8.0 feet in size, at which point each of the tunnels is equipped with a multiple butterfly-type check valve.

Immediately beyond the check valves, discharge is run through a large, single tunnel transition section which tapers to a 9 foot square cross-section before expanding to 9.0 feet by feet at its point of discharge into the bay. The discharge opening is normally completely submerged and is equipped with a trash rack and stop log (gate). When the stop log is in position, the tunnels can be drained for inspection or maintenance. Photos CA-181-A-27 through CA-181-A-32 show existing motor control centers located on the upper level of the pump room, controlling the dewatering and drainage pumps as well as the various valves, check valves and gates necessary for dock operations.

Pages 25 through 46 are the dry dock security operations (procedures) required to be followed by the dry dock operations and watch crews. CAISSON: This closure, constructed concurrently with Dry Dock No.4, is a reversible, rectangular type floating caisson that can be positioned in either the inner or outer dry dock caisson seat. A rubber seal runs vertically on both ends of the caisson and across the bottom. Concrete ballast is placed within the ballast and trim tanks along the entire bottom.

The caisson is divided into six compartments by a watertight deck and two watertight bulkheads, these being the operating room, the center ballast tank and trim tanks (see page A draft range of feet to feet is achieved either by flooding the lower three compartments or dewatering these tanks with pumps mounted in the caisson. All equipment is controlled from the upper operating room, with communications provided by portable two-way radios. The basic construction (see photo CA-181-A-43) is of structural steel plates and shapes with welded connections and seams. Shell plating varies in thickness from 3/8 to 7/8 of an inch. Horizontal girders are typically spaced 8 foot on centers with intermediate breast hooks added at each end.

The top deck, main deck and outer quarter panels of the typical girders are longitudinally stiffened plate girders, while the middle portions of the girders 8 Hunters Point Naval Shipyard, Dry Dock No, 4 HAER No,CA-181-A Page 9 are trusses comprised of structural tee and angle shapes, Vertical (transverse) frames are made of bent plates and are spaced 2 feet on center with additional cross bracing spaced at 8 foot centers, Sacrificial zinc anode blocks are attached to the shell to provide cathodic corrosion protection, Four screened inlets exist for caisson flooding, Gate valves at these inlets have cast iron bodies, These are operated by reach rods that extend to floor stands located in the operating room, The valves for the two smaller 8 inch inlets are hand-operated while the valves for the two larger inlets are motorized, Two vertical propeller pumps are available to dewater ballast water from the central ballast tank and to provide redundancy for the ballast dewatering system, The pumps are 18 inch, gallon-per-minute pumps powered by 75 horsepower motors, Discharge is by means of 18 inch motorized gate valves, Caisson electrical power--480 volts/3 phase/60 hz--is obtained from a detachable umbilical cable that is connected to shore-side power connections, located on either side of the dock entrance, when the caisson is in place, A transformer is located within the caisson to convert the 480 volt power to 120 volt /1-phase power for lighting and convenience outlets, III.

HISTORICAL CONTEXT

1677 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,38-SANFRA,195A-. Not written, edited or summarised by this site.

Private capital early recognized Hunters Point as an ideal site for dry docks and ship repair facilities and, at this location in the first dry dock Dock No, 1) on the Pacific Coast was built.

These same interests built a second dry dock Dock No, 2) here in because time proved the advantages of the mile long, rocky peninsula extending out into the deep water of San Francisco Bay, The importance to the nation of this privately-owned (Union Iron Works Company), deep water dry docking facility was officially recognized in when the United States Navy agreed to subsidize construction of a new foot dry dock on the site of original Dry Dock Number 1, Photograph CA-181-A- 1 shows site conditions prior to construction of Dry Dock No.4, reflecting the location of Dry Dock No, 3, Dry Dock No, 3 was completed and first used by the Navy in Photograph CA-181-A-1 shows a battleship, believed to be either the USS PENNSYLVANIA or USS ARIZONA in Dry Dock No, 3 in attesting to the Navy's interest and use of the Hunters Point facility prior to World War II.

Both ships were operational with the U,S, Pacific Fleet between and (Pearl Harbor) and were characterized by having tripod mast structures fore and aft and a 12-gun main battery, two turrets each with 3 barrels fore and aft. 9 Hunters Point Naval Shipyard, Dry Dock No.4 HAER No.CA-181-A Page 10 These features can clearly be seen in the photograph. Other battleships of similar configuration either had fewer guns in their main batteries or had caged mast structures fore and aft. The USS ARIZONA was sunk at Pearl Harbor during the December attack with virtually her entire onboard crew and today is maintained as a national memorial.

The USS PENNSYLVANIA was damaged during the attack on Pearl Harbor and was repaired and modernized shortly thereafter and returned to service with the Pacific Fleet for the remainder of World War II. The "Great White Fleet" of the United States Navy while on its historic around- the-world cruise of came to the San Francisco Bay with some ships in need of repair. Access to the existing Navy-owned repair facility at Mare Island, located above San Pablo Bay in the City of Vallejo, was impossible for many of the capital ships since their navigational drafts exceeded the water depths surrounding the facility. In view of this situation, during May and June of 23 vessels from this fleet were serviced at the privately-owned, docking facilities at Hunters Point.

It then became apparent that any major expansion of fleet operations in the Pacific area must include establishment of a new deep water naval repair facility at a location central to operations. In recognition of the problem, a Navy General Board was appointed in to survey the Navy's needs on the West Coast. In general, the Board recommended construction of a deep water naval repair base on the lower San Francisco Bay--a recommendation that was reaffirmed in by the Helm Commission, in by the Parks McKean Board, in by the Navy General Board and in by the Ball Committee of Congress. In the face of growing international tensions, the Navy subsequently obtained permission to buy the Hunters Point dry dock facilities.

On December 29, the Navy purchased the Hunters Point dry docks from the owners, Bethlehem Steel Company, and on December 18, 11 days after the Japanese attack on Pearl Harbor, took possession of its new facility known as the Hunters Point Naval Dry Docks. Construction of Dry Dock No.4 then commenced in early Page 16 shows the outline of Dry Dock No.4 and the resulting land mass (from the excavated materials) overlaying the existing site conditions in also reflected in photograph CA-181-A-33, which changed very little until Operation of the complex was initially placed under the long-established Mare Island Navy Yard (later the Mare Island Naval Shipyard).

On November 30, the Hunters Point facility was redesignated as the United States Naval Shipyard, Hunters Point and placed under its own Commander, making it a 10 Hunters Point Naval Shipyard, Dry Dock NO.4 HAER NO.CA-181-A Page 11 separate component of the San Francisco Naval Base within the Naval District. The original purchase included approximately 48 acres of land, the two existing dry docks and associated pumping equipment. Under the pressure of war, the extent of facilities and employment was rapidly expanded. By employment exceeded and facilities now included six dry docks, including Dry Dock No.4, as well as extensive industrial shops and warehouse and support facilities.

The dry and submerged land area also expanded to 635 acres, primarily from placement of excavated soils and rock from the construction of Dry Dock NO.4. Construction of the dock and evidence of the vast extent of the expansion of facilities is reflected in photos CA-181-A-5 through CA- 181-A-8. Dry Dock NO.4 was placed into service in mid-1943 to repair and overhaul Navy ships, many of which were docked to repair battle damage during World War II. It was therefore a significant component of United States Navy facilities on the West Coast.

For instance, the aircraft carrier USS INTREPID, one of the largest ships in the Pacific theater during World War II, was docked to repair battle damage to its hull and to receive general maintenance on three different occasions between and Photograph CA-181-A-13 shows a typical docking of the period with the battleship USS IOWA in dock. When not occupied by larger ships, two or more smaller ships could be simultaneously docked for servicing at the same time, as shown in photograph CA-181-A-14. This contributed significantly to the Navy's dominance in continually having a large numbers of ships committed to Pacific battle areas at any given time throughout World War II.

After World War II, Dry Dock NO.4 was continuously used to dock a large variety of Navy capital ships, and in some instances those of foreign nations, for repair, overhaul, maintenance and conversion. Photographs CA-181-A-15 and CA-181-A-16 show the undocking of the USS MIDWAY after undergoing a major conversion in Dry Dock NO.4 during the Photographs CA-181-A-6 through CA-181-A-8 provide additional aerial views of Dry Dock NO.4 and the Hunters Point Naval Shipyard at various times following World War II. For a brief period of time, Hunters Point Naval Shipyard and Mare Island Naval Shipyard operations were combined under a single operational command known as the San Francisco Bay Naval Shipyard. On November Secretary of Defense Robert S.

McNamara announced the merger of Hunters Point Naval Shipyard and Mare Island Naval Shipyard which was accomplished in a II Hunters Point Naval Shipyard, Dry Dock No.4 HAER No. CA-181-A Page 12 command ceremony on May 11, According to Mare Island Naval Shipyard historian, Ms. Sue Lemmon, thus was created the largest shipyard complex in the world, comprised of assets of approximately million, over civilian employees and over military personnel on active duty. This relationship existed until January when both shipyards returned to autonomous operations.

Hunters Point Naval Shipyard was subsequently formally disestablished by the Navy, and Navy ship repair operations were terminated in The shipyard was leased by the Navy to Triple A Machine Shop in and operated as a private marine repair yard until termination of the lease by the Government in Of note, Dry Dock No.4 was continuously operated by Triple A as the primary repair facility during this period.

After disestablishment in title to all land and facilities was held for the Navy by the Supervisor of Shipbuilding, Conversion and Repair, San Francisco Bay until transferred to Naval Station Treasure Island, as the Hunters Point Annex, in September, The heaviest ship ever docked is believed to be the T T STUYVESANT, a commercial tanker, docked in August, with an overall length of feet-8 inches, an extreme beam of 143 feet-8 inches and a full-load displacement of long tons The heaviest Navy ship to be docked prior to the short period of dockings in the mid-1980's, was the aircraft carrier

Uss Kitty Hawk

The actual displacement of this ship when docked is not currently known, but since the KITTY HAWK has a full-load displacement of tons, it is considered likely that she was docked at a displacement on the order of tons Other Navy aircraft carriers docked in Dry Dock No.4 include the USS RANGER the USS CORAL SEA the USS MIDWAY the USS ORISKANY the USS BON HOMME RICHARD the USS HANCOCK and the

Uss Hornet

Most recently, the USS ENTERPRISE and the USS CARL VINSON have been docked. The largest of these, the USS CARL VINSON, has a full- load displacement of approximately long tons. While no figure is available on the actual displacement when docked, the CARL VINSON was most likely docked at a displacement over that of the KITTY HAWK long tons), making her probably the largest and heaviest Navy capital ship ship to be accommodated in Dry Dock No.4. In Mare Island Naval Shipyard personnel completed an in-depth study of Dry Dock No.4 to determine the requirements to return the dry dock to a condition to support emergency dry docking of Navy nuclear surface ships.

12 Hunters Point Naval Shipyard, Dry Dock NO.4 HAER No.CA-181-A Page 13 Improvements to salt water and electrical distribution utility services, previously mentioned in this report, were constructed shortly thereafter. Between November and August six separate dockings of Navy surface ships occurred, including dockings of the aircraft carriers USS ENTERPRISE -see photographs CA-181-A-17 through CA-181-A-23, and USS CARL VINSON, the cruiser, USS TEXAS, and the cruiser,

Uss California

Upon termination of the lease to Triple A Machine Shop, title to Ex-Hunters Point Naval Shipyard and almost all facilities, passed to the Naval Station Treasure Island, with actual ownership of Dry Dock NO.4 and its associated facilities and utilities passing to Mare Island Naval Shipyard in After August no dockings of Navy ships occurred, and Dry Dock NO.4 was subsequently placed into an inactive status. At the time of writing this report, the Navy is evaluating potential leasing of the Hunters Point Complex, including Dry Dock No.4, to commercial interests. IV.

SOURCES

5716 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,38-SANFRA,195A-. Not written, edited or summarised by this site.

Black, Steven R., PLANNING STUDY FOR DOCKING OF NUCLEAR POWERED AND OTHER NAVY SHIPS AT HUNTERS POINT NAVAL SHIPYARD-DRY DOCK NO. 4/S0UTH PIER, Mare Island Naval Shipyard, Vallejo, California. located at Mare Island Naval Shipyard, Staff Civil Engineers Office. Lemmon, Sue and Ernest D. Wichels, SIDEWHEELERS TO NUCLEAR POWER-A PICTORIAL ESSAY COVERING 123 YEARS AT THE MARE ISLAND NAVAL SHIPYARD, Annapolis, Maryland, Leeward Publications, Inc., located at the Mare Island Naval Shipyard's Historian Office.

Schmidt, Edwin G., HISTORY OF THE DEVELOPMENT AND OPERATION OF A NAVAL REPAIR YARD AT HUNTERS POINT DURING WORLD WAR II, unpublished, reportedly located at the offices of the Supervisor of Shipbuilding, Conversion and Repair, Hunters Point, and at the San Francisco Maritime Museum, San Francisco, California (a recent query concerning this document was made to the staff at the maritime museum, and they had no direct knowledge of this document). 13 Hunters Point Naval Shipyard, Dry Dock No.4 HAER No.CA-181-A Page 14 MASTER PLAN-NAVAL STATION TREASURE ISLAND,HUNTERS POINT ANNEX-EXISTING CONDITIONS REPORT, prepared for Western Division, Naval Facilities Engineering Command by Hall, Goodhue, Haisley and Barker, inc. FACILITY CERTIFICATION REPORT-TRIPLE "A" SHIPYARD-DRY DOCK NO.

4; HUNTERS POINT, SAN FRANCISCO, CALIFORNIA, prepared by Moffatt & Nichol Engineers, located at Mare Island Naval Shipyard, Code Urban Programmers, National Register Nomination for Dry Dock No.4, prepared by Bonnie L. Bamburg/Principal Consultant and Ann Bloomfield/Research Assistant. US NAVY WAR PHOTOGRAPHS, editied by Edward Steichen, New York, New York; Crown Publishing, Inc., located at Mare Island Naval Shipyard, Code V. PROJECT INFORMATION: This documentation has been prepared as the result of a Memorandum of Understanding between the National Park Service, the California State Historic Preservation Officer, and the United States Navy (Mare Island Naval Shipyard) to mitigate the potential adverse effect of leasing the drydock to commercial interests.

Project Manager and investigator for this recordation was Mr. Steven R. Black of Mare Island Naval Shipyard. The documentation is based upon review of various available materials, historical records held at Mare Island Naval Shipyard Historian's Office, engineering drawings, and of the National Register Of Historic Places-Registration Form, prepared by Urban Programmers, San Jose, California. 14 , . ffiJNTERS POINT NAVAL SHIPYARD) DRY DOCK NO. 4 IIAER NO. CA-181-A PAGE 15 / NO~ATO\ ) c, -, ~ , RAe A::~ ) WALNUT \,' eRE:: K f A G I f I c. HAYWARD ,1 ~P.IH FREMONT v 0b HUNTERS POINT NAVAL SHIPYARI\ DRY DOCK NO, 4 ' , ' HAER NO, CA-181-A PAGE 16 0c .~ " " ." J' oc+ ? \ j'" z' ... \It' J' ,<' ') ,}' -, . J / J , \ 7 - . - .. j.- SITE. ... - .. . - - ' .

HUNTERS POINT NAVAL SHIPYARD, DRY DOCK NO.4 lMER NO. CA-J8J-A PAGE 17 I ARMY ST. j ,SLAIS CRee< . I ,J . / INDIA BASIN REDEVE~OPMENT AREA BAYVIEW HUNTEF,S POINT lNJIA BAYVIEW BREi HARTE BAYVIEW HILL CANDLESTICK, (/ .I \:J .. flo[l-1r1 L.o6AT ,or-J tY-e-- , I HUNTERS POINT NAVAL SHIPYARD! DRY DOCK NO. 4 HAER NO. CA-181-A PAGE 18 HUNIERS POINT NAVAL SHIPYARD, DRY DOCK NO. 4 MIL-HDBK-I029/3 HAER NO. CA-181-A PAGE 19 . I TO INNER FACE OF CAISSON 1\ s' C~PING oL I IN OUTER SEAT i, TO INNER FACE OF - 'I IIZ.O " ; CAISSON IN INNER SEAT I I!,-,-----,- i ~ ri ~_' I ... :J i -)OC:< "~ . "I .. ~LOOR.;: . ;_ . r. ... ., . '". ~ , :. ~ -:. <1 ~." 5' eLE A RA;"! CE !,I _ _ TO HEAD DOC~,;I:-,. ~:_ n . . :Ti i' , I J5'CL~ARANC~ fN N ER FAG E 0 F

Caisson in Outer

ScAT 70 LONGiTUDINAL SE:::TION (VIEW OOKING NORTHEAST) TO INNER FACE OF CAIS~ SON IN OUTER SEt..T L ~ OF DOCK NO,_4_ _+lI:+'I"--_ CAISSON IN - ,: OUTER SEAT 1 10' ! CR AN E PLAN II TR ACKS VIEW .1 FULLY RELJ~VED REINFORCED CONCRETE 'I , I I I COPING EL UK. ~Ir IML' i~'-- EDGE OF CAISSON SEAi'" ~ t~ ~." :<: " , ,1 - - "'- 51 U EL SECTION THRU DOCK ENTRANC::' SLEVATiON SHOWING MAXIMUM THEOR:;'TICAl.. ShiP DRY DOCK CHARACTERISTICS Hunters Point: Naval Shi.pyard Drydock No. 4 I' HUNTERS POINT NAVAL SHIPYARD; DRY DOCK NO.4 >- HAER NO. CA-181-A I- -J ~w PAGE 20 ~ Z ~z r- =:: I - \ UJUJ o~ <u; to h y I .' I ~ J:-------=:!!IIIlI !, - If) 0' I "LJ IJ', ~' ! '-" -J <w 0 CO D: z_z ~Z 'l < i, '" co I - I I I i ~\J J ~ ~, ?- I ~Cl Ow ~ ~ ,:i.-! ;ct ~ 0 IL w -~ ~ ~\~ "' \ 'I.

~:t v \.j '-" z I z "- ~ W J.' ::> ( . I 1,- . '. .~' ..J => .. N I. CO ..3 !(" ..J c: "" I - ) I ?- () C c:. HUNTERS POINT NAVAL SHIPYARD DRY DOCK N O . 4 ) MIL-HDBK-I029/3 HAER NO. CA-181-A PAGE 21 Date Comoleted Suitable for Docking! Foundation Construction Materiai CV Rock Concrete Item Data Closure _ Caisson, steel (rectangular box type). Dewatering pumps_ Three hp, Time to dewater: 150 min. Drainage pumps __ Two 150 hp, Flooding _ Through culverts. Time to flood: 60 min.

Capstans _ 13 total: 1 at head, 2 each side of entrance, 76 Ipm at 5 each side, 76 fpm at Portal Crane Maximum Capacities and Heights hook 5 It beyond dock ivlax height above coping centerline with hook at dock centerline Main 44 Ig Ions 62' 9" Auxiliary 28 19 tons 8" Whip 5 Ig tons 8", 90' 0" min radius Ship and Industrial Services Furnished at Dock Electrical Volts Amp Receptacles Ac, 3 Ph, 60 Hz 460 2 each side at amps; 4 each side at amps. Ac, 3 Ph, 60 Hz 5 at 400 amps each on north side Fresh water _ 6" mains, 400 gpm at 40 psi, eight and four outlets each side. Salt water _ [8" mains, gpm at 100 psi, six 4" outlets each side, 4" headers at dock floor with outlets: Not operational].

Fire protection _ 10" and 12" mains, gpm at 150 psi, sixteen 4", four 6" outlets each side, Low pressure air_ _ 6" mains, elm at 100 psi, six 3" outlets each side. 3" headers at dock floor w~h outlets. High pressure 2.i~ 1" mains, 160 cfm at psi, [one 1" outlet south side not operational]. Steam 6" mains, phr at 150 psi, six 3" outlets north side, [live 3" outlets south side, not operational]: Provided by rental boilers (portable). Oxygen _ [2" mains, cfm at 100 psi, six 1" outlets each side: Not operational]. Acetylene _ 12" mains, cfm at 5 psI, six 1" outlets each side: Not operational]. Sanitary sewer _ 8" mains, 500 two 4" inlets each side. Natural gas _ [4" mains, 15 psi, one 1" outiet each side, three north side, four south side: Not operational].

Hunters Point Naval Shipyard Drydock No.4 ..\ _ IU'O' tOAp."lllQl-1WM / ' MAWIW ....Il.'( -le'O~--"l ~Al(ll I It~TtH CJ 0 ~~I-I" ~/ - PCl\lAl:\U \'(ItlOI C()l.,.1f'AIlIOU"""'( ,A-tll( ACerB *OI!1\NG !Q\J\'~&-Il fN<:loS:UPf - - - tOtl11\.0I. UWI' ""TO' .PLAN "1 WP OECK - ._- ...-M01~lfO " lV~ ~11"'''on __ C~l!~~ALL~-:' , ~ [ '~~ TA~r1" ~ _ _ , ~ CtW"'H~I~1 S 0 ( ,I..UO !'\flAP ()I~C'\AA6t - '>. N 1-- fl ...,.....l(JA.l 'lOOOlll(} VAlV! tl 0( :L ~ ii: /l ~T \ if f.l --- <I ~I 0( .N .. .,; EQUAl VAL"!. ""'Alvt ~ ,~ , ~ b \.il(JlOIl1UO --- l(t v.A.NUA.t. O"~(l( FLOODlIl(} V,o,l'l'f cOllCPlH 3All,l..,U---';: 'rAW! iJ !I::..~~:~~(~~, PLAN ABOVE CONCRETE BALLAST =- -r - \ ..

I I - - - - - - ' - ","Otc" I OPIfl..Al1llG AOOM i , 5ECTIOf-J IvA ~~iil ~ - Dl!AAT!RIUO I ' OFflt.A.TO" Pt"AP = 11- "~ ,..-rMOtOR~'AJ'I.lI'" n ,- -WAlfRTIOIH .~ ! II Qt.e..'( I - 7L" (f\ O} _lI.tJ.CK WlHA. OZO tf1 - - lM.i1t., . "00 l!Allll-)l I,l"H~ -W.i.'!'Hl&tf e.\J,.P'IIEA.M to~ ~~Z ~ ., l I . _. . ';, -. . .:. , ~ _ .( ... " -roJ(IIl~lr: :l> , : / : ;: ~./ ::: ", .~ ',; .:. : f': ::. .'. ~.' 4' ~ "Iij CAISSON ij . -~ lOIolGITUOIN"L 5EeTION , 1i HUNTERS POINT NAVAL SHIPYARD; DRY DOCK NO.4 HAER NO. CA-181-A PAGE 23 RESOURCESDfl..PTINST HUh'TERS POIRT PUHP HOUSE NO. 4 SECURITY OPER.~TION 5.1 IHTRODUC'l'IOll 5.2 HUNTERS POD-IT WATCH STANDER RESPONSIBIL-TTIES Primary Responsibilities G"-neral Duties Security Inspections 5.3 PUMP HOUSE NO.

4 VlUNE LINEUP General Require~-nts Normal Valve Lineup Valve Lineup Verification 5.4 PUMP HOUSE NO. .;, HAIlI

Dewatering Systeh

General Requirements Preparing the Main Dewatering System for Operation Starting the Main Dewatering Pumps securing the Main De;,'atering Pumps 5.5 5.6 PUMP HOUSE NO. .;,

Drainage System

General Requirements Description of Electrical Float Bubbler Control System Operation of Drainage Pumping System PUMP HOUSE NO. .;, SUMP PUMPING SYSTEM 5.7 5.8 POIRT DRY DOCK NOS. 4 1iLI'IRM SYS'I'E:M HtJ},'TERS Pump House NO. 4 Drainage Alarm 5.9 H'JNTE:RS POTh'T CAISSON NO. 4 SECURITY C-eneral Requirements Caisson No. 4 Tank Level and Alarm Operation of Caisson No. 4 E'igures 5-1 Pump House No. 4 System Diagram 5-2 Pump House No. 4 Equipl!l"'..nt Identification 5-3 Pump House No.4 Normal Valve Lineup 5-4 Pump House No. 4 Hunters Point Normal Valve Lineup Verification 5-5 Pump House No.' 4. Main Vuve Control Panel 5-6 Hunters Point Caisson No. 4 System Diagram 5-7 Pump House No.4 Hydraulic Pump Unit for Main Pumps 5-8 Pump House No.

4 Main Pump Hydraulic !lOG CooJ..ing Water System 5-9 Pump House No. 4 Main Pump Control PMel Hunters Point Dry Dock No.4 Tunnel Layout 5-1 . 1 HUNTERS POINT NAVAL SHIPYARD1 DRY DOCK NO. 4 HAER NO. CA-181-A PAGE 24 RESOURCESDEPTINST H~.ters Point Pump House No. 4 Status Board Hunters Point Dry Dock No. 4 Pump Control/1-.larm Panel Hunters Point Caisson No. (, Ala..'"1Il Panel 5-2 ,1 HUNTERS POINT NAVAL SHIPYARD, DRY DOCK NO, 4 HAER NO, CA-181-A PAGE 25 RESOURCESDEPTINST ~JNTERS CHAPTER 5 POI1~ PUMP HOUSE NO, 4 SECURITY OPERF.TION 5.1 I1~ODUCTION 1. This chapte= applies specifically to the operation and security 0: Dry Dock No. 4 at Hunte~s Point when there is a shiD in dock and the pump house is manned by a watch sUll,oer.

Wnen there is no ship in dock, this chapter will be used by maintenance and inspection personnel as a referenc= for general ope=ations fu~d security of related systems and equipment. 2. The watch stander will maintain general dry dock securi~y in accordance chaDter 3 0: manual, and ~il1 adhere to all the instructions and requirements of this manual. 3. The watch stande~ will perfonm specific security operations in accordance with the procedures of this chapter. 5.2 POIh~

Watch Stander Responsibilities

Prirnarv Responsibilities. The primary responsibili~y of the watch stander is to control the operation and securioY of the pump house, Dry Dock No. 4 and caisson, and all related dockside equipment. General Duties. The follo"~ng list is provided as a general sumrr,ary of watch stander duties for Pump House No.4. Paragraph numbers providing detailed instructions elsewhere in this manual are provided rt~ere appropriate. 1. Control opera~ion and security of assigned dry deck areas. 2. Maintain a concise record in the s~tion log books of all conditions affecting the operation and security of the dry docks. 3. Maintain good housekeeping conditions in all assigned dry dock areas. 4:. Maintain physical security of assigned d!:JI doc}: a.reas as required by appropriate paragraphs of t!his chapter.

5. Perform required operator maintenance checks, lubricate machinery, make minor repai=s ~Id adjus~ents as necessary, and relamp assigned areas. 6, Place and remove clearances as directed in assigned areas, and restore systems to 'normal when clearances are removed. 7. Rotate operation of drainage pumps. 5-3 HUNTERS POINT NAVAL SHIPYARD/ DRY DOCK NO.4 HAER NO. CA-181-A PAGE 26 RESOURCESDEPTINST a. b. Run pumps in moo : Monday through Friday. Run pumps in 2+1 mode SaturG2y arrc Sunday. 8. Locate the CFBCON SLation for ~he in Dry Dock No. 4 a~d log the approp~iate ~elephone extension end location in w~e log book. 9. Repo~ equipmen~ problems ~nd deficiencies to the supervisor- . 10. 'Perform normal va:!.ve lineup v2:-ifi=at.ion a:. the of each shift. 11. M2int&in D~ Dock No.

~ drai~age level as required by appropriate sec~ions of this cnap:.er. 12. Maintain Caisson No. 4 ta~k levels 25 required by appropriate paragraphs of this chapter. 13. Perform additional du~ies as assignee by ~~e dock supervisor. Securitv Insoect.ions 1. The watch stander will perform two complete security inspections of all assigned dry dock ar~as each shift when there is a ship in dock. When there are no ships in dock, at least one inspection tour will be accomplished each 24 hours. 2. The watch stander will notify Hare Isla~d at prior to departure and upon return from each inspection tour during day and swing shift. Grave shift, weekehds, or holidays, will call 3. During these inspections, general conditions and security of all equipment will be checked.

Inspection will include, but is not limited to: a. Equipment lubrication and cleanliness. b. Oil or hazardous material spills. c. Fire and safety hazards. d. Water in capstan and valve pits. e. Leaks under dock caisson. f. Leaks through caisson valves. g. Unauthorized items tied to caisson or on the caisson deck. rep.1acement. h. Station lamps and dockside flood lights needing 5-4 HUNTERS POINT NAVAL SHIPYARD; DRY DOCK NO. 4 BAER NO. CA-181-A PAGE 27 RESOURCESDEPTINST J. Damaged or missing fire e~inguishe~s. ~~y othe~ unusual conditions. 4. }U1Y unusual candition will be reported to the watch supe:visor anc entered in the 109 beok. 5. During docking evolutions, 'C..1-:le w-at-en stance:: t-~ill ~ relieved of PUll? house operational duties OfruY. Secu~ity inspections ~ill not ~ 5U5?ended.

6. The dock superv'isor \ rill have the aut.hority to waive a security inspection ~our due to unusual conditions which demand the watch s~lder's attention to other duties. 5.3 PUMP HeUS, NO. 4 V~LVE LIN~UP ~neral Reouirements. Except during docking evolutions, the watch sta~der will ensure that the normal pum~ house v~lve lineup is m2intained at all times. Normal Valve LineuD 1. A diagram of Pump HOUSe NO.4 piping systems, pumps, and valves is p~ovided by figure Com?onent designa~ions are provided by fi9"'.1=e 2. Th~ Pump Bause No. 4 normal v21ve lineup is provided by figure 3. Tempor-an" changes to ~~e normal valve lineup lUUSt. be approved by W~t dock super\risor.

Any changes which may b~ necessary for longer ~~an 48 hours rnus~ be authorized in accordance with paragraph Valve Lineup Verification 1. A norm~l v~lve lineup verification will be performed by ~e ~otch stander at the sta~ of each shift when a vessel is in dock (figu=e 5- 3) <i- Wnen there are no in dock, the normal valve lineup ? ver~=ication will be performed by operations/maintenance personnel during the daily ~nspection tour. 5.4 PUMP HOUSE NO. 4 HAIN DEWATERING SYSTEM C~neral Reauir~ments op~rated ONLY procedures. 1. The main dewatering pumps w,Q are normally during docking evolutions per specific docking/llilQocking 5-5 HUNTERS POINT NAVAL SHIPYARD, DRY DOCK NO. 4 HAER NO. CA-181-A PAGE 28 RESOURCESDEPTINST 2.

The elEctric211y ope=a~eci main Plli~P discharge v21ves (HV -Ol, and will be m2inLained no~ally closed. ~. The secu~ity ~a~ch stanQe~ will operate the mai~ dewatering system ON~Y in support of s?eciti~ maintenanc~!tes~ procedu~es OR in extreme eme=gency 8ond~tions. The following ins~=uctions are provide6 for this purpose. ?reD~rinothe E2in D~wete~~nc Svstem for ODer~tion ~. Remove ~~e stop log from ~~e opening of the main discharge ~unnel at seawall. 2.Ve~i=y ac~uators for ~hc main dis=harge gate valves HV-Ol, HV- 02, ~Jd are in the moto~_posi~ion in the pit_and turn on cir=uit breakers for the valve actuators. !< F'::'-IZ- -ro FJ",l.(.ee i:i-:; 3. Close the disconnect swi~ches to three hydraulic ?umps for main check valves a~d MC\i-3 in valve pit.

NOTE: Ensure the check valves are fully closed a~d operational by verifying the sight glass on each hydraulic tank indicates full before opening L~e main discharge gate valves. 4. Place control switches for main check valves and inside the main pump control panels in the "AUTO" position. 5. Line up the fresh water bearing cooling and flushing system for each main pump as follows: (figure a. Open three cooling water valves and to lower, middle, and upper bearings on all three pumps (provides flushing for bearings when dock is flooded). b. Open cooling water valve to motor thrust bearing. c. Line up and start the cooling water booster pump if fresh water pressure drops below 30 psig or if the yellow low pressure warning light begins to flash.

Low cooling water pressure to any of the three main bearings will prevent the pump from starting. 6. Start the ventilation system intake and exhaust fans prior to running the main pumps to provide adequate ventilation for the main motors and lower pump level. Startina the Main Dewaterino Pumns 1. 0pen the main discharge gate valves and/or HV- 03 for the pumps to be used. The main pumps will not start unless their respective discharge valves are open. 5-6 HUNTERS POINT NAVAL SHIPYARD DRY DOCK NO. 4 I HAER NO. CA-l8l-A PAGE 29 RESOURCBSDEPTINST 2. Start one hydraulic pump to the main variable-pitch pump control, then line up the approp~iate valves (figure 3. Open the two hydraulic valves cu~d on each main pump (figure 4.

Place w~e main pump sele~tor switch in the Y.sta~" position on the pump control panel. 5. 'Place the variable-pitch blade control s-witch in the ~manual position on the pum? control panel, and "lower n the blade pitch control until the angle reads -4 degrees on the pump dial indicator, or rea=hes its lowest position, closing the microswitch in the uppermost position. 6. Energize the main pump motor with the breake~ cont~ol switch, and verify that the main check valve hydraulic pump has started to assist opening the check valve as indicated by the read light on the main pump control panel. R..&,FiW--;1) FI~()'tU $ ~ NOTE: If necessary, the main check valve hydraulic pumps can be started manually from the valve pit. 7.

Adjust the field curren"t- to 60 amperes t:r'J.e field rheostat on the auxiliary control panel when ~he pump is running. 8. PlacE the selec~or switch in the "run n position. 9. "Raise n ~~e blade pitch control to a blade angle where the motor is drawing 200 cO 250 amperes. 10. Wnen a constant opera~ing speed has ~en obtained, adjust the field rheostat to ob~2in 2 unity power factor. 11. The operator may need to adjust the blade angle periodically in order to maintain a constant motor load as the water level in ~~e dock decreases. Securinq the Main Dewaterinq ?limDs 1. Wnen the dock water level reaches one foot, or t-~e motor current begins failing quickly indicating loss of suction, st.art "lowering" the pump blade angle. 2.

When t.r,e pump blade angle reaches w'1e lowes~ position and the rnicroswitch i~ closed, secure the pump motor with the breaker control switch. 3. Close the main discharge gate valves HV-Ol, and open the circuit breakers to the valve actuators. 5-7 a~d , , HUNTERS POINT NAVAL SHIPYARD, DRY DOCK NO, 4 ' HAER NO, CA-181-A PAGE 30 RESOURCESDEPTINST 4. Secure the cooling water booste~ pump (if in use) ane close t~e fou~ cooling water valves ~ri-3! ~ld on eact main pump. 5. Close th~ two hydraulic v21ves and on each ID2in pump, anc secure ~he hydraulic pump and associa~ec v~lves. c. Place the cont~cl switches for ffia~~ chesK v~lves M 2, and in ~~e fto=fft position, and open ~~e Gisco~lec~ switches for ~~e ~hree hydraulic pumps in ~he valve pit. Ve~ify all three main check valves are closed. 7.

Replace ~he s~op log ove~ the main discharge tllilnel opening at the seawall. 'S SE.- ;:;1G,Urzr-- 5.5 PUMP HOUSE NO. <; DRr,mAGc General Re~wirements The wa~ch stander will record the status of the d~ainage pumping system on the pump house status board (figure 2. The pump controller manual-ofr-auto switches for drainage pumps ~~d located on the lower pump level will normally be maintained in the "auto" position with the elec~~ical float bubble~ system controlling the pump operation. 3. The pump controller switches "hand" position will only be used to manually operate drainage pumps and in the event the electrical float switch bubbler control system fails. 4.

Prior to flooding the dock for docking/undocking evolutions, the pump controller switches for drainage pumps and will be placed in the "off" position. Description of Electrical Float Bubbler Control System 1. The bubbler control system is supplied by two 100 psig air compressors located on the lower pump level. The system requires a regulated air pressure of 50 psig and also requires a regulated fresh water pressure of 10 psig and also requires a regulated flow of 2 to 3 gpm for a continuous flush of the system and for testing ~~e column for proper operation. 2. The electrical float bubbler system controls the operation of the drainage pumps when they are in the "auto" mode. 3. A selector switch located on the electrical float bubbler control panel provides the following functions: a.

"Auto" automatically starts and stops drainage pumps 1 and as follows, 5-8 HUNTERS POINT NAVAL SHIPYARD, DRY DOCK NO. 4 HAER NO. CA-l8l-A PAGE 31 RLCSOURCESDEPTINST ." the dock floo:-. (1) 5~a~s when the drainage level reaches 72" below (2) s~arts when the drainage level reaches 60" belo~ the dock floo:-. {3} Both and will stop when the d~ainage level drops to belo~ ~he aock floor. b. "manual" manually starts drainage pump c. "manuel" manually starts drainage pump d. "HaintenaD=e" removes the pump from the system for maintenance func~ions. ODera~ion of Drainacre PumDino SV5tem 1. The waLch sta'1ae= will nonnally maintain the drainage pumping system in thE "auto" mode for normal automatic drainage pumping. 2.

When it is necessary to pump drainage manually, the watch stander ~ill pump drainage as follows: a. Place the auto-off-manual control in the manual position tc start the pump. NOTE: Bo~~ and have a 90 second delay to There are not check valves in this system; therefore I when ~e pump being used stops, ~e drainage left over in the discharge pipe is allowed to free flow back to the suction ch~er, causing the pump to turn in reverse. This would cause damage to the pump if it was allowed to while -:.urning in reverse. b. Return the auto-off-rn2intenance-manual cont~ol swi~ch to the "off" position when the drainage level reaches belo~ the dock floor. c.

When the d::-ainage pumps are in manual control, the w-atch stander will pump drainage prior to leaving the pump house for routine inspection rounds or .nen the drainage level reaches the 72" level belo~ the dock floor. 5.6 PUHP HOUSE NO. 4 SUMP PUMPING SYSTEH 1- Automatic Sumo Purno. Normal dewatering of the pump house sump is provided by a float controlled electric sump pump loca~ed in the lower pump level. 2. Emeraencv SUIllP ?umos. A second electric pump aJ'1d an air- operated pump are provided for dewatering the pump house sump in the event the automatic pump fails, and must be operated manually by the watch stander. Tne control switch for the electrical emergency back-up sump is located on the control/alarm panel on the main operating leVel.

5-9 , )' HUNTERS POINT NAVAL SIllPYARD, DRY DOCK NO, 4 HAER NO, CA-181-A PAGE 32 RESOURCESDEPTINST 5.7 HUE'I'ERS POINT DRY DOCK NO. '" TRJ'JlSFER S!TI'1AGE SYSTE:J The sewaae L~~lsfe~ svs~em ~s loca~ed a~ L~e mark on the --~ s-carboe.rci side of Dry Noc. No. 4:. All s2rvice connections are maQ~ by -:....~e Serv~ice/Facili~ies a~d M2intenance Group. The ~atch stander ~ill repo~ ~IY leaKS or o~~e~ p~oblems Wi~l this sys~ern ~~ ~he dock supe~iso~ immedia~~ly. S.8 HUNTERS POI},"!' DRY DOCK NO. '" I>.LARM rJmo Rous~ Nc. 4 Dr2inaop Alarm _. A red wa=ning light ~~d audible ala~ are loca~ed on ~e po~ side of D=y Dock Nc. ~ 2~ welcins ~ub with du~licate indic2~ions inside the pump hOUSE on the elec~ri:::al floa~ bubbler sys~em conT::,ol pal1El. se P/~{)/!..e , 2.

The ~ed warning light and audible ala=m will come on a~ below the dock floor indicating high water. 3. ThE alarm cut-off switch located on the elect~ic2~ float bubbler system cont~ol panel can be used to turn eft ~he audible alarm after the reset bu~ton is pressed. 5.9 ~JNTERS POI~ CAISSON NO_ 4 SECURITY General Reouirements 1. The watch stander will record the tank level in the caisson log book during the first inspection tour each shift (or daily by operations/maintenance personnel when there is no ship in dock). 2. Any significant short- or long-term changes in the normal tank level will be reported to the dock supervisor immediately, and an attempt will be made to determine the cause of the change. Hinor fluctuations in the tank level may be attributed to temperature changes. 3.

The dock supervisor will obtain the necessary assistance and direct operations as required to restore normal tank level. 4. Caisson No. 4 system diagram for pumps and valves is provided in figure 5-~ Caisson No. 4 Tank Level and Alarms 1. The normal. tank level for Caisson No.4 is between 22 feet and 23 feet in the main ballast tank. 2. There are alarms installed for the main ballast and ~rim tanks levels (figure Operation of Caisson No.4 HUNTERS POINT NAVAL SHll'YARD) DRY DOCK NO, 4 HAER NO. CA-181-A PAGE 33 RESOURCESDEPTINST 1. Caisso~ No.4 bellast fill and dewate~ing systems are normally operated only during d~' docking evolutions per a specific docking/undocking -procedur~ for Dry DOCK No.4. 2.

The ~o~~h st&~der will operate the caisson systems ONLY in suppo~ of sDeciflc ma:n~enfuJce/tes~ Drocedu=es OR when extreme emergency conditions warr~tt dewatering O~ filling ~~e main ballast tank. Tne following instructions are provided for this pUrpOSe. 3. Dewatering the main ballast tank: a. Veri=v that pump and motor lubricators are full, all tank hatch covers are secured, and tank vents are open. b. OnEn ONLY the outboa~d ballast a~scharge v21ve O~ facing the sea. K check valve will prevent back flow into the tank until ~he pump is sta~ec. c. S~a~ ~he outboard ballast pump or ~~d dewater the ballast tank to a minimum level of 22 feet, then secure the pump and lubricators. d. Close the ballast discharge valve. 4. Pilling ~h~ main ballas~ t~ik: a.

Ve~ify that all ta~k hatch covers are secured aid tank vents are open. b. Open O~~y the outboard ballast fill valve as required to fill the ballast tank ~o a maximum level of 23 feet, ~~en close ~id secure the fill valve. 5. Reco~d all v2~ve ~Id pump operations and the ballast tank level in the caisson log bOOK. HUNTERS POINT NAVAL SHIPYARDi DRY DOCK NO. 4 HAER NO. CA-181-A RESOURCESDEPTINST PAGE 34 ?IGlJ?.E 5-1 PUM? HOUSE NO. 4 SYSTEH DL~GRAH /=- "Zi > .~. :.: 0=. ~ !I ,i I =1 1 <0, j "" ~I 51 ,, I 01 , w' I gl i iI I E II 2 d w ~ ~ z :r: I '" C. \, Z C c. '" ~I HUNTERS POINT NAVAL SHIPYARD) DRY DOCK NO.4 HAER NO. CA-l8l-A PAGE 35 RESOURCESDEPTINST FIGURE 5-2 PUMP HOUSE NO. 4 EQUIPMENT IDEhryIFICATION DESCRTPTION H~in Dewatering Pump No. 1 HE'-2 Main Dewatering Pump No.

2 Main Dewaterinq Pump No. 3 Drainag~ Pump No. 1 Drainage Pump No. 2 DESCRIPTION MV-Ol Main Pump No. 1 Discharge Valve Main Pump No. 2 Discharge Valve Main Pump No. 3 Discharge Valve Main Pump No. 1 Check Valve Main Pump No. 2 Check Valve Main Pump No. 3 Check Valve Drainage Pump No. 1 Check Valve Drainage Pump No. 2 Check Valve , , HUNTERS POINT NAVAL SHIPYARD! DRY DOCK NO.4 HAER NO. CA-181-A PAGE 36 RESOURCESDEPTINST FIGURE 5-3 PUHP HOUSE NO. 4 NORlo1.l\L Vl\

Lve Lineup Normal Position Hv-

Ol Closed Closed Closed HCV-Ol Closed Hydraulic assisted valve Closed Hydraulic assisted valve Closed Hydraulic assisted valve , , HUNTERS POINT NAVAL S}llPYARD, DRY DOCK NO, 4 HAER NO. CA-181-A PAGE 37 RESOURCESDEPTINST F!GUP2 S-~ PUM? HOUSE NO, 4 HUl\T:SRS POINT NOR'IJ<.L WJ.NE LINEUP VERI?ICF.TION I I f I I ! ( I I r I I I I l ( I I I i ( ( r ! i I InfT HUNTERS POINT NAVAL SHIPYARD; DRY DOCK NO.4 lfAER NO. CA-181-A PAGE 38 P SOURCESDEPTINST FIGURE PUMP HOUSE NO. 4 H!'.IN Vl<J..NE CONTROL s-b .. .. _. " ~ sC :: DrSCHARGZ G; n: DRr tiC. ~ CONTP,C.. PAN'C:.... CLOS0l0s PORT FUJO!l GAit: , Gl <; 0pa~ G' RI g 0; GpO...., Ri 0)po~::<: ~ -i ", ~:> N -, OPSN ~I OPS~ ~i Nt , C C?~ "i NI I O?~A\ CL.aS~ :i ... : NI CL'JSE.

~}a;>s~ ,I ifJ I I @C:-!!SED I ~ I @CLas::n ~ Si (De-asc y I S~T I @ON I ~ I E: ,I 0?Q\IE:R L ~I L -I ~ I @wr ~ I a D I!P~"'I v 1 I, ~ I i::~s~ HYDRAlJ'JC NC. 1 PORT nnon i~ @wr :I@t6! /- N G STAR, 0). E~ NO. 2 [NTIJ<l: rAN ,o .~ S1"ART E S1"ART ~ ~~ NO. 2 COiA1JST rAN NO. 1 DRA[N PUHP ABC 000 "sov GWUND MONITOR ~ ~ g [Jl g ~ ~ [Jl :!1 '" I-' i ,~ .1> -. ~~~ IV &1 o '" Ul .!' /. ___ I' DV 5 ~ 'V 0 ~~ . - H "TRIM 1ANK 1 [JAI LASl lANK Q lI!1f! 1Afn< ? ~ [ V 'S! n ~ ~Z ~ hJ ~. --[><)-L_._.?E_[JV~_4 (I) H (I) I;l U1 ~ I 0 Z lib z: 0 U, ." "', I PUttP D[SCHIPlIUN VALVE D(

Script Ion

Dal10st OI;>lI'nterlng PUMp Oilltl\st PUMp Dl!C:chorgq Vo,lvq Ul nolln~ t Tarl1~ Up,wo. '\e'rlng Bollast P"unp Val'll! , , 0< Bollo$-t Tanl< VotvG' Dollas'! To.nlt r~\ Volve' NO. 2 r~, ValvE' ~ Trn To.nl< No.1 nu Votv~ tJ IJV-7 lonh Ho. 2 H lonl< No. J DraIn Vol'll! '""I ~~~ DV IO kin Tonl< No, I T No.2 FlU Volve ~ m;o wZX;o @ 'OoXtr.I . X"" Z8 ~Z ;), : ~ ~ ~~ HUNTERS POINT NAVAL SHITYARD DRY DOCK N O . 4 ' HAER NO. CA-l8l-A PAGE 40 RBSOURCESDEPTINST FIGURE 5-1 PUMP HOUSE NO. 4 H'YDRl\ULIC PUMP UNIT FOP PUMPS HYDRAULIC PUMP UNIT FOR MAI~ PUMPS r\ r-: ': JJ i 1I UNIT lE I I I ' n I I I NCf DRAIN NC ) NC NORHALL Y CLOSED VALVES RETURN OPEN ALL LABELLED VALVES fOR !IN-LlNE '-'<IT. AND CLOSE ALL VALVES fOR STANDBY UNIT , , HUNITIRS POINT NAVAL SHIPYARD; DRY DOCK NO. 4 HAER NO..

CA-181-A PAGE 41 RESOURCESDEPTINST FIGURE 5-$ PUMP HOUSE NO, 4 MAIN PUMP HYDRAULIC AND COOLING W.~TER MAIN PUM.D HYD~A.UUC AND com. tNG VATER S'Y$TEJI. MAIN PUMP I _~l i ~~~ HOTDK I I I i _'I _' i-U=~= 1:_i=======I_I_Xh == --I KYDRAU'-l: COCLING COD_ING HYlJRAU,-IC S:'($i~M VAT ?,. \JAT;:R TO SUP?L l' LOVER BE:ARINGS 5-tSi , ,

Hunters Point Naval

SlllPYARD; DRY DOCK NO. 4 HAER NO. CA-181-A PAGE 42 P~SOU?CESDEPTINST PUMP HOUSE NO. 4 H;.IN PUM? CONCfROL MIN PU!'{fl CONT/IDL PANE!.. AUX:l:"'IAR':' paVER CDNTRO~ r:'ACTOP, PA.N~ H,Si'tR I I I ! I I' ! i TIH 1i, I i TIMED- PHASE: j I i II DvtR:URJEN7 I. IOVEKCURRE:N7 St:aU R::::'-A'f i I RELAY 'I AND UNDtRVOLiAG<:, ;' j nF~ IAC i IAC i C' AV I I I I - I I II I OV[RCURRE.NT I POLYP HAst i~D II ii' RC,..A'f VATTHOUR [I I~"I HETEK TYPE CrY i I 1 I , L AlARM RE:SET I GI LAMP INDICATES ! R i u~ R OiECK VALVE IS OPEN , , HUNTERS POINT NAVAL SHIPYARD; DRY DOCK NO.4 HAER NO. CA-181-A RESOURCESDEPTINST PAGE 43 "IGURE 5-1 0 HUNTERS POTh"}' DRY DOCK NO, 4 TUNNEl, L.WOUT w .- <: "'" v, ;2 ::J ::; Co ::l .- - "- "-' '"I NOSS!'<'J I ii , I I L! I ...

I I L I - II I u I I I I c: I I '" u HUNTERS POINT NAVAL SHIPYARD, , \ DRY DOCK NO. 4 HAER NO. CA-181-A PAGE 44 RLSOURCESDE?TINST FIGUP..E HUNTERS ?OINT PUH? HOUSE NO. " STATUS BOARD _ , I HUl:\;e-r PaIn":.; Punp House Nc, 4 S~C ius Boo.rd

Ships in Dock Dry Dock

Nu . .c, SHIP NAME AND HULL NUMBER CASCON ST A;ION LOCATION/PHONE EQUIPMENT STATJS DRIl,IN PUMP NO, 1 AUTO OrF MAINT MANUAL DRAIN PUMP NO, 2 SUMP PUMP BACK UP SUMP PUMP (- IR COMPRESSOR BACK-UP AIR COMPRESSOR OUTSTANDING VORK PERMITS AND CLEARANCES EQUIPMENi " LOCATION SHIPICODE PHONE NO, IJORK PERMli NO. EXPIRES CLE:ARANCE NO, OUTSTANDING TROUBlE 8EPORTS TR NO, DATE EQUIPMENT ex LOCATION DESCRIP I ION REMARKS, . . , ., HUNTERS POINT NAVAL SHIPYARD; DRY DOCK NO, 4 HAER NO. CA-181-A PAGE 45 RESOURCESDEPTINST FIGlJ"RE 5-1 ~ HlJ},'TERS POINT DRY DOCK NO. 4 PUHP CON'I'ROL/ALZ\.tU{ NEL , r- :.::..:HU~~ I1Htl1 .. DRYOO:K .( PUH,O COrHkfl./A.!.I\R:f ~ PAtEL DP DP I J I J~ n' I fDPI 3D' UN I I ~ .. .. &" orr MAli rOPER ?,;l"I"I<~~~ ' -"{ am - " Iw.:[rUN i n- ot ~" ~r~ .

m;1 DO< .- ~ ' le6' 1.W I"\Jt" .!'UI" [TT toPSV!i.9s n" PS.TPSVIWSVILPSV ~. IU!" :i]OS 5 :i70F' (2DP'!~.fIl",./WO; SYS II 1 . ECORDE , c :lLAfl LV. AIR I "IR~I 7eas 57of> ",'Of' I . A:. . .GIlI ECfLKIlEll ""TO IlFf or, 0 0 0 0 0 0 -@-MoI.IlIT ~-K4IUT " llE.::.J 0 0 0 0 0 0 AU'" or, or, " " " -0 HAJUT IWl\o'.:. EU.!SlLIILMl:i BArK-liP Ii:S.I 51 fH? HUNfERS POINT NAVAL SHIPYARD) DRY DOCK NO.4 HAER NO. CA-181-A PAGE 46 RESOURCESDEPTINST FIGURE HUNTERS POI].,"!' CAISSON NO. 4 P!illEL CAISSON NO.4 HUNTt...RS POH'.!T ALARM PANEL i !33'BEUJI,;i -4 5'BEL.D'w'i;; 9'BELD'119'BEL.O'w' b3'13ELJ'w'k 5' BELD'w'b 9'BElO'vl11 I13DV EDV I BO'vl IBD\!

AIN l'iAIN ~AIN MAIN I TANK ITANK.TANK /lANK ALLAST !:BALLAST IBAlLAST mAlLAS, TOP ITOP !TOP ITOP IT ANK TOP!T ANK TOPjI ANK TOPIr ANK TOP' STEY SlEY N!JR);Al.."Z) NORMAL", NOR>W.."'i' NOR>W--q\ NORHAL'Z) NORMAL"'0 NORMAl.. V "Z) NllRHAl. CUTOUT CUTOUT CUTOJT ~J CUTOUT " - " CUTOUT CUTOUT OJTDUT CUTOUT TEST TEST TEST TEST TEST TEST TEST TEST 45'][LOV 69'BElO'W STERN TANK TOP STERN TANK TOP

In context

San Francisco, California The place record: every map, photograph and survey of this town.
San Francisco County, California 67 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in San Francisco

24 of 381 records shown

The federal surveyors worked through San Francisco building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
San Francisco Oakland Bay BridgeHAER CAL,38-SANFRA,141-127,296 words
Presidio of San FranciscoHAER CA-227086,796 words
Ship BalcluthaHAER CAL,38-SANFRA,200-80,588 words
Market StreetHALS CA-16434,536 words
San Francisco Cable RailwayHAER CAL,38-SANFRA,137-30,695 words
Aquatic ParkHALS CA-11328,000 words
George Washington High SchoolHABS CA-293919,932 words
Sloop Yacht KathleenHAER CA-229919,410 words
Fort FunstonHAER CAL,38-SANFRA, 214A-16,940 words
Schooner C.A. THAYERHAER CAL,38-SANFRA,199-16,891 words
North Beach PlaceHABS CA-272716,167 words
Presidio of San FranciscoHABS CAL,38-SANFRA,211-14,693 words
Pier 16 & Bulkhead BuildingHAER CAL,38-SANFRA,142-14,202 words
Jewish Community Center of San FranciscoHABS CAL,38-SANFRA,204-14,088 words
Knights of Pythias BuildingHABS CAL,38-SANFRA,172-13,633 words
City of Paris Dry Goods CompanyHABS CAL,38-SANFRA,135-11,407 words
Ferry EUREKAHAER CAL,38-SANFRA,194-11,248 words
Hunters Point Naval ShipyardHAER CA-227310,046 words
Steam Tug HERCULESHAER CAL,38-SANFRA,201-9,787 words
Presidio of San FranciscoHABS CAL,38-SANFRA,177-9,564 words
California State BuildingHABS CAL,38-SANFRA,202-9,200 words
Fort MasonHABS CAL,38-SANFRA,9A-9,188 words
Presidio Water Treatment PlantHAER CAL,38-SANFRA,197-8,476 words
Aquatic ParkHALS CA-113-A8,377 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,38-SANFRA,195A-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.