BlockBefore

Salinas River Bridge, Spanning Salinas River on Chualar River Road, Chualar

Salinas River Bridge, Spanning Salinas River on Chualar River Road, Chualar, Monterey County, CA. Surveyed as HAER CAL,27-CHU.V,1-, with a 1,718-word written history.

From the record

“The Salinas River Bridge on Chualar River Road is an eight-span, pin-connected Pratt through truss bridge.”

Written record, HAER CAL,27-CHU.V,1- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,27-CHU.V,1- · the record runs 1718 words · one of 73 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

60 words

Source document Quoted word for word from HAER CAL,27-CHU.V,1-. Not written, edited or summarised by this site.

Spanning the Salinas at the crossing of Chualar River Road, miles west of Chualar, Monterey County, California UTH: 1O.63O0O0.404617O Quad: Chualar, California, Dates of Construction; Constructed in at Soledad, over the the Salinas River; moved to present site west of Chualar c. Scheduled for demolition in Builder/Designer: Mesmer & Rice, of Los Angeles - contractor American Bridge Company - subcontractor

Significance

80 words

Source document Quoted word for word from HAER CAL,27-CHU.V,1-. Not written, edited or summarised by this site.

The Salinas River Bridge on Chualar River Road is an eight-span, pin-connected Pratt through truss bridge. As such, it is the largest multiple-span through truss bridge, particularly of its period of initial construction, in the central coast area of California. With a high degree of integrity, and representing a period, and method of construction, the Salinas River Bridge has been determined eligible for inclusion in the National Register of Historic Places, meeting Criterion C at the local level of significance.

Written history

1502 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,27-CHU.V,1-. Not written, edited or summarised by this site.

John W. Snyder P. S. Preservation Services P. 0. Box Sacramento, California Salinas Biver Bridge HAEE No. CA-70 (Page 2)

Historical Information

By all accounts, the winter of proved to be a tough one for Monterey County. A series of storms in late January swept in from the coast, and the resulting deluge sent virtually every river and stream in the central coastal area over their "banks. The Salinas River, in particular, went on a rampage, overtopping its banks and changing its channel. When the storms has passed, almost every bridge crossing the Salinas in Monterey County had teen either destroyed or severely damaged. One of those destroyed wa3 the "bridge at Soledad, washed out when the river changed its channel at that location. The old bridge had been built in by the California Bridge Company, of San Francisco, for and was comprised of four combination timber and iron truss spans totaling 812 feet long overall.

It was declared a total loss. In fact, every bridge south of Chualar was gone. With country road transportation routes severed, the Board of Supervisors acted quickly to remedy the situation. At their February meeting, they ordered County Surveyor Lou G, Hare to begin emergency work on the county's bridges, authorizing for new bridges at Soledad, Jfecimiento and Neponset. Repair to damaged bridges took first priority, and it was not until April that the supervisors directed Hare to prepare plans and specifications for a new steel bridge at Soledad. Working quickly, Hare had the task complete by the time the supervisors met in May, at which time they approved the plans and specifications and ordered County Clerk T, P. Joy to advertise for "bids.

When the bids were opened on June 2, the bidders were the Clinton Bridge Works (of Clinton, Iowa, but with offices in San Francisco), the Security Construction Company, the W. N. Concannon Company, and the Merry [sic] Elwell Company (Mervy Slwell Company, of Oakland). No indication was given of the successful bidder, and on June 12, Hare submitted new plans and specifications. It is likely that all bids had exceeded estimates, requiring revision on the part of the county. Bids were again opened by the supervisors in July, with the same companies bidding, but joined this time by the Midland Bridge Company and by Kesraer & Rice of Los Angeles. The supervisors awarded the contract to Mesmer & Eice, with a bid of In August county elections saw Hare lose his position to Howard F.

Cozzens, and construction of this and other bridges designed by Hare came under Cozzen's supervision. Newspaper accounts fail to provide details of the construction, but by early January the contractors had completed the substructure of the Soledad bridge, and the supervisors accepted the work on January 4 Completion of the superstructure followed quickly, and the supervisors accepted the completed bridge on January 18, As completed, the new bridge stood 500 feet downstream from the old Salinas River Bridge HAER No, CA-70 (Page 3) bridge site, and consisted of eleven 119-foot pin-connected Pratt trass spans on concrete-filled steel cylinder piers (known as "lally [pronounced 'lolly1] columns"), with each cylinder founded on five 50-foot piles.

American Bridge Company, as subcontractors bo Mesmer & Rice, had supplied the trusses. Eventually taken into the State Highway System, the bridge continued to serve traffic through the ensuing years, though its design soon began to pose constraints. With the change from horse-drawn vehicles and early automobile traffic to heavier vehicles moving at higher speeds, by the mid-1930s it had been necessary to post the bridge for one-way traffic for trucks and buses, with a 15 mile per hour speed limit and a 12-ton load limit per vehicle. In a truck wrecked the northernmost truss span, which was then replaced by a roadway carried on temporary timber bents, the constraints of the Depression preventing replacement of the bridge at that time.

In a fire, blamed on a cigarette thrown by a passing motorist, destroyed a portion of the deck. With that damage repaired, the bridge continued in service until February 11, On that date, events similar to those which had led to the bridge's construction repeated themselves, when storm waters washed out the two southernmost truss spans, severing the highway at Soledad once more. Throughout the next month, State forces undertook repairs, while traffic was diverted from Soledad to King City on county roada east of the river. Repairs were complete by March 18, By this time, however, construction of a new reinforced concrete bridge, 500 feet downstream, was underway. The new structure was completed and put into service on October 23, rendering the old bridge surplus.

At this point, the available historic record becomes less clear as to the exact sequence of events. The records of the California Department of Transportation indicate the eight surviving truss spans were moved approximately 15 miles to the present site on Chualar River Road ca, This date seems reasonably accurate, as it is known that the steel cylinder piers were being removed from the river bed at Soledad by late The trusses may have been moved by that time, or may have been placed in storage for a short period. In either event, the bridge has continued to serve traffic in its new location for almost 50 years. II.

ENGINEERING INFORMATION The Salinas River Bridge (Bridge Number on Chualar River Road, FAS 009 in Monterey County, is described as follows: the east approach spans are simple span untreated Douglas fir timber stringers with concrete deck slab on treated Douglas fir four-pile bents; the west approach spans are simple span steel stringers with concrete deck slab; the main spans are eight pin-connected Pratt through trusses with untreated Douglas fir timber stringers and concrete deck slab, on reinforced concrete piers. Salinas River Bridge HAER No. CA-70 (Page 4) The eighteen spans total feet in length, feet in width (17 feet between the guardrails) and carry a single traffic lane between the metal beam bridge railing. The trusses provide 13 feet, 8 inches vertical clearance at the portals.

The bridge crosses the Salinas River at right angles (no skew). Originally built in across the Salinas River at Soledad, south of the present location, the bridge was moved to the present site ca. III. SOURCES OF INFORMATION Books Comp, T. A. and Donald C. Jackson, "Bridge Truss Types: a guide to dating and identifying," Nashville, Condit, Carl, American Building, 2nd edition, Chicago, Periodicals Ele, V.

J., "New Salinas River Bridge At Soledad Officially Opened," California Highways and Public Works, November "Highway Bids and Awards for bhe Month of April, California Highways and Public Works, May Newspapers "Flood Conditions in the Salinas Valley," Salinas Daily News, January 26, "Monterey County is Hit Hard by the Last Storm," Salinas Daily Fews, January 27, "Statement of Damages to Salinas River Bridges," Salinas Daily News, February 6, "Aftermath of the Recent Floods," Salinas Daily News, February 12, "Supervisors End a Busy Session" Salinas Daily News, April 8, "Supervisors End Monthly Session," Salinas Daily News, May 6, "Soledad Bridge Bids Are Opened," Salinas Daily News, June 2, "New Plans for Soledad Bridge," Salinas Daily News, June 12, Salinas River Bridge HAER No.

CA-70 (Page 5) "Supervisors Adjourn After a Busy Session," Salinas Daily News, July 8, "Late Returns Change Results," Salinas Daily News, August 27, "Proceedings of the Supervisors," Salinas Daily News, January 13, "Proceedings of the Supervisors," Salinas Daily News, January 20, Manuscripts Andrews, C. E. , "Final Report for Reflooring, cleaning and painting on Salinas River Bridge, One mile south of Soledad in Monterey County, Road V-Mon-2-D, Contract California Department of Transportation, Sacramento, March Gibson, L. H., "Final Report For Repairing Fire Damage To Bridge No. In The County Of Monterey Over Salinas River At Soledad, Day Labor Work Order Road V-Mon-2-D," California Department of Transportation, Sacramento, August 19, Jones, K. E., "Bridge Report, Bridge No.

California Department of Transportation, Sacramento, April 12, Snyder, John W., "An Evaluation of Salinas River Bridge on Chualar River Road, FAS Monterey County Department; of Public Works, Salinas, November 4, IV. PROJECT INFORMATION The proposed project which would affect the Salinas River Bridge on Chualar River Road is the replacement of the bridge itself, with its subsequent removal. Built to early century design standards, the bridge today is functionally a one-lane structure with limited load capacity and impaired vertical clearance; indeed, it was posted as one-way for trucks and buses more than 50 years ago. The new structure is proposed to be built to current design standards, and to be located approximately 850 feet downstream and crossing the river on a skew.

The bridge will be a reinforced concrete box girder structure, 40 feet, 8 inches wide between barriers, and feet long. Salinas River Bridge HAER No. CA.-70 (Page 6) c- - N v.. H . - T15 * PROJECT LOCATION WO03 < r-. X / V ^ i -i ^4- _L 1 -X. 'IIfl 4 V ' l/t # .^- / I ^l J i) ;

In context

Chualar, California The place record: every map, photograph and survey of this town.
Monterey County, California 424 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Monterey County

24 of 72 records shown

The federal survey recorded these other structures elsewhere in Monterey County. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Hovden CanneryHAER CAL,27-MONT,44-9,200 words
Arthur and Kathleen Connell HouseHABS CA-29808,693 words
Fort OrdHABS CAL,27-SEA,1A-7,181 words
Sherwood RanchHABS CAL,27-SALI.V,1-3,177 words
Custom HouseHABS CAL,27-MONT,14-3,096 words
Perkins ParkHALS CA-1553,013 words
Mission Nuestra Senora de la SoledadHALS CA-802,762 words
Presidio of MontereyHABS CAL,27-MONT,47A-2,428 words
Tor HouseHABS CAL,27-CARM,2-2,258 words
Finch-Fleischer HouseHABS CAL,27-MONT,41-2,220 words
Mission San Carlos BorromeoHALS CA-712,083 words
Larkin HouseHABS CAL,27-MONT,9-2,027 words
Soberanes AdobeHABS CAL,27-MONT,40-2,000 words
Colton Hall & JailHABS CAL,27-MONT,11-1,680 words
Jose Amesti CasaHABS CAL,27-MONT,20-1,664 words
Tor HouseHALS CA-561,428 words
Forest TheaterHALS CA-551,063 words
La MiradaHALS CA-58960 words
Casa AmestiHALS CA-57515 words
Mission San Antonio de PaduaHABS CAL,27-JOLO.V,1-161 words
San Carlos Presidio ChurchHABS CAL,27-MONT,1-135 words
House of the Four WindsHABS CAL,27-MONT,7-47 words
El Colegio de San JoseHABS CAL,27-SALI.V,2B-46 words
First Federal CourtHABS CAL,27-MONT,3-43 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,27-CHU.V,1-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.