BlockBefore

Pohono Bridge, Spanning Merced River on Yosemite Valley Road, Yosemite Village

Pohono Bridge, Spanning Merced River on Yosemite Valley Road, Yosemite Village, Mariposa County, CA. Surveyed as HAER CAL,22-YOSEM,14-, with a 2,368-word written history.

From the record

“Pohono Bridge exemplifies the National Park Service Mrustic style of architecture though its use of a stone veneer to conceal its reinforced concrete substructure.”

Written record, HAER CAL,22-YOSEM,14- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,22-YOSEM,14- · the record runs 2368 words · one of 124 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

64 words

Source document Quoted word for word from HAER CAL,22-YOSEM,14-. Not written, edited or summarised by this site.

The Pohono Bridge carries the main park entrance road ac~oss the Merced River at the west end of Yosemite Valley in Yosemite National Park, Mariposa County, California. QUAD: EL CAPITAN, CA UTM: Date of Construction: Designer and Builder: Designed by George D. Whittle, Senior Highway Engineer for the San Francisco district office of the Bureau of Public Roads. Contractors: Rocca and Caletti Original and

Written history

2219 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,22-YOSEM,14-. Not written, edited or summarised by this site.

Documentation of Pohono Bridge is part of the Yosemite National Park Roads and Bridges Recording Project, conducted in summer by the Historic American Engineering Record. Richard H. Quin, Historian POHONO BRIDGE HAER No. CA-90 (page 2) II.

History

This is one in a series of reports prepared for the Yosemite National Park Roads and Bridges Recording Project. HAER N~. CA-117, YOSEMITE NATIONAL PARK ROADS AND BRIDGES, contains an overview history of the park roads.

History of Pohono Bridge

The Pohono Bridge spans the Merced River in the lower end of Yosemite Valley, about four miles southwest of Yosemite Village. The single-span reinforced concrete and stone masonry structure is the first of a series of stone-faced arch bridges encountered by motorists entering the Valley over the Big Oak Flat Road (HAER No. CA-117c] and the All-Weather Highway (HAER No. CA-117f], and establishes a pattern for rustic-style bridges found throughout the park. The structure is actually constructed on a reinforced concrete arch, but the functional stone masonry arch rings and the stone spandrel, wing and parapet walls, give the structure the appearance of being of rustic masonry construction.

The first bridge on the site was built by under the auspices of the Board of Commissioners of the Yosemite Grant. The Board authorized the construction of a substantial bridge at the foot of Bridal Vale Valley, at about the point at which the saddle trails from the north and south entered Yosemite Valley. The bridge was built along with other spans across the river at Happy Isles (the Tisaack Bridge ) and across Bridalveil Creek. The new bridges were elements of a circuit road laid out around Yosemite Valley at the same time. 1 The Mariposa Gazette of 11 January mentions a bridge being built here, but the 17 April issue noted that the span was carried away by a flood. A replacement span was evidently built, but there is apparently no record of the structure.

Boulders above the bridge were blasted out of the river by order of the Board of Commissioners of the Yosemite Grant in 2 A new bridge of Douglas fir construction was erected in the spring of In James Mason Hutchings, an early Yosemite hotelier and promoter, described Pohono Bridge and its setting in his characteristic flowery prose but offered few details of its construction: A casual glance at this substantial structure will present an example of the strength, solidity, and permanence with which the Board of Commissioners are making the necessary improvements about the Valley. Looking down upon the swiftly surging current below the bridge, or the placid stretch of dark green water above it, one can scarcely refrain from exclaiming, what a glorious picture gallery.

Verily1 3 To guard against the weight of heavy snow loads, the bridge decking was generally removed in the late fall just before the first big winter storms. 4 However, snow was not the only problem, as the bridge was washed away again in the winter of The Gazette noted the completion of another replacement span in its 27 April issue, but gave no details of construction. The Pohono Bridge was replaced again under a military contract in 6 The new structure was a steel truss bridge. This bridge was apparently only adequate for the stage and wagon traffic then allowed in the park. Automobiles were reintroduced in Yosemite National Park in and the bridge was restricted to loads of up to three tons.

Heavier traffic had to be diverted to the El Capitan Bridge, which could handle loads up to six tons. POHONO BRIDGE HAER No. CA-90 (page 3) In his annual report to the Secretary of the Interior, Washington B. Lewis, the first Yosemite Park Superintendent under National Park Service administration, called for the bridge' s replacement with a structure which could bear loads of up to fifteen tons. (Lewis also requested the replacement of most of the other Valley bridges, as little bridge work had been done under the previous military administration.) 7 The National Park Service signed a Memorandum of Agreement with the Bureau of Public Roads (U.S.

Department of Agriculture) in under the terms of which the BPR assumed responsibility for construction and rebuilding of roads in the National Parks. In Yosemite National Park, the s first projects involved paving Valley roads and replacing early bridges. The new Pohono Bridge was designed by George D. Whittle, Senior Highway Engineer with the Bureau of Public Roads' San Francisco office. Several alternative designs were offered to the National Park Service. Daniel Hull, head of the NPS Landscape Engineering Division, finally selected the Alterate No. 6, which was for a stone-veneered reinforced concrete structure. Nathan w. Morgan, NPS Office Engineer, modified the design to provide for curved wing walls at the ends and the use of larger stones for the facing.

The final design was reviewed and improved by two members of the National Commission on Fine Arts. 8 Construction began in April with the excavation and pouring of the north abutment. The south abutment was started as well, but work was halted by high water. All work soon came to a halt as the river continued to rise. In June, the quarrying of the stone was completed and the stonecutters were discharged. Final excavation of the south abutment was done in July, and the laying of reinforcing steel was begun. This abutment was poured in August. The arch ring stones or voussoirs were then erected, more reinforcing steel was put in place, spandrel walls were constructed, and pouring of the concrete commenced.

By the end of September, the bridge was 90 percent complete; the only work remaining ing was construction of one of the guard walls, placing of the waterproof membrane coating, and the fill. The final work was carried out quickly. The bridge was soon paved, and it was put into use in October. 9 Total cost of the structure was The paving was done under a separate contract. No rough grade was required. A base of of crushed rock was first applied. Depressions were filled with quarry rejects that were watered down. The grade was then compressed with a 12-ton three-wheel roller. A finished base of 4" of crushed rock was then applied. Another 1~ to 2 of fine rock was then applied and sprayed with bitumuls. The pavement was then rolled to a 6~ thickness.

It was sprayed with bitumuls again, covered with another ~'to% of crushed rock, and rolled again. The paving work cost 11 Pohono Bridge is a single-span semi-elliptical reinforced concrete structure, faced with native granite and filled with compacted earth. The structure is long and 35' long. This broad width originally provided for two 10' lanes (one-way into the Valley) with 3' 6 shoulders to the sides; the roadway has since been widened to two 13' lanes, taking up most of the shoulders. A 5' wide sidewalk, originally designed as a bridle path, is set apart from the roadway by a stone curb and runs along the northwest side.

(This marks a departure from the general pattern; the other Valley bridges constructed in the same period have sidewalks or bridle paths on each side.) The single arch has a clear span of and rises 13' 4% from the springing line. The bridge rests on poured concrete footings that were carried to a firm foundation. The reinforced concrete barrel vault was poured within the masonry spandrel walls, which acted as formwork on a grid of steel reinforcing POHONO BRIDGE HAER No. CA-90 (page 4) bars. These were 1 diameter rods on 12 centers on the top and bottom, and ~ transverse rod on 24 centers, all mounted on hooped stirrups. The arch ring stones or voussoirs are joined to the concrete by steel cramps.

Several pours were required, and the joints made use pf shear keys 2 deep and 4 inches wide, increasing in dimension to one-third the width of the wall at the spring line. The granite stone masonry spandrel walls are built with a maximum batter of Concrete used in the arch rings is Class A, while that is used in the abutments is Class a. (Classes of concrete refer to the amount of Portland cement used in the mixture, with Class A having the highest proportion and so on.) A membrane waterproofing barrier was applied to the concrete before the structure was filled with compacted earth. 12 POHONO BRIDGE HAER No. CA-90 (page S) III. ENDNOTES 1.

Linda Wedel Greene, Yosemite, The Park and Its Resources: A History of the Discovery, Management, and Physical Development of Yosemite National Park, California. 3 vols. (Washington, National Park Service, I:67, yo Semite Valley, Mariposa Gazette, 11 January 2. 2. Mariposa Gazette, 11 January 17 April Yosemite Valley-- Interesting Proceedings of the Board of Commissioners, Mariposa Gazette, 18 June 2. 3. James M.

Hutchings, In the Heart of the Sierras, the Yo Semite Valley, Both Historical and Descriptive, and Scenes by the Way; the Big Tree Groves, the High Sierra, with its Magnificent Scenery, Ancient and Modern Glaciers, and Other Points of Interest, with Tables of Distances and Altitudes, Maps, Etc., Profusely Illustrated (Oakland, CA: Pacific Press Publishing House, reprint, Lafayette, CA: Great West Books, 4. Laurence V. Degnan to Douglass H. Hubbard, 8 January Yosemite Research Library. 5. Materials from Hood files (uncatalogued), Yosemite Research Library, made available by Yosemite National Park Historian Jim Snyder. 6. Greene, I:415. 7. Washington B. Lewis, Report of the Superintendent of Yosemite National Park" in Reports of the Department of the Interior, 2 vols.

(Washington, Government Printing Office, I:790 8. Robert Charles Pavlik, In Harmony with the Landscape: A History of the Built Environment of Yosemite National Park, (Master's thesis, University of California at Santa Barbara, Nathan W. Morgan, Office Engineer, National Park Service, Mesa Verde National Park, to Bert H. Burrell, Acting Chief Civil Engineer, National Park Service, Portland, Oregon, 4 October National Archives, Record Group 79, Entry 22, Box 18, Mesa Verde file. 9. E. P. Leavitt, Acting Superintendent's Monthly Report, April 4; E. c.

Solinsky, Acting Superintendent's Monthly Report, May 6; Leavitt, Acting Superintendent's Monthly Report, June 4; Acting Superintendent's Monthly Report, July 4; Acting Superintendent's Monthly Report, August 3; Acting Superintendent's Monthly Report, September 3; Acting Superintendent' s Monthly Report, October 5. 10. Merrill Ann Wilson, National Register of Historic Places nomination for the Yosemite Valley bridges, August Sec. 7 p. 2. POHONO BRIDGE HAER No. CA-90 (page 6) 11. o. G. Taylor, Resident Park Engineer and Charles Goff Thomson, Superintendent, "Final Construction Report Pohono Bridge Paving, 29 November Yosemite National Park Maintenance and Engineering Office. 12. Construction details taken from U.S.

Department of Agriculture, Bureau of Public Roads, "Yosemite National Park, Plans for Five Bridges, Pohono Bridge, construction drawing, sheet 4, December Idem, "Yosemite National Park, Plans for Five Bridges, Details of Construction, construction drawing, sheet 3, December Additional information from the HAER field survey, August POHONO BRIDGE HAER No. CA-90 (page 7) IV. BIBLIOGRAPHY PRIMARY SOURCES PUBLISHED PUBLIC DOCUMENTS Greene, Linda Wedel. Yosemite, The Park and Its Resources: A History of the Discovery, Management, and Physical Development of Yosemite National Park, California. 3 vols. Washington, National Park Service, Lewis, Washington B. Report of the Superintendent of Yosemite National Park in Reports of the Department of the Interior, 2 vols.

Washington, Government Printing Office,

Unpublished Public Documents

Leavitt, E. P. Acting Superintendent' s Monthly Report, April --Acting Superintendent' s Monthly Report, June --Acting Superintendent' s Monthly Report, July --Acting Superintendent' s Monthly Report, September --Acting Superintendent' s Monthly Report, October Moss, Lonnie E. Bridge Safety Inspection Report, Clark's Bridge, Yosemite National Park. (Denver, CO: Federal Highway Administration, 27 January Solinsky, E. c. Acting Superintendent's Monthly Report, May Sovulewski, Gabriel. Report of the Park Supervisor, in William w. Forsyth, Report of the Acting Superintendent of the Yosemite National Park, in Reports of the Department of the Interior, 2 vols. Washington, Government Printing Office, Vol. I, Taylor, o. G. and Charles Goff Thomson. Final Construction Report Pohono Bridge Paving.

29 November Yosemite National Park Maintenance and Engineering Office. United States Department of Agriculture, Bureau of Public Roads, Yosemite National Park, Plans for Five Bridges, Pohono Bridge, construction drawing, sheet 4, December Idem, Yosemite National Park, Plans for Five Bridges, Details of Construction, construction drawing, sheet 3, December Washington, National Archives. Nathan W. Morgan, Office Engineer, National Park Service, Mesa Verde National Park, to Bert H. Burrell, Acting Chief Civil Engineer, National Park Service, Portland, Oregon, 4 October Record Group 79, Entry 22, Box 18, Mesa Verde file Wheeler, George M., Captain, U.S. Army Corps of Engineers, Topographic Map of the Yosemite Valley, Copy in Yosemite Research Library. POHONO BRIDGE HAER No.

CA-90 (page 8) Wilson, Merrill Ann. National Register of Historic Places nomination for the Yosemite Valley Bridges, August

Other Documents

Pavlik, Robert Charles. rn Harmony with the Landscape: A History of the Built Environment of Yosemite National Park, Master' s thesis, University of California at Santa Barbara, Yosemite Valley--Interesting Proceedings of the Board of Commissioners. Mariposa Gazette, 18 June 2. ADDENDUM TO: HAER No. CA-90

Pohono Bridge

Yosemite National Park Yosemite National Park Roads & Bridges Spanning Merced River on Yosemite Valley Road Yosemite National Park Mariposa County California PAPER COPIES OF COLOR TRANSPARENCIES HISTORIC AMERICAN ENGINEERING RECORD National Park Service U.S. Department of the Interior C St. NW Washington, DC

In context

Mariposa County, California 179 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Mariposa County

24 of 123 records shown

The federal survey recorded these other structures elsewhere in Mariposa County. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Yosemite National Park Roads & BridgesHAER CAL,22-YOSEM,5-61,713 words
Ahwahnee HotelHABS CA-283053,778 words
Ahwahnee HotelHABS CA-2830-B23,148 words
Camp CurryHALS CA-6522,874 words
Ahwahnee HotelHABS CA-2830-C21,781 words
Ahwahnee HotelHABS CA-2830-A21,698 words
Wawona RoadHAER CAL,22-WAWO,4-12,883 words
Big Oak Flat RoadHAER CAL,22-YOSEM,29-11,999 words
Yosemite Hydroelectric Power PlantHAER CAL,22-YOSEM,4-10,292 words
Wawona HotelHABS CAL,22-WAWO,1-8,556 words
All Year HighwayHAER CAL,22-ELPOR,1-8,260 words
Glacier Point RoadHAER CAL,22-YOSEM,10-6,292 words
Yosemite MuseumHABS CA-28094,975 words
Coulterville RoadHAER CAL,22-YOSEM,28-4,927 words
Sweetwater Gold MineHAER CA-2281-A4,915 words
Wawona TunnelHAER CAL,22-YOSEM,26-4,803 words
Sweetwater Gold MineHAER CA-22814,787 words
Wawona Covered BridgeHAER CAL,22-WAWO,5-3,748 words
Chinquapin Service Station & Lunch RoomHABS CAL,22-WAWO,2-3,510 words
El Capitan BridgeHAER CAL,22-YOSEM,22-3,219 words
Sweetwater Gold MineHAER CA-2281-B3,188 words
Tenaya Creek BridgeHAER CAL,22-YOSEM,19-2,497 words
Tamarack Creek BridgeHAER CAL,22-YOSEM,12-2,480 words
Cascade Creek BridgeHAER CAL,22-YOSEM,13-2,447 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,22-YOSEM,14-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.